UKEPR Issue 01

Size: px
Start display at page:

Download "UKEPR Issue 01"

Transcription

1 Title: PCSR Sub-chapter 7.5 Class 3 Instrumentatin and Cntrl Systems Ttal number f pages: 41 Page N.: I / V Chapter Pilt: B. WORINGER Name/Initials Date Apprved fr EDF by: A. MARECHAL Apprved fr AREVA by: G. CRAIG Name/Initials Date Name/Initials Date REVISION HISTORY Issue Descriptin Date 00 First issue. Nte: the RRC-B Safety Autmatin System ( 1), Prcess Infrmatin and Cntrl System ( 2), Prcess Autmatin System ( 3), and Severe Accident I&C System ( 4) were previusly cvered by Sub-chapter 7.4. Fr clarity, the changes frm the previus text in Sub-chapter 7.4 are sidelined in this dcument as fllws: - Minr editrial changes - Clarificatin f text - Update and additin f references - Update f Safety Functin Categrisatin and SCC Classificatin t clearly summarise Categry A, B, C and Class 1, 2, 3 fr I&C scpe - Architecture : Class 1 manual cntrl and indicatin systems in the MCR and RSS - Rle f RRC-A in Defence in Depth Cncept and assciated allcatin - Electrical and functinal islatin fr interfaces t systems f different safety class - Respnse times invlving netwrk cmmunicatin achievable 01 Cnslidated PCSR update: - References listed under each numbered sectin r sub-sectin heading numbered [Ref-1], [Ref-2], [Ref-3], etc - Minr editrial changes - Update and additin f references - Clarificatin f text and additin f crss-references ( 1, 1.0, 1.4.3, , , , 2.4.1, 2.4.3, 2.5, 3.0, 3.3.2, 4.0, 4.4.1, , Figure 1) Cntinued n next page

2 Title: PCSR Sub-chapter 7.5 Class 3 Instrumentatin and Cntrl Systems Page N.: II / V REVISION HISTORY (Cnt d) Issue Descriptin Date 01 cnt d Cnslidated PCSR update: - Justificatin prvided fr the end t end respnse times fr the plant bus and terminal bus ( 2.3.2)

3 Title: PCSR Sub-chapter 7.5 Class 3 Instrumentatin and Cntrl Systems Page N.: III / V Cpyright 2012 AREVA NP & EDF All Rights Reserved This dcument has been prepared by r n behalf f AREVA NP and EDF SA in cnnectin with their request fr generic design assessment f the EPR TM design by the UK nuclear regulatry authrities. This dcument is the prperty f AREVA NP and EDF SA. Althugh due care has been taken in cmpiling the cntent f this dcument, neither AREVA NP, EDF SA nr any f their respective affiliates accept any reliability in respect t any errrs, missins r inaccuracies cntained r referred t in it. All intellectual prperty rights in the cntent f this dcument are wned by AREVA NP, EDF SA, their respective affiliates and their respective licensrs. Yu are permitted t dwnlad and print cntent frm this dcument slely fr yur wn internal purpses and/r persnal use. The dcument cntent must nt be cpied r reprduced, used r therwise dealt with fr any ther reasn. Yu are nt entitled t mdify r redistribute the cntent f this dcument withut the express written permissin f AREVA NP and EDF SA. This dcument and any cpies that have been made f it must be returned t AREVA NP r EDF SA n their request. Trade marks, lgs and brand names used in this dcument are wned by AREVA NP, EDF SA, their respective affiliates r ther licensrs. N rights are granted t use any f them withut the prir written permissin f the wner. EPR TM is an AREVA Trade Mark. Trade Mark Fr infrmatin address: AREVA NP SAS Tur AREVA Paris La Défense Cedex France EDF Divisin Ingénierie Nucléaire Centre Natinal d'equipement Nucléaire , avenue Pierre Brsslette BP Mntruge France

4 Title: PCSR Sub-chapter 7.5 Class 3 Instrumentatin and Cntrl Systems Page N.: IV / V TABLE OF CONTENTS 1. RRC-B SAFETY AUTOMATION SYSTEM (RRC-B SAS) 1.0. SAFETY REQUIREMENTS 1.1. ROLE 1.2. FUNCTIONS PERFORMED 1.3. DESIGN BASIS 1.4. ARCHITECTURE 1.5. OPERATING CONFIGURATIONS TECHNOLOGY 1.7. POWER SUPPLY 1.8. PROVISIONS FOR PERIODIC TESTING 2. PROCESS INORMATION AND CONTROL SYSTEM (MCP [PICS]) 2.0. SAFETY REQUIREMENTS 2.1. ROLE 2.2. FUNCTIONS PERFORMED 2.3. DESIGN BASIS 2.4. ARCHITECTURE 2.5. OPERATING CONFIGURATIONS TECHNOLOGY 2.7. POWER SUPPLY 2.8. PROVISIONS FOR PERIODIC TESTING 3. PROCESS AUTOMATION SYSTEM (PAS) 3.0. SAFETY REQUIREMENTS 3.1. ROLE

5 Title: PCSR Sub-chapter 7.5 Class 3 Instrumentatin and Cntrl Systems Page N.: V / V 3.2. FUNCTIONS PERFORMED 3.3. DESIGN BASIS 3.4. ARCHITECTURE 3.5. OPERATING CONFIGURATIONS TECHNOLOGY 3.7. POWER SUPPLY 3.8. PROVISIONS FOR PERIODIC TESTING 4. SEVERE ACCIDENT I&C SYSTEM (SA I&C) 4.0. SAFETY REQUIREMENTS 4.1. ROLE 4.2. FUNCTIONS PERFORMED 4.3. DESIGN BASIS 4.4. ARCHITECTURE 4.5. TECHNOLOGY OPERATING CONFIGURATIONS 4.7. POWER SUPPLY 4.8. PROVISION FOR MAINTENANCE AND I&C TESTS

6 PAGE : 1 / 36 SUB-CHAPTER 7.5 CLASS 3 INSTRUMENTATION AND CONTROL SYSTEMS 1. RRC-B SAFETY AUTOMATION SYSTEM (RRC-B SAS) Nte: Refer t the quality plans, system specificatin reprts and verall architecture drawings fr mre detailed infrmatin n the Safety Autmatin System (SAS), which is als applicable t RRC-B SAS [Ref-1] t [Ref-7] SAFETY REQUIREMENTS The Risk Reductin Categry B (RRC-B) SAS is subject t the safety requirements applicable t Class 3 I&C systems, due t its management f Categry C RRC-B functins (with the exceptin f functins devted t the particular Lss Of Offsite Pwer (LOOP) severe accident scenari, allcated t the Severe Accident I&C system (SA I&C), see sectin 4 f this sub-chapter). The requirements are detailed in several dcuments, which prvide all the required infrmatin cntained within an IEC cmpliant system requirements specificatin, as demnstrated fr the SAS in sectin 1.0 f Sub-chapter 7.4 [Ref-1] and fr the PAS in sectin 3.0 f this subchapter [Ref-2]. The RRC-B SAS enables the prcessing f mstly manual actins, tgether with the assciated mnitring, necessary fr the perfrmance f the I&C Functins detailed belw Safety functins The RRC-B SAS cntributes t the RRC-B functins related t preventin f large releases in the event f a pstulated lw pressure cre melt, with the exceptin f the LOOP RRC-B sequence. It cntributes t the fllwing safety functins: primary circuit depressurisatin; hydrgen cntrl (mitigatin); cntainment depressurisatin and heat remval; radilgical surce term mnitring. It shuld be nted that a significant number f RRC-B functins are passive withut requiring I&C management. With regard t the safety analysis, the RRC-B SAS perfrms RRC-B Categry C seismic classified I&C Functins. The RRC-B SAS will nt be allcated any Categry A r Categry B I&C Functins.

7 PAGE : 2 / Design requirements The RRC-B SAS must meet the requirements detailed belw. These requirements must be met fr all the I&C Safety Features managed by the RRC-B SAS Requirements resulting frm the functinal classificatins Functinal classificatin f the system The RRC-B SAS must be safety-classified, in accrdance with the classificatin indicated in Sub-chapter Single failure criterin The single failure criterin des nt apply t the RRC-B SAS Emergency pwer supplies The electrical pwer supply fr the RRC-B SAS equipment must be backed-up by the Emergency Diesel Generatrs. Mrever, the pwer supply must be uninterruptible, guaranteeing the pwer supply even during switching between nrmal pwer and diesel pwer (i.e. it must ensure that the RRC-B SAS I&C Functins can cntinue withut interruptin). In additin, the electrical pwer supply fr the RRC-B SAS equipment must be backed-up by the Ultimate Diesel Generatrs. Fr that reasn, the RRC-B SAS equipment is lcated in electrical divisins 1 and Qualificatin under perating cnditins The RRC-B SAS equipment must remain peratinal in severe accident cnditins, and must therefre meet the qualificatin requirements defined in Sub-chapter 3.6. Mrever, the RRC-B SAS equipment must be peratinal in bth nrmal and extreme envirnmental cnditins applicable t the I&C equipment rms in which it is lcated. These cnditins are defined in sectin 1 f Sub-chapter Electrical and I&C classificatins The electrical and I&C classificatin f the RRC-B SAS is cnsistent with the classificatin principles given in Sub-chapter Seismic classificatin The RRC-B SAS meets the seismic requirements defined in Sub-chapter Peridic testing The I&C Functins managed by the RRC-B SAS must be tested peridically (as defined in sectin 1 f Sub-chapter 3.2). The RRC-B SAS must be designed t allw peridic tests.

8 PAGE : 3 / Additinal requirements Nt applicable Hazards The RRC-B SAS is nt subject t requirements regarding internal hazards. Prtectin against external hazards fr the RRC-B SAS system cncerns nly seismic phenmena and is defined cnsistent with the principles in Sub-chapter Tests After installatin, the RRC-B SAS must be subject t pre-peratinal testing t verify that it cnfrms t the system perfrmance required by the design. The requirements fr peridic testing are set ut in sectin f this sub-chapter ROLE A Severe Accident (RRC-B) is an abnrmal event which leads t the meltdwn f the cre within the Reactr Pressure Vessel (RPV) and is likely t cause a ptential release f radiatin due t an RPV failure. The management f a Severe Accident is primarily accmplished by RRC-B SAS equipment. Cmbined with the passive safety systems dedicated t Severe Accident scenaris, and with lcal manual cmmands, it prvides the necessary mitigatin path t limit discharges f radiactivity t the envirnment FUNCTIONS PERFORMED The I&C Functins prcessed by the RRC-B SAS have the same features as ther Standard I&C autmatin systems: Data prcessing: acquisitin and/r cnditining (example: mnitring f cre utlet temperature, radiactivity mnitring ); Prcessing f applicatin calculatins: mst I&C Functins are manual (example : manual pening f the SA relief valve in electrical divisin 4); Prcessing f mnitring signals: Prcessing f status and fault check-backs, generatin f alarms and status indicatins.

9 PAGE : 4 / DESIGN BASIS Availability requirements The main availability requirements fr the RRC-B SAS are linked t the reliability and the maintainability f the system i.e.: t limit the lss f the RRC-B SAS due t failure f ne f its cmpnents (mainly by cmpnent redundancy); t facilitate the maintenance and repair f the RRC-B SAS t minimise dwntime Perfrmance requirements The RRC-B SAS is subject t specific perfrmance requirements: Respnse time requirements: maximum time frm the variatin f an input signal (analgue r digital) t transmissin t an utput interface; maximum time frm the receipt f a manual cmmand t its transmissin t an utput interface. These glbal criteria are applied t the RRC-B SAS as fllws: fr a manual cmmand, see sectin f this sub-chapter; fr an autmatic cmmand: nt applicable. The RRC-B SAS must cntribute t fulfilling the glbal criteria described abve and in sectin f this sub-chapter In particular, the tw acquisitin, prcessing and transmissin actins perfrmed by the RRC-B SAS must be cmpatible with the required ttal respnse time (including Safety Infrmatin and Cntrl System (MCS [SICS]), Prcess Infrmatin and Cntrl System (MCP [PICS]), RRC-B SAS and level 0 cmpnents and systems). Sizing requirements: static sizing includes actuatrs, sensrs and I&C Functins that the RRC-B SAS supprts; dynamic sizing includes sampling and prcessing times, taking int accunt the way in which the I&C Functins are prcessed (peridic r eventtriggered) Envirnmental requirements The ambient cnditins that the RRC-B SAS must tlerate are linked t the temperature and relative humidity f the rms husing this equipment. The envirnmental characteristics are defined in Sub-chapter 9.4, fr nrmal and extreme cnditins.

10 PAGE : 5 / Human-machine interface requirements The RRC-B SAS must interface with an engineering Human-Machine Interface (HMI) t enable safe, effective and errr-free cmmissining, maintenance, peridic testing and cnfiguratin f the RRC-B SAS. The peratinal HMI fr the RRC-B SAS is prvided by the level 2 I&C systems (see sectin 1.1 f Sub-chapter 7.2) ARCHITECTURE Structure and cmpsitin The structure and cmpsitin f the RRC-B SAS are dictated by the functinal requirements. This set f requirements affects the allcatin f I&C prcessing tasks t the varius cmpnents within the RRC-B SAS. These functinal requirements relate t the fllwing: The functinal classificatin f the prcessing (all RRC-B SAS I&C Functins are Categry C); The electrical divisin (tgether with the prcessing cabinet, and assciated actuatrs and sensrs) : RRC-B SAS I&C Functins are allcated t electrical divisins 1 and 4; The prcessing perfrmance requirements (respnse times, prpagatin times, accuracy); The prcessing grupings/exclusins which require certain prcesses t be gruped (due t the requirement t simultaneusly shut dwn all these prcesses in the event f malfunctin f part f the I&C system that manages them), r cnversely, that certain prcessing grups need t be managed by different input/utput bards. In additin, the RRC-B SAS structure takes int accunt the segmentatin f the prcess being cntrlled, dictated by the number, gegraphic lcatin and type f actuatr and sensr interfaces t be managed. Unlike the Class 2 Plant SAS, the RRC-B SAS des nt have any dedicated SAS Bus interface, but nly its Class 3 Plant bus interface Installatin The RRC-B SAS equipment is installed in the I&C cabinet rms f divisins 1 and 4 in the safeguard buildings. The RRC-B SAS cabinets are psitined cnsidering: cnsistency with the lcatin and divisin f the actuatrs and the sensrs t be managed; available space; and

11 PAGE : 6 / 36 cnsistency with the electrical supplies f the electrical divisins Interfaces with ther I&C systems The RRC-B SAS exchanges infrmatin with the fllwing: the HMI, MCS [SICS] in the MCR and MCP [PICS] in bth the MCR and RSS, related t plant peratin by the peratr; the PAS, related t the plant autmatin management; the instrumentatin prcess assciated with measurement and data acquisitin; the switchgear units (electrical bards) and the cntrl devices (electr-psitiners, etc.) that are assciated with actuatr cntrls; the external systems (I&C cabinets fr the diesels, etc.), assciated with the units autmatin management. Cncerning the RRC-B SAS interfaces: The RRC-B SAS I&C Functins have the characteristics, in accrdance with the defence in depth cncept, f being autnmus in relatin t ther I&C systems at level 1 f the I&C architecture. This means that these I&C Functins d nt depend n infrmatin cming frm ther systems and the interfaces are limited in number OPERATING CONFIGURATIONS The cnfiguratin f the RRC-B SAS (frm the hardware and functinal pints f view) is independent f the plant situatin. Prcessing allcatin depends nly n functinal criteria and n the allcatin principles f the I&C system. The cnfiguratin f the RRC-B SAS is, frm this pint f view, cnstant. The RRC-B SAS cnfiguratin is based n the principle that, in the event f malfunctin f an active CPU, the system switches t a redundant standby unit. This principle applies t all the redundant RRC-B SAS bards (CPU bards and cmmunicatin management bards) TECHNOLOGY The equipment used t implement the RRC-B SAS is the digital I&C system based n SPPA-T2000 [Ref-1] POWER SUPPLY Within each f divisins 1 and 4, the I&C cabinets f the RRC-B SAS are supplied by a dual pwer supply via independent AC/DC cnverters and DC/DC cnverters. One pwer supply is prvided by a 400V AC supply and the ther by a 220V DC supply with apprpriate cnverters. The vltage required by the cabinets will be regulated internally in dedicated pwer supply cabinets. These pwer supply cabinets are situated in the same rms as the I&C cabinets. The descriptin f the pwer supply distributin f the NI is given in Sub-chapter 8.3.

12 PAGE : 7 / PROVISIONS FOR PERIODIC TESTING All I&C Functins are subject t peridic testing. The safety functin test will allw the verificatin f the whle cntrl channel, frm the sensr, r frm the MCP [PICS]/MCS [SICS], via RRC-B SAS, up t the change f state f the actuatr. Hwever, if recnfiguratin f the relevant actuatr cannt be carried ut (fr example, during plant peratin), prvisins are taken fr blcking the cntrl signals during the test, s that the actuatr cntrl line can be tested withut physically cntrlling it.

13 PAGE : 8 / PROCESS INFORMATION AND CONTROL SYSTEM (MCP [PICS]) Nte: Refer t the quality plans, system specificatin reprts and verall architecture drawings fr mre detailed infrmatin n the Prcess Infrmatin and Cntrl System (MCP [PICS]) [Ref-1] t [Ref-7] SAFETY REQUIREMENTS The MCP [PICS] is subject t the safety requirements applicable t Class 3 I&C systems Safety functins The way the MCP [PICS] cntributes t the I&C Functins is described in Sub-chapter 7.1. With regard t safety, the MCP [PICS] prvides the peratrs with infrmatin and cmmand facilities necessary t perate and mnitr the plant in nrmal (PCC-1) perating cnditins (cnditins within the limits f the nrmal functining f the installatin) and als in RRC-A and RRC-B situatins. The MCP [PICS] is required t be designed t supprt Categry C I&C Functins. The MCP [PICS] is als the preferred means f cntrl t ensure ptimised peratin f the installatin in PCC-2 t PCC-4 cnditins (see Chapter 14 fr mre details) Design requirements Requirements resulting frm functinal classificatin Functinal classificatin f the system The MCP [PICS] is a Class 3 system and supprts Categry C and nn-categrised perating and mnitring I&C Functins accrding t the classificatin principles described in Sub-chapter 3.2. The MCP [PICS] is a Class 3 I&C system. The MCP [PICS] is the preferred means f cntrl t ensure ptimised peratin f the installatin in PCC-2 t PCC-4 cnditins. In additin t its Class 3 requirements, the fllwing requirements apply t the MCP [PICS]: peratr wrkstatin equipment and the architecture f the cmputerised Human- Machine Interface in the Main Cntrl Rm (MCR) must meet requirements applicable t Class 2 systems; the crrespnding sftware must meet related qualificatin requirements prpsed by the designer in the RCC-E (implementatin f thse parts f IEC standard fr Class 3 cmputer-based systems) [Ref-1]; systems must be implemented (utside the MCP [PICS]) fr the detectin f failures f the MCP [PICS] prcessing units and assciated netwrk links, and these systems must meet the requirements applicable t Class 2 systems.

14 PAGE : 9 / Single failure criterin The single failure criterin is nt required fr the Class 3 I&C Safety Features f the MCP [PICS]. Due t the applicatin f Class 2 requirements t peratr wrkstatin equipment and t the architecture f the cmputerised Human-Machine Interface in the cntrl rm, the single failure criterin must be met by the architecture f this sub-set f MCP [PICS] equipment Emergency pwer supply Due t the MCP [PICS] being Class 3, a requirement fr a backed-up pwer supply f the MCP [PICS] equipment is defined n a case-by-case basis. Due t the applicatin f Class 2 architecture and design requirements fr electrical back-up t the peratr wrkstatin equipment and t the architecture f the cmputerised Human-Machine Interface in the cntrl rm, the pwer supply f the assciated equipment must, at least, be backed-up by the Emergency Diesel Generatrs. In additin, this pwer supply must be f an uninterruptible type in all pssible perating mdes and crrespnding transients Qualificatin under perating cnditins The MCP [PICS] equipment must be qualified accrding t its safety class, and must in cnsequence meet the qualificatin requirements (integrity, availability, etc.) defined in Sub-chapter 3.6, under nrmal and extreme envirnmental cnditins t which they are subjected in carrying ut their task (see sectin f this sub-chapter) Electrical and I&C classificatins The electrical and I&C classificatin f the MCP [PICS] is cnsistent with the classificatin principles given in Sub-chapter Seismic classificatin MCP [PICS] system meets the seismic requirements defined in Sub-chapter Peridic testing MCP [PICS] equipment is subject t peridic tests Hazards The MCP [PICS] must be prtected against cmmn cause failures that can result frm internal r external hazards by meeting requirements defined in Sub-chapter 3.1 (external and internal hazards) Tests Pre-peratinal tests The MCP [PICS] must be subject t pre-peratinal tests t check that, after installatin, the system perfrmance cnfrms t the design requirements.

15 PAGE : 10 / Mnitring during peratin Class 2 systems implemented t detect and annunciate ptential failures f the MCP [PICS] prcessing units enable mnitring f the crrect peratin f the MCP [PICS] prcessing units in the cntrl rm Peridic tests All I&C Functins must be subject t peridic testing. The equipment must be designed s that specific peridic tests can be perfrmed ROLE The Prcess Infrmatin and Cntrl System (MCP [PICS]) is the I&C system that supprts the cmputerised means fr cmmand and mnitring f the installatin. It includes: the peratr wrkstatins and the Plant Overview Panel (POP) installed in the MCR; the peratr wrkstatins installed in the Remte Shutdwn Statin (RSS); the peratr wrkstatin installed in the Technical Supprt Centre (TSC) fr supervisin; the basic peratr wrkstatins (with fewer screens) that can be installed in additin t the cmputerised perating means in particular plant situatins (e.g. cmmissining) r fr specific activities (e.g. maintenance). In additin, the MCP [PICS] recrds significant events that ccur in the plant and prvide the interface with the nn real-time applicatins (als called level 3 applicatins) such as the applicatin fr dcument assistance. The main functin f the MCP [PICS] is t prvide the peratrs with cntrls, infrmatin and perating guides that are fully apprpriate t their tasks, in any plant situatin. As this functin entails an interactin with peratrs, the MCP [PICS] Human-Machine Interface must cmply with ergnmic criteria taking int accunt the cgnitive and physilgical aptitudes f the peratrs FUNCTIONS PERFORMED In rder t meet the bjective described in the previus sectin, the MCP [PICS] must prvide the fllwing features: Display functins: displaying graphical images including representing data frm sensrs, perating guides, alarm sheets, technical sheets and lists; navigatin thrugh different images; designatin f the item with which the peratr must interact; updating images (clur, shape f bjects etc.) accrding t the prcess state;

16 PAGE : 11 / 36 visualisatin and pltting curves; printing f varius images r lists. Instrumentatin and Cntrl functins: sending cmmands t actuatrs via the I&C systems; displaying cmmand feedback; allwing the presentatin f data t the peratr. Alarm functins: warning the peratrs as sn as an alarm ccurs; managing the lists f alarms; allwing access t alarm sheets. Prcessing functins: managing databases; initiating prcessing in the event f a change f state; elabrating infrmatin if needed (situatins, alarms, synthetic infrmatin etc.). Interface functins: retrieving and filtering data frm the prcess via the autmatin level; sending cmmands t the prcess via the autmatin level. Archiving functin: archiving digital and analgue data; retrieving archived data; Administrative and maintenance functins: prviding help fr maintenance; managing the intrductin f data int peratin; prviding help fr analysis (e.g. analysis f wrkstatin access etc.); ensuring security tasks (e.g. the management f wrkstatin access etc.); self mnitring.

17 PAGE : 12 / 36 These features help ensure that the results f the Human Factrs prgramme described in Sub-chapter 18.1 are made available t the shift team. T cmplement these features, special attentin is paid t the design f the interface and the wrking envirnment as detailed in sectin belw DESIGN BASIS Availability requirements The main bjectives fr MCP [PICS] architecture are availability, flexibility and maintainability. In particular, this means that the MCP [PICS] architecture must be sufficiently flexible and redundant t: prevent mst lsses f MCP [PICS] due t the failure f ne item f equipment; allw redistributin f the wrking area (screens, perating wrkstatins etc.) when sme equipment (screen, cmputer etc...) is unavailable; facilitate maintenance and repair t minimise the perid f unavailability f the MCP [PICS]; allw cnnectin f additinal cmpnents (fr example additinal peratr wrkstatins) during specific phases (e.g. cmmissining, maintenance) Perfrmance requirements The MCP [PICS] is subject t particular perfrmance requirements: Respnse time requirements: these requirements are intended t ensure that the MCP [PICS] is able t prvide the necessary level f infrmatin whatever the plant situatin; Glbal criteria cncerning the fllwing: maximum permissible time between a variatin ccurring at level 0 (sensr level) and the update f the crrespnding infrmatin n screen; maximum permissible time between an peratr actin and the transmissin f the crrespnding cmmand t the actuatr; time necessary fr requested infrmatin t reach the peratr. These glbal requirements are taken int accunt in the design f the MCP [PICS] by specifying: fr a manual cmmand (frm the actin f the peratr t transmissin t level 1) taking int accunt the HMI respnse time, the accuracy f the transmitted value and the transit time; fr feedback frm a manual cmmand (frm level 1 utput t screen update) taking int accunt the respnse time fr the visualisatin display, the accuracy f the displayed value and the transit time;

18 PAGE : 13 / 36 fr the visualisatin f a sensr value (frm level 1 utput t the screen update) taking int accunt the respnse time fr the visualisatin display, the accuracy f the displayed value and the transit time. Sizing requirements: static sizing specificatin includes the number f actuatrs, sensrs etc. that the MCP [PICS] must manage and the number f images, animated bjects, prcedures pages, alarms sheet etc. that must be supprted by the cmputerised perating system; dynamic sizing specificatin includes specificatin f the number f state changes r analgue variatins that the MCP [PICS] must be able t prcess within a fixed interval f time. Values fr the different criteria listed abve will be defined in detailed studies as fr FA3. They depend mainly n ergnmic criteria (e.g. respnse time fr infrmatin refreshment r cmmand feedback; type f infrmatin and its rganisatin fr static sizing), r n functinal studies. An analysis f the FA3 studies and tests shws that the design derived time respnses are cnsiderably mre pessimistic than thse determined by the testing perfrmed. It presents arguments fr the acceptability f the results that have been btained and argues that the equipment t be used fr the UK EPR can be expected t prduce mre acceptable results. It is nted that the numerical criteria fr the time respnses are nt safety related limits but are average respnse time targets [Ref-1] Envirnmental requirements The envirnmental requirements depend largely n the lcatin f the different equipment items (MCR r RSS r I&C cabinet rms). They are divided int tw categries: the envirnmental cnditins that the equipment must withstand. This includes temperature and relative humidity f the equipment rm; the impact f the equipment n lcal envirnmental cnditins. This categry includes nise level and dissipated heat. Fr display equipment, sme particular envirnmental cnditins, such as lighting, must be cnsidered frm an ergnmic pint f view. The prvisins that must be made are determined as part f the Human Factrs apprach (see Sub-chapter 18.1 fr a descriptin f the Human Factrs prgramme, particularly with regard t definitin f requirements fr lighting and ther envirnmental cnditins) Human-machine interface requirements The MCP [PICS] must interface with an engineering HMI t enable safe, effective and errr-free cmmissining, maintenance, peridic testing and cnfiguratin f the MCP [PICS].

19 PAGE : 14 / 36 With regard t the Human Factrs apprach, the MCP [PICS] plays tw rles: the MCP [PICS] must have the functinality necessary t implement the results f the Human Factr apprach (e.g. treatment and type f supprted data, rganisatin f data, layut f infrmatin, means f navigatin, alarm system, perating help mechanisms etc.); the MCP [PICS] must prvide a wrking envirnment fr the peratrs with an interface that meets the requirement f the state-f-the-art ergnmic criteria (rganisatin f the different means f cntrl in the MCR, wrkstatin layut, dialgue methds, cmmunicatins methds etc). These requirements are included in the Human Factrs prgramme described in Sub-chapter The peratinal HMI fr the MCP [PICS] is prvided by the level 2 I&C systems (see sectin 1.1 f Sub-chapter 7.2) ARCHITECTURE Structure and cmpsitin T accmplish its bjective, the MCP [PICS] includes the fllwing resurces (sftware and/r hardware): graphical interfaces fr the Human-Machine Interface; netwrk interfaces fr data exchange; real time data bases (prcess and elabrated data, and their attributes, Human- Machine Interface data); archiving and printing facilities; perating systems; applicatin sftware. These resurces are used by the fllwing equipment: cntrl wrkstatins in the MCR and in the RSS; mnitring wrkstatins in the MCR and in the TSC; a POP incrprating large screens in the MCR; basic peratr wrkstatins fr use during specific phases (e.g. cmmissining) r specific tasks; a set f cmputers, either assciated with the wrkstatins r, if required, centralised and installed in the I&C cabinet rms (divisins 1 and 4);

20 PAGE : 15 / 36 equipment allwing printing; equipment allwing archiving; interfaces with engineering tls; interfaces with ther nn real time (level 3) applicatins; netwrks fr exchange f data between MCP [PICS] and level 1 r 3 systems. Operatr wrkstatins cnsist f standardised screens refreshed by prcessing units depending n the cntent f databases and pinting and data input devices (mice, keybards, etc). Operatr wrkstatins, whether they perate in cntrl mde r mnitring mde, are based n similar equipment and prvide similar functinality. Any mnitring wrkstatin installed in the MCR r in the RSS can be cnfigured n-line t becme a cntrl wrkstatin t allw a reallcatin f peratr wrkstatin in the event f ttal lss f an peratr wrkstatin in cntrl mde. This flexibility is cntrlled by prcedures. The number f wrkstatins, their detailed cmpsitin (e.g. number f screens), their rganisatin in the MCR, RSS r TSC, is determined by the Human Factrs Engineering prgramme (see Sub-chapter 18.1). The POP is cnsidered as an integral part f the MCP [PICS]: therefre, it is subject t the same functinal classificatin (i.e. Categry C/nn-categrised) and culd be cnsidered as an peratr wrkstatin cnfigured in mnitring mde. Therefre simultaneus failure f the POP and MCP [PICS] must be cnsidered, especially in the MCS [SICS] design. The I&C Functins supprted by the MCP [PICS] are rganised within the equipment listed abve in rder t satisfy safety and availability requirements: MCP [PICS] and MCS [SICS] cmpnents are chsen t be sufficiently diverse t minimise the risk f cmmn cause failure (i.e. the MCS [SICS] is cnventinal and the MCP [PICS] is a digital system). This measure is reinfrced by apprpriate equipment installatin measures (see Sub-chapter 7.7); the prcessing equipment needed t cntrl and mnitr the plant frm the RSS wrkstatins is installed in I&C cabinet rms f divisins 1 and 4, utside the MCR (in a different fire cmpartment t the MCR) s that it cannt be lst simultaneusly with the MCR; MCP [PICS] architecture is fault-tlerant, i.e. the design takes accunt f criteria fr redundancy and independence s that prbable failures will nt result in a lss f HMI functins Installatin The MCP [PICS] equipment is typically installed as fllws: In the main cntrl rm (MCR): peratr wrkstatins in cntrl mde; peratr wrkstatins in mnitring mde;

21 PAGE : 16 / 36 basic peratr wrkstatins with a reduced number f screens, sme f which may be temprary (e.g. fr initial start-up); POP; printing devices. In the remte shutdwn statin (RSS): peratr wrkstatins in cntrl mde (when the RSS is active, r therwise in mnitring mde ); ne basic peratr wrkstatin cnfigured in mnitring mde; printing devices. In the technical supprt centre (TSC): peratr wrkstatin in mnitring mde; printing devices. In the I&C cabinet rms f divisin 1 and 4 f the safeguard buildings: prcessr units (PU); server units (SU); RAID system (Divisin 4 nly) Interfaces with ther I&C systems The MCP [PICS] has three types f interfaces with ther I&C systems: the interface with the autmatin level (Prtectin System (RPR [PS]) 1 / SAS / PAS / (Reactr Cntrl, Surveillance and Limitatin system, RCSL) / (Severe Accident I&C system, SA I&C) 2 ); the interface with the engineering and maintenance tls (f MCP [PICS]); the interface with nn real time (level 3) applicatins. 1 The cnnectin t the RPR [PS] is unidirectinal frm the RPR [PS] t the MCP [PICS] and is a Class 3 netwrked interface. 2 The SA I&C prvides status data t MCP [PICS] via a netwrk link.

22 PAGE : 17 / OPERATING CONFIGURATIONS Frm the I&C standpint, the varius mdes f peratin f the MCP [PICS] are as fllws: The standard cnfiguratin f the MCP [PICS] is: all peratr wrkstatins f the MCR, whether they are in cntrl mde r mnitring mde, are wrking; the POP is peratinal; the wrkstatins f the RSS are in mnitring mde; the TSC peratr wrkstatin is nt peratinal except in a situatin where a supprt team is needed. In this situatin, the TSC peratr wrkstatin is in mnitring mde. Nn-critical failure f MCP [PICS] equipment. In this situatin, a part f the MCP [PICS] has failed but sufficient means are still available t allw a redistributin f the peratin I&C Functins t allw cntinued use f the MCP [PICS] t cntrl and mnitr the plant. Typical situatins are as fllws: lss f nn-graphical equipment: the redistributin f the prcess resurces r interface resurces is in mst cases dne autmatically by the system (e.g. thrugh redundancy mechanisms) and it des nt affect significantly the peratr tasks; lss f a screen f an peratr wrkstatin: as the screens f an peratr wrkstatin are standardised, the peratr can redistribute tasks frm the lst screen t the remaining screens; lss f an peratr wrkstatin in cntrl mde: a wrkstatin in mnitring mde can be cnfigured t cntrl mde t replace the lss; lss f a part f the POP: the POP is divided int several areas in the same way that an peratr wrkstatin has several screens. This allws redistributin f the display f the POP using the remaining areas in the event f failure f ne f the large screens making up the POP; lss f the POP: All infrmatin shwn n the POP is als available frm the peratr wrkstatins, therefre in this situatin the peratrs wuld use these t cntinue peratins. Lss f the POP des nt lead t the lss f the MCP [PICS]. In additin t these arrangements, special attentin is paid t maintenance and repair tasks t reduce the time needed t replace r repair the cmpnent that has failed. Unavailability f the MCP [PICS] In the event f accidental lss f MCP [PICS] r a shutdwn f the MCP [PICS] scheduled fr maintenance purpses, cntrl is transferred t the MCS [SICS]. The transfer is cntrlled by prcedures. Fr the I&C, thse prcedures stipulate particular actins t prevent spurius cntrl signals being generated by the MCP [PICS] which are taken int accunt by the prcess [Ref-1] [Ref-2]. The MCP [PICS] is mnitred by the SAS. The SAS displays the MCP [PICS] status n the PSIS. When cntrl is passed t MCS [SICS] it sends a message t the SAS t blck the MCP [PICS] utputs.

23 PAGE : 18 / 36 Unavailability f the MCR: in the event f lss f the MCR due t an internal hazard (e.g. fire), the equipment f the MCS [SICS] and f the MCP [PICS] lcated in the MCR is n lnger available. In this situatin, the shift team uses the cntrl system situated in the RSS. As fr the previus cnfiguratin, particular actins must be taken t prevent spurius cntrl signals being generated frm the MCR. The cnfiguratin f the MCP [PICS] is as fllws: RSS wrkstatins are peratinal and cnfigured in cntrl mde; All cmmand means f the MCP [PICS] in the MCR are islated t avid spurius cmmands; see sectin f Sub-chapter 7.2 fr details. The way in which the varius MCP [PICS] peratr wrkstatins are used t cntrl r supervise the unit is detailed in Sub-chapter The different cnfiguratins (particularly different cnfiguratins arising due t unavailability f the MCP [PICS] and nn-critical failure f ne f the cmpnents) are determined by setting the minimum equipment required t perate the plant with the MCP [PICS] (minimum number f screens needed t perate the plant frm an peratr wrkstatin, minimum number f cntrl and supervisin wrkstatins t perate the plant etc.). These limits depend n the way in which the different items f equipment are used and are therefre mainly determined by the Human Factrs engineering prgramme (see Sub-chapter 18.1) TECHNOLOGY The equipment used t implement the MCP [PICS] is the digital Operating and Mnitring system OM690, which is part f the SPPA-T2000 platfrm POWER SUPPLY The prcessing part f the MCP [PICS] (which is lcated utside the MCR) is electrically pwered by divisins 1 and 4 s that the lss f ne f these tw pwer surces des nt lead t the ttal lss f MCP [PICS]. The pwer supply fr the peratr wrkstatins in the MCR is frm divisins 1 t 4 s that the pwer distributin in the MCR wuld minimise the impact n the MCR equipment if there was a lss f electrical pwer frm ne divisin. A descriptin f the pwer distributin system in the NI is given in Sub-chapter PROVISIONS FOR PERIODIC TESTING All MCP [PICS] equipment is subject t peridic testing.

24 PAGE : 19 / PROCESS AUTOMATION SYSTEM (PAS) Nte: Refer t the quality plans, system specificatin reprts and verall architecture drawings fr mre detailed infrmatin n the Prcess Autmatin System [Ref-1] t [Ref-12] SAFETY REQUIREMENTS The PAS is subject t safety requirements applicable t Class 3 I&C systems, due t its management f Categry C I&C Functins. The requirements are detailed in several dcuments, which prvide all the required infrmatin cntained within an IEC cmpliant system requirements specificatin [Ref-1]. The PAS prcesses autmatic and manual actins and the related mnitring required t fulfil the I&C Functins described belw Safety functins The PAS is an peratinal system that participates in the three main safety functins defined in Sub-chapter 3.2. Due t this peratinal aspect, PAS I&C Safety Features fulfil Categry C I&C Functins Design requirements The PAS must fulfil the requirements described belw. These requirements must be met fr all the autmatic I&C Safety Features managed by the PAS (including the part f the PACS functins prcessed by the PAS equipment accrding t sectin 1.4 f Sub-chapter 7.2) Requirements resulting frm functinal classificatin Functinal classificatin f the system The PAS is required t be safety classified, in accrdance with the classificatin principles in Sub-chapter Single failure criterin The single failure criterin des nt apply t the PAS. Independence and physical separatin must be prvided when: the PAS is used t reduce the cnsequences f internal r external hazards. In this situatin its peratin must nt be affected (in an unacceptable manner) by the hazard.

25 PAGE : 20 / Emergency pwer supply The requirement fr emergency pwer supplies t PAS equipment is defined n a case-by-case basis. If required, the pwer supply must be backed-up by the Emergency Diesel Generatrs. In these cases, the pwer supply must be uninterruptible t ensure cntinuatin f the supply during the switchver frm nrmal t diesel pwer supplies. The PAS is required t be pwered frm the same divisin r sectin that is supplying the prcess that the PAS is cntrlling Qualificatin under perating cnditins The PAS equipment must remain peratinal in pst-accident cnditins. It must therefre meet the qualificatin requirements defined in Sub-chapter 3.6. In additin, the equipment must remain peratinal in nrmal and extreme envirnmental cnditins ccurring in the plant rms in which it is installed. These cnditins are defined in Sub-chapter Electrical and I&C classificatin The electrical and I&C classificatin f the PAS is cnsistent with the classificatin principles given in Sub-chapter Seismic classificatin The PAS equipment meets the seismic requirements defined in Sub-chapter Peridic testing The I&C Functins managed by the PAS must be tested peridically (as defined in sectin 1 f Sub-chapter 3.2). The PAS must be designed t allw peridic tests Additinal requirements Nt applicable Hazards The PAS system manages autmatic cntrl and mnitring I&C Functins designed t reduce the cnsequences f internal and external hazards. These I&C Functins must remain peratinal fllwing a hazard, and thus must nt be affected (t an unacceptable extent) by the hazard itself r by its cnsequences. Fr these I&C Functins, an analysis is perfrmed n a case-by-case basis t define the measures t be implemented (redundancy, separatin, independence) t prtect the PAS equipment against hazards Tests The PAS system must be subjected t pre-peratinal tests t check that, after installatin, the system perfrmance cmplies with design requirements.

26 PAGE : 21 / 36 The requirements assciated with the peridic tests are given in sectin ROLE The rle f the PAS is t manage the required Categry C nn-seismically qualified and nn-categrised I&C Functins f the nuclear and cnventinal islands and the site (see sectin 3.0.1) FUNCTIONS PERFORMED The PAS carries ut the fllwing I&C Functins: data prcessing: acquisitin, cnditining and transmissin; prcessing f applicatin calculatins: regulatins, generating individual and gruped cmmands (simultaneus r sequential), hierarchical rganisatin f the pririties f cmmands, generating diverse infrmatin t be sent t ther instrumentatin and cntrl units, etc. survey prcessing: prcessing f state and default reprts, alarms and signals elabratin. Refer t sectin 1 f Sub-chapter 7.2 fr details f hw Risk Reductin Categry A (RRC-A) I&C Functins are allcated in PAS DESIGN BASIS Availability requirements The main requirements n PAS availability are linked t reliability and maintainability, and are summarised as fllws: T reduce the prbability f lsses f the PAS due t the failure f ne f its cmpnents (i.e. by prviding redundancy f cmpnents); T facilitate maintenance and repair t minimise the duratin f unavailability f the PAS Perfrmance requirements The PAS is subject t specific perfrmance requirements (see sectin 3 f Sub-chapter 7.1 fr mre detail f where these will be defined) and is subject t the fllwing perfrmance requirements: Respnse time requirements: Maximum allwable time between the variatin f an input signal (digital r analgue) and the transmissin t the utput interface;

27 PAGE : 22 / 36 Maximum allwable time between the receipt f a manual cmmand and the transmissin t the utput interface. These glbal criteria are adapted t the PAS as fllws: fr a manual cmmand, see sectin 2.3.2; fr an autmatic cmmand: acquisitin f a digital input, prcessing f the digital cmmand, and transmissin t an utput interface; acquisitin f an analgue input signal, calculatin f a digital r analgue cmmand, and transmissin t an utput interface. The PAS cnfrms with the glbal criteria described abve and with thse f sectin In particular, the transmissin and prcessing I&C Functins perfrmed by the PAS must cnfrm t the ttal respnse time requirements (including the exchanges between MCP [PICS] in bth the MCR and RSS, PAS and level 0). Sizing requirements: Static sizing requirements define the number f input/utputs (actuatrs, sensrs, etc.) that the PAS has t manage; Dynamic sizing requirements define the prcessing times, taking int accunt the prgram executin types (peridic r event-driven) that the PAS must manage Envirnmental requirements The envirnmental cnditins that the PAS equipment must withstand relate t the temperature and relative humidity in the rms where the equipment is lcated. These envirnmental cnditins (nrmal and extreme) are described in sectin 1 f Sub-chapter Human-machine interface requirements The PAS must interface with an engineering HMI t enable safe, effective and errr-free cmmissining, maintenance, peridic testing and cnfiguratin f the PAS. The peratinal HMI fr the PAS is prvided by the level 2 I&C systems (see sectin 1.1 f Sub-chapter 7.2) ARCHITECTURE Structure and cmpsitin The structure and the cmpsitin f the PAS are dictated by functinal requirements. These requirements gvern the allcatin f the treatment f cntrl cmmands in the different entities f the PAS.

28 PAGE : 23 / 36 The functinal requirements deal with: the functinal classificatin f the prcessing I&C Functins; the electrical divisin r train (which crrespnds with that f the prcess, actuatrs and sensrs, t be managed); the type f prcessing t be perfrmed (which may cnditin the chice f the type f input/utput cards fr example); the perfrmance required f the prcessing functin (respnse time, prpagatin time, accuracy); the gruping/exclusins f prcessing required. Certain prcessing I&C Functins are gruped (in relatin t requirements due t a simultaneus lss f prcessing I&C Functins during a malfunctin f the part f the I&C system that cntrls them). Cnversely, there may be a requirement fr certain prcessing I&C Functins t be cntrlled by different PAS hardware units (t preserve perability f a grup f prcessing I&C Functins despite lss f certain thers due t a malfunctin). Furthermre, the structure f the PAS takes int accunt the segmentatin f the prcess cntrl dictated by the number, lcatin and the type f interfaces f actuatrs and sensrs t be managed. Fr a given safety functin, different cmbinatins are pssible e.g.: 1 x 100 %: One mechanical train, with its assciated I&C, is necessary t fulfil the safety functin; 4 x 50 %: Tw ut f fur mechanical trains, with their assciated I&C, are necessary t fulfil the safety functin; 2 x 100 %: One ut f tw mechanical trains, with its assciated I&C, is necessary t fulfil the safety functin. In rder t prevent an internal failure having an impact n mre than ne mechanical train, each mechanical train is cntrlled by a sub-system f the PAS lcated in the same divisin r sectin as the mechanical train Installatin The equipment, which manages the I&C Functins f the PAS, is distributed within the fur divisins f the nuclear island and in the tw sectins f the cnventinal island and site. It is installed in the I&C cabinets f divisins 1 t 4 f the safeguard buildings, in the I&C cabinets f the tw sectins f the cnventinal island, and in the I&C cabinets f the site buildings. The PAS equipment is lcated: in crrespndence with the lcatin f the divisin r sectin f the systems (actuatrs and sensrs) managed; in accrdance with the space available; in crrespndence with the pwer supply divisin r sectin.

29 PAGE : 24 / Interfaces with ther I&C systems The PAS exchanges infrmatin with the fllwing: Prcess instrumentatin: exchanges linked t the acquisitin f measurements and states; The HMI: MCP [PICS]/RSS, and MCS [SICS]: exchanges linked with peratr cntrl; The RCSL, RPR [PS], and SAS: exchanges* assciated with the management f plant prcess cntrl; Electrical cells (electrical bards) and the cntrl systems (electr-psitiners etc.): exchanges linked t actuatr cntrl; External systems (turbine I&C cabinets, etc.): exchanges linked t the management f the plant prcess cntrl. * Nte that the cmmunicatin frm higher class systems is managed by the higher class system and is usually unidirectinal (frm the higher class t the lwer). See sectin f Sub-chapter 7.3 fr the descriptin f the interfaces frm the RPR [PS] t lwer class systems OPERATING CONFIGURATIONS The cnfiguratin (hardware and functinal aspects) f the PAS is independent f the plant state. Prcessing allcatin nly depends n functinal criteria and the prcessing allcatin principles f the I&C system. The cnfiguratin f the PAS is, frm this pint f view, cnstant. The cnfiguratin f the PAS is subject t the fllwing principle: in the event f a malfunctin f an active bard, the system switches autmatically t the redundant standby bard. This principle applies t any redundant card f the PAS (CPU cards and cmmunicatin management cards) TECHNOLOGY The equipment used t implement the PAS is the digital I&C system based n SPPA-T POWER SUPPLY Within each divisin, the I&C cabinets f the PAS are supplied by a dual pwer supply, via independent AC/DC cnverters and DC/DC cnverters. One pwer supply is prvided by a 400V AC supply and the ther by a 220V DC supply with apprpriate cnverters. Each mechanical train is cntrlled by a sub-system f the PAS that is lcated and electrically supplied by the same electrical divisin as the mechanical train. The adjustment t the vltage required by the PAS cabinets will be made internally t the cabinet supplying them with pwer. The supply cabinets are lcated in the same rm as the PAS cabinets. The descriptin f the pwer supply distributin f the NI is given in Sub-chapter 8.3.

30 PAGE : 25 / PROVISIONS FOR PERIODIC TESTING Peridic tests are required fr all classified I&C Functins. The testing f a functin must allw verificatin f the cmplete cmmand channel, frm the sensr (autmatic cmmand), r frm the MCP [PICS] via the PAS (manual cmmand), up t the change f state f the actuatr. Hwever, if effecting an actuatr change f state is nt feasible (e.g. during peratin f the plant) prvisins are taken t blck the cmmand signals while the test is in prgress, in rder t test the line f cmmand f the actuatr withut effecting the cmmand.

31 PAGE : 26 / SEVERE ACCIDENT I&C SYSTEM (SA I&C) Nte: Refer t the quality plans, system specificatin reprts and verall architecture drawings fr mre detailed infrmatin n the SA I&C system [Ref-1] t [Ref-7] SAFETY REQUIREMENTS The SA I&C is subject t safety requirements applicable t Class 3 I&C systems, due t its management f Categry C I&C Functins. The requirements are detailed in several dcuments, which prvide all the required infrmatin cntained within an IEC cmpliant system requirements specificatin as demnstrated fr the RPR [PS] in sectin 1.0 f Sub-chapter Safety functins The Severe Accident (SA) I&C system participates in the fllwing main safety functin: Limiting the radiactive releases at the site bundary t an acceptable level and maintaining the integrity f the primary and secndary systems. The SA I&C system perfrms the Severe Accident I&C Functins (RRC-B functins) needed in the event f a ttal lss f pwer (Lss f Off-site Pwer (LOOP) and lss f Emergency Diesel Generatrs and lss f Ultimate Diesel Generatrs) Design requirements Requirements resulting frm functinal classificatin Functinal classificatin f the system The Severe Accident I&C system must be classified accrding t the principles specified in Sub-chapter Single failure criterin Nt applicable Emergency pwer supply T cmpensate fr the ttal lss f pwer scenari, the SA I&C system will be supplied by redundant Uninterruptible Pwer Supply (UPS) systems using battery-backed systems with a 12 hur capacity Qualificatin under perating cnditins The SA I&C cmpnents perfrming a Categry C I&C Functin must be qualified t remain functinal under pst-accident and severe accident cnditins.

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden Internet:

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden   Internet: SARAD GmbH Tel.: 0351 / 6580712 Wiesbadener Straße 10 FAX: 0351 / 6580718 01159 Dresden e-mail: supprt@sarad.de GERMANY Internet: www.sarad.de APPLICATION NOTE AN-001_EN The Installatin f autnmus instrumentatin

More information

Consolidated Edison Company of New York. Developer Welcome Kit

Consolidated Edison Company of New York. Developer Welcome Kit Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

Upgrading to PlanetPress Suite Version 5

Upgrading to PlanetPress Suite Version 5 Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt

More information

LED wdali MC Switch Input Modul Set - User Manual

LED wdali MC Switch Input Modul Set - User Manual LED wli MC Switch Input Mdul Set - User Manual Buttn mdul (Transmitter) 1. Prduct Descriptin Item N.: LC-004-302 Receive mdul (Receiver) The wli MC Switch Input Mdul Set is a cmpact wireless Multi Cntrl

More information

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations Specificatin fr a cmmunicating Panelbard system t mnitr, cntrl and maintain LV electrical installatins A system fr: - Mnitring the prtectin and cntrl devices in an electrical installatin and prviding the

More information

Spectracom GSG ecall Test Suite

Spectracom GSG ecall Test Suite 18-Dec-2017 GSG App Nte Spectracm GSG ecall Test Suite Table f Cntents 1. Intrductin... 1 2. Befre Starting the Test... 2 3. Running the ecall Test Suite... 4 4. Psitin Errr Tests 2.2.2-2.2.4... 10 5.

More information

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5 Prduct Specificatin Prduct specificatin. February 2007 ByVac 2007 ByVac Page 1 f 5 Prduct Specificatin Cntents 1. Dcument Versins... 2 2. Intrductin... 2 3. Features... 2 4. Battery Life... 2 5. Blck Diagram...

More information

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group Crwn Recgnised Spectrum Access in 3400 t 3600 MHz The respnse f Alcatel-Lucent t Ofcm Spectrum Plicy Grup Spectrum Access in 1 3400 t 3600MHz Fr additinal infrmatin and clarificatin, please cntact: Jean-Pierre

More information

Transmission is reliable and safe when antennas are managed by Movicon

Transmission is reliable and safe when antennas are managed by Movicon Transmissin is reliable and safe when antennas are managed by Mvicn Simetel Spa and Sigma Cnsulting have engineered an interesting supervisin system fr mnitring and security f the NATO VLF transceiver

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

Transmission Substation Field Instructions

Transmission Substation Field Instructions 4.14 Substatin Permits Purpse This instructin deals with the use f permits t wrk in Hrizn Pwer s, and must be read in cnjunctin with FI 4.4 Secndary Islatins. Scpe The persnnel cvered by this instructin

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

Annex II to Decision 2019/004/R. AMC and GM to Part ATCO Issue 1, Amendment 2

Annex II to Decision 2019/004/R. AMC and GM to Part ATCO Issue 1, Amendment 2 Annex II t Decisin 2019/004/R AMC and GM t Part ATCO Issue 1, Amendment 2 Annex I t Decisin 2015/010/R f 13 March 2015 is hereby amended as fllws: The text f the amendment is arranged t shw deleted text,

More information

Processors with Sub-Microsecond Response Times Control a Variety of I/O. *Adapted from PID Control with ADwin, by Doug Rathburn, Keithley Instruments

Processors with Sub-Microsecond Response Times Control a Variety of I/O. *Adapted from PID Control with ADwin, by Doug Rathburn, Keithley Instruments PID Cntrl with ADwin Prcessrs with Sub-Micrsecnd Respnse Times Cntrl a Variety f I/O CHESTERLAND OH March 9, 2015 *Adapted frm PID Cntrl with ADwin, by Dug Rathburn, Keithley Instruments By Terry Nagy,

More information

PJM Protection Standards

PJM Protection Standards PJM Manual 07: PJM Prtectin Standards Revisin: 10 Effective Date: 11/16/2011 Prepared by System Planning Divisin Transmissin Planning Department PJM 20121 PJM 2011 Revisin 00, Effective Date: XX/XX/2010

More information

Transmit and receive information by marine radio or telephone

Transmit and receive information by marine radio or telephone MARC020 Transmit and receive infrmatin by marine radi r telephne DRAFT 9/12/2013 UNIT CODE UNIT TITLE Release Release 1 APPLICATION COMPETENCY FIELD ELEMENTS Elements describe the essential utcmes. 1 Operate

More information

Specification for Learning and Qualifications for Physical Intervention Skills

Specification for Learning and Qualifications for Physical Intervention Skills Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure Crdinatr Prcedure Reliability Crdinatr Area Restratin Prcedure N. RC0460 Versin N. 1.0 Distributin Restrictin: Nne Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 2.1 Backgrund...

More information

Acceptance and verification PCI tests according to MIL-STD

Acceptance and verification PCI tests according to MIL-STD Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE

More information

idcv Isolated Digital Voltmeter User Manual

idcv Isolated Digital Voltmeter User Manual www.akcp.cm idcv Islated Digital Vltmeter User Manual Help Versin updated till firmware SP446 Cpyright 2011, AKCess Pr Limited Prvided by fficial AKCP-Distributr Didactum https://www.didactum-security.cm/en/

More information

Communication Protocol Procedure

Communication Protocol Procedure APPLICABILITY: Reliability Crdinatr System Operatrs I. Purpse Prvide the Reliability Crdinatr System Operatrs (RCSO) with established prcedures t: Imprve cmmunicatins fr the issuance f Operating Instructins

More information

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics Martel LC-110H Lp Calibratr and HART Cmmunicatins/Diagnstics Abstract Martel Electrnics Crpratin This white paper describes the basic functins f HART cmmunicatins and the diagnstic capability f the Martel

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools Victrian Student Number Data Quality and Prcess Guidelines fr Victrian Gvernment Schls Published by the Cmmunicatins Divisin fr Educatin Chief Infrmatin Officer Divisin Department f Educatin and Early

More information

Notified Body Office, VUZ a.s. Novodvorská 1698, Praha 4, Czech Republic

Notified Body Office, VUZ a.s. Novodvorská 1698, Praha 4, Czech Republic RAILCOM Final Reprting Interactive Cnference Electrmagnetic cmpatibility at train-track track interface - lw frequency dmain Karel Beneš Ntified Bdy Office, VUZ a.s. Nvdvrská 1698, 142 01 Praha 4, Czech

More information

Fig 1 System architecture. As shown in Figure 1, AUV system could be separated in 3 main blocks:

Fig 1 System architecture. As shown in Figure 1, AUV system could be separated in 3 main blocks: AUV System Descriptin Railway usage authrizatin system (called AUV, by its abbreviatin in Spanish) is a Safe Train Cntrl (STC) system prvided by Alta Rail Technlgy (ART). AUV system s structure is based

More information

Operating Instructions

Operating Instructions TC 60/8 THERMOCOMPUTER TC 60/8 temp / time s s temp / time k start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing

More information

Meteorological Satellites (MetSat) Overview of the global network of Meteorological Satellites. Speaker: Markus Dreis (EUMETSAT)

Meteorological Satellites (MetSat) Overview of the global network of Meteorological Satellites. Speaker: Markus Dreis (EUMETSAT) Meterlgical Satellites (MetSat) Overview f the glbal netwrk f Meterlgical Satellites Speaker: Markus Dreis (EUMETSAT) Secnd ITU/WMO Seminar "Use f Radi Spectrum fr Meterlgy: Weather, Water and Climate

More information

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005 Netwrk Wrking Grup Request fr Cmments: 4062 Categry: Infrmatinal V. Manral SiNett Crp. R. White Cisc Systems A. Shaikh AT&T Labs (Research) April 2005 Status f This Mem OSPF Benchmarking Terminlgy and

More information

Figure 1: View, connection compartment closed

Figure 1: View, connection compartment closed Radi Management Art. N. : 2700AP Operating instructins 1 Safety instructins Electrical equipment may nly be installed and fitted by electrically skilled persns. Serius injuries, fire r prperty damage pssible.

More information

Materials: Metals, timber, plastics, composites, smart and nanomaterials Candidates should:

Materials: Metals, timber, plastics, composites, smart and nanomaterials Candidates should: AQA Resistant Materials - Unit 1 Specificatin 2014-4560 Materials: Metals, timber, plastics, cmpsites, smart and nanmaterials Be aware f the surce f a range f materials. Understand they are prcessed fr

More information

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord High Level Design Circuit CitEE Irere Kwihangana Lauren Mahle Jaclyn Nrd 12/16/2013 Table f Cntents 1 Intrductin. 3 2 Prblem Statement and Prpsed Slutin. 3 3 Requirements. 3 4 System Blck Diagram 4.1 Overall

More information

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities Prject QC-2015-02 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin sessin fr registered entities Nvember 26, 2015 Presentatin Overview 1. Meeting bjectives 2. Webinar instructins

More information

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed.

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed. Intrductin Dry Cntact Sensr The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable and can be

More information

C&E Mobility Policy (Standard)

C&E Mobility Policy (Standard) C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment

More information

GE Multilin 339 Motor Protection Specifications

GE Multilin 339 Motor Protection Specifications GE Multilin 339 Mtr Prtectin Specificatins The mtr prtectin relay shall prvide primary prtectin fr medium vltage mtrs. The relay shall be equipped with the fllwing prtectin functins. Mtr Thermal Overlad

More information

Common Network Operation Tools

Common Network Operation Tools Cmmn Netwrk Operatin Tls Prcess fr the develpment f data exchanges Mnika Kaldnek Adviser, System Operatins Brussels xxx2014 Backgrund > WHY: Regulatin 715/2009 (Art 8)...ENTSOG shall adpt: cmmn netwrk

More information

PS 430 FOUR CHANNEL REMOTE SPEAKER STATION

PS 430 FOUR CHANNEL REMOTE SPEAKER STATION PS 430 FOUR CHANNEL REMOTE SPEAKER STATION USER MANUAL August 2016 This prduct is designed and manufactured by: ASL Intercm BV Znnebaan 42 3542 EG Utrecht The Netherlands Phne: +31 (0)30 2411901 Fax: +31

More information

VIP-200. Point to Point Extension Configuration Quick Start Guide. Video over IP Extender and Matrix System

VIP-200. Point to Point Extension Configuration Quick Start Guide. Video over IP Extender and Matrix System VIP-200 Vide ver IP Extender and Matrix System Pint t Pint Extensin Cnfiguratin Quick Start Guide PureLink TM 535 East Crescent Avenue Ramsey, NJ 07446 USA Cntents What is in the bx... 3 Transmitter kit

More information

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com

SARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com SARMAP RELEASE NOTES Versin: 7.0 (July 2016) 55 Village Square Dr. Suth Kingstwn, RI 02879 Tel: (401) 789-6224 Fax: (401) 789-1932 Email: MapSupprt@ Table f Cntents Table f Cntents...ii 1 Intrductin...

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements

More information

TC 60 THERMOCOMPUTER TC 60. prog. start stop. Operating Instructions

TC 60 THERMOCOMPUTER TC 60. prog. start stop. Operating Instructions TC 60 prg start stp THERMOCOMPUTER TC 60 h C/h C Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing Curve...2 Checing

More information

PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE. Gary L. Burkhardt and R.E. Beissner

PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE. Gary L. Burkhardt and R.E. Beissner PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE COMPONENT USING ELECTRIC CURRENT PERTURBATION Gary L. Burkhardt and R.E. Beissner Suthwest Research Institute 6220 CUlebra Rad San Antni, Texas

More information

Operating Process for Access to Gas Insulated Switchgear

Operating Process for Access to Gas Insulated Switchgear Operating Prcess fr Access t Gas Insulated Switchgear Summary This dcument supprts the Pwer System Safety Rules and its requirements assembled under Operate Gas Insulated Switchgear - Categry 5.6 Dcument

More information

IEEE C802.16h-06/029

IEEE C802.16h-06/029 Prject Title IEEE 802.16 Bradband Wireless Access Wrking Grup Timing fr sending messages using the frequency dmain energy pulses Date Submitted Surce(s) Re: Abstract Purpse Ntice

More information

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard ELEC 7250 VLSI TESTING Term Paper On Analg Test Bus Standard Muthubalaji Ramkumar 1 Analg Test Bus Standard Muthubalaji Ramkumar Dept. f Electrical and Cmputer Engineering Auburn University Abstract This

More information

Figure 1: A Battleship game by Pogo

Figure 1: A Battleship game by Pogo CSCI 2312-002: Object Oriented Prgramming Final Prject Assigned: Octber 17, 2017 Design Due: Octber 24, 2017 IN CLASS (Graded as ne hmewrk grade) Final prject Due: Nvember 16, 2017 at 11:59 PM Fr many

More information

CB-030S Circuit Board

CB-030S Circuit Board CB-030S Circuit Bard Designed fr use with the high trque PM486FH (up t 7A) Adjustable acceleratin and deceleratin time (0 t 2.5s) Stable speed peratin Switch fr manual r autmatic recvery f the thermal

More information

User Guide. ACC Mobile 3 Preview App for ios

User Guide. ACC Mobile 3 Preview App for ios User Guide ACC Mbile 3 Preview App fr ios 2017, Avigiln Crpratin. All rights reserved. AVIGILON, the AVIGILON lg, AVIGILON CONTROL CENTER, ACC, and TRUSTED SECURITY SOLUTIONS are trademarks f Avigiln Crpratin.

More information

PTE-100-V USER S MANUAL VOLTAGE, FREQUENCY, AND SYNCHRONIZING RELAY TESTING UNIT USER S MANUAL DISCLAIMER

PTE-100-V USER S MANUAL VOLTAGE, FREQUENCY, AND SYNCHRONIZING RELAY TESTING UNIT USER S MANUAL DISCLAIMER VOLTAGE, FREQUENCY, AND SYNCHRONIZING RELAY TESTING UNIT Quality is the cre reference fr EurSMC s activities, aimed t fully satisfy ur custmers needs and expectatins. DISCLAIMER The infrmatin, prduct specificatins,

More information

SVT Tab and Service Visibility Tool Job Aid

SVT Tab and Service Visibility Tool Job Aid Summary This Jb Aid cvers: SVT Tab Overview Service Visibility Tl (SVT) Area Overview SVT Area: Satellite Mdem Status (Frm Mdem) Clumn SVT Area: Satellite Mdem Status (Frm SMTS) Clumn SVT Area: Prvisining

More information

WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL

WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL Issue February 2011 ASL Intercm BV DESIGNED AND MANUFACTURED BY: ASL INTERCOM BV ZONNEBAAN 42 3542 EG UTRECHT THE NETHERLANDS

More information

Dry Contact Sensor DCS15 User Manual

Dry Contact Sensor DCS15 User Manual Dry Cntact Sensr DCS15 User Manual Help Versin updated till firmware 404i / SP456 Cpyright 2012, AKCess Pr C., Ltd.. Intrductin / What is a Dry Cntact Sensr The Dry Cntact sensr r DCS15 is a simple cnnectin

More information

Declaration of Amsterdam. Cooperation in the field of connected and automated driving

Declaration of Amsterdam. Cooperation in the field of connected and automated driving Declaratin f Amsterdam Cperatin in the field f cnnected and autmated driving 14-15 April 2016 Declaratin f Amsterdam n cperatin in the field f cnnected and autmated driving Navigating t cnnected and autmated

More information

Study of New architecture needs for AOCS / Avionics Abstract. Abstract

Study of New architecture needs for AOCS / Avionics Abstract. Abstract The ESA "Study f New architecture needs fr AOCS / Avinics" was perfrmed in parallel t the study Attitude estimatin systems, Requirements n sensr suite. Bth studies have the cmmn bjective t derive a develpment

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE First Meeting f the AFI VSAT Netwrks Managers (AFI VSAT/1) (Kwa-Zulu Natal, Suth Africa, 13 t 15 June 2011) Agenda Item 6: Need fr

More information

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach Safety Architect : A Tl fr Mdel-Based Safety Analyses Cmpliant with the System Engineering Apprach Authrs: Jnathan Dumnt, Franck Sadmi, Frédérique Vallée (All4tec) Keywrds: Safety, Dependability, Mdel-Based

More information

Electrical devices may only be mounted and connected by electrically skilled persons.

Electrical devices may only be mounted and connected by electrically skilled persons. Order N. : 5323 02 Operating instructins 1 Safety instructins Electrical devices may nly be munted and cnnected by electrically skilled persns. Serius injuries, fire r prperty damage pssible. Please read

More information

Standard OPS-020 Avionics and Communications

Standard OPS-020 Avionics and Communications Standard OPS-020 Avinics and Cmmunicatins The Natinal Aerial Firefighting Centre r NAFC is a business unit f the Australasian Fire and Emergency Service Authrities Cuncil Limited (ACN 060 049 327). The

More information

CAR ASYST - Quick Start Guide MAIN MENU

CAR ASYST - Quick Start Guide MAIN MENU fficially apprved by CAR ASYST - Quick Start Guide MAIN MENU Main menu The main menu f ur CAR ASYST APP is divided int 7 menu items. Belw yu will find a list f these items including a shrt descriptin.

More information

Information Article. Relevance

Information Article. Relevance Infrmatin Article Relevance 1. Airline (Aircraft Operatr) Crisis Respnse - an verview t assist understanding f sme significant emergency terms used by e.g. Air Traffic Service Units and Search & Rescue

More information

Wonder Tree Video Slot Introduction. How to Bet. Gamble Feature

Wonder Tree Video Slot Introduction. How to Bet. Gamble Feature Wnder Tree Vide Slt Intrductin Wnder Tree vide slt is a 5-reel, 20-line game. The slt cnsists f 11 cards - 1 f which is Wild, and 1 is Scatter. All winning cmbinatins are paid left t right, except fr the

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

Guide for ESP32-Sense Development Kit

Guide for ESP32-Sense Development Kit Guide fr ESP32-Sense Develpment Kit 1. Overview The ESP32 tuch sensr develpment kit, ESP32-Sense Kit, is used fr evaluating and develping ESP32 tuch sensr system. ESP32-Sense Kit cnsists f ne mtherbard

More information

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist

Fuel-D Dependencies on Fuels and Impact of Alternative Options for Crisis Management Operations Compliance Checklist Annex IX Fr each requirement in the Functinal and Technical Specificatins stated belw, the Tenderer shall cmment cmpliance and detail hw the requirement is fulfilled. 4. Prject Cntents 4.1 Cllectin and

More information

LED DALI MC+ Switch Input Module - User Manual

LED DALI MC+ Switch Input Module - User Manual LED MC+ Switch Input Mdule - User Manual Item n.: LC-004-301 1. Prduct Descriptin The MC+ is a Cmpact Multi Cntrl mdule with 4 freely prgramable swithcing inputs (ptential-free clsing cntacts). The supply

More information

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS DT0069 Design tip Enabling the Bluetth Lw Energy Direct Test Mde (DTM) with BlueNRG-MS By Salv Bnina Main cmpnents BlueNRG-MS Upgradable Bluetth Lw Energy netwrk prcessr SPBTLE-RF Very lw pwer mdule fr

More information

Operating Instructions

Operating Instructions TC 40 THERMOCOMPUTER TC 40 start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing Curve...2 Checing the Prgramme

More information

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY. Applicatin Package Checklist Cpy f Distributed Generatin frm Renewable Resurces Rider Cpy f Technical Requirements fr Distributed Generatin Agreement Cpy f Applicatin fr Intercnnectin and Parallel Operatin

More information

XDSL/TELEPHONE CABLE MEASUREMENT

XDSL/TELEPHONE CABLE MEASUREMENT XDSL/TELEPHONE CABLE MEASUREMENT Phenix 10056 Cmplete Slutin fr xdsl Cables Cat 3, 4, 5 and 5e DESCRIPTION Custmer requirements can vary cnsiderably in terms f size and design f cnnecting frames depending

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

Dry Contact Sensor

Dry Contact Sensor www.akcp.cm Dry Cntact Sensr Intrductin The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable

More information

EGHD Position Paper Optimising ATM staff working stations in the Joint Human-Machine System 1

EGHD Position Paper Optimising ATM staff working stations in the Joint Human-Machine System 1 EGHD December 2018 FINAL EGHD Psitin Paper Optimising ATM staff wrking statins in the Jint Human-Machine System 1 1 Intrductin This paper identifies principles and recmmendatins fr the Eurpean Cmmissin

More information

EE 311: Electrical Engineering Junior Lab Phase Locked Loop

EE 311: Electrical Engineering Junior Lab Phase Locked Loop Backgrund Thery EE 311: Electrical Engineering Junir Lab Phase Lcked Lp A phase lcked lp is a cntrlled scillatr whse instantaneus frequency is dynamically adjusted thrugh multiplicative feedback and lw

More information

Hospital Task Scheduling using Constraint Programming

Hospital Task Scheduling using Constraint Programming Hspital Task Scheduling using Cnstraint Prgramming Authr: Chaman Chahal Supervisr: Dr. P. Bse, Schl f Cmputer Science Organizatin: Carletn University Curse: COMP4905 Date: Dec. 11, 2012 1 Abstract Hspitals

More information

Exam solutions FYS3240/

Exam solutions FYS3240/ Exam slutins FYS3240/4240 2014 Prblem 1 a) Explain hw the accuracy (cnstant frequency utput) f quartz crystal scillatrs is imprved. The accuracy is imprved using temperature cmpensatin (temperature cmpensated

More information

AND8333/D High Power PoE Applications

AND8333/D High Power PoE Applications /D High Pwer PE Applicatins 1.0 Scpe This applicatin nte explains hw the NCP1081 PE-PD device can be used t deliver high pwer levels t applicatins ver the Ethernet cable. Sufficient infrmatin is included

More information

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA APPENDIX B TRAFFIC IMPACT STUDY CRITERIA Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r

More information

Wide-Area Voltage and VAR Control of SCE Transmission Network. i-pcgrid 2014 March 26-28, 2014

Wide-Area Voltage and VAR Control of SCE Transmission Network. i-pcgrid 2014 March 26-28, 2014 1 Wide-Area Vltage and VAR Cntrl f SCE Transmissin Netwrk i-pcgrid 2014 March 26-28, 2014 CONTRIBUTORS SCE Team Frank Ashrafi Armand Salazar Backer Abu-Jaradeh WSU Team Mani Vekatasubramanian Hung Chun

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure N. Table f Cntents Purpse... 2 1. Respnsibilities... 2 2. Scpe/Applicability... 2 3. Detail... 2 3.1. Capacity and Energy Emergencies... 2 3.1.1. EEA 1 All Available Generatin in Use... 3 3.1.2. EEA 2

More information

IA CERTIFICATE (Revision 3 Revised for Annual review)

IA CERTIFICATE (Revision 3 Revised for Annual review) Certificate Number: MASC M/11-376X Issue: 22 September 2014 Expire: 22 September 2015 Page: 1 f 5 IA CERTIFICATE (Revisin 3 Revised fr Annual review) IN TERMS OF REGULATION 21.17.2 OF THE MINERALS ACT

More information

Software manual. GoPal Navigator Version 5

Software manual. GoPal Navigator Version 5 Sftware manual GPal Navigatr Versin 5 GPal Navigatr Versin 5 Cntents CHAPTER 1: INTRODUCTION... 1 Greeting...1 Cntents f CD/DVD...1 System requirements...3 Cnventins in this manual...3 Tips and warnings...4

More information

RSB Service Bulletin No.. RSB--E4--003/12

RSB Service Bulletin No.. RSB--E4--003/12 RECOMMENDED SERVICE BULLETIN N.. RSB--E4--003/12 SSUUPPEERRSSEEDEESS SSBB N.. RRSSBB--EE44--000033//1111 1. BASIC INFORMATION 1.1. SUBJECT Sftware and Hardware Versins f the E4 Engine. 1.2. ENGINES AFFECTED

More information

A Basis for LDO and It s Thermal Design

A Basis for LDO and It s Thermal Design A Basis fr LDO and It s Thermal Design Hawk Chen Intrductin The AIC LDO family device, a 3-terminal regulatr, can be easily used with all prtectin features that are expected in high perfrmance vltage regulatin

More information

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01 Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft

More information

Galileo Exploitation 2018 Grant Plan

Galileo Exploitation 2018 Grant Plan Galile Explitatin 2018 Grant Plan Galile Explitatin 2018 Grant Plan 1. Multi-frequency multipurpse antenna fr Galile (GEX.0034) LEGAL BASIS Regulatin (EU) N 1285/2013 f the Eurpean Parliament and f the

More information

HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY

HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY A. Sudrià 1, E. Jaureguialz 2, A. Sumper 1, R. Villafáfila 1 and J. Rull 1 1 Centre fr Technlgical Innvatin

More information

APPLICATION NOTE Sales & Application DEWESoft Slovenia

APPLICATION NOTE Sales & Application DEWESoft Slovenia Sales & Applicatin DEWESft Slvenia Abstract: This applicatin nte shws a measurement with DEWESft sund pwer measurement system and GRAS 67HA Hemisphere. The bject under test was a standard ntebk, the measurement

More information

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017 Cleveland Public Theatre Catapult Request fr Prpsals Cleveland Public Theatre s New Play Develpment CPT s missin is t raise cnsciusness and nurture cmpassin thrugh grundbreaking perfrmances and life-changing

More information

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256)

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256) ADS ECHO Qstart Quick Reference Guide December 2016 QR 775033 A0 340 The Bridge Street, Suite 204 Huntsville, Alabama 35806 (256) 430-3366 www.adsenv.cm 2 ADS ECHO Qstart Quick Reference Guide 2016 ADS

More information

KELOX room thermostats - KM690D Digital-Standard/ KM690U Digital-Control

KELOX room thermostats - KM690D Digital-Standard/ KM690U Digital-Control KELOX rm thermstats - KM690D Digital-Standard/ KM690U Digital-Cntrl The KELOX rm thermstats are high-quality rm temperature cntrllers fr recrding and cntrlling the required rm temperature fr a maximum

More information

1300 S. Interocean Ave. Holyoke, CO

1300 S. Interocean Ave. Holyoke, CO 1300 S. Intercean Ave. Hlyke, CO Intercnnectin Standard fr Small Generating Facilities N Larger Than 25kW and 600VAC Intrductin This dcument prvides a standard fr intercnnectin f distributed resurces within

More information

Reliability Coordinator Area Restoration Plan

Reliability Coordinator Area Restoration Plan Reliability Crdinatr Area Restratin Plan Versin 8.0 Operating Prcedure APPLICABILITY: Reliability Crdinatr I. Purpse Transmissin Operatr Prepare Reliability Crdinatr (RC) System Operatrs and Transmissin

More information

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID:

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID: xtltipelement Service Infrmatin 2015 Chevrlet Crvette Crvette Service Manual 7527625 Bdy Systems Vehicle Access Repair Instructins Dcument ID: 3448513 Remte Cntrl Dr Lck and Theft Deterrent Transmitter

More information

Kennecott Utah Copper Corporation Safety and Health Standards

Kennecott Utah Copper Corporation Safety and Health Standards Revisin N. 4 03 / 2007 Page 1 f 5 Kennectt Utah Cpper Crpratin Safety and Health Standards Standard N. 10.5 Radiatin 10.5.1 INTRODUCTION 10.5.1.1 Radiactive materials and radiatin generatrs, which include

More information

The WHO e-atlas of disaster risk for the European Region Instructions for use

The WHO e-atlas of disaster risk for the European Region Instructions for use The WHO e-atlas f disaster risk fr the Eurpean Regin Instructins fr use 1 Last Update: June 2011 Cntents 1. Basic system requirements... 3 2. Structure f the WHO e-atlas... 4 2.1. Main menu... 4 2.1.1.

More information