Zintra Acoustic Textures Cutting and Installation Instructions for ½ panels

Size: px
Start display at page:

Download "Zintra Acoustic Textures Cutting and Installation Instructions for ½ panels"

Transcription

1 Zintra Acustic Textures Cutting and Installatin Instructins fr ½ panels CUTTING AND FABRICATING PANELS ON SITE Any f the panels can be cut r adjusted n site. This allws fr site adjustments r adaptatins t bstacles (such as fire alarm bxes r electrical bxes.) When cutting r drilling, make sure t use sharpened tls t avid any verheating f the material. A utility knife with a new blade can als be used. The texture f the panels are similar t MDF. A panel may be cut with: Hand saw Use a fine tthed blade. Hld the blade at a lw angle. Cut slwly with regular and even strkes. Table saw r Circular saw Allw the panel t pass thrugh the saw with even pressure. D nt frce the panel at any time. Use a fine tthed blade with 80 teeth r mre. Carbide tipped blades are recmmended fr extensive cutting r if many panels are t be cut cnsecutively. Jig saw If adjustable, use a slwer speed and steady mvement. Select a fine tthed blade suited fr finish wds and plastics and use a template fr cututs. Be aware t nt verheat an area with any blade. D nt attempt t use ruters r spiral cutters. Laser tls are als nt recmmended. Best results will be achieved by using nly very sharp tls and blades, ensuring clean cutting while nt verheating the material during the cut. Carefully clamp all panels t avid vibratin during cutting. Vibratin during cutting r fabricatin may result in panel damage. Prperly supprt the panel at all times. Carefully measure all walls t be cnfident that yu can transfer thse measurements nt the panels prir t cutting. Scribe t fit as necessary. Use a pencil t mark the panel. If yu must mark the face side, use blue tape befre marking it. Pencil marks will nt erase frm Zintra. Zintra panels can be drilled. Carbide tipped steel drills are recmmended t btain a high grade finish n the sides f every hle. Better results will be btained with slw t medium drill speeds. MDC 400 High Grve Blvd., Glendale Heights, IL tel fax mdcwall.cm

2 INSTALLATION Zintra panels are simple t install. The panels are mst cmmnly installed using ne f fur methds: Direct adhesin t the substrate. Using Z clips. Using stand ffs. Mechanical fasteners (screws and nails). If yu are unsure abut which methd has been specified fr yur prject, please cnfirm thse details with yur specificatin surce and direct yur questins t them. MDC may be able t assist yu with sme cmmn questins, but please realize that yur specific prject may be unique t yu. Suitable substrates are scuffed MDF, plywd, gyp bard, CMU r any unifrmly clean, suitably sund, stable, smth and/r previusly painted surface with a verified bnd f the catings and layers with a surface which has sme tth t allw adequate bnding. If yu have any dubts abut yur surface, then a site mck up is suggested. Applicatin t lse r unsecured plywd r MDF panels is nt recmmended. D nt rush the installatin. A prfessinal installer is recmmended s that prper care and attentin are paid t this. Installatin details fr thse fur methds: Direct Adhesin t the Substrate. Be certain that yur substrate will hld an adequate bnd t the recmmended adhesive. If in dubt abut a cating r a finish already in place, an adhesin mck up test is recmmended befre yu begin. Cut, scribe and pre fit all Zintra ½ panels as necessary. Once all f the panels have been prperly sized and trimmed, begin the applicatin f the adhesive t the BACK SIDE ONLY f each panel. Use ONLY Liquid Nails LN710 Panel and Mlding adhesive tubes. Place the cartridge tube int the caulking gun, cut the nzzle and puncture the inner seal. Trim nzzle t prduce a ¼ thick bead. First, apply a squiggly bead 1 in frm the edge f the panel alng all fur perimeter edges f the BACK face f the panel. See belw images fr reference. Then apply a zig zag pattern diagnally acrss the central sectin f the panel, within the already placed bead f adhesive. Apply the panel t the substrate within 20 minutes and mnitr yur adhesive t prevent it frm skinning ver. Set the panel gently int place. MDC 400 High Grve Blvd., Glendale Heights, IL tel fax mdcwall.cm

3 Smth the panel int place and then lift it ff the surface, hlding the panel separate fr ne minute. Then reset the panel t the substrate, this time applying adequate pressure t firmly set it. Mechanically supprt the panel(s) if yu deem it necessary until the adhesive is cmpletely set. NEVER use slvent based cntact adhesives r unauthrized adhesives. Using Z Clips (als called 2 part French cleats r Z bars ) Z clips are tw parts fr each clip, ne munted t the wall substrate and the ther munted t the back f the material. If using a Z clip system, be sure t allw a gap at the ceiling line which is sufficient in dimensin t allw the clip, which will be installed n the panel, t be lifted up ver the wall munted prtin f that clip and then drpped in t be seated prperly. This is cmmnly a 1 r s allwance. Depending upn the size f yur panel, yu will have 2, 3 r 4 f the Z clips t munt the panel securely. MDC 400 High Grve Blvd., Glendale Heights, IL tel fax mdcwall.cm

4 The gal is t munt each panel level and plumb. Begin by munting yur first half f each Z clip t the back f the first panel. Orient the clip t be facing dwnward (pen gap is dwn). Install the uppermst clip n clser than 1 t the hrizntal tp edge f the panel. Clips shuld be psitined t be: Parallel t the hrizntal edge f the panel. Centered n the panel and n clser than 6 away frm each vertical side edge. Separate each clip t be psitined n clser than 2 belw the clip abve it. Attach the panel clip halves t the panel using pan head #8 sheet metal screws, ½ lng. Yu will need t drill hles fr these screws in the Z clip halves, but nt int the panel itself. D nt vertighten any screws. Psitin a screw anchr t be n less than every 12 alng the clip. With each half clip nw attached t the panels, yu can crdinate the placement f the ppsing half f each clip attached t the substrate. BE SURE YOUR PLACEMENTS ARE DESIGNED TO ALLOW FOR THE DROP IN HEIGHT ALLOWANCE NEEDED TO LIFT THE PANEL OVER THE BOTTOM CLIPS BEFORE SEATING EACH. Measure dwn frm the ceiling n the substrate and psitin the uppermst clip n a hrizntal line which is placed t allw the tw halves t be seated prperly nce the panel is installed. Verify that these clip psitins are level and prperly spaced t crdinate with the ppsing halves befre cmmitting. Install these clips using a suitable anchr fr yur substrate. Mst cmmnly, that will be 5/8 gyp bard. Select yur anchr knwing that the best chice fr the screw is a pan r truss head #8 f apprpriate length t securely embed int the wall studs. We d nt recmmend the use f fluted head drywall screws fr this. Yu will need t drill hles fr these screws in each f the Z clip halves. With the wall halves nw secured, yu can lift the panel t slip ver the wall Z clips and then drp int prperly seated psitin. Using Stand Offs The number f stand ffs will be determined by yur panel dimensins. Please refer t the fllwing diagram fr an verview f hw many that might be. Blcking is als recmmended with Stand-Offs as a hidden supprt t prevent caving f panels. Stand ff placement guide Stand ffs shuld be 3 frm the edge f panel 2 x 2 2 x 4 2 x 9 4 x 4 4 x 9 MDC 400 High Grve Blvd., Glendale Heights, IL tel fax mdcwall.cm

5 Begin by marking the panel back fr the placement f each hle fr each stand ff required. N hle shuld be clser than 3 away frm the perimeter edges f the panel. Using a tungsten carbide bit f the diameter apprpriate t match yur stand ff (nt supplied, s yu will need t determine these), use a pwer drill t create each hle as yu have marked. With all f the hles nw drilled, determine the precise placement f where the panel is t be installed. With ne persn hlding the panel level and plumb, a secnd persn will mark the substrate fr the precise placement f the hles. Secure each stand ff base t the substrate using an apprpriate anchr. (We recmmend that yu have arranged a backing supprt already in the wall r align a vertical clumn f anchrs t fall n a wall stud instead f hanging the full weight ff just the gyp bard wall panel. The installer r specifier will be making these chices.) Set the panel in place ver the stand ff bases and attach the stand ff head cap trims t secure the panel. Tighten nly by hand, d nt ver tighten. Mechanical Fasteners Yu may als secure the Zintra panel t the substrate using the same fastener placement guide as used fr the stand ffs, but use direct fastening (screw r nails) t secure the panel. If using screws, we suggest that yu use a pan r truss head and that yu pre drill yur hles (selecting a tungsten carbide drill bit f the apprpriate diameter t the screw yu have selected.) Remember t select an anchr which is apprpriate t yur substrate. Each standard Zintra panel is apprximately 18 lbs. Make sure t tighten all screws t be tight, but t nt be verly tight (d nt cmpress the Zintra unevenly.) Pwer nailing can be utilized if yu have adjusted the tip f the gun fr the density f the Zintra. If yu are unsure abut the system selected fr yur prject, please stp and verify the details. MDC may be able t assist yu with sme methds f cmmn attachment, but thers may be unique t yur prject. MDC 400 High Grve Blvd., Glendale Heights, IL tel fax mdcwall.cm

SLATE LITE. handling fabrication and installation guide

SLATE LITE. handling fabrication and installation guide e inf@ handling fabricatin and installatin guide PLEASE CAREFULLY INSPECT THE PRODUCT PRIOR TO INSTALLING, CUTTING, DRILLING OR FABRICATING AND INFORM BARESQUE (Baresque Australia - +612 9966 8470) IMMEDIATELY

More information

Installing a Squeak-Free Nascor Floor System

Installing a Squeak-Free Nascor Floor System Nascr s precise manufacturing tlerances deliver a prduct that resists shrinking, warping and twisting the mst cmmn causes f squeaks in flr systems built with dimensinal lumber. Ensuring a squeak-free flr,

More information

PhotoVu Digital Picture Frame Service & Repair Guide

PhotoVu Digital Picture Frame Service & Repair Guide PhtVu Digital Picture Frame Service & Repair Guide PhtVu, LLC 2450 Central Ave, #G1 Bulder, CO 80301 USA www.phtvu.cm/supprt Versin: 1.0 Table f Cntents Getting Started... 3 Determine Yur Generatin f PhtVu

More information

Big Kahuna Assembly Instructions

Big Kahuna Assembly Instructions Big Kahuna Assembly Instructins Thank yu fr purchasing a d-it-yurself pergla kit frm Average Je s Pergla Dept. We appreciate yur business, and we are here t help yu in any way pssible. Read this entire

More information

DynaRound Hatch Guard System Installation Instructions

DynaRound Hatch Guard System Installation Instructions DynaRund Hatch Guard System Installatin Instructins Estimated Installatin Time: Man Crew, 0-90 Minutes The DynaRund Hatch Guard System is designed t prtect all rftp hatch entry and exit pints. This nn-penetrating

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad with min. 5 kg 405000090 405070090 INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main dimensins. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

ASSEMBLE ALUMINUM TOOLBOX

ASSEMBLE ALUMINUM TOOLBOX ASSEMBLE ALUMINUM TOOLBOX INTRODUCTION In this lessn, yu will assemble an aluminum sheet metal tlbx using rivets. Yu will start with a kit that includes pre cut and pre frmed aluminum tlbx panels. This

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

Note: If using fusible web adhesive to secure stars, prewash all fabric but do NOT use fabric softener.

Note: If using fusible web adhesive to secure stars, prewash all fabric but do NOT use fabric softener. Made in USA By Dawn Cavanaugh APQS Natinal Educ atin and Service Directr Celebrate summer with this bright, patritic quilt! Use yur favrite methd t secure the stars t lng strips f blue fabric t speed up

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

How to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved

How to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved Hw t Install a Slate Tile Flr By See Jane Drill TM Cpyright 2014, All Rights Reserved Resurces Needed t Cmplete the Jb Tls & Supplies Pwer drill with mixing want (a bucket trwel can als be used fr mixing)

More information

I I I I. Assembly Instructions:

I I I I. Assembly Instructions: Tls required: A. Wrenches r ratchets, used fr attaching the elements t the bm and the bm t the mast. 1. 7/16" 2. 1/2" 3. 9/16" B. A 3/8" nut driver, r small crescent wrench fr the feedpint 10-24 nuts.

More information

Standard Operating Procedure for SEM3 (ThermoFisher / FEI Apreo)

Standard Operating Procedure for SEM3 (ThermoFisher / FEI Apreo) Standard Operating Prcedure fr SEM3 (ThermFisher / FEI Apre) Befre beginning, ensure yu have an active reservatin fr SEM3 in CreResearch@Duke Lading a Sample: If Sample Exchange Windw is nt pen, click

More information

BASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines

BASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines BASIC SAFETY AND FABRICATION GUIDE Safety Guidelines These manuals are designed t give basic guidelines t help ensure that Century Quartz Stne Surfaces prducts are t be handled, stred, fabricated, and

More information

Ten-Tec Model RX-366 Subreceiver 565/566 Subreceiver Installation and Operation Manual-74467

Ten-Tec Model RX-366 Subreceiver 565/566 Subreceiver Installation and Operation Manual-74467 Ten-Tec Mdel RX-366 Subreceiver 565/566 Subreceiver Installatin and Operatin Manual-74467 Tls required: Sldering irn r heat gun (fr shrinking heat shrink tubing) Number 1 Phillips screw driver Number 2

More information

Pencil Drawing. Hard 2H H F HB B 2B 4B 6B Soft

Pencil Drawing. Hard 2H H F HB B 2B 4B 6B Soft This activity is abut learning hw t use ur pencils t create wnderful images like these. Take a lk at a few that All Saints students have dne in the past. (Take a lk at the riginals at the frnt f the rm

More information

BigMouth

BigMouth http://www.scaryguys.cm/bigmuth.htm BigMuth Yu're walking dwn a dark path, and cme upn an area cvered with cam net. On ne wall it lks like a table with a skull perched n the edge. Just cam net hanging

More information

Double Axis Square Turned Bowl

Double Axis Square Turned Bowl Duble Axis Square Turned Bwl Thames Valley Wdturners' Guild Presented by Paul Newtn INTRODUCTION Yur Presenter: Paul Newtn has been wdturning fr apprximately six years. He is a member f the American Assciatin

More information

A2: Aperture, DOF, & Focus

A2: Aperture, DOF, & Focus Art 205 A2: Aperture, DOF, & Fcus Original RAW Shts Due: Crit Date: Requires 2 Ink Jet Prints (50 pints) Objectives: 1. T understand hw apertures like f-16 & f-22 have a large DOF r range f fcus. 2. T

More information

A Geno Technology, Inc. (USA) brand name. Orbital Shaker. Cat. No. BT909, BT926, BT

A Geno Technology, Inc. (USA) brand name. Orbital Shaker. Cat. No. BT909, BT926, BT A Gen Technlgy, Inc. (USA) brand name Orbital Shaker Cat. N. BT909, BT926, BT927 1-800-628-7730 1-314-991-6034 inf@btlabsystems.cm Thanks fr chsing BT Lab Systems BT909 Orbital Shaker. This peratin manual

More information

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start:

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start: Claim Amalgamatin Amalgamate means t jin 2 r mre cell claims int ne cell claim. Befre yu start: Yu will need t knw the title numbers f the cell titles fr amalgamatin. If yu are acting as an agent, yu must

More information

Cascading Skirt Pattern

Cascading Skirt Pattern Cascading Skirt Pattern Fr this pattern yu will need: 1/3 yard f well draping fabric. Swimwear, dance fabrics, and very stretch knits are the perfect fabrics fr this pattern s style. (Yu can use ld T-shirts

More information

Take Along Sewing Tote

Take Along Sewing Tote Take Alng Sewing Tte This great tte will hld lts f supplies fr yur take alng prjects. Specifically designed fr English Paper Piecing, any small prject will fit int this tte. Just thrw it in yur purse and

More information

21 st Century Shooting

21 st Century Shooting 21 st Century Shting NECK TURNING LATHE USER MANUAL WARNING: FAILURE TO FOLLOW THESE INSTRUCTIONS CAN CAUSE CATASTROPHIC CASE FAILURE RESULTING IN DAMAGE TO YOUR FIREARM AND SEVERE INJURY OR DEATH. Precisin

More information

Using the Register of Swiss Surnames

Using the Register of Swiss Surnames Using the Register f Swiss Surnames Switzerland Hw t Guide, Beginning Level: Instructin Octber 2015 GOAL This guide will teach yu t navigate the nline versin f the Register f Swiss Surnames, and hw t utilize

More information

Cyrus Redblock. Kit Inventory

Cyrus Redblock. Kit Inventory Kit Inventry Cyrus Redblck Left and Right Inner Side Panels Frnt and Back Inner Panels Shelf Panel Base Outer Panel Drawer Left and Right Sides Frnt and Back Drawer pieces Drawer Stp and Tw (2) Drawer

More information

Appendix M Trellis Type Shade Structure Design Guide

Appendix M Trellis Type Shade Structure Design Guide Residential Design Guidelines fr Marley Park 178 Appendix M Trellis Type Shade Structure Design Guide Trellis Type Shade Structures: Trellis Type Shade Structures are typically cnstructed with pen trellis

More information

m LUCASEY SLELCD COMPANY Important! Please read all warnings and cautions before installing the mount. SLELCD DETAILED INSTRUCTIONS Page 1 of 6

m LUCASEY SLELCD COMPANY Important! Please read all warnings and cautions before installing the mount. SLELCD DETAILED INSTRUCTIONS Page 1 of 6 SLELCD DETAILED INSTRUCTIONS Page 1 f 6 SLELCD m LUCASEY STEALTH LOCKING FURNITURE MOUNT Fits up t 26" flat panel mnitrs with 200mm x 200mm, 200mm x 100mm, 100mm x 100mm and 75mm x 75mm VESA munt ng patterns.

More information

Wilsonart Decorative Edge Fabrication Manual. Wilsonart Decorative Edges

Wilsonart Decorative Edge Fabrication Manual. Wilsonart Decorative Edges Wilsnart Decrative Edge Fabricatin Manual Wilsnart Decrative Edges BR1515 - Revisin 9-30-2011 Wilsnart Decrative Edges Prduct Descriptin Wilsnart Decrative Edge mldings may well be the best way t attain

More information

SolarEdge Built-in Revenue Grade Meter Troubleshooting

SolarEdge Built-in Revenue Grade Meter Troubleshooting SlarEdge Built-in Revenue Grade Meter Trubleshting Versin 1.0 Cntents Trubleshting Meter Cnnectin 3 Cmmunicatin Status Screen Trubleshting 3 Device Type and Prtcl are cnfigured incrrectly 3 Number f devices

More information

Samples from

Samples from BCI jist hanger. - Backer blck. Nail with 10 ~ 10d nails. Filler blck. Nail with 10 10d nails. Backer blck required where hanger lad exceeds 1000 Ibs. Backer fr hriznal / siding r stucc. --- BCI jist hanger.

More information

SISTEMA ELEVATÓRIO ETV 460A

SISTEMA ELEVATÓRIO ETV 460A Parts included with yur Flat Lift Lift unit ( #1 ) Pwer supply ( #2 ) R.F. Mdule ( #3 ) Rcker switch ( #4 ) Remte Cntrl ( #5 ) Lift unit ( #1 ) Remte Cntrl ( #5 ) Pwer supply ( #2 ) Rcker switch ( #4 )

More information

Meet the Science Expert

Meet the Science Expert Smithsnian Latin Center Meet the Science Expert DESCUBRA! CREATE-IT POCKET SCIENCE HANDOUTS DESIGN AND BUILD WIND INSTRUMENTS 1. Overview: Wrking with different sized straws and ther materials (see the

More information

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID:

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID: xtltipelement Service Infrmatin 2015 Chevrlet Crvette Crvette Service Manual 7527625 Bdy Systems Vehicle Access Repair Instructins Dcument ID: 3448513 Remte Cntrl Dr Lck and Theft Deterrent Transmitter

More information

COMP 110 INTRODUCTION TO PROGRAMMING WWW

COMP 110 INTRODUCTION TO PROGRAMMING WWW COMP 110 INTRODUCTION TO PROGRAMMING WWW http://cmp110www.web.unc.edu Fall 2011 Hmewrk 3 Submissin Deadline: 10:59 AM, Oct 24 Overview Validating Multiple Chess Mves n a Chessbard Fr this assignment yu

More information

OMAL MITER RT Round End Tenon Machine for Stiles and Rails

OMAL MITER RT Round End Tenon Machine for Stiles and Rails OMAL MITER 600 2 RT Rund End Tenn Machine fr Stiles and Rails MACHINE SPECIFICATIONS: CNC END TENON MACHINE with TWO Spindles The Miter 600 2 RT is a CNC ruting machine specially studied t execute a precise

More information

To receive a service letter, please scan the Volunteer Log and it to:

To receive a service letter, please scan the Volunteer Log and  it to: Thank yu fr yur interest in helping the animals at San Dieg Humane Sciety s Prject Wildlife! We wuld nt be able t prvide the level f care and cmmitment t ur animals withut the help f peple like yu. This

More information

Machine Shop Lab Manual GENERAL INSTRUCTION

Machine Shop Lab Manual GENERAL INSTRUCTION Machine Shp Lab Manual GENERAL INSTRUCTION 1. Every student shuld btain a set f instructin sheets entitled manufacturing prcesses Labratry. 2. Fr reasns f safety, every student must cme t the labratry

More information

Consciousness Shifting

Consciousness Shifting Frmula fr Miracles Presents Cnsciusness Shifting Shift Yur Cnsciusness, Open Yur Mind, and See Int The Matrix With Open Eyes! By Brent Phillips and Daniel Metraux www.frmulafrmiracles.net Shift Yur Cnsciusness

More information

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server.

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server. Autmatic impsitin Page 1/8 Autmatic impsitin Descriptin Autmatic impsitin will d the mst cmmn impsitins fr yur digital printer. It will autmatically d flders fr A5, A4 r US Letter page sizes in either

More information

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter .,Plc..d,~t l~ucji PA300 DIGITAL BASS PROCESSOR Cngratulatins n yur purchase f a Planet Audi signal prcessr. It has been designed, engineered and manufactured t bring yu the highest level f perfrmance

More information

INFINITY ALUMINUM INSTALLATION GUIDE

INFINITY ALUMINUM INSTALLATION GUIDE 1 INFINITY ALUMINUM INSTALLATION GUIDE Revised 01/17 2 PLEASE NOTE All installatins have a varying degree f uniqueness t them. The fllwing instructins are meant t be general guidelines. If yu are installing

More information

WiFi Lab C. Equipment Needs:

WiFi Lab C. Equipment Needs: WiFi Lab C Event Objective: Teams will cnstruct an antenna prir t the turnament that is designed t transmit a signal at 2.4 GHz and cmplete a written test n the principles f electrmagnetic wave prpagatin.

More information

Great Guitars! SKILLS/OBJECTIVES o To understand how sound is created o To understand frequency and its relationship to wave shape o To make guitars

Great Guitars! SKILLS/OBJECTIVES o To understand how sound is created o To understand frequency and its relationship to wave shape o To make guitars Great Guitars! FRAMEWORK I. Scientific and Engineering Practices 4 II. Crss-Cutting Cncepts 2 III. Disciplinary Cre Ideas PS 1, PS 2, ETS 2 SKILLS/OBJECTIVES T understand hw sund is created T understand

More information

ComfortView. Application and Technical Overview. Neighborhood Street Lights.

ComfortView. Application and Technical Overview. Neighborhood Street Lights. CmfrtView Neighbrhd Street Lights Applicatin and Technical Overview www.letek.cm LED street lights first entered the marketplace nearly a decade ag. Since that time, millins f luminaires have been specified,

More information

FG-03: Hand Burn Profile

FG-03: Hand Burn Profile FG-03: Hand Burn Prfile Page 1 f 9 SAFETY FIRST Fllw all Caterpillar facility safety standards when perfrming this task. An explsive hazard exists if acetylene leaks when wrking in a cnfined space r if

More information

6 th and 7 th Grade Advisory Plans (Week 16)

6 th and 7 th Grade Advisory Plans (Week 16) 6 th and 7 th Grade Advisry Plans (Week 16) This week in Advisry: On Mnday students will check in and share ut. On Tuesday- Thursday, students will participate in a fun grup building activity t minimize

More information

Pool & Hot Tub Guide

Pool & Hot Tub Guide Pl & Ht Tub Guide PERMIT(S) FOR POOLS/HOT TUBS WITH SIDE WALLS > 24 ***** ALL FEES DUE AT TIME OF APPLICATION ***** Building Permit Applicatin. Be aware f any subdivisin restrictins prir t applicatin.

More information

CUSTOMER PORTAL. Floorplan Management

CUSTOMER PORTAL. Floorplan Management CUSTOMER PORTAL Flrplan Management FLOORPLAN ANALYTICS The flrplan analytics area displays flrplans yu have uplad t the prtal (if yu haven t yet upladed a flrplan please cntact ur supprt department). Frm

More information

Remote Control Learn Button Receiver Input Connections

Remote Control Learn Button Receiver Input Connections Remte Cntrl Learn Buttn Receiver Input Cnnectins Remte Cntrl LED Light Wi-fi/Factry Reset Buttn Receiver Output Cnnectin Heartbeat LED Light PRV Cnnectins Pwer Reset Buttn Pl / Treadmill Switch Flat Switch

More information

VM1AT-R1 INDUSTRIAL MICROCONTROLLER

VM1AT-R1 INDUSTRIAL MICROCONTROLLER VM1AT-R1 INDUSTRIAL MICROCONTROLLER WARNING T avid permanent damage t integrated circuits yu may take precautins t discharge any static electricity frm yur bdy befre handling them. ASSEMBLY INSTRUCTIONS

More information

Design and fabricate a lamp using the given electrical component.

Design and fabricate a lamp using the given electrical component. Lamp Prject: Design and fabricate a lamp using the given electrical cmpnent. Cmplete the fllwing: Preliminary sketches Bill f Materials Dcument Hardware List Dcument Labr Time Estimate Dcument What is

More information

Improv Piecing and Matchstick Quilting By Kelly Nagel, Sulky of America

Improv Piecing and Matchstick Quilting By Kelly Nagel, Sulky of America Imprv Piecing and Matchstick Quilting By Kelly Nagel, Sulky f America What is Imprv Piecing? Piecing withut a set pattern, hwever, yu can plan yur entire quilt befre yu start, if yu chse. This kind f piecing

More information

Insert Picture, reduce the size of a Picture and Wrap text around a picture

Insert Picture, reduce the size of a Picture and Wrap text around a picture Insert Picture, reduce the size f a Picture and Wrap text arund a picture Yu can insert pictures frm different places, such as yur cmputer, an nline surce like Bing.cm, a webpage, r a scanned image. Insert

More information

Banner pocket v3 Page 1/7. Banner pocket v3

Banner pocket v3 Page 1/7. Banner pocket v3 Banner pcket v3 Page 1/7 Banner pcket v3 Descriptin Banner pcket will help yu get the printed sheets arranged in the way yu need fr attaching the frnt and back side pckets tgether. It will crp ne sides

More information

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL Yu will learn the fllwing in this lab: The UNIVERSITY f NORTH CAROLINA at CHAPEL HILL Cmp 541 Digital Lgic and Cmputer Design Prf. Mntek Singh Fall 2016 Lab Prject (PART A): Attaching a Display t the Prcessr

More information

APPLICATION NOTE Sales & Application DEWESoft Slovenia

APPLICATION NOTE Sales & Application DEWESoft Slovenia Sales & Applicatin DEWESft Slvenia Abstract: This applicatin nte shws a measurement with DEWESft sund pwer measurement system and GRAS 67HA Hemisphere. The bject under test was a standard ntebk, the measurement

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

Dorsey s Search. Name Address Home Telephone Work.  Address. Property Owner s Signature Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr

More information

RIG SOLAR FILM. High quality clear 48 gauge Polymer material \V;th excellent transmission qualities.

RIG SOLAR FILM. High quality clear 48 gauge Polymer material \V;th excellent transmission qualities. ... a. Ul -'" '" c / RIG SOLAR FILM Fr ver 25 years, Thusand Oak Optical has manufactured the mst ppular white lightfilters in the wrld. Nw with the intrductin f the R-G slar film, ur traditin f excellence

More information

N2CX Accuprobe Plus Assembly Instructions

N2CX Accuprobe Plus Assembly Instructions N2CX Accuprbe Plus Assembly Instructins First ff, check t see if the parts match the parts list. Electrical cmpnents: R1 1K, 1/4W, 5%, (BRN, BLK, RED, GLD) R2 1M, 1/4W, 5%, (BRN, BLK, GRN, GLD) R3 15K,

More information

Using the Laser Cutter

Using the Laser Cutter Using the Laser Cutter Prerequisites Befre yu will be allwed t use the laser cutter, yu must cmplete these three steps: 1. Yu must have cmpleted the Laser Cutter training at Cyberia 2. Yu must schedule

More information

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting Revisin Date: 12/31/2012 Table f Cntents 1. Institutin, Cre Facility and Lab Administratin Reprting Overview...2 2. Hw d I access ilab Reprts?...3 3. What is the General Functinality fr ilab Reprting?...6

More information

Specification for Learning and Qualifications for Physical Intervention Skills

Specification for Learning and Qualifications for Physical Intervention Skills Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

Selecting Yo r Guitar Notes on the First String: Introducing E Acoustic Guitars and Electric Guitars The Note E with Chords Tuning Your Guitar

Selecting Yo r Guitar Notes on the First String: Introducing E Acoustic Guitars and Electric Guitars The Note E with Chords Tuning Your Guitar Selecting Yur Guitar... 5 Steel Strings and Nyln Strings Acustic Guitars and Electric Guitars... 7 aring fr Yur Guitar Tuning Yur Guitar... 9 Tuning with the Ds Tuning withut the Ds Hw t Hld Yur Guitar...

More information

Colourful Stitches. Quick Summer Medallion. 45 x 45 Gyleen X. Fitzgerald Quick Summer Medallion.

Colourful Stitches. Quick Summer Medallion. 45 x 45 Gyleen X. Fitzgerald   Quick Summer Medallion. Quick Summer Medallin 45 x 45 Clurful Stitches 16 (finished) panel r rphan blck fr center ½ yard, center framing triangles ¼ yard, skinny frame brder 1 ⅔ yard, inside setting triangles 1¼ yard, utside

More information

Operating Instructions

Operating Instructions TC 60/8 THERMOCOMPUTER TC 60/8 temp / time s s temp / time k start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing

More information

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732 Prgram Infrmatin 1 DXF2DAT 3.0 Prfessinal Designed Cmputing Systems 848 W. Brtn Rad Essexville, Michigan 48732 Cntact: (989) 892-4376 website: http://www.famwrk.net General Infrmatin: inf@famwrk.net Technical

More information

5. Experimental Results

5. Experimental Results 5. xperimental Results Prttype mdels f the duble spherical helix the hemispherical helix studied in Sectins 4.3.2 4.4 were cnstructed measured. Fabricatin f these antennas measurement f their radiatin

More information

Installation hole (4.2mm) Push. Ambient daylight threshold. 8 hours manual on

Installation hole (4.2mm) Push. Ambient daylight threshold. 8 hours manual on STPSENSOR fr STRIP Mdel: STPSENSOR Infrared remte receiver Remte Cntrl (SENSORRC) sld separately Sensr antenna Buzzer Detectin area LED indicatin. Daylight threshld Stand-by perid 6. 9. 0 SYNC SYNC N L

More information

STRONGHOLD IRON INSTALLATION GUIDE

STRONGHOLD IRON INSTALLATION GUIDE 1 STRONGHOLD IRON INSTALLATION GUIDE Revised 01/16 2 PLEASE NOTE All installatins have a varying degree f uniqueness t them. The fllwing instructins are meant t be general guidelines. If yu are installing

More information

For as long as there have been people trying to find their way, there have been stars to guide them. Stars dance in the heavens weather we see them

For as long as there have been people trying to find their way, there have been stars to guide them. Stars dance in the heavens weather we see them Fr as lng as there have been peple trying t find their way, there have been stars t guide them. Stars dance in the heavens weather we see them there r nt. They warm the darkness f the night and fill us

More information

Set up and use your Beats X earphones

Set up and use your Beats X earphones Set up and use yur Beats X earphnes Here's everything yu need t knw t make the mst f yur Beats X earphnes. Turn n The pwer buttn is n the cable beneath the right earphne. Press and hld the buttn fr 1 secnd

More information

Super ABC Plug-in kit for Pacman or Ms Pacman

Super ABC Plug-in kit for Pacman or Ms Pacman Super ABC Plug-in kit fr Pacman r Ms Pacman This page is a technical reference fr thse wh wn the SUPER ABC kit manufactured by Tw Bit Scre during the 1990's. This prduct is n lnger available. Under the

More information

Dry Contact Sensor DCS15 User Manual

Dry Contact Sensor DCS15 User Manual Dry Cntact Sensr DCS15 User Manual Help Versin updated till firmware 404i / SP456 Cpyright 2012, AKCess Pr C., Ltd.. Intrductin / What is a Dry Cntact Sensr The Dry Cntact sensr r DCS15 is a simple cnnectin

More information

Fitting instructions for all. SitaRoof- and renovation outlets, extension elements and accessories

Fitting instructions for all. SitaRoof- and renovation outlets, extension elements and accessories s fr all SitaRf- and renvatin utlets, extensin elements and accessries Cntents General Infrmatin... 01. SitaStandard SitaTrendy - SitaDSS Prfi rf utlet... with extensin unit... 5 02. SitaTrendy screw-n-flange

More information

Fitting instructions for all. Sita balcony outlets, extension units and accessoires

Fitting instructions for all. Sita balcony outlets, extension units and accessoires Fitting instructins fr all Sita balcny utlets, extensin units and accessires Fitting instructin Cntents General infrmatin...3 1. Sita balcny utlet with cnnectin sleeve... 4 2. Sita balcny utlet with screw-n-flange...

More information

Door Restore System 2K

Door Restore System 2K Dr Restre System 2K Using Chem-Clear 2k Clear Cats Fr refurbishing ld mini warehuse rlling steel drs Dr-Restre System 2K was develped specifically fr the restratin f aging rll drs where the paint has xidized

More information

Potting Bench BUILD TIME

Potting Bench BUILD TIME Ptting Bench 1 GET MORE PROJECT PLANS AT www.yellawd.cm BUILD TIME Cutting parts: 2 4 hurs Assembly: 6 8 hurs Finishing: 4 5 hurs Ttal: 12 17 hurs Gardening wrk will be mre enjyable and efficient with

More information

Pulse Width Modulation (PWM) Cornerstone Electronics Technology and Robotics II

Pulse Width Modulation (PWM) Cornerstone Electronics Technology and Robotics II Pulse Width Mdulatin (PWM) Crnerstne Electrnics Technlgy and Rbtics II Administratin: Prayer PicBasic Pr Prgrams Used in This Lessn: General PicBasic Pr Prgram Listing: http://www.crnerstnerbtics.rg/picbasic.php

More information

Tube Change for PANalytical X-Pert Pro

Tube Change for PANalytical X-Pert Pro Tube Change fr PANalytical X-Pert Pr Hw t change x-ray tube fr PANalytical X-Pert Pr in CSL 1011 @ Flrida State University Dr Thayumanasamy Smasundaram, Senir Research Assciate Flrida State University

More information

Excel Step by Step Instructions Creating Lists and Charts. Microsoft

Excel Step by Step Instructions Creating Lists and Charts. Microsoft Infrmatin Yu Can Enter in a Wrksheet: Labels: Any type f text r infrmatin nt used in any calculatins. Labels are used fr wrksheet headings and make wrksheets easy t read and understand. Labels can als

More information

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data IR Emitter and Detectr 1. Descriptin Lite-On ffers a brad range f discrete infrared cmpnents fr applicatin such as remte cntrl, IR wireless data transmissin, security alarm & etc. Custmers need infrared

More information

You Be The Chemist Challenge Official Competition Format

You Be The Chemist Challenge Official Competition Format 2018-2019 Yu Be The Chemist Challenge Official Cmpetitin Frmat This dcument prvides detailed infrmatin regarding the Challenge frmat at each level f the cmpetitin. Schl Crdinatrs, participants, and parents/guardians

More information

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges Please read all instructions before installing Palladium Wall Panel System. 1. Before installation: a. Acclimate Palladium Panels, reveals, adhesives and wall substrates to room temperature 24 hours before

More information

SINGER FUTURA TM Holiday Banner

SINGER FUTURA TM Holiday Banner SINGER FUTURA TM Hliday Banner Have fun decking the halls with this festive banner! It s s simple t make the HyperFnt sftware and yur SINGER FUTURA machine. Create the base applique right in yur embridery

More information

FXP611 Flexible PCB Antenna with Cable Application Note

FXP611 Flexible PCB Antenna with Cable Application Note FXP611 Flexible PCB Antenna with Cable Applicatin Nte APN-14-8-001/A/MB Page 1 f 6 1. BASICS A Flexible PCB antenna with cable is a very flexible, lw prfile, highly reliable, and ecnmical slutin widely

More information

2018 Print and DPI Annual Competition Rules

2018 Print and DPI Annual Competition Rules Brisbane Camera Grup 'Annual Cmpetitin' takes place in Nvember each year. It's the highlight f the club cmpetitin year and submissin standards are cnsistently high. All graded members are eligible and

More information

MWL-MT10DX Turbo Ace Semi-Automated Tungsten Electrode Grinder

MWL-MT10DX Turbo Ace Semi-Automated Tungsten Electrode Grinder MWL-MT10DX Turb Ace Semi-Autmated Tungsten Electrde Grinder Operatins Guide 2 Table f Cntents Technical Specificatins 2 Parts Diagram 3 Grinding Instructins 4 Adjusting Preset Grinding Time 5 Adjusting

More information

Flash Image Rotator Web Part

Flash Image Rotator Web Part Flash Image Rtatr Web Part User Guide Cpyright 2007 Data Springs Inc. All rights reserved. Table f cntents: 1 INTRODUCTION...3 2 INSTALLATION PROCEDURE...4 2.1 After installatin ntes:...5 2.2 Trubleshting...6

More information

Laminators Incorporated manufactures a full line of sign panel products that are the industry standard for professional sign makers.

Laminators Incorporated manufactures a full line of sign panel products that are the industry standard for professional sign makers. 2014 Laminatrs Incrprated manufactures a full line f sign panel prducts that are the industry standard fr prfessinal sign makers. Our sign bards are strng, durable, and ready t use. Available in a variety

More information

Building and Installing Bumblebee Houses

Building and Installing Bumblebee Houses 17507 Frt Rad Edmntn AB T5Y 6H3 Phne: 780-643-6732 Email: inf@awes-ab.ca Building and Installing Bumblebee Huses Each spring in Alberta, millins f queen bumblebees wake up frm hibernatin, shake themselves

More information

Introduction to Life Cycle Risk Management Help Page

Introduction to Life Cycle Risk Management Help Page Select a frequently asked questin (FAQ) t skip t its answer. Hw is the curse rganized? Wh shuld take this curse? Hw d I get credit fr this curse? What d all the navigatin buttns d? Hw d I knw what t click?

More information

ANTIOCH UNIVERSITY VIRTIUAL WRITING CENTER

ANTIOCH UNIVERSITY VIRTIUAL WRITING CENTER IDENTIFYING AUDIENCE AND PURPOSE As yu mve further int yur research, it can be helpful t step back and name the purpse and audience yu think yur writing will serve. The prcess belw will help yu sift thrugh

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

IR Emitter and Detector Product Data Sheet LTE-R38386AS-ZF Spec No.: DS Effective Date: 09/14/2016 LITE-ON DCC RELEASE

IR Emitter and Detector Product Data Sheet LTE-R38386AS-ZF Spec No.: DS Effective Date: 09/14/2016 LITE-ON DCC RELEASE IR Emitter and Detectr Prduct Data Sheet Spec N.: DS5-216-5 Effective Date: 9/14/216 Revisin: - LITE-ON DCC RELEASE BNS-OD-FC1/A4 LITE-ON Technlgy Crp. / Optelectrnics N.9,Chien 1 Rad, Chung H, New Taipei

More information

Flux Bender Equalizer

Flux Bender Equalizer Lightning By Audi Flux Bender Equalizer Users Guide 2014 Revised 2015 Cngratulatins n an excellent purchase! This guide was put tgether t help yu get the mst ut f yur investment. Please read this thrughly

More information

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS DT0069 Design tip Enabling the Bluetth Lw Energy Direct Test Mde (DTM) with BlueNRG-MS By Salv Bnina Main cmpnents BlueNRG-MS Upgradable Bluetth Lw Energy netwrk prcessr SPBTLE-RF Very lw pwer mdule fr

More information

INSTRUCTION BOOKLET (PUZZLES BY NIKOLA ZIVANOVIC)

INSTRUCTION BOOKLET (PUZZLES BY NIKOLA ZIVANOVIC) LMI DECEMBER PUZZLE TEST PUZZLES & CHESS -2. DECEMBER 200. INSTRUCTION BOOKLET (PUZZLES BY NIKOLA ZIVANOVIC) SUBMISSION: http://lgicmastersindia.cm/m2002p 0 PUZZLES 70 MINUTES POINTS TABLE CHESS BATTLESHIPS

More information