Installing a Squeak-Free Nascor Floor System
|
|
- Gwenda Ford
- 5 years ago
- Views:
Transcription
1 Nascr s precise manufacturing tlerances deliver a prduct that resists shrinking, warping and twisting the mst cmmn causes f squeaks in flr systems built with dimensinal lumber. Ensuring a squeak-free flr, hwever, als requires attentin t detail during installatin t avid squeaks resulting frm cntact between metal n metal, such as nails n a jist hanger wd n metal, such as a jist s bttm flange n a steel beam wd n wd, such as a sheathing jint This guide has been prepared t identify installatin situatins that can result in squeaks, and t prvide infrmatin n hw t avid the situatins, r fix them if they have already ccurred. Hanger issues When jists are te-nailed nt a beam fr temprary supprt, and then hangers are installed, the head f the te-nail rubs against the side flanges f the hanger, resulting in a squeak. Squeaks can als be caused by a hanger rubbing against a defrmatin in the fundatin. Install the hangers n the beam prir t installatin f the jists, r ensure that te-nails d nt cntact the hanger flanges by mving the nails, r cmpletely embedding them in the wd fiber. Bearing issues Pry the hanger flanges away frm the nail head, and insert a shim r cnstructin adhesive t avid metal-n-metal cntact. When jists are framed directly nt the flange f a drpped steel beam and there is a gap between the bttm f the jist and the steel beam, the jists can shift dwnward when lad is applied, resulting in a squeak. Install strapping t the underside f the jists t ensure that the jists rest firmly against the supprts, r use a nailer plate. Install shims r strapping t ensure the jists rest firmly n the supprt. 1
2 Bearing issues (cnt d.) When the sill plate is nt installed in the right place it prevents the tp flange f the hanger frm being fully supprted. When a lad is applied, the tp flange f the hanger can rub against the face f the cncrete r beam, causing a squeak. Make sure the sill plate is installed flush with the inside f the fundatin r beam. Jack up the jist near the hanger t eliminate the gap. Use a stud wall, pst r ledger t supprt frm belw. When jists are imprperly set in hangers, it may create a vid between the bttm f the jist and the seat f the hanger. A squeak may result if the vid allws mvement when a lad is applied. Place the jist carefully t enable full bearing in the hanger. Squeaks can be reduced by placing a small amunt f sub flr adhesive in the hanger befre the jist is installed. If a hle is prvided, install a wd screw (#8 x 1½" max.) thrugh the bttm seat (install the screws befre the adhesive sets t ensure unifrm bearing). These steps are in additin t vs. a replacement fr the required jist fasteners. If a vid exists and yu can access the hanger, put a shim between the jist and the hanger. Fr jists with a directly attached ceiling, find the middle f the hanger, and make a hle thrugh the ceiling. Drill a hle larger than the screw shank thrugh the hanger seat and apply adhesive thrugh the hle. Draw the jist int the hanger with a single #8 x1¼" screw. Alternatively, yu culd install a wd screw at a 45 degree angle frm abve - drill a pilt hle larger than the screw shank thrugh the flr sheathing, the tp flange f the jist and partially int the beam. Put the screw thrugh the hle and draw the jist dwn int hanger. *Gap 2
3 Fastener issues When nailing is dne imprperly r inadequate nail diameters are used, it impacts the lad-carrying ability f the hanger and can als cause a squeak due t mvement between the jist and hanger. Fill every nail hle with the nails specified by the hanger manufacturer and ensure that the head f the nail is driven tight t the hanger. Cmmn jist hangers typically require a 3 lng 10d nail, which has a shank diameter f Access the hanger and crrect the nailing. When sheathing nails barely hit the jist they d nt hld the panel tight. This enables the nails t rub against the side f the jist, and a squeak t result when the sheathing deflects. Exercise care when nailing sheathing. If pssible, remve the nails frm abve and reattach the sheathing t the jist. If the flr finishing is already installed, try t access it frm belw and bend the nail away frm the jist flange. Re-attach the sheathing t the jist frm belw. Mechanical & electrical issues When pipes, ducts r similar items are threaded thrugh Nascr jists, they may rub against the jist web and cause a squeak. Allw a ¼" clearance when cutting hles in the jist web. See the charts in the Nascr Installatin Guide fr allwable hle sizes and lcatins. Put plastic sleeves arund the threaded items. When items are hanging frm Nascr jists, they may rub against the jist flange and cause a squeak. D nt hang strapping directly ver the flanges. Cnnect strapping t a filler blck that is secured t the Nascr jist web, r install a shim between the strap and the jist flange. 3
4 Mechanical & electrical issues (cnt d.) When crss-bridging r blcking rubs n the jists it can result in a squeak. Ensure that crss-bridging, blcking and all ther elements are prperly fastened as per the Building Cde, r per Nascr s installatin guidelines. If mid-span blcking is required, ensure it is cut t fit tight and apply adhesive t the surfaces. Nail thrugh the sheathing int the blcking with at least tw 10d (3") bx nails and attach t bttm flange with 10d bx nails. Crss Bridging Sheathing issues Add required fasteners t prperly secure elements. Using screws rather than nails may be necessary due t access restrictins. When flr sheathing gets very wet during cnstructin it ften swells and shrinks after drying, leaving a vid under the nail head. When stepped n, the sheathing can mve and result in a squeak. Keep building materials as dry as pssible. Use prper adhesive and prper technique t bnd sheathing t the jists. There are a few ways t re-attach the flr sheathing if this ccurs: Pull back the carpet, drive the nails flush and install a wd screw near the nail. Install scred screws thrugh the pad and carpet they can then be brken ff at the face f the sheathing. (A special tl is required.) If yu can reach the jists frm belw, drill a hle thrugh the tp flange f the jist and partially int the sheathing, then install a screw t pull them tight. 4
5 Sheathing issues (cnt d.) When the wrng sheathing is used, it may result in excessive deflectin, causing mvement and therefre squeaks thrughut the flr. Use a sub flr that is thicker than that required by the Building Cde. Add anther layer f decking ver the existing sub flr. Installing blcking between the flanges f the jists alng the sheathing seams (if the flr is accessible frm belw) may als help. Use adhesive t bnd all cntact surfaces, and nail the blcking carefully t prevent new squeaks. When sheathing is installed imprperly, squeaks at the jist r T&G jint can result. Leave a ⅛" vid at all edges and end jints. Use adhesive n all T&G jints. Sheathing shuld be adhered t the jists with slvent-based adhesive that cnfrms t APA-The Engineered Wd Assciatin perfrmance specificatin AFG-01. Apply enugh adhesive fr nly 1 r 2 panels at a time s that the adhesive desn t set prir t installatin. Apply tw lines f adhesive where the panel ends meet. Extend the adhesive all the way acrss the panel and nail befre the adhesive sets. Fr squeaks at the jist, re-attach the sheathing t the jists with the apprpriate nail r screw. Fr squeaks at T&G jints, install a 2x4 blck directly under the jint and screw thrugh. Lcate the screws n bth sides f the T&G jint and apply adhesive between the sheathing and the blck. Alternatively, a saw kerf cut at the jint may stp the squeak. 5
6 Underlay issues When underlay is nt installed prperly, squeaks r ther nises can ccur. Often, the nises are intermittent and may cincide with changes in temperature and Relative Humidity. Fllw the manufacturer s recmmendatins fr installatin f the underlay. Ensure dust and debris is remved frm the sub flr befre placing the underlay. Offset the underlay jints frm the sub flr jints. Prperly attach the sub flr t the underlay by nailing, stapling, r gluing and nailing. Partitin wall issues Fr an islated squeak where access frm belw is pssible, drill a hle thrugh the sub flr and partially int the underlay. Install a screw that is lng enugh t reach at least half way thrugh the underlay. Fr squeaks thrughut the flr, the carpet shuld be pulled back and the underlay reattached. When the partitin flr is nailed nly t the flr sheathing and a lad is applied, the sheathing deflects and rubs n the shank f the nail, resulting in a squeak. When studs are cut t shrt, it can als result in nails squeaking at the bttm f the wall, between the plate and studs. Nail interir partitin walls t the jists. Where the partitin runs parallel t the jists and extends ver mre than half f the jist span, add a jist under the partitin. If this is nt pssible, run a bead f cnstructin adhesive under the wall and either crss-nail, nail thrugh and clinch tight r screw frm belw. Anther ptin is t bridge between the jists and attach wall at blcking lcatins. If accessible frm belw, install screws thrugh the flr sheathing and int the bttm plate f the wall. Otherwise, remve the basebard alng the partitin and drill a hle (larger than the screw shank) thrugh the bttm plate f the partitin at a 45 degree angle. Use a screw t pull the flr sheathing up t the partitin. Nn Ladbearing Wall Sheathing Blcking 6
7 General recmmendatins fr the preventin and cure f squeaks High quality cnstructin adhesive is imprtant. Use slvent-based adhesive that will bnd wd and metal. All fasteners attaching the sheathing t the jists shuld be driven vertically, nt at an angle. The best fastener t use fr nailing flr deck sheathing t the Nascr jist is a defrmed shank nail. Screws are als gd, but nly if the tp ¾" f the screw under the head has n threads. D nt use smth, cement r vinyl cated nails. Always install hardwd flring perpendicular t the jists. Fllw the manufacturer's recmmendatins. T minimize vibratin in flrs withut direct applied ceilings, attach 1x4 strapping (perpendicular t the jists) t the underside f the bttm flange f each jist with tw 8d (2½") nails. Run cntinuus strapping at 8' ncenter and tie it ff at the end walls. When the finished flr and ceiling have already been installed, it can be difficult t access t a flr squeak. A recmmended methd is: Pull back the carpet and pad. Use a stud finder t lcate the jists, r prbe thrugh the sheathing with a pattern f nailing. Cut a 4" hle thrugh the sheathing between the jists. Fix the prblem (see recmmendatins fr specific prblems abve). T repair the hle, put 2x4 blcks with adhesive already applied thrugh the hle, then pull them up against the bttm f the sheathing and screw them in place. Glue and screw the 4 cut-ut sheathing piece back in place n the 2x4s. Fr mre infrmatin n Nascr prducts and their prper installatin, cntact Nascr at
Samples from
BCI jist hanger. - Backer blck. Nail with 10 ~ 10d nails. Filler blck. Nail with 10 10d nails. Backer blck required where hanger lad exceeds 1000 Ibs. Backer fr hriznal / siding r stucc. --- BCI jist hanger.
More informationZintra Acoustic Textures Cutting and Installation Instructions for ½ panels
Zintra Acustic Textures Cutting and Installatin Instructins fr ½ panels CUTTING AND FABRICATING PANELS ON SITE Any f the panels can be cut r adjusted n site. This allws fr site adjustments r adaptatins
More informationBig Kahuna Assembly Instructions
Big Kahuna Assembly Instructins Thank yu fr purchasing a d-it-yurself pergla kit frm Average Je s Pergla Dept. We appreciate yur business, and we are here t help yu in any way pssible. Read this entire
More informationINSTALLATION INSTRUCTIONS
Lad with min. 5 kg 405000090 405070090 INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main dimensins. 3. Parts included. 4. Installatin. 5. Adjusting the strke
More informationSLATE LITE. handling fabrication and installation guide
e inf@ handling fabricatin and installatin guide PLEASE CAREFULLY INSPECT THE PRODUCT PRIOR TO INSTALLING, CUTTING, DRILLING OR FABRICATING AND INFORM BARESQUE (Baresque Australia - +612 9966 8470) IMMEDIATELY
More informationINSTALLATION INSTRUCTIONS
Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke
More informationDynaRound Hatch Guard System Installation Instructions
DynaRund Hatch Guard System Installatin Instructins Estimated Installatin Time: Man Crew, 0-90 Minutes The DynaRund Hatch Guard System is designed t prtect all rftp hatch entry and exit pints. This nn-penetrating
More informationHow to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved
Hw t Install a Slate Tile Flr By See Jane Drill TM Cpyright 2014, All Rights Reserved Resurces Needed t Cmplete the Jb Tls & Supplies Pwer drill with mixing want (a bucket trwel can als be used fr mixing)
More informationPhotoVu Digital Picture Frame Service & Repair Guide
PhtVu Digital Picture Frame Service & Repair Guide PhtVu, LLC 2450 Central Ave, #G1 Bulder, CO 80301 USA www.phtvu.cm/supprt Versin: 1.0 Table f Cntents Getting Started... 3 Determine Yur Generatin f PhtVu
More informationINSTALLATION INSTRUCTIONS
Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke
More informationm LUCASEY SLELCD COMPANY Important! Please read all warnings and cautions before installing the mount. SLELCD DETAILED INSTRUCTIONS Page 1 of 6
SLELCD DETAILED INSTRUCTIONS Page 1 f 6 SLELCD m LUCASEY STEALTH LOCKING FURNITURE MOUNT Fits up t 26" flat panel mnitrs with 200mm x 200mm, 200mm x 100mm, 100mm x 100mm and 75mm x 75mm VESA munt ng patterns.
More informationASSEMBLE ALUMINUM TOOLBOX
ASSEMBLE ALUMINUM TOOLBOX INTRODUCTION In this lessn, yu will assemble an aluminum sheet metal tlbx using rivets. Yu will start with a kit that includes pre cut and pre frmed aluminum tlbx panels. This
More informationSISTEMA ELEVATÓRIO ETV 460A
Parts included with yur Flat Lift Lift unit ( #1 ) Pwer supply ( #2 ) R.F. Mdule ( #3 ) Rcker switch ( #4 ) Remte Cntrl ( #5 ) Lift unit ( #1 ) Remte Cntrl ( #5 ) Pwer supply ( #2 ) Rcker switch ( #4 )
More informationPrevention and Repair of Floor System Squeaks
#9009 TECHNICAL RESOURCE SHEET and of Floor System Squeaks There are many causes of floor noise, such as dimensionally unstable building materials, hangers, nails, and utilities. Proper installation of
More informationNote: If using fusible web adhesive to secure stars, prewash all fabric but do NOT use fabric softener.
Made in USA By Dawn Cavanaugh APQS Natinal Educ atin and Service Directr Celebrate summer with this bright, patritic quilt! Use yur favrite methd t secure the stars t lng strips f blue fabric t speed up
More informationTownship of Derry. Dauphin County, Pennsylvania. Residential Deck Addition Submittal Guide and Construction Fact Sheet
Twnship f Derry Dauphin Cunty, Pennsylvania Residential Deck Additin Submittal Guide and Cnstructin Fact Sheet The text and illustratins included in this guide represent tables and illustratins frm the
More informationRIG SOLAR FILM. High quality clear 48 gauge Polymer material \V;th excellent transmission qualities.
... a. Ul -'" '" c / RIG SOLAR FILM Fr ver 25 years, Thusand Oak Optical has manufactured the mst ppular white lightfilters in the wrld. Nw with the intrductin f the R-G slar film, ur traditin f excellence
More informationBigMouth
http://www.scaryguys.cm/bigmuth.htm BigMuth Yu're walking dwn a dark path, and cme upn an area cvered with cam net. On ne wall it lks like a table with a skull perched n the edge. Just cam net hanging
More informationPotting Bench BUILD TIME
Ptting Bench 1 GET MORE PROJECT PLANS AT www.yellawd.cm BUILD TIME Cutting parts: 2 4 hurs Assembly: 6 8 hurs Finishing: 4 5 hurs Ttal: 12 17 hurs Gardening wrk will be mre enjyable and efficient with
More informationDesktop Teller Exception User Guide
Desktp Teller Exceptin User Guide Jammed Dcuments If a dcument jams during the scanning prcess, the scanner will stp, and a message bx will display a Device Errr Message, as shwn belw: Click OK t allw
More information21 st Century Shooting
21 st Century Shting NECK TURNING LATHE USER MANUAL WARNING: FAILURE TO FOLLOW THESE INSTRUCTIONS CAN CAUSE CATASTROPHIC CASE FAILURE RESULTING IN DAMAGE TO YOUR FIREARM AND SEVERE INJURY OR DEATH. Precisin
More informationBASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines
BASIC SAFETY AND FABRICATION GUIDE Safety Guidelines These manuals are designed t give basic guidelines t help ensure that Century Quartz Stne Surfaces prducts are t be handled, stred, fabricated, and
More informationSVT Tab and Service Visibility Tool Job Aid
Summary This Jb Aid cvers: SVT Tab Overview Service Visibility Tl (SVT) Area Overview SVT Area: Satellite Mdem Status (Frm Mdem) Clumn SVT Area: Satellite Mdem Status (Frm SMTS) Clumn SVT Area: Prvisining
More informationOwner's Manual & Assembly Instructions. Model No.
Owner's Manual & Assembly Instructins IV0 Mdel N. RGB66ONEU RGB66FGEU 780409 Strage Area: 34 Sq. Ft. Cu. Ft. 3, m 6,0 m 3 BUILDING DIMENSIONS * Size runded ff t the nearest ft CAUTION: SOME PARTS HAVE
More informationAppendix M Trellis Type Shade Structure Design Guide
Residential Design Guidelines fr Marley Park 178 Appendix M Trellis Type Shade Structure Design Guide Trellis Type Shade Structures: Trellis Type Shade Structures are typically cnstructed with pen trellis
More informationOwner's Manual & Assembly Instructions
Owner's Manual & Assembly Instructins IU01 Mdel N. RGB65ONEU RGB65FGEU 727950119 Strage Area: 27 Sq. Ft. 167 Cu. Ft. 2,5 m 2 4,7 m 3 BUILDING DIMENSIONS * Size runded ff t the nearest ft CAUTION: SOME
More informationCyrus Redblock. Kit Inventory
Kit Inventry Cyrus Redblck Left and Right Inner Side Panels Frnt and Back Inner Panels Shelf Panel Base Outer Panel Drawer Left and Right Sides Frnt and Back Drawer pieces Drawer Stp and Tw (2) Drawer
More informationRoof Safe Netting CONTENTS
Rf Safe Netting CONTENTS SUMMARY OF FEATURES... 2 TECHNICAL INFORMATION... 2 Prduct Descriptin... 2 Applicatins... 2 Prduct Infrmatin... 2 Handling & Strage... 3 Technical Data... 4 Size Range Available...
More informationSuper ABC Plug-in kit for Pacman or Ms Pacman
Super ABC Plug-in kit fr Pacman r Ms Pacman This page is a technical reference fr thse wh wn the SUPER ABC kit manufactured by Tw Bit Scre during the 1990's. This prduct is n lnger available. Under the
More informationI I I I. Assembly Instructions:
Tls required: A. Wrenches r ratchets, used fr attaching the elements t the bm and the bm t the mast. 1. 7/16" 2. 1/2" 3. 9/16" B. A 3/8" nut driver, r small crescent wrench fr the feedpint 10-24 nuts.
More informationBuilding and Installing Bumblebee Houses
17507 Frt Rad Edmntn AB T5Y 6H3 Phne: 780-643-6732 Email: inf@awes-ab.ca Building and Installing Bumblebee Huses Each spring in Alberta, millins f queen bumblebees wake up frm hibernatin, shake themselves
More informationColourful Stitches. Quick Summer Medallion. 45 x 45 Gyleen X. Fitzgerald Quick Summer Medallion.
Quick Summer Medallin 45 x 45 Clurful Stitches 16 (finished) panel r rphan blck fr center ½ yard, center framing triangles ¼ yard, skinny frame brder 1 ⅔ yard, inside setting triangles 1¼ yard, utside
More informationTo receive a service letter, please scan the Volunteer Log and it to:
Thank yu fr yur interest in helping the animals at San Dieg Humane Sciety s Prject Wildlife! We wuld nt be able t prvide the level f care and cmmitment t ur animals withut the help f peple like yu. This
More informationPool & Hot Tub Guide
Pl & Ht Tub Guide PERMIT(S) FOR POOLS/HOT TUBS WITH SIDE WALLS > 24 ***** ALL FEES DUE AT TIME OF APPLICATION ***** Building Permit Applicatin. Be aware f any subdivisin restrictins prir t applicatin.
More informationWiFi Lab C. Equipment Needs:
WiFi Lab C Event Objective: Teams will cnstruct an antenna prir t the turnament that is designed t transmit a signal at 2.4 GHz and cmplete a written test n the principles f electrmagnetic wave prpagatin.
More informationFitting instructions for all. Sita balcony outlets, extension units and accessoires
Fitting instructins fr all Sita balcny utlets, extensin units and accessires Fitting instructin Cntents General infrmatin...3 1. Sita balcny utlet with cnnectin sleeve... 4 2. Sita balcny utlet with screw-n-flange...
More information.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter
.,Plc..d,~t l~ucji PA300 DIGITAL BASS PROCESSOR Cngratulatins n yur purchase f a Planet Audi signal prcessr. It has been designed, engineered and manufactured t bring yu the highest level f perfrmance
More informationLite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data
IR Emitter and Detectr 1. Descriptin Lite-On ffers a brad range f discrete infrared cmpnents fr applicatin such as remte cntrl, IR wireless data transmissin, security alarm & etc. Custmers need infrared
More informationSet up and use your Beats X earphones
Set up and use yur Beats X earphnes Here's everything yu need t knw t make the mst f yur Beats X earphnes. Turn n The pwer buttn is n the cable beneath the right earphne. Press and hld the buttn fr 1 secnd
More informationCUSTOMER PORTAL. Floorplan Management
CUSTOMER PORTAL Flrplan Management FLOORPLAN ANALYTICS The flrplan analytics area displays flrplans yu have uplad t the prtal (if yu haven t yet upladed a flrplan please cntact ur supprt department). Frm
More information1.12 Equipment Manager
Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment
More informationAccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements
AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements
More informationTen-Tec Model RX-366 Subreceiver 565/566 Subreceiver Installation and Operation Manual-74467
Ten-Tec Mdel RX-366 Subreceiver 565/566 Subreceiver Installatin and Operatin Manual-74467 Tls required: Sldering irn r heat gun (fr shrinking heat shrink tubing) Number 1 Phillips screw driver Number 2
More informationThis app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server.
Autmatic impsitin Page 1/8 Autmatic impsitin Descriptin Autmatic impsitin will d the mst cmmn impsitins fr yur digital printer. It will autmatically d flders fr A5, A4 r US Letter page sizes in either
More informationC&E Mobility Policy (Standard)
C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment
More informationDouble Axis Square Turned Bowl
Duble Axis Square Turned Bwl Thames Valley Wdturners' Guild Presented by Paul Newtn INTRODUCTION Yur Presenter: Paul Newtn has been wdturning fr apprximately six years. He is a member f the American Assciatin
More informationDeveloped By: Firefighter Alex Chapin August 2017
F O G N A I L O P E R A T I O N S 1. 1 Develped By: Firefighter Alex Chapin August 2017 T A S K S K I L L D E S C R I P T I O N A N D D E T A I L The fgnail, when deplyed in a timely and accurate manner
More informationTechnical Information
Technical Infrmatin P997-LA05 Liquid Aluminum 2 used in repair prcess f Nissan KAB Super Silver TCB101 The fllwing prcess utlining the repair f Nissan KAB Super Silver paint scheme has been apprved by
More informationOperating Instructions
TC 60/8 THERMOCOMPUTER TC 60/8 temp / time s s temp / time k start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing
More informationDice Box. Kit Inventory. Other Items Needed o Glue I use a craft type tacky glue such as Aleenes Tacky Glue which can be found at craft stores like
Kit Inventry Dice Bx Frnt, Left, Back, Right and Bttm Inner Bx Panels Spacer (left), Sliding Piece (left), and Left Outer Panel Spacer 1 (back), Spacer 2 (back), Sliding Piece (back), and Back Outer Panel
More informationWireless Bridge Module for DXR2.E
Technical Specificatin Sheet Dcument N. A6V11470500 July 31, 2018 Wireless Bridge Mdule fr DXR2.E Descriptin A wireless bridge cnnects tw wired netwrks tgether ver Wi-Fi utilizing a Wireless Access Pint.
More informationA Geno Technology, Inc. (USA) brand name. Orbital Shaker. Cat. No. BT909, BT926, BT
A Gen Technlgy, Inc. (USA) brand name Orbital Shaker Cat. N. BT909, BT926, BT927 1-800-628-7730 1-314-991-6034 inf@btlabsystems.cm Thanks fr chsing BT Lab Systems BT909 Orbital Shaker. This peratin manual
More informationSolarEdge Built-in Revenue Grade Meter Troubleshooting
SlarEdge Built-in Revenue Grade Meter Trubleshting Versin 1.0 Cntents Trubleshting Meter Cnnectin 3 Cmmunicatin Status Screen Trubleshting 3 Device Type and Prtcl are cnfigured incrrectly 3 Number f devices
More informationBuild a Gopher Tortoise Burrow. Instructions
Build a Gpher Trtise Burrw Instructins Burrw Supply List 'A PVC pipe (need 5, 10 lng pipes @ 1.75 each = $8.75, Lwe s will cut pipe fr free) Fur 3 pieces Seventeen 2 pieces Fur 4 pieces Five 4 PEX pipe
More informationManitoba Paint Recycling Program LVEU Guidelines
Manitba Paint Recycling Prgram LVEU Guidelines 1. INTRODUCTION The Cllectin Site Guidelines are intended t prvide practical guidance t peratrs wh will be participating as Cllectin Sites in the Manitba
More informationSINGER FUTURA TM Holiday Banner
SINGER FUTURA TM Hliday Banner Have fun decking the halls with this festive banner! It s s simple t make the HyperFnt sftware and yur SINGER FUTURA machine. Create the base applique right in yur embridery
More informationAmor Come. Build. Hope. Single House (01-18) 1
Amr Cme. Build. Hpe. Single Huse (01-18) 1 Amr Cme. Build. Hpe. Single Huse (01-18) 2 TABLE OF CONTENTS BEFORE YOU BEGIN: Inventry and Srt... 3 PHASE ONE: Slab.... 4 PHASE TWO - A: Framing... 7 PHASE TWO
More informationINFINITY ALUMINUM INSTALLATION GUIDE
1 INFINITY ALUMINUM INSTALLATION GUIDE Revised 01/17 2 PLEASE NOTE All installatins have a varying degree f uniqueness t them. The fllwing instructins are meant t be general guidelines. If yu are installing
More informationVC 246 :: Week 01 1 of 6 28 September These carriers often take the form of printing plates.
VC 246 :: Week 01 1 f 6 28 September 2017 week::ne Printing Techniques and Prcesses Tw Basic Printing Techniques Printing Presses Use an image carrier t prduce images. These carriers ften take the frm
More informationDragon Chest. Kit Inventory. Other Items Needed o
Kit Inventry Dragn Chest Frnt, Back and Base Panels Frnt Bttm Rail, Back Bttm Rail Tw (2) Tp Rails Left Upper Inner End, Left Lwer Inner End Right Upper Inner End, Right Lwer Inner End Left Tngue Piece,
More informationImprov Piecing and Matchstick Quilting By Kelly Nagel, Sulky of America
Imprv Piecing and Matchstick Quilting By Kelly Nagel, Sulky f America What is Imprv Piecing? Piecing withut a set pattern, hwever, yu can plan yur entire quilt befre yu start, if yu chse. This kind f piecing
More informationDXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732
Prgram Infrmatin 1 DXF2DAT 3.0 Prfessinal Designed Cmputing Systems 848 W. Brtn Rad Essexville, Michigan 48732 Cntact: (989) 892-4376 website: http://www.famwrk.net General Infrmatin: inf@famwrk.net Technical
More informationFitting instructions for all. SitaRoof- and renovation outlets, extension elements and accessories
s fr all SitaRf- and renvatin utlets, extensin elements and accessries Cntents General Infrmatin... 01. SitaStandard SitaTrendy - SitaDSS Prfi rf utlet... with extensin unit... 5 02. SitaTrendy screw-n-flange
More informationLED wdali MC Switch Input Modul Set - User Manual
LED wli MC Switch Input Mdul Set - User Manual Buttn mdul (Transmitter) 1. Prduct Descriptin Item N.: LC-004-302 Receive mdul (Receiver) The wli MC Switch Input Mdul Set is a cmpact wireless Multi Cntrl
More informationUsing the Laser Cutter
Using the Laser Cutter Prerequisites Befre yu will be allwed t use the laser cutter, yu must cmplete these three steps: 1. Yu must have cmpleted the Laser Cutter training at Cyberia 2. Yu must schedule
More information60min Tinkerb t games
60min + - Tinkerb t games Creepstne Manr has been clsed fr nearly ne hundred years, standing dark and silent abve the twn f Creepstne and that s just the way resident ghst Spkie likes it! But nw the manr
More informationPencil Drawing. Hard 2H H F HB B 2B 4B 6B Soft
This activity is abut learning hw t use ur pencils t create wnderful images like these. Take a lk at a few that All Saints students have dne in the past. (Take a lk at the riginals at the frnt f the rm
More informationSupplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01
Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft
More informationMachine Shop Lab Manual GENERAL INSTRUCTION
Machine Shp Lab Manual GENERAL INSTRUCTION 1. Every student shuld btain a set f instructin sheets entitled manufacturing prcesses Labratry. 2. Fr reasns f safety, every student must cme t the labratry
More informationMpressive Threadz Studio
Mpressive Threadz Studi Sewing Schl Prject # 1 Drafting Yur Six- gre Skirt and Fitting It The six gre skirt is easy t draft, easy t sew, and easy t fit. It has a gentle flare t it and it flatters all bdy
More informationSTRONGHOLD IRON INSTALLATION GUIDE
1 STRONGHOLD IRON INSTALLATION GUIDE Revised 01/16 2 PLEASE NOTE All installatins have a varying degree f uniqueness t them. The fllwing instructins are meant t be general guidelines. If yu are installing
More informationCOMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)
COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required
More informationHands-Free Music Tablet
Hands-Free Music Tablet Steven Tmer Nate Decker Grup Website: steve@wasatch.cm milamberftheassembly@yah.cm http://www.cs.utah.edu/~ndecker/ce3992/ Abstract The typical musician handles a great deal f sheet
More informationClaim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start:
Claim Amalgamatin Amalgamate means t jin 2 r mre cell claims int ne cell claim. Befre yu start: Yu will need t knw the title numbers f the cell titles fr amalgamatin. If yu are acting as an agent, yu must
More informationIR Emitter and Detector Product Data Sheet LTE-R38386AS-ZF Spec No.: DS Effective Date: 09/14/2016 LITE-ON DCC RELEASE
IR Emitter and Detectr Prduct Data Sheet Spec N.: DS5-216-5 Effective Date: 9/14/216 Revisin: - LITE-ON DCC RELEASE BNS-OD-FC1/A4 LITE-ON Technlgy Crp. / Optelectrnics N.9,Chien 1 Rad, Chung H, New Taipei
More informationAppendix D. Photography
Appendix D Phtgraphy 1 I. Taking Phtgraphs Taking phtgraphs is a required NWCA field activity that prvides an imprtant visual recrd f sampling activities at each site. Phtgraphs are taken with a digital
More informationPRE-INSTALLATION & JOBSITE CONDITIONS
Wire Brushed Teak Installatin Guidelines Thank yu fr chsing Casabella Hardwd Flring. T prtect yur investment, it is extremely imprtant that yu understand this infrmatin prir t beginning, since imprper
More informationFlux Bender Equalizer
Lightning By Audi Flux Bender Equalizer Users Guide 2014 Revised 2015 Cngratulatins n an excellent purchase! This guide was put tgether t help yu get the mst ut f yur investment. Please read this thrughly
More informationThe UNIVERSITY of NORTH CAROLINA at CHAPEL HILL
Yu will learn the fllwing in this lab: The UNIVERSITY f NORTH CAROLINA at CHAPEL HILL Cmp 541 Digital Lgic and Cmputer Design Prf. Mntek Singh Fall 2016 Lab Prject (PART A): Attaching a Display t the Prcessr
More informationPre-Installation Preparation Job Aid
Summary This Jb Aid cvers: ViaSat Installatin Standards Equipment Necessary fr ViaSat Service installatin Installatin Tls Safety: IDU Safety: ODU Safety: Persnal Safety: Wrking Arund Electricity Safety:
More informationPotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC)
PtashCrp Tier 1 Safety Standard Date Revisin Changes 03/09/2016 0 Dcument issued 11/01/2016 1 Apprved by Nutrient Presidents 1.0 Purpse This prcedure utlines the PtashCrp (PCS) Flame Resistant Clthing
More informationTROUBLESHOOTING GUIDE
TROUBLESHOOTING GUIDE Dcument revisin 1.3 Last revised: December 6, 2017 Recn Wireless Blckage and Flw Mnitr Trubleshting Guide 2014-2017 Intelligent Agricultural Slutins All Rights Reserved. Recn Wireless
More informationI SEWING I MACH_N! E CABINET I CA "
1 OWNER'S MANUAL I SEWING I MACH_N! E CABINET I CA " Mdel N. 272,98100.491 I Mdel N 491 ASSEMBLY PARTS LIST IMPORTANT: Read instructins befre assembling. 98100-FC Ntice t Custmer: Befre beginning assembly,
More informationIR Emitter and Detector Product Data Sheet LTE-C9511-E Spec No.: DS Effective Date: 07/05/2014 LITE-ON DCC RELEASE
IR Emitter and Detectr Prduct Data Sheet Spec N.: DS5-214-28 Effective Date: 7/5/214 Revisin: B LITE-ON DCC RELEASE BNS-OD-FC1/A4 LITE-ON Technlgy Crp. / Optelectrnics N.9,Chien 1 Rad, Chung H, New Taipei
More informationNational Curriculum Programme of Study:
Natinal Curriculum Prgramme f Study: Cunt in steps f 2, 3, and 5 frm 0, and in tens frm any number, frward and backward. Recall and use multiplicatin and divisin facts fr the 2, 5 and 10 multiplicatin
More informationSpectracom GSG ecall Test Suite
18-Dec-2017 GSG App Nte Spectracm GSG ecall Test Suite Table f Cntents 1. Intrductin... 1 2. Befre Starting the Test... 2 3. Running the ecall Test Suite... 4 4. Psitin Errr Tests 2.2.2-2.2.4... 10 5.
More informationFG-03: Hand Burn Profile
FG-03: Hand Burn Prfile Page 1 f 9 SAFETY FIRST Fllw all Caterpillar facility safety standards when perfrming this task. An explsive hazard exists if acetylene leaks when wrking in a cnfined space r if
More informationDrawing Canvas Word 2007
Drawing Canvas Wrd 2007 This is nt an fficial training handut f the Educatinal Technlgy Center, Davis Schl District The Drawing Canvas... 2 Creating the Drawing Canvas... 2 Shapes... 2 Inserting a Shape...
More information6 th and 7 th Grade Advisory Plans (Week 16)
6 th and 7 th Grade Advisry Plans (Week 16) This week in Advisry: On Mnday students will check in and share ut. On Tuesday- Thursday, students will participate in a fun grup building activity t minimize
More informationWS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL
WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL Issue February 2011 ASL Intercm BV DESIGNED AND MANUFACTURED BY: ASL INTERCOM BV ZONNEBAAN 42 3542 EG UTRECHT THE NETHERLANDS
More informationLaminators Incorporated manufactures a full line of sign panel products that are the industry standard for professional sign makers.
2014 Laminatrs Incrprated manufactures a full line f sign panel prducts that are the industry standard fr prfessinal sign makers. Our sign bards are strng, durable, and ready t use. Available in a variety
More informationA2: Aperture, DOF, & Focus
Art 205 A2: Aperture, DOF, & Fcus Original RAW Shts Due: Crit Date: Requires 2 Ink Jet Prints (50 pints) Objectives: 1. T understand hw apertures like f-16 & f-22 have a large DOF r range f fcus. 2. T
More informationWilsonart Decorative Edge Fabrication Manual. Wilsonart Decorative Edges
Wilsnart Decrative Edge Fabricatin Manual Wilsnart Decrative Edges BR1515 - Revisin 9-30-2011 Wilsnart Decrative Edges Prduct Descriptin Wilsnart Decrative Edge mldings may well be the best way t attain
More informationIR Emitter and Detector Product Data Sheet LTR-C5510-DC Spec No.: DS Effective Date: 09/24/2016 LITE-ON DCC RELEASE
Prduct Data Sheet Spec N.: DS50-2016-0032 Effective Date: 09/24/2016 Revisin: - LITE-ON DCC RELEASE BNS-OD-FC001/A4 LITE-ON Technlgy Crp. / Optelectrnics N.90,Chien 1 Rad, Chung H, New Taipei City 23585,
More informationBanner pocket v3 Page 1/7. Banner pocket v3
Banner pcket v3 Page 1/7 Banner pcket v3 Descriptin Banner pcket will help yu get the printed sheets arranged in the way yu need fr attaching the frnt and back side pckets tgether. It will crp ne sides
More informationLast update: December 26, English Translation DRAFTS of Asian Rules by Eric Wu. Contents
WXF r Asia rule Name:Lee JiHai (The Cmmittee f Referees Hng Kng Chinese Chess Assciatin) Lcatin:Hng Kng Last update: December 26, 2005 English Translatin DRAFTS f Asian Rules by Eric Wu. Cntents Intrductin
More informationAPPENDIX B: DESIGN RATING SURVEYS (DRS)
APPENDIX B: DESIGN RATING SURVEYS (DRS) 1. Is the device handheld? Yes, it s handheld N Nt Explicitly Stated MILK FROTHER DRS (if nt handheld) 2. If the device is NOT handheld, what des it lk like? it
More informationSAMPLE: HEALTH CHECK REPORT Insert Site Name
Cnnected Industrial SAMPLE: HEALTH CHECK REPORT Insert Site Name Date: Cmpany: Cuntry: Site Representative(s): Mr. Secndary Manager Maintenance & Mr. Maintenance Technician Hneywell-Enraf Engineer: Mr.
More informationPRODUCT SAFETY ALERT
Allen-Bradley Mtr Prtectin Circuit Breakers 140M-C2E and 140M-C2T, Series A and B 140M-D8E and 140M-D8T, Series A and B 140M-F8E and 140M-F8T, Series A, B and C Starters that use Allen-Bradley Mtr Prtectin
More informationState Bank Virtual Card FAQs
State Bank Virtual Card FAQs 1. What is State Bank Virtual Card? State Bank Virtual Card is a limit Debit card, which can be created using the State Bank Internet Banking facility fr ecmmerce (nline) transactins.
More information