1 Lightning Prtectin Study/Reprt UMKC Substatin Kansas City, Missuri Burns & McDnnell University f Missuri - Kansas City By: Rbert Biggs
2 The fllwing lightning prtectin study, with its assciated drawings, is intended t display the level f prtectin and suggested lightning prtectin that shuld be added t the new ring bus substatin cnfiguratin in the scpe f the UMKC Substatin Prject. This lightning prtectin study was dne based n the prtectin f equipment in the substatin using different cmbinatins fr the electrdes and shield wires t prvide the best prtectin t the equipment within the substatin frm lightning strkes. All prtectin calculatins have been derived frm the IEEE Standard , "IEEE Guide fr Direct Lightning Strke Shielding f Substatins." UMKC used the rlling sphere methd fr this study. Each calculatin f prtectin was taken as a single piece f prtectin equipment first. Next, depending n the distance f separatin between ther pieces f prtectin equipment the cmbinatin calculatin was dne t determine what level f prtectin exists in between the tw pieces f equipment. Definitins and Equatins: h(e): Referred t as the height f the equipment in feet. This is the tallest piece f equipment needing prtectin arund the electrde. r(c): Referred t as the radius f cnductr in feet. This is the radius r effective radius (in feet) f the energized bus needing prtectin. h(m): Referred t as the height f the shielding mast abve grund in feet. h(w): Referred t as the height f the shield wire abve grund in feet. d(1), d(2), d(3): Refer t the distances between adjacent masts r shield wires (in feet). I(s): Referred t as the strke current. This is the maximum allwable current the statin bus and insulatin can withstand befre experiencing flashver in ka. 2.2xBIL I(s) =! Z( s) fr BIL > 350kV I(s) = 2kA fr BIL 350kV Z(s) = 60Ln(2h(e)/r(c)) S: Referred t as the strike distance. The strike distance is the length f the last stepped leader (in feet), which defines the radius f the rlling sphere. 0.65! S = 26.25kI( s) k is a cefficient t accunt fr different striking distances fr masts and wires. It is 1.2 fr strikes t masts and 1 fr strikes t wires. r: Referred t as the radius f prtectin. The distance (in feet) frm the shielding electrde t the edge f prtectin fr a given equipment height. Fr a Mast:! r = S 2 S h m S 2 S h e fr h(m) < S! r = S 2 S 2 S h e fr h(m) S Fr a Wire
3 ! r = S 2 S h w S 2 S h e r(1): Referred t as the radius (in feet) f the curvature f the unprtected area riginating a distance f x frm the fllwing midpint f tw structures.! r( 1) = S 2 S h e x(1), x(2), x(3): Referred t as the distance (in feet) frm the midpint f adjacent masts (r shield wire supprts), perpendicular t the center f the unprtected area with r(1) as explained abve. Fr a Mast: r =! Fr a Wire: 2 d r = S ( S h( w ) 2! 2 d is the distance between tw adjacent structures (in feet) Calculatins fr Prtectin 138kV Prtectin (See Appendix Figures 1 thrugh ) S 2 2 d 2 2 ( S h( m ) 2 Triple Mast Cnfiguratin 1. Mast1 New lightning mast lcated abve west leg f the new A-frame nrth f the west breaker. Mast2 New lightning mast lcated 84.2' directly nrth f Mast1. Mast3 New lightning mast lcated 71.9' directly east f Mast 1. Prtecting 3 bus whse radius is (See Figure 1) h(e)=25, r(c)=0.1458, h(m)=71, d(1)=68.5, d(2)=84.2, d(3)=113.3 Prtectin Results I(s)=3.45kA, S=70.5, r =16.7, x(1)=61.6, x(2)=56.6, x(3)=42.0, r(1)=53.9, sin alpha=0.60, R=56.9, b=87.7' 2. Mast1 New lightning mast lcated abve west leg f the new A-frame nrth f the west breaker.
4 Mast2 New lightning mast lcated 84.2' directly nrth f Mast1. Mast3 New lightning mast lcated 15.5' nrth and 15.8' east f Mast3. Prtecting 3 bus whse radius is (See Figure 2) h(e)=25, r(c)=0.1458, h(m)=71, d(1)=89.0, d(2)=84.2, d(3)=113.4 Prtectin Results I(s)=3.45kA, S=70.5, r =16.66', x(1)=54.7, x(2)=56.6, x(3)=41.9, r(1)=53.9, sin alpha=0.78, R=57.3, b=87.1 Duble Shield Wire Cnfiguratins 6. First Wire: New shield wire extending frm the 138kV transmissin twer t Mast3 n the east leg f the new A-frame structure. Secnd Wire: New shield wire extending frm Mast5 t Mast6. Prtecting 3 bus whse radius is (See Figure 3) h(e)=25.0, r(c)=0.1458, h(w suth)=80', h(w nrth)=56' d(1)=110.7, d(2)=106.5' Prtectin Results I(s)=3.45kA, S=58.8, r =10.6, x(1)=19.5, x(2)=24.7', r(1)= First Wire: New shield wire extending frm the 138kV transmissin twer t Mast1. Secnd Wire: New shield wire extending frm the 138kV transmissin twer t Mast3. Prtecting 3 bus whse radius is (See Figure 4) h(e)=25.0, r(c)=0.1458', h(w)=56, d(1)=68.54 Prtectin Results I(s)=3.45kA, S=58.8, r =10.6', x(1)=47.7, r(1)= First Wire: New shield wire extending frm Mast1 t Mast2. Secnd Wire: New shield wire extending frm the 69kV transmissin twer t Mast4. Prtecting 3 bus whse radius is (See Figure 5) h(e)=25.0, r(c)=0.1458, h(w masts)=56, h(w twer)=70', d(1)=68.5, d(2)=114.8 Prtectin Results I(s)=3.45kA, S=58.8, r =10.6, x(1)=47.7, x(2)=12.3', r(1)=48.1
5 Recmmendatins The scpe f this lightning prtectin prject includes cmplete prtectin fr substatin cmpnents, in their entirety. UMKC Senir Design Substatin Team recmmends cmpleting this cverage: 1. By running shield wires frm the 138kV transmissin twer t a) lightning Mast1, lcated n the west leg f the A-frame structure, and t b) lightning Mast2 lcated abve the east leg f the A-frame structure. This A-frame structure is lcated between the tw suth breakers and nrth-east breaker. 2. By running a shield wire frm the 69kV transmissin twer t lightning Mast4, lcated abve the west leg f the H-frame structure. The H-frame structure is lcated nrth f the transfrmer and the 69kV breaker. 3. By running shield wire frm lighting Mast5, lcated suth f the cntrl building, t lightning Mast6, lcated nrth f the cntrl building. With these lightning prtectin cmpnents installed in the prescribed lcatins, bth the 138kV system and the 69kV system will have cmplete lightning prtectin cverage. Figure 6 shws cmplete lightning mast and shield wire prtectin.
6 APPENDIX Reference Figures Fr Different Prtectin Cnfiguratins Figure 1 Figure 2
7 Figure 3 Figure 4 Figure 5
8 Figure 6
NATF CIP Requirement R1 Guideline
Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves
More informationRiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014
SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr
More informationEASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION
Streamer AG INMR Wrld Cngress 2017 EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION Authrs: Jens Bthe, Etienne Cuisinier SUMMARY: Fr nw mre than 20 years, Streamer has dedicated its
More informationAcceptance and verification PCI tests according to MIL-STD
Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE
More informationPJM Protection Standards
PJM Manual 07: PJM Prtectin Standards Revisin: 10 Effective Date: 11/16/2011 Prepared by System Planning Divisin Transmissin Planning Department PJM 20121 PJM 2011 Revisin 00, Effective Date: XX/XX/2010
More informationTee (Not a Coupler) Open Circuit Line. Z Z Z jz d
ECSE-2 Spring 22 Analysis Using Matlab Cable System R2 T2 Tee (Nt a Cupler) T TV Set Input R V 75 75 T3 Open Circuit Line The basic principle f this signal blcker is relatively simple. The CATV cable (T2
More informationGuide for ESP32-Sense Development Kit
Guide fr ESP32-Sense Develpment Kit 1. Overview The ESP32 tuch sensr develpment kit, ESP32-Sense Kit, is used fr evaluating and develping ESP32 tuch sensr system. ESP32-Sense Kit cnsists f ne mtherbard
More informationWorking Group PC Guide for Fault Current Limiter Testing Sponsored by IEEE Switchgear ADSCOM Fall Switchgear Committee Meeting San Diego, CA
Wrking Grup PC37.302 - Guide fr Fault Current Limiter Testing Spnsred by IEEE Switchgear ADSCOM Fall Switchgear Cmmittee Meeting San Dieg, CA Octber 3, 2012 Minutes Mischa Steurer called the meeting f
More informationUSER MANUAL HIGH INTERCEPT LOW NOISE AMPLIFIER (HILNA TM ) V1
USER MANUAL HIGH INTERCEPT LOW NOISE AMPLIFIER (HILNA TM ) V1 PART NUMBERS: HILNA-V1 HILNA-V1-M/F RF, Wireless, and Embedded Systems Engineering NuWaves Engineering 132 Edisn Drive Middletwn, Ohi 45044
More informationSARMAP RELEASE NOTES. Version: 7.0 (July 2016) rpsgroup.com
SARMAP RELEASE NOTES Versin: 7.0 (July 2016) 55 Village Square Dr. Suth Kingstwn, RI 02879 Tel: (401) 789-6224 Fax: (401) 789-1932 Email: MapSupprt@ Table f Cntents Table f Cntents...ii 1 Intrductin...
More informationOperating Process for Access to Gas Insulated Switchgear
Operating Prcess fr Access t Gas Insulated Switchgear Summary This dcument supprts the Pwer System Safety Rules and its requirements assembled under Operate Gas Insulated Switchgear - Categry 5.6 Dcument
More informationConsolidated Edison Company of New York. Developer Welcome Kit
Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable
More informationWaves Unit / Mechanical Waves Sub-Unit
Waves Unit / Mechanical Waves Sub-Unit 5.1.1 Oscillatins - time fr ne scillatin - number f scillatins per secnd Equatin Pendulum Mass n a Spring PRACTICE Regents Physics 1. A pendulum is timed as it mves
More informationHospital Task Scheduling using Constraint Programming
Hspital Task Scheduling using Cnstraint Prgramming Authr: Chaman Chahal Supervisr: Dr. P. Bse, Schl f Cmputer Science Organizatin: Carletn University Curse: COMP4905 Date: Dec. 11, 2012 1 Abstract Hspitals
More informationNew construction or additions permit guide
Cmmunity Develpment Department 12350 W. 87 th St. Pkwy., Lenexa, KS 66215 913.477.7700 fax 913.477.7730 New cnstructin r additins permit guide The infrmatin prvided are general requirements which shuld
More informationConnection tariffs
Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER
More informationAPPENDIX B TRAFFIC IMPACT STUDY CRITERIA
APPENDIX B TRAFFIC IMPACT STUDY CRITERIA Traffic Impact Studies Traffic impact studies (TIS) may be required by the Cunty in rder t adequately assess the impacts f a develpment prpsal n the existing and/r
More informationElectrical devices may only be mounted and connected by electrically skilled persons.
Order N. : 5323 02 Operating instructins 1 Safety instructins Electrical devices may nly be munted and cnnected by electrically skilled persns. Serius injuries, fire r prperty damage pssible. Please read
More informationConsider a boost-buck converter with the following parameters (Fig. 1-1). R cs2. R s2a HV9930 VDD PWMD REF C3
Design f the Bst-Buck cnverter with HV9930 Cnsider a bst-buck cnverter with the fllwing parameters (Fig. -. D L C L - VN Q d Cd D D3 C VO cs cs + s VN HV9930 VDD C sa sb GATE CS PWMD CS ref ref GND EF
More informationPool & Hot Tub Guide
Pl & Ht Tub Guide PERMIT(S) FOR POOLS/HOT TUBS WITH SIDE WALLS > 24 ***** ALL FEES DUE AT TIME OF APPLICATION ***** Building Permit Applicatin. Be aware f any subdivisin restrictins prir t applicatin.
More informationTownship of Derry. Dauphin County, Pennsylvania. Residential Deck Addition Submittal Guide and Construction Fact Sheet
Twnship f Derry Dauphin Cunty, Pennsylvania Residential Deck Additin Submittal Guide and Cnstructin Fact Sheet The text and illustratins included in this guide represent tables and illustratins frm the
More information5. Experimental Results
5. xperimental Results Prttype mdels f the duble spherical helix the hemispherical helix studied in Sectins 4.3.2 4.4 were cnstructed measured. Fabricatin f these antennas measurement f their radiatin
More informationSupplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01
Discipline Engineering Specificatin Categry Supplementary Appendix t ARTC Cde f Practice Trackside Mnuments Applicability ARTC Netwrk wide New Suth Wales Western Jurisdictin Victria Primary Surce (Draft
More informationTROUBLESHOOTING GUIDE
TROUBLESHOOTING GUIDE Dcument revisin 1.3 Last revised: December 6, 2017 Recn Wireless Blckage and Flw Mnitr Trubleshting Guide 2014-2017 Intelligent Agricultural Slutins All Rights Reserved. Recn Wireless
More informationPRODUCT SAFETY ALERT
Allen-Bradley Mtr Prtectin Circuit Breakers 140M-C2E and 140M-C2T, Series A and B 140M-D8E and 140M-D8T, Series A and B 140M-F8E and 140M-F8T, Series A, B and C Starters that use Allen-Bradley Mtr Prtectin
More informationORIGINAL SIZE SYSTEM CONTROL DWG. FILE. ROSEMOUNT 2410 OrCADl. o o
CH. ORDER CH. ORDER N CH. ORDER N CH. ORDER N FIELDBUS INTRINSICALLY SAFE CONCEPT (FISCO) APPROVAL FISCO allws f intrinsically safe apparatus t assciated apparatus nt specially examined in such cmbinatin.
More informationHow to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved
Hw t Install a Slate Tile Flr By See Jane Drill TM Cpyright 2014, All Rights Reserved Resurces Needed t Cmplete the Jb Tls & Supplies Pwer drill with mixing want (a bucket trwel can als be used fr mixing)
More informationTransmission is reliable and safe when antennas are managed by Movicon
Transmissin is reliable and safe when antennas are managed by Mvicn Simetel Spa and Sigma Cnsulting have engineered an interesting supervisin system fr mnitring and security f the NATO VLF transceiver
More informationidcv Isolated Digital Voltmeter User Manual
www.akcp.cm idcv Islated Digital Vltmeter User Manual Help Versin updated till firmware SP446 Cpyright 2011, AKCess Pr Limited Prvided by fficial AKCP-Distributr Didactum https://www.didactum-security.cm/en/
More informationInstalling a Squeak-Free Nascor Floor System
Nascr s precise manufacturing tlerances deliver a prduct that resists shrinking, warping and twisting the mst cmmn causes f squeaks in flr systems built with dimensinal lumber. Ensuring a squeak-free flr,
More informationTransmission Substation Field Instructions
4.14 Substatin Permits Purpse This instructin deals with the use f permits t wrk in Hrizn Pwer s, and must be read in cnjunctin with FI 4.4 Secndary Islatins. Scpe The persnnel cvered by this instructin
More informationMath 3201 Unit 8: SINUSODIAL FUNCTIONS NAME: Up until now we can measure angles using degrees.
Math 0 Unit 8: SINUSODIAL FUNCTIONS NAME: Sectin 8.: Understanding Angles p. 8 Hw can we measure things? Eamples: Length - meters (m) r ards (d.) Temperature - degrees Celsius ( C) r Fahrenheit (F) Hw
More informationDry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed.
Intrductin Dry Cntact Sensr The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable and can be
More informationKIP Cost Center User Guide
- 1 - KIP Cst Center User Guide Cntents 1 Intrductin... 3 1.1 Requirements:... 4 1.2 Supprted Operating Systems... 4 2 Installatin... 5 3 Setup... 8 4 KIP Cst Center Main Screen Print Mde... 12 4.1 Lading
More informationMachine Shop Lab Manual GENERAL INSTRUCTION
Machine Shp Lab Manual GENERAL INSTRUCTION 1. Every student shuld btain a set f instructin sheets entitled manufacturing prcesses Labratry. 2. Fr reasns f safety, every student must cme t the labratry
More informationDOCUMENT OBSOLETE. Advanced Systems Tester 900AST Series Calibration Verification Procedure. Instructions. February A
Advanced Systems Tester 900AST Series Calibratin Verificatin Prcedure Instructins February 2006 Table f Cntents Intrductin...3 Test Instruments Required...3 Test Cmpnents Required...3 Test Prcedure...3
More informationPAPER SPACE AND LAYOUTS
PAPER SPACE AND LAYOUTS There are tw distinct wrking envirnments in AutCAD namely: Mdel Space and Paper space. Prjects can be develped by either wrking in the mdel space thrugh the use f MVSETUP r PAPER
More informationWelcome to the Digital Humanities Fall School!!
Welcme t the Digital Humanities Venice Fall Schl!! Greetings frm the Ca Fscari University f Venice and l Ecle Plytechnique Fédérale de Lausanne! With this letter we hpe t prvide yu with useful infrmatin
More informationTHE SECOND 1 x 500 MW HVDC BACK-TO-BACK INTERCONNECTION AT VIZAG
THE SECOND 1 x 500 MW HVDC BACK-TO-BACK INTERCONNECTION AT VIZAG Abstract R.Suri Birger Jnssn N. Ottssn R.S. Mni POWERGRID, ABB Pwer Technlgies AB, ABB Limited, India Sweden India The Secnd 1 x 500 MW
More informationLab 1 Load Cell Measurement System
BME/ECE 386 Lab 1 Lad Cell Measurement System GOALS Lab 1 Lad Cell Measurement System 1) Build and test a lad cell amplifier. 2) Write an Arduin prgram t: a. Acquire data frm a lad cell amplifier b. Cmpute
More informationEE 3323 Electromagnetics Laboratory
EE 3323 Electrmagnetics Labratry Experiment #1 Waveguides and Waveguide Measurements 1. Objective The bjective f Experiment #1 is t investigate waveguides and their use in micrwave systems. Yu will use
More informationCURRENT AND VOLTAGE SENSORS. General Information. Overhead Current and Voltage Monitoring Insulators (CVMI)
CURRENT AND VOLTAGE SENSORS General Infrmatin Overhead Current and Vltage Mnitring Insulatrs (CVMI) Many electric utilities are using Distributin Autmatin (DA) fr bth verhead and undergrund systems. DA
More informationP ^ DETERMINATION OF. Part I. Doner, W3FAL. maximum ratings and typical operating conditions. service are given below. This procedure may
1 AT P ^ -, r A PUBLICATION OF THE RCA ELECTRON TUBE DIVISION VOL., NO. 1, RADIO CORPORATION OF AMERICA DECEMBER, 1 DETERMINATION OF TYPICAL OPERATING CONDITIONS Fr RCA Tubes Used as Linear RF Pwer Amplifiers
More informationStandard Authorization Request Form
When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke
More information6.1 Angles in Standard Position In Quadrant 1.notebook May 24, 2015
Unit 6 Trignmetry 6.1 Angles in Standard Psitin in Quadrant 1 1 6.1 Trignmetry: Angles in Standard Psitin Outcmes 6.1, 6.2 & 6.6 Determine & sketch the angle in standard psitin given a pint P(x, y) n the
More informationE-Learning, DC drives DCS800 Hardware Options, part 1 Size D1 D4. ABB Group February 2, 2010 Slide 1 DCS800_HARDWARE_OPTIONS_01R0101
E-Learning, DC drives DCS800 Hardware Optins, part 1 Size D1 D4 February 2, 2010 Slide 1 Objectives This training mdule cvers: Lcatin fr plug-in ptins Types f plug-in ptins Fiber ptic cnnectin bard DCS800
More informationSafety Architect : A Tool for Model-Based Safety Analyses Compliant with the System Engineering Approach
Safety Architect : A Tl fr Mdel-Based Safety Analyses Cmpliant with the System Engineering Apprach Authrs: Jnathan Dumnt, Franck Sadmi, Frédérique Vallée (All4tec) Keywrds: Safety, Dependability, Mdel-Based
More informationLab2 Digital Weighing Scale (Sep 18)
GOAL Lab2 Digital Weighing Scale (Sep 18) The gal f Lab 2 is t demnstrate a digital weighing scale. INTRODUCTION The electrnic measurement f mass has many applicatins. A digital weighing scale typically
More informationDispatcher Control for MotoTRBO Capacity Plus Systems
Dispatcher Cntrl fr MtTRBO Capacity Plus Systems This tutrial prvides brief instructins t set up the dispatch cntrl ver MtTRBO Capacity Plus systems, using SmartPTT dispatch sftware. Bth cases are cnsidered:
More informationDynaRound Hatch Guard System Installation Instructions
DynaRund Hatch Guard System Installatin Instructins Estimated Installatin Time: Man Crew, 0-90 Minutes The DynaRund Hatch Guard System is designed t prtect all rftp hatch entry and exit pints. This nn-penetrating
More information1.12 Equipment Manager
Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment
More information3: Community Gathering Space
3: Cmmunity Gathering Space What: 2 part spatial sequence with gathering area fr varius sized grups Entry Zne Prvide an intrductin t the area by establishing a md and character and as well as separating
More informationCan Fire Suppressant Gels Protect Log Decks? A Case Study to Test the Concept
Intrductin Can Fire Suppressant Gels Prtect Lg Decks? A Case Study t Test the Cncept Dave Schreder Wildland Fire Operatins Research Grup Frest Engineering Research Institute f Canada As part f its lg deck
More informationLab 1 Load Cell Measurement System (Jan 09/10)
BME/ECE 386 Lab 1 Lad Cell Measurement System GOALS Lab 1 Lad Cell Measurement System (Jan 09/10) 1) Test the lad cell amplifier. 2) Write an Arduin prgram t: a. Acquire data frm a lad cell amplifier b.
More informationHands-Free Music Tablet
Hands-Free Music Tablet Steven Tmer Nate Decker Grup Website: steve@wasatch.cm milamberftheassembly@yah.cm http://www.cs.utah.edu/~ndecker/ce3992/ Abstract The typical musician handles a great deal f sheet
More informationHIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY
HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY A. Sudrià 1, E. Jaureguialz 2, A. Sumper 1, R. Villafáfila 1 and J. Rull 1 1 Centre fr Technlgical Innvatin
More informationGenerating Facility Interconnection Guide. Revision 5.0
Generating Facility Intercnnectin Guide Revisin 5.0 AMERICAN TRANSMISSION COMPANY Generating Facility Intercnnectin Guide (An ATC Business Practice) Revisin 5.0 April 2014 American Transmissin Cmpany W234
More informationLite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data
IR Emitter and Detectr 1. Descriptin Lite-On ffers a brad range f discrete infrared cmpnents fr applicatin such as remte cntrl, IR wireless data transmissin, security alarm & etc. Custmers need infrared
More informationNORTH CAROLINA ODYSSEY OF THE MIND SCHOLARSHIP APPLICATION
NORTH CAROLINA ODYSSEY OF THE MIND 2009-2010 SCHOLARSHIP APPLICATION Nrth Carlina Odyssey f the Mind (NCOM) is pleased t annunce tw cllege schlarships available t current and/r frmer Odyssey f the Mind
More informationPuget Sound Company Overview. Purpose of the Project. Solution Overview
Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within
More informationMeaningful Use Stage 2- Menu Measure 3 Imaging Results Configuration Guide
Enterprise EHR Meaningful Use Stage 2- Menu Measure 3 Imaging Results Cnfiguratin Guide Last Updated: January 30, 2014 Cpyright 2013 Allscripts Healthcare, LLC. www.allscripts.cm MU Menu 3 Imaging Results
More informationSpecification for a communicating Panelboard system to monitor, control and maintain LV electrical installations
Specificatin fr a cmmunicating Panelbard system t mnitr, cntrl and maintain LV electrical installatins A system fr: - Mnitring the prtectin and cntrl devices in an electrical installatin and prviding the
More information3G Coverage Obligation Verification Methodology
3G Cverage Obligatin Verificatin Methdlgy Statement Publicatin date: 9 May 2012 Main Heading Cntents Sectin Page 1 Intrductin 1 2 Summary f apprach 2 3 Key parameters t be used in the SINR calculatin
More informationExperiment 2 Complex Impedance, Steady State Analysis, and Filters
Experiment 2 Cmplex Impedance, Steady State Analysis, and Filters Purpse: The bjective f this experiment is t learn abut steady state analysis and basic filters. Backgrund: Befre ding this experiment,
More informationNotified Body Office, VUZ a.s. Novodvorská 1698, Praha 4, Czech Republic
RAILCOM Final Reprting Interactive Cnference Electrmagnetic cmpatibility at train-track track interface - lw frequency dmain Karel Beneš Ntified Bdy Office, VUZ a.s. Nvdvrská 1698, 142 01 Praha 4, Czech
More informationBanner pocket v3 Page 1/7. Banner pocket v3
Banner pcket v3 Page 1/7 Banner pcket v3 Descriptin Banner pcket will help yu get the printed sheets arranged in the way yu need fr attaching the frnt and back side pckets tgether. It will crp ne sides
More informationTransmission Line Design Standard
Transmissin Line Design Standard Summary This standard defines the perfrmance design parameters fr verhead transmissin lines cnstructed t cnnect t and frm part f the TransGrid netwrk. TransGrid publishes
More informationRoof Safe Netting CONTENTS
Rf Safe Netting CONTENTS SUMMARY OF FEATURES... 2 TECHNICAL INFORMATION... 2 Prduct Descriptin... 2 Applicatins... 2 Prduct Infrmatin... 2 Handling & Strage... 3 Technical Data... 4 Size Range Available...
More informationAlgebra2/Trig Honors: Trig Unit 2 Packet
Algebra2/Trig Hnrs: Trig Unit 2 Packet In this unit, students will be able t: Learn and apply c-functin relatinships between trig functins Learn and apply the sum and difference identities Learn and apply
More informationUpgrading to PlanetPress Suite Version 5
Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt
More informationExcel Step by Step Instructions Creating Lists and Charts. Microsoft
Infrmatin Yu Can Enter in a Wrksheet: Labels: Any type f text r infrmatin nt used in any calculatins. Labels are used fr wrksheet headings and make wrksheets easy t read and understand. Labels can als
More informationAF4000 MOD-1 OEM Production Line Troubleshooting Guide
Revisin 0: Initial dcument creatin, 9/2006, M. Rgers AF4000 MOD-1 OEM Prductin Line Trubleshting Guide If erratic system behavir is bserved that cannt be reslved by the methds utlined belw, ensure that
More informationFigure 1: View, connection compartment closed
Radi Management Art. N. : 2700AP Operating instructins 1 Safety instructins Electrical equipment may nly be installed and fitted by electrically skilled persns. Serius injuries, fire r prperty damage pssible.
More informationOPERATOR S MANUAL BOP (M) (D) 100W, 200W, 400W BIPOLAR POWER SUPPLY
OPERATOR S MANUAL BOP (M) (D) 100W, 200W, 400W BIPOLAR POWER SUPPLY 100W: BOP 20-5, BOP 50-2, BOP 100-1 200W: BOP 20-10, BOP 36-6, BOP 50-4, BOP 72-3, BOP 100-2, BOP 200-1 400W: BOP 20-20, BOP 36-12, BOP
More informationProject Description Arctic Safety Center
Prject Descriptin Arctic Safety Center Classificatin: Open Status: Final Expiry date: 2012-10-21 Page 1 f 11 Prject Descriptin Arctic Safety Center Dcument n. : Prject n.: Prject: 990020 Arctic Safety
More informationFigure 1: A Battleship game by Pogo
CSCI 2312-002: Object Oriented Prgramming Final Prject Assigned: Octber 17, 2017 Design Due: Octber 24, 2017 IN CLASS (Graded as ne hmewrk grade) Final prject Due: Nvember 16, 2017 at 11:59 PM Fr many
More informationLINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules
Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme
More informationRF MONO 8.2MHz RF MONO HIGH FREQUENCY PCB CONNECTION. Please see the last section in this document. FOREWARDS
RF MONO 8.2MHz PCB CONNECTION Please see the last sectin in this dcument. FOREWARDS This user guide cntains basic infrmatin n hw t adjust ur RF Mn Antenna System SP82 and btain its best perfrmance pssible.
More informationStudy of Dipole Antenna Height for Radio Telescope According to Baghdad Location
Study f Diple Antenna Height fr Radi Telescpe Accrding t Baghdad Lcatin Kamal M. Abd 1, Mretadha J. Kadhim and Zinah F. Kadhim 3 1 Department f Astrnmy and Space, Cllege f Science, University f Baghdad,
More informationSPIRE Detector Angular Offset and Instrument Mode Mask Calibration Products Edward Polehampton & Marc Ferlet
Page: 1 f 12 SPIRE Detectr Angular Offset and Instrument Mde Mask Calibratin Prducts Edward Plehamptn & Marc Ferlet 1.1 Reference Dcuments RD1 Calibratin Prducts fr SPIRE Data Prcessing SPIRE-RAL-DOC-002261
More informationTUTORIAL I ECE 555 CADENCE SCHEMATIC SIMULATION USING SPECTRE
TUTORIAL I ECE 555 CADENCE SCHEMATIC SIMULATION USING SPECTRE Cadence Virtus Schematic editing prvides a design envirnment cmprising tls t create schematics, symbls and run simulatins. This tutrial will
More informationTransmitting voice and data using electromagnetic waves in open space
What is Wireless Cmmunicatin? Transmitting vice and data using electrmagnetic waves in pen space Why Wireless? Freedm frm wires N cst f installing the wires, N bunches f wires running arund e.g. Bluetth,
More informationApplication Note. Lock-in Milliohmmeter
Applicatin Nte AN2207 Lck-in Millihmmeter Authr: Oleksandr Karpin Assciated Prject: Yes Assciated Part Family: CY8C24xxxA, CY8C27xxx PSC Designer Versin: 4.1 SP1 Assciated Applicatin Ntes: AN2028, AN2044,
More informationFourier Series LABVIEW GUI Documentation
Furier Series LABVIEW GUI Dcumentatin INTRODUCTION The Furier Series GUI is meant t be used as a learning tl t better understand the Furier Series. The user is able t input the amplitude and frequency
More informationMultistate Mobility Performance Monitoring
Great Lakes Reginal Operatins Calitin (GLRTOC) Multistate Mbility Perfrmance Mnitring September 2015 GLRTOC Members The Great Lakes Reginal Transprtatin Operatins Calitin was funded in May 2010, and was
More informationIR Emitter and Detector Product Data Sheet LTE-R38386AS-ZF Spec No.: DS Effective Date: 09/14/2016 LITE-ON DCC RELEASE
IR Emitter and Detectr Prduct Data Sheet Spec N.: DS5-216-5 Effective Date: 9/14/216 Revisin: - LITE-ON DCC RELEASE BNS-OD-FC1/A4 LITE-ON Technlgy Crp. / Optelectrnics N.9,Chien 1 Rad, Chung H, New Taipei
More informationExperiment 4 Op-Amp Circuits
Experiment 4 Op-Amp Circuits Purpse: In this experiment, yu will learn abut peratinal amplifiers (r p-amps). Simple circuits cntaining peratinal amplifiers can be used t perfrm mathematical peratins, such
More informationSpecification for Learning and Qualifications for Physical Intervention Skills
Specificatin fr Learning and Qualificatins fr Physical Interventin Skills September 2018 Security Industry Authrity www.sia.hmeffice.gv.uk Frewrd The Security Industry Authrity (SIA) recgnises that it
More informationELECTRICAL CIRCUITS LABORATORY II EEE 209 EXPERIMENT-6. Operational Amplifiers II
ADANA SCIENCE AND TECHNOLOGY UNIVERSITY ELECTRICAL ELECTRONICS ENGINEERING DEPARTMENT ELECTRICAL CIRCUITS LABORATORY II EEE 209 EXPERIMENT-6 Operatinal Amplifiers II OPERATIONAL AMPLIFIERS Objectives The
More informationClaim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start:
Claim Amalgamatin Amalgamate means t jin 2 r mre cell claims int ne cell claim. Befre yu start: Yu will need t knw the title numbers f the cell titles fr amalgamatin. If yu are acting as an agent, yu must
More informationSPACE-BASED ADS-B SURVEILLANCE DATA AND ITS DISTRIBUTION VIA REDDIG II. (Working paper presented by AIREON) SUMMARY
RCC/20-WP/07 13/03/2017 Internatinal Civil Aviatin Organizatin Suth American Reginal Office - Reginal Prject RLA/03/901 REDDIG Management System and Satellite Segment Administratin Twentieth Meeting f
More informationIR Emitter and Detector Product Data Sheet LTR-C5510-DC Spec No.: DS Effective Date: 09/24/2016 LITE-ON DCC RELEASE
Prduct Data Sheet Spec N.: DS50-2016-0032 Effective Date: 09/24/2016 Revisin: - LITE-ON DCC RELEASE BNS-OD-FC001/A4 LITE-ON Technlgy Crp. / Optelectrnics N.90,Chien 1 Rad, Chung H, New Taipei City 23585,
More informationAmerican Association of State Highway and Transportation Officials
American Assciatin f State Highway and Transprtatin Officials Please save and send as a wrd file. Yu can attach a map in PDF r JPG with the applicatin t usrutes@aasht.rg (M.Vitale) An Applicatin frm the
More informationArc Vault Protection System
GE Energy Industrial Slutins Arc Vault Prtectin System Applicatin and Technical Guide HAZARD CLASSIFICATIONS The fllwing imprtant highlighted infrmatin appears thrughut this dcument t warn f ptential hazards
More informationGE Multilin 339 Motor Protection Specifications
GE Multilin 339 Mtr Prtectin Specificatins The mtr prtectin relay shall prvide primary prtectin fr medium vltage mtrs. The relay shall be equipped with the fllwing prtectin functins. Mtr Thermal Overlad
More informationELEC 7250 VLSI TESTING. Term Paper. Analog Test Bus Standard
ELEC 7250 VLSI TESTING Term Paper On Analg Test Bus Standard Muthubalaji Ramkumar 1 Analg Test Bus Standard Muthubalaji Ramkumar Dept. f Electrical and Cmputer Engineering Auburn University Abstract This
More informationIR Emitter and Detector Product Data Sheet LTE-C9511-E Spec No.: DS Effective Date: 07/05/2014 LITE-ON DCC RELEASE
IR Emitter and Detectr Prduct Data Sheet Spec N.: DS5-214-28 Effective Date: 7/5/214 Revisin: B LITE-ON DCC RELEASE BNS-OD-FC1/A4 LITE-ON Technlgy Crp. / Optelectrnics N.9,Chien 1 Rad, Chung H, New Taipei
More informationThe Mathematics of the Rubik s Cube
In this lessn, students will explre the pssible number ways the pieces f a Rubik's Cube can be arranged, and still fit the criteria fr a Rubik's Cube. Clrs are riented in a set way, s sme pieces (such
More informationAccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements
AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements
More informationCENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT
CENTRE FOR DISTANCE EDUCATION ANNA UNIVERSITY CHENNAI 600 025 GUIDELINES FOR PREPARATION OF MCA PROJECT REPORT (Prescribed Frmat and Specificatin) 1. GENERAL: The guideline is intended t prvide brad guidelines
More information