ida Certification Services IEC Functional Safety Assessment Project:

Size: px
Start display at page:

Download "ida Certification Services IEC Functional Safety Assessment Project:"

Transcription

1 e ida Certificatin Services IEC Functinal Safety Assessment Prject: Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves Custmer: Flw-Tek A Subsidary f Bray Internatinal, Inc Hustn, Texas USA Cntract Number: Q07/12-19 Reprt N.: BRA R007 Versin V2, Revisin R1, April 22, 2013 Steven Clse The dcument was prepared using best effrt. The authrs make n warranty f any kind and shall nt be liable in any event fr incidental r cnsequential damages in cnnectin with the applicatin f the dcument. All rights reserved.

2 Management summary This reprt summarizes the results f the functinal safety assessment accrding t IEC carried ut n the: Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves The functinal safety assessment perfrmed by exida cnsisted f the fllwing activities: - exida Certificatin assessed the develpment prcess used by Flw-Tek A Subsidary f Bray Internatinal, Inc by an n-site audit and creatin f a safety case against the requirements f IEC exida perfrmed a detailed Failure Mdes, Effects, and Diagnstic Analysis (FMEDA) f the devices t dcument the hardware architecture and failure behavir. - exida reviewed field failure data t ensure that the FMEDA analysis was cmplete. - exida reviewed the manufacturing quality system in use at Flw-Tek. The functinal safety assessment was perfrmed t the requirements f IEC 61508, SIL 3 fr mechanical cmpnents. A full IEC Safety Case was prepared, using the exida SafetyCasetl, and used as the primary audit tl. Hardware prcess requirements and all assciated dcumentatin were reviewed. Envirnmental test reprts were reviewed. Als the user dcumentatin (safety manual) was reviewed. The results f the Functinal Safety Assessment can be summarized as: The Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves were fund t meet the requirements f IEC fr up t SIL 3 (SIL 3 Capable). The PFD AVG and Safe Failure Fractin requirements f the standard must be verified fr a cmplete final element design using these final element cmpnents. The manufacturer will be entitled t use the Functinal Safety Lg. The manufacturer may use the mark: T-023 V2R1, August, Page 2 f 15

3 Table f Cntents Management summary Purpse and Scpe Prject management exida Rles f the parties invlved Standards / Literature used Reference dcuments Dcumentatin prvided by Flw-Tek A Subsidary f Bray Internatinal, Inc Dcumentatin generated by exida Prduct Descriptins IEC Functinal Safety Assessment Methdlgy Assessment level Results f the IEC Functinal Safety Assessment Open Issues Lifecycle Activities and Fault Avidance Measures Functinal Safety Management Safety Requirements Specificatin and Architecture Design Hardware Design Validatin Verificatin Prven In Use Mdificatins User dcumentatin Hardware Assessment Terms and Definitins Status f the Dcument Liability Releases Future Enhancements Release Signatures T-023 V2R1, August, Page 3 f 15

4 1 Purpse and Scpe This dcument shall describe the results f the IEC functinal safety assessment f Flw- Tek A Subsidary f Bray Internatinal, Inc Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves by exida accrding t the requirements f IEC 61508: ed2, The results f this prvides the safety instrumentatin engineer with the required failure data as per IEC / IEC and cnfidence that sufficient attentin has been given t systematic failures during the develpment prcess f the device. T-023 V2R1, August, Page 4 f 15

5 2 Prject management 2.1 exida exida is ne f the wrld s leading accredited Certificatin Bdies and knwledge cmpanies specializing in autmatin system safety and availability with ver 300 years f cumulative experience in functinal safety. Funded by several f the wrld s tp reliability and safety experts frm assessment rganizatins and manufacturers, exida is a glbal cmpany with ffices arund the wrld. exida ffers training, caching, prject riented cnsulting services, safety lifecycle engineering tls, detailed prduct assurance and certificatin analysis and a cllectin f n-line safety and reliability resurces. exida maintains a cmprehensive failure rate and failure mde database n prcess equipment. 2.2 Rles f the parties invlved Flw-Tek A Subsidary f Bray Internatinal, Inc Manufacturer f the Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves exida exida Perfrmed the hardware assessment. Perfrmed the IEC Functinal Safety Assessment and Surveillance audit. Flw-Tek cntracted exida in July 2009 fr the IEC Functinal Safety Assessment f the abve mentined devices. 2.3 Standards / Literature used The services delivered by exida were perfrmed based n the fllwing standards / literature. [N1] IEC (Parts 1-7): 2010 Functinal Safety f Electrical/Electrnic/Prgrammable Electrnic Safety-Related Systems 2.4 Reference dcuments Dcumentatin prvided by Flw-Tek A Subsidary f Bray Internatinal, Inc [D1] QSM, Rev 1, May 2009 FlwTek Quality System Manual [D2] IOM, Rev 1, 2008 FlwTek F15-30 Series Valve Manual [D3] Design Input, Mar 2009 Metal Seat Develpment Prgram [D4] Operatinal Engineering task List [D5] OP, Rev 2, Jul 2008 Operating Prcedures OP4 t OP8 [D6] Frm 104, Jun 2008 FlwTek Cmpetency Requirements [D7] Cert N , Jul 2008 FlwTek Mdy Certificate [D8] Cert N , Sep 2008 FlwTek Mdy Certificate fr the Quality Management System (ISO 9001:2000) T-023 V2R1, August, Page 5 f 15

6 [D9] ISO 9001 Audit, May, 2009 FlwTek Quality Systems Develpment Cmpliance [D10] Metal Seat Prgress, Aug, 2009 [D11] Design Plan, Jul 2009 [D12] WI-132, Rev 0, Mar, 2004 [D13] Test Reprt, Apr, 2005 [D14] Schedule, Oct 2009 FlwTek Metal Seat design status reprt FlwTek Design Plan Sign Off Sheet FlwTek Prttype Test Plan WI-132 FlwTek New Prduct Cycle test Reprt FlwTek Schedule fr Metal Initial Prductin [D15] ECN , Sep, 2009 FlwTek Engineering Change Ntice [D16] SM Series 7/8000, Rev 1, April 2013 [D17] SM Series F15/F30, Rev 1, April 2013 [D18] SM Series S85, Rev 1, April 2013 [D19] SM Series TRIAD, Rev 1, April 2013 [D20] ECN , May 2008 [D21] Prductin Meeting, Mar 2010 Safety Manual Quarter Turn Flating Ball Valves Series 7/8000 Safety Manual Quarter Turn Flating Ball Valves Series F15/F30, RF15/RF30 Safety Manual Quarter Turn Flating Ball Valves Series S85 Safety Manual Quarter Turn Flating Ball Valves Series TRIAD Dimensin Crrectin ECN Prductin Meeting Status Meeting Dcumentatin generated by exida [R1] BRA R001, V1R4, April 3, 2013 [R2] BRA 07/12-19 R001, V1R1, Oct 29, 2009 [R3] Bray_ SafetyCaseDB IEC esc, Mar 18, 2010 [R4] BRA R007 V2R1 FlwTek IEC Assessment.dc, April 22, 2013 FMEDA reprt, Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves IEC Prcess Gap Analysis Reprt, Flw-Tek A Subsidary f Bray Internatinal, Inc IEC SafetyCaseDB fr Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves IEC Functinal Safety Assessment, Flw-Tek A Subsidary f Bray Internatinal, Inc Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves (this reprt) T-023 V2R1, August, Page 6 f 15

7 3 Prduct Descriptins Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves descriptin: The fllwing table cntains the descriptins f the Fl-Tek Ball Valves that were the subject f this assessment. All f these valves are classified as Type A 1 devices accrding t IEC 61508, having a hardware fault tlerance f 0. Valve Family Specificatins Descriptin Triad Series Mdels FP/SP-2000/ Piece Bdies Flating ball design Stainless Steel & Carbn Steel Full Prt / Standard Prt Valve Sizes: Mdel FP: 1/4 thrugh 4 Mdel SP: 3/4 thrugh 2 1/2 Pressure Ratings: Mdel FP: 2200 psi WOG Mdel SP: 2200 psi WOG FP & SP: up t 425 psi WSP Series 7000 & 8000 Mdels 7000/ Piece Bdies Stainless Steel & Carbn Steel Full Prt Valve Sizes: 1/4 thrugh 12 Pressure Ratings: 1/4-4 : 1000 psi WOG 6-12 : 400 psi WOG Series F15 & F30 Mdels F15/F30 2 Piece Bdies Stainless Steel & Carbn Steel Full Prt Valve Sizes: 1/2 thrugh 12 Pressure Ratings: Mdel F15: ASME Class 150 Mdel F30: ASME Class 300 Triad Series ball valves are fire safe t API 6074th Editin and are designed in accrdance with ASME B16.34 specificatins. Features include live laded Smart Stem seals, a redundant bdy seal design, anti-static prtectin, lcking safety handles and ISO 5211 Secure Munt actuatr tp flange. Hex head cap screws jin end cnnectins t the tapped center sectin. Threaded, weld end, extended weld end and custm end cnnectins are ffered. Series 7000/8000 ball valves ffer threaded, scket weld, butt weld, flanged, quick clamp, and extended weld end cnnectins. Features include live laded Smart Stem seals, antistatic prtectin, ease f installatin and maintenance, lcking safety handles and ISO 5211 (1/4 2 ) actuatr tp flange. These valves are als available with cavity filler seats fr special service requirements. Series RF15/RF30 ball valves are available as nn-fire safe r fire safe t API 607 4th Editin and are designed in accrdance with ASME B16.34 specificatins. These ecnmical, ne piece Class 150/300 end entry flanged valves are an excellent cst effective chice. Features include live laded Smart Stem seals, anti-static prtectin, lcking safety handles and ISO 5211 (1-2 ) actuatr tp flange. Special bdy materials are ffered upn request. 1 Type A element: Nn-Cmplex element (using discrete cmpnents); fr details see f IEC , ed2, 2010 T-023 V2R1, August, Page 7 f 15

8 Series RF15/RF30 Series S85 Mdels RF15/RF30 1 Piece Bdies Stainless Steel & Carbn Steel Standard Prt Valve Sizes: Mdel RF15: 1 thrugh 12 Mdel RF30: 1 thrugh 12 Pressure Ratings: Mdel RF15: ASME Class 150 Mdel RF30: ASME Class Piece Bdies Full Prt Stainless Steel Valve Sizes: 1/2" thrugh 3" Pressure Ratings: - 1/2"-3": 1000 psi WOG / 150 psi WSP Series RF15/RF30 ball valves are available as nn-fire safe r fire safe t API 607 4th Editin and are designed in accrdance with ASME B16.34 specificatins. These ecnmical, ne piece Class 150/300 end entry flanged valves are an excellent cst effective chice. Features include live laded Smart Stem seals, anti-static prtectin, lcking safety handles and ISO 5211 (1-2 ) actuatr tp flange. Special bdy materials are ffered upn request. Flw-Tek s Series S85 ball valves have been designed fr ease f autmatin. Standard 2-piece valve bdies are investment cast Stainless Steel, slutin annealed fr the highest quality and added strength. All bdy castings are marked with a fundry heat number fr full traceability. These valves ffer quarter turn peratin and lw perating trque. The S85 features live-laded, selfadjusting stem seals that autmatically adjust packing t cmpensate fr changes in wear and temperature. Other features include replaceable seats and seals, antistatic devices, blwut prf stems, and stainless steel safety latch handles. T-023 V2R1, August, Page 8 f 15

9 4 IEC Functinal Safety Assessment The IEC Functinal Safety Assessment was perfrmed based n the infrmatin received frm Flw-Tek A Subsidary f Bray Internatinal, Inc and is dcumented in this reprt. A surveillance audit was cnducted in April f This reprt was revised t reflect the results f the surveillance audit. In Summary the surveillance audit did nt reveal any nn-cnfrmances. 4.1 Methdlgy The full functinal safety assessment includes an assessment f all fault avidance and fault cntrl measures during hardware develpment and demnstrates full cmpliance with IEC t the end-user. The assessment cnsiders all requirements f IEC Any requirements that have been deemed nt applicable have been marked as such in the full Safety Case reprt, e.g. sftware develpment requirements fr a prduct with n sftware. The assessment als includes a review f existing manufacturing quality prcedures t ensure cmpliance t the quality requirements f IEC As part f the IEC functinal safety assessment the fllwing aspects have been reviewed: Develpment prcess, including: Functinal Safety Management, including training and cmpetence recrding, FSM planning, and cnfiguratin management Specificatin prcess, techniques and dcumentatin Design prcess, techniques and dcumentatin, including tls used Validatin activities, including develpment test prcedures, test plans and reprts, prductin test prcedures and dcumentatin Verificatin activities and dcumentatin Mdificatin prcess and dcumentatin Installatin, peratin, and maintenance requirements, including user dcumentatin Manufacturing Quality System Prduct design Hardware architecture and failure behavir, dcumented in a FMEDA The review f the develpment prcedures is described in sectin 5. The review f the prduct design is described in sectin Assessment level The Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves have been assessed per IEC t the fllwing levels: SIL 3 capability The develpment prcedures have been assessed as suitable fr use in applicatins with a maximum Safety Integrity Level f 3 (SIL3) accrding t IEC T-023 V2R1, August, Page 9 f 15

10 5 Results f the IEC Functinal Safety Assessment exida assessed the develpment prcess used by Flw-Tek A Subsidary f Bray Internatinal, Inc fr these prducts against the bjectives f IEC parts 1 and 2. The assessment was dne n-site at the Flw-Tek A Subsidary f Bray Internatinal, Inc facility n Octber 27, 2009 and dcumented in the SafetyCase [R3]. 5.1 Open Issues The verall prcess is strng and the designs have extensive prven field experience, sufficient fr SIL 3 capability. Sme areas f imprvement were identified in the design prcess and sme f the design prcedures and frms were upgraded during the prject. All f the imprvements were evaluated and included in the final versin f the SafetyCase. The Safety Requirements Specificatin is nt in a final Bray frmat. This will be required fr Certificatin Renewal. 5.2 Lifecycle Activities and Fault Avidance Measures Flw-Tek A Subsidary f Bray Internatinal, Inc has a defined prduct lifecycle prcess in place. This is dcumented in the Quality Management System Manual [D1] and varius Operating Prcedures [D5]. A dcumented mdificatin prcess is als cvered OP 7.3 in the Operating Prcedures [D5]. N sftware is part f the design and therefre any requirements specific frm IEC t sftware and sftware develpment d nt apply. The assessment investigated the cmpliance with IEC f the prcesses, prcedures and techniques as implemented fr prduct design and develpment. The investigatin was executed using subsets f the IEC requirements tailred t the SIL 3 wrk scpe f the develpment team. The defined prduct lifecycle prcess was mdified as a result f the audit which shwed sme areas fr imprvement. Hwever, given the simple nature f the safety functin and the extensive prven field experience fr existing prducts Flw-Tek was able t demnstrate that the bjectives f the standard have been met. The result f the assessment can be summarized by the fllwing bservatins: The audited Flw-Tek design and develpment prcess cmplies with the relevant managerial requirements f IEC SIL 3. T-023 V2R1, August, Page 10 f 15

11 5.2.1 Functinal Safety Management FSM Planning Flw-Tek has a defined prcess in place fr prduct design and develpment. Required activities are specified alng with review and apprval requirements. This is primarily dcumented in sectin 7 f their Quality System Manual [D1] and in greater detail in OP 7.3 f the Operating Prcedures [D5]. Templates and sample dcuments were reviews and fund t be sufficient. The mdificatin prcess is cvered by OP 7.3 f the Operating Prcedures [D5]. This prcess and the prcedures referenced therein fulfill the requirements f IEC with respect t functinal safety management fr a prduct with simple cmplexity and well defined safety functinality. Versin Cntrl Sectin & f the Quality System Manual [D1] specifies cntrl f dcuments and recrds at a high level. OP f the Operating Prcedures [D5] defines prcedures fr the cntrl f dcuments that are related t activities identified in the QMS such as the QMS manuals, frms, drawings, dcuments f external rigin and supply f dcuments t and frm ntified bdies pertaining t the PED requirements. Use f this t cntrl revisins was evident during the audit. Training, Cmpetency recrding Sectin f the QSM [D1] addresses Cmpetence, awareness and training at a high level. This is addressed in mre detail in OP 6.2 f the Operating Prcedures [D5]. It is the respnsibility f the department managers and supervisrs t establish the training needs f individuals. Jb descriptins and recrds f educatin, training and skills are maintained in the quality system files and in persnnel files. The prcedures and frms were examined and fund up-t-date and sufficient. Flw-Tek hired exida Cnsulting t be the independent assessr per IEC and t prvide specific IEC knwledge Safety Requirements Specificatin and Architecture Design Fr the Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves, the simple primary functinality f the valve is the same as the safety functinality f the prduct (t pen r clse in a specified time). A Safety Requirements Specificatin (SRS) was created fr the Fl-Tek Ball Valves. This SRS will serve as a guide fr impact analysis that may be assciated with future prduct mdificatins. As the Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves designs are simple and are based upn standard designs with extensive field histry, n semi-frmal methds are needed. General Design and testing methdlgy is dcumented and required as part f the design prcess. This meets SIL Hardware Design The design prcess is dcumented at a high level in Sectin 7 f the QSM [D1] and in greater detail n OP 7 f the Operating Prcedure [D5]. Items frm IEC , Table B.2 include bservance f guidelines and standards, (EU Directives, API, ASME, ASTM, & MSS) prject management, dcumentatin (design utputs are dcumented per quality prcedures), structured design, mdularizatin, use f well-tried cmpnents / materials, and cmputer-aided design tls (Pr/Engineer). This meets SIL 3. T-023 V2R1, August, Page 11 f 15

12 5.2.4 Validatin Validatin Testing is dcumented thrugh Wrk Instructin (WI) frms. WI-132 [D12] is a validatin test plan fr the F30 prttype. As the Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves are purely mechanical devices with a simple safety functin, there is n separate integratin testing necessary. The Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves perfrm nly 1 Safety Functin, which is extensively tested under varius cnditins during validatin testing. Items frm IEC , Table B.3 include functinal testing, prject management, dcumentatin, and black-bx testing (fr the cnsidered devices this is similar t functinal testing). Field experience and statistical testing via regressin testing are nt applicable. This meets SIL 3. Items frm IEC , Table B.5 included functinal testing and functinal testing under envirnmental cnditins, prject management, dcumentatin, failure analysis (analysis n prducts that failed), expanded functinal testing, black-bx testing, and fault insertin testing. This meets SIL Verificatin The develpment and verificatin activities are defined in Sectin f the QSM f [D1] and in greater detail in OP 7.3 f the Operating Prcedures [D5]. Fr each design phase the bjectives are stated, required input and utput dcuments and review activities. Pr/Engineer is used t verify design stresses as well as fit. This meets SIL Prven In Use In additin t the Design Fault avidance techniques listed abve, a Prven in Use evaluatin was carried ut n the Flw-Tek Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves during the surveillance activities in April Shipment recrds were used t determine that the actuatrs have >200 millin perating hurs and they have demnstrated a field failure rate less than the failure rates indicated in the FMEDA reprts. This meets the requirements fr Prven In Use fr SIL Mdificatins The mdificatin prcedure fr existing designs is described in sectin 3.0 f OP 7.3 [D5] Preparatin, Issue and Cntrl f Engineering Change Orders is described in sectin 5.0 f OP 7.3 [D5]. Engineering Revisin Ntices are cntrlled thrugh an ECO Lg system. All changes are first reviewed and analyzed fr impact befre being apprved. Measures t verify and validate the change are develped fllwing the nrmal design prcess. This meets SIL User dcumentatin Flw-Tek A Subsidary f Bray Internatinal, Inc creates the fllwing user dcumentatin: prduct catalgs and Installatin Maintenance Manuals. A sample f the F15 and F30 Series Manual [D2] is included in the SafetyCase. The Safety Manuals fr each valve series were fund t cntain all f the required infrmatin given the simplicity f the prducts. The Safety Manuals reference the FMEDA reprts which are available and cntain the required failure rates, failure mdes, useful life, and suggested prf test infrmatin. There was sme infrmatin in the Safety Manuals that require editing. The changes have been captured in the SafetyCase. T-023 V2R1, August, Page 12 f 15

13 Items frm IEC , Table B.4 include peratin and maintenance instructins, user friendliness, maintenance friendliness, prject management, dcumentatin, limited peratin pssibilities (Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves perfrm well-defined actins) and peratin nly by skilled peratrs (peratrs familiar with type f valve, althugh this is partly the respnsibility f the end-user). This meets SIL Hardware Assessment T evaluate the hardware design f the Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves a Failure Mdes, Effects, and Diagnstic Analysis was perfrmed by exida. This is dcumented in [R1]. An Failure Mdes and Effects Analysis (FMEA) is a systematic way t identify and evaluate the effects f different cmpnent failure mdes, t determine what culd eliminate r reduce the chance f failure, and t dcument the system in cnsideratin. An FMEDA (Failure Mde Effect and Diagnstic Analysis) is an FMEA extensin. It cmbines standard FMEA techniques with extensin t identify nline diagnstics techniques and the failure mdes relevant t safety instrumented system design. Frm the FMEDA, failure rates are derived fr each imprtant failure categry. All failure rate analysis results and useful life limitatins are listed in the FMEDA reprt [R1]. Tables in the FMEDA reprt list these failure rates fr the Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves under a variety f applicatins. The failure rates listed are valid fr the useful life f the devices. Nte, as the Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves are nly ne part f a (sub)system, the SFF shuld be calculated fr the entire final element cmbinatin. These results must be cnsidered in cmbinatin with PFD AVG values f ther devices f a Safety Instrumented Functin (SIF) in rder t determine suitability fr a specific Safety Integrity Level (SIL). The architectural cnstraints requirements f IEC , Table 2 als need t be evaluated fr each final element applicatin. It is the end users respnsibility t cnfirm this fr each particular applicatin and t include all cmpnents f the final element in the calculatins. The analysis shws that the design f the Flw-Tek 3-Piece Family Series 7/8000, Triad, S85, F15/F30 & RF15/RF30 Ball Valves can meet the hardware requirements f IEC 61508, SIL 3. The Hardware Fault Tlerance, PFD AVG, and Safe Failure Fractin requirements f IEC must be verified fr each specific design. T-023 V2R1, August, Page 13 f 15

14 6 Terms and Definitins Fault tlerance FIT FMEDA HFT Lw demand mde PFD AVG PVST SFF SIF SIL SIS Type A element Type B element Ability f a functinal unit t cntinue t perfrm a required functin in the presence f faults r errrs (IEC , 3.6.3) Failure In Time (1x10-9 failures per hur) Failure Mde Effect and Diagnstic Analysis Hardware Fault Tlerance Mde, where the demand interval fr peratin made n a safety-related system is greater than twice the prf test interval. Average Prbability f Failure n Demand Partial Valve Strke Test It is assumed that the Partial Strke Testing, when perfrmed, is autmatically perfrmed at least an rder f magnitude mre frequent than the prf test, therefre the test can be assumed an autmatic diagnstic. Because f the autmatic diagnstic assumptin the Partial Valve Strke Testing als has an impact n the Safe Failure Fractin. Safe Failure Fractin summarizes the fractin f failures, which lead t a safe state and the fractin f failures which will be detected by diagnstic measures and lead t a defined safety actin. Safety Instrumented Functin Safety Integrity Level Safety Instrumented System Implementatin f ne r mre Safety Instrumented Functins. A SIS is cmpsed f any cmbinatin f sensr(s), lgic slver(s), and final element(s). Nn-Cmplex element (using discrete cmpnents); fr details see f IEC Cmplex element (using cmplex cmpnents such as micr cntrllers r prgrammable lgic); fr details see f IEC T-023 V2R1, August, Page 14 f 15

15 7 Status f the Dcument 7.1 Liability exida prepares reprts based n methds advcated in Internatinal standards. exida accepts n liability whatsever fr the use f this reprt r fr the crrectness f the standards n which the general calculatin methds are based. 7.2 Releases Versin: V2 Revisin: R1 Versin Histry: V2,R1: Updates during surveillance audit, S. Clse, April V1, R1: Released t Flw-Tek A Subsidary f Bray Internatinal, Inc V0, R1: Draft; March 25, 2010 Authrs: Steven Clse Review: V2, R1: William Gble, exida, April 19, 2013 Release status: Released 7.3 Future Enhancements At request f client. 7.4 Release Signatures Steven F. Clse, Safety Engineer Dr. William M. Gble, Principal Partner T-023 V2R1, August, Page 15 f 15

ida Certification Services IEC Functional Safety Assessment Project: Tri Lok Triple Offset Butterfly Valves Customer: Bray International, Inc.

ida Certification Services IEC Functional Safety Assessment Project: Tri Lok Triple Offset Butterfly Valves Customer: Bray International, Inc. e ida Certificatin Services IEC 61508 Functinal Safety Assessment Prject: Tri Lk Triple Offset Butterfly Valves Custmer: Bray Internatinal, Inc. Hustn, Texas USA Cntract Number: Q07/12-19 Reprt N.: BRA

More information

IEC Functional Safety Assessment

IEC Functional Safety Assessment IEC 61508 Functinal Safety Assessment Prject: 1052 Series Actuatrs Cmpany: Fisher Cntrls Internatinal LLC, Inc. (an Emersn Prcess Management cmpany) Marshalltwn, IA USA Cntract Number: Q13/05-046 Reprt

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

Software Engineering

Software Engineering What Is Sftware Engineering? Sftware Engineering Sftware engineering is the study and an applicatin f engineering t the, develpment, and maintenance f sftware. The applicatin f a systematic, disciplined,

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS DT0069 Design tip Enabling the Bluetth Lw Energy Direct Test Mde (DTM) with BlueNRG-MS By Salv Bnina Main cmpnents BlueNRG-MS Upgradable Bluetth Lw Energy netwrk prcessr SPBTLE-RF Very lw pwer mdule fr

More information

Industrial use cases: Description and business impact D1.2.a Automotive Use Case

Industrial use cases: Description and business impact D1.2.a Automotive Use Case Cllabrative Large-scale Integrating Prject Open Platfrm fr EvlutiNary Certificatin Of Safety-critical Systems Industrial use cases: Descriptin and business impact Autmtive Use Case Wrk Package: WP1: Industrial

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach Safety Architect : A Tl fr Mdel-Based Safety Analyses Cmpliant with the System Engineering Apprach Authrs: Jnathan Dumnt, Franck Sadmi, Frédérique Vallée (All4tec) Keywrds: Safety, Dependability, Mdel-Based

More information

Evidence analysis VET Quality Framework

Evidence analysis VET Quality Framework Evidence analysis VET Quality Framewrk ORGANISATION DETAILS Organisatin s legal name Trading name/s RTO number (if any) 30477 Industry Training Qld Pty Ltd Industry Training Qld Industry Training Qld Pty

More information

Common Network Operation Tools

Common Network Operation Tools Cmmn Netwrk Operatin Tls Prcess fr the develpment f data exchanges Mnika Kaldnek Adviser, System Operatins Brussels xxx2014 Backgrund > WHY: Regulatin 715/2009 (Art 8)...ENTSOG shall adpt: cmmn netwrk

More information

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

Downloaded from THE JPL SOFTWARE DEVELOPMENT PROCESS DESCRIPTION

Downloaded from   THE JPL SOFTWARE DEVELOPMENT PROCESS DESCRIPTION Dwnladed frm http://www.everyspec.cm JPL D-15378 Revisin D THE JPL SOFTWARE DEVELOPMENT PROCESS DESCRIPTION Prepared by: Miltn L. Lavin and Jeanne S. Makihara JPL Jet Prpulsin Labratry Califrnia Institute

More information

Transmit and receive information by marine radio or telephone

Transmit and receive information by marine radio or telephone MARC020 Transmit and receive infrmatin by marine radi r telephne DRAFT 9/12/2013 UNIT CODE UNIT TITLE Release Release 1 APPLICATION COMPETENCY FIELD ELEMENTS Elements describe the essential utcmes. 1 Operate

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements

More information

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations Specificatin fr a cmmunicating Panelbard system t mnitr, cntrl and maintain LV electrical installatins A system fr: - Mnitring the prtectin and cntrl devices in an electrical installatin and prviding the

More information

XDSL/TELEPHONE CABLE MEASUREMENT

XDSL/TELEPHONE CABLE MEASUREMENT XDSL/TELEPHONE CABLE MEASUREMENT Phenix 10056 Cmplete Slutin fr xdsl Cables Cat 3, 4, 5 and 5e DESCRIPTION Custmer requirements can vary cnsiderably in terms f size and design f cnnecting frames depending

More information

Develop preliminary specification and plans from a design brief

Develop preliminary specification and plans from a design brief Unit Title: OCR unit number 1 Level: 2 Credit value: 3 Guided learning hurs: 24 Unit reference number A/503/5851 Develp preliminary specificatin and plans frm a design brief Unit purpse and aim The fcus

More information

Materials: Metals, timber, plastics, composites, smart and nanomaterials Candidates should:

Materials: Metals, timber, plastics, composites, smart and nanomaterials Candidates should: AQA Resistant Materials - Unit 1 Specificatin 2014-4560 Materials: Metals, timber, plastics, cmpsites, smart and nanmaterials Be aware f the surce f a range f materials. Understand they are prcessed fr

More information

LED wdali MC Switch Input Modul Set - User Manual

LED wdali MC Switch Input Modul Set - User Manual LED wli MC Switch Input Mdul Set - User Manual Buttn mdul (Transmitter) 1. Prduct Descriptin Item N.: LC-004-302 Receive mdul (Receiver) The wli MC Switch Input Mdul Set is a cmpact wireless Multi Cntrl

More information

Participation is open on equal conditions to all national and international experienced individual consultants.

Participation is open on equal conditions to all national and international experienced individual consultants. REQUEST FOR EXPRESSIONS OF INTEREST N 1216/S/EOI-ICB/RE-ADV/AD/RDB/GOR/12 TITLE: CONSULTANCY SERVICES TO SUPERVISE CONSTRUCTION WORKS RELATED TO SUPPLY & INSTALLATION OF FURNITURE, BUILDING PARTITIONS

More information

Spinline - FPGA and µprocessor based platform Taken and sharing advantages of both worlds

Spinline - FPGA and µprocessor based platform Taken and sharing advantages of both worlds Spinline - FPGA and µprcessr based platfrm Taken and sharing advantages f bth wrlds Julien BACH, Rlls-Ryce Civil Nuclear SAS AIEA FPGA wrkshp 2016 Lyn, France - Octber 2016 2016 Rlls-Ryce Civil Nuclear

More information

ACA Standard Measurement One-time program

ACA Standard Measurement One-time program Service Request 101183 ACA Standard Measurement One-time prgram Created n: December 22, 2015 Last Mdified n: 12/23/2015 Prepared by Baskar Chitravel Infrmatin Technlgy Services Office f the President University

More information

CADET SOFTWARE ENGINEERS

CADET SOFTWARE ENGINEERS Psitin Highlights Highly cmpetitive cmpensatin package. Be a part f strng innvative team. Patent Incentive Prgram. Stck Optin Grant Signing and Retentin Bnus. CADET SOFTWARE ENGINEERS Psitin Summary The

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

IA CERTIFICATE (Revision 3 Revised for Annual review)

IA CERTIFICATE (Revision 3 Revised for Annual review) Certificate Number: MASC M/11-376X Issue: 22 September 2014 Expire: 22 September 2015 Page: 1 f 5 IA CERTIFICATE (Revisin 3 Revised fr Annual review) IN TERMS OF REGULATION 21.17.2 OF THE MINERALS ACT

More information

Hospital Task Scheduling using Constraint Programming

Hospital Task Scheduling using Constraint Programming Hspital Task Scheduling using Cnstraint Prgramming Authr: Chaman Chahal Supervisr: Dr. P. Bse, Schl f Cmputer Science Organizatin: Carletn University Curse: COMP4905 Date: Dec. 11, 2012 1 Abstract Hspitals

More information

RSB Service Bulletin No.. RSB--E4--003/12

RSB Service Bulletin No.. RSB--E4--003/12 RECOMMENDED SERVICE BULLETIN N.. RSB--E4--003/12 SSUUPPEERRSSEEDEESS SSBB N.. RRSSBB--EE44--000033//1111 1. BASIC INFORMATION 1.1. SUBJECT Sftware and Hardware Versins f the E4 Engine. 1.2. ENGINES AFFECTED

More information

CATA Composer R2016 Fact Sheet. Add a New Dimension to Your Product Communications

CATA Composer R2016 Fact Sheet. Add a New Dimension to Your Product Communications CATA Cmpser R2016 Fact Sheet Add a New Dimensin t Yur Prduct Cmmunicatins Versin 1.0-8/11/2015 Table f Cntents 1. CATIA Cmpser: VALUE AT A GLANCE... 3 2. CATIA Cmpser: Overview... 4 2.1. Immediate Prductivity

More information

Consultancy Proposal. Abstract This document lays out the consultancy service proposal details Reference:

Consultancy Proposal. Abstract This document lays out the consultancy service proposal details Reference: Cnsultancy Prpsal Abstract This dcument lays ut the cnsultancy service prpsal details Reference: www.gamalearn.cm e-mail: inf@gamalearn.cm Page 1 f 8 Table f Cntents: Overview... 3 Cnsultatin Services:

More information

The Motorcycle Industry in Europe. L-category vehicles type approval regulation ACEM comments on draft TRL durability study

The Motorcycle Industry in Europe. L-category vehicles type approval regulation ACEM comments on draft TRL durability study L-categry vehicles type apprval regulatin ACEM cmments n draft TRL durability study 1. ACEM members welcme the pprtunity t cmment n the draft TRL durability study. Since 2004, ACEM members have supprted

More information

CAR ASYST - Quick Start Guide MAIN MENU

CAR ASYST - Quick Start Guide MAIN MENU fficially apprved by CAR ASYST - Quick Start Guide MAIN MENU Main menu The main menu f ur CAR ASYST APP is divided int 7 menu items. Belw yu will find a list f these items including a shrt descriptin.

More information

Figure 1: View, connection compartment closed

Figure 1: View, connection compartment closed Radi Management Art. N. : 2700AP Operating instructins 1 Safety instructins Electrical equipment may nly be installed and fitted by electrically skilled persns. Serius injuries, fire r prperty damage pssible.

More information

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard ELEC 7250 VLSI TESTING Term Paper On Analg Test Bus Standard Muthubalaji Ramkumar 1 Analg Test Bus Standard Muthubalaji Ramkumar Dept. f Electrical and Cmputer Engineering Auburn University Abstract This

More information

FIRMWARE RELEASE NOTES. Versions V2.0.0 to V Model HDL-32E. High Definition LiDAR Sensor

FIRMWARE RELEASE NOTES. Versions V2.0.0 to V Model HDL-32E. High Definition LiDAR Sensor FIRMWARE RELEASE NOTES Versins V2.0.0 t V2.2.21.0 Mdel HDL-32E High Definitin LiDAR Sensr HDL-32E Firmware Release Ntes Page 2 Fr all new features and changes, refer t the dcumentatin that accmpanies the

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

Engineering Design and Development

Engineering Design and Development Engineering Design and Develpment Grade 12 Prerequisites: Intrductin t Engineering Design Principles f Engineering Digital Electrnics Credit Value: 5 ABSTRACT The Engineering Design and Develpment curse

More information

KELOX room thermostats - KM690D Digital-Standard/ KM690U Digital-Control

KELOX room thermostats - KM690D Digital-Standard/ KM690U Digital-Control KELOX rm thermstats - KM690D Digital-Standard/ KM690U Digital-Cntrl The KELOX rm thermstats are high-quality rm temperature cntrllers fr recrding and cntrlling the required rm temperature fr a maximum

More information

NSW Prototype User Manual AUTHORITIES. Delegation agreement from the European Commission MOVE D2/ME D(2012)

NSW Prototype User Manual AUTHORITIES. Delegation agreement from the European Commission MOVE D2/ME D(2012) NSW Prttype User Manual AUTHORITIES Delegatin agreement frm the Eurpean Cmmissin MOVE D2/ME D(2012) Versin: 1.2 Date: 22/09/2015 NSW Prttype/ Users Manual/ Authrities TABLE OF CONTENTS 1 Intrductin...

More information

Workflow Working Group

Workflow Working Group Wrkflw Wrking Grup June 19, 2007 Chiba University Ann McCarthy Lexmark Internatinal Inc. Chair, Wrkflw Wrking Grup presented by: William Li Wrkflw WG Charter T identify a small number f the mst cmmnly

More information

your resumes & indicate job title in subject to:

your resumes & indicate job title in subject to: ENABLING THE DIGITAL WORLD List f Jb Openings: 1) Analyst Prgrammer 2) Payrll Officer 3) Sftware Engineer (Prduct Develpment) 4) Prcess Engineer (Enabling Technlgy) 5) Optics Engineer 6) Mechanical Design

More information

Foundations of Technology

Foundations of Technology EXAM INFORMATION Items 70 Pints 70 Prerequisites NONE Grade Level 9-10 Curse Length ONE SEMESTER DESCRIPTION is an actin-based engineering and technlgy educatinal curse emphasizing design and prblem-slving

More information

Engineering CAD 3-D Solids and Surfaces. Architecture and Engineering Design Department. Engineering and Design Technology. o Work Experience, General

Engineering CAD 3-D Solids and Surfaces. Architecture and Engineering Design Department. Engineering and Design Technology. o Work Experience, General SECTION A - Curse Infrmatin 1. Curse ID: 2. Curse Title: 3. Divisin: 4. Department: 5. Subject: 6. Shrt Curse Title: 7. Effective Term:: EDT 24 Engineering CAD 3-D Slids and Surfaces Technlgy and Health

More information

Upgrading to PlanetPress Suite Version 5

Upgrading to PlanetPress Suite Version 5 Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt

More information

CADD Workshop. Course Design

CADD Workshop. Course Design CADD Wrkshp Curse Design 2005-2006 Curse Infrmatin Organizatin Eastern Arizna Cllege Divisin Industrial Technlgy Educatin Curse Number DRF 207 Title CADD Wrkshp Credits 1 Develped by Dee Lauritzen Lecture/Lab

More information

Alberta Infrastructure. Digital Project Delivery COBie Requirements

Alberta Infrastructure. Digital Project Delivery COBie Requirements Alberta Infrastructure Digital Prject Delivery COBie Requirements COBie Requirements Table f Cntent COBie Requirements Objective 2 COBie Standard 2 1. COBie Deliverable 3 1.1 Cmpressed File 3 1.2 The COBie

More information

DEVELOPMENT APPLICATION

DEVELOPMENT APPLICATION DEVELOPMENT APPLICATION FOR CITY STAFF ONLY PROJECT NUMBER: DATE RECEIVED: RECEIVED BY: NAME OF SUBDIVISION AND/OR PROJECT: Revised April 2018 ITEMS SUBMITTED: Filing Fee* Filing Fee* Land Study/Cncept

More information

Tension meter dynaline HF45/LPT

Tension meter dynaline HF45/LPT Tensin meter dynaline HF45/LPT EN Operatin and maintenance manual SUMMARY 1. DEFINITIONS... 3 2. PICTOGRAMS USED IN THIS MANUAL... 3 3. STANDARD CONTENT OF DELIVERY... 3 4. INTRODUCTION... 4 4.1. Descriptin...

More information

SeeGull CW Transmitter User Guide

SeeGull CW Transmitter User Guide SeeGull CW Transmitter User Guide Rev. E PCTEL 1 SeeGull CW Transmitter User Guide Dcument Number: 100103-00 Revisin E Octber 2018 Restrictins: This dcument cntains prprietary infrmatin that is prtected

More information

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics Martel LC-110H Lp Calibratr and HART Cmmunicatins/Diagnstics Abstract Martel Electrnics Crpratin This white paper describes the basic functins f HART cmmunicatins and the diagnstic capability f the Martel

More information

Automatic Number Plate Recognition

Automatic Number Plate Recognition Release Ntes Autmatic Number Plate Recgnitin Versin 14.2.0 Release Ntes Revisin 0 This dcument describes new features and reslved issues fr Autmatic Number Plate Recgnitin 14.2.0. Yu can retrieve the latest

More information

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 Apprval Amendment Recrd Apprval Date Versin Descriptin 01/08/2017 1 Initial Issue under MTM. Supersedes PTV DMS Dispensatin Prcess & L1-CHE-INS-002

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

KIP Cost Center User Guide

KIP Cost Center User Guide - 1 - KIP Cst Center User Guide Cntents 1 Intrductin... 3 1.1 Requirements:... 4 1.2 Supprted Operating Systems... 4 2 Installatin... 5 3 Setup... 8 4 KIP Cst Center Main Screen Print Mde... 12 4.1 Lading

More information

Ditton Primary School: Design and Technology Curriculum Planning

Ditton Primary School: Design and Technology Curriculum Planning Year Grup Natinal Curriculum Learning Objective Design KS1 Natinal Curriculum I can design purpseful, functinal, appealing fr myself and ther users based n design criteria I can generate, develp, mdel

More information

The WHO e-atlas of disaster risk for the European Region Instructions for use

The WHO e-atlas of disaster risk for the European Region Instructions for use The WHO e-atlas f disaster risk fr the Eurpean Regin Instructins fr use 1 Last Update: June 2011 Cntents 1. Basic system requirements... 3 2. Structure f the WHO e-atlas... 4 2.1. Main menu... 4 2.1.1.

More information

Figure 1: A Battleship game by Pogo

Figure 1: A Battleship game by Pogo CSCI 2312-002: Object Oriented Prgramming Final Prject Assigned: Octber 17, 2017 Design Due: Octber 24, 2017 IN CLASS (Graded as ne hmewrk grade) Final prject Due: Nvember 16, 2017 at 11:59 PM Fr many

More information

Experion MX Formation Measurement

Experion MX Formation Measurement Experin MX Frmatin Measurement Experin MX will help imprve yur business perfrmance in tday s challenging ecnmic envirnment. This fully integrated quality cntrl and prcess knwledge system prvides superir

More information

Electrical devices may only be mounted and connected by electrically skilled persons.

Electrical devices may only be mounted and connected by electrically skilled persons. 2-gang Art. N. : HS2 RF 4-gang Art. N. : HS4 RF Operating instructins 1 Safety instructins Electrical devices may nly be munted and cnnected by electrically skilled persns. Serius injuries, fire r prperty

More information

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist Annex IX Fr each requirement in the Functinal and Technical Specificatins stated belw, the Tenderer shall cmment cmpliance and detail hw the requirement is fulfilled. 4. Prject Cntents 4.1 Cllectin and

More information

PhotoVu Digital Picture Frame Service & Repair Guide

PhotoVu Digital Picture Frame Service & Repair Guide PhtVu Digital Picture Frame Service & Repair Guide PhtVu, LLC 2450 Central Ave, #G1 Bulder, CO 80301 USA www.phtvu.cm/supprt Versin: 1.0 Table f Cntents Getting Started... 3 Determine Yur Generatin f PhtVu

More information

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY. Applicatin Package Checklist Cpy f Distributed Generatin frm Renewable Resurces Rider Cpy f Technical Requirements fr Distributed Generatin Agreement Cpy f Applicatin fr Intercnnectin and Parallel Operatin

More information

Privacy is the Global Ba2lefield - Do we have the Tools and Standards to Fight and What is Privacy Engineering?

Privacy is the Global Ba2lefield - Do we have the Tools and Standards to Fight and What is Privacy Engineering? Privacy is the Glbal Ba2lefield - D we have the Tls and Standards t Fight and What is Privacy Engineering? Jhn Sab, Chair OASIS IDTrust Member Sectin and Chair, PMRM Technical Cmmittee Jhn.sab711@yah.cm

More information

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden Internet:

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden   Internet: SARAD GmbH Tel.: 0351 / 6580712 Wiesbadener Straße 10 FAX: 0351 / 6580718 01159 Dresden e-mail: supprt@sarad.de GERMANY Internet: www.sarad.de APPLICATION NOTE AN-001_EN The Installatin f autnmus instrumentatin

More information

Specification for Learning and Qualifications for Physical Intervention Skills

Specification for Learning and Qualifications for Physical Intervention Skills Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it

More information

FARGO Printer SDK Version

FARGO Printer SDK Version FARGO Printer SDK Versin 2.3.0.7 Release Ntes 510994, Rev. G April 2018 hidglbal.cm FARGO Printer SDK Versin 2.3.0.7 Release Ntes, 510994, Rev. G Cntents 1 Overview... 4 2 FARGO Printer Supprt... 4 3 Develpment

More information

VIP-200. Point to Point Extension Configuration Quick Start Guide. Video over IP Extender and Matrix System

VIP-200. Point to Point Extension Configuration Quick Start Guide. Video over IP Extender and Matrix System VIP-200 Vide ver IP Extender and Matrix System Pint t Pint Extensin Cnfiguratin Quick Start Guide PureLink TM 535 East Crescent Avenue Ramsey, NJ 07446 USA Cntents What is in the bx... 3 Transmitter kit

More information

SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM

SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM March 29, 2018 Richard B. Oliver Orange Cunty Pst Presenter Richard Oliver, a Ls Angeles-based Pillsbury partner, is a leading authrity n gvernment cntracts and disputes

More information

Meaningful Use Stage 2- Menu Measure 3 Imaging Results Configuration Guide

Meaningful Use Stage 2- Menu Measure 3 Imaging Results Configuration Guide Enterprise EHR Meaningful Use Stage 2- Menu Measure 3 Imaging Results Cnfiguratin Guide Last Updated: January 30, 2014 Cpyright 2013 Allscripts Healthcare, LLC. www.allscripts.cm MU Menu 3 Imaging Results

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

PPA PORTS UKC STANDARDS

PPA PORTS UKC STANDARDS TABLE OF CONTENTS 1. DEFINITIONS AND ABBREVIATIONS...3 1.1 Abbreviatins r acrnyms will have the fllwing meaning:...4 2. INTRODUCTION...5 3. STATIC UNDER KEEL CLEARANCE (SUKC)...5 4. PREDICTIVE UNDER KEEL

More information

Models 7008, 7034, 7035, 7035R & 7041 Planar Blind-Mate Connectors, dc to 40.0 GHz

Models 7008, 7034, 7035, 7035R & 7041 Planar Blind-Mate Connectors, dc to 40.0 GHz Mdels 7008, 7034, 7035, 7035R & 7041 Planar Blind-Mate Cnnectrs, dc t 40.0 GHz Threadless Cnnectr System / S pace Saving / L ng Life Features Threadless Cnnectr Mating - This blind-mate cnnectr series

More information

Acceptance and verification PCI tests according to MIL-STD

Acceptance and verification PCI tests according to MIL-STD Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE

More information

Transmission Substation Field Instructions

Transmission Substation Field Instructions 4.14 Substatin Permits Purpse This instructin deals with the use f permits t wrk in Hrizn Pwer s, and must be read in cnjunctin with FI 4.4 Secndary Islatins. Scpe The persnnel cvered by this instructin

More information

APPLICATION NOTE Sales & Application DEWESoft Slovenia

APPLICATION NOTE Sales & Application DEWESoft Slovenia Sales & Applicatin DEWESft Slvenia Abstract: This applicatin nte shws a measurement with DEWESft sund pwer measurement system and GRAS 67HA Hemisphere. The bject under test was a standard ntebk, the measurement

More information

GANTOM iq AND iqx USER GUIDE

GANTOM iq AND iqx USER GUIDE GANTOM iq AND iqx USER GUIDE The Gantm iq is the wrld s smallest gb prjectr with zm and fcus fr prfessinal lighting applicatins. The Gantm iqx features the same amazing ptics f the Gantm iq but adds integrated

More information

PRODUCT SAFETY ALERT

PRODUCT SAFETY ALERT Allen-Bradley Mtr Prtectin Circuit Breakers 140M-C2E and 140M-C2T, Series A and B 140M-D8E and 140M-D8T, Series A and B 140M-F8E and 140M-F8T, Series A, B and C Starters that use Allen-Bradley Mtr Prtectin

More information

DynaRound Hatch Guard System Installation Instructions

DynaRound Hatch Guard System Installation Instructions DynaRund Hatch Guard System Installatin Instructins Estimated Installatin Time: Man Crew, 0-90 Minutes The DynaRund Hatch Guard System is designed t prtect all rftp hatch entry and exit pints. This nn-penetrating

More information

SENSOR AND MEASUREMENT TECHNOLOGY

SENSOR AND MEASUREMENT TECHNOLOGY SENSOR AND MEASUREMENT TECHNOLOGY FOR SENSOR MANUFACTURERS The perfect wireless system FOR MACHINE MANUFACTURERS Transferring sensr data directly int the cntrl unit Using the Wireless Sensr Gateway DATAEAGLE

More information

Project Description Arctic Safety Center

Project Description Arctic Safety Center Prject Descriptin Arctic Safety Center Classificatin: Open Status: Final Expiry date: 2012-10-21 Page 1 f 11 Prject Descriptin Arctic Safety Center Dcument n. : Prject n.: Prject: 990020 Arctic Safety

More information

MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE

MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE 23rd Wrld Gas Cnference, Amsterdam 2006 MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE B. KORTTE USA ABSTRACT This paper details the features, functins and benefits f the Mueller C. MAGIC

More information

Creating Gift Card Batches

Creating Gift Card Batches Every active custmer gift card issued is a part f a batch f gift cards. Prir t activating any individual gift card, yu must define a batch f gift cards and any accmpanying rules that apply t each batch.

More information

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256)

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256) ADS ECHO Qstart Quick Reference Guide December 2016 QR 775033 A0 340 The Bridge Street, Suite 204 Huntsville, Alabama 35806 (256) 430-3366 www.adsenv.cm 2 ADS ECHO Qstart Quick Reference Guide 2016 ADS

More information

PLANNING AND DECISION ANALYSIS School of Architecture and the Built Environment, KTH

PLANNING AND DECISION ANALYSIS School of Architecture and the Built Environment, KTH Syllabus fr dctral studies in the subject f PLANNING AND DECISION ANALYSIS Schl f Architecture and the Built Envirnment, KTH General regulatins and guidelines fr dctral studies are fund in the cmprehensive

More information

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005 Netwrk Wrking Grup Request fr Cmments: 4062 Categry: Infrmatinal V. Manral SiNett Crp. R. White Cisc Systems A. Shaikh AT&T Labs (Research) April 2005 Status f This Mem OSPF Benchmarking Terminlgy and

More information

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord High Level Design Circuit CitEE Irere Kwihangana Lauren Mahle Jaclyn Nrd 12/16/2013 Table f Cntents 1 Intrductin. 3 2 Prblem Statement and Prpsed Slutin. 3 3 Requirements. 3 4 System Blck Diagram 4.1 Overall

More information

User Guide. ACC Mobile 3 Preview App for ios

User Guide. ACC Mobile 3 Preview App for ios User Guide ACC Mbile 3 Preview App fr ios 2017, Avigiln Crpratin. All rights reserved. AVIGILON, the AVIGILON lg, AVIGILON CONTROL CENTER, ACC, and TRUSTED SECURITY SOLUTIONS are trademarks f Avigiln Crpratin.

More information

Operating Instructions

Operating Instructions TC 60/8 THERMOCOMPUTER TC 60/8 temp / time s s temp / time k start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing

More information

Tension meter dynarope HF37/2/LPT

Tension meter dynarope HF37/2/LPT Tensin meter dynarpe HF37/2/LPT EN Operatin and maintenance manual SUMMARY 1. DEFINITIONS... 3 2. PICTOGRAMS USED IN THIS MANUAL... 3 3. STANDARD CONTENT OF DELIVERY... 3 4. INTRODUCTION... 4 4.1. Descriptin...

More information

MP49 Series HC-49/U Crystal December 2018

MP49 Series HC-49/U Crystal December 2018 The Pletrnics MP49 Series is a thru-hle crystal Bulk packaging 1.8 MHz t 210 MHz AT Cut Crystal Pletrnics Inc. certifies this device is in accrdance with the RHS (2011/65/EC) and WEEE (2002/96/EC) directives.

More information

Application Note: Conducted Immunity: Quick Guide

Application Note: Conducted Immunity: Quick Guide icatin Nte: Cnducted Immunity: Quick Guide (Please refer t AZD052 fr the full applicatin nte) 1 Intrductin: Lng cables are at risk f picking up RF, but t test this belw 80MHz require very large antennas

More information

Model Assignment Issued September 2008

Model Assignment Issued September 2008 Mdel Assignment Issued September 2008 OCR Level 3 Principal Learning in Engineering Unit F558: Selectin and applicatin f engineering materials Please nte: This OCR mdel assignment may be used t prvide

More information

DTM Collection 04 / 2018 Publication date

DTM Collection 04 / 2018 Publication date Versin histry: VEGA DTM Cllectin DTM Cllectin 04 / 2018 Publicatin date 5.4.2018 The DTM Cllectin cntains the fllwing sftware cmpnents: - Micrsft.NET Framewrk Versin 1.1, 2.0 and 4.5.2 - PACTware TM Versin

More information

Beechcraft Bonanza HID Landing Light Assembly Kit

Beechcraft Bonanza HID Landing Light Assembly Kit Beech Bnanza HID Light Assembly Kit Manual N. HID-B-001 Issue Date: 5-8-05 STC N. SA01834CH Revisin Date: 12-22-07 Beechcraft Bnanza HID Landing Light Assembly Kit INSTALLATION MANUAL N. HID-B-001 Beechcraft

More information

ACES & PIES. What They Are and What They Are Not

ACES & PIES. What They Are and What They Are Not What They Are and What They Are Nt Table f Cntents Intrductin... 3 What s in ACES r PIES... 4 ACES... 4 PIES... 4 Databases... 4 Vehicle Cnfiguratin Database (VCdb)... 4 Prduct Classificatin Database (PCdb)...

More information

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS PURPOSE AND SCOPE The intent f this primary standard is t utline the requirements fr the effective islatin f static and mbile plant and equipment prir t the wrk

More information

SAMPLE: HEALTH CHECK REPORT Insert Site Name

SAMPLE: HEALTH CHECK REPORT Insert Site Name Cnnected Industrial SAMPLE: HEALTH CHECK REPORT Insert Site Name Date: Cmpany: Cuntry: Site Representative(s): Mr. Secndary Manager Maintenance & Mr. Maintenance Technician Hneywell-Enraf Engineer: Mr.

More information

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations The industry where innvatin saves mre Australian lives Submissin t the AS/NZS 4760:2017 Cnsultatin n behalf f the IVD Industry in Australia, including Wrkplace Drug and Alchl Testing Organisatins In-Vit

More information

Release Notes for Avaya Scopia PathFinder Firewall Traversal

Release Notes for Avaya Scopia PathFinder Firewall Traversal Release Ntes fr Avaya Scpia PathFinder Firewall Traversal Versin 8.3.7.0.4 Fr Slutin 8.3.7 January 2017 2000-2017 Avaya Inc. All intellectual prperty rights in this publicatin are wned by Avaya Inc. and

More information