National Implementation Vendor Engineering Standards. June 26, 2018

Size: px
Start display at page:

Download "National Implementation Vendor Engineering Standards. June 26, 2018"

Transcription

1 Natinal Implementatin Vendr Engineering Standards June 26, 2018

2 1 Cntents 2 Purpse General Infrmatin General Design Infrmatin New Rute Design Aerial vs Undergrund Basic Prject Frmat System Requirements Face Sheet Vicinity Map Custmer Cntact Infrmatin Building Management Infrmatin Call Befre Yu Dig Lg Cnstructin Units Dimensins Layers, Blcks and Line types Running Line Building Access Cmmn Dmarc ISP Cnstructin Guidelines Undergrund Cnstructin Handhle/Manhle/Vault (Access Pint) Lcatins Cnduits Methd f Placement Crssings Slack Strage Lcate Wire Lcate Management System BRIDGE AND FIXED STRUCTURE ATTACHMENTS General Design Guidelines Drawing Requirements Aerial Design page 2 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

3 7.1 Ple Attachments Tagging Stand Size, Grunding, Dwn Guys Clearance Anchrs Make Ready ADSS Wind Lading Aerial Cnduits Slack strage Fiber Fiber Cable Fiber Sizing Building Laterals High Capacity Buildings Metr Backbne Intercity Intercity Fiber Builds Replacement Permitting Specificatins Redlines As Builts Directinal Bring Requirements Cable Versin Histry page 3 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

4 2 Purpse The purpse f this dcument is t prvide OSP Engineering Vendrs with a single reference pint t find all relative infrmatin fr designing and drafting utside plant fr CenturyLink Natinal Implementatin. This may cntain links t ther reference materials as needed. 3 General Infrmatin 3.1 General Design Infrmatin All CenturyLink Natinal prjects will fllw the same basic design requirements. This manual will prvide sme f the basic details that shuld be included n every prject. Each area may have individual requirements in additin t thse fund here. CenturyLink requires all Outside Plant designs (engineering/cnstructin and final as-builts) t be created in an AutCAD 2014 r Newer frmat using UTM83 crdinate systems in US Survey Ft units. CenturyLink has created design standards including blcks, line types, and plt styles that are t be used in every prject. The standards will nt nly ensure cnsistency in ur prjects but are als time savers that will help with accuracy and legibility. All CenturyLink utside plant designs must utilize these standards. This is fr engineering/cnstructin prints and as well as final As-built. CenturyLink standards need t be fllwed when creating prints. In additin, anything that is required by the permitting agencies must als be included. Anything nt needed n the final as-built will be remved when creating the as-built. Every drawing will in PaperSpace/MdelSpace frmat. The maximum number f tabs must nt exceed 20 (excluding nn-prject sheet tabs). The Base will be in PaperSpace and n every tab that is needed All handhles must have cnfiguratins. All Manhles must have butterfly details where required by the OSPE. All Directinal Bres must have prfile details. All Prject sheets must have HDPE cnfiguratins. All Prject sheets where cable has been pulled must have cable infrmatin added. All Bridges must have bridge details. Existing As-builts must be used when available. These will be prvided by the CenturyLink Natinal Recrds, GIS and Fiber Management (RGFM) Team. These prints will act as base drawing t design and create as-builts fr a prject. Engineering vendr is respnsible fr representing all undergrund utilities including the CenturyLink running line n the drawings prvided. Only the area f the prject that is changing shuld be changed n the existing print. If n existing print exists, the engineering vendr must create new drawings using CenturyLink standards. The Engineering/Cnstructin Prints will be used t create the final as-builts NOTE: This manual is nt meant t cver every situatin that may arise in the field. Discretin shuld be used when designing CenturyLink prjects using best practices and industry standards. Requirements set frth by all gverning authrities (having jurisdictin ver the wrk that is taking place) shuld be met and included in the design as apprpriate. page 4 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

5 3.2 New Rute Design There are many items t cnsider when designing the rute f a new CenturyLink fiber ptic cable. When able, the engineer shuld explre the mst cst effective, time efficient and secure rute. Market planning and ther ptential pprtunities and/r expansin in the area shuld be cnsidered in rder t place the fiber in the mst beneficial lcatin fr future use. Cnsideratin shuld als be taken arund areas that have ptential fr rad imprvements due t develpments in the area. When designing a new rute, the general practice is t build back t an existing access pint in rder t prevent additinal lss in the rute due t added splice lcatins. There may, hwever, be times where a new access pint must be placed, and slack pulled frm the nearest vault in rder t create a new splice. Cst cnsideratin and due diligence is necessary t ensure the design is cnsistent with netwrk capabilities. 3.3 Aerial vs Undergrund Undergrund design is the preferred methd f placement fr CenturyLink fiber ptic cable. At times, there are lcatins where an aerial lead is required due t reginal issues. Items t cnsider when determining the best methd f placement include custmer requirements, ptential safety cncerns, future grwth in the area, recurring ple rental fees, maintenance csts, envirnmental cncerns and make ready issues. The CenturyLink OSPE is required t use due diligence and cnsider all ptins befre making the decisin t build an aerial lead. 4 Basic Prject Frmat All design and engineering packages fr placing new plant shall be cmpleted using the CenturyLink prvided AutCAD blcks and standards. All external engineering/drafting design (including final asbuilts as applicable) shall be delivered t CenturyLink in bth a.dwg file and.pdf frmat. Where existing CenturyLink plant is in place, prjects may be drawn utilizing CenturyLink as builts. Final as-built drawings must be drawn n existing as-builts. In lcatins where there are n existing CenturyLink as-built drawings, CenturyLink will prvide a baseline drawing fr the engineering cntractr t use. All drawings must be drawn t CenturyLink standards regardless f base file. 4.1 System Requirements It is required t have drawing bjects created and lcated gespatially. If yu have a surce f rad/building vectr data that is gespatially lcated (with UTM prjectin) in the AutCAD DWG frmat, yu can use these files. Hwever, if yu dn t have this surce, yu can use live Bing aerial imagery, The Bing live data map desn t travel with the drawing file (DWG), but the drawing bjects and prjectin, are cnsidered gespatially lcated, and d travel with the drawing. See AutCAD setup dcument fr the installatin instructins. Need t get the vendr prtal infrmatin fr linkages. All layers, linetypes, blcks, detail standards and prgrams that will be used t create drawings will be prvided by the RGFM team. Any questins may be sent t askspdesign@centurylink.cm. 4.2 Face Sheet Every CenturyLink prject must have a face sheet t identify the necessary details f the prject at a glance. Each face sheet shuld have the fllwing infrmatin: page 5 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

6 4.2.1 Vicinity Map The vicinity map f the face sheet shuld be a clear map that utlines the limits f the prject. The map shuld have street names and arrws marking the beginning and end f the prject. It shuld als include shadw bxes that shw which prject pages encmpass which sectins f the prject Custmer Cntact Infrmatin The custmer cntact infrmatin, if applicable, shuld be prvided n the face sheet. This shuld include a name and a phne number whm the cnstructin team can cntact when ready t begin the prject Building Management Infrmatin The building management cntact infrmatin, if applicable, shuld be prvided n the face sheet. This shuld include a name and a phne number whm the cnstructin team shuld cntact befre beginning wrk n the prperty Call Befre Yu Dig Lg Each face sheet must have a Call Befre Yu Dig lg that shuld be lcated in the bttm right hand crner f the sheet. Apprved versins and rules regarding the use f the 811 lgs can be fund at The fllwing is the lg used in mst states: 4.3 Cnstructin Units Every CenturyLink prject must include a list f the applicable cnstructin units fr that prject. A list f the cnstructin units and their descriptins can be btained by cntacting yur CenturyLink representative. The cntract design firm must be familiar with these units and when t use them. The unit list fr each prject must be reviewed by the CenturyLink OSPE during review f the design, befre sending t cnstructin. 4.4 Dimensins Statining is required n mst CenturyLink prjects. In the event it is nt used, dimensining shuld be n the prject t prvide a running line and/r lcatin fr the placement f facilities. Statining marks alng trench running line are at a minimum required at every bend in the cnduit n either end f the manhle (access pint), at every riser, utility markers, transitins between public and private ROW, and every 100. Aerial plant will require statining at every ple where strand is attached t supprt the prject (including verhead guys). These requirements are at a minimum. ROW and/r Easement dimensins shuld als be prvided n every CenturyLink prject where facilities are t be placed in the ROW r Easement. This is especially imprtant if the same prject prints used fr placing are als utilized t gain the apprpriate permit. Shwing these dimensins n the prject gives the cnstructin cntractr a clear idea f where they need t be and helps eliminate accidental placement n private prperty. page 6 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

7 Use ne baseline fr ffsets and statining, example: the centerline f a rad, the edge f a rad r ne track Yur baseline must be smething that is visible and statinary. Edge f prperty line r right f way is nt acceptable since it is nt a visible reference. (See Engineering and As-built Handbks fr mre details) Drawings shuld line up sheet t sheet at the match lines. Right f Way shuld be added t all prject sheets with Dimensins but it shuld never be used as a baseline. Standard Scale It is recmmended the maximum standard scale n 11x17 paper t be used fr undergrund is 1 = 50, Intercity/aerial is 1 = Layers, Blcks and Line types CenturyLink will prvide all blcks and line types that are t be used. CenturyLink will als prvide the layer set up and the standards fr what will reside n each layer. These items shuld be used as much as pssible when creating r wrking n the engineering/cnstructin prints. Anything nt created per the standards will have t be changed t reflect the standards n the final as-built. 4.6 Running Line The lcatin f undergrund fiber in the ROW r easement is very imprtant. Be sure t design the running line as far back in the ROW as pssible t avid pssible frced relcatins in the future. This als allws fr less damage frm ther utilities that are placed in the ROW. Keep running line changes t a minimum. If the cable meanders back and frth in the ROW, it has a much higher chance f being damaged during placement f ther utilities in the ROW. Clearly mark the running line f the cable n the prject drawings using ffset measurements as apprpriate. Severe running line changes that are needed nce cnstructin has begun shuld be discussed befre placement t ensure the fiber will still be in the ROW r easement and that the changes are necessary. There are standard clearances frm ther utilities that shuld be maintained when placing undergrund fiber ptic cable. Please check the lcal and state requirements fr yur area t determine prper clearances. 4.7 Building Access The bjective f the BEA Drawings is t prvide the landlrd with visual depictins and scpe f what CenturyLink intends t install in their building. The scpe f wrk shuld utline when these are required and if they must be certified, if scpe desn t state certified drawings are required then wrk can be self-perfrmed if preferred. The elements t be included in the drawings are: The lcatins where CenturyLink intends t enter the private prperty. page 7 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

8 The building entrance link(s) depictin f existing and prpsed new entrance infrastructure and methd f installatin: trenching, bring, size f cnduit, etc. Nte: Undergrund building penetratins will be made with steel sleeves, r as mandated by building engineer, and shall never cmprmise the architectural structure f the building. Equipment and Facilities t be placed in the MPOE. Risers t be utilized existing and/r new installatin. Equipment rm where CenturyLink equipment is t be installed with space dimensins f the Equipment Rm and Equipment ftprint. Pwer needs and surce t be identified and depicted. Pathways utilized inside the building cnnecting MPOE t equipment spaces and facilities demarks existing and/r new pathways t be installed. Any additinal facilities t be installed n the subject prperty that cmplete the full scpe f the build (OSP and ISP elements). The level f detail cntained in the drawings is dependent upn the individual landlrd s requirements necessary in rder t btain apprval t clse a BAA. The minimum requirement is an excel General Depictin drawings incrprating elements described abve. When required by landlrd, Detailed Engineering drawings mst typically prduced by cnstructin. 4.8 Cmmn Dmarc This sectin is meant t reference the design criterin fr Cmmn Dmarcs deplyed thrughut the netwrk. In sme scenaris, a Cllectr Nde will be deplyed as an aggregatin pint fr several Cmmn Dmarcs. A cllectr nde may als be used as a fiber distributin pint t aggregate traffic. The specificatins fr the Cllectr Nde will have minr variatins as stipulated belw r by the individual scpe f wrk. Cmmn Dmarc a Pint-f-Presence lcated within a building that is intended t serve all ptential custmers within the building via electrnic slutin r dark fiber extensin. A Distributin POP will typically be served via a single lateral and shuld be ideally be centrally lcated in a dedicated r cmmn area f the building. Cmmn Dmarc layut mdels will vary depending n prspective custmer base, space availability and availability f suitable pwer within the building. Cllectr Nde a Pint-f-Presence in a building that will be used t serve custmers in a cluster f buildings via transprt equipment r dark fiber extensin. A Cllectr Nde will typically be served via diverse laterals and cntain at least 3 racks and will typically require prvisins fr access t emergency generatr pwer r an umbilical fr a rll-up generatr. 4.9 ISP Cnstructin Guidelines Selectin f Distributin POP space This sectin shall gvern all new building adds (including single tenant buildings - understanding that single tenant buildings can be subdivided int multi-tenant buildings in the future) and fr existing sites that require an augment t be brught up t these standards. page 8 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

9 When deplying int a building, the preferred lcatin fr the CenturyLink Distributin POP is t be n the same level as the MPOE. Either a dedicated r cmmn area space is acceptable. If the building is lcated within a fld plain, then cnsideratin shuld be given t the flr level such that the CenturyLink Distributin POP is lcated abve anticipated fld levels. Space selectin fr the Distributin POP will be at the discretin f the GFS Field Planner with input frm the OSPE and Metr Planner and will typically be identified during the initial site survey. Cnsideratin fr prspective custmer base, space availability within the building and availability f suitable pwer will be primary cntributing factrs in DistrPOP space determinatin. Refer t the Typical Distr POP Mdels.dc fr standard mdels: There may be circumstances where specific site requirements exceed the Typical Distr POP Mdels.dc specificatins and thse will be identified n a case-by-case basis. Ideally, the space shuld be secured by a lckable dr r caged area. If a cmmn area is t be used, then lcking cabinets may be deplyed in lieu f a caged area. Heat lading frm the rectifier and telecm equipment needs t be taken int cnsideratin, and the chsen space shuld have adequate ventilatin. Huse cling is the preferred methd fr cling f the space. Supplemental cling is nt planned as a part f these Distributin POP s; hwever, cnsideratin shuld be given t determine if the planned space will be at risk fr exceeding the alarming threshlds fr equipment (50 F t 100 F). In instances where there is cncern fr ptential temperature threshlds being exceeded, Netwrk Planning will evaluate the apprpriate supplemental requirements. A flr lad capacity rated at a minimum f 100+ lbs. per square ft is required. Riser System Typically, nly a fiber ptic riser system will be cnstructed in multi-tenant buildings. All installatins shuld fllw CenturyLink standards, lcal building cdes and building requirements. Cpper r caxial facilities will nly be used as part f a specific apprved business case. Riser cabling shuld be designed t the specifics f the building and the prspective custmer base. The distributin riser cable shuld be apprpriately sized depending upn the number f prspective tenants t be served with the guideline f 6 fibers per prspective tenant, and a minimum fiber cable cunt f 48. If n tenant infrmatin is available, the riser is t be designed with 4 fibers per flr. If the Distributin POP is t be lcated n an upper flr, the riser shuld be apprpriately sized as listed abve fr distributin t tenants, plus 24 fibers t serve the POP. Cnsideratin f the planned riser cnduit sizing shuld als be cnsidered when sizing the distributin riser cable (i.e. if the cnduit size will nly allw a single fiber cable - versizing the distributin riser cable wuld be apprpriate). The riser system shuld be designed t integrate seamlessly with the existing building riser system and nt interfere by bstructing any pathways. Any FDP s r splice cases need t be ut f the way f existing r future riser cables/cnduits. A small cil shall be placed n every third flr t be available t serve custmers ne flr abve, belw, r n the same flr. The density f the cil shuld be a minimum f 50 feet and nt t exceed 100 feet t prvide apprpriate slack fr the adjacent flrs. In buildings that utilize a rigid cnduit, CenturyLink will deply cnduit that is prperly sized t pull the apprpriately sized fiber thrugh withut frictin. All junctin bxes shall be NEMA1 rated. page 9 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

10 When using a Crning FlexNap slutin, it is recmmended that a 4 fiber/flr slutin is implemented t serve a typical multi-stry building. Hwever, the tenant density and ptential bandwidth demands shuld be evaluated t determine if a 6, 8, r 12 fiber/flr slutin is required. In such cases, the FlexNap taps shall be placed at three-flr spacing (in a fur fiber per flr slutin, each tap wuld be a 12-fiber tap). In instances where the Distributin POP is lcated n a flr abve the basement r MPOE level, cnstructin f a parallel integrated distributin riser shuld be designed and cnstructed at the time f the Distributin POP. 5 Undergrund Cnstructin 5.1 Handhle/Manhle/Vault (Access Pint) Lcatins It is strngly recmmended that an Access Pint be placed alng a metr cable rute at least every 1000 t allw fr easier cable placement and access. Fr Intercity applicatins the minimum access pint placement is It is recmmended that n mre than 270 degrees wrth f bend radius be allwed befre placing an access pint, hwever, the design shuld never exceed the manufacturer s recmmended pulling tensin. There shuld als be an Access Pint lcated n bth sides f any majr crssings such as RR, Interstate, Waterway, and in lcatins where future access t the cable is anticipated. Cnsideratin shuld be given t items such as future needs, majr water crssings, highways, RR s, multi-tenant buildings, ingress/egress, future rad prjects, and riser lcatins, just t name a few. In building applicatins, Access Pints shuld be placed in a lcatin that allws fr easy access while taking int cnsideratin ptential impacts t building tenants and aesthetics. Fr slack strage in Access Pints, please see the Slack Strage infrmatin cntained in these standards. It is recmmended when placing a new Access Pint that is a splice lcatin, an 8 5/8 grund rd with #6 cpper wire attached and ciled in the vault shuld be shwn n the design. Where apprpriate, access pint installatin shuld include the placement f the racking and fllw the manufacturer s recmmended placement guidelines and lad requirements. 5.2 Cnduits CenturyLink des nt direct bury fiber. All undergrund fiber must be placed in a duct in accrdance with the CenturyLink Cnstructin standards r the gverning permitting authrity requirements, whichever is greater. CenturyLink utilizes primarily Orange, Green, Blue r Black cnduit. The minimum depth fr Metr fiber is 36 ; hwever, the lcal permitting authrity requirements prevail. Fr building applicatins, the fiber must be placed in the apprpriate rated duct per the NEC r the lcal building cde, whichever is mre stringent, fr the envirnment. When designing cnduit, the apprpriate number f cnduits must be designed t be sufficient fr grwth in the area and the cable being placed. Ideally yu shuld be cnsidering cnduit placement fr at a minimum, the next 20 years. Details such as frecasted grwth, market pprtunity as well as cst, length and difficulty f placement shuld be measured. page 10 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

11 Fr backbne a minimum f cnduit pathways r sufficiently sized cnduit fr the grwth in the area, shall be included in the design. Fr intercity design cnsideratin shuld be given t future grwth and existing crss-sectins f cnduit; hwever, a minimum f cnduit pathways r equivalent shuld be included in the design. Fr custmer laterals, a minimum f r equivalent cnduit pathway shuld be included in the design if nt using existing custmer wned duct. All CenturyLink cnduits shall terminate directly int manhles, handhles, vaults, buildings r stubbed up a ple int a u-guard, per the CenturyLink Cnstructin Standards. 5.3 Methd f Placement It is the respnsibility f the CenturyLink OSPE t determine the best and mst cst-efficient methd f placement fr a prject. The mst cmmn methds fr placing undergrund fiber are directinal bre, trenching and plwing. Micr-trenching is als used albeit rarely. The feasibility f the placement alng with cnsideratin f field cnditins must be reviewed in the determinatin. 5.4 Crssings Whenever pssible majr crssings such as interstate, waterway r RR shuld be avided due t the cst f placement, permitting fees, and difficulty f placement. Future maintenance, cngestin f the ROW and future relcatin requirements are als a cncern. In the instance where it is nt pssible t avid these crssings, the CenturyLink OSPE shuld research the permitting authrity requirements n depth, distance, and fees assciated with such crssings in rder t determine the mst safe and ecnmical design pssible. The OSPE may als reach ut t the reginal Implementatin Services 3 rd Party Fiber and Right f Way Cntract Acquisitins reginal manager fr assistance with the due diligence. 5.5 Slack Strage When designing a new undergrund fiber rute, sufficient slack must be placed in strategic lcatins t best ptimize the use f the cable fr future needs. The minimum requirement fr metr cable is 100 slack lcated every 1000 and in access pints that culd be utilized t serve future businesses. Fr Intercity, the minimum requirement is 100 slack lp at every access pint. When designing slack, the amunt needed may depend n the lcatin f the lp. Fr instance, if the splicing truck cannt park directly adjacent t the access pint where the slack is stred, additinal slack may be needed s the lp can be pulled int the splicing vehicle. There shuld als be sufficient slack strage at the dmarc lcatin f a building t allw fr splicing. A minimum f 65 is recmmended. page 11 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

12 5.6 Lcate Wire All CenturyLink undergrund cable must be lcatable. This can be dne in a cuple f diverse ways. If the cable is dielectric, a lcate wire must be placed. If the cable is armred, a lcate wire is nt required as lng as the integrity f the cable is maintained. In areas where a di-electric cable will be placed in a newly placed duct r in situatins where duct nly is being placed, the design shuld include placement f a cntinuus #10 AWG lcate wire in the trench r bre hle t be terminated t a grund lug in the access pint r at an abve grund marker pst r in a pedestal if allwed by the permitting authrity. If placing di-electric cable int an existing duct, the lcate wire shuld be pulled int the cnduit with the cable. The lcate wire must be terminated t a grund lug as per abve paragraph. 5.7 Lcate Management System A lcatin management system is a system that prvides cntinuus signal using a remtely cntrlled transmitter hused in a Central Office r ther centralized lcatin. Tne n individual rutes can be turned ff and n remtely via phne Permanent tne shuld be prvided n all intercity backbne and where apprpriate n intracity backbne rutes. Grunding units with surge prtectin t be used at all OSP splicing lcatins. Laterals will be designed t be lcated via prtable tne generatin as a rule. Side leg bnding shuld nly be dne in special situatins as warranted by unique circumstances where prtable tne generatin isn t an ptin and backbne tne will nt be impeded. Rack munted units are preferred fr generatin f permanent tne. Tne generatrs shuld be spaced amng sites fr maximum efficiency in a leap frg cnfiguratin. Tne generatrs t be specified with the prper channel capacity fr sufficient cverage f mre than tw cables in sites with mre than tw backbne terminatins 6 BRIDGE AND FIXED STRUCTURE ATTACHMENTS 6.1 General This practice describes methds fr the placement f CenturyLink cnduit and fiber ptic cable nt bridges and fixed structures. In this cntext, a fixed structure is defined as a tunnel, wall r ther permanent surface t which CenturyLink will attach cnduits, cables, devices r supprt structures. 6.2 Design Guidelines The fllwing factrs must be cnsidered befre designing bridge r structure attachments: Acceptable engineering techniques Accessibility fr cnstructin Aesthetics Alternative rutes Ecnmics Envirnmental cnsideratins page 12 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

13 Ownership Permitting agencies and requirements Security Structure building materials Type f structure Wrker safety All bridge and structure attachments will be cnsidered and designed individually. There is n single standard type f bridge r structure attachment. Each situatin is unique, and each attachment must be engineered with a particular bridge r structure in mind. Hwever, bracket types and assciated hardware shuld be limited t CenturyLink standard designs when pssible. Nn-standard bracket designs and assciated hardware must be submitted t the apprpriate CenturyLink representative fr written apprval prir t incrpratin int an engineering design. The design engineer is required t btain cpies f all available bridge drawings frm the permitting agency / structure wner. The design f bridge attachments shall minimize bends and t the greatest pssible extent shall maintain a hrizntally and vertically straight cnduit alignment. If there are expansin jints in the bridge design, a cnduit cupler that allws fr expansin r an attachment that allws fr cnduit mvement shuld be utilized. Due care and cnsideratin will be given t future bridge cnstructin, relcatin, maintenance and the impact n the cnduit system. Bridge attachments will be placed as high n the structure as practical, but always abve the bttm f the bridge. If future bridge recnstructin and/r maintenance is anticipated, cnsideratin shuld be given t the pssibility f using split GSP, sltted GSP r split GSP cllars and t string extra cable in adjacent handhles. CenturyLink apprved cnduit materials fr attachment t bridges and fixed structures are: Galvanized Rigid Cnduit (GRC) Split r Sltted Galvanized Steel Pipe (SPGSP) Bullet Resistant Fiberglass (with CenturyLink apprval) High Density Plyethylene (HDPE) Generally, head walls may be cre bred if required. Hwever, the cre bre must nt cut any rebar. The cre bre must be sleeved with Schedule 40 GSP/GRC and cncrete gruted. Link Seal inserts may be used in lieu f GSP/GRC and grut, if apprved by the wner f the structure. Cnduit will nt be attached t draw, swing r ther type f mvable bridges r structures. Cnduit will nt be attached t wden bridges r structures unless n alternative placement methd is available. Apprval fr attachment t wden bridges r structures must be btained in writing frm the apprpriate CenturyLink representative and the structure wner. Handhles will be placed at bth ends f bridges at which lcatins a transitin frm the cnduit used t crss the bridge t HDPE will be made. page 13 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

14 All casings will be equipped with a minimum f three crrugated innerducts When designing cnduit, the apprpriate number f cnduits must be designed t be sufficient fr grwth in the area and the cable being placed. Ideally yu shuld be cnsidering cnduit placement fr a minimum the next 20 years. Details such as frecasted grwth, market pprtunity as well as cst, length and difficulty f placement shuld be measured. All attachment brackets will be ht-dipped galvanized. Attachment brackets will be placed t adequately supprt the cnduit structure. A general guideline wuld be attachment at ptimum intervals f ten feet (10 ). Bracket spacing t fifteen feet (15 ) may be allwed in special cases. Design must als include vibratin-dampening materials fr easing vibratin stress caused by rail r rad traffic. Neprene insulatrs r equivalent will have a minimum f ne-quarter inch (1/4 ) thickness. When embedding bracket studs in cncrete, an epxy cartridge will be used. Welding t a metal bridge r structure is nt allwed unless therwise apprved in writing by the apprpriate CenturyLink representative and the permitting agency / structure wner. All nuts (tp cne lck-nuts, side-lck nuts r equivalent), blts and lck washers will be f stainless steel r ht-dipped galvanized design. A length equal t ne diameter f the blt will be expsed after nut is in place. The design engineer is required t btain cpies f all available bridge drawings frm the permitting agency / structure wner. The design f bridge attachments shall minimize bends and t the greatest pssible extent shall maintain a hrizntally and vertically straight cnduit alignment. If there are expansin jints in the bridge design, a cnduit cupler that allws fr expansin r an attachment that allws fr cnduit mvement shuld be utilized. Due care and cnsideratin will be given t future bridge cnstructin, relcatin, maintenance and the impact n the cnduit system. Bridge attachments will be placed as high n the structure as practical, but always abve the bttm f the bridge. If future bridge recnstructin and/r maintenance is anticipated, cnsideratin shuld be given t the pssibility f using split GSP, sltted GSP r split GSP cllars and t string extra cable in adjacent handhles. 6.3 Drawing Requirements Drawing requirements fr bridge crssings will be dictated by the permitting authrity but at a minimum will require three views: plan, prfile and crss sectin. Bridge drawing will be incrprated int the cnstructin drawings. Bridge and cnstructin drawings will be prperly crss-referenced. Drawings will reflect each sectin f structural changes, with a crss sectin fr each structural change. Drawings will als include the fllwing: Methd f attachment and attachment bracket details, lcatin and spacing with all apprpriate measurements and manufacturing ntatins that may be required page 14 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

15 All apprpriate handhle and pull bx lcatins and cnduit, sweeps and riser details The lcatin f all expansin jints, which shuld be placed at the same lcatin as the bridge expansin jint and have a capacity t expand and cntract greater than, r equal t, that f the bridge's jint Tie-dwn measurements fr cnduit placement Any special cnstructin requirements and/r restrictins Attachment bracket details fr each bridge and will be f sufficient detail fr fabricatin. All nut and blt specificatins Cmplete materials list All cre brings References t milepst lcatins, railrad bridge numbers and cnstructin drawing sheet numbers Directinal arrws and nrth arrw Pertinent permitting infrmatin and cntact numbers All apprpriate rad, railrad, stream, river and/r creek names and directin f flw Special cnstructin materials, cnduit size, cnduit type and innerduct specificatins The height f the bridge abve the rad r water will be shwn t the bttm and tp f the bridge structure If the bridge is ver water, the depths f the water will be indicated Single r multiple duct placement and nte the ducts ccupied by CenturyLink Bridge drawing will be incrprated int the cnstructin drawings. Bridge and cnstructin drawings will be prperly crss-referenced. 7 Aerial Design CenturyLink s preferred methd f cable placement is undergrund. At times it may be a requirement t place aerial cable instead f undergrund due t extenuating circumstances. Cnditin f ples, recurring fees, number f attachments, clearance and safety cncerns must all be taken int accunt when cnsidering aerial placement. 7.1 Ple Attachments At times, it may be mre cst efficient t attach t existing ples wned by ther utilities than it is t place cable undergrund r build a new ple lead. Cnsideratin f recurring ple rental fees, number f utilities already n the ple line, anchr and dwn guy requirements, clearance issues, and ptential make ready requirements shuld be cnsidered when attaching t a ple nt wned by CenturyLink. The OSPE may als reach ut t the Natinal Implementatin Services 3rd Party Fiber and ROW Cntract Acquisitin Team reginal manager fr assistance with the due diligence needed t determine use f the identified ples. The ple prvider s engineering guidelines may change upn attachment submittal t the ple wner. This will serve as the OSPE s ntice f engineering requirements. These engineering changes will need t be adhered t and design changes made. page 15 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

16 7.2 Tagging When placing cable in an aerial envirnment, it is a requirement t tag the cable. Cable will have a 4 t 6 slack lp and fiber warning tag at every ple and at every building entry. Many ple wners require specific clred tags fr each utility that attaches t their ples. Be sure t check with the ple wner fr their specific requirements and nte the drawings accrdingly. When placing a CenturyLink ple, the ple must be tagged with the unique ID that matches the fiber inventry system. 7.3 Stand Size, Grunding, Dwn Guys Strand - Minimum 6.6M 1/4 EHS. (r greater as required by CenturyLink, ple wner, r permitting agency) At a minimum, Strand will be grunded at ¼ mile intervals with #6 cpper wire bnded t pwer cmpany MGN/MGNV (if permissible) r t a 10-ft lng cpper clad ¾ grund rd. New anchrs shall be ¾ (minimum) when required and shall be nted n the engineering drawings. Slack spans may be utilized when necessary but shuld be kept at a minimum and nly when the sag will nt exceed the minimum clearance requirements All crner ples will be guyed where the change in directin exceeds 4'. 7.4 Clearance Aerial plant clearance requirements are based n the Natinal Electric Safety Cde (N.E.S.C.) and shall meet all requirements f the gverning authrity. The cable is classified as a fiber ptic supply cable as described in the N.E.S.C Anchrs Dwn guys and anchrs are t be utilized at the end r beginning f an aerial lead and at every lcatin where there is a directinal change greater than 4 r as required t maintain the structural integrity f the ple lead. There are several types f anchrs t chse frm. The scenari, type f sil, and weight f cable determine the mst applicable material t use. 7.6 Make Ready A make ready is when existing attachees n a ple need t mve in rder t make rm fr anther utility t attach t the ple and maintain prper clearance. When designing aerial cable, make ready wrk shuld be identified early in the prcess and the requests submitted as sn as pssible due t the lead time the wrk generally takes t get cmpleted. page 16 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

17 7.7 ADSS ADSS r self-supprting cable shuld nly be used in situatins where the specific requirements warrant it. An example wuld be a shrt sectin int a building where there is n way t place strand. When placing ADSS cable, adherence t the ADSS standards frm the cable manufacturer is required. 7.8 Wind Lading In many areas wind lading calculatins are required t request a ple attachment, r t add t an existing ne. There are several wind lading calculatin sftware applicatins that may be used fr this. It is a requirement that the OSP Engineering vendr be familiar with the wind lading specificatins and requirements fr their area. When designing aerial prjects, it is a requirement that the engineering vendr prvide the OCALC dcumentatin with the design package. This infrmatin must be stred with the rest f the drawing package fr future reference if needed. 7.9 Aerial Cnduits Aerial cnduits are used in situatins where additinal prtectin is required fr the fiber cable r where we may need t pull an additinal cable ver a difficult aerial crssing. It can als be beneficial where scheduling difficulties in new cable placement require the crssing t be dne at a different time than the verall cnstructin. Sme examples f areas where an aerial cnduit might be helpful include areas f heavy vegetatin, highway, RR, r water crssings and areas where we have severe pest issues. The recmmended size fr an aerial duct is a minimum f 1 ½ HDPE type cnduit. Yu must verify that the gverning authrity f bth the crssing and ple wner will allw use f the cnduit. Aerial duct type, span lading and anchrs must be called ut in the design Slack strage When designing an aerial fiber rute, sufficient slack must be placed in strategic lcatins t best ptimize the use f the cable fr future needs. The minimum requirement is 150 slack lcated every 1500 and lcatins that culd be utilized t serve future businesses. Slack strage must be stred in snw shes. When designing slack, the amunt needed may depend n the lcatin f the lp. Fr instance, if the splicing truck cannt park directly adjacent t the ple where the slack is stred, additinal slack may be needed s the lp can be pulled int the splicing vehicle. 8 Fiber 8.1 Fiber Cable Standard Cable Type is (SMF28 ELL) single mde, single armr, single jacket, lse tube is the standard fr mst undergrund and aerial applicatins. Standardize n the sizes. In sme instances, it is acceptable t use an all dielectric design if the cable will be in a highly cnductive envirnment such as leasing a duct frm a pwer cmpany r if the cable is utilized as a building entry cable. It is als acceptable t use an indr-utdr cable fr building entries r a riser rated r plenum cable fr interir building applicatins. page 17 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

18 8.2 Fiber Sizing Building Laterals When designing a building entry prject, the cable shuld be sized with sufficient spare fibers t allw fr grwth alng the given rute t the building. While the minimum cable size fr a lateral t a building is a 24-cunt fiber, cnsideratin shuld be given t the requirements f the building, bth lng and shrt term. Fr instance, larger buildings r campus envirnments may require a higher cunt fiber based n their future needs. Lng laterals with ptential fr future custmers alng the rute, shuld be cnsidered a backbne extensin and the apprpriate size fiber shuld be used High Capacity Buildings When designing high capacity buildings such as data centers, stadiums, and high-rise buildings, the cable shuld be sized with sufficient spare fiber t allw grwth t the building. The minimum cable size fr ne f these types f high-capacity buildings is a 48-cunt fiber. The OSPE shuld cnsider the size and ptential custmer capacity f the building when designing the fiber t ensure future needs will be met Metr Backbne Fr backbne design, the cable shuld be designed utilizing grwth ptential in the area cmbined with scalability and cst efficiency. Fr instance, if yu are planning t build backbne in a dwntwn area where the cnstructin will be cstly and difficult, it may be a gd idea t scale the cable up t eliminate the need fr a larger cable in the near future. Care shuld be taken t place the cable alng a rute that will prvide CenturyLink with the mst pprtunity. The minimum standard fr backbne size is a 288- cunt fiber ptic cable fr many areas. 9 Intercity New intercity, frmally knwn as lng haul fiber, is built infrequently. Hwever, yu may run acrss the need t replace r utilize intercity fiber r cnduit. 9.1 Intercity Fiber Builds Fr any new Intercity fiber builds, the current cable standard is a 288 Hybrid with 240 fibers SMF-28 Ultra Max, and 48 SMF-28 Ultra Lw Lss, hwever, a cst study shuld be cmpleted t determine the best ptin fr the cable and cnduit depending n what is needed fr yur specific prject. Minimum cnduit placement fr a new Intercity fiber build is 3-11/2 innerducts placed at a minimum depth f 36. In sme cases, it may be prudent t place mre r less depending n the size f fiber being placed, lcatin, and expectatin f future needs. It may als make better sense t place a larger size duct, such as 2, t accmmdate a larger fiber size. Fr the last span int a metr market a cnsideratin shuld be made t upsize the cable fr metr cnsumptin frm the Gateway t the 1st ILA n the span. (i.e. a 288 ct culd be upsized t a 432 ct with being made available fr metr cnsumptin) 9.2 Replacement As a rule, when replacing Intercity Fiber and cnduit, shrt sectins less than 2 miles shuld be replaced like fr like. Fr lnger replacements r high cst builds, a feasibility study shuld be cnducted t determine the best ptin fr cable and cnduit size. Each situatin shuld be studied fr best slutin and design based n requirements f the cmpany. The Transprt & Infrastructure planning and prduct teams will prvide the final apprval fr intercity fiber and cnduit replacement if nt using a like fr like replacement. page 18 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

19 10 Permitting Specificatins It is the CenturyLink vendr s respnsibility t research the ROW, understand the permitting requirements, and create a drawing that can be utilized t secure the permit as well as cnstruct the prject. This includes but is nt limited t: Examine and search public recrds t determine land wnership, including the names and addresses f surface wners, tenants, renters, mrtgages, liens, etc. Prepare abstract and title reprts sufficient t cmply with CenturyLink s requirements and perfrm title curatives as may be requested by CenturyLink. Prepare all types f land related dcuments in a frm acceptable t CenturyLink. Such dcuments shall include, but nt necessarily be limited t: leases, easements, deeds, permits, ptins, cnsents, assignments, letter agreements, releases and amendments. Cntractr shall als be respnsible fr furnishing infrmatin necessary t prepare said land-related dcuments. Negtiate, acquire, settle and deliver t CenturyLink all types f land related dcuments as described in the abve paragraph, prperly executed and in a frm acceptable t CenturyLink. Perfrm thse functins custmary t the administratin f a land ffice, including but nt necessarily limited t: maintaining fee prperties (encrachments, granting f easements, sale and acquisitin); cnducting facility assessment and due diligence fr asset sales/acquisitins and spindwns; prviding supervisin f land persnnel and crdinating staffing needs; establishing and maintaining favrable public relatins with landwners and gvernmental agencies; assisting peratin crews fr cnstructin and maintenance related wrk; managing easements and leases; prviding payment f rights; handling permitting, zning franchise issues and assisting in easement/lease encrachments. Prvide supprt n the need fr authrizatins fr wrk in r near Waters f the United States. The perfrmance f these functins shall be in a manner acceptable t CenturyLink Prvide supprt and give testimny in matters f litigatin when require by CenturyLink. When necessary and mutually agreed upn between CenturyLink and the vendr, permit and assist in the crdinatin f land and envirnmental related surveys. Perfrm liaisn rle during permitting, acquisitin, cnstructin and maintenance activities n behalf f CenturyLink and between cntractrs, landwners, tenants, gvernmental agencies and CenturyLink. Prvide land-related input t CenturyLink during the cnceptin, evaluatin, planning and implementatin phases f prjects. Prvide all ther related assistance as requested by CenturyLink t accmplish necessary wrk generated by and thrugh CenturyLink 11 Redlines Either the Engineering inspectr r the cnstructin vendr will dcument hw, what and where plant is being placed. CenturyLink will prvide sequential blcks n the drawings fr cnstructin t fill ut the infrmatin during the redline creatin. In situatins where the drawings becme t cluttered, a standard blank cable pull sheet will be prvided as part f the prject drawings. All Manhle/Handhle need t have a LAT/LONG and a MH/HH verificatin frm filled ut if requested by the CenturyLink OSPE 12 As Builts page 19 f 20 Services nt available everywhere. CenturyLink may change r cancel prducts and services r substitute similar prducts and services at its sle discretin withut ntice CenturyLink. All Rights Reserved. The CenturyLink mark, pathways lg and certain CenturyLink prduct names are the prperty f CenturyLink. All ther marks are the prperty f their respective wners.

C&E Mobility Policy (Standard)

C&E Mobility Policy (Standard) C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

Appendix M Trellis Type Shade Structure Design Guide

Appendix M Trellis Type Shade Structure Design Guide Residential Design Guidelines fr Marley Park 178 Appendix M Trellis Type Shade Structure Design Guide Trellis Type Shade Structures: Trellis Type Shade Structures are typically cnstructed with pen trellis

More information

DEVELOPMENT APPLICATION

DEVELOPMENT APPLICATION DEVELOPMENT APPLICATION FOR CITY STAFF ONLY PROJECT NUMBER: DATE RECEIVED: RECEIVED BY: NAME OF SUBDIVISION AND/OR PROJECT: Revised April 2018 ITEMS SUBMITTED: Filing Fee* Filing Fee* Land Study/Cncept

More information

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA APPENDIX B TRAFFIC IMPACT STUDY CRITERIA Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r

More information

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01 Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

Installing a Squeak-Free Nascor Floor System

Installing a Squeak-Free Nascor Floor System Nascr s precise manufacturing tlerances deliver a prduct that resists shrinking, warping and twisting the mst cmmn causes f squeaks in flr systems built with dimensinal lumber. Ensuring a squeak-free flr,

More information

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements

More information

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys)

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys) 1 Octber 2016 Inaccessible Electrical Facilities Phase 2 Primary Lines (Lwer Keys) Revised Oct 20 th 2016 2 Executive Summary Flrida Public Service Cmmissin In 2006, fllwing the 2004 and 2005 hurricane

More information

DynaRound Hatch Guard System Installation Instructions

DynaRound Hatch Guard System Installation Instructions DynaRund Hatch Guard System Installatin Instructins Estimated Installatin Time: Man Crew, 0-90 Minutes The DynaRund Hatch Guard System is designed t prtect all rftp hatch entry and exit pints. This nn-penetrating

More information

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

Dorsey s Search. Name Address Home Telephone Work.  Address. Property Owner s Signature Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

Pool & Hot Tub Guide

Pool & Hot Tub Guide Pl & Ht Tub Guide PERMIT(S) FOR POOLS/HOT TUBS WITH SIDE WALLS > 24 ***** ALL FEES DUE AT TIME OF APPLICATION ***** Building Permit Applicatin. Be aware f any subdivisin restrictins prir t applicatin.

More information

b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 2 April 2012 ( ENCLOSURE 1)

b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 2 April 2012 ( ENCLOSURE 1) CELRL-PM-R April ARCOS BULLITEN - SUBJECT: IT Design. REFERENCE: a. Army Reserve IT Manual, Change b. Army Reserve Design Prcess Submittal Requirements (DPSR) c. USARC G-/ IT Design Whitepaper, April (

More information

Acceptance and verification PCI tests according to MIL-STD

Acceptance and verification PCI tests according to MIL-STD Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE

More information

Xerox 8160/8142 Wide Format Color

Xerox 8160/8142 Wide Format Color PRODUCT RANGE / POSITIONING The Xerx 8142/8160 Slutin Printer is a thermal inkjet printing system intended fr use in a prductin envirnment prducing graphical cntent, including Psters, POP, signage, etc.

More information

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732 Prgram Infrmatin 1 DXF2DAT 3.0 Prfessinal Designed Cmputing Systems 848 W. Brtn Rad Essexville, Michigan 48732 Cntact: (989) 892-4376 website: http://www.famwrk.net General Infrmatin: inf@famwrk.net Technical

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

Upgrading to PlanetPress Suite Version 5

Upgrading to PlanetPress Suite Version 5 Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt

More information

Consolidated Edison Company of New York. Developer Welcome Kit

Consolidated Edison Company of New York. Developer Welcome Kit Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable

More information

How to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved

How to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved Hw t Install a Slate Tile Flr By See Jane Drill TM Cpyright 2014, All Rights Reserved Resurces Needed t Cmplete the Jb Tls & Supplies Pwer drill with mixing want (a bucket trwel can als be used fr mixing)

More information

Transmission Substation Field Instructions

Transmission Substation Field Instructions 4.14 Substatin Permits Purpse This instructin deals with the use f permits t wrk in Hrizn Pwer s, and must be read in cnjunctin with FI 4.4 Secndary Islatins. Scpe The persnnel cvered by this instructin

More information

SVT Tab and Service Visibility Tool Job Aid

SVT Tab and Service Visibility Tool Job Aid Summary This Jb Aid cvers: SVT Tab Overview Service Visibility Tl (SVT) Area Overview SVT Area: Satellite Mdem Status (Frm Mdem) Clumn SVT Area: Satellite Mdem Status (Frm SMTS) Clumn SVT Area: Prvisining

More information

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com SARMAP RELEASE NOTES Versin: 7.0 (July 2016) 55 Village Square Dr. Suth Kingstwn, RI 02879 Tel: (401) 789-6224 Fax: (401) 789-1932 Email: MapSupprt@ Table f Cntents Table f Cntents...ii 1 Intrductin...

More information

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server.

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server. Autmatic impsitin Page 1/8 Autmatic impsitin Descriptin Autmatic impsitin will d the mst cmmn impsitins fr yur digital printer. It will autmatically d flders fr A5, A4 r US Letter page sizes in either

More information

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS DT0069 Design tip Enabling the Bluetth Lw Energy Direct Test Mde (DTM) with BlueNRG-MS By Salv Bnina Main cmpnents BlueNRG-MS Upgradable Bluetth Lw Energy netwrk prcessr SPBTLE-RF Very lw pwer mdule fr

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Please save and send as a wrd file. Yu can attach a map in PDF r JPG with the applicatin t usrutes@aasht.rg (M.Vitale) An Applicatin frm the

More information

You Be The Chemist Challenge Official Competition Format

You Be The Chemist Challenge Official Competition Format 2018-2019 Yu Be The Chemist Challenge Official Cmpetitin Frmat This dcument prvides detailed infrmatin regarding the Challenge frmat at each level f the cmpetitin. Schl Crdinatrs, participants, and parents/guardians

More information

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY. Applicatin Package Checklist Cpy f Distributed Generatin frm Renewable Resurces Rider Cpy f Technical Requirements fr Distributed Generatin Agreement Cpy f Applicatin fr Intercnnectin and Parallel Operatin

More information

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017 Cleveland Public Theatre Catapult Request fr Prpsals Cleveland Public Theatre s New Play Develpment CPT s missin is t raise cnsciusness and nurture cmpassin thrugh grundbreaking perfrmances and life-changing

More information

Big Kahuna Assembly Instructions

Big Kahuna Assembly Instructions Big Kahuna Assembly Instructins Thank yu fr purchasing a d-it-yurself pergla kit frm Average Je s Pergla Dept. We appreciate yur business, and we are here t help yu in any way pssible. Read this entire

More information

idcv Isolated Digital Voltmeter User Manual

idcv Isolated Digital Voltmeter User Manual www.akcp.cm idcv Islated Digital Vltmeter User Manual Help Versin updated till firmware SP446 Cpyright 2011, AKCess Pr Limited Prvided by fficial AKCP-Distributr Didactum https://www.didactum-security.cm/en/

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

PhotoVu Digital Picture Frame Service & Repair Guide

PhotoVu Digital Picture Frame Service & Repair Guide PhtVu Digital Picture Frame Service & Repair Guide PhtVu, LLC 2450 Central Ave, #G1 Bulder, CO 80301 USA www.phtvu.cm/supprt Versin: 1.0 Table f Cntents Getting Started... 3 Determine Yur Generatin f PhtVu

More information

CUSTOMER PORTAL. Floorplan Management

CUSTOMER PORTAL. Floorplan Management CUSTOMER PORTAL Flrplan Management FLOORPLAN ANALYTICS The flrplan analytics area displays flrplans yu have uplad t the prtal (if yu haven t yet upladed a flrplan please cntact ur supprt department). Frm

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad with min. 5 kg 405000090 405070090 INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main dimensins. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

City of Sarasota Public Art Requirements Information Package

City of Sarasota Public Art Requirements Information Package City f Sarasta Public Art Requirements Infrmatin Package APPLICABILITY: Any prperty wner r develper wh applies t the City fr a Building Permit t cnstruct r make imprvements that exceed $250,000.00 in cnstructin

More information

PAPER SPACE AND LAYOUTS

PAPER SPACE AND LAYOUTS PAPER SPACE AND LAYOUTS There are tw distinct wrking envirnments in AutCAD namely: Mdel Space and Paper space. Prjects can be develped by either wrking in the mdel space thrugh the use f MVSETUP r PAPER

More information

Township of Derry. Dauphin County, Pennsylvania. Residential Deck Addition Submittal Guide and Construction Fact Sheet

Township of Derry. Dauphin County, Pennsylvania. Residential Deck Addition Submittal Guide and Construction Fact Sheet Twnship f Derry Dauphin Cunty, Pennsylvania Residential Deck Additin Submittal Guide and Cnstructin Fact Sheet The text and illustratins included in this guide represent tables and illustratins frm the

More information

Archi-take on Laboratory Furniture

Archi-take on Laboratory Furniture Archi-take n Labratry Furniture Published In: Express Pharma, July 1-15, 2011 Link: Archi-take n labratry furniture - Express Pharma The labratry envirnment is the place where creative and practical wrk

More information

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks Briefing n Discussins Regarding a Master Lease Agreement fr the Intelligent Digital Kisks Cmmittee-f-the-Whle September 11, 2018 Nevin Grinnell Vice President Chief Marketing Officer 1 Agenda Backgrund

More information

Figure 1: A Battleship game by Pogo

Figure 1: A Battleship game by Pogo CSCI 2312-002: Object Oriented Prgramming Final Prject Assigned: Octber 17, 2017 Design Due: Octber 24, 2017 IN CLASS (Graded as ne hmewrk grade) Final prject Due: Nvember 16, 2017 at 11:59 PM Fr many

More information

Pre-Installation Preparation Job Aid

Pre-Installation Preparation Job Aid Summary This Jb Aid cvers: ViaSat Installatin Standards Equipment Necessary fr ViaSat Service installatin Installatin Tls Safety: IDU Safety: ODU Safety: Persnal Safety: Wrking Arund Electricity Safety:

More information

TROUBLESHOOTING GUIDE

TROUBLESHOOTING GUIDE TROUBLESHOOTING GUIDE Dcument revisin 1.3 Last revised: December 6, 2017 Recn Wireless Blckage and Flw Mnitr Trubleshting Guide 2014-2017 Intelligent Agricultural Slutins All Rights Reserved. Recn Wireless

More information

Developed By: Firefighter Alex Chapin August 2017

Developed By: Firefighter Alex Chapin August 2017 F O G N A I L O P E R A T I O N S 1. 1 Develped By: Firefighter Alex Chapin August 2017 T A S K S K I L L D E S C R I P T I O N A N D D E T A I L The fgnail, when deplyed in a timely and accurate manner

More information

Models 7008, 7034, 7035, 7035R & 7041 Planar Blind-Mate Connectors, dc to 40.0 GHz

Models 7008, 7034, 7035, 7035R & 7041 Planar Blind-Mate Connectors, dc to 40.0 GHz Mdels 7008, 7034, 7035, 7035R & 7041 Planar Blind-Mate Cnnectrs, dc t 40.0 GHz Threadless Cnnectr System / S pace Saving / L ng Life Features Threadless Cnnectr Mating - This blind-mate cnnectr series

More information

5500K LED Module. 123,000- hours to a 30% decrease in brightness Aluminum Printed circuit board, Cree LEDs

5500K LED Module. 123,000- hours to a 30% decrease in brightness Aluminum Printed circuit board, Cree LEDs 5500K LED Mdule Descriptin: Size, Quantity f LEDs, Pwer, Brightness Vltage Dimming CRI: (R4) 84 ~6 x 6 x 0.28-in, 36 LEDs, 6-watts, 60 lm ~6 x 6 x 0.28-in, 49 LEDs, 8-watts, 830 lm ~2 x 2 x 0.28-in, 44

More information

Call to Artists. PO Box 369 Lake Oswego, OR

Call to Artists. PO Box 369 Lake Oswego, OR PO Bx 369 Lake Osweg, OR 97034 503.675.2531 www.artscuncill.rg Call t Artists Prgram & Lcatin: Gallery Withut Walls, Lake Osweg, Oregn Budget: $850.00 hnrarium / An pprtunity t be nminated fr an up t $15,000

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Please save and send as a wrd file. Yu can attach a map in PDF r JPG with the applicatin t usrutes@aasht.rg (M.Vitale) An Applicatin frm the

More information

SITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1

SITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1 SUBMITTAL GUIDELINES FOR SITE PLAN & BUILDING ELEVATIONS APPROVAL Planning Department City f Cedar Hill Zning Regulatins requires a SITE PLAN and BUILDING ELEVATIONS t be apprved by the City Cuncil befre

More information

MANUFACTURED HOME New Homes, Replacements, and Additions SUBMITTAL REQUIREMENTS

MANUFACTURED HOME New Homes, Replacements, and Additions SUBMITTAL REQUIREMENTS Carsn City Building Divisin 108 E. Prctr Street Carsn City, Nevada 89701 (775) 887-2310 Hearing Impaired: 711 bldgdiv@carsn.rg www.carsn.rg/building MANUFACTURED HOME New Hmes, Replacements, and Additins

More information

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting Revisin Date: 12/31/2012 Table f Cntents 1. Institutin, Cre Facility and Lab Administratin Reprting Overview...2 2. Hw d I access ilab Reprts?...3 3. What is the General Functinality fr ilab Reprting?...6

More information

CATA Composer R2016 Fact Sheet. Add a New Dimension to Your Product Communications

CATA Composer R2016 Fact Sheet. Add a New Dimension to Your Product Communications CATA Cmpser R2016 Fact Sheet Add a New Dimensin t Yur Prduct Cmmunicatins Versin 1.0-8/11/2015 Table f Cntents 1. CATIA Cmpser: VALUE AT A GLANCE... 3 2. CATIA Cmpser: Overview... 4 2.1. Immediate Prductivity

More information

Alberta Infrastructure. Digital Project Delivery COBie Requirements

Alberta Infrastructure. Digital Project Delivery COBie Requirements Alberta Infrastructure Digital Prject Delivery COBie Requirements COBie Requirements Table f Cntent COBie Requirements Objective 2 COBie Standard 2 1. COBie Deliverable 3 1.1 Cmpressed File 3 1.2 The COBie

More information

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment BLM-Alaska Yukn Lwlands - Kuskkwim Uplands - Lime Hills Rapid Ecreginal Assessment Cmmunicatin and Cllabratin Strategic Framewrk and Implementatin Plan Intrductin and Overview The purpse f the YKL REA

More information

ComfortView. Application and Technical Overview. Neighborhood Street Lights.

ComfortView. Application and Technical Overview. Neighborhood Street Lights. CmfrtView Neighbrhd Street Lights Applicatin and Technical Overview www.letek.cm LED street lights first entered the marketplace nearly a decade ag. Since that time, millins f luminaires have been specified,

More information

Banner pocket v3 Page 1/7. Banner pocket v3

Banner pocket v3 Page 1/7. Banner pocket v3 Banner pcket v3 Page 1/7 Banner pcket v3 Descriptin Banner pcket will help yu get the printed sheets arranged in the way yu need fr attaching the frnt and back side pckets tgether. It will crp ne sides

More information

New construction or additions permit guide

New construction or additions permit guide Cmmunity Develpment Department 12350 W. 87 th St. Pkwy., Lenexa, KS 66215 913.477.7700 fax 913.477.7730 New cnstructin r additins permit guide The infrmatin prvided are general requirements which shuld

More information

BASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines

BASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines BASIC SAFETY AND FABRICATION GUIDE Safety Guidelines These manuals are designed t give basic guidelines t help ensure that Century Quartz Stne Surfaces prducts are t be handled, stred, fabricated, and

More information

The WHO e-atlas of disaster risk for the European Region Instructions for use

The WHO e-atlas of disaster risk for the European Region Instructions for use The WHO e-atlas f disaster risk fr the Eurpean Regin Instructins fr use 1 Last Update: June 2011 Cntents 1. Basic system requirements... 3 2. Structure f the WHO e-atlas... 4 2.1. Main menu... 4 2.1.1.

More information

Creating Gift Card Batches

Creating Gift Card Batches Every active custmer gift card issued is a part f a batch f gift cards. Prir t activating any individual gift card, yu must define a batch f gift cards and any accmpanying rules that apply t each batch.

More information

Wireless Bridge Module for DXR2.E

Wireless Bridge Module for DXR2.E Technical Specificatin Sheet Dcument N. A6V11470500 July 31, 2018 Wireless Bridge Mdule fr DXR2.E Descriptin A wireless bridge cnnects tw wired netwrks tgether ver Wi-Fi utilizing a Wireless Access Pint.

More information

KIP Cost Center User Guide

KIP Cost Center User Guide - 1 - KIP Cst Center User Guide Cntents 1 Intrductin... 3 1.1 Requirements:... 4 1.2 Supprted Operating Systems... 4 2 Installatin... 5 3 Setup... 8 4 KIP Cst Center Main Screen Print Mde... 12 4.1 Lading

More information

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data IR Emitter and Detectr 1. Descriptin Lite-On ffers a brad range f discrete infrared cmpnents fr applicatin such as remte cntrl, IR wireless data transmissin, security alarm & etc. Custmers need infrared

More information

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden Internet:

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden   Internet: SARAD GmbH Tel.: 0351 / 6580712 Wiesbadener Straße 10 FAX: 0351 / 6580718 01159 Dresden e-mail: supprt@sarad.de GERMANY Internet: www.sarad.de APPLICATION NOTE AN-001_EN The Installatin f autnmus instrumentatin

More information

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics Martel LC-110H Lp Calibratr and HART Cmmunicatins/Diagnstics Abstract Martel Electrnics Crpratin This white paper describes the basic functins f HART cmmunicatins and the diagnstic capability f the Martel

More information

Flash Image Rotator Web Part

Flash Image Rotator Web Part Flash Image Rtatr Web Part User Guide Cpyright 2007 Data Springs Inc. All rights reserved. Table f cntents: 1 INTRODUCTION...3 2 INSTALLATION PROCEDURE...4 2.1 After installatin ntes:...5 2.2 Trubleshting...6

More information

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist Annex IX Fr each requirement in the Functinal and Technical Specificatins stated belw, the Tenderer shall cmment cmpliance and detail hw the requirement is fulfilled. 4. Prject Cntents 4.1 Cllectin and

More information

PotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC)

PotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC) PtashCrp Tier 1 Safety Standard Date Revisin Changes 03/09/2016 0 Dcument issued 11/01/2016 1 Apprved by Nutrient Presidents 1.0 Purpse This prcedure utlines the PtashCrp (PCS) Flame Resistant Clthing

More information

State Bank Virtual Card FAQs

State Bank Virtual Card FAQs State Bank Virtual Card FAQs 1. What is State Bank Virtual Card? State Bank Virtual Card is a limit Debit card, which can be created using the State Bank Internet Banking facility fr ecmmerce (nline) transactins.

More information

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start:

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start: Claim Amalgamatin Amalgamate means t jin 2 r mre cell claims int ne cell claim. Befre yu start: Yu will need t knw the title numbers f the cell titles fr amalgamatin. If yu are acting as an agent, yu must

More information

Chapter 15 Integration and (De-)installation

Chapter 15 Integration and (De-)installation Chapter 15 Integratin and (De-)installatin P. Fessia and S. Weisz CERN, Acceleratr & Technlgy Sectr, Geneva, Switzerland 15 Integratin and (de-)installatin 15.1 Gegraphical distributin f HL-LHC upgrade

More information

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector CAMPBELL COUNTY GILLETTE, WYOMING Electrical Inspectr Senir Electrical Inspectr Class specificatins are intended t present a descriptive list f the range f duties perfrmed by emplyees in the class. Specificatins

More information

Excel Step by Step Instructions Creating Lists and Charts. Microsoft

Excel Step by Step Instructions Creating Lists and Charts. Microsoft Infrmatin Yu Can Enter in a Wrksheet: Labels: Any type f text r infrmatin nt used in any calculatins. Labels are used fr wrksheet headings and make wrksheets easy t read and understand. Labels can als

More information

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL Yu will learn the fllwing in this lab: The UNIVERSITY f NORTH CAROLINA at CHAPEL HILL Cmp 541 Digital Lgic and Cmputer Design Prf. Mntek Singh Fall 2016 Lab Prject (PART A): Attaching a Display t the Prcessr

More information

PowerGuide 200 SkyLight

PowerGuide 200 SkyLight All-Dielectric, Self Supprting (ADSS) Aerial Lse Tube Fiber Optic Cable Dry cre design PwerGuide 200 SkyLight Fiber Cunt Tubes Cre Design Outer Diameter [mm] accrding t OFS Generic Specificatin Applicatin

More information

6/22/17 MEMO TO: CALL TO TEEN ARTISTS (AGES 15-18) NEW Creative Crosswalk project in ViBe District

6/22/17 MEMO TO: CALL TO TEEN ARTISTS (AGES 15-18) NEW Creative Crosswalk project in ViBe District 6/22/17 MEMO TO: CALL TO TEEN ARTISTS (AGES 15-18) RE: NEW Creative Crsswalk prject in ViBe District ViBe Creative District will hst a NEW creative crsswalk painting event n the Secnd Saturday f July (7/8/17)

More information

Hospital Task Scheduling using Constraint Programming

Hospital Task Scheduling using Constraint Programming Hspital Task Scheduling using Cnstraint Prgramming Authr: Chaman Chahal Supervisr: Dr. P. Bse, Schl f Cmputer Science Organizatin: Carletn University Curse: COMP4905 Date: Dec. 11, 2012 1 Abstract Hspitals

More information

DS1112SG. Rectifier Diode DS1112SG KEY PARAMETERS V RRM I F(AV) I FSM FEATURES 6000V 811A 10500A APPLICATIONS VOLTAGE RATINGS

DS1112SG. Rectifier Diode DS1112SG KEY PARAMETERS V RRM I F(AV) I FSM FEATURES 6000V 811A 10500A APPLICATIONS VOLTAGE RATINGS DS1112SG Rectifier Dide Replaces January 2000 versin, DS4181-4.0 DS4181-5.0 August 2001 FEATURES Duble Side Cling High Surge Capability APPLICATIONS Rectificatin Freewheel Dide DC Mtr Cntrl Pwer Supplies

More information

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION Date f Request: Prperty Owner Name: (Please Print) Prperty Address: Day Time Phne: ( ) E-Mail: Est. Start Date: Est. Cmpletin Date: The hmewner must ntify the Prperty Management Office, via e-mail, upn

More information

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1 Altis Flight Manager PC applicatin fr AerbTec devices AerbTec Altis v3 User Manual 1 Table f Cntents Intrductin...3 Requirements...3 Installatin...3 Applicatin...3 USB Driver fr Altis v3 interface ALink...4.NET

More information

E-Jobsheet Tablet Application Functionality

E-Jobsheet Tablet Application Functionality E-Jbsheet Tablet Applicatin Functinality The e-jbsheet applicatin has been created fr Truck Service Prviders (TSP) in rder fr their admin staff and fitters t handle all types f wrk via a mbile platfrm

More information

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 Apprval Amendment Recrd Apprval Date Versin Descriptin 01/08/2017 1 Initial Issue under MTM. Supersedes PTV DMS Dispensatin Prcess & L1-CHE-INS-002

More information

Roof Safe Netting CONTENTS

Roof Safe Netting CONTENTS Rf Safe Netting CONTENTS SUMMARY OF FEATURES... 2 TECHNICAL INFORMATION... 2 Prduct Descriptin... 2 Applicatins... 2 Prduct Infrmatin... 2 Handling & Strage... 3 Technical Data... 4 Size Range Available...

More information

RZ251W. Remote Sensing & Zoning Installation Guide. Quick Reference. Wireless Range

RZ251W. Remote Sensing & Zoning Installation Guide. Quick Reference. Wireless Range Remte Sensing & Zning Installatin Guide Pr Technlgies P.O. Bx 3377 Springfield, MO 65804 Tll ree : 888-776-47 Web: www.priaq.cm Hurs f Operatin: M- 9AM - 6PM Eastern Table f Cntents Table f Cntents Quick

More information

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005 Netwrk Wrking Grup Request fr Cmments: 4062 Categry: Infrmatinal V. Manral SiNett Crp. R. White Cisc Systems A. Shaikh AT&T Labs (Research) April 2005 Status f This Mem OSPF Benchmarking Terminlgy and

More information

Northern Powergrid Appendices A and B for ENA Engineering Recommendation G81 Part 1: Design and Planning

Northern Powergrid Appendices A and B for ENA Engineering Recommendation G81 Part 1: Design and Planning Versin:- 2.0 Date f Issue:- Sept 2013 Page 1 f 9 Nrthern Pwergrid Appendices A and B fr ENA Engineering Recmmendatin G81 Part 1: Design and Planning Framewrk fr design and planning, materials specificatin,

More information

Figure 1: View, connection compartment closed

Figure 1: View, connection compartment closed Radi Management Art. N. : 2700AP Operating instructins 1 Safety instructins Electrical equipment may nly be installed and fitted by electrically skilled persns. Serius injuries, fire r prperty damage pssible.

More information

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group Crwn Recgnised Spectrum Access in 3400 t 3600 MHz The respnse f Alcatel-Lucent t Ofcm Spectrum Plicy Grup Spectrum Access in 1 3400 t 3600MHz Fr additinal infrmatin and clarificatin, please cntact: Jean-Pierre

More information

Automated Meters Frequently Asked Questions

Automated Meters Frequently Asked Questions Autmated Metering Prject Utilities Divisin Phne: 403.529.8111 Autmated Meters Frequently Asked Questins Intrductin The City f Medicine Hat has cmpleted its prject t install autmated meters fr all electric,

More information

TUTORIAL I ECE 555 CADENCE SCHEMATIC SIMULATION USING SPECTRE

TUTORIAL I ECE 555 CADENCE SCHEMATIC SIMULATION USING SPECTRE TUTORIAL I ECE 555 CADENCE SCHEMATIC SIMULATION USING SPECTRE Cadence Virtus Schematic editing prvides a design envirnment cmprising tls t create schematics, symbls and run simulatins. This tutrial will

More information

SITE PLAN CONTROL APPLICATION SUBMISSION CHECKLIST

SITE PLAN CONTROL APPLICATION SUBMISSION CHECKLIST SITE PLAN CONTROL APPLICATION SUBMISSION CHECKLIST Pre-Cnsultatin Meeting City f Welland Applicatin Fee Regin f Niagara Review Fee NPCA Review Fee Cmpleted Applicatin Frm Ten (10) cpies f all required

More information

Materials: Metals, timber, plastics, composites, smart and nanomaterials Candidates should:

Materials: Metals, timber, plastics, composites, smart and nanomaterials Candidates should: AQA Resistant Materials - Unit 1 Specificatin 2014-4560 Materials: Metals, timber, plastics, cmpsites, smart and nanmaterials Be aware f the surce f a range f materials. Understand they are prcessed fr

More information

VILLAGE COORDINATOR AGREEMENT

VILLAGE COORDINATOR AGREEMENT Date Received at AHSGR VILLAGE COORDINATOR AGREEMENT Frm materials written by the riginal funders f AHSGR, we knw that the grup f peple wh gt tgether in the late 1960s t frm what was t later becme AHSGR

More information