Final Project Report. Abstract. Document information

Size: px
Start display at page:

Download "Final Project Report. Abstract. Document information"

Transcription

1 Final Prject Reprt Dcument infrmatin Prject Title ATS Datalink Operatinal Imprvements Prject Number 9.33 Prject Manager Aurélien FASAN Deliverable Name Final Prject Reprt Deliverable ID 000 Editin Template Versin Task cntributrs Airbus, Hneywell, Thalèsw. Abstract The prject 9.33 is aimed at cntributing t define and validate the ATS Datalink cncepts based n specificatins utcmes frm Datalink standardizatin grups (WG78/SC214), in cmplementary/supprt f the prjects 9.01 (Airbrne Initial 4D Trajectry Management), 9.05 (ASAS-ASPA) and 9.13 (Airprt Surface Taxi Clearances) which addressed the datalink definitin related t their respective tpics: initial 4D, ASAS-Spacing and Datalink-TAXI peratins. Besides the three specifics peratins listed abve, the prject 9.33 has cntributed t prgress n mre generic subject cnsidered as cre CPDLC services. The 9.33 prject has allwed cncluding at the expected level f matury fr technical aspects in line with Eurpean Master Plan (ATN Baseline2 Aircraft Capacity), and has permitted t prgress n Human Factr perspective with regard t the use f datalink in varius flight phases.

2 Authring & Apprval Prepared By - Authrs f the dcument. Name & Cmpany Psitin & Title Date Aurélien FASAN / Airbus 9.33 Prject Leader 15/04/2016 Reviewed By - Reviewers internal t the prject. Name & Cmpany Psitin & Title Date Raphaël PASCAL / Airbus WP9 Deputy Leader 15/04/2016 Snja BIEDE / Airbus SESAR human factrs specialist and & member 15/04/2016 Karl MONAR / Hneywell Prject Leader 15/04/2016 Pascal ROHAULT / Thalès Prject Leader 15/04/2016 Reviewed By - Other SESAR prjects, Airspace Users, staff assciatin, military, Industrial Supprt, ther rganisatins. Name & Cmpany Psitin & Title Date Apprved fr submissin t the SJU By - Representatives f the cmpany invlved in the prject. Name & Cmpany Psitin & Title Date Raphaël PASCAL / Airbus WP9 Deputy Leader 15/04/2016 Rejected By - Representatives f the cmpany invlved in the prject. Name & Cmpany Psitin & Title Date Ratinal fr rejectin Nne. Dcument Histry Editin Date Status Authr Justificatin /01/2016 Final Aurélien FASAN /03/2016 Final Aurélien FASAN /03/2016 Final Aurélien FASAN Intellectual Prperty Rights (fregrund) This deliverable cnsists f SJU fregrund Final Prject Reprt creatin SJU cmments taking accunt First update culd nt clse all SJU cmments. This new update will allw t d. 2 f 12

3 Acrnyms Acrnym AFN AIS-MET ATM ATN ATS ATSA-ITP ASAS ATSU CMA CMU CNS CPLDC DCL D-OTIS D-TAXI FIS I4D OCL SESAR SJU SPR SWIM VLSD V&V Definitin ATS Facilities Ntificatin Aernautical Infrmatin Service - Meterlgical Air Traffic Management Aernautical Telecmmunicatin Netwrk Air Traffic Service Airbrne Traffic Situatin Awareness- In Trail Prcedure Airbrne Separatin Assurance System Air Traffic Service Unit Cntext Management Applicatin Cmmunicatin Management Unit Cmmunicatin Navigatin Service Cntrller Pilt Data Link Cmmunicatin Departure Clereance Datalink Operatinal Terminal Infrmatin Service Datalink Taxi Flight Infrmatin Services Initial Fur Dimensinal Oceanic Clereance Single Eurpean Sky ATM Research SESAR Jin Undertaking Safety Perfrmance Requirements System Wide Infrmatin Management Very Large Scale Demnstratin Validatin & Verificatin 3 f 12

4 1 Prject Overview It is reminded that the bjective f the prject is t prgress with the technical definitin and validatin f cre CPDLC services required fr a mre extensive use f D/L expected in the mid/lng terms (e.g. Airprt Operatins, I4D, AIS-MET, ASAS-ITP, ASPA, ). In additin, the prject addresses all new D/L services which will be necessary t supprt future r enhanced applicatins. 1.1 Prject prgress and cntributin t the Master Plan The prject prgressed n the technical definitin and validatin f the autmatic transitin frm ceanic t dmestic airspaces t enable lng haul aircraft cmmunicatins in dmestic envirnment. The fllwing seven future area were wrked: F1- CPDLC cmmunicatins fr Departure Clearance (including Departure Request and Rute clearance included in a DCL) F2- ATS Datalink cmmunicatins in apprach F3- CPDLC cmmunicatins fr silent transfer F4- CPDLC cmmunicatins t supprt ATSA-ITP F5- Autmatic and seamless transitin F6- D-OTIS service F7- Cnvergent Oceanic-Dmestic ATS Datalink Additinal initially nt planned tpics were addressed such as fr example the management f deferred clearances and message mnitring and multi-element message receptin including ladable elements. It is anticipated that the use f Datalink (based n ATN technlgy) fr ATS cmmunicatins will be widely deplyed in Eurpean dmestic airspaces and ultimately be managed inside the SWIM cntext. These steps frward will then enable the extensin f the use f CPDLC cmmunicatins fr nn-tactical peratins t alleviate sme existing prcedures and intrductin f new services and allw autmatic and seamless transitin f Datalink equipped aircraft frm ceanic t cntinental ATS Datalink cmmunicatins envirnments (and vice versa). The main issues are the definitin f peratinal, safety and perfrmance requirements t supprt these extensins, and the definitin f agreed prcedures at air/grund interperability level (mainly t deal with AFN and CMA synchrnized use t achieve autmatic transfers). The methdlgy applied t reach the maturity bjective f 9.33 prject was cmpsed f different elements. Its ranges frm theretical studies until prttype develpments tested in realistic envirnments. 4 f 12

5 The fllwing table describes the methdlgy applied t each f the Prject 9.33 slutins (different frm the ntin f SESAR slutin): Prject 9.33 element: Future area ident. r additinal item F1 F2 F3 F4 F5 F6 F7 Additinal: anticipatin f Very Large Scale activity (intrduced at 2013 re-allcatin exercise) Technical means used t drive study Develped int aircraft integratin simulatr (i.e. realistic system) since the first iteratin f prttype develped in the prject. Theretical study and mck-up Develped int aircraft integratin simulatr (i.e. realistic system) since the first iteratin f prttype develped in the prject, and wrkshp with cntributin f Airspace users experts. Develped int aircraft integratin simulatr (i.e. realistic system) but nt evaluated peratinally. Theretical study Mck-up Theretical study Early preparatin f Airbus "FANS A + C" prttype t anticipate the need fr later early deplyment. The fllwing table describes hw the activities addressed by prject 9.33 have cntributed t supprt maturity demnstratin f Eurpean ATM Master Plan items (Enabler and OI step). Prject feature Specifically linked t Master Plan (intrduced in the sle scpe f prject 9.33 at 2013 re-allcatin exercise): Enabler A/C-31a Data link cmmunicatin exchange fr ATN baseline 2 General supprt t Master Plan (initial prject scpe) TS-0103 Cntrlled Time f Arrival (CTA) in medium density/cmplexity envirnment TS-0105-A ASAS Spacing - target direct t merge pint (Speed/simple gemetry) AUO-0603-A Enhanced Guidance Assistance t Aircraft n the Airprt Surface Cmbined with Ruting AUO-0308-A Datalink Services used fr Prvisin Grund-related Clearances and Infrmatin fr Step 1 Future area 1 Departure Clearance Cntributin t OI step CM-0105-A Future area 2 Datalink in apprach Future area 3 Silent Transfer Status/Maturity at the end f Prject V3 (TRL6) EXE VP-472 (Release 4) EXE VP-477 (Release 5) "Airbus prttype used is called std 2" V3 (TRL6) EXE-5.3-VP-805 (Release 5) "Airbus prttype used is called std 4" V3 (TRL6) EXE VP719 (Release 5) "Airbus prttype used is called std 4" V3 (TRL6) EXE VP719 (Release 5) "Airbus prttype used is called std 4" V3 (TRL6) Interp trials with prject Enhanced ATC prcesses by the use f new CPDLC messages and related prcedures V2 (TRL4) All pssible peratins supprted by datalink in apprach are nt matured (e.g. use f datalink fr-brake t- Vacate fr ATM purpse). V2/V3 (TRL4) Standardized prcedure (ACM) matches with peratinal requirement, with vice acknwledgement. 5 f 12

6 Future area 4 ATSA-ITP Future area 5 Autmatic and seamless transitin Future area 6 D-OTIS service N/A fr ATN/Cntinental envirnment. The Operatinal prject 4.7.4a which was suppsed t address ATSA-ITP in Cntinental envirnment has nt been launched because spacing rules in radar cvered airspace allw aircraft t fly at the expected altitude in cruise. The OIstep AUO-0302A has been remved frm Master Plan, and successr AUO- 0302C has n plan fr deplyment. V3 (TRL5) The new lgic f management f the silent transfer was validated during RTS (Real Time Simulatin) and des nt impact the flight peratins and pilts easily manage the messages and succeed t achieve their tasks in timely manner. V2 (TRL3) At that pint in time, it is nt relevant t include D-OTIS in ATN. D-OTIS tpic has been discarded frm standardizatin grup WG-78 based ntably n 9.33 inputs. There is n plan t implement the assciated OI-Step (IS-0402 "extended prvisin f Terminal Infrmatin using datalink"). Sme Infrmatin are eligible t SWIM rather than ATN (e.g. NOTAM) -and this will be part f cmplementary activities prpsed by Hneywell beynd Clsure Gate-, while current peratins nt allw cncluding n ATN frmat fr D-ATIS. Future area 7 Cnvergent Oceanic-Dmestic ATS datalink V1/V2 (TRL2) Study paper cnfirmed the need t have cherence between Oceanic and Cntinental frm peratinal perspective. Regarding this, feedback n set f message was made t WG78/SC214 and HMI was harmnized n prttype airbrne systems. The exercise VP-477 frmally achieves the V3 validatin f the OI-step. Nevertheless, cntributin f airbrne prttype was perfrmed in the exercise VP-472 and befre. 1.2 Prject achievements A summary f the prject achievements is presented belw: SESAR 9.33 prject has supprted WG78/SC214 standardizatin by Cntribute t achieve the fficial ATN B2 standardizatin (ED228) by reviewing it 6 f 12

7 Cntribute t the standardizatin maturity by prviding early feedback n develpment airbrne systems capable regarding the technical definitin and peratinal cncept Develpment f several mainline airbrne systems ATSU prttype sftware 1 (Airbus slutin): CPDLC set messages implementatin cmpliant with SPR versin H frm WG78/SC214 Airbus mck-up 1: D-OTIS set messages implementatin cmpliant with SPR versin H frm WG78/SC214 CMU prttype sftware 1 (Hneywell slutin): Departure Clearance and D-ATIS services implementatin cmpliant with SPR versin H frm WG78/SC214 ATSU prttype sftware 2 (Airbus Slutin): ASPA, ITP and D-TAXI implementatin cmpliant with SPR versin H frm WG78/SC214 CMU prttype sftware 2 (Hneywell slutin): Departure Clearance services update cmpliant with SPR versin I frm WG78/SC214 ATSU prttype sftware 3 (Airbus Slutin): DCL and D-TAXI update cmpliant with ED228 frm WG78/SC214 CMU prttype sftware 3 (Hneywell slutin): Departure Clearance services update cmpliant with ED228 frm WG78/SC214 ATSU prttype sftware 4 (Airbus Slutin): D-TAXI and i4d/aspa update t supprt exercise #708 New ATSU mck-up (Airbus Slutin): partial ED228 implementatin t anticipate VLSD activities planned in SESAR Develpment f several reginal airbrne systems P933 reginal prttype sftware 1 and sftware 2 (Thalès slutin): Departure Clearance, "silent" Vice Cntact Management and ATSA-ITP uplink messages implementatin cmpliant with SPR versin H frm WG78/SC214 Several Airspace User Wrkshps were rganized taking place each year invlving the SESAR expert datalink cmmunity t prgress n the main datalink cncepts definitin/implementatin based airline peratin. Frm transverse perspective, Human Perfrmance assessments were cnducted in the frame f the mainline technical verificatin and validatin activities. The final versin f the Human Perfrmance (HP) lg [25] is equally accessible thrugh the dcumentatin f the Human Perfrmance Supprt and Crdinatin Functin (Prject ). SESAR 9.33 prject has supprted 9.13 TAXI airprt prject by Prviding airbrne systems capable fr peratinal assessment Giving technical expertise SESAR 9.33 prject has supprted 9.01 i4d prject by Prviding airbrne systems capable fr peratinal assessment Giving technical expertise SESAR 9.33 prject has supprted 9.05 ASAS prject by Prviding airbrne systems capable fr peratinal assessment Giving technical expertise SESAR 9.33 prject has supprted Pegase prject by Using withut mdificatin the existing airbrne systems capable fr peratinal assessment 7 f 12

8 1.3 Prject Deliverables The fllwing table presents the relevant deliverables that have been prduced by the prject. Reference Title Descriptin D06 Technical Validatin Reprt Status n validatin f the first iteratin f mainline airbrne systems D07 Technical Validatin Reprt Status n validatin f the first iteratin f reginal airbrne systems D08 Aircraft Functinal Definitin Assumptins Update f the high level hypthesis frm D01 D10 D11 Technical Nte n Avinics System Definitin - reginal aircraft Verificatin and Validatin Plan 9.33 Update f the technical definitin fr reginal airbrne systems - iteratin 2 Update f the V&V Plan based n the new scpe (standard 2) fr Mainline aircraft D12 Verificatin and Validatin Plan - Reginal Aircraft D Technical Validatin Reprt - reginal aircraft Update f the V&V Plan based n the new scpe (standard 2) fr reginal aircraft Status n validatin f the secnd iteratin f reginal airbrne systems D16 D22 D23 D24 D25 D26 Yearly synthesis f standardizatin cntributin Technical Verificatin reprt fr sftware standard 3 activities and additinal activities Technical Verificatin reprt fr sftware standard 4 prttype Sftware Standard 2 - Technical Verificatin Reprt Sftware Standard 2 - Technical Nte n avinics system definitin v02 Technical nte n avinics system definitin Status n WG78/SC214 fllw-up and cntributin Descriptin f mainline airbrne system scpe (called standard 3) and the assciated system and peratinal validatin including a deeper Human Perfrmance assessment Descriptin f mainline airbrne system scpe (called sftware standard 4) and the assciated system and peratinal validatin including a deeper Human Perfrmance assessment. This deliverable describes als activities in framewrk f the anticipatin f VLD SESAR 2020 Update f D13 fr mainline airbrne system frm Hneywell nly t mature the prttype Update f D09 t add high level requirement t emphasize the link between activities prvided under SESAR P09.33 and the missin f SJU (SJU cmments). Hneywell part update nly. Update f D09 t add high level requirement t emphasize the link between activities prvided under SESAR P09.33 and the missin f SJU (SJU cmments). Airbus part update nly 8 f 12

9 1.4 Cntributin t Standardisatin 9.33 members have significantly cntributed t the standardizatin maturity and cnsistency by prviding early feedback n develpment airbrne systems capable regarding the technical definitin and peratinal cncept. RTCA/EUROCAE SC214/WG78 fr Advanced ATS DataCmm Services and Applicatins ICAO OPLINK This activity allws t the different standardizatin grup t have mature and cnsistant specificatin as utcmes (eg ED228 standard) thanks t recmmandatins, reviews made. All these activities were fficially achieved by end f 2014 in the prject, even thugh Airbus and Hneywell cntinued t fllw the standardizatin activity with reduced invlvement. 1.5 Prject Cnclusin and Recmmendatins Thanks t the prttype develpments, technical feedbacks culd be cnsidered in WG78/SC214 standardizatin regarding the industrial cnstraint and feasibility. It is an imprtant pint t highlight as it is a strength f this prject. The detailed cnclusins are prvided belw fr the different future area: MAINLINE AIRCRAFT F1- CPDLC cmmunicatins fr Departure Clearance The maturity bjective is reached frm an airbrne perspective. The recmmendatin is t invlve grund partners t make a full end-t-end validatin in real envirnment t fully reach V3. F2- ATS Datalink cmmunicatins in apprach The maturity bjective is reached frm an airbrne perspective but tw imprtant pints remind pen which are the CPDLC availability trigger when A/C is n grund and, CPDLC inhibitin just after sending a message withut waiting the respnse Frm an peratinal lng-term perspective, the use f CPDLC in apprach still has t be further studied invlving bth the air and grund perspective, since currently implemented technical slutins make it difficult t supprt an adequate time management fr the specific peratinal cntext. Wrk remains t be dne t achieve V3. F3- CPDLC cmmunicatins fr silent transfer The maturity bjective is reached. As F1, it is recmmended t invlve grund partners t make a full end-t-end validatin in real envirnment t fully reach V3. It shall be nted that during Air Space User Wrkshps and assessments, pilts appreciated t have a vice cnfirmatin frm the grund ATC in any situatin t be sure t be under cntrl by the new datalink authrity. This peratinal recmmendatin shuld be taken int accunt in the peratinal prcedure. F4- CPDLC cmmunicatins t supprt ATSA-ITP 9 f 12

10 The maturity bjective is nt reached frm an airbrne technical perspective due t n peratin prject were launched. Hwever; the peratinal feedback frm the Airbus pilts is that is nt relevant t use ATSA-ITP service in cntinental area. This service is still present in WG78/SC214 standardizatin. F5- Autmatic and seamless transitin The maturity bjective is reached. Based n this study, Airbus submitted a psitin paper t WG78/SC214 regarding the transitin between ceanic and cntinental area t ease Datalink cntinuity during airspace transitins. On Hneywell side, they made feedback n this tpic t during the review f ED154 FRAC deliverable. F6- D-OTIS service The maturity bjective is reached but tw imprtant pints remain pen: T test the D-OTIS service in real envirnment allwing the cmbinatin f the cmmunicatin and navigatin tasks in each flight phase T review the HMI design t reduce clutter If yu cnsider the level f maturity and that sme services are in cmpetitin with the existing A623 applicatin (which is still under deplyment), 9.33 prject made the recmmendatin t pull this slutin ff the WG78/SC214 standardizatin, which was fllwed. F7- Cnvergent Oceanic-Dmestic ATS Datalink The maturity bjective is reached. Based n the study, the review f WG78/SC214 deliverable was made by keeping in mind the need t have cherent services and the assciated set f messages in ceanic and cntinental area. The harmnisatin was cnsidered t by develping cherent HMI between ceanic and cntinental prduct t be as much pssible transparent fr the peratinal use. The rganisatin f wrkshps with Airspace Users revealed new issues which were nt in the scpe f the prject and require further studies tgether with grund representatives t enable an extensive use f CPDLC. Fr example, the peratinal use f sme f the new datalink messages frm cntinental area was questined (e.g. reprt landing, requesting special prcedures), whereas thers were identified as imprtant and shuld be added t the message set (e.g. requesting descent). The Human Perfrmance Lg [25] develped during 9.33 prject captures any identified issues t supprt the identificatin f future studies. REGIONAL AIRCRAFT F1- CPDLC cmmunicatins fr Departure Clearance The maturity bjective is reached. The functinality is validated with ne minr limitatin (test mean representativeness). F3- CPDLC cmmunicatins fr silent transfer The maturity bjective is reached and n recmmendatin r limitatin t be nticed. F4- CPDLC cmmunicatins t supprt ATSA-ITP The maturity bjective is partially reached due t a limitatin frm test means. 10 f 12

11 2 References [1] SESAR Prgramme Management Plan, Editin [2] Eurpean ATM Master Plan [3] Multilateral Framewrk Agreement ( MFA ) signed between the SJU, EUROCONTROL and its 15 selected members n August 11, 2009, amended n 14 June 2010, 19 Octber 2010 and 2 July 2012 [4] 9.33 PIR Part 1 v2 [5] 9.33 D01 Aircraft Functinal Definitin Assumptin [6] 9.33 D02 Technical nte n avinic system definitin [7] 9.33 D03 Technical Nte n reginal avinic system [8] 9.33 D04 Technical Vérificatin & Validatin Plan - mainline aircraft [9] 9.33 D05 Technical Vérificatin & Validatin Plan - reginal aircraft [10] 9.33 D06 Technical Validatin Reprt [11] 9.33 D07 Technical Validatin Reprt [12] 9.33 D08 Aircraft Functinal Definitin Assumptins [13] 9.33 D09 Technical Nte n Avinics System Definitin - mainline aircraft [14] 9.33 D10 Technical Nte n Avinics System Definitin - reginal aircraft [15] 9.33 D11 Verificatin and Validatin Plan 9.33 [16] 9.33 D12 Verificatin and Validatin Plan - Reginal Aircraft [17] 9.33 D13 Sftware Standard 2 Verificatin and Validatin Reprt [18] 9.33 D14 Sftware Standard 2 Verificatin and Validatin Reprt [19] 9.33 D16 Yearly synthesis f standardizatin cntributin [20] 9.33 D22 Sftware Standard 3 Verificatin and Validatin Reprt [21] 9.33 D23 Sftware Standard 3 Verificatin and Validatin Reprt [22] 9.33 D24 Update: Sftware Standard 2 - Technical Verificatin Reprt [23] 9.33 D25 Sftware Standard 2 - Technical Nte n avinics system definitin v02 [24] 9.33 D26 Update Technical nte n avinics system definitin [25] 9.33 Human Perfrmance Lg [26] SCH_09.33_Latest_Apprved_Baseline change request_v2 [27] Prject 9.33 Scpe change - final versin_update 2015_v2 11 f 12

12 -END OF DOCUMENT- 12 f 12

Final Project Report. Abstract. Document information

Final Project Report. Abstract. Document information Final Prject Reprt Dcument infrmatin Prject Title Integratin f Departure Management and Surface Management Prject Number 12.04.04 Prject Manager THALES Deliverable Name Final Prject Reprt Deliverable ID

More information

Common Network Operation Tools

Common Network Operation Tools Cmmn Netwrk Operatin Tls Prcess fr the develpment f data exchanges Mnika Kaldnek Adviser, System Operatins Brussels xxx2014 Backgrund > WHY: Regulatin 715/2009 (Art 8)...ENTSOG shall adpt: cmmn netwrk

More information

PPA PORTS UKC STANDARDS

PPA PORTS UKC STANDARDS TABLE OF CONTENTS 1. DEFINITIONS AND ABBREVIATIONS...3 1.1 Abbreviatins r acrnyms will have the fllwing meaning:...4 2. INTRODUCTION...5 3. STATIC UNDER KEEL CLEARANCE (SUKC)...5 4. PREDICTIVE UNDER KEEL

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN OFFICE First Meeting f the AFI VSAT Netwrks Managers (AFI VSAT/1) (Kwa-Zulu Natal, Suth Africa, 13 t 15 June 2011) Agenda Item 6: Need fr

More information

Declaration of Amsterdam. Cooperation in the field of connected and automated driving

Declaration of Amsterdam. Cooperation in the field of connected and automated driving Declaratin f Amsterdam Cperatin in the field f cnnected and autmated driving 14-15 April 2016 Declaratin f Amsterdam n cperatin in the field f cnnected and autmated driving Navigating t cnnected and autmated

More information

Galileo Exploitation 2018 Grant Plan

Galileo Exploitation 2018 Grant Plan Galile Explitatin 2018 Grant Plan Galile Explitatin 2018 Grant Plan 1. Multi-frequency multipurpse antenna fr Galile (GEX.0034) LEGAL BASIS Regulatin (EU) N 1285/2013 f the Eurpean Parliament and f the

More information

Episode 3 D WP4 Gaming on Queue, Trajectory and Separation Management Consolidated Plan EPISODE 3

Episode 3 D WP4 Gaming on Queue, Trajectory and Separation Management Consolidated Plan EPISODE 3 Episde 3 D4.3.3-01 - WP4 Gaming n Queue, Trajectry and Separatin Management Cnslidated Plan Versin : 1.02 EPISODE 3 Single Eurpean Sky Implementatin supprt thrugh Validatin Dcument infrmatin Prgramme Sixth

More information

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach

Safety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach Safety Architect : A Tl fr Mdel-Based Safety Analyses Cmpliant with the System Engineering Apprach Authrs: Jnathan Dumnt, Franck Sadmi, Frédérique Vallée (All4tec) Keywrds: Safety, Dependability, Mdel-Based

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005 Netwrk Wrking Grup Request fr Cmments: 4062 Categry: Infrmatinal V. Manral SiNett Crp. R. White Cisc Systems A. Shaikh AT&T Labs (Research) April 2005 Status f This Mem OSPF Benchmarking Terminlgy and

More information

EGHD Position Paper Optimising ATM staff working stations in the Joint Human-Machine System 1

EGHD Position Paper Optimising ATM staff working stations in the Joint Human-Machine System 1 EGHD December 2018 FINAL EGHD Psitin Paper Optimising ATM staff wrking statins in the Jint Human-Machine System 1 1 Intrductin This paper identifies principles and recmmendatins fr the Eurpean Cmmissin

More information

Annex II to Decision 2019/004/R. AMC and GM to Part ATCO Issue 1, Amendment 2

Annex II to Decision 2019/004/R. AMC and GM to Part ATCO Issue 1, Amendment 2 Annex II t Decisin 2019/004/R AMC and GM t Part ATCO Issue 1, Amendment 2 Annex I t Decisin 2015/010/R f 13 March 2015 is hereby amended as fllws: The text f the amendment is arranged t shw deleted text,

More information

Specification for Learning and Qualifications for Physical Intervention Skills

Specification for Learning and Qualifications for Physical Intervention Skills Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it

More information

Spinline - FPGA and µprocessor based platform Taken and sharing advantages of both worlds

Spinline - FPGA and µprocessor based platform Taken and sharing advantages of both worlds Spinline - FPGA and µprcessr based platfrm Taken and sharing advantages f bth wrlds Julien BACH, Rlls-Ryce Civil Nuclear SAS AIEA FPGA wrkshp 2016 Lyn, France - Octber 2016 2016 Rlls-Ryce Civil Nuclear

More information

Software Engineering

Software Engineering What Is Sftware Engineering? Sftware Engineering Sftware engineering is the study and an applicatin f engineering t the, develpment, and maintenance f sftware. The applicatin f a systematic, disciplined,

More information

NSW Prototype User Manual AUTHORITIES. Delegation agreement from the European Commission MOVE D2/ME D(2012)

NSW Prototype User Manual AUTHORITIES. Delegation agreement from the European Commission MOVE D2/ME D(2012) NSW Prttype User Manual AUTHORITIES Delegatin agreement frm the Eurpean Cmmissin MOVE D2/ME D(2012) Versin: 1.2 Date: 22/09/2015 NSW Prttype/ Users Manual/ Authrities TABLE OF CONTENTS 1 Intrductin...

More information

The Motorcycle Industry in Europe. L-category vehicles type approval regulation ACEM comments on draft TRL durability study

The Motorcycle Industry in Europe. L-category vehicles type approval regulation ACEM comments on draft TRL durability study L-categry vehicles type apprval regulatin ACEM cmments n draft TRL durability study 1. ACEM members welcme the pprtunity t cmment n the draft TRL durability study. Since 2004, ACEM members have supprted

More information

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements

More information

26 th January 2016 IRIT Toulouse

26 th January 2016 IRIT Toulouse 2014 Airbus Defence and Space All rights reserved. The reprductin, distributin and utilizatin f this dcument as well as the cmmunicatin f its cntents t thers withut express authrizatin is prhibited. Offenders

More information

CATA Composer R2016 Fact Sheet. Add a New Dimension to Your Product Communications

CATA Composer R2016 Fact Sheet. Add a New Dimension to Your Product Communications CATA Cmpser R2016 Fact Sheet Add a New Dimensin t Yur Prduct Cmmunicatins Versin 1.0-8/11/2015 Table f Cntents 1. CATIA Cmpser: VALUE AT A GLANCE... 3 2. CATIA Cmpser: Overview... 4 2.1. Immediate Prductivity

More information

Rapid Innovation Fund (RIF) Program Overview

Rapid Innovation Fund (RIF) Program Overview Rapid Innvatin Fund (RIF) Prgram Overview Ted Bujewski, Directr, Rapid Innvatin Fund Prgram Office f the Under Secretary f Defense (Research and Engineering) January 2019 Backgrund Established as the Rapid

More information

CARE/ASAS Action Plan

CARE/ASAS Action Plan C-perative Actins f R&D in EUROCONTROL Actin n Airbrne Separatin Assistance System Executive summary Fllwing the decisin f the EUROCONTROL R&D Review Grup, CARE/ASAS started in September 1999. The actin

More information

Independent Association of Latin America and the Caribbean AILAC. Ad-Hoc Working Group on the Durban Platform for Enhanced Action (ADP)

Independent Association of Latin America and the Caribbean AILAC. Ad-Hoc Working Group on the Durban Platform for Enhanced Action (ADP) Independent Assciatin f Latin America and the Caribbean AILAC Ad-Hc Wrking Grup n the Durban Platfrm fr Enhanced Actin (ADP) Submissin n the ex-ante infrmatin requirements fr the cmmunicatin f INDCs and

More information

EMODnet Thematic Lot n 6 HUMAN ACTIVITIES

EMODnet Thematic Lot n 6 HUMAN ACTIVITIES EMODnet Thematic Lt n 6 HUMAN ACTIVITIES EASME/EMFF/2016/1.3.1.2 Lt 6/SI2.749458 Start date f the prject: 03/03/2017 - (24 mnths) EMODnet Phase III Quarterly Prgress Reprt (6) Reprting Perid: 01/07/2018

More information

ida Certification Services IEC Functional Safety Assessment Project: Tri Lok Triple Offset Butterfly Valves Customer: Bray International, Inc.

ida Certification Services IEC Functional Safety Assessment Project: Tri Lok Triple Offset Butterfly Valves Customer: Bray International, Inc. e ida Certificatin Services IEC 61508 Functinal Safety Assessment Prject: Tri Lk Triple Offset Butterfly Valves Custmer: Bray Internatinal, Inc. Hustn, Texas USA Cntract Number: Q07/12-19 Reprt N.: BRA

More information

Formative Evaluation of GeeGuides: Educational Technology to Enhance Art Exploration

Formative Evaluation of GeeGuides: Educational Technology to Enhance Art Exploration Frmative Evaluatin f GeeGuides: Educatinal Technlgy t Enhance Art Explratin Prepared by Clleen F. Manning Senir Research Assciate Gdman Research Grup, Inc. Submitted t GeeGuides LLC March 2005 EXECUTIVE

More information

PBN Implementation Status in Spain. May 2011

PBN Implementation Status in Spain. May 2011 PBN Implementatin Status in Spain May 2011 TABLE OF CONTENTS 1. GNSS as a sensr f Navigatin 2. RNAV-5 (B-RNAV) status 3. RNAV-1 (P-RNAV) status 4. RNP APCH Implementatin Plan TABLE OF CONTENTS 1. GNSS

More information

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools Victrian Student Number Data Quality and Prcess Guidelines fr Victrian Gvernment Schls Published by the Cmmunicatins Divisin fr Educatin Chief Infrmatin Officer Divisin Department f Educatin and Early

More information

Information Article. Relevance

Information Article. Relevance Infrmatin Article Relevance 1. Airline (Aircraft Operatr) Crisis Respnse - an verview t assist understanding f sme significant emergency terms used by e.g. Air Traffic Service Units and Search & Rescue

More information

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group Crwn Recgnised Spectrum Access in 3400 t 3600 MHz The respnse f Alcatel-Lucent t Ofcm Spectrum Plicy Grup Spectrum Access in 1 3400 t 3600MHz Fr additinal infrmatin and clarificatin, please cntact: Jean-Pierre

More information

Transforming the University of Minnesota through the Enhancement of Interdisciplinary Research

Transforming the University of Minnesota through the Enhancement of Interdisciplinary Research DRIVING TOMORROW Our plan t lead and innvate Twin Cities Campus Strategic Plan Grand Challenges Research Transfrming the University f Minnesta thrugh the Enhancement f Interdisciplinary Research Prvst

More information

Proof of the concept Validation Results

Proof of the concept Validation Results Deliverable N.: D9 Prf f the cncept Validatin Results Sept 2008 Final Draft 1.0 Prject funded by the Eurpean Cmmunity under the Sixth Framewrk Prgramme fr Research and Technlgical Develpment. Prject ref.

More information

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA APPENDIX B TRAFFIC IMPACT STUDY CRITERIA Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

Workflow Working Group

Workflow Working Group Wrkflw Wrking Grup June 19, 2007 Chiba University Ann McCarthy Lexmark Internatinal Inc. Chair, Wrkflw Wrking Grup presented by: William Li Wrkflw WG Charter T identify a small number f the mst cmmnly

More information

Privacy in online services

Privacy in online services Privacy in nline services Rdica Tirtea rdica.tirtea@enisa.eurpa.eu 30 March 2011 www.enisa.eurpa.eu Overview Intrductin & cntext f the wrk Abut ENISA and its activities in ENISA 2010 activities n privacy

More information

Hands-Free Music Tablet

Hands-Free Music Tablet Hands-Free Music Tablet Steven Tmer Nate Decker Grup Website: steve@wasatch.cm milamberftheassembly@yah.cm http://www.cs.utah.edu/~ndecker/ce3992/ Abstract The typical musician handles a great deal f sheet

More information

ECE 3829: Advanced Digital System Design with FPGAs A Term 2017

ECE 3829: Advanced Digital System Design with FPGAs A Term 2017 ECE 3829: Advanced Digital System Design with FPGAs A Term 2017 Lab 2- VGA display and Light Sensr interface Reprt due at start f class Friday September 15 th Use the prvided Ambient Light Sensr mdule

More information

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

Dorsey s Search. Name Address Home Telephone Work.  Address. Property Owner s Signature Drsey s Search Return t: Linden Hall 4765 Drsey Hall Drive Ellictt City, MD 21042 410 730-4005 Fax 410 730-4008 ihatz@clumbiavillages.rg - Cvenant Advisr nmeredith@clumbiavillages.rg - Asst. Cvenant Advisr

More information

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS DT0069 Design tip Enabling the Bluetth Lw Energy Direct Test Mde (DTM) with BlueNRG-MS By Salv Bnina Main cmpnents BlueNRG-MS Upgradable Bluetth Lw Energy netwrk prcessr SPBTLE-RF Very lw pwer mdule fr

More information

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS

ENGINEERING PROCEDURE DISPENSATION FOR INFRASTRUCTURE DRAWINGS L1-CHE-PRO-036 Versin: 1 Effective frm: 1 st August 2017 Apprval Amendment Recrd Apprval Date Versin Descriptin 01/08/2017 1 Initial Issue under MTM. Supersedes PTV DMS Dispensatin Prcess & L1-CHE-INS-002

More information

Engineering Design and Development

Engineering Design and Development Engineering Design and Develpment Grade 12 Prerequisites: Intrductin t Engineering Design Principles f Engineering Digital Electrnics Credit Value: 5 ABSTRACT The Engineering Design and Develpment curse

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1 Altis Flight Manager PC applicatin fr AerbTec devices AerbTec Altis v3 User Manual 1 Table f Cntents Intrductin...3 Requirements...3 Installatin...3 Applicatin...3 USB Driver fr Altis v3 interface ALink...4.NET

More information

Application for Drive Technology

Application for Drive Technology Applicatin fr Drive Technlgy MICROMASTER 4 Applicatin Descriptin Warranty, Liability and Supprt 1 Warranty, Liability and Supprt We d nt accept any liability fr the infrmatin cntained in this dcument.

More information

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard

ELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard ELEC 7250 VLSI TESTING Term Paper On Analg Test Bus Standard Muthubalaji Ramkumar 1 Analg Test Bus Standard Muthubalaji Ramkumar Dept. f Electrical and Cmputer Engineering Auburn University Abstract This

More information

FIRMWARE RELEASE NOTES. Versions V2.0.0 to V Model HDL-32E. High Definition LiDAR Sensor

FIRMWARE RELEASE NOTES. Versions V2.0.0 to V Model HDL-32E. High Definition LiDAR Sensor FIRMWARE RELEASE NOTES Versins V2.0.0 t V2.2.21.0 Mdel HDL-32E High Definitin LiDAR Sensr HDL-32E Firmware Release Ntes Page 2 Fr all new features and changes, refer t the dcumentatin that accmpanies the

More information

IEEE C802.16h-06/029

IEEE C802.16h-06/029 Prject Title IEEE 802.16 Bradband Wireless Access Wrking Grup Timing fr sending messages using the frequency dmain energy pulses Date Submitted Surce(s) Re: Abstract Purpse Ntice

More information

Industrial use cases: Description and business impact D1.2.a Automotive Use Case

Industrial use cases: Description and business impact D1.2.a Automotive Use Case Cllabrative Large-scale Integrating Prject Open Platfrm fr EvlutiNary Certificatin Of Safety-critical Systems Industrial use cases: Descriptin and business impact Autmtive Use Case Wrk Package: WP1: Industrial

More information

Acceptance and verification PCI tests according to MIL-STD

Acceptance and verification PCI tests according to MIL-STD Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE

More information

IEC Functional Safety Assessment

IEC Functional Safety Assessment IEC 61508 Functinal Safety Assessment Prject: 1052 Series Actuatrs Cmpany: Fisher Cntrls Internatinal LLC, Inc. (an Emersn Prcess Management cmpany) Marshalltwn, IA USA Cntract Number: Q13/05-046 Reprt

More information

Operating Instructions

Operating Instructions TC 60/8 THERMOCOMPUTER TC 60/8 temp / time s s temp / time k start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing

More information

Hospital Task Scheduling using Constraint Programming

Hospital Task Scheduling using Constraint Programming Hspital Task Scheduling using Cnstraint Prgramming Authr: Chaman Chahal Supervisr: Dr. P. Bse, Schl f Cmputer Science Organizatin: Carletn University Curse: COMP4905 Date: Dec. 11, 2012 1 Abstract Hspitals

More information

GAMIFICATION REFERENCE GUIDE

GAMIFICATION REFERENCE GUIDE GAMIFICATION REFERENCE GUIDE 2 TERMINOLOGY Game Gal: What the bjective f the game is/ hw t win the game. The Game gal des nt equal the learning gal Ex: In Mnply, the gal f the game is t have the mst prperty

More information

SPACE-BASED ADS-B SURVEILLANCE DATA AND ITS DISTRIBUTION VIA REDDIG II. (Working paper presented by AIREON) SUMMARY

SPACE-BASED ADS-B SURVEILLANCE DATA AND ITS DISTRIBUTION VIA REDDIG II. (Working paper presented by AIREON) SUMMARY RCC/20-WP/07 13/03/2017 Internatinal Civil Aviatin Organizatin Suth American Reginal Office - Reginal Prject RLA/03/901 REDDIG Management System and Satellite Segment Administratin Twentieth Meeting f

More information

Figure 1: A Battleship game by Pogo

Figure 1: A Battleship game by Pogo CSCI 2312-002: Object Oriented Prgramming Final Prject Assigned: Octber 17, 2017 Design Due: Octber 24, 2017 IN CLASS (Graded as ne hmewrk grade) Final prject Due: Nvember 16, 2017 at 11:59 PM Fr many

More information

New Perspectives in Science Education March 2018 Florence, Italy

New Perspectives in Science Education March 2018 Florence, Italy New Perspectives in Science Educatin 22-23 March 2018 Flrence, Italy Intrducing science teaching in early years educatin: practical insights f SciLit prject Ruta Grigaliunaite CESIE Italy ruta.grigaliunaite@cesie.rg

More information

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations Specificatin fr a cmmunicating Panelbard system t mnitr, cntrl and maintain LV electrical installatins A system fr: - Mnitring the prtectin and cntrl devices in an electrical installatin and prviding the

More information

3: Community Gathering Space

3: Community Gathering Space 3: Cmmunity Gathering Space What: 2 part spatial sequence with gathering area fr varius sized grups Entry Zne Prvide an intrductin t the area by establishing a md and character and as well as separating

More information

CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT

CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI 600 025 GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT (Prescribed Frmat and Specificatin) 1. GENERAL: The guideline is intended t prvide brad guidelines

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248) COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Cmmunity Develpment Department (248) 347-0415 MICHIGAN BUILDING CODE 2015 DATE: PLAN EXAMINER: PROJECT NAME: PROJECT ADDRESS: All dcuments required

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

CAR ASYST - Quick Start Guide MAIN MENU

CAR ASYST - Quick Start Guide MAIN MENU fficially apprved by CAR ASYST - Quick Start Guide MAIN MENU Main menu The main menu f ur CAR ASYST APP is divided int 7 menu items. Belw yu will find a list f these items including a shrt descriptin.

More information

Communication Protocol Procedure

Communication Protocol Procedure APPLICABILITY: Reliability Crdinatr System Operatrs I. Purpse Prvide the Reliability Crdinatr System Operatrs (RCSO) with established prcedures t: Imprve cmmunicatins fr the issuance f Operating Instructins

More information

Transmit and receive information by marine radio or telephone

Transmit and receive information by marine radio or telephone MARC020 Transmit and receive infrmatin by marine radi r telephne DRAFT 9/12/2013 UNIT CODE UNIT TITLE Release Release 1 APPLICATION COMPETENCY FIELD ELEMENTS Elements describe the essential utcmes. 1 Operate

More information

Visual tools for sustainable design education

Visual tools for sustainable design education Lughbrugh University Institutinal Repsitry Visual tls fr sustainable design educatin This item was submitted t Lughbrugh University's Institutinal Repsitry by the/an authr. Citatin: LOFTHOUSE, V.A., 2011.

More information

Develop preliminary specification and plans from a design brief

Develop preliminary specification and plans from a design brief Unit Title: OCR unit number 1 Level: 2 Credit value: 3 Guided learning hurs: 24 Unit reference number A/503/5851 Develp preliminary specificatin and plans frm a design brief Unit purpse and aim The fcus

More information

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment BLM-Alaska Yukn Lwlands - Kuskkwim Uplands - Lime Hills Rapid Ecreginal Assessment Cmmunicatin and Cllabratin Strategic Framewrk and Implementatin Plan Intrductin and Overview The purpse f the YKL REA

More information

Introduction to Life Cycle Risk Management Help Page

Introduction to Life Cycle Risk Management Help Page Select a frequently asked questin (FAQ) t skip t its answer. Hw is the curse rganized? Wh shuld take this curse? Hw d I get credit fr this curse? What d all the navigatin buttns d? Hw d I knw what t click?

More information

Signature Assignment. Course. ANTH 2302: Introduction to Archaeology. Ethical Case Dilemma. Assignment ID (to be assigned)

Signature Assignment. Course. ANTH 2302: Introduction to Archaeology. Ethical Case Dilemma. Assignment ID (to be assigned) Signature Assignment : Intrductin t Archaelgy Outcmes/Rubrics t be Assessed by the Assignment Cmmunicatin Critical Thinking Empirical and Quantitative Reasning Scial Respnsibility Assignment Descriptin

More information

What is a Customer Service Model?

What is a Customer Service Model? What is a Custmer Service Mdel? Qin Wu IETF 97 Seul Krean L2SM WG meeting 1 Mtivatin Mtivatin: Nt everybdy understand the difference between the device mdel and service mdel Clarify what a service mdel

More information

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information Session with Concerned Entities.

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information Session with Concerned Entities. Prject QC-2015-01 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin Sessin with Cncerned Entities May 12, 2015 Outline Objectives f sessin Webinar (instructins) Québec regulatry

More information

Evidence analysis VET Quality Framework

Evidence analysis VET Quality Framework Evidence analysis VET Quality Framewrk ORGANISATION DETAILS Organisatin s legal name Trading name/s RTO number (if any) 30477 Industry Training Qld Pty Ltd Industry Training Qld Industry Training Qld Pty

More information

City of Richmond. Report to Committee

City of Richmond. Report to Committee City f Richmnd Reprt t Cmmittee T: Frm: Re: Parks, Recreatin and Cultural Services Cmmittee Jane Fernyhugh Directr, Arts, Culture and Heritage Services Public Art Cmmunity Mural Prgram Date: January 5,

More information

CESSDA-Questionnaire on PIDs

CESSDA-Questionnaire on PIDs CESSDA-Questinnaire n PIDs The persistent identificatin f CESSDA Service Prviders data hldings requires mre attentin. While sme ERICs achieved practical and administrative successes (e.g. CLARIN), CESSDA

More information

Downloaded from THE JPL SOFTWARE DEVELOPMENT PROCESS DESCRIPTION

Downloaded from   THE JPL SOFTWARE DEVELOPMENT PROCESS DESCRIPTION Dwnladed frm http://www.everyspec.cm JPL D-15378 Revisin D THE JPL SOFTWARE DEVELOPMENT PROCESS DESCRIPTION Prepared by: Miltn L. Lavin and Jeanne S. Makihara JPL Jet Prpulsin Labratry Califrnia Institute

More information

EUROPEAN ORGANISATIONFOR THE SAFETY OF AIR NAVIGATION EUROCONTROL EUROCONTROL EXPERIMENTAL CENTRE. EEC Technical/Scientific Report No.

EUROPEAN ORGANISATIONFOR THE SAFETY OF AIR NAVIGATION EUROCONTROL EUROCONTROL EXPERIMENTAL CENTRE. EEC Technical/Scientific Report No. EUROPEAN ORGANISATIONFOR THE SAFETY OF AIR NAVIGATION EUROCONTROL EUROCONTROL EXPERIMENTAL CENTRE OPERATIONAL CONCEPT & REQUIREMENTS FOR AIRPORT SURFACE SAFETY NETS EEC Technical/Scientific Reprt N. 2010-008

More information

CADET SOFTWARE ENGINEERS

CADET SOFTWARE ENGINEERS Psitin Highlights Highly cmpetitive cmpensatin package. Be a part f strng innvative team. Patent Incentive Prgram. Stck Optin Grant Signing and Retentin Bnus. CADET SOFTWARE ENGINEERS Psitin Summary The

More information

You Be The Chemist Challenge Official Competition Format

You Be The Chemist Challenge Official Competition Format 2018-2019 Yu Be The Chemist Challenge Official Cmpetitin Frmat This dcument prvides detailed infrmatin regarding the Challenge frmat at each level f the cmpetitin. Schl Crdinatrs, participants, and parents/guardians

More information

Transmission is reliable and safe when antennas are managed by Movicon

Transmission is reliable and safe when antennas are managed by Movicon Transmissin is reliable and safe when antennas are managed by Mvicn Simetel Spa and Sigma Cnsulting have engineered an interesting supervisin system fr mnitring and security f the NATO VLF transceiver

More information

Focus Session on Simulation at Aeronautics Test Facilities

Focus Session on Simulation at Aeronautics Test Facilities Fcus Sessin n Simulatin at Aernautics Test Facilities Octber 15, 2014 Overview f Presentatin Questins t be addressed during presentatin Hw has the ability t d increasingly accurate mdeling and simulatin

More information

MSI Self Assessment - NAVAREA I - CPRNW I Submitted by: United Kingdom

MSI Self Assessment - NAVAREA I - CPRNW I Submitted by: United Kingdom MSI Self Assessment - NAVAREA I - CPRNW9-3.2.1-I Submitted by: United Kingdm 1. Actin Required: Nne, submitted fr infrmatin nly. 2. Backgrund: Within NAVAREA I the WWNWS is a mature and effective system

More information

Internship opportunities

Internship opportunities Internship pprtunities 2018-2019 1 General Infrmatin Why is an internship valuable fr yu? In the first instance, an internship needs t be wrthwhile fr yu, the student! Everyne deserves the pprtunity t

More information

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities

Project QC Consultation on Proposed Reliability Standards and Supporting Documents. Information session for registered entities Prject QC-2015-02 Cnsultatin n Prpsed Reliability Standards and Supprting Dcuments Infrmatin sessin fr registered entities Nvember 26, 2015 Presentatin Overview 1. Meeting bjectives 2. Webinar instructins

More information

Study of New architecture needs for AOCS / Avionics Abstract. Abstract

Study of New architecture needs for AOCS / Avionics Abstract. Abstract The ESA "Study f New architecture needs fr AOCS / Avinics" was perfrmed in parallel t the study Attitude estimatin systems, Requirements n sensr suite. Bth studies have the cmmn bjective t derive a develpment

More information

Establishing a Regional AIS Application Specific Message Register

Establishing a Regional AIS Application Specific Message Register Establishing a Reginal AIS Applicatin Specific Message Register Dr. Lee Alexander and Dr. Kurt Schwehr, University f New Hampshire, USA; and Rlf Zetterberg, Swedish Maritime Administratin, Sweden ABSTRACT

More information

Submission Guidance. The Editorial Board is keen to receive submissions from students, past and present, of the University of Aberdeen.

Submission Guidance. The Editorial Board is keen to receive submissions from students, past and present, of the University of Aberdeen. Submissin Guidance The Editrial Bard is keen t receive submissins frm students, past and present, f the University f Aberdeen. Overview The purpse f the ASLR is t shwcase the wrk f the students f Aberdeen,

More information

ENA Demand Side Response Shared Services Working Group

ENA Demand Side Response Shared Services Working Group Energy Netwrks Assciatin ENA Demand Side Respnse Shared Services Wrking Grup Demand Side Respnse Shared Services Framewrk Cncept Paper Cnsultatin Respnse Executive Summary... 3 Backgrund... 3 Purpse f

More information

CiDA CiDA: Unit 3 Unit 3

CiDA CiDA: Unit 3 Unit 3 Pearsn CiDA Unit 3 Artwrk and Imaging: SW CiDA CiDA: Unit 3 Unit 3 Artwrk and Artwrk and Imaging Imaging Scheme f Wrk Scheme f Wrk 1 Pearsn Educatin Ltd 2017 Unit 3: Artwrk and Imaging: Scheme f Wrk Pearsn

More information

PLANNING AND DECISION ANALYSIS School of Architecture and the Built Environment, KTH

PLANNING AND DECISION ANALYSIS School of Architecture and the Built Environment, KTH Syllabus fr dctral studies in the subject f PLANNING AND DECISION ANALYSIS Schl f Architecture and the Built Envirnment, KTH General regulatins and guidelines fr dctral studies are fund in the cmprehensive

More information

Meteorological Satellites (MetSat) Overview of the global network of Meteorological Satellites. Speaker: Markus Dreis (EUMETSAT)

Meteorological Satellites (MetSat) Overview of the global network of Meteorological Satellites. Speaker: Markus Dreis (EUMETSAT) Meterlgical Satellites (MetSat) Overview f the glbal netwrk f Meterlgical Satellites Speaker: Markus Dreis (EUMETSAT) Secnd ITU/WMO Seminar "Use f Radi Spectrum fr Meterlgy: Weather, Water and Climate

More information

Dispatcher Control for MotoTRBO Capacity Plus Systems

Dispatcher Control for MotoTRBO Capacity Plus Systems Dispatcher Cntrl fr MtTRBO Capacity Plus Systems This tutrial prvides brief instructins t set up the dispatch cntrl ver MtTRBO Capacity Plus systems, using SmartPTT dispatch sftware. Bth cases are cnsidered:

More information

Meal Time! Game Concept

Meal Time! Game Concept Meal Time! Game Cncept Lucien LeMenager Kevin Mann Rbert Dyle Wrking Title Meal Time! Prject Thumbnail A game based n turn- based trading card games, Meal Time! pits players against each ther t crwn the

More information

Spinning Mills Registration Guidelines

Spinning Mills Registration Guidelines COTTON MADE IN AFRICA Spinning Mills Registratin Guidelines 07/2018 1 Dear spinning mill partner, We have had very prmising develpment with ur Cttn made in Africa (CmiA) Initiative in the past few years.

More information

M M Eissa (SIEEE), Egypt Mahmoud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hossam Gabbar, Canada

M M Eissa (SIEEE), Egypt Mahmoud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hossam Gabbar, Canada Wide Area Synchrnized Frequency Measurement System Architecture with Secure Cmmunicatin fr 500kV/220kV Egyptian Grid M M Eissa (SIEEE), Egypt Mahmud M. El-Mesalawy, Egypt Yilu Liu (FIEEE), USA Hssam Gabbar,

More information

Ditton Primary School: Design and Technology Curriculum Planning

Ditton Primary School: Design and Technology Curriculum Planning Year Grup Natinal Curriculum Learning Objective Design KS1 Natinal Curriculum I can design purpseful, functinal, appealing fr myself and ther users based n design criteria I can generate, develp, mdel

More information

City of Sarasota Public Art Requirements Information Package

City of Sarasota Public Art Requirements Information Package City f Sarasta Public Art Requirements Infrmatin Package APPLICABILITY: Any prperty wner r develper wh applies t the City fr a Building Permit t cnstruct r make imprvements that exceed $250,000.00 in cnstructin

More information

Airfield Lighting Product Description SAGA. System of Azimuthal Guidance for Approach (SAGA)

Airfield Lighting Product Description SAGA. System of Azimuthal Guidance for Approach (SAGA) SAGA System f Azimuthal Guidance fr Apprach (SAGA) Nte: This page is blank fr cnvenient duble-sided printing. 1. INTRODUCTION Utilisatin Apprach Azimuth Guidance. The SAGA (System f Azimuth Guidance fr

More information

VILLAGE COORDINATOR AGREEMENT

VILLAGE COORDINATOR AGREEMENT Date Received at AHSGR VILLAGE COORDINATOR AGREEMENT Frm materials written by the riginal funders f AHSGR, we knw that the grup f peple wh gt tgether in the late 1960s t frm what was t later becme AHSGR

More information