1 Cnnectin tariffs A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER OUTPUT TO MEDIUM VOLTAGE The tariff cnditins fr each cnnectin t the Elia-grid as stipulated by the decisin f the CREG f December 3 rd 2015 are applicable frm January 1 st 2016 until December 31 st These cnditins are: the tariff fr the rientatin study; the tariff fr a detail study ; the tariff fr the use f the first cnnectin bay ; the tariff fr the use f ther cnnectin equipments: lines r cables and their requisites, equipments fr transfrmatin, cmpensatin f reactive pwer and filtering f the vltage wave ; the tariff fr the use f supplementary prtectin-equipments, supplementary equipments fr alarm signalisatin, metering ; particular terms. 1. The tariff fr the rientatin study The tariff fr an rientatin study fr either a new cnnectin r fr the adaptatin f an existing cnnectin is a ne-sht tariff whse amunt depends n the nminal pwer t cnnect. The amunts f the tariff are published in the table belw. Nminal pwer t cnnect (P) Tariff fr an rientatin study P < 25 MVA MVA < P < 50 MVA MVA <= P /13 04/12/15

2 2. The tariff fr the detail study 2.1. Detail study in view f cnnectin f new equipments r mdificatin f existing equipments The tariff fr a detail study fr either a new cnnectin r fr the adaptatin f an existing cnnectin is a ne-sht tariff whse amunt depends n the type and the vltage level f the investment bject f the detail study. Fr a study cncerning bth a bay and a cnnectin, the inviced amunt is the sum f the amunt fr the study f the bay(s) and the amunt fr the study f the cnnectin. This tariff will be applicable fr each required variant. The tariffs fr the detail study figure in the table belw. Fr prductin units, an incremental factr f 33% will be applied t these tariffs, nly fr the part cncerning the cnnectin bay(s), in rder t cver the csts resulting frm the fact that a detailed study fr prductin units encmpasses several additinal elements. 2/13 04/12/15

3 Study type Tariff detail study 1 bay Tariff detail study 2 bays Tariff detail study 1 cnnectin* (n tp f the detail study fr 1 r 2 bays) Minr changes (changes lw vltage) Minr changes (changes lw vltage) Minr changes (changes lw vltage)) Minr changes (changes lw vltage) * fr each track 3/13 04/12/15

4 2.2. Pwer Quality evaluatin fr cnnectin r mdificatin f disturbing installatins r f cmpensatin installatins ( pre-assessment ) In rder t deliver a vltage accrding t the specificatins intended by the article 47 f the Technical Cde, the permitted level f the caused disturbance n the grid, intended by the article 46 f the Technical Cde, has t be respected. On this subject, the article 54 f the Technical Cde impses the grid user t cmmunicate n his wn initiative at Elia all infrmatin cncerning his installatins that have an impact n the quality, the reliability and the efficiency f the grid. The grid user will verify if the levels f disturbances emanating frm his installatins respect de Stage 1 emissin limits described in the Synergrid C10/17 prcedure, based n the vltage level at the cnnectin pint and the yearly peak 1. He will present these evaluatins as well as a descriptin f these installatins (nature and nminal pwer) t Elia fr acceptance. If the Stage 1 emissin limits are transgressed, even after cnsidering supplementary steps fr limiting the levels f perturbatin, the grid user must ask Elia t apply the apprach fr Stage 2 r Stage 3. In this case, the fllwing tariffs will be applicable: Study relative t the calculatin f emissin limits Stage 2 ** Study relative t the calculatin f emissin limits Stage 3 ** ** In accrdance t the instructins Synergrid C10/17 Pwer Quality instructins fr the users cnnected t the high vltage grids. The inviced amunts fr the studies relative t the calculatin f emissin limit Stage 2 r 3 cannt be reclaimed when the cnnectin is rdered. At the end f the study, Elia delivers a reprt t the grid user encmpassing the adapted emissin limits. The grid user will verify if his installatins respect these authrised emissin limits. The result f this verificatin will have t be submitted in writing t Elia fr acceptance. 1 The yearly peak used is this framewrk is defined as the maximum f the mnthly peaks f the previus 12 mnths, i.e. the nging invicing mnth and the 11 preceding mnths withut taking int accunt the tariff perid fr annual peak. This yearly peak crrespnds t the yearly peak used in the framewrk f the tariff fr additinal fftake f reactive energy and is therefre different frm the yearly peak used in the cntext f the tariff fr yearly peak. 4/13 04/12/15

5 3. The tariff fr the use f the first cnnectin bay The tariff fr the use f the first cnnectin bay cnsists f: a yearly charge t realize r mdify in a substantial way the cnnectin bay a yearly charge t perate and t maintain the cnnectin bay. These yearly charges, whse amunts are mentined in the summary table under sectin 5, give the grid user a right t use the ttal functinality f the cnnectin bay including preservatin and replacement. The first cnnectin bay includes ne metering equipment fr invicing. Regarding the existing cnnectin bays, the charges fr putting a cnnectin bay at dispsal f the grid user are prprtinally adapted in rder t reflect the financial interventins by the clients in the past. This adaptatin is applicable until the date f replacement f the cnnectin bay and nt lnger than 33 years after the date the cnnectin has been put int service. 4. The tariff fr the use f ther cnnectin equipments: lines r cables and their requisites, equipments fr transfrmatin, cmpensatin f reactive pwer and filtering f the vltage wave 4.1. Fr a new cnnectin (r the adaptatin f an existing cnnectin): charge t realize r mdify in a substantial way The amunt, representing the ttal investment amunt, is determined accrding t specificatin Charges t put existing equipments at dispsal The annual charge fr putting at dispsal is the ne as mentined in the summary table under sectin 5, which has t be des-indexed n basis f the cnsumptin price index until the date when the cncerned equipment has been put int service. If there were financial interventins in the past, thse charges have t be reduced n a prprtinal basis. 5/13 04/12/15

6 4.3. Charges t perate and maintain the cnnectin equipments (new r existing nes) The charge t perate and maintain the «ther» cnnectin equipments is mentined in the summary table under sectin 5. Fr the transfrmers that have a capacity that differs frm thse indicated in the table abve, fllwing frmula is applied t determine the charges: with K K 0 MVA MVA0 0,25 0,75. K is the charge t put the cncerned transfrmer at dispsal and t perate and maintain it; MVA is the transfrmer capacity f the cncerned transfrmer; K 0 and MVA 0 are respectively the charge t put the reference transfrmer at dispsal and t perate and maintain it and the transfrmer capacity f the reference transfrmer, chsen in the list f the summary table s that the primary vltage equals the ne f the cncerned transfrmer and the transfrmer capacity is nearest t the ne f the cncerned transfrmer. 0, Tariff applicable in case f light management by Elia f the cnnectin equipments This tariff is applied in case the grid user perates and maintains himself the cnnectin equipments ther than the cnnectin bay. The tariff is expressed under the frm f an annual charge per cnnectin bay. Cnnectin bay Annual charge per bay kv /bay /bay /bay /bay 220 kv /bay /bay /bay /bay 150 kv /bay /bay /bay /bay 70 kv /bay /bay /bay /bay 36 kv r 30 kv 585 /bay 593 /bay 601 /bay 609 /bay Medium vltage 292 /bay 296 /bay 301 /bay 305 /bay 6/13 04/12/15

7 5. Summary table In case f a shrt cnnectin (line r cable), the charge t perate and maintain can, per cnnectin, nt be smaller than the charge applicable in case f light management by Elia as described in sectin 4.4 f this dcument. When a Distributin System Operatr uses a cnnectin bay f Elia fr cnnecting its equipment fr injectin f centralized remte cntrl and this cnnectin bay is at the same time used fr the transmissin f electrical energy by Elia, the charges fr the cnnectin bays f the injectin f centralized remte cntrl will be limited t 50% f the yearly charges fr realisatin r mdificatin in a substantial way and t 25% f the charge fr peratin and maintenance f a cnnectin bay as a cnsequence f simultaneus use, while fr cables 100% f the charges will be inviced fllwing their unique use fr the transmissin f the signals. 7/13 04/12/15

8 Charge t realise r mdify in a substantial way *** Bay 380 kv k /bay 147,24 149,30 151,39 153,51 Bay 220 kv k /bay 59,42 60,26 61,10 61,95 Bay 150 kv k /bay 54,14 54,90 55,67 56,45 Bay 70 kv k /bay 34,66 35,15 35,64 36,14 Bay 36 r 30 kv k /bay 17,31 17,55 17,80 18,05 Bay Medium vltage k /bay 8,66 8,78 8,90 9,02 Line 380 kv 1 circuit k /km 36,31 36,82 37,34 37,86 Line 220 kv 1 circuit k /km 15,19 15,40 15,61 15,83 Line 150 kv 1 circuit k /km 15,52 15,73 15,95 16,18 Line 70 kv 1 circuit k /km 11,03 11,18 11,34 11,50 Line 36 f 30 kv 1 circuit k /km 7,20 7,30 7,40 7,50 Line 380 kv 2 circuits k /km 55,07 55,84 56,62 57,41 Line 220 kv 2 circuits k /km 25,09 25,44 25,80 26,16 Line 150 kv 2 circuits k /km 23,44 23,77 24,10 24,44 Line 70 kv 2 circuits k /km 16,70 16,94 17,18 17,42 Line 36 r 30 kv 2 circuits k /km 10,89 11,05 11,20 11,36 Cable 380 kv k /km 111,92 113,49 115,08 116,69 Cable 220 kv k /km 71,37 72,37 73,38 74,41 Cable 150 kv k /km 49,52 50,21 50,92 51,63 Cable 70 kv k /km 34,33 34,81 35,30 35,80 Cable 36 r 30 kv k /km 16,51 16,74 16,97 17,21 Cable Medium vltage k /km 8,40 8,52 8,64 8,76 Tf 380/70 kv (220 MVA) k /transfrmer 190,40 193,07 195,77 198,51 Tf 220/MS (50 MVA) k /transfrmer 68,18 69,13 70,10 71,08 Tf 150/MS (50 MVA) k /transfrmer 60,43 61,27 62,13 63,00 Tf 150/36 kv (125 MVA) k /transfrmer 101,98 103,41 104,86 106,33 Tf 70/MT (40 MVA) k /transfrmer 54,90 55,67 56,45 57,24 Tf 36-30/MT (25 MVA) k /transfrmer 34,81 35,29 35,79 36,29 *** t put at dispsal in case f an existing cnnectin 8/13 04/12/15

9 Charge t perate and maintain Bay 380 kv k /bay 49,72 50,41 51,12 51,84 Bay 220 kv k /bay 20,07 20,35 20,63 20,92 Bay 150 kv k /bay 18,28 18,54 18,80 19,06 Bay 70 kv k /bay 11,70 11,87 12,03 12,20 Bay 36 r 30 kv k /bay 5,85 5,93 6,01 6,09 Bay Medium vltage k /bay 2,92 2,96 3,01 3,05 Line 380 kv 1 circuit k /km 15,94 16,16 16,39 16,62 Line 220 kv 1 circuit k /km 6,67 6,76 6,85 6,95 Line 150 kv 1 circuit k /km 6,81 6,91 7,00 7,10 Line 70 kv 1 circuit k /km 4,84 4,91 4,98 5,05 Line 36 f 30 kv 1 circuit k /km 3,16 3,20 3,25 3,29 Line 380 kv 2 circuits k /km 24,17 24,51 24,85 25,20 Line 220 kv 2 circuits k /km 11,01 11,17 11,32 11,48 Line 150 kv 2 circuits k /km 10,29 10,43 10,58 10,73 Line 70 kv 2 circuits k /km 7,33 7,44 7,54 7,65 Line 36 r 30 kv 2 circuits k /km 4,78 4,85 4,92 4,99 Cable 380 kv k /km 15,12 15,33 15,54 15,76 Cable 220 kv k /km 9,64 9,77 9,91 10,05 Cable 150 kv k /km 6,69 6,78 6,88 6,97 Cable 70 kv k /km 4,64 4,70 4,77 4,83 Cable 36 r 30 kv k /km 2,23 2,26 2,29 2,32 Cable Medium vltage k /km 1,13 1,15 1,17 1,18 Tf 380/70 kv (220 MVA) k /transfrmer 64,29 65,19 66,11 67,03 Tf 220/MS (50 MVA) k /transfrmer 23,02 23,34 23,67 24,00 Tf 150/MS (50 MVA) k /transfrmer 20,40 20,69 20,98 21,27 Tf 150/36 kv (125 MVA) k /transfrmer 34,44 34,92 35,41 35,90 Tf 70/MT (40 MVA) k /transfrmer 18,54 18,80 19,06 19,33 Tf 36-30/MT (25 MVA) k /transfrmer 11,75 11,92 12,08 12,25 9/13 04/12/15

10 6. The tariff fr the use f supplementary prtectin-equipments, supplementary equipments fr alarm signalisatin, metering The tariff fr the use f supplementary prtectin-equipments, supplementary equipments fr alarm signalisatin, metering will be determined case-by-case, taking int accunt the specificity f the cncerned equipments. A replacement f existing equipments belnging t the first cnnectin bay, but with a supplementary functinality, cmes under this arrangement. The putting at dispsal f new metering equipment is dne accrding t specificatins. The annual charge fr peratin and maintaining f these metering equipments is prvided in the table belw Annual charge fr peratin and maintaining metering equipment , , , ,19 Pwer Quality receptin tests While installatins are put int service r after mdificatin f these installatins, Elia has the right t realise receptin tests in rder t cntrl the level f perturbatin caused by these installatins. If the verificatin f these levels can be dne n basis f measures f the vltage at the cnnectin pint f the grid user, the tariff fr the receptin tests equals At the end f these tests, Elia delivers a reprt t the grid user with the mst imprtant measuring results and the cnclusins f the tests. Fr grid users with emissin limits f «Stage 3» as well as fr the cases that require mre cmplex measures, an extra charge f will be impsed (the ttal fr thse cases is thus ). 10/13 04/12/15

11 7. Particular terms 7.1. Reductin cefficients if several users use simultaneusly the same cnnectin bays All csts cvered by a ne-sht tariff relative t (a part f) the equipments that are used by 2 r mre grid users, except fr the csts fr the equipments fr metering, can be divided under thse grid users. The equipments fr metering have t be installed separately fr each user. The divisin is dne prprtinally t the pwer f cnnectin as stipulated in the Cnnectin cntract, r accrding t any ther agreement between all cncerned parties. All csts cvered by a peridically applied tariff relative t (a part f) the equipments that are used by 2 r mre grid users, will first be multiplied by a cefficient k 1 (1+0,05) and then be divided prprtinally t the pwer f cnnectin as stipulated in the Cnnectin cntract, r accrding t any ther agreement between all cncerned parties. In rder t cver the extra administrative csts f Elia, the increase f 5% will be replaced by an amunt f /year if that increase f 5% crrespnds t an amunt inferir t /year Reductin cefficients n the cnnectin tariffs fr the use f cnnectins f prductin units based n renewable energy surces r cgeneratin units N reductin cefficient is in applicatin n January, 1 st Fr the tenders emitted by Elia befre the date f December 31 st 2007, the reductin cefficients n the cnnectin tariffs fr the use f cnnectins f prductin units based n renewable energy surces with limited predictability and fr the use f cnnectins f aut-prductin units remain in applicatin fllwing the frmer mdalities. This is until the perid f 10 years has expired in case the ptin f a peridical tariff has been chsen fr putting the cnnectin equipment at dispsal. 11/13 04/12/15

12 B. TARIFF CONDITIONS FOR DISTRIBUTION GRID OPERATORS EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER OUTPUT TO MEDIUM VOLTAGE The tariff cnditins fr the cnnectins t the Elia grid fr Distributin Grid Operatrs encmpass the annual tariffs fr cnnectin t the Elia grid fr Distributin Grid Operatrs t whm Elia puts at dispsal and/r perates and maintains infrastructure necessary fr their activity. These tariffs are structured alng tw axes: the nature f the perfrmances, i.e. a tariff fr the putting at dispsal f these installatins and a tariff fr maintaining and perating them; the cncerned installatins, i.e. cnnectin tariffs with respect t the cncerned installatins: the transfrmatin accessries twards Medium vltage, the nnfeeder Medium vltage cells, the general installatins and buildings. The Medium vltage reference pst presents a reference transfrmatin pwer f 80 MVA (suppsed t be brught frth by 2 reference transfrmers de 40 MVA); it is cmpsed f 2 cnnectins frm the transfrmers t the bus bar t the Medium vltage level, and 2 arrival cells f the transfrmers; it is als cmpsed f a bus bar fr cupling; the pst is lcated in a building equipped with specifically its electrical infeed fr heating and lighting. The cnnectin tariffs are multiplied by a factr, mre precisely the size f Medium vltage pst. The size f a Medium vltage pst is defined as the rati between the effective pwer f the pst under cnsideratin and the reference pwer. The effective pwer f the pst under cnsideratin is determined by the pwer put at dispsal at this Medium vltage pst. Fr example, fr a Medium vltage pst fed by 2 transfrmers f 25 MVA: The effective pwer equals 2 x 25 = 50 MVA ; The size f the pst is 50 MVA / 80 MVA = 0,625 ; The tariffs (if applicable fr this pst) are multiplied by a factr 0,625. The charges fr putting at dispsal and maintaining and perating cnnectin equipments are represented in the table belw. 12/13 04/12/15

13 Table 1: Cnnectin tariffs fr Distributin Grid Operatrs in crrespndence with the reference equipment Annual charge fr putting at dispsal infrastructure relative t Medium vltage psts [k per year] Annual charge fr maintaining and perating infrastructure relative t medium vltage psts [k per year] Cnnectin tariffs - Transfrmer accessries 10,137 10,279 10,422 10,568 4,904 4,972 5,042 5,113 Cnnectin tariffs - Nn-feeder Medium vltage cells 7,321 7,424 7,528 7,633 4,613 4,678 4,743 4,810 Cnnectin tariffs - General installatins and building 18,075 18,328 18,584 18,844 8,369 8,486 8,605 8,725 13/13 04/12/15

Acceptance and verification PCI tests according to MIL-STD

Acceptance and verification PCI tests according to MIL-STD Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE

More information

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5 Prduct Specificatin Prduct specificatin. February 2007 ByVac 2007 ByVac Page 1 f 5 Prduct Specificatin Cntents 1. Dcument Versins... 2 2. Intrductin... 2 3. Features... 2 4. Battery Life... 2 5. Blck Diagram...

More information

Electrical devices may only be mounted and connected by electrically skilled persons.

Electrical devices may only be mounted and connected by electrically skilled persons. Order N. : 5323 02 Operating instructins 1 Safety instructins Electrical devices may nly be munted and cnnected by electrically skilled persns. Serius injuries, fire r prperty damage pssible. Please read

More information

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations Specificatin fr a cmmunicating Panelbard system t mnitr, cntrl and maintain LV electrical installatins A system fr: - Mnitring the prtectin and cntrl devices in an electrical installatin and prviding the

More information

Chapter 15 Integration and (De-)installation

Chapter 15 Integration and (De-)installation Chapter 15 Integratin and (De-)installatin P. Fessia and S. Weisz CERN, Acceleratr & Technlgy Sectr, Geneva, Switzerland 15 Integratin and (de-)installatin 15.1 Gegraphical distributin f HL-LHC upgrade

More information

ELECTRICAL CIRCUITS LABORATORY II EEE 209 EXPERIMENT-6. Operational Amplifiers II

ELECTRICAL CIRCUITS LABORATORY II EEE 209 EXPERIMENT-6. Operational Amplifiers II ADANA SCIENCE AND TECHNOLOGY UNIVERSITY ELECTRICAL ELECTRONICS ENGINEERING DEPARTMENT ELECTRICAL CIRCUITS LABORATORY II EEE 209 EXPERIMENT-6 Operatinal Amplifiers II OPERATIONAL AMPLIFIERS Objectives The

More information

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements

More information

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden Internet:

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden   Internet: SARAD GmbH Tel.: 0351 / 6580712 Wiesbadener Straße 10 FAX: 0351 / 6580718 01159 Dresden e-mail: supprt@sarad.de GERMANY Internet: www.sarad.de APPLICATION NOTE AN-001_EN The Installatin f autnmus instrumentatin

More information

DISTRIBUTION IMPACT STUDY (DIS) GUIDELINE Guideline for Studying the Impact of Rooftop PV-Systems on Distribution Networks in the Philippines

DISTRIBUTION IMPACT STUDY (DIS) GUIDELINE Guideline for Studying the Impact of Rooftop PV-Systems on Distribution Networks in the Philippines DISTRIBUTION IMPACT STUDY (DIS) GUIDELINE Guideline fr Studying the Impact f Rftp PV-Systems n Distributin Netwrks in the Philippines www.renewables-made-in-germany.cm Imprint Authrs Meller & Peller Engineering

More information

Transmission Substation Field Instructions

Transmission Substation Field Instructions 4.14 Substatin Permits Purpse This instructin deals with the use f permits t wrk in Hrizn Pwer s, and must be read in cnjunctin with FI 4.4 Secndary Islatins. Scpe The persnnel cvered by this instructin

More information

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities Prject QC-2015-02 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin sessin fr registered entities Nvember 26, 2015 Presentatin Overview 1. Meeting bjectives 2. Webinar instructins

More information

You Be The Chemist Challenge Official Competition Format

You Be The Chemist Challenge Official Competition Format 2018-2019 Yu Be The Chemist Challenge Official Cmpetitin Frmat This dcument prvides detailed infrmatin regarding the Challenge frmat at each level f the cmpetitin. Schl Crdinatrs, participants, and parents/guardians

More information

LED wdali MC Switch Input Modul Set - User Manual

LED wdali MC Switch Input Modul Set - User Manual LED wli MC Switch Input Mdul Set - User Manual Buttn mdul (Transmitter) 1. Prduct Descriptin Item N.: LC-004-302 Receive mdul (Receiver) The wli MC Switch Input Mdul Set is a cmpact wireless Multi Cntrl

More information

Figure 1: View, connection compartment closed

Figure 1: View, connection compartment closed Radi Management Art. N. : 2700AP Operating instructins 1 Safety instructins Electrical equipment may nly be installed and fitted by electrically skilled persns. Serius injuries, fire r prperty damage pssible.

More information

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

Input-Series Two-Stage DC-DC Converter with Inductor Coupling

Input-Series Two-Stage DC-DC Converter with Inductor Coupling Input-Series w-stage DC-DC Cnverter with Inductr Cupling ing Qian Wei Sng Brad Lehman Nrtheastern University Dept. Electrical & Cmputer Engineering Bstn MA 0 USA Abstract: his paper presents an input-series

More information

Comparative analysis of influence of the type line supplying nonlinear load on deformation of voltage and current in the power system

Comparative analysis of influence of the type line supplying nonlinear load on deformation of voltage and current in the power system Cmputer Applicatins in Electrical Engineering Cmparative analysis f influence f the type line supplying nnlinear lad n defrmatin f vltage and current in the pwer system tanisław Blkwski, Wiesław Brciek

More information

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY. Applicatin Package Checklist Cpy f Distributed Generatin frm Renewable Resurces Rider Cpy f Technical Requirements fr Distributed Generatin Agreement Cpy f Applicatin fr Intercnnectin and Parallel Operatin

More information

Wireless Bridge Module for DXR2.E

Wireless Bridge Module for DXR2.E Technical Specificatin Sheet Dcument N. A6V11470500 July 31, 2018 Wireless Bridge Mdule fr DXR2.E Descriptin A wireless bridge cnnects tw wired netwrks tgether ver Wi-Fi utilizing a Wireless Access Pint.

More information

WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL

WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL Issue February 2011 ASL Intercm BV DESIGNED AND MANUFACTURED BY: ASL INTERCOM BV ZONNEBAAN 42 3542 EG UTRECHT THE NETHERLANDS

More information

UKEPR Issue 01

UKEPR Issue 01 Title: PCSR Sub-chapter 7.5 Class 3 Instrumentatin and Cntrl Systems Ttal number f pages: 41 Page N.: I / V Chapter Pilt: B. WORINGER Name/Initials Date 30-10-2012 Apprved fr EDF by: A. MARECHAL Apprved

More information

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information Session with Concerned Entities.

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information Session with Concerned Entities. Prject QC-2015-01 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin Sessin with Cncerned Entities May 12, 2015 Outline Objectives f sessin Webinar (instructins) Québec regulatry

More information

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID:

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID: xtltipelement Service Infrmatin 2015 Chevrlet Crvette Crvette Service Manual 7527625 Bdy Systems Vehicle Access Repair Instructins Dcument ID: 3448513 Remte Cntrl Dr Lck and Theft Deterrent Transmitter

More information

SVT Tab and Service Visibility Tool Job Aid

SVT Tab and Service Visibility Tool Job Aid Summary This Jb Aid cvers: SVT Tab Overview Service Visibility Tl (SVT) Area Overview SVT Area: Satellite Mdem Status (Frm Mdem) Clumn SVT Area: Satellite Mdem Status (Frm SMTS) Clumn SVT Area: Prvisining

More information

CURRENT AND VOLTAGE SENSORS. General Information. Overhead Current and Voltage Monitoring Insulators (CVMI)

CURRENT AND VOLTAGE SENSORS. General Information. Overhead Current and Voltage Monitoring Insulators (CVMI) CURRENT AND VOLTAGE SENSORS General Infrmatin Overhead Current and Vltage Mnitring Insulatrs (CVMI) Many electric utilities are using Distributin Autmatin (DA) fr bth verhead and undergrund systems. DA

More information

Operating Process for Access to Gas Insulated Switchgear

Operating Process for Access to Gas Insulated Switchgear Operating Prcess fr Access t Gas Insulated Switchgear Summary This dcument supprts the Pwer System Safety Rules and its requirements assembled under Operate Gas Insulated Switchgear - Categry 5.6 Dcument

More information

XDSL/TELEPHONE CABLE MEASUREMENT

XDSL/TELEPHONE CABLE MEASUREMENT XDSL/TELEPHONE CABLE MEASUREMENT Phenix 10056 Cmplete Slutin fr xdsl Cables Cat 3, 4, 5 and 5e DESCRIPTION Custmer requirements can vary cnsiderably in terms f size and design f cnnecting frames depending

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad with min. 5 kg 405000090 405070090 INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main dimensins. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

Consolidated Edison Company of New York. Developer Welcome Kit

Consolidated Edison Company of New York. Developer Welcome Kit Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable

More information

SENSOR AND MEASUREMENT TECHNOLOGY

SENSOR AND MEASUREMENT TECHNOLOGY SENSOR AND MEASUREMENT TECHNOLOGY FOR SENSOR MANUFACTURERS The perfect wireless system FOR MACHINE MANUFACTURERS Transferring sensr data directly int the cntrl unit Using the Wireless Sensr Gateway DATAEAGLE

More information

Dry Contact Sensor DCS15 User Manual

Dry Contact Sensor DCS15 User Manual Dry Cntact Sensr DCS15 User Manual Help Versin updated till firmware 404i / SP456 Cpyright 2012, AKCess Pr C., Ltd.. Intrductin / What is a Dry Cntact Sensr The Dry Cntact sensr r DCS15 is a simple cnnectin

More information

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks Briefing n Discussins Regarding a Master Lease Agreement fr the Intelligent Digital Kisks Cmmittee-f-the-Whle September 11, 2018 Nevin Grinnell Vice President Chief Marketing Officer 1 Agenda Backgrund

More information

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01 Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft

More information

EE 3323 Electromagnetics Laboratory

EE 3323 Electromagnetics Laboratory EE 3323 Electrmagnetics Labratry Experiment #1 Waveguides and Waveguide Measurements 1. Objective The bjective f Experiment #1 is t investigate waveguides and their use in micrwave systems. Yu will use

More information

CM5530 GENERAL DESCRIPTION APPLICATIONS TYPICAL APPLICATION CIRCU. Rev.1.0 0

CM5530 GENERAL DESCRIPTION APPLICATIONS TYPICAL APPLICATION CIRCU.  Rev.1.0 0 FEATURES Quasi-Resnant Primary Side Regulatin (QR-PSR) Cntrl with High Efficiency Multi-Mde PSR Cntrl Fast Dynamic Respnse Built-in Dynamic Base Drive Audi Nise Free Operatin ±4% CC and C Regulatin Lw

More information

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard ELEC 7250 VLSI TESTING Term Paper On Analg Test Bus Standard Muthubalaji Ramkumar 1 Analg Test Bus Standard Muthubalaji Ramkumar Dept. f Electrical and Cmputer Engineering Auburn University Abstract This

More information

SolarEdge Built-in Revenue Grade Meter Troubleshooting

SolarEdge Built-in Revenue Grade Meter Troubleshooting SlarEdge Built-in Revenue Grade Meter Trubleshting Versin 1.0 Cntents Trubleshting Meter Cnnectin 3 Cmmunicatin Status Screen Trubleshting 3 Device Type and Prtcl are cnfigured incrrectly 3 Number f devices

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS DT0069 Design tip Enabling the Bluetth Lw Energy Direct Test Mde (DTM) with BlueNRG-MS By Salv Bnina Main cmpnents BlueNRG-MS Upgradable Bluetth Lw Energy netwrk prcessr SPBTLE-RF Very lw pwer mdule fr

More information

SHORT CODE. Short Code

SHORT CODE. Short Code SHORT OD By keying 3 digits shrt cdes, users can easily access predefined infrmatin frm custmer interface unit The fllwing table ffers the shrt cde list and the related descriptin Shrt de Descriptin OBIS

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

A New Protection Technique Against Overvoltages in Low-Voltage Electrical Networks. Experimental Results

A New Protection Technique Against Overvoltages in Low-Voltage Electrical Networks. Experimental Results 160 A New Prtectin Technique Against Overvltages in Lw-Vltage Electrical Netwrks. Experimental Results Mircea TĂMAŞ, Emil MERDAN and Călin MUNTEANU Abstract: This paper prpses a new apprach ver the electrical

More information

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist Annex IX Fr each requirement in the Functinal and Technical Specificatins stated belw, the Tenderer shall cmment cmpliance and detail hw the requirement is fulfilled. 4. Prject Cntents 4.1 Cllectin and

More information

Wonder Tree Video Slot Introduction. How to Bet. Gamble Feature

Wonder Tree Video Slot Introduction. How to Bet. Gamble Feature Wnder Tree Vide Slt Intrductin Wnder Tree vide slt is a 5-reel, 20-line game. The slt cnsists f 11 cards - 1 f which is Wild, and 1 is Scatter. All winning cmbinatins are paid left t right, except fr the

More information

PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE. Gary L. Burkhardt and R.E. Beissner

PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE. Gary L. Burkhardt and R.E. Beissner PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE COMPONENT USING ELECTRIC CURRENT PERTURBATION Gary L. Burkhardt and R.E. Beissner Suthwest Research Institute 6220 CUlebra Rad San Antni, Texas

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

A Basis for LDO and It s Thermal Design

A Basis for LDO and It s Thermal Design A Basis fr LDO and It s Thermal Design Hawk Chen Intrductin The AIC LDO family device, a 3-terminal regulatr, can be easily used with all prtectin features that are expected in high perfrmance vltage regulatin

More information

IA CERTIFICATE (Revision 3 Revised for Annual review)

IA CERTIFICATE (Revision 3 Revised for Annual review) Certificate Number: MASC M/11-376X Issue: 22 September 2014 Expire: 22 September 2015 Page: 1 f 5 IA CERTIFICATE (Revisin 3 Revised fr Annual review) IN TERMS OF REGULATION 21.17.2 OF THE MINERALS ACT

More information

E-Learning, DC drives DCS800 Hardware Options, part 1 Size D1 D4. ABB Group February 2, 2010 Slide 1 DCS800_HARDWARE_OPTIONS_01R0101

E-Learning, DC drives DCS800 Hardware Options, part 1 Size D1 D4. ABB Group February 2, 2010 Slide 1 DCS800_HARDWARE_OPTIONS_01R0101 E-Learning, DC drives DCS800 Hardware Optins, part 1 Size D1 D4 February 2, 2010 Slide 1 Objectives This training mdule cvers: Lcatin fr plug-in ptins Types f plug-in ptins Fiber ptic cnnectin bard DCS800

More information

LCN Remote Control. Perfection. High-End Building Management. Remote Control

LCN Remote Control. Perfection. High-End Building Management. Remote Control Remte Cntrl C 1992 YEARS 2017 High-End Building Management C Remte Cntrl 25 ISSEORFF KG Magdeburger Str.3 30880 Rethen/Germany Tel: +49 (0)5066 99 80 www.c.eu Remte Cntrl C-RR Infrared receiver with lens

More information

Nordic ID AR82 User Guide Version 1.2 NORDIC ID AR82 USER GUIDE

Nordic ID AR82 User Guide Version 1.2 NORDIC ID AR82 USER GUIDE NORDIC ID AR82 USER GUIDE TABLE OF CONTENTS GETTING STARTED... 4 1.1. GENERAL... 4 1.2. AVAILABLE VARIANTS... 4 1.3. AVAILABLE ACCESSORIES... 4 1.4. PACKAGE CONTENT... 4 1.5. FEATURES AND CONNECTORS OVERVIEW...

More information

IntesisBox IS-IR-KNX-1i v1.0. User's Manual Issue Date: 06/2017 r1.0 eng

IntesisBox IS-IR-KNX-1i v1.0. User's Manual Issue Date: 06/2017 r1.0 eng IntesisBx IS-IR-KNX-1i v1.0 User's Manual Issue Date: 06/2017 r1.0 eng IntesisBx KNX IR Universal AC Intesis Sftware S.L.U. 2017 All Rights Reserved. Infrmatin in this dcument is subject t change withut

More information

KELOX room thermostats - KM690D Digital-Standard/ KM690U Digital-Control

KELOX room thermostats - KM690D Digital-Standard/ KM690U Digital-Control KELOX rm thermstats - KM690D Digital-Standard/ KM690U Digital-Cntrl The KELOX rm thermstats are high-quality rm temperature cntrllers fr recrding and cntrlling the required rm temperature fr a maximum

More information

PJM Protection Standards

PJM Protection Standards PJM Manual 07: PJM Prtectin Standards Revisin: 10 Effective Date: 11/16/2011 Prepared by System Planning Divisin Transmissin Planning Department PJM 20121 PJM 2011 Revisin 00, Effective Date: XX/XX/2010

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY

HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY A. Sudrià 1, E. Jaureguialz 2, A. Sumper 1, R. Villafáfila 1 and J. Rull 1 1 Centre fr Technlgical Innvatin

More information

Upgrading to PlanetPress Suite Version 5

Upgrading to PlanetPress Suite Version 5 Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt

More information

Experion MX Formation Measurement

Experion MX Formation Measurement Experin MX Frmatin Measurement Experin MX will help imprve yur business perfrmance in tday s challenging ecnmic envirnment. This fully integrated quality cntrl and prcess knwledge system prvides superir

More information

idcv Isolated Digital Voltmeter User Manual

idcv Isolated Digital Voltmeter User Manual www.akcp.cm idcv Islated Digital Vltmeter User Manual Help Versin updated till firmware SP446 Cpyright 2011, AKCess Pr Limited Prvided by fficial AKCP-Distributr Didactum https://www.didactum-security.cm/en/

More information

Wide-Area Voltage and VAR Control of SCE Transmission Network. i-pcgrid 2014 March 26-28, 2014

Wide-Area Voltage and VAR Control of SCE Transmission Network. i-pcgrid 2014 March 26-28, 2014 1 Wide-Area Vltage and VAR Cntrl f SCE Transmissin Netwrk i-pcgrid 2014 March 26-28, 2014 CONTRIBUTORS SCE Team Frank Ashrafi Armand Salazar Backer Abu-Jaradeh WSU Team Mani Vekatasubramanian Hung Chun

More information

C&E Mobility Policy (Standard)

C&E Mobility Policy (Standard) C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment

More information

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed.

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed. Intrductin Dry Cntact Sensr The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable and can be

More information

Dry Contact Sensor

Dry Contact Sensor www.akcp.cm Dry Cntact Sensr Intrductin The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable

More information

Generating Facility Interconnection Guide. Revision 5.0

Generating Facility Interconnection Guide. Revision 5.0 Generating Facility Intercnnectin Guide Revisin 5.0 AMERICAN TRANSMISSION COMPANY Generating Facility Intercnnectin Guide (An ATC Business Practice) Revisin 5.0 April 2014 American Transmissin Cmpany W234

More information

CONTENTS. Product Type Output No of Output Input Approvals Page! and Series Power Outputs Voltage Voltage Number. Open Frame.

CONTENTS. Product Type Output No of Output Input Approvals Page! and Series Power Outputs Voltage Voltage Number. Open Frame. NTENTS Prduct Type Output N f Output Input Apprvals Page! and Series Pwer Outputs Vltage Vltage Number Open Frame RA 15t29W 1 5, 15 r 24V 100, 120, 220, 240V a.c. CE 211 RB 30 t 58W 1 5, 12 r 24V 100,

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data IR Emitter and Detectr 1. Descriptin Lite-On ffers a brad range f discrete infrared cmpnents fr applicatin such as remte cntrl, IR wireless data transmissin, security alarm & etc. Custmers need infrared

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics Martel LC-110H Lp Calibratr and HART Cmmunicatins/Diagnstics Abstract Martel Electrnics Crpratin This white paper describes the basic functins f HART cmmunicatins and the diagnstic capability f the Martel

More information

S-400 Series User Guide

S-400 Series User Guide S-400 Series User Guide temptimecrp.cm Ntices and Safety 1 Ntices and Safety 1.1 Disclaimer and limitatin f liability Temptime assumes n respnsibility fr any lss r claims by third parties which may arise

More information

Transmission is reliable and safe when antennas are managed by Movicon

Transmission is reliable and safe when antennas are managed by Movicon Transmissin is reliable and safe when antennas are managed by Mvicn Simetel Spa and Sigma Cnsulting have engineered an interesting supervisin system fr mnitring and security f the NATO VLF transceiver

More information

Participation is open on equal conditions to all national and international experienced individual consultants.

Participation is open on equal conditions to all national and international experienced individual consultants. REQUEST FOR EXPRESSIONS OF INTEREST N 1216/S/EOI-ICB/RE-ADV/AD/RDB/GOR/12 TITLE: CONSULTANCY SERVICES TO SUPERVISE CONSTRUCTION WORKS RELATED TO SUPPLY & INSTALLATION OF FURNITURE, BUILDING PARTITIONS

More information

Dice High Video Slot. Introduction. How to Bet. Gamble Feature

Dice High Video Slot. Introduction. How to Bet. Gamble Feature Dice High Vide Slt Intrductin Hw t Bet Gamble Feature Game Cntrls Rules Dice Feature Jackpt Cards Bnus Game Interruptins Return t Player Intrductin Dice High vide slt is a 5-reel, 20-line fixed game. The

More information

Operating Instructions

Operating Instructions TC 60/8 THERMOCOMPUTER TC 60/8 temp / time s s temp / time k start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing

More information

7.3 3 CENTRAL PANEL DISPLAY SYSTEM 3.1 GENERAL 3.2 CONTROLS VEMD COMPLEMENTARY FLIGHT MANUAL

7.3 3 CENTRAL PANEL DISPLAY SYSTEM 3.1 GENERAL 3.2 CONTROLS VEMD COMPLEMENTARY FLIGHT MANUAL 3 CENTRAL PANEL DISPLAY SYSTEM 3.1 GENERAL COMPLEMENTARY FLIGHT MANUAL The CPDS includes the Vehicle and Engine Management Display (VEMD) and the Cautin Advisry Panel (CAD). The CPDS displays the necessary

More information

Creating Gift Card Batches

Creating Gift Card Batches Every active custmer gift card issued is a part f a batch f gift cards. Prir t activating any individual gift card, yu must define a batch f gift cards and any accmpanying rules that apply t each batch.

More information

Insertion Loss (db)

Insertion Loss (db) Optical Interleavers Optplex s Optical Interleaver prducts are based n ur patented Step-Phase Interfermeter design. Used as a DeMux (r Mux) device, an ptical interleaver separates (r cmbines) the Even

More information

Desktop Teller Exception User Guide

Desktop Teller Exception User Guide Desktp Teller Exceptin User Guide Jammed Dcuments If a dcument jams during the scanning prcess, the scanner will stp, and a message bx will display a Device Errr Message, as shwn belw: Click OK t allw

More information

1300 S. Interocean Ave. Holyoke, CO

1300 S. Interocean Ave. Holyoke, CO 1300 S. Intercean Ave. Hlyke, CO Intercnnectin Standard fr Small Generating Facilities N Larger Than 25kW and 600VAC Intrductin This dcument prvides a standard fr intercnnectin f distributed resurces within

More information

100 Super Hot Video Slot Introduction. How to Bet. Gamble Feature

100 Super Hot Video Slot Introduction. How to Bet. Gamble Feature 100 Super Ht Vide Slt Intrductin 100 Super Ht vide slt is a 5-reel, 100-line fixed game. The slt cnsists f 8 cards - 1 f which is Wild, and 1 is Scatter. All winning cmbinatins are paid left t right, except

More information

Application Note: Conducted Immunity: Quick Guide

Application Note: Conducted Immunity: Quick Guide icatin Nte: Cnducted Immunity: Quick Guide (Please refer t AZD052 fr the full applicatin nte) 1 Intrductin: Lng cables are at risk f picking up RF, but t test this belw 80MHz require very large antennas

More information

LED DALI MC+ Switch Input Module - User Manual

LED DALI MC+ Switch Input Module - User Manual LED MC+ Switch Input Mdule - User Manual Item n.: LC-004-301 1. Prduct Descriptin The MC+ is a Cmpact Multi Cntrl mdule with 4 freely prgramable swithcing inputs (ptential-free clsing cntacts). The supply

More information

Common Network Operation Tools

Common Network Operation Tools Cmmn Netwrk Operatin Tls Prcess fr the develpment f data exchanges Mnika Kaldnek Adviser, System Operatins Brussels xxx2014 Backgrund > WHY: Regulatin 715/2009 (Art 8)...ENTSOG shall adpt: cmmn netwrk

More information

ACM1281 NFC Reader Module Reference Information

ACM1281 NFC Reader Module Reference Information ACM1281 NFC Reader Mdule Reference Infrmatin ACM1281 NFC Reader Mdule Technical Reference Infrmatin V1.00 Subject t change withut prir ntice inf@acs.cm.hk www.acs.cm.hk Versin Histry Date By Changes Versin

More information

Supervision Relay SR100

Supervision Relay SR100 ISKRA Sistemi 2017 1 Supervisin Relay SR100 Vltage and current aut range measurements up t 600VLN, 12.5A Active, Reactive, Apparent Pwer calculatin based n IEC 61400 21 Annex C Pwer accuracy class 0.5

More information

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group Crwn Recgnised Spectrum Access in 3400 t 3600 MHz The respnse f Alcatel-Lucent t Ofcm Spectrum Plicy Grup Spectrum Access in 1 3400 t 3600MHz Fr additinal infrmatin and clarificatin, please cntact: Jean-Pierre

More information

SolarEdge. Immersion Heater Controller Installation Guide. For Europe, APAC & South Africa Version 1.6

SolarEdge. Immersion Heater Controller Installation Guide. For Europe, APAC & South Africa Version 1.6 SlarEdge Immersin Heater Cntrller Installatin Guide Fr Eurpe, APAC & Suth Africa Versin 1.6 Cntents Cntents HANDLING AND SAFETY INSTRUCTIONS 2 Safety Symbls Infrmatin 2 Immersin Heater Cntrller Installatin

More information

IR Emitter and Detector Product Data Sheet LTE-R38386AS-ZF Spec No.: DS Effective Date: 09/14/2016 LITE-ON DCC RELEASE

IR Emitter and Detector Product Data Sheet LTE-R38386AS-ZF Spec No.: DS Effective Date: 09/14/2016 LITE-ON DCC RELEASE IR Emitter and Detectr Prduct Data Sheet Spec N.: DS5-216-5 Effective Date: 9/14/216 Revisin: - LITE-ON DCC RELEASE BNS-OD-FC1/A4 LITE-ON Technlgy Crp. / Optelectrnics N.9,Chien 1 Rad, Chung H, New Taipei

More information

Energy system of Moldova

Energy system of Moldova Energy system f Mldva General infrmatin Vltage levels: 400 kv, 330 kv, 110 kv Interstate intercnnectrs: 7 transmissin lines f 330 kv 11 transmissin lines f 110 kv between Ukraine and Mldva 1 transmissin

More information

DOCUMENT OBSOLETE. Advanced Systems Tester 900AST Series Calibration Verification Procedure. Instructions. February A

DOCUMENT OBSOLETE. Advanced Systems Tester 900AST Series Calibration Verification Procedure. Instructions. February A Advanced Systems Tester 900AST Series Calibratin Verificatin Prcedure Instructins February 2006 Table f Cntents Intrductin...3 Test Instruments Required...3 Test Cmpnents Required...3 Test Prcedure...3

More information

AIR CONDITIONER REMOTE CONTROLLER ILLUSTRATION CS406-R51E

AIR CONDITIONER REMOTE CONTROLLER ILLUSTRATION CS406-R51E AIR CONDITER REMOTE CONTROLLER ILLUSTRAT CS406-R5E 00550905 0009 Thank yu very much fr purchasing ur air cnditiner. Please read this wner's manual carefully befre using yur air cnditiner. CONTENTS Handling

More information

OPERATING FEATURES & FUNCTIONS

OPERATING FEATURES & FUNCTIONS OPERATON T stp an peratin at any time Press and hld the Start Key until the cntrl beeps fr tw secnds, indicating the peratin has been cancelled. The ven will remain in a pwer-n state. T turn ven cntrl

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

Signature Assignment. Course. ANTH 2302: Introduction to Archaeology. Ethical Case Dilemma. Assignment ID (to be assigned)

Signature Assignment. Course. ANTH 2302: Introduction to Archaeology. Ethical Case Dilemma. Assignment ID (to be assigned) Signature Assignment : Intrductin t Archaelgy Outcmes/Rubrics t be Assessed by the Assignment Cmmunicatin Critical Thinking Empirical and Quantitative Reasning Scial Respnsibility Assignment Descriptin

More information

5500K LED Module. 123,000- hours to a 30% decrease in brightness Aluminum Printed circuit board, Cree LEDs

5500K LED Module. 123,000- hours to a 30% decrease in brightness Aluminum Printed circuit board, Cree LEDs 5500K LED Mdule Descriptin: Size, Quantity f LEDs, Pwer, Brightness Vltage Dimming CRI: (R4) 84 ~6 x 6 x 0.28-in, 36 LEDs, 6-watts, 60 lm ~6 x 6 x 0.28-in, 49 LEDs, 8-watts, 830 lm ~2 x 2 x 0.28-in, 44

More information

KIP Cost Center User Guide

KIP Cost Center User Guide - 1 - KIP Cst Center User Guide Cntents 1 Intrductin... 3 1.1 Requirements:... 4 1.2 Supprted Operating Systems... 4 2 Installatin... 5 3 Setup... 8 4 KIP Cst Center Main Screen Print Mde... 12 4.1 Lading

More information

M M Eissa (SIEEE), Egypt Mahmoud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hossam Gabbar, Canada

M M Eissa (SIEEE), Egypt Mahmoud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hossam Gabbar, Canada Wide Area Synchrnized Frequency Measurement System Architecture with Secure Cmmunicatin fr 500kV/220kV Egyptian Grid M M Eissa (SIEEE), Egypt Mahmud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hssam Gabbar,

More information

The WHO e-atlas of disaster risk for the European Region Instructions for use

The WHO e-atlas of disaster risk for the European Region Instructions for use The WHO e-atlas f disaster risk fr the Eurpean Regin Instructins fr use 1 Last Update: June 2011 Cntents 1. Basic system requirements... 3 2. Structure f the WHO e-atlas... 4 2.1. Main menu... 4 2.1.1.

More information

Owner s Manual Installation and Operating Instructions

Owner s Manual Installation and Operating Instructions Meitav-tec Ltd (Cntel grup) Tel: +972 (3) 962 6462 Fax: +972 (3) 962 6620 www.meitavtec.cm - supprt@meitavtec.cm ETN-24-P-1S Owner s Manual Installatin and Operating Instructins Please read this manual

More information