Galileo Exploitation 2018 Grant Plan

Size: px
Start display at page:

Download "Galileo Exploitation 2018 Grant Plan"

Transcription

1 Galile Explitatin 2018 Grant Plan Galile Explitatin 2018 Grant Plan 1. Multi-frequency multipurpse antenna fr Galile (GEX.0034) LEGAL BASIS Regulatin (EU) N 1285/2013 f the Eurpean Parliament and f the Cuncil f 11 December 2013 n the implementatin and explitatin f Eurpean satellite navigatin systems and repealing Cuncil Regulatin (EC) N 876/2002 and Regulatin (EC) N 683/2008 f the Eurpean Parliament and f the Cuncil and Delegatin Agreement between the Eurpean Unin, represented by the Eurpean Cmmissin and the Eurpean GNSS Agency n the Explitatin Phase f the Galile Prgramme signed n 2 Octber Call fr prpsals BUDGET LINE: 3922 BACKGROUND: The mdernisatin f existing GNSS cnstellatins and the arrival f new GNSS systems have increased the number f bands t be cvered by GNSS antennas. Bth the mass market and the prfessinal applicatins will benefit f the imprvement in psitining and navigatin perfrmances derived frm this multi-frequency cncept, bringing the need fr antennas that can supprt a wider bandwidth. Users grups frm different GNSS markets have particular needs, such as peratinal requirements, regulatins r envirnmental cnditins. Enabling multi-frequency capabilities requires the antenna t cpe with, n ne hand, higher bandwidth requirements and n the ther hand with the cnstraints impsed by the platfrm n which the antenna perates. Advances in antenna design enable the emergence f multipurpse antennas, able t cperate with varius type f receivers and t be used in hetergeneus applicatins and market segments. This may maximise in this way the advantages f the ecnmies f scale. Enabling multipurpse capabilities requires cping with different user needs and allwing a smth integratin with very hetergeneus platfrms and receivers. Objectives pursued and freseen results: 1

2 Galile Explitatin 2018 Grant Plan T invest further in Galile-ready multipurpse multifrequencies antennas, develping a cmmn technlgy multi-frequency antenna fr Galile prfessinal and mass-market users. Descriptin f the activities t be funded under the call fr prpsals: The call fr prpsals is intended t fund up t tw (2) prjects with the fllwing activities: Develp and test f a cmmn technlgy multi-frequency antenna fr Galile prfessinal and mass-market users. The advanced antenna shall be multi frequency-capable (e.g. L1/E1, L2, L5/E5, E6) antennas and adaptive in rder t supprt prfessinal/mass market and ptentially gvernmental applicatins requiring high accuracy, high rbustness and high reliability. The antenna shall be cmmercially ready with a cmpetitive cst. Essential eligibility, selectin and award criteria: 1. Eligibility - The prpsal may be submitted by entities fulfilling all the criteria belw: Legal persns established 1 in and/r natural persn(s) wh is natinal f ne f the fllwing cuntries, are eligible: EU Member States Switzerland, Nrway, Applicants must crrespnd t the definitin f the fllwing target rganisatins: active in the develpment, integratin and/r manufacturing f GNSS antennas, cmpnents, receivers and/r expert in the field f GNSS Research and develpment (R&D) 2. Nn-exclusin criteria Article 105a, paragraphs 1 t 4, 6 and 7, except pint (b) f the first subparagraph and the secnd subparagraph f that paragraph, paragraphs 8, 9, 11 and 13 t 17 f Article 106 and Article 108 f Financial Regulatins shall apply t grant applicants and beneficiaries. Article 107 shall apply t applicants. Applicants shall declare whether they are in ne f the situatins referred t in Article 106(1) r Article 107 and, where applicable, whether they have taken remedial measures as referred t in pint (a) f Article 106(7). 3. The applicants must fulfil the fllwing selectin criteria: - The financial capacity f the applicant t perfrm the prpsed activities - The technical capacity f the applicant t perfrm the prpsed activities 1 Established shuld be understd as having a registered ffice, central administratin r principal place f business in ne f these cuntries. 2

3 Galile Explitatin 2018 Grant Plan 4. Main award criteria: - Relevance f the prpsal t achieve the bjectives f the call, credibility f the prpsed apprach, and innvatin f the slutins prpsed; - Impact in terms f ecnmic and public benefits derived frm the prpsal including but nt limited t a cherent business plan fr the explitatin f the results f the grant; - Credible and effective disseminatin plan fr the results in the best interest f the Eurpean Unin; - Quality f the implementatin: cherence and effectiveness f the wrk plan, including apprpriateness f the allcatin f tasks and resurces. Indicative timetable and indicative amunt f the call fr prpsals: - Allcated budget fr the Call fr Prpsal: 2,800,000 (up t 2 (tw) prjects t be granted, depending n the quality f the prpsals received) Stages Planning (pssible subject t updates) a) Publicatin f the call Q b) Deadline fr submitting applicatins Q c) Evaluatin perid Q d) Infrmatin t applicants n the utcme f the evaluatin Q e) Signature f the Grant Agreements Q Maximum pssible rate f c-financing f the eligible ttal csts: Up t 70% funding f the eligible ttal csts. 3

4 Galile Explitatin 2018 Grant Plan 2. Safety f Life fr lcalisatin in train signalling (GEX.0066) LEGAL BASIS Regulatin (EU) N 1285/2013 f the Eurpean Parliament and f the Cuncil f 11 December 2013 n the implementatin and explitatin f Eurpean satellite navigatin systems and repealing Cuncil Regulatin (EC) N 876/2002 and Regulatin (EC) N 683/2008 f the Eurpean Parliament and f the Cuncil and Delegatin Agreement between the Eurpean Unin, represented by the Eurpean Cmmissin and the Eurpean GNSS Agency n the Explitatin Phase f the Galile Prgramme signed n 2 Octber Call fr prpsals BUDGET LINE: 3922 BACKGROUND: E-GNSS serves the rail sectr in varius ways: frm the well-knwn applicatins such as passenger infrmatin, asset management t High and Lw Density Cmmand & Cntrl Systems. GNSS enabled signalling applicatins prvide increased safety and reduce csts f infrastructure management and peratins cmpared t legacy signalling slutins. The Eurpean signalling industry is in strng cmpetitin frm ther cuntries, which invested in the past int GNSS based railway signalling slutins. Objectives pursued and freseen results: Develpment f reliable train psitining slutin t ensure presence f Eurpean prducts fr the future signalling slutins based n E-GNSS. Descriptin f the activities t be funded under the call fr prpsals: The call fr prpsals is intended t fund up t ne (1) prjects with the fllwing activities: Develpment and qualificatin f a Safety f Life multicnstellatin receiver fr use in Safety critical railway signalling applicatins accrding t the user requirements and train psitining system architecture and accrding t the perfrmance specificatin, based n previus related prjects and initiatives E-GNSS perfrmance test in railway specific envirnment and develpment f Minimum Operatinal Perfrmance specificatin 4

5 Galile Explitatin 2018 Grant Plan Essential eligibility, selectin and award criteria: 5. Eligibility - The prpsal may be submitted by entities fulfilling all the criteria belw: Legal persns established 2 in and/r natural persn(s) wh is natinal f ne f the fllwing cuntries, are eligible: EU Member States Switzerland, Nrway, Applicants must crrespnd t the definitin f the fllwing target rganisatins: active in the develpment, integratin and/r manufacturing f GNSS cmpnents, receivers, antennas and/r expert in the field f GNSS Research and develpment (R&D) 6. Nn-exclusin criteria Article 105a, paragraphs 1 t 4, 6 and 7, except pint (b) f the first subparagraph and the secnd subparagraph f that paragraph, paragraphs 8, 9, 11 and 13 t 17 f Article 106 and Article 108 f Financial Regulatins shall apply t grant applicants and beneficiaries. Article 107 shall apply t applicants. Applicants shall declare whether they are in ne f the situatins referred t in Article 106(1) r Article 107 and, where applicable, whether they have taken remedial measures as referred t in pint (a) f Article 106(7). 7. The applicants must fulfil the fllwing selectin criteria: - The financial capacity f the applicant t perfrm the prpsed activities - The technical capacity f the applicant t perfrm the prpsed activities 8. Main award criteria: - Relevance f the prpsal t achieve the bjectives f the call, credibility f the prpsed apprach, and innvatin f the slutins prpsed; - Impact in terms f ecnmic and public benefits derived frm the prpsal including but nt limited t a cherent business plan fr the explitatin f the results f the grant; - Credible and effective disseminatin plan fr the results in the best interest f the Eurpean Unin; - Quality f the implementatin: cherence and effectiveness f the wrk plan, including apprpriateness f the allcatin f tasks and resurces. 2 Established shuld be understd as having a registered ffice, central administratin r principal place f business in ne f these cuntries. 5

6 Galile Explitatin 2018 Grant Plan Indicative timetable and indicative amunt f the call fr prpsals: - Allcated budget fr the Call fr Prpsal: 5,000,000 (up t 1 (ne) prjects t be granted, depending n the quality f the prpsals received) Stages Planning (pssible subject t updates) a) Publicatin f the call Q b) Deadline fr submitting applicatins Q c) Evaluatin perid Q d) Infrmatin t applicants n the utcme f the evaluatin Q e) Signature f the Grant Agreements Q Maximum pssible rate f c-financing f the eligible ttal csts: Up t 70% funding f the eligible ttal csts. 6

7 Galile Explitatin 2018 Grant Plan 3. Filling the gaps in E-GNSS receivers and assciated technlgies (GEX.0206) LEGAL BASIS Regulatin (EU) N 1285/2013 f the Eurpean Parliament and f the Cuncil f 11 December 2013 n the implementatin and explitatin f Eurpean satellite navigatin systems and repealing Cuncil Regulatin (EC) N 876/2002 and Regulatin (EC) N 683/2008 f the Eurpean Parliament and f the Cuncil and Delegatin Agreement between the Eurpean Unin, represented by the Eurpean Cmmissin and the Eurpean GNSS Agency n the Explitatin Phase f the Galile Prgramme signed n 2 Octber Call fr prpsals BUDGET LINE: 3922 BACKGROUND: GNSS market and technlgy is rapidly evlving, fllwing n ne hand the pull f increasingly sphisticated technlgies and emplying f cmplementary techniques and, n the ther hand, the push frm the users that have grwing demands in terms f psitining accuracy, cntinuity, availability and interperability with ther systems. Additinally, the prices f the GNSS user equipment is reprtedly decreasing. The Fundamental Elements scheme is funding the develpment f E-GNSS-enabled chipsets, receivers and antennas fr dedicated user grups and the n-ging prjects cver the distinctive GNSS markets such as aviatin, maritime, rad, rail, LBS, agriculture, surveying and mapping, timing and synchrnisatin. One f the bjectives f the Fundamental Elements is t strengthen the Eurpean manufacturers, integratrs by enlarging the ffer f Eurpean GNSS prducts. Objectives pursued and freseen results: T invest in clse-t-market GNSS receivers and assciated technlgies that are nt develped by the FE ther prjects 7

8 Galile Explitatin 2018 Grant Plan Descriptin f the activities t be funded under the call fr prpsals: The call fr prpsals is intended t fund up t five (5) prjects with the fllwing activities: The applicants shall identify technlgy gaps and prpse receivers and/r assciated technlgies t ptimally leverage Galile and EGNOS differentiatrs Develp and test Galile-enabled GNSS receivers and/r underlying technlgy fr key user applicatins nt cvered by any ther Fundamental Elements prject The receivers and/r assciated technlgies shall be aligned with the market trends fr the specific user segments and target cmpetitive prices The applicants shall include a business plan detailing n hw the develped technlgies will be brught int the market Essential eligibility, selectin and award criteria: 9. Eligibility - The prpsal may be submitted by entities fulfilling all the criteria belw: Legal persns established 3 in and/r natural persn(s) wh is natinal f ne f the fllwing cuntries, are eligible: EU Member States Switzerland, Nrway, Applicants must crrespnd t the definitin f the fllwing target rganisatins: active in the develpment, integratin and/r manufacturing f GNSS cmpnents (either HW r SW) and/r GNSS receivers and/r antennas and/r expert in the field f GNSS Research and develpment (R&D) 10. Nn-exclusin criteria Article 105a, paragraphs 1 t 4, 6 and 7, except pint (b) f the first subparagraph and the secnd subparagraph f that paragraph, paragraphs 8, 9, 11 and 13 t 17 f Article 106 and Article 108 f Financial Regulatins shall apply t grant applicants and beneficiaries. Article 107 shall apply t applicants. Applicants shall declare whether they are in ne f the situatins referred t in Article 106(1) r Article 107 and, where applicable, whether they have taken remedial measures as referred t in pint (a) f Article 106(7). 11. The applicants must fulfil the fllwing selectin criteria: - The financial capacity f the applicant t perfrm the prpsed activities - The technical capacity f the applicant t perfrm the prpsed activities 12. Main award criteria: - Relevance f the prpsal t achieve the bjectives f the call, credibility f the prpsed apprach, and innvatin f the slutins prpsed; 3 Established shuld be understd as having a registered ffice, central administratin r principal place f business in ne f these cuntries. 8

9 Galile Explitatin 2018 Grant Plan - Impact in terms f ecnmic and public benefits derived frm the prpsal including but nt limited t a cherent business plan fr the explitatin f the results f the grant; - Credible and effective disseminatin plan fr the results in the best interest f the Eurpean Unin; - Quality f the implementatin: cherence and effectiveness f the wrk plan, including apprpriateness f the allcatin f tasks and resurces. Indicative timetable and indicative amunt f the call fr prpsals: - Allcated budget fr the Call fr Prpsal: 5,000,000 (up t 5 (five) prjects t be granted, depending n the quality f the prpsals received) Stages Planning (pssible subject t updates) a) Publicatin f the call Q b) Deadline fr submitting applicatins Q c) Evaluatin perid Q d) Infrmatin t applicants n the utcme f the evaluatin Q e) Signature f the Grant Agreements Q Maximum pssible rate f c-financing f the eligible ttal csts: Up t 70% funding f the eligible ttal csts. 9

10 Galile Explitatin 2018 Grant Plan 4. Enhanced RX fr autnmus driving/navigatin (GEX.0220) LEGAL BASIS Regulatin (EU) N 1285/2013 f the Eurpean Parliament and f the Cuncil f 11 December 2013 n the implementatin and explitatin f Eurpean satellite navigatin systems and repealing Cuncil Regulatin (EC) N 876/2002 and Regulatin (EC) N 683/2008 f the Eurpean Parliament and f the Cuncil and Delegatin Agreement between the Eurpean Unin, represented by the Eurpean Cmmissin and the Eurpean GNSS Agency n the Explitatin Phase f the Galile Prgramme signed n 2 Octber Call fr prpsals BUDGET LINE: 3922 BACKGROUND: Within the cntext f rad transprtatin, safety-critical applicatins are defined as thse applicatins that pssess the ptential t, directly r indirectly, avid causing harm t humans, destrying the vehicle r damaging external prperty r the envirnment. Autnmus driving and cperative psitining are bth included in this grup. Autnmus driving and cnnected vehicles are the mst relevant trends in the autmtive sectr, which rely n accurate and reliable psitining infrmatin. Driving autmatin is increasing ver time and the full autmatin (Level 5) will sn becme reality, thanks t psitining and cmmunicatin technlgies. Vehicles cnnectivity is als part f this prcess, making a large amunt f infrmatin available t the vehicles and thus imprving the achievable psitining perfrmance. Future psitining techniques are therefre expected t deviate frm the traditinal way f prviding psitining infrmatin (i.e. multiple sensrs data including expensive radar/lidar-based sensr and cameras). Innvative psitining, based n high speed cnnectivity (e.g. 5G), vehicle-t-vehicle (V2V) and vehicle-t-infrastructure (V2I) cmmunicatin enabling the sharing f large amunt f infrmatin and the explitatin f relative psitining will be specifically designed fr autmtive applicatins. GNSS-based psitining, including ptimised algrithms making an efficient use f PPP and RTK (r a cmbinatin f the tw) and the explitatin f wide-band signals, are increasingly used fr getting the required psitining accuracy and integrity necessary fr safety-critical applicatins. In additin new signals prviding higher chip rate already enabled better multipath mitigatin, which is necessary t supprt such peratins in urban envirnment. In this cntext Galile with its differentiatrs plays an imprtant rle and, when used in a hybridised technlgy mix integrated with ther sensrs, it can further bst the technlgies fr safe autnmus cars. 10

11 Galile Explitatin 2018 Grant Plan Objectives pursued and freseen results: T develp f an innvative clse-t-market GNSS-based On-bard-Unit (OBU) suitable fr fully autmated driving and/r cperative psitining, integrating a GNSS receiver and pssibly additinal sensrs and cmmunicatin mdem t enable the target applicatins perfrmance. The receiver OBU shall leverage the E-GNSS differentiatrs. This may include, in additin t duble-frequency E1/E5 r triple-frequency E1/E5/E6, the wide band E5 AltBOC, the use f pilt signals, the Open Service Navigatin Message Authenticatin (OS-NMA), the use f Precise-Pint-Psitining (PPP, (e.g. frm the Galile cmmercial service) and in general the ptimal explitatin f the Galile full peratinal capability (i.e. full cnstellatin deplyment). The develped receiver OBU shall be cst efficient and shall be cmpliant with the specific applicatin cnstraints. Descriptin f the activities t be funded under the call fr prpsals: The call fr prpsals is intended t fund up t tw (2) prjects with the fllwing activities: Design, develpment, testing and demnstratin f dual- r multi-frequency GNSS OBU fr fully autnmus driving and/r cperative psitining t be embedded n autnmus vehicles. Tight integratin f the GNSS receiver with ther sensrs t reach the applicatin needs. Essential eligibility, selectin and award criteria: 13. Eligibility - The prpsal may be submitted by entities fulfilling all the criteria belw: Legal persns established 4 in and/r natural persn(s) wh is natinal f ne f the fllwing cuntries, are eligible: EU Member States Switzerland, Nrway, Applicants must crrespnd t the definitin f the fllwing target rganisatins: active in the design, develpment, integratin and/r manufacturing f GNSS related prducts (i.e. cmpnents, receivers, On Bard Units, etc.) fr autmtive applicatins and/r knwledgeable abut safety-critical applicatins and/r cnnectivity cncepts applicable t autmtive and/r expert in the field f GNSS Research and develpment (R&D). 14. Nn-exclusin criteria Article 105a, paragraphs 1 t 4, 6 and 7, except pint (b) f the first subparagraph and the secnd subparagraph f that paragraph, paragraphs 8, 9, 11 and 13 t 17 f Article 106 and Article 108 f Financial Regulatins shall apply t grant applicants and beneficiaries. Article 107 shall apply 4 Established shuld be understd as having a registered ffice, central administratin r principal place f business in ne f these cuntries. 11

12 Galile Explitatin 2018 Grant Plan t applicants. Applicants shall declare whether they are in ne f the situatins referred t in Article 106(1) r Article 107 and, where applicable, whether they have taken remedial measures as referred t in pint (a) f Article 106(7). 15. The applicants must fulfil the fllwing selectin criteria: - The financial capacity f the applicant t perfrm the prpsed activities - The technical capacity f the applicant t perfrm the prpsed activities 16. Main award criteria: - Relevance f the prpsal t achieve the bjectives f the call, credibility f the prpsed apprach and innvatin f the slutins prpsed; - Impact in terms f ecnmic and public benefits derived frm the prpsal including but nt limited t a cherent business plan fr the explitatin f the results f the grant; - Credible and effective disseminatin plan fr the results in the best interest f the Eurpean Unin; - Cherence and effectiveness f the wrk plan, including cmplementarity f the participants within the cnsrtium and apprpriateness f the allcatin f tasks and resurces. Indicative timetable and indicative amunt f the call fr prpsals: - Allcated budget fr the Call fr Prpsal: 4,000,000 (up t 2 (tw) prjects t be granted, depending n the quality f the prpsals received) Stages Planning (pssible subject t updates) a) Publicatin f the call Q b) Deadline fr submitting applicatins Q c) Evaluatin perid Q d) Infrmatin t applicants n the utcme f the evaluatin Q e) Signature f the Grant Agreements Q Maximum pssible rate f c-financing f the eligible ttal csts: Up t 70% funding f the eligible ttal csts. 12

13 Galile Explitatin 2018 Grant Plan 5. Enhanced GNSS user terminal (GEX.0216) LEGAL BASIS Regulatin (EU) N 1285/2013 f the Eurpean Parliament and f the Cuncil f 11 December 2013 n the implementatin and explitatin f Eurpean satellite navigatin systems and repealing Cuncil Regulatin (EC) N 876/2002 and Regulatin (EC) N 683/2008 f the Eurpean Parliament and f the Cuncil and Delegatin Agreement between the Eurpean Unin, represented by the Eurpean Cmmissin and the Eurpean GNSS Agency n the Explitatin Phase f the Galile Prgramme signed n 2 Octber Call fr prpsals BUDGET LINE: 3922 BACKGROUND: The Open Service is the Galile prgram s free service fr psitining, navigatin and timing, accessible thrugh the signals E1, E5a and E5b, prviding bth data and pilt cmpnents. The Galile prgramme will sn prvide innvative features which are expected t enhance the perfrmance f Open Service users. Such features will cnsist f: Navigatin Message Authenticatin (NMA), knwn as OS-NMA, allwing users t verify that a navigatin message is actually bradcast by a Galile satellite and nt by a ptentially malicius surce; Upgraded Signal-in-Space (SiS) Interface Cntrl Dcument (ICD), including additinal data transmitted ver the I/NAV message imprving the Galile psitining slutin in user devices By the time Galile OS-NMA and I/NAV imprvements will be fully peratinal, a new generatin f enhanced receivers must be develped, tested and implemented. In the recent past, the GSA has launched a prcurement t develp a clse-t-market Galile OS-NMA user terminal suitable fr the Smart Tachgraph applicatin. 13

14 Galile Explitatin 2018 Grant Plan Objectives pursued and freseen results: T build clse-t-market (i.e. min TRL 7) OS-NMA enabled receivers r terminals suitable fr additinal target applicatin dmains, such as Lgistics (e.g. prf f delivery), cnsumer lcatin based services (e.g. mbile payment) and/r specific maritime applicatins. The receivers and/r terminals shall be fully cmpliant with the updated ICD als receiving and prcessing I/NAV imprvements data. The enhanced receivers and/r terminals shall aim at ptimising the level f prtectin at least against thse spfing attacks that are specific t the target applicatin. The enhanced receivers and/r terminals shall make ptimal use f the additinal data transmitted ver the I/NAV. The develped receivers and/r terminals shall be cst efficient and cmpliant with the specific applicatin cnstraints. Descriptin f the activities t be funded under the call fr prpsals: The call fr prpsals is intended t fund up t tw (2) prjects with the fllwing activities: Design, develpment, test and demnstratin f a clse-t-market enhanced GNSS user terminal suitable fr ne r mre applicatins t be selected amng a list (prpsed by the GSA). GNSS user terminal maturity demnstrated in an peratinal envirnment. Executin f perfrmance tests t assess the actual perfrmance imprvement reached by the user terminal. Implementatin f the user terminal market uptake strategy in the selected applicatins segment Essential eligibility, selectin and award criteria: 17. Eligibility - The prpsal may be submitted by entities fulfilling all the criteria belw: Legal persns established 5 in and/r natural persn(s) wh is natinal f ne f the fllwing cuntries, are eligible: EU Member States Switzerland, Nrway, Applicants must crrespnd t the definitin f the fllwing target rganisatins: active in the design, develpment, integratin, test, demnstratin and/r manufacturing f innvative GNSS-based prducts, including knwledge in signal prcessing, cryptgraphy techniques and/r assessment f anti-spfing capability. 18. Nn-exclusin criteria Article 105a, paragraphs 1 t 4, 6 and 7, except pint (b) f the first subparagraph and the secnd subparagraph f that paragraph, paragraphs 8, 9, 11 and 13 t 17 f Article 106 and Article 108 f Financial Regulatins shall apply t grant applicants and beneficiaries. Article 107 shall apply 5 Established shuld be understd as having a registered ffice, central administratin r principal place f business in ne f these cuntries. 14

15 Galile Explitatin 2018 Grant Plan t applicants. Applicants shall declare whether they are in ne f the situatins referred t in Article 106(1) r Article 107 and, where applicable, whether they have taken remedial measures as referred t in pint (a) f Article 106(7). 19. The applicants must fulfil the fllwing selectin criteria: - The financial capacity f the applicant t perfrm the prpsed activities - The technical capacity f the applicant t perfrm the prpsed activities 20. Main award criteria: - Relevance f the prpsal t achieve the bjectives f the call, credibility f the prpsed apprach, and innvatin f the slutins prpsed; - Impact in terms f ecnmic and public benefits derived frm the prpsal including but nt limited t a cherent business plan fr the explitatin f the results f the grant; - Credible and effective disseminatin plan fr the results in the best interest f the Eurpean Unin; - Cherence and effectiveness f the wrk plan, including cmplementarity f the participants within the cnsrtium and apprpriateness f the allcatin f tasks and resurces. Indicative timetable and indicative amunt f the call fr prpsals: - Allcated budget fr the Call fr Prpsal: 3,000,000 (up t 2 (tw) prjects t be granted, depending n the quality f the prpsals received) Stages Planning (pssible subject t updates) a) Publicatin f the call Q b) Deadline fr submitting applicatins Q c) Evaluatin perid Q d) Infrmatin t applicants n the utcme f the evaluatin Q e) Signature f the Grant Agreements Q Maximum pssible rate f c-financing f the eligible ttal csts: Up t 70% funding f the eligible ttal csts. End f Dcument 15

Declaration of Amsterdam. Cooperation in the field of connected and automated driving

Declaration of Amsterdam. Cooperation in the field of connected and automated driving Declaratin f Amsterdam Cperatin in the field f cnnected and autmated driving 14-15 April 2016 Declaratin f Amsterdam n cperatin in the field f cnnected and autmated driving Navigating t cnnected and autmated

More information

Webinar: The smart city is open by Machina Research and Philips Lighting 6/12/2016

Webinar: The smart city is open by Machina Research and Philips Lighting 6/12/2016 Webinar: The smart city is pen by Machina Research and Philips Lighting 6/12/2016 Webinar: The smart city is pen by Machina Research and Philips Lighting Guest speaker Machina Research Hst Philips Lighting

More information

Small Business Innovation Challenge Program. Ministry of Economic Development and Growth Ministry of Research, Innovation and Science

Small Business Innovation Challenge Program. Ministry of Economic Development and Growth Ministry of Research, Innovation and Science Small Business Innvatin Challenge Prgram Ministry f Ecnmic Develpment and Grwth Ministry f Research, Innvatin and Science Small Business Innvatin Challenge (SBIC) Overview On March 1, MEDG launched the

More information

Meteorological Satellites (MetSat) Overview of the global network of Meteorological Satellites. Speaker: Markus Dreis (EUMETSAT)

Meteorological Satellites (MetSat) Overview of the global network of Meteorological Satellites. Speaker: Markus Dreis (EUMETSAT) Meterlgical Satellites (MetSat) Overview f the glbal netwrk f Meterlgical Satellites Speaker: Markus Dreis (EUMETSAT) Secnd ITU/WMO Seminar "Use f Radi Spectrum fr Meterlgy: Weather, Water and Climate

More information

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group Crwn Recgnised Spectrum Access in 3400 t 3600 MHz The respnse f Alcatel-Lucent t Ofcm Spectrum Plicy Grup Spectrum Access in 1 3400 t 3600MHz Fr additinal infrmatin and clarificatin, please cntact: Jean-Pierre

More information

Creative Scotland is the national development agency for the arts, screen and creative industries.

Creative Scotland is the national development agency for the arts, screen and creative industries. Creative Sctland is the natinal develpment agency fr the arts, screen and creative industries. Unlcking Ptential, Embracing Ambitin Creative Sctland is the public bdy that supprts the arts, screen and

More information

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017 Cleveland Public Theatre Catapult Request fr Prpsals Cleveland Public Theatre s New Play Develpment CPT s missin is t raise cnsciusness and nurture cmpassin thrugh grundbreaking perfrmances and life-changing

More information

EuropeAid Funding opportunities in the ACP Regions

EuropeAid Funding opportunities in the ACP Regions Funding pprtunities in the ACP Regins Infrmatin n the past and future f the EDULINK and ACP S&T Prgrammes A lk at what we have achieved ACP S&T Plitical fundatins Cape Twn ACP Ministerial Frum n Research

More information

CATA Composer R2016 Fact Sheet. Add a New Dimension to Your Product Communications

CATA Composer R2016 Fact Sheet. Add a New Dimension to Your Product Communications CATA Cmpser R2016 Fact Sheet Add a New Dimensin t Yur Prduct Cmmunicatins Versin 1.0-8/11/2015 Table f Cntents 1. CATIA Cmpser: VALUE AT A GLANCE... 3 2. CATIA Cmpser: Overview... 4 2.1. Immediate Prductivity

More information

Common Network Operation Tools

Common Network Operation Tools Cmmn Netwrk Operatin Tls Prcess fr the develpment f data exchanges Mnika Kaldnek Adviser, System Operatins Brussels xxx2014 Backgrund > WHY: Regulatin 715/2009 (Art 8)...ENTSOG shall adpt: cmmn netwrk

More information

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

Proof of the concept Validation Results

Proof of the concept Validation Results Deliverable N.: D9 Prf f the cncept Validatin Results Sept 2008 Final Draft 1.0 Prject funded by the Eurpean Cmmunity under the Sixth Framewrk Prgramme fr Research and Technlgical Develpment. Prject ref.

More information

Rapid Innovation Fund (RIF) Program Overview

Rapid Innovation Fund (RIF) Program Overview Rapid Innvatin Fund (RIF) Prgram Overview Ted Bujewski, Directr, Rapid Innvatin Fund Prgram Office f the Under Secretary f Defense (Research and Engineering) January 2019 Backgrund Established as the Rapid

More information

Study of New architecture needs for AOCS / Avionics Abstract. Abstract

Study of New architecture needs for AOCS / Avionics Abstract. Abstract The ESA "Study f New architecture needs fr AOCS / Avinics" was perfrmed in parallel t the study Attitude estimatin systems, Requirements n sensr suite. Bth studies have the cmmn bjective t derive a develpment

More information

EMODnet Thematic Lot n 6 HUMAN ACTIVITIES

EMODnet Thematic Lot n 6 HUMAN ACTIVITIES EMODnet Thematic Lt n 6 HUMAN ACTIVITIES EASME/EMFF/2016/1.3.1.2 Lt 6/SI2.749458 Start date f the prject: 03/03/2017 - (24 mnths) EMODnet Phase III Quarterly Prgress Reprt (6) Reprting Perid: 01/07/2018

More information

Materials: Metals, timber, plastics, composites, smart and nanomaterials Candidates should:

Materials: Metals, timber, plastics, composites, smart and nanomaterials Candidates should: AQA Resistant Materials - Unit 1 Specificatin 2014-4560 Materials: Metals, timber, plastics, cmpsites, smart and nanmaterials Be aware f the surce f a range f materials. Understand they are prcessed fr

More information

Transforming the University of Minnesota through the Enhancement of Interdisciplinary Research

Transforming the University of Minnesota through the Enhancement of Interdisciplinary Research DRIVING TOMORROW Our plan t lead and innvate Twin Cities Campus Strategic Plan Grand Challenges Research Transfrming the University f Minnesta thrugh the Enhancement f Interdisciplinary Research Prvst

More information

Specification for Learning and Qualifications for Physical Intervention Skills

Specification for Learning and Qualifications for Physical Intervention Skills Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it

More information

Access and Reciprocity

Access and Reciprocity The Inaugural Meeting f the Asia Eurpe Australia Creative Residency Netwrk is supprted by the prgramme ASEF Creative Netwrks f the Asia- Eurpe Fundatin (ASEF). This prject was selected fr supprt frm ver

More information

Privacy is the Global Ba2lefield - Do we have the Tools and Standards to Fight and What is Privacy Engineering?

Privacy is the Global Ba2lefield - Do we have the Tools and Standards to Fight and What is Privacy Engineering? Privacy is the Glbal Ba2lefield - D we have the Tls and Standards t Fight and What is Privacy Engineering? Jhn Sab, Chair OASIS IDTrust Member Sectin and Chair, PMRM Technical Cmmittee Jhn.sab711@yah.cm

More information

Announcement of the International Law Research Program s 2017 Post-Doctoral Fellowship Competition. $80,000 per year

Announcement of the International Law Research Program s 2017 Post-Doctoral Fellowship Competition. $80,000 per year Annuncement f the Internatinal Law Research Prgram s 2017 Pst-Dctral Fellwship Cmpetitin Overview Value Duratin $80,000 per year 24 mnths with pssibility f ne year extensin The Internatinal Law Research

More information

Hospital Task Scheduling using Constraint Programming

Hospital Task Scheduling using Constraint Programming Hspital Task Scheduling using Cnstraint Prgramming Authr: Chaman Chahal Supervisr: Dr. P. Bse, Schl f Cmputer Science Organizatin: Carletn University Curse: COMP4905 Date: Dec. 11, 2012 1 Abstract Hspitals

More information

Roll/Pitch Sensor. Roll Pitch Measurement for Sonar Geo Reference. ELECOMP Capstone Design Project

Roll/Pitch Sensor. Roll Pitch Measurement for Sonar Geo Reference. ELECOMP Capstone Design Project Rll/Pitch Sensr Rll Pitch Measurement fr Snar Ge Reference ELECOMP Capstne Design Prject 2018-2019 Spnsring Cmpany: FarSunder, Inc. 151 Lavan St Warwick, RI 02888 http://www.farsunder.cm Cmpany Overview:

More information

Leicestershire Partnership NHS Trust: Gender Pay Gap Report

Leicestershire Partnership NHS Trust: Gender Pay Gap Report Leicestershire Partnership NHS Trust: Gender Pay Gap Reprt 31 st March 2017 Backgrund t the gender pay gap analyses The Gender Pay Gap Regulatins (a 2017 update t the Equality Act 2010) intrduced a requirement

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

Privacy in online services

Privacy in online services Privacy in nline services Rdica Tirtea rdica.tirtea@enisa.eurpa.eu 30 March 2011 www.enisa.eurpa.eu Overview Intrductin & cntext f the wrk Abut ENISA and its activities in ENISA 2010 activities n privacy

More information

CESSDA-Questionnaire on PIDs

CESSDA-Questionnaire on PIDs CESSDA-Questinnaire n PIDs The persistent identificatin f CESSDA Service Prviders data hldings requires mre attentin. While sme ERICs achieved practical and administrative successes (e.g. CLARIN), CESSDA

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks

Briefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks Briefing n Discussins Regarding a Master Lease Agreement fr the Intelligent Digital Kisks Cmmittee-f-the-Whle September 11, 2018 Nevin Grinnell Vice President Chief Marketing Officer 1 Agenda Backgrund

More information

M M Eissa (SIEEE), Egypt Mahmoud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hossam Gabbar, Canada

M M Eissa (SIEEE), Egypt Mahmoud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hossam Gabbar, Canada Wide Area Synchrnized Frequency Measurement System Architecture with Secure Cmmunicatin fr 500kV/220kV Egyptian Grid M M Eissa (SIEEE), Egypt Mahmud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hssam Gabbar,

More information

5G Work Programme. July 2018

5G Work Programme. July 2018 5G Wrk Prgramme July 2018 5G I. 5G: a disruptive generatin II. Internatinal mbilisatin III. Onging wrk since 2017 IV.Arcep s wrk prgramme 2 I. 5G: a disruptive generatin 5G will make it pssible t increase

More information

What is a Customer Service Model?

What is a Customer Service Model? What is a Custmer Service Mdel? Qin Wu IETF 97 Seul Krean L2SM WG meeting 1 Mtivatin Mtivatin: Nt everybdy understand the difference between the device mdel and service mdel Clarify what a service mdel

More information

City of Richmond. Report to Committee

City of Richmond. Report to Committee City f Richmnd Reprt t Cmmittee T: Frm: Re: Parks, Recreatin and Cultural Services Cmmittee Jane Fernyhugh Directr, Arts, Culture and Heritage Services Public Art Cmmunity Mural Prgram Date: January 5,

More information

Engineering Design and Development

Engineering Design and Development Engineering Design and Develpment Grade 12 Prerequisites: Intrductin t Engineering Design Principles f Engineering Digital Electrnics Credit Value: 5 ABSTRACT The Engineering Design and Develpment curse

More information

Context: Inter-Industry Tussle

Context: Inter-Industry Tussle Prpsal fr Bradband Wrking Grup, Cmmunicatin Futures Prgramme January 25 th, 2005 page 1 Cntext: Inter-Industry Tussle! Traditinal industry bundaries within the technlgy sectr are becming increasingly blurred:

More information

PCCW Solutions Engineering Graduate Trainee Program - Audio Visual / Aviation / Broadcasting / Systems Integration

PCCW Solutions Engineering Graduate Trainee Program - Audio Visual / Aviation / Broadcasting / Systems Integration PCCW Slutins Engineering Graduate Trainee Prgram - Audi Visual / Aviatin / Bradcasting / Systems Integratin Becme a PCCW Slutins prfessinal with a technical specialty 101010101010101010101010101 0101010101010101010101010101010101010101010

More information

Develop preliminary specification and plans from a design brief

Develop preliminary specification and plans from a design brief Unit Title: OCR unit number 1 Level: 2 Credit value: 3 Guided learning hurs: 24 Unit reference number A/503/5851 Develp preliminary specificatin and plans frm a design brief Unit purpse and aim The fcus

More information

Processors with Sub-Microsecond Response Times Control a Variety of I/O. *Adapted from PID Control with ADwin, by Doug Rathburn, Keithley Instruments

Processors with Sub-Microsecond Response Times Control a Variety of I/O. *Adapted from PID Control with ADwin, by Doug Rathburn, Keithley Instruments PID Cntrl with ADwin Prcessrs with Sub-Micrsecnd Respnse Times Cntrl a Variety f I/O CHESTERLAND OH March 9, 2015 *Adapted frm PID Cntrl with ADwin, by Dug Rathburn, Keithley Instruments By Terry Nagy,

More information

David R. Beering Christopher Erickson

David R. Beering Christopher Erickson Spectrum Aggregatin and Interference/Jamming Mitigatin in Pint-t-Pint Satellite Cmmunicatins Systems with the Opprtunistic Mdem TM by Cntinuus Satellite Data David R. Beering drbeering@sprynet.cm +1 630-235-7965

More information

CADET SOFTWARE ENGINEERS

CADET SOFTWARE ENGINEERS Psitin Highlights Highly cmpetitive cmpensatin package. Be a part f strng innvative team. Patent Incentive Prgram. Stck Optin Grant Signing and Retentin Bnus. CADET SOFTWARE ENGINEERS Psitin Summary The

More information

Notified Body Office, VUZ a.s. Novodvorská 1698, Praha 4, Czech Republic

Notified Body Office, VUZ a.s. Novodvorská 1698, Praha 4, Czech Republic RAILCOM Final Reprting Interactive Cnference Electrmagnetic cmpatibility at train-track track interface - lw frequency dmain Karel Beneš Ntified Bdy Office, VUZ a.s. Nvdvrská 1698, 142 01 Praha 4, Czech

More information

T-Mobile. Interim Text to Services and Wireless Emergency Alerts. Harold Salters, Director, Federal Regulatory Affairs, T-Mobile, USA

T-Mobile. Interim Text to Services and Wireless Emergency Alerts. Harold Salters, Director, Federal Regulatory Affairs, T-Mobile, USA T-Mbile Interim Text t 9-1-1 Services and Wireless Emergency Alerts Harld Salters, Directr, Federal Regulatry Affairs, T-Mbile, USA Interim Text t 9-1-1 ~ Vluntary Cmmitment Vluntary cmmitment t ffer Interim

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

Smart Specialization: Cross-linking Innovation & New Industry Policy. K. Debackere, KU Leuven

Smart Specialization: Cross-linking Innovation & New Industry Policy. K. Debackere, KU Leuven Smart Specializatin: Crss-linking Innvatin & New Industry Plicy K. Debackere, KU Leuven 15.05.2014 THE CHALLENGE ann 2014 The need t align: Innvatin Plicy + New Industry Plicy Innvatin Plicy: 3% nrm Hrizn

More information

PLANNING AND DECISION ANALYSIS School of Architecture and the Built Environment, KTH

PLANNING AND DECISION ANALYSIS School of Architecture and the Built Environment, KTH Syllabus fr dctral studies in the subject f PLANNING AND DECISION ANALYSIS Schl f Architecture and the Built Envirnment, KTH General regulatins and guidelines fr dctral studies are fund in the cmprehensive

More information

Regional (smart) specialization and competitiveness. K. Debackere, KU Leuven

Regional (smart) specialization and competitiveness. K. Debackere, KU Leuven Reginal (smart) specializatin and cmpetitiveness K. Debackere, KU Leuven 4.2013 THE CHALLENGE ann 2013 The need t align: Innvatin Plicy + New Industry Plicy Innvatin Plicy: 3% nrm Hrizn 2020 EU >< natinal/reginal

More information

Internship opportunities

Internship opportunities Internship pprtunities 2018-2019 1 General Infrmatin Why is an internship valuable fr yu? In the first instance, an internship needs t be wrthwhile fr yu, the student! Everyne deserves the pprtunity t

More information

Manufacturing Futures Initiative (MFI) Postdoctoral Fellowship Program

Manufacturing Futures Initiative (MFI) Postdoctoral Fellowship Program Manufacturing Futures Initiative (MFI) Pstdctral Fellwship Prgram I. Abut the MFI Pstdctral Fellwship Prgram The MFI Pstdctral Fellwship Prgram seeks candidates that will supprt the visin f MFI by demnstrating

More information

Designing IoT Applications: Why, What, and How! Adam Drobot Forum IoT Tunisia 2018 April 27 th, 2018

Designing IoT Applications: Why, What, and How! Adam Drobot Forum IoT Tunisia 2018 April 27 th, 2018 Why, What, and Hw! IEEE IT Vertical and Tpical Summit at IEEE RWW2018 January 14-15, 2018 Adam Drbt 2018 April 27 th, 2018 Outline Why: Value and Benefits Level f Value Examples f Value frm the Internet

More information

DON T COMPROMISE AWK INDUSTRIES PVT. LTD. AWK Industries (Pvt) Ltd (C) Copyright 2017 All Rights Reserved

DON T COMPROMISE AWK INDUSTRIES PVT. LTD. AWK Industries (Pvt) Ltd (C) Copyright 2017 All Rights Reserved DON T COMPROMISE AWK INDUSTRIES PVT. LTD 1 CONTENTS 1. ABOUT AWK INDUSTRIES (PVT) LTD 1.1 Cmpany Details 1.2 Business Descriptin 1.3 Cmpany Strategy 2. MANAGEMENT 3. COMPANY CORE PERSONNEL 3.1 Supprt Persnnel

More information

Foundations of Technology

Foundations of Technology EXAM INFORMATION Items 70 Pints 70 Prerequisites NONE Grade Level 9-10 Curse Length ONE SEMESTER DESCRIPTION is an actin-based engineering and technlgy educatinal curse emphasizing design and prblem-slving

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

Consultancy Proposal. Abstract This document lays out the consultancy service proposal details Reference:

Consultancy Proposal. Abstract This document lays out the consultancy service proposal details Reference: Cnsultancy Prpsal Abstract This dcument lays ut the cnsultancy service prpsal details Reference: www.gamalearn.cm e-mail: inf@gamalearn.cm Page 1 f 8 Table f Cntents: Overview... 3 Cnsultatin Services:

More information

Participation is open on equal conditions to all national and international experienced individual consultants.

Participation is open on equal conditions to all national and international experienced individual consultants. REQUEST FOR EXPRESSIONS OF INTEREST N 1216/S/EOI-ICB/RE-ADV/AD/RDB/GOR/12 TITLE: CONSULTANCY SERVICES TO SUPERVISE CONSTRUCTION WORKS RELATED TO SUPPLY & INSTALLATION OF FURNITURE, BUILDING PARTITIONS

More information

New Perspectives in Science Education March 2018 Florence, Italy

New Perspectives in Science Education March 2018 Florence, Italy New Perspectives in Science Educatin 22-23 March 2018 Flrence, Italy Intrducing science teaching in early years educatin: practical insights f SciLit prject Ruta Grigaliunaite CESIE Italy ruta.grigaliunaite@cesie.rg

More information

Independent Association of Latin America and the Caribbean AILAC. Ad-Hoc Working Group on the Durban Platform for Enhanced Action (ADP)

Independent Association of Latin America and the Caribbean AILAC. Ad-Hoc Working Group on the Durban Platform for Enhanced Action (ADP) Independent Assciatin f Latin America and the Caribbean AILAC Ad-Hc Wrking Grup n the Durban Platfrm fr Enhanced Actin (ADP) Submissin n the ex-ante infrmatin requirements fr the cmmunicatin f INDCs and

More information

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden Internet:

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden   Internet: SARAD GmbH Tel.: 0351 / 6580712 Wiesbadener Straße 10 FAX: 0351 / 6580718 01159 Dresden e-mail: supprt@sarad.de GERMANY Internet: www.sarad.de APPLICATION NOTE AN-001_EN The Installatin f autnmus instrumentatin

More information

Preparing microwave transport network for the 5G world

Preparing microwave transport network for the 5G world Preparing micrwave transprt netwrk fr the 5G wrld Maris Bugiuks, Ph.D. 18-12-2017 1 Nkia Netwrks 2015 Micrwave technlgy Transmitting infrmatin Micrwave transmissin is the transmissin f infrmatin r energy

More information

NTNU ALUMNI EVENT. October 3rd 2016 Kathirne Angell-Hansen. Joint Programming Initiative Healthy and Productive Seas and Oceans

NTNU ALUMNI EVENT. October 3rd 2016 Kathirne Angell-Hansen. Joint Programming Initiative Healthy and Productive Seas and Oceans NTNU ALUMNI EVENT Octber 3rd 2016 Kathirne Angell-Hansen Jint Prgramming Initiative Healthy and Prductive Seas and Oceans Visin dcument 2 3 majr gals: Knwledge based maritime ecnmy Optimise the respnse

More information

YOUR FUTURE STARTS AT IMEC

YOUR FUTURE STARTS AT IMEC IMEC IN NUMBERS YOUR FUTURE STARTS AT IMEC Last year, mre than 300 Ph.D. researchers cntributed with their wrk t imec s lng-term research. 2,300 Mre than peple wrk at imec, 36% f which are guest researchers

More information

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord High Level Design Circuit CitEE Irere Kwihangana Lauren Mahle Jaclyn Nrd 12/16/2013 Table f Cntents 1 Intrductin. 3 2 Prblem Statement and Prpsed Slutin. 3 3 Requirements. 3 4 System Blck Diagram 4.1 Overall

More information

Advanced Manufacturing Technology Roadmap Project Photonics

Advanced Manufacturing Technology Roadmap Project Photonics Advanced Manufacturing Technlgy Radmap Prject Phtnics Light-based technlgies innvatin frum 14 March 2016 Francis Prinsl - Task Team Leader Cntents Cntents Advanced Manufacturing Technlgy Radmap Prject

More information

Figure 1: View, connection compartment closed

Figure 1: View, connection compartment closed Radi Management Art. N. : 2700AP Operating instructins 1 Safety instructins Electrical equipment may nly be installed and fitted by electrically skilled persns. Serius injuries, fire r prperty damage pssible.

More information

Towards a European Solution for Networked Cars -Integration of Car-to-Car Technology into Cellular Systems for Vehicular Communication in Europe

Towards a European Solution for Networked Cars -Integration of Car-to-Car Technology into Cellular Systems for Vehicular Communication in Europe Twards a Eurpean Slutin fr Netwrked Cars -Integratin f Car-t-Car Technlgy int Cellular Systems fr Vehicular Cmmunicatin in Eurpe Yunpeng Zang, Bernhard Walke Department f Cmmunicatin Netwrks RWTH Aachen

More information

WIRELESS BROADBAND SPECTRUM POLICY

WIRELESS BROADBAND SPECTRUM POLICY 1. PREAMBLE MINISTRY OF INFORMATION, COMMUNICATIONS AND TECHNOLOGY WIRELESS BROADBAND SPECTRUM POLICY The radi-frequency spectrum is a critical and finite scarce resurce which supprts a wide range f wireless

More information

EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION

EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION Streamer AG INMR Wrld Cngress 2017 EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION Authrs: Jens Bthe, Etienne Cuisinier SUMMARY: Fr nw mre than 20 years, Streamer has dedicated its

More information

Horizon EuMW/ EuMC2014. Dirk Beernaert Rome, 9 Oct 2014

Horizon EuMW/ EuMC2014. Dirk Beernaert Rome, 9 Oct 2014 Hrizn 2020 "Industrial, Research & Innvatin plicy cntext" EuMW/ EuMC2014 Dirk Beernaert Rme, 9 Oct 2014 The Eurpean Unin 'United in diversity' 28 Member States, 24 languages 508 millin citizens GDP f 13,1

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

BCX CHAIR IN DIGITAL BUSINESS

BCX CHAIR IN DIGITAL BUSINESS POWERED BY WITS BUSINESS SCHOOL BCX CHAIR IN DIGITAL BUSINESS Master yur digital future Master f Management in the field f Digital Business INTRODUCTION FROM HEAD OF SCHOOL Wits Business Schl takes very

More information

Why Kodak CTP is best for process free plates

Why Kodak CTP is best for process free plates Eastman Kdak Cmpany 343 State Street Rchester, NY 14650-0238 USA Revised: April 11, 2017 White Paper Cntact Name Nathanael Eijbersen Wrldwide Prduct Manager, Output Devices nathanael.eijbersen@kdak.cm

More information

Spinline - FPGA and µprocessor based platform Taken and sharing advantages of both worlds

Spinline - FPGA and µprocessor based platform Taken and sharing advantages of both worlds Spinline - FPGA and µprcessr based platfrm Taken and sharing advantages f bth wrlds Julien BACH, Rlls-Ryce Civil Nuclear SAS AIEA FPGA wrkshp 2016 Lyn, France - Octber 2016 2016 Rlls-Ryce Civil Nuclear

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

DTTB Frequency Planning

DTTB Frequency Planning DTTB Frequency Planning Apprach and chices made in develping the DTTB frequency plan in Thailand ITU/NBTC Wrkshp 4 December 2014 Jan Deven DTTB frequency planning Tpics 1. Frequency plan Spectrum management

More information

Oerlikon Skyshield MOOTW / C-RAM System

Oerlikon Skyshield MOOTW / C-RAM System Oerlikn Skyshield MOOTW / C-RAM System Rheinmetall Air Defence AG - Innvative technlgy against mdern air threats Page 1/10 Prtectin against RAM Attacks RAM stands fr rckets, artillery and mrtar. These

More information

Plenipotentiary Conference (PP-18) Dubai, 29 October 16 November 2018

Plenipotentiary Conference (PP-18) Dubai, 29 October 16 November 2018 Pleniptentiary Cnference (PP-18) Dubai, 29 Octber 16 Nvember 2018 PLENARY MEETING Dcument 12-E 17 December 2017 Original: English Nte by the Secretary-General CANDIDACY FOR THE POST OF MEMBER OF THE RADIO

More information

Transmit and receive information by marine radio or telephone

Transmit and receive information by marine radio or telephone MARC020 Transmit and receive infrmatin by marine radi r telephne DRAFT 9/12/2013 UNIT CODE UNIT TITLE Release Release 1 APPLICATION COMPETENCY FIELD ELEMENTS Elements describe the essential utcmes. 1 Operate

More information

TRAINEESHIP NOTICE Ref. EMSA/TRAINEESHIP/2019/01

TRAINEESHIP NOTICE Ref. EMSA/TRAINEESHIP/2019/01 TRAINEESHIP NOTICE Ref. EMSA/TRAINEESHIP/2019/01 The Eurpean Maritime Safety Agency ffers traineeships fr a perid f at least 3 mnths and at mst 6 mnths. The traineeship prgram aims t prvide trainees with

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE First Meeting f the AFI VSAT Netwrks Managers (AFI VSAT/1) (Kwa-Zulu Natal, Suth Africa, 13 t 15 June 2011) Agenda Item 6: Need fr

More information

Transmission is reliable and safe when antennas are managed by Movicon

Transmission is reliable and safe when antennas are managed by Movicon Transmissin is reliable and safe when antennas are managed by Mvicn Simetel Spa and Sigma Cnsulting have engineered an interesting supervisin system fr mnitring and security f the NATO VLF transceiver

More information

Software Engineering

Software Engineering What Is Sftware Engineering? Sftware Engineering Sftware engineering is the study and an applicatin f engineering t the, develpment, and maintenance f sftware. The applicatin f a systematic, disciplined,

More information

U.S. GROUP ON EARTH OBSERVATIONS ASSESSMENT

U.S. GROUP ON EARTH OBSERVATIONS ASSESSMENT U.S. GROUP ON EARTH OBSERVATIONS ASSESSMENT Image Credit: ISERV/NASA Timthy Newman Vice-Chair, USGEO U.S. Gelgical Survey Cmmittee n Earth Science & Applicatins frm Space December 2, 2015 USGEO ASSESSMENT

More information

GUIDELINES FOR CRITICAL

GUIDELINES FOR CRITICAL GUIDELINES FOR CRITICAL REVIEW OF PRODUCT LCA BY BO P. WEIDEMA, 2.-0 LCA CONSULTANTS, WWW.LCA-NET.COM Originally published 1997 by SPOLD (www.spld.rg), Brussels. Traditinally, critical reviews - r peer

More information

Hands-Free Music Tablet

Hands-Free Music Tablet Hands-Free Music Tablet Steven Tmer Nate Decker Grup Website: steve@wasatch.cm milamberftheassembly@yah.cm http://www.cs.utah.edu/~ndecker/ce3992/ Abstract The typical musician handles a great deal f sheet

More information

Open Call for Artists and Arts Professionals 2018

Open Call for Artists and Arts Professionals 2018 Open Call fr Artists and Arts Prfessinals 2018 Open Call fr Artists and Arts Prfessinals 2018 All materials must be received by 5:00 pm EST n Friday, March 16, 2018 Art n the Atlanta BeltLine is seeking

More information

VILLAGE COORDINATOR AGREEMENT

VILLAGE COORDINATOR AGREEMENT Date Received at AHSGR VILLAGE COORDINATOR AGREEMENT Frm materials written by the riginal funders f AHSGR, we knw that the grup f peple wh gt tgether in the late 1960s t frm what was t later becme AHSGR

More information

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector CAMPBELL COUNTY GILLETTE, WYOMING Electrical Inspectr Senir Electrical Inspectr Class specificatins are intended t present a descriptive list f the range f duties perfrmed by emplyees in the class. Specificatins

More information

IEEE C802.16h-06/029

IEEE C802.16h-06/029 Prject Title IEEE 802.16 Bradband Wireless Access Wrking Grup Timing fr sending messages using the frequency dmain energy pulses Date Submitted Surce(s) Re: Abstract Purpse Ntice

More information

your resumes & indicate job title in subject to:

your resumes & indicate job title in subject to: ENABLING THE DIGITAL WORLD List f Jb Openings: 1) Analyst Prgrammer 2) Payrll Officer 3) Sftware Engineer (Prduct Develpment) 4) Prcess Engineer (Enabling Technlgy) 5) Optics Engineer 6) Mechanical Design

More information

Troubleshooting Guide StarFire Satellite Changes

Troubleshooting Guide StarFire Satellite Changes Trubleshting Guide StarFire Satellite Changes This guide is updated t reflect the sftware frm NavCm which is related t the StarFire satellite and frequency changes. The mst recent versin f sftware fr bth

More information

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach Safety Architect : A Tl fr Mdel-Based Safety Analyses Cmpliant with the System Engineering Apprach Authrs: Jnathan Dumnt, Franck Sadmi, Frédérique Vallée (All4tec) Keywrds: Safety, Dependability, Mdel-Based

More information

MIDIH First Open Call Data driven applications and experiments in CPS/IoT Information about Competence Centers

MIDIH First Open Call Data driven applications and experiments in CPS/IoT Information about Competence Centers Grant Agreement N. 767498 Innvatin Actin Prject H2020-FOF-12-2017 MIDIH First Open Call Data driven applicatins and experiments in CPS/IT Infrmatin abut Cmpetence Centers Table f Cntents Table f Cntents...2

More information

INTRODUCTION)TO)INNOVATION)AND)ENTREPRENEURSHIP) 2! INNOVATION)TYPES)AND)SOURCES) 7! RECOGNISING)AND)EVALUATING)OPPORTUNITIES) 10!

INTRODUCTION)TO)INNOVATION)AND)ENTREPRENEURSHIP) 2! INNOVATION)TYPES)AND)SOURCES) 7! RECOGNISING)AND)EVALUATING)OPPORTUNITIES) 10! Table&f&Cntents& INTRODUCTION)TO)INNOVATION)AND)ENTREPRENEURSHIP) 2! INNOVATION)TYPES)AND)SOURCES) 7! RECOGNISING)AND)EVALUATING)OPPORTUNITIES) 10! ACTING)ON)THE)OPPORTUNITY) 12! EXPLOITING)THE)OPPORTUNITY)

More information

IR Emitter and Detector Product Data Sheet LTE-R38386AS-ZF Spec No.: DS Effective Date: 09/14/2016 LITE-ON DCC RELEASE

IR Emitter and Detector Product Data Sheet LTE-R38386AS-ZF Spec No.: DS Effective Date: 09/14/2016 LITE-ON DCC RELEASE IR Emitter and Detectr Prduct Data Sheet Spec N.: DS5-216-5 Effective Date: 9/14/216 Revisin: - LITE-ON DCC RELEASE BNS-OD-FC1/A4 LITE-ON Technlgy Crp. / Optelectrnics N.9,Chien 1 Rad, Chung H, New Taipei

More information

ENISA activities in the area of Privacy & Trust

ENISA activities in the area of Privacy & Trust ENISA activities in the area f Privacy & Trust Rdica Tirtea 2 nd December 2011 @ 1 st ISACA Athens Chapter Cnference www.enisa.eurpa.eu Overview Intrductin & cntext f the wrk Abut ENISA activities Activities

More information

IR Emitter and Detector Product Data Sheet LTR-C5510-DC Spec No.: DS Effective Date: 09/24/2016 LITE-ON DCC RELEASE

IR Emitter and Detector Product Data Sheet LTR-C5510-DC Spec No.: DS Effective Date: 09/24/2016 LITE-ON DCC RELEASE Prduct Data Sheet Spec N.: DS50-2016-0032 Effective Date: 09/24/2016 Revisin: - LITE-ON DCC RELEASE BNS-OD-FC001/A4 LITE-ON Technlgy Crp. / Optelectrnics N.90,Chien 1 Rad, Chung H, New Taipei City 23585,

More information

Become a PCCW Solutions professional with a technical specialty

Become a PCCW Solutions professional with a technical specialty Audi Visual Aviatin Systems Integratin Bradcasting Engineering Graduate Trainee Prgram Becme a PCCW Slutins prfessinal with a technical specialty We need: Fresh talents t jin the market leader in best-f-breed

More information

Policy Review and Strategic Framework of Radio Spectrum Management Consultation Paper

Policy Review and Strategic Framework of Radio Spectrum Management Consultation Paper Plicy Review and Strategic Framewrk f Radi Spectrum Management Cnsultatin Paper 30 th Octber 2006 Malta Cmmunicatins Authrity Valletta Waterfrnt, Pint Wharf, Valletta VLT01, Malta, Eurpe Tel: (356) 21

More information

5G-PHOS Project: Integrated Fiber-Wireless 5G network technologies for high capacity scenarios

5G-PHOS Project: Integrated Fiber-Wireless 5G network technologies for high capacity scenarios 5G-PHOS Prject: Integrated Fiber-Wireless 5G netwrk technlgies fr high capacity scenaris Dr. Knstantins Filis Senir R&D Engineer, PhD COSMOTE - Mbile Telecmmunicatins S.A. R&D Prjects Department - Fixed

More information

Insertion Loss (db)

Insertion Loss (db) Optical Interleavers Optplex s Optical Interleaver prducts are based n ur patented Step-Phase Interfermeter design. Used as a DeMux (r Mux) device, an ptical interleaver separates (r cmbines) the Even

More information

HOLIDAZZLE CREATIVE LIGHTING EXPERIENCE 2016

HOLIDAZZLE CREATIVE LIGHTING EXPERIENCE 2016 Minneaplis Dwntwn Experience Cmmittee & The Minneaplis Dwntwn Cuncil HOLIDAZZLE CREATIVE LIGHTING EXPERIENCE 2016 Request fr Creativity Issue Date: June 2016 Submissin Deadline: June 24, 2016 at 5:00 p.m.

More information