1 APPENDIX B TRAFFIC IMPACT STUDY CRITERIA

2 Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r planned street system. A (TIS) shall be required fr prpsed develpments with peak hur trip generatin vlumes anticipated t exceed 50 vehicles during any peak hur. The primary respnsibility fr assessing the traffic impacts assciated with a prpsed develpment will rest with the applicant, with the Cunty serving in a review capacity. The fllwing shall require a written TIS: a. A rezning, inclusive f majr amendments t a planned develpment and use by special review applicatins. In the case f a rezning where the prpsed zning is anticipated t generate less traffic than the existing zning, a letter summarizing the trip generatin characteristics f the applicatin, including a cmparisn t the trip generatin characteristics f the existing zning may be submitted in lieu f a full TIS. (see Traffic Impact Study Cmpliance Letter requirements in this Appendix B) b. A preliminary plan r final plat. c. Site access is required ff a State Highway. Prir t issuing an access permit, apprval frm bth the Cunty and the Clrad Department f Transprtatin (CDOT) must be btained. d. Additinal access ff a State Highway t an existing use is being requested. e. Any change f use affecting access frm a State Highway. f. The applicant will be required t submit a new TIS if, after submitting the riginal TIS fr any f the abve submittals, the land use intensity is increased by mre than 20% r the land use is changed s that trip generatin is increased by mre than 20%. g. The applicant will be required t update an existing TIS if the existing TIS related t the develpment is mre than tw years ld, unless the Cunty determines the cnditins have nt changed significantly. Scping the TIS Transprtatin cnsultants are required t meet with and discuss prjects with Cunty staff prir t starting the TIS. At a minimum, tpics fr discussin at such meetings will include trip generatin, directinal distributin f traffic, trip assignment, definitin f the study area, intersectins requiring capacity/level f service (LOS) analysis, and methds fr prjecting build-ut vlume. Specific requirements will vary depending n the site lcatin and develpment prpsal. The scpe f the TIS shall be cmmensurate with the scale and scpe f prbable peratinal and safety impacts t the general street system. A general guideline related t determining the extent f the study area, is t carry the analysis ut at least as far as thse areas where newly generated site traffic represents 5 percent r mre f a radway s peak hur capacity. Where site generated traffic will be less than 5 percent f the radway capacity, the study area limits wuld, at minimum, include all site accesses, Duglas Cunty Radway Design and Cnstructin Standards Page B-1

3 adjacent radways and adjacent majr intersectins, and at maximum wuld als include all radways and cllectr/cllectr and cllectr/arterial intersectins, extending frm the prpsed develpment t and including the intersectin with the nearest state r federal highway. The study area and/r imprvement cmmitments may extend int ther jurisdictins r incrprated areas. The TIS will be the respnsibility f the applicant and must be prepared, stamped and signed by a licensed Prfessinal Engineer registered in the State f Clrad with adequate experience in Transprtatin Engineering. Upn submissin f a draft TIS, the Cunty will review the study data surces, methds, and findings. Cmments will be prvided in a written frm. The applicant and the prject engineer will then have an pprtunity t incrprate necessary revisins prir t submitting a final reprt. TIS Frmat In rder t prvide cnsistency and t facilitate staff review f a TIS, the fllwing frmat must be fllwed in the preparatin f such studies by transprtatin cnsultants. Intrductin The intrductin prtin f the TIS must cntain the fllwing: a. Develpment Site and Study Area Bundaries A brief descriptin f the size f the land parcel, existing land uses, general terrain features, and the lcatin within the jurisdictin shall be included. The exact limits f the study area shall be based n engineering judgment, and an understanding f existing traffic cnditins surrunding the site. In all instances, hwever, the applicant, engineer, and the Cunty must mutually agree upn the study area limits. These limits will usually result frm initial discussins with staff. A vicinity map that shws the site and the study area bundaries, in relatin t the surrunding transprtatin system, must be included. b. Prpsed Develpment Descriptin The specific prpsed land use types(s) and size(s) must be identified. If the develpment is t be built in a phased manner, the types and sizes f the land use in each phase, as well as the prjected cmpletin date f each phase, shall be identified. If specific land uses are nt knwn, the mst intense use (in terms f traffic generatin) allwed by current r prpsed zning must be assumed fr the TIS. c. TIS Scpe The agreed upn scpe f the TIS, in terms f the study intersectins, driveways, and radway segments, time perids and future scenaris t be analyzed, must be briefly described. Existing Cnditins The current traffic cnditins within the study area must be identified. Duglas Cunty Radway Design and Cnstructin Standards Page B-2

4 a. Radway Netwrk Within the study area, the applicant must describe existing radways and intersectins including radway classificatin, speed limits, gemetrics, traffic cntrl etc. A map must be prvided shwing the lcatin f such facilities as well as surrunding land use and zning. b. Traffic Vlumes The current traffic vlumes at identified intersectins (turning mvements) and radway links (24 hur vlume cunts) fr the study time perids must be measured. At a minimum mrning and evening (A.M. and P.M.) peak perid turning mvement cunts will be required. Turning mvement vlumes fr ther perids may be required. Traffic vlumes ver tw years ld will nt be accepted. A graphic shwing these vlumes shall be included. All raw traffic cunt data (including average daily traffic vlumes and peak hur turning mvements) shall be included in the appendices f the reprt. c. Levels f Service (LOS) The current traffic peratins LOS within the study area shall be described during the identified time perids. LOS shall be determined using the peratinal methdlgy as detailed in the mst recent versin f the Highway Capacity Manual (HCM). The Cunty will prvide the apprpriate existing traffic signal timing values. All calculatins must be included in the appendices f the TIS and electrnic data files must accmpany the TIS submittal. d. Traffic Safety Analysis Analysis f available entering sight distance at all prpsed site access pints (per Chapter 4 f these Standards). Traffic crash data fr radway crridrs affected by the prpsed develpment may be required fr the TIS. The safety analysis perid will nrmally be the mst recent three years. The Cunty will specify when a traffic safety analysis will be required. Site Traffic/Trip Prjectins a. Site Trip Generatin A summary table listing type, size, the Institute f Transprtatin Engineers (ITE) Trip Generatin - Land Use Cde fr each land use in the develpment, trip generatin rates used, and the resultant ttal trips fr each time perid analyzed must be prvided. Trip generatin rates frm the mst current ITE Trip Generatin manual shall be used. In the event that data fr the prpsed develpment is unavailable, trip generatin frm similar land uses, either frm ther surces, jurisdictins, r field studies, may be used with Cunty apprval. With apprval, these surces may be used t supplement ITE Trip Generatin data. Fr phased develpments, trip generatin fr each phase, as well as develpment build-ut, shall be prvided. b. Site Trip Reductins Use f the fllwing types f trip reductin factrs may be cnsidered with apprval f the Cunty. Duglas Cunty Radway Design and Cnstructin Standards Page B-3

5 Pass-by factrs as published in the current ITE Trip Generatin manual. Pass-by factrs are t be used t reduce the prjected additinal ttal daily traffic t street(s) serving a prpsed develpment. They are nt t be applied directly t reduce trip generatin and turning mvement vlumes at driveways serving the prpsed develpment. Internal trip assumptins with analytical supprt. Mdal split assumptins with analytical supprt. Fr example, when the prpsed develpment is lcated in a transit riented develpment r within a quarter f a mile f a majr transit crridr, a trip reductin may be applicable. c. Site Trip Distributin The estimates f percentage distributin f trips frm the prpsed develpment t destinatins in the metr regin must be clearly stated in the reprt using the nrth, suth, east, and west cmpass pints. Trip distributin shuld be based n actual traffic data. Market studies and infrmatin cncerning rigin f trip attractins t the prpsed develpment may be used t supprt these assumptins where available. A graphic shwing the percentage f site traffic n each street must be prvided as part f the TIS. d. Traffic Assignment The directin f apprach f site-generated traffic via the area s street system must be presented in this sectin. The technical analysis steps, basic methds, and assumptins used in this wrk must be clearly stated and agreed t by the Cunty. The assumed trip distributin and assignment must represent the mst lgically traveled rutes fr drivers accessing the prpsed develpment. These rutes can be determined by bservatin f travel patterns t existing land uses in the study area. A graphic shwing the site traffic assignment n the surrunding radway netwrk must be included. Backgrund Cnditins Backgrund traffic grwth fr intersectins and radways within the study area must be determined fr the pening date f the prpsed develpment (shrt-term) and in the twenty-year planning hrizn r area build-ut (lng-range) withut influence f the prpsed site, as determined by the Cunty. Fr large develpments, analysis f additinal hrizns may be required. a. Apprved Develpments Traffic frm platted but un-built develpments within the study area, r having impact n the study area, shall be added t the apprpriate planning hrizn (based n expected level f build-ut f the apprved plat(s)). Typically this will primarily affect the backgrund traffic at the time f the pening f the prpsed develpment; hwever traffic generated by sme larger apprved prjects may nt impact the area until after pening. This traffic must be added int the twenty-year planning hrizn. b. General Grwth In additin t apprved develpments, reginal traffic grwth will affect backgrund traffic vlumes at bth analysis scenaris. Future traffic grwth shall be develped thrugh means determined apprpriate by Duglas Cunty, such as the DRCOG, Duglas Cunty Transprtatin Master Plan, grwth rate methdlgy etc. The Cunty will determine whether prpsed general traffic grwth rates are acceptable. Duglas Cunty Radway Design and Cnstructin Standards Page B-4

6 c. Currently Planned Radway Imprvements Radway imprvements that wuld impact traffic cnditins within the study area and that are currently planned and funded may be included in the future base cnditins, as apprpriate. Include the nature f the imprvement prject, its extent, implementatin schedule, and the agency r funding surce respnsible. d. Backgrund LOS The backgrund traffic LOS within the study area, withut influence f the prpsed site, shall be described during the identified time perids. LOS shall be determined using the peratinal methdlgy as detailed in the mst recent versin f the (HCM). The extent f vehicle queuing and its ptential impact t adjacent intersectins shall be evaluated using a Pissn s distributin methdlgy (see the Queuing Analysis sectin f this Appendix B), r ther methd apprved by the Cunty. Fr unsignalized intersectins, the current HCM methdlgy fr determining LOS shall be used t identify prjected backgrund traffic cnditins. Backgrund traffic vlumes and LOS shall be shwn in graphical frmat fr each analysis scenari studied. All LOS calculatins shall be included in an appendix t the TIS and electrnic data files must accmpany the TIS submittal. Prjected Site Traffic Impacts Traffic impacts f the prpsed develpment shall be analyzed fr the anticipated pening time frame, including all prject phases, and the identified planning hrizn. Shrt-term a. Ttal Traffic Site Opening. The ttal prjected traffic vlumes at the day f develpment cmpletin shall be determined by adding the prpsed site generated traffic t the shrt-term backgrund traffic. Ttal traffic vlumes n study area radways at prpsed pening shall be shwn in graphical frmat. b. Level f Service Site Build-ut. The LOS within the study area at develpment cmpletin shall be described during the identified time perids. LOS shall be determined using the peratinal methdlgy as detailed in the mst recent versin f the (HCM). Fr signalized intersectins and/r radway segments in zning applicatins, LOS D will be the design bjective in urban areas and LOS C will be the design bjective in nnurban areas. Urban and nnurban areas shall be determined by Cunty staff based n the Duglas Cunty Cmprehensive Master Plan. Fr all ther types f develpment (nt related t zning), LOS D will be the design bjective fr verall signalized intersectin peratin at develpment pening and build-ut. Under n circumstances shall the develpment cause a drp belw an verall LOS E at signalized intersectins fr any analysis scenari. Fr analysis f unsignalized intersectins, the current HCM methdlgy fr determining LOS shall be used t identify prjected traffic cnditins. Duglas Cunty Radway Design and Cnstructin Standards Page B-5

7 c. Mitigatin Site Opening. At intersectins within the study area with prjected LOS E r wrse, mitigatin measures shall be identified t bring the intersectin peratin t an acceptable level. Lng-range a. Ttal Traffic Lng-range Prjectin. The ttal prjected traffic vlume at the lng-range hrizn year shall be determined by adding the prpsed site generated traffic t the lng-term backgrund traffic. Ttal traffic vlumes at the lng-range hrizn year shall be shwn in graphical frmat. b. Level f Service Lng-range Prjectin. The lng-range LOS within the study area shall be described during the identified time perids. LOS shall be determined using the peratinal methdlgy as detailed in the mst recent versin f the HCM. The design bjective fr the lng-range LOS with the prpsed develpment shuld be n wrse than the lng-range LOS prjectins (backgrund) withut the influence f the prpsed site. The extent f queuing and its ptential impact t adjacent intersectins shall be evaluated using a Pissn s distributin methdlgy (see Queuing Analysis sectin f this Appendix B), r ther methd apprved by the Cunty. The current HCM methdlgy fr determining LOS shall be used t identify prjected traffic cnditins at unsignalized intersectins. c. Mitigatin Lng-Range Prjectin. At intersectins with unacceptable prjected LOS (as defined in b., abve), mitigatin measures shall be identified t bring intersectin peratin t an acceptable level. LOS values shall be tabulated in a single table fr all study intersectins, analyzed time perids, and analysis scenaris. All LOS calculatins shall be included in the appendices and electrnic data files must accmpany the TIS submittals. Cnclusins and Recmmendatins This chapter f the TIS is a descriptin f the study findings and shall include: a. Identified Imprvements. This sectin describes the lcatin, nature, and extent f prpsed imprvements that wuld be necessary t ensure sufficient radway capacity at design bjective LOS. A graphic f each imprvement shuld be prvided shwing the length, width and ther pertinent gemetric features f the prpsed imprvements. b. Operatinal Analysis at Critical Pints. Anther iteratin f the LOS analysis must be described, which demnstrates the anticipated level f service as a result f making the prpsed imprvements. c. Traffic Vlume Prprtin. Percentages based n the traffic impact analysis may be required by the Cunty t identify the prprtin f traffic using varius public imprvements (bth existing and prpsed) frm several develpments within the study area. Duglas Cunty Radway Design and Cnstructin Standards Page B-6

8 Fair share percentage calculatins shall be based n the traffic grwth and nt a percentage f the ttal (grwth plus site) traffic. Ptential Mitigatin Measures Any type f ptential mitigatin measures, including new radways, additinal traffic lanes n existing radways, and changes t traffic cntrl are required t be apprved by Duglas Cunty. Rundabuts as Mitigatin Measures At intersectins f tw radways that are prjected t perate at a pr LOS r require signalizatin, Duglas Cunty will require evaluatin f a mdern rundabut as a mitigatin measure. Traffic Signals as Mitigatin Measures The need fr new traffic signals will be based n warrants cntained in the Manual n Unifrm Traffic Cntrl Devices (MUTCD) and any additinal warrants established by the Natinal Cmmittee n Unifrm Traffic Cntrl Devices. In determining the lcatin f a new signal, traffic prgressin is f paramunt imprtance. Generally, a spacing f ne-half mile fr all signalized intersectins shuld be maintained. This spacing is usually desirable t achieve gd speed, capacity, and ptimum signal prgressin. Pedestrian mvements must be cnsidered in the evaluatin and adequate pedestrian clearance prvided in the signal cycle split assumptins. T prvide flexibility and ensure ptimum tw-way signal prgressin, an apprved traffic engineering analysis must be made t prperly lcate all prpsed accesses that may require signalizatin. The sectin f radway t be analyzed fr signal prgressin will be determined by the Cunty and will include all existing and pssible future signalized intersectins. The prgressin pattern calculatins must use a cycle cnsistent with current signal timing plicies f the Cunty. A desirable bandwidth f 50% f the signal cycle shuld be used where existing cnditins allw. Where intersectins have n signals presently, but are expected t have signals, typically a 60% mainline, and 40% crss street cycle split shuld be assumed. Cycle split assumptins must relate t vlume assumptins in the capacity analysis f individual intersectins and cnsider pedestrian clearance times in the develpment f time/space diagrams. The green time allcated t the crss street will be n less than the time which is required fr a pedestrian t clear the main street using MUTCD standards. Thse intersectins that wuld reduce the ptimum bandwidth if a traffic signal were installed may be required t remain unsignalized and have turning mvements limited by access design r median islands. Refer t sectin 3 f the State Highway Access Cde fr signal spacing n State highways. Queuing Analysis A 95%-ile (using Pissn s distributin) queue length will be used as the basis f strage length design and verificatin f the adequacy f existing strage lengths. Alternative methdlgies, such as SynchrTM 95th percentile length calculatins may be used with Cunty apprval. At signalized intersectins, a backgrund cycle length f 120 secnds shall be assumed. Green times fr specific mvements shall be based n the mvement s prprtin f the critical lane vlume, subject t phase Duglas Cunty Radway Design and Cnstructin Standards Page B-7

9 minimums. Minimum greens shall be assumed t be 10 secnds fr thrugh mvements and 4 secnds fr left turns. Yellw change and red clearance intervals shall be assumed t be 3 secnds and 2 secnds, respectively fr left turn mvements and 4 secnds and 2 secnds, respectively fr thrugh mvements. Fr lane grups that have multiple lanes, a lane utilizatin factr, in accrdance with the HCM methdlgy, shall be applied t the calculatin f queue lengths. Electrnic data files must accmpany the TIS submittal. Revisins t Traffic Impact Study Revisins t the TIS must be prvided as required by the Cunty. The need t require revisins will be based n the cmpleteness f the TIS, the thrughness f the impact evaluatin, the adequacy f prpsed imprvements and mitigatin measures, and the cmpatibility f the TIS with the prpsed access and develpment plan. Traffic Impact Study Cmpliance Letter A standard TIS apprved fr a develpment that has been master planned may be used as reference fr the further develpment f individual lts r subareas. The required TIS fr subareas may take the frm f a TIS Cmpliance Letter. The applicant in this case may submit a Cmpliance Letter cnfirming the riginal standard TIS validity as related t the current applicatin. The Cunty may als require additinal infrmatin beynd the Cmpliance Letter. Cmpliance Letter Qualifying Cnditins A TIS Cmpliance Letter may be cnsidered if all f the fllwing cnditins are present: A standard TIS fr the area has been cmpleted, and accepted by the Cunty. Ttal prjected Trip Generatin (per the ITE Trip Generatin Manual) including the lt r subarea is less than r equal t the build-ut scenari assumptins in the standard TIS. Trip distributin is expected t be similar t thse prjected in the standard TIS. Access t the lt r subarea is unchanged frm the standard TIS. If the standard TIS is ut f date as determined by Cunty staff, additinal data cllectin and analysis may be required. Submittal f a Cmpliance Letter The applicant must prvide the fllwing infrmatin in a letter prepared, stamped, and signed by the transprtatin cnsultant engineer. The Cmpliance Letter shall include at a minimum the fllwing figures and tables: Intrductin/Prject Descriptin Figure: vicinity map Figure: prpsed develpment site plan Prpsed Cnditins Duglas Cunty Radway Design and Cnstructin Standards Page B-8

10 Site trip generatin Table: trip generatin summary Table: cmparisn f standard TIS trip generatin and prpsed site uses Cnclusins/Recmmendatins Cmpare/Cntrast standard TIS with prpsed develpment. Finding f n significant change t any site attributes including: Operatins Access Parcel layut Cnclusin page(s) f standard TIS Appendix Cver page f standard TIS Trip generatin page(s) f standard TIS Master site plan Duglas Cunty Radway Design and Cnstructin Standards Page B-9

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

DEVELOPMENT APPLICATION

DEVELOPMENT APPLICATION DEVELOPMENT APPLICATION FOR CITY STAFF ONLY PROJECT NUMBER: DATE RECEIVED: RECEIVED BY: NAME OF SUBDIVISION AND/OR PROJECT: Revised April 2018 ITEMS SUBMITTED: Filing Fee* Filing Fee* Land Study/Cncept

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

Dorsey s Search. Name Address Home Telephone Work.  Address. Property Owner s Signature Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

SITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1

SITE PLAN APPROVAL PROCESS Step 1 Step 2 Step 3 Step 4 Step 5 Week 1 SUBMITTAL GUIDELINES FOR SITE PLAN & BUILDING ELEVATIONS APPROVAL Planning Department City f Cedar Hill Zning Regulatins requires a SITE PLAN and BUILDING ELEVATIONS t be apprved by the City Cuncil befre

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Please save and send as a wrd file. Yu can attach a map in PDF r JPG with the applicatin t usrutes@aasht.rg (M.Vitale) An Applicatin frm the

More information

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector CAMPBELL COUNTY GILLETTE, WYOMING Electrical Inspectr Senir Electrical Inspectr Class specificatins are intended t present a descriptive list f the range f duties perfrmed by emplyees in the class. Specificatins

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Please save and send as a wrd file. Yu can attach a map in PDF r JPG with the applicatin t usrutes@aasht.rg (M.Vitale) An Applicatin frm the

More information

City of Sarasota Public Art Requirements Information Package

City of Sarasota Public Art Requirements Information Package City f Sarasta Public Art Requirements Infrmatin Package APPLICABILITY: Any prperty wner r develper wh applies t the City fr a Building Permit t cnstruct r make imprvements that exceed $250,000.00 in cnstructin

More information

The Motorcycle Industry in Europe. L-category vehicles type approval regulation ACEM comments on draft TRL durability study

The Motorcycle Industry in Europe. L-category vehicles type approval regulation ACEM comments on draft TRL durability study L-categry vehicles type apprval regulatin ACEM cmments n draft TRL durability study 1. ACEM members welcme the pprtunity t cmment n the draft TRL durability study. Since 2004, ACEM members have supprted

More information

C&E Mobility Policy (Standard)

C&E Mobility Policy (Standard) C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment

More information

The Corporation of Delta COUNCIL REPORT Regular Meeting. File No.:

The Corporation of Delta COUNCIL REPORT Regular Meeting. File No.: The Crpratin f Delta COUNCIL REPORT Regular Meeting F. 11 T: Mayr and Cuncil File N.: LU007147 Frm: Cmmunity Planning & Develpment Department Date: June 10, 2014 Develpment Permit Amendment fr the Prperty

More information

Bronco Billy s Expansion: Investor Highlights November 2017 FULL HOUSE RESORTS 1

Bronco Billy s Expansion: Investor Highlights November 2017 FULL HOUSE RESORTS 1 Brnc Billy s Expansin: Investr Highlights Nvember 2017 FULL HOUSE RESORTS 1 Frward-lking Statements This presentatin may cntain statements that are "frward-lking statements" within the meaning f the safe

More information

SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM

SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM SBA S ALL SMALL MENTOR PROTÉGÉ PROGRAM March 29, 2018 Richard B. Oliver Orange Cunty Pst Presenter Richard Oliver, a Ls Angeles-based Pillsbury partner, is a leading authrity n gvernment cntracts and disputes

More information

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION Date f Request: Prperty Owner Name: (Please Print) Prperty Address: Day Time Phne: ( ) E-Mail: Est. Start Date: Est. Cmpletin Date: The hmewner must ntify the Prperty Management Office, via e-mail, upn

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON BUILDING SERVICES ENGINEERING PLAN REVIEW GUIDELINES (PRG 2): Guidelines Objective: 1. Imprve cmmunicatins between Building Services and the engineering design cmmunity that prepares

More information

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group Crwn Recgnised Spectrum Access in 3400 t 3600 MHz The respnse f Alcatel-Lucent t Ofcm Spectrum Plicy Grup Spectrum Access in 1 3400 t 3600MHz Fr additinal infrmatin and clarificatin, please cntact: Jean-Pierre

More information

SUBMITTAL REQUIREMENTS FOR PLAT IMPROVEMENTS

SUBMITTAL REQUIREMENTS FOR PLAT IMPROVEMENTS SUBMITTAL REQUIREMENTS FOR The Plat Imprvement prcess invlves the review and apprval f detailed engineering drawings and infrmatin related t an apprved preliminary plat such as grading, radways, sewer,

More information

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations

Submission to the AS/NZS 4760:2017 Consultation on behalf of the IVD Industry in Australia, including Workplace Drug and Alcohol Testing Organisations The industry where innvatin saves mre Australian lives Submissin t the AS/NZS 4760:2017 Cnsultatin n behalf f the IVD Industry in Australia, including Wrkplace Drug and Alchl Testing Organisatins In-Vit

More information

REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD

REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD REQUEST FOR QUALIFICATIONS DENVER INTERNATIONAL AIRPORT T1 ROADWAY PROJECT PUBLIC ART BUDGET: APPROXIMATELY $200,000 USD Intrductin The Denver Internatinal Airprt (DEN) Art & Culture Prgram (in cllabratin

More information

Radiofrequency Radiation Assessment Report

Radiofrequency Radiation Assessment Report Radifrequency Radiatin Assessment Reprt Cathlic Schls Office Lismre Xavier Cathlic Cllege and Hly Family Primary Schl July 2014 Reference: C109995:J123349 Nel Arnld & Assciates Pty Ltd Level 1, 2 Mayneview

More information

Property Address/Location: Case No.: (to be completed by Staff)

Property Address/Location: Case No.: (to be completed by Staff) Site Develpment Plan Applicatin Checklist City f Greenwd Village Cmmunity Develpment Department 6060 S. Quebec Street Greenwd Village, CO 80111-4591 (303) 486-5783; FAX (303) 773-1238 Prperty Address/Lcatin:

More information

The WHO e-atlas of disaster risk for the European Region Instructions for use

The WHO e-atlas of disaster risk for the European Region Instructions for use The WHO e-atlas f disaster risk fr the Eurpean Regin Instructins fr use 1 Last Update: June 2011 Cntents 1. Basic system requirements... 3 2. Structure f the WHO e-atlas... 4 2.1. Main menu... 4 2.1.1.

More information

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732 Prgram Infrmatin 1 DXF2DAT 3.0 Prfessinal Designed Cmputing Systems 848 W. Brtn Rad Essexville, Michigan 48732 Cntact: (989) 892-4376 website: http://www.famwrk.net General Infrmatin: inf@famwrk.net Technical

More information

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005 Netwrk Wrking Grup Request fr Cmments: 4062 Categry: Infrmatinal V. Manral SiNett Crp. R. White Cisc Systems A. Shaikh AT&T Labs (Research) April 2005 Status f This Mem OSPF Benchmarking Terminlgy and

More information

City of Richmond. Report to Committee

City of Richmond. Report to Committee City f Richmnd Reprt t Cmmittee T: Frm: Re: Parks, Recreatin and Cultural Services Cmmittee Jane Fernyhugh Directr, Arts, Culture and Heritage Services Public Art Cmmunity Mural Prgram Date: January 5,

More information

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017 Cleveland Public Theatre Catapult Request fr Prpsals Cleveland Public Theatre s New Play Develpment CPT s missin is t raise cnsciusness and nurture cmpassin thrugh grundbreaking perfrmances and life-changing

More information

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01 Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure Crdinatr Prcedure Reliability Crdinatr Area Restratin Prcedure N. RC0460 Versin N. 1.0 Distributin Restrictin: Nne Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 2.1 Backgrund...

More information

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com SARMAP RELEASE NOTES Versin: 7.0 (July 2016) 55 Village Square Dr. Suth Kingstwn, RI 02879 Tel: (401) 789-6224 Fax: (401) 789-1932 Email: MapSupprt@ Table f Cntents Table f Cntents...ii 1 Intrductin...

More information

Common Network Operation Tools

Common Network Operation Tools Cmmn Netwrk Operatin Tls Prcess fr the develpment f data exchanges Mnika Kaldnek Adviser, System Operatins Brussels xxx2014 Backgrund > WHY: Regulatin 715/2009 (Art 8)...ENTSOG shall adpt: cmmn netwrk

More information

3: Community Gathering Space

3: Community Gathering Space 3: Cmmunity Gathering Space What: 2 part spatial sequence with gathering area fr varius sized grups Entry Zne Prvide an intrductin t the area by establishing a md and character and as well as separating

More information

Multistate Mobility Performance Monitoring

Multistate Mobility Performance Monitoring Great Lakes Reginal Operatins Calitin (GLRTOC) Multistate Mbility Perfrmance Mnitring September 2015 GLRTOC Members The Great Lakes Reginal Transprtatin Operatins Calitin was funded in May 2010, and was

More information

IEEE C802.16h-06/029

IEEE C802.16h-06/029 Prject Title IEEE 802.16 Bradband Wireless Access Wrking Grup Timing fr sending messages using the frequency dmain energy pulses Date Submitted Surce(s) Re: Abstract Purpse Ntice

More information

Request for Statement of Interest (SOI) Advanced Traffic Management System (ATMS) Software Development and Integration

Request for Statement of Interest (SOI) Advanced Traffic Management System (ATMS) Software Development and Integration Request fr Statement f Interest (SOI) Advanced Traffic Management System (ATMS) Sftware Develpment and Integratin The Kane Cunty Divisin f Transprtatin (KDOT) is in need f prfessinal services frm a qualified

More information

Formative Evaluation of GeeGuides: Educational Technology to Enhance Art Exploration

Formative Evaluation of GeeGuides: Educational Technology to Enhance Art Exploration Frmative Evaluatin f GeeGuides: Educatinal Technlgy t Enhance Art Explratin Prepared by Clleen F. Manning Senir Research Assciate Gdman Research Grup, Inc. Submitted t GeeGuides LLC March 2005 EXECUTIVE

More information

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist Annex IX Fr each requirement in the Functinal and Technical Specificatins stated belw, the Tenderer shall cmment cmpliance and detail hw the requirement is fulfilled. 4. Prject Cntents 4.1 Cllectin and

More information

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements

More information

Model Assignment Issued September 2008

Model Assignment Issued September 2008 Mdel Assignment Issued September 2008 OCR Level 3 Principal Learning in Engineering Unit F558: Selectin and applicatin f engineering materials Please nte: This OCR mdel assignment may be used t prvide

More information

WIRELESS COMMUNICATION FACILITY APPLICATION SUPPLEMENT

WIRELESS COMMUNICATION FACILITY APPLICATION SUPPLEMENT WIRELESS COMMUNICATION FACILITY APPLICATION SUPPLEMENT CITY OF ENCINITAS DEVELOPMENT SERVICES DEPARTMENT 505 Suth Vulcan Avenue Encinitas CA 92024 (760) 633-2710 W Applicant/Permittees are t becme familiar

More information

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment BLM-Alaska Yukn Lwlands - Kuskkwim Uplands - Lime Hills Rapid Ecreginal Assessment Cmmunicatin and Cllabratin Strategic Framewrk and Implementatin Plan Intrductin and Overview The purpse f the YKL REA

More information

Independent Association of Latin America and the Caribbean AILAC. Ad-Hoc Working Group on the Durban Platform for Enhanced Action (ADP)

Independent Association of Latin America and the Caribbean AILAC. Ad-Hoc Working Group on the Durban Platform for Enhanced Action (ADP) Independent Assciatin f Latin America and the Caribbean AILAC Ad-Hc Wrking Grup n the Durban Platfrm fr Enhanced Actin (ADP) Submissin n the ex-ante infrmatin requirements fr the cmmunicatin f INDCs and

More information

Leicestershire Partnership NHS Trust: Gender Pay Gap Report

Leicestershire Partnership NHS Trust: Gender Pay Gap Report Leicestershire Partnership NHS Trust: Gender Pay Gap Reprt 31 st March 2017 Backgrund t the gender pay gap analyses The Gender Pay Gap Regulatins (a 2017 update t the Equality Act 2010) intrduced a requirement

More information

New construction or additions permit guide

New construction or additions permit guide Cmmunity Develpment Department 12350 W. 87 th St. Pkwy., Lenexa, KS 66215 913.477.7700 fax 913.477.7730 New cnstructin r additins permit guide The infrmatin prvided are general requirements which shuld

More information

ACA Standard Measurement One-time program

ACA Standard Measurement One-time program Service Request 101183 ACA Standard Measurement One-time prgram Created n: December 22, 2015 Last Mdified n: 12/23/2015 Prepared by Baskar Chitravel Infrmatin Technlgy Services Office f the President University

More information

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data IR Emitter and Detectr 1. Descriptin Lite-On ffers a brad range f discrete infrared cmpnents fr applicatin such as remte cntrl, IR wireless data transmissin, security alarm & etc. Custmers need infrared

More information

3G Coverage Obligation Verification Methodology

3G Coverage Obligation Verification Methodology 3G Cverage Obligatin Verificatin Methdlgy Statement Publicatin date: 9 May 2012 Main Heading Cntents Sectin Page 1 Intrductin 1 2 Summary f apprach 2 3 Key parameters t be used in the SINR calculatin

More information

Describing Digital Materials in Finding Aids

Describing Digital Materials in Finding Aids Describing Digital Materials in Finding Aids Versin 2.0 March 14, 2013 Intrductin Staff frm the Michigan Histrical Cllectins, University Archives and Recrds Prgram, and Digital Curatin adpted the fllwing

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

Open Call for Artists and Arts Professionals 2018

Open Call for Artists and Arts Professionals 2018 Open Call fr Artists and Arts Prfessinals 2018 Open Call fr Artists and Arts Prfessinals 2018 All materials must be received by 5:00 pm EST n Friday, March 16, 2018 Art n the Atlanta BeltLine is seeking

More information

POLICY NUMBER: C539. Guidelines for the implementation of new services, walking distances to transit service and time periods of operation

POLICY NUMBER: C539. Guidelines for the implementation of new services, walking distances to transit service and time periods of operation Page 1 f 5 POLICY NUMBER: C539 REFERENCE: ADOPTED BY: City Cuncil 2 September 2009 SUPERSEDES: New PREPARED BY: Transprtatin Department DATE: 17 August 2009 TITLE: Transit Service Standards Plicy Statement:

More information

ECE 3829: Advanced Digital System Design with FPGAs A Term 2017

ECE 3829: Advanced Digital System Design with FPGAs A Term 2017 ECE 3829: Advanced Digital System Design with FPGAs A Term 2017 Lab 2- VGA display and Light Sensr interface Reprt due at start f class Friday September 15 th Use the prvided Ambient Light Sensr mdule

More information

Specification for Learning and Qualifications for Physical Intervention Skills

Specification for Learning and Qualifications for Physical Intervention Skills Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it

More information

Alberta Infrastructure. Digital Project Delivery COBie Requirements

Alberta Infrastructure. Digital Project Delivery COBie Requirements Alberta Infrastructure Digital Prject Delivery COBie Requirements COBie Requirements Table f Cntent COBie Requirements Objective 2 COBie Standard 2 1. COBie Deliverable 3 1.1 Cmpressed File 3 1.2 The COBie

More information

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 Apprval Amendment Recrd Apprval Date Versin Descriptin 01/08/2017 1 Initial Issue under MTM. Supersedes PTV DMS Dispensatin Prcess & L1-CHE-INS-002

More information

Participation is open on equal conditions to all national and international experienced individual consultants.

Participation is open on equal conditions to all national and international experienced individual consultants. REQUEST FOR EXPRESSIONS OF INTEREST N 1216/S/EOI-ICB/RE-ADV/AD/RDB/GOR/12 TITLE: CONSULTANCY SERVICES TO SUPERVISE CONSTRUCTION WORKS RELATED TO SUPPLY & INSTALLATION OF FURNITURE, BUILDING PARTITIONS

More information

Transforming the University of Minnesota through the Enhancement of Interdisciplinary Research

Transforming the University of Minnesota through the Enhancement of Interdisciplinary Research DRIVING TOMORROW Our plan t lead and innvate Twin Cities Campus Strategic Plan Grand Challenges Research Transfrming the University f Minnesta thrugh the Enhancement f Interdisciplinary Research Prvst

More information

PCCW Solutions Engineering Graduate Trainee Program - Audio Visual / Aviation / Broadcasting / Systems Integration

PCCW Solutions Engineering Graduate Trainee Program - Audio Visual / Aviation / Broadcasting / Systems Integration PCCW Slutins Engineering Graduate Trainee Prgram - Audi Visual / Aviatin / Bradcasting / Systems Integratin Becme a PCCW Slutins prfessinal with a technical specialty 101010101010101010101010101 0101010101010101010101010101010101010101010

More information

Call to Artists. PO Box 369 Lake Oswego, OR

Call to Artists. PO Box 369 Lake Oswego, OR PO Bx 369 Lake Osweg, OR 97034 503.675.2531 www.artscuncill.rg Call t Artists Prgram & Lcatin: Gallery Withut Walls, Lake Osweg, Oregn Budget: $850.00 hnrarium / An pprtunity t be nminated fr an up t $15,000

More information

2018 Print and DPI Annual Competition Rules

2018 Print and DPI Annual Competition Rules Brisbane Camera Grup 'Annual Cmpetitin' takes place in Nvember each year. It's the highlight f the club cmpetitin year and submissin standards are cnsistently high. All graded members are eligible and

More information

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks Briefing n Discussins Regarding a Master Lease Agreement fr the Intelligent Digital Kisks Cmmittee-f-the-Whle September 11, 2018 Nevin Grinnell Vice President Chief Marketing Officer 1 Agenda Backgrund

More information

FINAL REPORT CRYSTAL MOUNTAIN SKI RESORT AT WESTBANK TRAFFIC IMPACT STUDY Prepared By:

FINAL REPORT CRYSTAL MOUNTAIN SKI RESORT AT WESTBANK TRAFFIC IMPACT STUDY Prepared By: FINAL RPORT TO CRYSTAL MOUNTAIN SKI RSORT AT WSTBANK TRAFFIC IMPACT STUDY 2111-02219-0 Prepared By: Mclhanney Cnsulting Services Ltd. 13160-88 Avenue Surrey, British Clumbia V3W 3K3 March 2006 The infrmatin

More information

SITE PLAN CONTROL APPLICATION SUBMISSION CHECKLIST

SITE PLAN CONTROL APPLICATION SUBMISSION CHECKLIST SITE PLAN CONTROL APPLICATION SUBMISSION CHECKLIST Pre-Cnsultatin Meeting City f Welland Applicatin Fee Regin f Niagara Review Fee NPCA Review Fee Cmpleted Applicatin Frm Ten (10) cpies f all required

More information

THORNDALE TRAIN STATION TRAFFIC STUDY

THORNDALE TRAIN STATION TRAFFIC STUDY THORNDALE TRAIN STATION TRAFFIC STUDY JUNE 1992 ~~ DELAWARE VALLEY ~~ REGIONAL PLANNING COMMISSION --- ~ - ------ -~ -------- - ------- - -~-~- - ------ ;:-::-----------::;----,--- ------- THORNDALE TRAIN

More information

IR Emitter and Detector Product Data Sheet LTE-R38386AS-ZF Spec No.: DS Effective Date: 09/14/2016 LITE-ON DCC RELEASE

IR Emitter and Detector Product Data Sheet LTE-R38386AS-ZF Spec No.: DS Effective Date: 09/14/2016 LITE-ON DCC RELEASE IR Emitter and Detectr Prduct Data Sheet Spec N.: DS5-216-5 Effective Date: 9/14/216 Revisin: - LITE-ON DCC RELEASE BNS-OD-FC1/A4 LITE-ON Technlgy Crp. / Optelectrnics N.9,Chien 1 Rad, Chung H, New Taipei

More information

Project Description Arctic Safety Center

Project Description Arctic Safety Center Prject Descriptin Arctic Safety Center Classificatin: Open Status: Final Expiry date: 2012-10-21 Page 1 f 11 Prject Descriptin Arctic Safety Center Dcument n. : Prject n.: Prject: 990020 Arctic Safety

More information

Annex II to Decision 2019/004/R. AMC and GM to Part ATCO Issue 1, Amendment 2

Annex II to Decision 2019/004/R. AMC and GM to Part ATCO Issue 1, Amendment 2 Annex II t Decisin 2019/004/R AMC and GM t Part ATCO Issue 1, Amendment 2 Annex I t Decisin 2015/010/R f 13 March 2015 is hereby amended as fllws: The text f the amendment is arranged t shw deleted text,

More information

SunGuide TM GUI Design Review Release 3.1 Express Lanes Meeting Minutes Date: March 10, 2008 Location: Video Conference

SunGuide TM GUI Design Review Release 3.1 Express Lanes Meeting Minutes Date: March 10, 2008 Location: Video Conference SunGuide TM GUI Design Review Release 3.1 Express Lanes Meeting Minutes Date: Lcatin: Vide Cnference Attendees: Trey Tillander, FDOT CO Steve Crbin, FDOT D4 Rry Santana, FDOT D6 Manny Fntan, FDOT D6 David

More information

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys)

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys) 1 Octber 2016 Inaccessible Electrical Facilities Phase 2 Primary Lines (Lwer Keys) Revised Oct 20 th 2016 2 Executive Summary Flrida Public Service Cmmissin In 2006, fllwing the 2004 and 2005 hurricane

More information

CUSTOMER PORTAL. Floorplan Management

CUSTOMER PORTAL. Floorplan Management CUSTOMER PORTAL Flrplan Management FLOORPLAN ANALYTICS The flrplan analytics area displays flrplans yu have uplad t the prtal (if yu haven t yet upladed a flrplan please cntact ur supprt department). Frm

More information

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL Yu will learn the fllwing in this lab: The UNIVERSITY f NORTH CAROLINA at CHAPEL HILL Cmp 541 Digital Lgic and Cmputer Design Prf. Mntek Singh Fall 2016 Lab Prject (PART A): Attaching a Display t the Prcessr

More information

CiDA CiDA: Unit 3 Unit 3

CiDA CiDA: Unit 3 Unit 3 Pearsn CiDA Unit 3 Artwrk and Imaging: SW CiDA CiDA: Unit 3 Unit 3 Artwrk and Artwrk and Imaging Imaging Scheme f Wrk Scheme f Wrk 1 Pearsn Educatin Ltd 2017 Unit 3: Artwrk and Imaging: Scheme f Wrk Pearsn

More information

MANUFACTURED HOME New Homes, Replacements, and Additions SUBMITTAL REQUIREMENTS

MANUFACTURED HOME New Homes, Replacements, and Additions SUBMITTAL REQUIREMENTS Carsn City Building Divisin 108 E. Prctr Street Carsn City, Nevada 89701 (775) 887-2310 Hearing Impaired: 711 bldgdiv@carsn.rg www.carsn.rg/building MANUFACTURED HOME New Hmes, Replacements, and Additins

More information

CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT

CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI 600 025 GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT (Prescribed Frmat and Specificatin) 1. GENERAL: The guideline is intended t prvide brad guidelines

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

Journal of Mississippi Academy of Sciences

Journal of Mississippi Academy of Sciences Jurnal f Mississippi Academy f Sciences Authr Guidelines Editrial Plicy. The Editrial Bard publishes articles n all aspects f science that are f general interest t the scientific cmmunity. General articles

More information

idcv Isolated Digital Voltmeter User Manual

idcv Isolated Digital Voltmeter User Manual www.akcp.cm idcv Islated Digital Vltmeter User Manual Help Versin updated till firmware SP446 Cpyright 2011, AKCess Pr Limited Prvided by fficial AKCP-Distributr Didactum https://www.didactum-security.cm/en/

More information

IR Emitter and Detector Product Data Sheet LTR-C5510-DC Spec No.: DS Effective Date: 09/24/2016 LITE-ON DCC RELEASE

IR Emitter and Detector Product Data Sheet LTR-C5510-DC Spec No.: DS Effective Date: 09/24/2016 LITE-ON DCC RELEASE Prduct Data Sheet Spec N.: DS50-2016-0032 Effective Date: 09/24/2016 Revisin: - LITE-ON DCC RELEASE BNS-OD-FC001/A4 LITE-ON Technlgy Crp. / Optelectrnics N.90,Chien 1 Rad, Chung H, New Taipei City 23585,

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

MSI Self Assessment - NAVAREA I - CPRNW I Submitted by: United Kingdom

MSI Self Assessment - NAVAREA I - CPRNW I Submitted by: United Kingdom MSI Self Assessment - NAVAREA I - CPRNW9-3.2.1-I Submitted by: United Kingdm 1. Actin Required: Nne, submitted fr infrmatin nly. 2. Backgrund: Within NAVAREA I the WWNWS is a mature and effective system

More information

U.S. GROUP ON EARTH OBSERVATIONS ASSESSMENT

U.S. GROUP ON EARTH OBSERVATIONS ASSESSMENT U.S. GROUP ON EARTH OBSERVATIONS ASSESSMENT Image Credit: ISERV/NASA Timthy Newman Vice-Chair, USGEO U.S. Gelgical Survey Cmmittee n Earth Science & Applicatins frm Space December 2, 2015 USGEO ASSESSMENT

More information

You Be The Chemist Challenge Official Competition Format

You Be The Chemist Challenge Official Competition Format 2018-2019 Yu Be The Chemist Challenge Official Cmpetitin Frmat This dcument prvides detailed infrmatin regarding the Challenge frmat at each level f the cmpetitin. Schl Crdinatrs, participants, and parents/guardians

More information

Biochemistry Laboratory II CHEM Course Syllabus

Biochemistry Laboratory II CHEM Course Syllabus Bichemistry Labratry II CHEM 4582 Curse Syllabus 1 General Infrmatin COURSE OBJECTIVE The primary bjective f this curse is fr students t learn labratry methds fr characterizing bilgical macrmlecules using

More information

GRFX 1801: Game Development for Platforms

GRFX 1801: Game Development for Platforms GRFX 1801: Game Develpment fr Platfrms Instructr Camern Buckley Email cbuckley@astate.edu Office Lcatin Fine Arts Center 123 Office Hurs Friday 10a 1p Curse Overview Intermediate and advanced techniques

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE First Meeting f the AFI VSAT Netwrks Managers (AFI VSAT/1) (Kwa-Zulu Natal, Suth Africa, 13 t 15 June 2011) Agenda Item 6: Need fr

More information

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools Victrian Student Number Data Quality and Prcess Guidelines fr Victrian Gvernment Schls Published by the Cmmunicatins Divisin fr Educatin Chief Infrmatin Officer Divisin Department f Educatin and Early

More information

Appendix M Trellis Type Shade Structure Design Guide

Appendix M Trellis Type Shade Structure Design Guide Residential Design Guidelines fr Marley Park 178 Appendix M Trellis Type Shade Structure Design Guide Trellis Type Shade Structures: Trellis Type Shade Structures are typically cnstructed with pen trellis

More information

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard ELEC 7250 VLSI TESTING Term Paper On Analg Test Bus Standard Muthubalaji Ramkumar 1 Analg Test Bus Standard Muthubalaji Ramkumar Dept. f Electrical and Cmputer Engineering Auburn University Abstract This

More information

Notified Body Office, VUZ a.s. Novodvorská 1698, Praha 4, Czech Republic

Notified Body Office, VUZ a.s. Novodvorská 1698, Praha 4, Czech Republic RAILCOM Final Reprting Interactive Cnference Electrmagnetic cmpatibility at train-track track interface - lw frequency dmain Karel Beneš Ntified Bdy Office, VUZ a.s. Nvdvrská 1698, 142 01 Praha 4, Czech

More information

IR Emitter and Detector Product Data Sheet LTE-C9511-E Spec No.: DS Effective Date: 07/05/2014 LITE-ON DCC RELEASE

IR Emitter and Detector Product Data Sheet LTE-C9511-E Spec No.: DS Effective Date: 07/05/2014 LITE-ON DCC RELEASE IR Emitter and Detectr Prduct Data Sheet Spec N.: DS5-214-28 Effective Date: 7/5/214 Revisin: B LITE-ON DCC RELEASE BNS-OD-FC1/A4 LITE-ON Technlgy Crp. / Optelectrnics N.9,Chien 1 Rad, Chung H, New Taipei

More information

ROSCOMMON COUNTY Public Summary of FOIA Procedures and Guidelines

ROSCOMMON COUNTY Public Summary of FOIA Procedures and Guidelines ROSCOMMON COUNTY Public Summary f FOIA Prcedures and Guidelines This is nly a summary f the Cunty s FOIA Prcedures and Guidelines. Fr mre details and infrmatin, cpies f the Cunty s FOIA Prcedures and Guidelines

More information

Producing Research Posters

Producing Research Posters Dr Keith E. Fildes 21/23 Octber 2014 (with acknwledgments t Dr Lyuba Albul, CARR) Objectives This sessin will cver: The purpse f psters What shuld be included Design cnsideratins Getting started The fllw-up

More information

Guidelines for Preparation of Accepted Papers (Full Length) / Posters

Guidelines for Preparation of Accepted Papers (Full Length) / Posters 23 rd Internatinal Cngress n Irrigatin and Drainage 8-14 Octber 2017, Mexic City, Mexic Theme: Mdernizing Irrigatin and Drainage fr a New Green Revlutin Guidelines fr Preparatin f Accepted Papers (Full

More information

APPENDIX A. Review of OSUA s Noise Complaint Process

APPENDIX A. Review of OSUA s Noise Complaint Process APPENDIX A Review f OSUA s Nise Cmplaint Prcess 8950 Cal Center Drive Bldg, 3, Suite 300 Sacrament, CA 95826 916.564.4500 phne 916.564-4501 fax www.esassc.cm memrandum date June 12, 2008 t frm subject

More information

Evidence analysis VET Quality Framework

Evidence analysis VET Quality Framework Evidence analysis VET Quality Framewrk ORGANISATION DETAILS Organisatin s legal name Trading name/s RTO number (if any) 30477 Industry Training Qld Pty Ltd Industry Training Qld Industry Training Qld Pty

More information

Communication Protocol Procedure

Communication Protocol Procedure APPLICABILITY: Reliability Crdinatr System Operatrs I. Purpse Prvide the Reliability Crdinatr System Operatrs (RCSO) with established prcedures t: Imprve cmmunicatins fr the issuance f Operating Instructins

More information

Establishing a Regional AIS Application Specific Message Register

Establishing a Regional AIS Application Specific Message Register Establishing a Reginal AIS Applicatin Specific Message Register Dr. Lee Alexander and Dr. Kurt Schwehr, University f New Hampshire, USA; and Rlf Zetterberg, Swedish Maritime Administratin, Sweden ABSTRACT

More information