INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE
|
|
- Katrina Haynes
- 5 years ago
- Views:
Transcription
1 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE First Meeting f the AFI VSAT Netwrks Managers (AFI VSAT/1) (Kwa-Zulu Natal, Suth Africa, 13 t 15 June 2011) Agenda Item 6: Need fr a reginal prject DEVELOPMENT OF A REGIONAL PROJECT TO ENHANCE AERONAUTICAL TELECOMMUNICATIONS INFRASTRUCTURE IN THE AFI REGION (Presented by the Secretariat) SUMMARY This paper identifies the need t develp a reginal prject in rder t enhance the aernautical telecmmunicatins infrastructure in the AFI Regin, based n the status f implementatin status the AFI aernautical fixed services (AFS) as discussed under Agenda Items 2 and 3. Actin by the meeting is at para 3 t this wrking paper. REFERENCES Annex 10- Aernautical Telecmmunicatins (Vlumes 2 and 3) Annex 11- Air Traffic Services Dc Manual n the Planning and Engineering f the Aernautical Fixed Telecmmunicatin Netwrk Dc Reprt f the Seventh Africa-Indian-Ocean Reginal Air Navigatin Meeting (RAN/AFI/7) APIRG - Meeting Reprts 1. INTRODUCTION 1.1 The aernautical fixed service AFS - cmprises the fllwing systems and applicatins that are used fr grund-grund (i.e. pint-t-pint and/r pint-t-multipint) cmmunicatins in the internatinal aernautical telecmmunicatin service: 1) ATS direct speech circuits and netwrks; 2) meterlgical peratinal circuits, netwrks and bradcast systems; 3) the aernautical fixed telecmmunicatins netwrk (AFTN); 4) the cmmn ICAO data interchange netwrk (CIDIN) 1 ; 5) the air traffic services (ATS) message handling services (AMHS); and 6) the inter-centre cmmunicatins (ICC). 1.2 This paper analyses 1, 3 and 5 abve frm the perspective f the migratin t the Aernautical Telecmmunicatin Netwrk (ATN) grund-grund applicatins. 1 CIDIN is perated by Egypt (Cair) and Mrcc (Casablanca). 1
2 2 DISCUSSION AFS deficiencies in the AFI Regin 2.1. APIRG/17 Meeting Reprt cntains the list f AFS deficiencies reprted in the AFI Regin, in respect f internatinal standards and recmmended practices (SARPs) and requirements in the air navigatin plan (ANP). These deficiencies culd be summarized as fllws: partial implementatin f ANP requirements fr AFTN and ATS/DS circuits; lw availability f sme AFS circuits; inadequate transit times (AFTN messages); disparities between sub-reginal satellite telecmmunicatin netwrks; and inadequate staffing and lack f r insufficient training n aernautical equipment and assciated technlgies (satellites, netwrking, digital data prcessing and transmissin, autmatin, distributed systems, etc.). AFS implementatin status and perfrmance 2.2 The requirements fr AFS cmmunicatins are cntained in the AFI Air Navigatin Plan (ANP), FASID Tables CNS 1A (AFTN Ratinalized Plan), CNS 1B (ATN Ruter Plan), CNS 1C (AMHS Ruting Plan) and CNS 1D (ATS/DS Plan). AFTN main circuits have been implemented in accrdance with the AFI Ratinalized Plan, with digital circuits. Sme AFTN circuits (such as Addis-Ababa/Asmara, Addis-Ababa/Djibuti) and ATS/DS circuits (such as Addis-Ababa/Asmara, Bujumbura/Kinshasa, Djibuti/Hargeisa, Kigali /Kinshasa) have nt yet been implemented 2. AFTN circuit availability 2.3 Thugh significant imprvements are nted, ntably with the implementatin f aernautical satellite telecmmunicatins netwrks (as discussed under Agenda Item 2 f this meeting), the minimum specificatin f 97% stated in the AFI Air Navigatin Plan (AFI/7 Recmmendatin 9/3) is nt met by a number f AFTN circuits. This adversely affects flight crdinatin between ATS units as well as AIS, OPMET and SAR messages, which in turn has negative impact n air transprt peratins safety and efficiency. 2.4 The nn- availability f AFTN circuits is ne f mst cncern insfar as cmmunicatins t/frm tributary centres r statins cannt be ruted by alternative circuits due t the star cnfiguratin. Hwever, the existence f VSAT netwrks and the meshed cnfiguratin f AFTN in sme areas, increase availability and flexibility. AFTN Transit Time Statistics 2.5 The transit time f a message is defined as the elapsed time between instant f filing f a message with an AFTN statin fr transmissin n the netwrk, and the instant that is made available t the addressee. It can als be cnsidered as the sum f relay times f AFTN statins thrugh which it passes. AFTN users establish their requirement fr transit-time perfrmance as a criterin t be achieved between tw AFTN statins in the average peak hur in the peak seasn fr at least 95% f messages f higher pririty classificatins (SS, DD and FF), as ppsed t lesser pririty classificatins (KK, GG). ICAO Annex 11 prescribes a maximum transit time f 5 minutes fr written message, while the AFI Regin intrduces a distinctin between a high pririty message (5 minutes) and a lw pririty message (10 minutes). 2 As defined by ICAO, implementatin f a facility, service r prcedure required in the Air Navigatin Plan has been established r acquired, installed and perated satisfactrily in accrdance with agreed perfrmance criteria.
3 2.6 As per established prcedures, the States respnsible fr the peratin f AFTN circuits are expected t recrd transit time statistics n the 23 rd day f each third mnth (January, April, July and Octber) f each year, and exchange the recrded infrmatin directly with their crrespndents, with cpies t Administratins cncerned and t the ICAO Reginal Office. These established prcedures are nt cmplied with by many States. Hwever, available reprts received frm States by ICAO Reginal Offices shw that the prescribed transit times fr AFTN messages are nt always met. AFTN Circuit Lading 2.7 There is a significant benefit in carrying ut perfrmance evaluatin f AFTN circuits n the basis f statistics cllected fr a perid f minimum three days at the interval f six mnths frm 23 t 25 April and Octber. It is recmmended that the AFTN centres and statins experiencing difficulties in taking character cunt due t system limitatins shuld cntinue t recrd circuits lading in accrdance with the criteria specified in ICAO Dc Manual n the Planning and Engineering f AFTN. These reprts d nt prvide indicatins n traffic vlume, traffic statistics and circuit ccupancy, which are needed t assess the suitability f the mdulatin rate f AFTN circuits. Transmissin speed 2.8 In rder t meet transit-time requirements, a minimum mdulatin rate f 1200 bauds has been specified fr AFI AFTN main circuits (APIRG Cnclusin 12/13 refers). All AFTN main circuits currently perate at 9.6 kb/secnd r 19.2 kb/secnd and meet this minimum requirement. Sme links have 64 kb/secnd capability required fr ATN backbne circuits. Intercnnectin f VSAT netwrks 2.9 The jint use f satellites, digital and data prcessing techniques is an effective means f cmpliance with ANP requirements fr CNS systems, as well as the requirements f the Aernautical Telecmmunicatin Netwrk (ATN) cncept and related applicatins The existing netwrks were designed independently and at different epchs, with similarities and dissimilarities (as discussed under Agenda Items 2 and 3 f this meeting), and later intercnnected in rder t imprve AFS cnnectivity, and pave the way fr the migratin frm the AFTN t the ATN. Applicatin f bit-riented prtcls 2.11 Pursuant t AFI/7 Recmmendatin 9/6, APIRG adpted Cnclusin 13/10 requesting all AFI AFTN main centres t gradually intrduce bit-riented prtcls (BOPs) based n prvisins cntained in Annex 10, Vlume III with a view t upgrading the integrity f data transmissin and paving the way t the migratin t the ATN. Accrdingly, AFI VSAT netwrks utilize X.25 3, Frame Relay r Internet Prtcl Suite (IPS). AMHS implementatin status and perfrmance 2.12 Indicatins are that at least five (5) AFI States 4 have implemented AMHS initially n natinal basis. An AFI AMHS Strategy and Plan is under develpment by APIRG CNS Sub-grup in rder t ensure an internatinally crdinated, harmnized and cst-effective implementatin f AMHS in the AFI Regin. Tw levels f service are defined within the ATS Message Handling Service: 1) The Basic ATS Message Handling Service. Cmpared t the service f the AFTN, it ffers sme significant imprvements such as: 3 APIRG/16 Cnclusin 16/3 discurages the use f X.25 in the AFI Regin. 4 Algeria, Ethipia, Suth Africa, Tunisia and Zimbabwe. 3
4 practically unlimited message length; virtually n limit n the number f addressees f a message; prvisin f nn-delivery reprts; indicatin f the subject f a message. 2) The Extended ATS Message Handling Service. It prvides functinality in additin t thse f the Basic ATS Message Handling Service such as the intrductin f directry services and security mechanisms. Furthermre, in additin t IA-5 text, the extended service allws fr the transfer f binary cded data, files, etc. AIDC implementatin status and perfrmance 2.13 Sme States situated at the interface between AFI and EUR Regins have implemented n-line data infrmatin exchange prcedures (OLDI). Prper AIDC prcedures are yet t be implemented by AFI States. Human factrs 2.14 Cnsidering the critical rle f cmmunicatins facilities in air navigatin peratins safety and efficiency AFI States shuld ensure that: a sufficient number f well trained and skilled persnnel is available; cmprehensive training prgrammes fr cmmunicatin persnnel t remain prficient in the skills necessary t perate and maintain facilities. The develpment f a human resurce prgramme shuld be addressed as a reginal prject; and c-peratin arrangements are cncluded between States in rder t ptimise the expertise available in the Regin. 3. ACTION BY THE MEETING 3.1 The meeting is invited t: a) take nte f the infrmatin prvided in this wrking paper; b) exchange views n ways and means f imprving/upgrading AFTN perfrmance and prcedures (including mnitring prcedures) in the AFI Regin; c) recmmend the pursuit f c-peratin agreements between States/Organizatins fr CNS peratins and maintenance, including the exchange f persnnel; d) recmmend the establishment f a training/qualificatin plan fr a sufficient number f staff in cnventinal and new cmmunicatin techniques and technlgies used in the aviatin industry, based n reginal requirements; and e) agree t develp an AFI reginal prject aimed t: 1) achieve an integrated and interperable telecmmunicatins infrastructure based n a cmmn reginal CNS Technlgy Radmap; and 2) facilitate gradual migratin t the ATN. 4
5 -END- AFI VSAT1 - WP/XX
Meteorological Satellites (MetSat) Overview of the global network of Meteorological Satellites. Speaker: Markus Dreis (EUMETSAT)
Meterlgical Satellites (MetSat) Overview f the glbal netwrk f Meterlgical Satellites Speaker: Markus Dreis (EUMETSAT) Secnd ITU/WMO Seminar "Use f Radi Spectrum fr Meterlgy: Weather, Water and Climate
More information3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group
Crwn Recgnised Spectrum Access in 3400 t 3600 MHz The respnse f Alcatel-Lucent t Ofcm Spectrum Plicy Grup Spectrum Access in 1 3400 t 3600MHz Fr additinal infrmatin and clarificatin, please cntact: Jean-Pierre
More informationStandard Authorization Request Form
When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke
More informationNATF CIP Requirement R1 Guideline
Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves
More informationAPT Preparations for WRC-19. ICAO NAM/CAR/SAM Regional Preparatory Workshop for WRC-19 Mexico City, 6-7 February 2018
APT Preparatins fr WRC-19 ICAO NAM/CAR/SAM Reginal Preparatry Wrkshp fr WRC-19 Mexic City, 6-7 February 2018 Presented by Eddy D Amic develped based n meeting utcmes f the APT Preparatry Grup fr WRC-19
More informationDeclaration of Amsterdam. Cooperation in the field of connected and automated driving
Declaratin f Amsterdam Cperatin in the field f cnnected and autmated driving 14-15 April 2016 Declaratin f Amsterdam n cperatin in the field f cnnected and autmated driving Navigating t cnnected and autmated
More informationLeicestershire Partnership NHS Trust: Gender Pay Gap Report
Leicestershire Partnership NHS Trust: Gender Pay Gap Reprt 31 st March 2017 Backgrund t the gender pay gap analyses The Gender Pay Gap Regulatins (a 2017 update t the Equality Act 2010) intrduced a requirement
More informationThe Motorcycle Industry in Europe. L-category vehicles type approval regulation ACEM comments on draft TRL durability study
L-categry vehicles type apprval regulatin ACEM cmments n draft TRL durability study 1. ACEM members welcme the pprtunity t cmment n the draft TRL durability study. Since 2004, ACEM members have supprted
More informationNetwork Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005
Netwrk Wrking Grup Request fr Cmments: 4062 Categry: Infrmatinal V. Manral SiNett Crp. R. White Cisc Systems A. Shaikh AT&T Labs (Research) April 2005 Status f This Mem OSPF Benchmarking Terminlgy and
More informationCOMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)
COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required
More informationProject QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities
Prject QC-2015-02 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin sessin fr registered entities Nvember 26, 2015 Presentatin Overview 1. Meeting bjectives 2. Webinar instructins
More informationA cross Border Frequency Coordination Agreement
A crss Brder Frequency Crdinatin Agreement ITU Wrkshp n crss brder Radi Frequency Management in Arab States 26 th January 2017 Dubai, United Arab Emirates Internatinal Telecmmunicatin Unin Aamir Riaz Internatinal
More informationSpecification for a communicating Panelboard system to monitor, control and maintain LV electrical installations
Specificatin fr a cmmunicating Panelbard system t mnitr, cntrl and maintain LV electrical installatins A system fr: - Mnitring the prtectin and cntrl devices in an electrical installatin and prviding the
More informationEGHD Position Paper Optimising ATM staff working stations in the Joint Human-Machine System 1
EGHD December 2018 FINAL EGHD Psitin Paper Optimising ATM staff wrking statins in the Jint Human-Machine System 1 1 Intrductin This paper identifies principles and recmmendatins fr the Eurpean Cmmissin
More informationSPACE-BASED ADS-B SURVEILLANCE DATA AND ITS DISTRIBUTION VIA REDDIG II. (Working paper presented by AIREON) SUMMARY
RCC/20-WP/07 13/03/2017 Internatinal Civil Aviatin Organizatin Suth American Reginal Office - Reginal Prject RLA/03/901 REDDIG Management System and Satellite Segment Administratin Twentieth Meeting f
More informationWhat is a Customer Service Model?
What is a Custmer Service Mdel? Qin Wu IETF 97 Seul Krean L2SM WG meeting 1 Mtivatin Mtivatin: Nt everybdy understand the difference between the device mdel and service mdel Clarify what a service mdel
More informationAPPENDIX B TRAFFIC IMPACT STUDY CRITERIA
APPENDIX B TRAFFIC IMPACT STUDY CRITERIA Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r
More informationTransition from Analogue to Digital Radio Broadcasting An overview of trends
Transitin frm Analgue t Digital Radi Bradcasting An verview f trends ITU/NBTC Wrkshp 16 December 2014 Peter Walp Internatinal Telecmmunicatin Unin Internatinal Telecmmunicatin Unin Presentatin Overview
More informationApplication for Drive Technology
Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.
More informationDevelop preliminary specification and plans from a design brief
Unit Title: OCR unit number 1 Level: 2 Credit value: 3 Guided learning hurs: 24 Unit reference number A/503/5851 Develp preliminary specificatin and plans frm a design brief Unit purpse and aim The fcus
More informationFocus Session on Simulation at Aeronautics Test Facilities
Fcus Sessin n Simulatin at Aernautics Test Facilities Octber 15, 2014 Overview f Presentatin Questins t be addressed during presentatin Hw has the ability t d increasingly accurate mdeling and simulatin
More informationCommunication Protocol Procedure
APPLICABILITY: Reliability Crdinatr System Operatrs I. Purpse Prvide the Reliability Crdinatr System Operatrs (RCSO) with established prcedures t: Imprve cmmunicatins fr the issuance f Operating Instructins
More informationNew Perspectives in Science Education March 2018 Florence, Italy
New Perspectives in Science Educatin 22-23 March 2018 Flrence, Italy Intrducing science teaching in early years educatin: practical insights f SciLit prject Ruta Grigaliunaite CESIE Italy ruta.grigaliunaite@cesie.rg
More informationConsolidated Edison Company of New York. Developer Welcome Kit
Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable
More informationAnnex II to Decision 2019/004/R. AMC and GM to Part ATCO Issue 1, Amendment 2
Annex II t Decisin 2019/004/R AMC and GM t Part ATCO Issue 1, Amendment 2 Annex I t Decisin 2015/010/R f 13 March 2015 is hereby amended as fllws: The text f the amendment is arranged t shw deleted text,
More informationCommon Network Operation Tools
Cmmn Netwrk Operatin Tls Prcess fr the develpment f data exchanges Mnika Kaldnek Adviser, System Operatins Brussels xxx2014 Backgrund > WHY: Regulatin 715/2009 (Art 8)...ENTSOG shall adpt: cmmn netwrk
More informationNetwork Hierarchy Flexibility in an HTS Environment. Dr Harald Stange, Managing Director/CEO, Romantis
Netwrk Hierarchy Flexibility in an HTS Envirnment Dr Harald Stange, Managing Directr/CEO, Rmantis Requirements fr Oil & Gas - class VSAT Flexible tplgy, supprting P2P, Star and Mesh Cmpatible with fixed
More informationCOMMUNICATIONS FORUM
EV06y.S46 q g7@ COMMUNICATIONS FORUM WHAT IS THE FUTURE FOR VSAT'S-- IS IT BYPASS OR MORE? Octber 22, 1987 Seminar Ntes E MASSACHUSETTS INSTITUTE OF TECHNOLOGY I! -- -- j MASSACHUSETTS INSTITUTE OF TECHNOLOGY
More informationBronco Billy s Expansion: Investor Highlights November 2017 FULL HOUSE RESORTS 1
Brnc Billy s Expansin: Investr Highlights Nvember 2017 FULL HOUSE RESORTS 1 Frward-lking Statements This presentatin may cntain statements that are "frward-lking statements" within the meaning f the safe
More informationUTC Great Lakes Regional (Region 4) Training & Meeting The Franklin Conference Center September 20 21, 2018 Chicago, IL
UTC Great Lakes Reginal (Regin 4) Training & Meeting The Franklin Cnference Center September 20 21, 2018 Chicag, IL PREMIER SPONSOR: SNC LAVALIN GOLD SPONSORS: 4RF, RFL/HUBBELL and SELECT SPECTRUM REGISTRATION
More informationELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard
ELEC 7250 VLSI TESTING Term Paper On Analg Test Bus Standard Muthubalaji Ramkumar 1 Analg Test Bus Standard Muthubalaji Ramkumar Dept. f Electrical and Cmputer Engineering Auburn University Abstract This
More informationACA Standard Measurement One-time program
Service Request 101183 ACA Standard Measurement One-time prgram Created n: December 22, 2015 Last Mdified n: 12/23/2015 Prepared by Baskar Chitravel Infrmatin Technlgy Services Office f the President University
More informationParticipation is open on equal conditions to all national and international experienced individual consultants.
REQUEST FOR EXPRESSIONS OF INTEREST N 1216/S/EOI-ICB/RE-ADV/AD/RDB/GOR/12 TITLE: CONSULTANCY SERVICES TO SUPERVISE CONSTRUCTION WORKS RELATED TO SUPPLY & INSTALLATION OF FURNITURE, BUILDING PARTITIONS
More informationTransmit and receive information by marine radio or telephone
MARC020 Transmit and receive infrmatin by marine radi r telephne DRAFT 9/12/2013 UNIT CODE UNIT TITLE Release Release 1 APPLICATION COMPETENCY FIELD ELEMENTS Elements describe the essential utcmes. 1 Operate
More informationProject QC Consultation on Proposed Reliability Standards and Supporting Documents. Information Session with Concerned Entities.
Prject QC-2015-01 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin Sessin with Cncerned Entities May 12, 2015 Outline Objectives f sessin Webinar (instructins) Québec regulatry
More informationMSI Self Assessment - NAVAREA I - CPRNW I Submitted by: United Kingdom
MSI Self Assessment - NAVAREA I - CPRNW9-3.2.1-I Submitted by: United Kingdm 1. Actin Required: Nne, submitted fr infrmatin nly. 2. Backgrund: Within NAVAREA I the WWNWS is a mature and effective system
More informationInformation Article. Relevance
Infrmatin Article Relevance 1. Airline (Aircraft Operatr) Crisis Respnse - an verview t assist understanding f sme significant emergency terms used by e.g. Air Traffic Service Units and Search & Rescue
More informationAcceptance and verification PCI tests according to MIL-STD
Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE
More informationT-Mobile. Interim Text to Services and Wireless Emergency Alerts. Harold Salters, Director, Federal Regulatory Affairs, T-Mobile, USA
T-Mbile Interim Text t 9-1-1 Services and Wireless Emergency Alerts Harld Salters, Directr, Federal Regulatry Affairs, T-Mbile, USA Interim Text t 9-1-1 ~ Vluntary Cmmitment Vluntary cmmitment t ffer Interim
More informationGalileo Exploitation 2018 Grant Plan
Galile Explitatin 2018 Grant Plan Galile Explitatin 2018 Grant Plan 1. Multi-frequency multipurpse antenna fr Galile (GEX.0034) LEGAL BASIS Regulatin (EU) N 1285/2013 f the Eurpean Parliament and f the
More informationEuropeAid Funding opportunities in the ACP Regions
Funding pprtunities in the ACP Regins Infrmatin n the past and future f the EDULINK and ACP S&T Prgrammes A lk at what we have achieved ACP S&T Plitical fundatins Cape Twn ACP Ministerial Frum n Research
More informationVictorian Student Number Data Quality and Process Guidelines for Victorian Government Schools
Victrian Student Number Data Quality and Prcess Guidelines fr Victrian Gvernment Schls Published by the Cmmunicatins Divisin fr Educatin Chief Infrmatin Officer Divisin Department f Educatin and Early
More informationPuget Sound Company Overview. Purpose of the Project. Solution Overview
Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within
More informationRadiofrequency Radiation Assessment Report
Radifrequency Radiatin Assessment Reprt Cathlic Schls Office Lismre Xavier Cathlic Cllege and Hly Family Primary Schl July 2014 Reference: C109995:J123349 Nel Arnld & Assciates Pty Ltd Level 1, 2 Mayneview
More informationMaterials: Metals, timber, plastics, composites, smart and nanomaterials Candidates should:
AQA Resistant Materials - Unit 1 Specificatin 2014-4560 Materials: Metals, timber, plastics, cmpsites, smart and nanmaterials Be aware f the surce f a range f materials. Understand they are prcessed fr
More informationFinal Project Report. Abstract. Document information
Final Prject Reprt Dcument infrmatin Prject Title ATS Datalink Operatinal Imprvements Prject Number 9.33 Prject Manager Aurélien FASAN Deliverable Name Final Prject Reprt Deliverable ID 000 Editin 00.01.01
More informationJPS Interoperability Solutions SNV-12 Voter Executive Outline
JPS Interperability Slutins SNV-12 Vter Executive Outline December 1, 2017 Prepared by: JPS Interperability Slutins, Inc. 5800 Departure Drive Raleigh, NC 27616 (919) 790-1011 supprt@jpsinterp.cm sales@jpsinterp.cm
More informationEMODnet Thematic Lot n 6 HUMAN ACTIVITIES
EMODnet Thematic Lt n 6 HUMAN ACTIVITIES EASME/EMFF/2016/1.3.1.2 Lt 6/SI2.749458 Start date f the prject: 03/03/2017 - (24 mnths) EMODnet Phase III Quarterly Prgress Reprt (6) Reprting Perid: 01/07/2018
More informationSpecification for Learning and Qualifications for Physical Intervention Skills
Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it
More informationEPOCH 50 V4.70 GNSS Firmware
25 April 2013 EPOCH 50 V4.70 GNSS Firmware A new versin f EPOCH 50 GNSS firmware v4.70 has been released. This updated versin prvides the fllwing imprvements and fixes: New Antenna library versin 7.49
More informationConnection tariffs
Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER
More informationBLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment
BLM-Alaska Yukn Lwlands - Kuskkwim Uplands - Lime Hills Rapid Ecreginal Assessment Cmmunicatin and Cllabratin Strategic Framewrk and Implementatin Plan Intrductin and Overview The purpse f the YKL REA
More informationUpgrading to PlanetPress Suite Version 5
Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt
More informationCAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector
CAMPBELL COUNTY GILLETTE, WYOMING Electrical Inspectr Senir Electrical Inspectr Class specificatins are intended t present a descriptive list f the range f duties perfrmed by emplyees in the class. Specificatins
More informationWhite Paper on the Exhaust of Electronic Serial Numbers (ESNs) and Migration to Mobile Equipment Identifiers (MEIDs)
White Paper n the Exhaust f Electrnic Serial Numbers (ESNs) and Migratin t Mbile Equipment Identifiers (MEIDs) Nvember 2007 1 DOCUMENT USE Items cnsidered in this ESN Migratin t MEID Whitepaper: ESN and
More informationNASA s Next Generation Space Communications Architecture Concept Ka-Band and International Communication Satellite Systems Conferences
NASA s Next Generatin Space Cmmunicatins Architecture Cncept Ka-Band and Internatinal Cmmunicatin Satellite Systems Cnferences Jim Schier, Chief Architect and Dep. Directr System Engineering Space Cmmunicatins
More informationImplementation of the ITS Directive Martin Böhm. Budapest Hungary AustriaTech
Implementatin f the ITS Directive Martin Böhm Agenda ITS Directive 2010/40/EU Member State Obligatins Scenaris fr implementing Natinal Access Pints acrss Eurpe Implementatin in Austria Discussin ITS Directive
More informationApplication Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.
Applicatin Package Checklist Cpy f Distributed Generatin frm Renewable Resurces Rider Cpy f Technical Requirements fr Distributed Generatin Agreement Cpy f Applicatin fr Intercnnectin and Parallel Operatin
More informationNo, Cell C has partnered up with various Fibre Network Operators (FNO) in the market providing fibre on an open access network.
C-FIBRE FREQUENTLY ASKED QUESTIONS 1. What is Fibre? Fibre is a next generatin bradband technlgy that intrduces super-fast speeds and a high capacity netwrk with flexibility, reliability and stability
More informationNAISP Operations Guidelines
NAISP Operatins Guidelines Whlesale Services & Operatins February 2017 1 P a g e Cntents RESPONSIBILITIES... 3 OVERVIEW... 4 PRODUCTS... 4 CONTACTS... 5 DSL PREQUAL PROCESS/TIMELINES... 5 ORDER PROCESS/TIMELINES...
More informationFig 1 System architecture. As shown in Figure 1, AUV system could be separated in 3 main blocks:
AUV System Descriptin Railway usage authrizatin system (called AUV, by its abbreviatin in Spanish) is a Safe Train Cntrl (STC) system prvided by Alta Rail Technlgy (ART). AUV system s structure is based
More informationRiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014
SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr
More informationyour resumes & indicate job title in subject to:
ENABLING THE DIGITAL WORLD List f Jb Openings: 1) Analyst Prgrammer 2) Payrll Officer 3) Sftware Engineer (Prduct Develpment) 4) Prcess Engineer (Enabling Technlgy) 5) Optics Engineer 6) Mechanical Design
More informationUK Italy. Greece. Mauritania
PROFILE Rep. f Panama Dminican Rep. Brazil UK Italy Greece Mauritania Rmania Bulgaria Cyprus Sih Stractin Internatinal Hlding LTD Chile Argentine Republic Melburne Cntents Brief Intrductin p. 4 Our Missin
More informationNew Eagle J1939 Library v1.0 New Eagle Products Datasheet
New Eagle New Eagle Prducts 2012-3-28 New Eagle 3588 Plymuth Rad, Bx #274 Ann Arbr, MI 48105-2603 PH: 877.234.1410 FAX: 928.395.2114 Table f Cntents M E C H A T R O N I C C O N T R O L S O L U T I O N
More informationModel Assignment Issued September 2008
Mdel Assignment Issued September 2008 OCR Level 3 Principal Learning in Engineering Unit F558: Selectin and applicatin f engineering materials Please nte: This OCR mdel assignment may be used t prvide
More informationMartel LC-110H Loop Calibrator and HART Communications/Diagnostics
Martel LC-110H Lp Calibratr and HART Cmmunicatins/Diagnstics Abstract Martel Electrnics Crpratin This white paper describes the basic functins f HART cmmunicatins and the diagnstic capability f the Martel
More informationVILLAGE COORDINATOR AGREEMENT
Date Received at AHSGR VILLAGE COORDINATOR AGREEMENT Frm materials written by the riginal funders f AHSGR, we knw that the grup f peple wh gt tgether in the late 1960s t frm what was t later becme AHSGR
More informationUKEPR Issue 01
Title: PCSR Sub-chapter 7.5 Class 3 Instrumentatin and Cntrl Systems Ttal number f pages: 41 Page N.: I / V Chapter Pilt: B. WORINGER Name/Initials Date 30-10-2012 Apprved fr EDF by: A. MARECHAL Apprved
More informationSARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden Internet:
SARAD GmbH Tel.: 0351 / 6580712 Wiesbadener Straße 10 FAX: 0351 / 6580718 01159 Dresden e-mail: supprt@sarad.de GERMANY Internet: www.sarad.de APPLICATION NOTE AN-001_EN The Installatin f autnmus instrumentatin
More informationHands-Free Music Tablet
Hands-Free Music Tablet Steven Tmer Nate Decker Grup Website: steve@wasatch.cm milamberftheassembly@yah.cm http://www.cs.utah.edu/~ndecker/ce3992/ Abstract The typical musician handles a great deal f sheet
More informationWide-Area Voltage and VAR Control of SCE Transmission Network. i-pcgrid 2014 March 26-28, 2014
1 Wide-Area Vltage and VAR Cntrl f SCE Transmissin Netwrk i-pcgrid 2014 March 26-28, 2014 CONTRIBUTORS SCE Team Frank Ashrafi Armand Salazar Backer Abu-Jaradeh WSU Team Mani Vekatasubramanian Hung Chun
More informationAPPENDIX A. Review of OSUA s Noise Complaint Process
APPENDIX A Review f OSUA s Nise Cmplaint Prcess 8950 Cal Center Drive Bldg, 3, Suite 300 Sacrament, CA 95826 916.564.4500 phne 916.564-4501 fax www.esassc.cm memrandum date June 12, 2008 t frm subject
More informationJJ / CP RFP Response to Inquiries
GENERAL QUESTIONS Is it pssible t have pages 19 thrugh 40? The MS Wrd versin f the RFP can be fund n the Clerk f the Curt s website at www.ckcuntyclerkfcurt.rg. Please clarify the due date f the prpsals.
More informationUC Southern Regional Library Facility. 2008/09 Annual Report
UC Suthern Reginal Library Facility 2008/09 Annual Reprt SIGNIFICANT EVENTS AND ACCOMPLISHMENTS 2008/09 New Depsits: the SRLF received 277,023 new items, including 16,000 extra depsits frm UCSD, 37,142
More informationWorkflow Working Group
Wrkflw Wrking Grup June 19, 2007 Chiba University Ann McCarthy Lexmark Internatinal Inc. Chair, Wrkflw Wrking Grup presented by: William Li Wrkflw WG Charter T identify a small number f the mst cmmnly
More informationEstablishing a Regional AIS Application Specific Message Register
Establishing a Reginal AIS Applicatin Specific Message Register Dr. Lee Alexander and Dr. Kurt Schwehr, University f New Hampshire, USA; and Rlf Zetterberg, Swedish Maritime Administratin, Sweden ABSTRACT
More information9/5/2017. Radio Operations and Policies. Radio Operations: Message From the Director. Radio Operations: System Description
Zne Batt Nuis 9/5/2017 Rensselaer Cunty Bureau f Public Safety 800 MHz User Training and Plicies : Message Frm the Directr Message Frm the Directr: This manual prvides a plan and directive fr unifrm prcedures
More informationPJM Protection Standards
PJM Manual 07: PJM Prtectin Standards Revisin: 10 Effective Date: 11/16/2011 Prepared by System Planning Divisin Transmissin Planning Department PJM 20121 PJM 2011 Revisin 00, Effective Date: XX/XX/2010
More informationBV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5
Prduct Specificatin Prduct specificatin. February 2007 ByVac 2007 ByVac Page 1 f 5 Prduct Specificatin Cntents 1. Dcument Versins... 2 2. Intrductin... 2 3. Features... 2 4. Battery Life... 2 5. Blck Diagram...
More informationApplication Note: Conducted Immunity: Quick Guide
icatin Nte: Cnducted Immunity: Quick Guide (Please refer t AZD052 fr the full applicatin nte) 1 Intrductin: Lng cables are at risk f picking up RF, but t test this belw 80MHz require very large antennas
More informationBig Data in Capturing Travel Time
Big Data in Capturing Travel Time A quick snapsht f the applicatins in Auckland Transprt Authr/Presenter: Bill Qu, B.E.(hns), M.E.(hns) Principal Traffic Engineer, Auckland Transprt Email: bill.qu@aucklandtransprt.gvt.nz
More informationLesson Plans. Geography. Grade 9. Mrs. Newgard
Lessn Plans Gegraphy Grade 9 Mrs. Newgard Mnday, Nvember 16, 9-12.2.20 Explain cntemprary issues and events in an interdependent wrld Objective: Discuss Benghazi attack and Learn hw varius landfrms have
More informationMultistate Mobility Performance Monitoring
Great Lakes Reginal Operatins Calitin (GLRTOC) Multistate Mbility Perfrmance Mnitring September 2015 GLRTOC Members The Great Lakes Reginal Transprtatin Operatins Calitin was funded in May 2010, and was
More information5G Work Programme. July 2018
5G Wrk Prgramme July 2018 5G I. 5G: a disruptive generatin II. Internatinal mbilisatin III. Onging wrk since 2017 IV.Arcep s wrk prgramme 2 I. 5G: a disruptive generatin 5G will make it pssible t increase
More informationEngineering Design and Development
Engineering Design and Develpment Grade 12 Prerequisites: Intrductin t Engineering Design Principles f Engineering Digital Electrnics Credit Value: 5 ABSTRACT The Engineering Design and Develpment curse
More informationPPA PORTS UKC STANDARDS
TABLE OF CONTENTS 1. DEFINITIONS AND ABBREVIATIONS...3 1.1 Abbreviatins r acrnyms will have the fllwing meaning:...4 2. INTRODUCTION...5 3. STATIC UNDER KEEL CLEARANCE (SUKC)...5 4. PREDICTIVE UNDER KEEL
More informationPolicy Review and Strategic Framework of Radio Spectrum Management Consultation Paper
Plicy Review and Strategic Framewrk f Radi Spectrum Management Cnsultatin Paper 30 th Octber 2006 Malta Cmmunicatins Authrity Valletta Waterfrnt, Pint Wharf, Valletta VLT01, Malta, Eurpe Tel: (356) 21
More informationCreative Scotland is the national development agency for the arts, screen and creative industries.
Creative Sctland is the natinal develpment agency fr the arts, screen and creative industries. Unlcking Ptential, Embracing Ambitin Creative Sctland is the public bdy that supprts the arts, screen and
More informationRapid Innovation Fund (RIF) Program Overview
Rapid Innvatin Fund (RIF) Prgram Overview Ted Bujewski, Directr, Rapid Innvatin Fund Prgram Office f the Under Secretary f Defense (Research and Engineering) January 2019 Backgrund Established as the Rapid
More informationBriefing on Discussions Regarding a Master Lease Agreement for the Intelligent Digital Kiosks
Briefing n Discussins Regarding a Master Lease Agreement fr the Intelligent Digital Kisks Cmmittee-f-the-Whle September 11, 2018 Nevin Grinnell Vice President Chief Marketing Officer 1 Agenda Backgrund
More informationCOMPLETE project stakeholder mapping and management
COMPLETE prject stakehlder mapping and management 1. Backgrund COMPLETE (Cmpleting management ptins in the Baltic Sea Regin t reduce risk f invasive species intrductin by shipping) is an Interreg Baltic
More informationProof of the concept Validation Results
Deliverable N.: D9 Prf f the cncept Validatin Results Sept 2008 Final Draft 1.0 Prject funded by the Eurpean Cmmunity under the Sixth Framewrk Prgramme fr Research and Technlgical Develpment. Prject ref.
More informationService Level Agreement
Service Level Agreement SIP This SIP Service Level Agreement ( SLA ) is incrprated int the Qute executed by TekLinks and Custmer fr SIP Services and sets frth the specific terms and cnditins under which
More informationWIRELESS BROADBAND SPECTRUM POLICY
1. PREAMBLE MINISTRY OF INFORMATION, COMMUNICATIONS AND TECHNOLOGY WIRELESS BROADBAND SPECTRUM POLICY The radi-frequency spectrum is a critical and finite scarce resurce which supprts a wide range f wireless
More informationSharing Research Infrastructures Experiences from two Pilot Actions. John Hanus JPI Oceans Secretariat
Sharing Research Infrastructures Experiences frm tw Pilt Actins Jhn Hanus JPI Oceans Secretariat Research Infrastructures in Ocean Sciences Research Infrastructures (RIsin marine sciences essential fr
More information3G Coverage Obligation Verification Methodology
3G Cverage Obligatin Verificatin Methdlgy Statement Publicatin date: 9 May 2012 Main Heading Cntents Sectin Page 1 Intrductin 1 2 Summary f apprach 2 3 Key parameters t be used in the SINR calculatin
More informationGE Multilin 339 Motor Protection Specifications
GE Multilin 339 Mtr Prtectin Specificatins The mtr prtectin relay shall prvide primary prtectin fr medium vltage mtrs. The relay shall be equipped with the fllwing prtectin functins. Mtr Thermal Overlad
More informationSoftware Engineering
What Is Sftware Engineering? Sftware Engineering Sftware engineering is the study and an applicatin f engineering t the, develpment, and maintenance f sftware. The applicatin f a systematic, disciplined,
More informationAvista Corporation s Standards of Conduct Implementation and Compliance Procedures 1
Avista Crpratin s Standards f Cnduct Implementatin and Cmpliance Prcedures 1 These prcedures explain in detail the measures taken by Avista Crp. and its affiliates t implement and cmply with the Federal
More information