MEMORANDUM. March 31, President Michael K. Young President, Texas A&M University TO: CBE Recommendation: Softball Complex SUBJECT:

Size: px
Start display at page:

Download "MEMORANDUM. March 31, President Michael K. Young President, Texas A&M University TO: CBE Recommendation: Softball Complex SUBJECT:"

Transcription

1 COUNCIL FOR THE BUlL T ENVIRONMENT Co-Chairs: Dr. Karan L. Watson, Provost and Executive Vice President Dr. Jerry R. Strawser, Vice President for Finance and Administration March 31, 2016 MEMORANDUM TO: SUBJECT: President Michael K. Young President, Texas A&M University CBE Recommendation: Softball Complex The Council for the Built Environment (CBE) reviewed a request from the Athletic Department to build a Softball Complex. The facility is needed to continue the further development of softball student-athletes by giving them a state-of-the-art facility. This new and advanced softball facility will house areas for skill development, medical care, locker rooms, coach's offices, playing field, fan seating and amenities, press box, and service areas. The complex is desired to come on-line in the summer of2017. Funding for this project will be provided through donor funds. The request as well as the CBE sub-councils recommendations are attached. CBE sub-councils' recommendations are as follows: The Design Review sub-council (DRsc) members voted for approval ofthe Softball Stadium as presented at 100% Concept Design, with the following caveats: Request reconciliation of the exterior aesthetics so that its architectural language relates to Blue Bell Park and the new Track & Field Complex, rather than the West Campus Player Development Center. Request reconciliation of the pedestrian connection to the new Track & Field Complex, and the approved Athletics District Plan. As presented, the divergence from the Athletics District Plan has occurred in the following areas: east-west pedestrian axis, new tennis facilities. The design team should look beyond the scope of this individual project to study how pedestrians and bicycles will move through the spaces. In coordination with the Track & Field Complex, request further development of plazas and gathering spaces. Proposed signage should coordinate with existing signage found at athletic venues and should comply with the Campus Signage Policy and the Campus Master Plan Update. Pavers surrounding the Track & Field Complex and the Softball Stadium should tie in with the existing athletic facilities, in terms of pattern, materials, and color. Reconsideration of the metal panel material that relates back to the West Campus Player Development Center. Jack K. Wllllams'Admlnistratlon Building SUite TAMU College Station TX USA Tel Fax

2 March 31, CBE Recommendation: Softball Complex Page 2 Further details should be presented to the DRsc at 100% Schematic Design and 100% Design Development, in accordance with DRsc procedures. The Facilities Utilization and Planning sub-council (Fsc) recommends the request from the Athletic Department to build a softball complex and add the facility to the Capital Plan. The Technical Review sub-council (TRsc) supports the proposed Softball Complex and recommends approval, provided the following issues/concerns are addressed and funded. The project teams should ensure that the facility is designed in accordance with all applicable laws, regulations and codes, including the Life Safety Code and the Americans with Disabilities Act. The project teams need to ensure that the project does not increase the rate of storm runoff into local creeks. The project teams shall ensure that the facility is designed to minimize, as much as practical, the effort needed for future maintenance. It is preferred that items requiring maintenance be easy to service, be easily accessible from ground or floor level, have generous clearances and be easy to isolate from energy sources with minimal impact to the rest of the facility. Elevated items requiring maintenance that are difficult to service by ladder or lift should have permanent maintenance access platforms with permanent stairs or ladders, built-in fall prevention, and davits for hoisting parts and tools. The project teams should coordinate with SSC Grounds Management for landscaping issues to ensure the proposed plants and hardscape are viable and can be maintained. FCOR requests that floor plans be provided in native CADD format for all new construction. Transportation Services recommends that setbacks from Penberthy Blvd. be looked at in order to maintain a corridor for future widening of the road. T AMU UES personnel have reviewed the proposed location and have identified some possible utility conflicts as well as the need to design and develop a new utility corridor to deliver commodities to the site. TAMU UES will work with the project design team to select routing and confirm relocation/modification of any existing systems. The project and design team will need to follow the applicable T AMU UES Design Standards - https//utilities.tamu.edu/design-standards/. The project and design team will need to follow the TAMU policy on digging on campus prior to any excavation-

3 March 3 I, 2016 CBE Recommendation: Softball Complex Page 3 The CBE voted to recommend, with noted caveats, the President's approval of the request from the Athletic Department to build a Softball Complex. 1-- I - ;~., Date Provost and Executive Vice President Co-Chair, Council for the Built Environment ~ ~ -.;.,,}, Jery-i?~ Date Vice President for Finance & Administration Co-Chair, Council for the Built Environment Approved: President cc: Sub-Council Chairs, Council for the Built Environment Kevin Hurley, Associate Athletic Director for Facilities

4 ATHLETICS DEPARTMENT February 15,2016 MEMORANDUM TO: THROUGH: FROM: SUBJECT: Dr. Jerry Strawser, CBE Dr. Karan Watson, CBE Scott Woodward ~ Kevin Hurl@ Softball Complex The Athletic Department proposes to build a Softball Complex. The facility is needed to continue the further development of softball student-athletes by giving them a state-of-the-art facility. This new and advanced softball facility will house areas for skill development, medical care, locker rooms, coach's offices, playing field, fan seating and amenities, press box, and service areas. The center is projected to be approximately 74,000 square feet. The Athletic District Plan is being followed both in terms of location and aesthetics and the project will be overseen by Facilities Planning and Coordination. The complex is desired to come on-line in the summer of Funding for this project will be provided through donor funds. The Athletic Department is seeking approval to construct the facility and add the facility to the Capital Plan. Thank you for your consideration. KH/sll Attachment 1228 TAMU College Station, TX Tel _2575 Fax www. 12ti1Man.com

5 West Campus PLayer Development Center Home Bullpens Hitting Facility Home Dugout Visiting Dugout Softball Stadium Visiting Bullpens Entry Plaza Site Plan Texas A&M University New Softball Stadium College Station, Texas November 25, Gensler. All rights reserved.

6 01 - FIELD LEVEL - SCHEDULE Name Area Level 12/22/2015 1:51:12 PM \\gensler.ad\projects\revitusermodels\23385\ _central_tamu_softball_23385.rvt P N M L J.9 THERMAL & WATER ENTRY 241 SF LOBBY 841 SF J WET 499 SF 10 HITTING FACILITY 6744 SF 1055 SF TRAINER 124 SF STAIR #1 215 SF 9 H.1 LAUNDRY 322 SF EQUIPMENT 589 SF HITTING FACILITY VESTIBULE 77 SF 196 SF HYDROTHERAPY 385 SF TRAINING 790 SF TICKETING 285 SF PASS. ELEV. 76 SF ELEV. MACH. 63 SF DOCTOR EXAM 123 SF COUNTING 123 SF CORRIDOR 177 SF LOBBY 324 SF SMALL COACH 156 SF PLAYER LOUNGE 817 SF CORRIDOR 1980 SF COACH WET 166 SF WALK IN COOLER 112 SF F.9 G PLAYER VIDEO 791 SF MALE STAFF 329 SF FEMALE STAFF 331 SF HEAD COACH WET 81 SF 145 SF DUGOUT 155 SF DUGOUT TOILET DN 65 SF TRAINING 113 SF A/V 68 SF LARGE COACH 369 SF VESTIBULE 130 SF CORRIDOR 408 SF MUD / BAT SWING 400 SF COACH WET 273 SF JANITOR 68 SF TURF 112 SF HOME BULLPENS CLUB 3861 SF LOBBY 304 SF HOME DUGOUT 944 SF ELEV. MACH. 63 SF SERVICE ELEV. 76 SF STAIR #2 215 SF DN PREMIUM FOOD SERVICE 566 SF WOMEN'S CLUB REST 252 SF E.1E MEN'S CLUB REST 320 SF FH K CATERING KITCHEN 899 SF MAIN ELECTRICAL 331 SF DUGOUT 151 SF DUGOUT TOILET 86 SF JANITOR 151 SF D CORR. 399 SF CORRIDOR 310 SF MUD / BAT SWING 315 SF DN VEST. 56 SF VISITOR DUGOUT 944 SF VISITOR 400 SF 12TH MAN TV 317 SF DATA/ TELECOM 132 SF C MAINT. 98 SF VISITOR WET 327 SF MEP 462 SF MAINT. TOILET 81 SF UMP. WET 283 SF UMP. WET 122 SF B LARGE UMP. 253 SF FIELD MAINTENANCE 1787 SF SMALL UMP. 156 SF VESTIBULE 72 SF A VISITOR BULLPENS LEVEL 01 TURF Not Enclosed LEVEL 01 HOME Not Enclosed LEVEL 01 BULLPENS VISITOR Not Enclosed LEVEL 01 BULLPENS VEST SF LEVEL 01 ELEV. MACH SF LEVEL 01 ELEV. MACH SF LEVEL 01 DUGOUT SF LEVEL 01 TOILET A/V SF LEVEL 01 JANITOR SF LEVEL 01 VESTIBULE SF LEVEL 01 PASS. ELEV SF LEVEL 01 SERVICE ELEV SF LEVEL 01 VESTIBULE SF LEVEL 01 WET SF LEVEL 01 MAINT. TOILET SF LEVEL 01 DUGOUT SF LEVEL 01 TOILET MAINT SF LEVEL 01 WALK IN SF LEVEL 01 COOLER SF LEVEL 01 TRAINING SF LEVEL 01 UMP. WET SF LEVEL 01 COUNTING SF LEVEL 01 DOCTOR EXAM SF LEVEL 01 TRAINER SF LEVEL 01 VESTIBULE SF LEVEL 01 DATA/ SF LEVEL 01 TELECOM HEAD COACH SF LEVEL 01 DUGOUT SF LEVEL 01 JANITOR SF LEVEL 01 DUGOUT SF LEVEL 01 SMALL COACH SF LEVEL 01 SMALL UMP SF LEVEL 01 COACH WET SF LEVEL 01 CORRIDOR SF LEVEL 01 HITTING SF LEVEL 01 FACILITY STAIR # SF LEVEL 01 STAIR # SF LEVEL 01 THERMAL & SF LEVEL 01 WATER ENTRY WOMEN'S CLUB SF LEVEL 01 REST LARGE UMP SF LEVEL 01 COACH WET SF LEVEL 01 UMP. WET SF LEVEL 01 TICKETING SF LEVEL 01 LOBBY SF LEVEL 01 CORRIDOR SF LEVEL 01 MUD / SF LEVEL 01 BAT SWING 12TH MAN TV SF LEVEL 01 MEN'S CLUB SF LEVEL 01 REST SF LEVEL 01 LAUNDRY LOBBY SF LEVEL 01 VISITOR WET SF LEVEL 01 MALE STAFF SF LEVEL 01 MAIN SF LEVEL 01 ELECTRICAL FEMALE STAFF SF LEVEL 01 LARGE COACH SF LEVEL 01 HYDROTHERAP SF LEVEL 01 Y CORR SF LEVEL 01 MUD / SF LEVEL 01 BAT SWING VISITOR SF LEVEL 01 CORRIDOR SF LEVEL 01 MEP SF LEVEL SF LEVEL 01 WET PREMIUM FOOD SF LEVEL 01 SERVICE SF LEVEL 01 EQUIPMENT TRAINING SF LEVEL SF LEVEL 01 PLAYER VIDEO SF LEVEL 01 PLAYER LOUNGE LOBBY SF LEVEL 01 CATERING SF LEVEL 01 KITCHEN VISITOR SF LEVEL 01 DUGOUT HOME DUGOUT SF LEVEL 01 1, SF LEVEL 01 FIELD 1, SF LEVEL 01 MAINTENANCE CORRIDOR 1, SF LEVEL 01 CLUB 3, SF LEVEL 01 HITTING 6, SF LEVEL 01 FACILITY LEVEL 01 35, SF UNIVERSITY ATHLETICS DEPARTMENT 756 HOUSTON STREET COLLEGE STATION, TX FACILITIES DEPARTMENT 301 TARROW STREET COLLEGE STATION, TX Two Lincoln Centre 5420 LBJ Freeway Suite 1100 Dallas, TX United States MEP Engineering Aguirre Roden N. Central Expwy 6th Floor Dallas, TX Tel Fax xxx.xxx.xxxx Structural / Civil Engineering Jaster-Quintanilla 2105 Commerce Street Suite 300 Dallas, TX Tel Fax xxx.xxx.xxxx Date Seal / Signature Project Name Project Number Description Scale Description Tel Fax NOT FOR CONSTRUCTION SOFTBALL FACILITY FIELD LEVEL PLAN 1/16" = 1'-0" A Gensler

7 02 - CONCOURSE LEVEL - SCHEDULE Name Area Level 5 LEVEL 02 TLT SF LEVEL 02 ELEC SF LEVEL 02 ELEC SF LEVEL 02 SERVICE ELEV SF LEVEL 02 PASS. ELEV SF LEVEL 02 FAM. TLT SF LEVEL 02 FAM. TLT SF LEVEL 02 JAN SF LEVEL 02 JAN SF LEVEL 02 DATA SF LEVEL 02 DATA SF LEVEL 02 ELEC SF LEVEL 02 ELEC SF LEVEL 02 ASST. COACH SF LEVEL 02 ASST. COACH SF LEVEL 02 SOFTBALL OPS SF LEVEL 02 VOLUNTEER SF LEVEL 02 COACH GA SF LEVEL 02 FIRST AID SF LEVEL 02 EXIT STAIR # SF LEVEL 02 BREAK SF LEVEL 02 CONF SF LEVEL 02 HEAD COACH SF LEVEL 02 STAIR # SF LEVEL 02 STAIR # SF LEVEL 02 RETAIL SF LEVEL 02 GUEST SF LEVEL 02 SERVICES EXIT STAIR # SF LEVEL 02 RECEPTION SF LEVEL 02 CORRIDOR SF LEVEL 02 MEN SF LEVEL 02 MEN SF LEVEL 02 CONCESSION SF LEVEL 02 CONCESSION SF LEVEL 02 WOMEN SF LEVEL 02 WOMEN SF LEVEL 02 MEP SF LEVEL 02 CONCOURSE 11, SF LEVEL 02 BOWL 11, SF LEVEL 02 LEVEL 02 32, SF UNIVERSITY ATHLETICS DEPARTMENT 756 HOUSTON STREET COLLEGE STATION, TX FACILITIES DEPARTMENT 301 TARROW STREET COLLEGE STATION, TX Two Lincoln Centre 5420 LBJ Freeway Suite 1100 Dallas, TX United States MEP Engineering Aguirre Roden N. Central Expwy 6th Floor Dallas, TX Tel Fax xxx.xxx.xxxx Tel Fax BREAK 190 SF RECEPTION 379 SF VOLUNTEER GA COACH SOFTBALL 120 SF 120 SF OPS 120 SF ASST. COACH 120 SF CORRIDOR 389 SF ASST. COACH 120 SF HEAD COACH 211 SF Structural / Civil Engineering Jaster-Quintanilla 2105 Commerce Street Suite 300 Dallas, TX Tel Fax xxx.xxx.xxxx TLT. 47 SF MEP 805 SF CONF. 195 SF FIRST AID 138 SF P WOMEN 706 SF N M ELEC. 115 SF MEN 427 SF DATA 91 SF Date Description L GUEST SERVICES 280 SF CONCESSION 689 SF J.9 K 10 9 JAN. 81 SF FAM. TLT. 80 SF J STAIR #1 215 SF PASS. ELEV. 76 SF ELEC. 63 SF CONCOURSE SF BOWL SF 1 2 H.1 H F 3 Seal / Signature 12/22/2015 1:51:13 PM \\gensler.ad\projects\revitusermodels\23385\ _central_tamu_softball_23385.rvt F.9 G ELEC. 63 SF SERVICE ELEV. 76 SF STAIR #2 215 SF FAM. TLT. 80 SF JAN. 81 SF E.1 E CONCESSION 689 SF D RETAIL 280 SF ELEC. 115 SF DATA 91 SF C MEN 427 SF B WOMEN 701 SF A 4 Project Name Project Number Description Scale NOT FOR CONSTRUCTION SOFTBALL FACILITY CONCOURSE LEVEL PLAN 1/16" = 1'-0" A Gensler

8 03 - PRESS LEVEL SCHEDULE Name Area Level LEVEL 03 Room SF LEVEL 03 ELEC SF LEVEL 03 ELEC SF LEVEL 03 PASS. ELEV SF LEVEL 03 SERVICE ELEV SF LEVEL 03 Room SF LEVEL 03 MEDIA STOR SF LEVEL 03 SCOREBOARD/ SF LEVEL 03 VIDEO/ PA SF LEVEL SF LEVEL 03 TV SF LEVEL 03 STAIR # SF LEVEL 03 STAIR # SF LEVEL 03 RADIO SF LEVEL 03 RADIO SF LEVEL 03 WRITING PRESS SF LEVEL 03 SUITE SF LEVEL 03 SUITE SF LEVEL 03 CORRIDOR 1, SF LEVEL 03 LEVEL 03 5, SF UNIVERSITY ATHLETICS DEPARTMENT 756 HOUSTON STREET COLLEGE STATION, TX FACILITIES DEPARTMENT 301 TARROW STREET COLLEGE STATION, TX Two Lincoln Centre 5420 LBJ Freeway Suite 1100 Dallas, TX United States Tel Fax HITTING FACILITY ROOF SLOPE 1/4" / 1'-0" TO ROOF DRAINS 5 MEP Engineering Aguirre Roden N. Central Expwy 6th Floor Dallas, TX Tel Fax xxx.xxx.xxxx Structural / Civil Engineering Jaster-Quintanilla 2105 Commerce Street Suite 300 Dallas, TX Tel Fax xxx.xxx.xxxx P N M FAN AMMENITIES ROOF SLOPE 1/4" / 1'-0" TO ROOF DRAINS Date Description L FH K J SF SUITE 592 SF J STAIR #1 215 SF PASS. ELEV. 76 SF ELEC. 63 SF MEDIA STOR. 152 SF WRITING PRESS 417 SF SCOREBOARD/ VIDEO/ PA 167 SF TV 215 SF 1 2 H.1 CORRIDOR 1391 SF Room 95 SF RADIO 220 SF Room 50 SF RADIO 230 SF SUITE 592 SF 3 Seal / Signature 12/22/2015 1:51:16 PM \\gensler.ad\projects\revitusermodels\23385\ _central_tamu_softball_23385.rvt F.9 G ELEC 63 SF SERVICE ELEV. 76 SF STAIR #2 215 SF 210 SF E.1E D C FAN AMMENITIES ROOF SLOPE 1/4" / 1'-0" TO ROOF DRAINS B A 4 Project Name Project Number Description Scale NOT FOR CONSTRUCTION SOFTBALL FACILITY PRESS LEVEL PLAN 1/16" = 1'-0" A Gensler

9 UNIVERSITY ATHLETICS DEPARTMENT 756 HOUSTON STREET COLLEGE STATION, TX FACILITIES DEPARTMENT 301 TARROW STREET COLLEGE STATION, TX Two Lincoln Centre 5420 LBJ Freeway Suite 1100 Dallas, TX United States Tel Fax MEP Engineering Aguirre Roden N. Central Expwy 6th Floor Dallas, TX Tel Fax xxx.xxx.xxxx Structural / Civil Engineering Jaster-Quintanilla 2105 Commerce Street Suite 300 Dallas, TX Tel Fax xxx.xxx.xxxx P N SLOPE M ROOF CANOPY Date Description L FH K J J PRESS BOX ROOF SLOPE 1/4" / 1'-0" TO ROOF DRAINS H.1 ROOF CANOPY SLOPE Seal / Signature 12/22/2015 1:51:18 PM \\gensler.ad\projects\revitusermodels\23385\ _central_tamu_softball_23385.rvt F.9 G E.1E D C B A 4 Project Name Project Number Description Scale NOT FOR CONSTRUCTION SOFTBALL FACILITY ROOF PLAN 1/16" = 1'-0" A Gensler

10 Home Plate Entry Aerial Texas A&M University Softball Stadium Study College Station, TX November 25, Gensler. All rights reserved.

11 Outfield Aerial Texas A&M University Softball Stadium Study College Station, TX November 25, Gensler. All rights reserved.

12 Outfield Aerial Texas A&M University Softball Stadium Study College Station, TX November 25, Gensler. All rights reserved.

13 Home Plate Entry Texas A&M University Softball Stadium Study College Station, TX November 25, Gensler. All rights reserved.

14 View from Right Field Corner Texas A&M University Softball Stadium Study College Station, TX November 25, Gensler. All rights reserved.

15 View from First Baseline Seats Texas A&M University Softball Stadium Study College Station, TX November 25, Gensler. All rights reserved.

16 View from Left Field Texas A&M University Softball Stadium Study College Station, TX November 25, Gensler. All rights reserved.

17 COUNCIL FOR THE BUILT ENVIRONMENT DESIGN REVIEW SUB-COUNCIL MEMORANDUM TO: Dr. Jerry Strawser Co Chair, Council for the Built Environment Dr. Karan Watson Co Chair, Council for the Built Environment FROM: Ms. Lilia Gonzales, AIA University Architect and Chair, Design Review Sub Council DATE: March 23, 2016 RE: Design Review Sub Council (DRsc) Report Softball Stadium 100% Concept Design On February 24, 2016 the Design Review sub council (DRsc) reviewed a request from Athletics for project approval and conceptual design of a new Softball Stadium. The new softball stadium will be located on the corner of Penberthy Blvd and Tom Chandler Drive at the northwest corner of the existing intramural fields. As a reminder, in February 2015, the President approved the relocation of the intramural fields to a location south of George Bush Drive at the Jones Butler Road intersection. The new softball stadium will be located west of the existing West Campus Player Development Center. An adjoining hitting facility is located just north of the stadium. The softball stadium is located north of the proposed Track & Field Complex, and the two areas will be joined by a consistent paving pattern. Gensler will work with the firm designing the Track & Field Complex, PBK Architects, to coordinate the paved area in compliance with TAMU standards. The new softball stadium is approximately 74,000 square feet of interior and exterior space. The layout of the stadium is very similar to Blue Bell Park. The first level will contain the main entry and lobby, club area, locker rooms, apparel storage, and training and therapy areas. The second level (concourse) has approximately 2,000 seats, restrooms, concession stands, first aid, and coaches offices. The third level contains an elevated press box and two premium suites. The architectural language for the Softball Stadium will be similar to the West Campus Player Development Center. Exterior masonry materials will be consistent with those found at other recently constructed athletic facilities, particularly Blue Bell Park and Kyle Field. Recommendation DRsc members voted for approval of the Softball Stadium as presented at 100% Concept Design, with the following caveats: Request reconciliation of the exterior aesthetics so that its architectural language relates to Blue Bell Park and the new Track & Field Complex, rather than the West Campus Player Development Center. 1

18 COUNCIL FOR THE BUILT ENVIRONMENT DESIGN REVIEW SUB-COUNCIL Request reconciliation of the pedestrian connection to the new Track & Field Complex, and the approved Athletics District Plan. As presented today, the divergence from the Athletics District Plan has occurred in the following areas: east west pedestrian axis, new tennis facilities. The design team should look beyond the scope of this individual project to study how pedestrians and bicycles will move through the spaces. In coordination with the Track & Field Complex, request further development of plazas and gathering spaces. Proposed signage should coordinate with existing signage found at athletic venues and should comply with the Campus Signage Policy and the Campus Master Plan Update. Pavers surrounding the Track & Field Complex and the Softball Stadium should tie in with the existing athletic facilities, in terms of pattern, materials, and color. Reconsideration of the metal panel material that relates back to the West Campus Player Development Center. Further details should be presented to the DRsc at 100% Schematic Design and 100% Design Development, in accordance with DRsc procedures. Selected images are attached. Please contact me with any questions. cc: Kevin Hurley DRsc Members Bettyann Zito 2

19 01 - FIELD LEVEL - SCHEDULE Name Area Level 12/22/2015 1:51:12 PM \\gensler.ad\projects\revitusermodels\23385\ _central_tamu_softball_23385.rvt P N M L J.9 THERMAL & WATER ENTRY 241 SF LOBBY 841 SF J WET 499 SF 10 HITTING FACILITY 6744 SF 1055 SF TRAINER 124 SF STAIR #1 215 SF 9 H.1 LAUNDRY 322 SF EQUIPMENT 589 SF HITTING FACILITY VESTIBULE 77 SF 196 SF HYDROTHERAPY 385 SF TRAINING 790 SF TICKETING 285 SF PASS. ELEV. 76 SF ELEV. MACH. 63 SF DOCTOR EXAM 123 SF COUNTING 123 SF CORRIDOR 177 SF LOBBY 324 SF SMALL COACH 156 SF PLAYER LOUNGE 817 SF CORRIDOR 1980 SF COACH WET 166 SF WALK IN COOLER 112 SF F.9 G PLAYER VIDEO 791 SF MALE STAFF 329 SF FEMALE STAFF 331 SF HEAD COACH WET 81 SF 145 SF DUGOUT 155 SF DUGOUT TOILET DN 65 SF TRAINING 113 SF A/V 68 SF LARGE COACH 369 SF VESTIBULE 130 SF CORRIDOR 408 SF MUD / BAT SWING 400 SF COACH WET 273 SF JANITOR 68 SF TURF 112 SF HOME BULLPENS CLUB 3861 SF LOBBY 304 SF HOME DUGOUT 944 SF ELEV. MACH. 63 SF SERVICE ELEV. 76 SF STAIR #2 215 SF DN PREMIUM FOOD SERVICE 566 SF WOMEN'S CLUB REST 252 SF E.1E MEN'S CLUB REST 320 SF FH K CATERING KITCHEN 899 SF MAIN ELECTRICAL 331 SF DUGOUT 151 SF DUGOUT TOILET 86 SF JANITOR 151 SF D CORR. 399 SF CORRIDOR 310 SF MUD / BAT SWING 315 SF DN VEST. 56 SF VISITOR DUGOUT 944 SF VISITOR 400 SF 12TH MAN TV 317 SF DATA/ TELECOM 132 SF C MAINT. 98 SF VISITOR WET 327 SF MEP 462 SF MAINT. TOILET 81 SF UMP. WET 283 SF UMP. WET 122 SF B LARGE UMP. 253 SF FIELD MAINTENANCE 1787 SF SMALL UMP. 156 SF VESTIBULE 72 SF A VISITOR BULLPENS LEVEL 01 TURF Not Enclosed LEVEL 01 HOME Not Enclosed LEVEL 01 BULLPENS VISITOR Not Enclosed LEVEL 01 BULLPENS VEST SF LEVEL 01 ELEV. MACH SF LEVEL 01 ELEV. MACH SF LEVEL 01 DUGOUT SF LEVEL 01 TOILET A/V SF LEVEL 01 JANITOR SF LEVEL 01 VESTIBULE SF LEVEL 01 PASS. ELEV SF LEVEL 01 SERVICE ELEV SF LEVEL 01 VESTIBULE SF LEVEL 01 WET SF LEVEL 01 MAINT. TOILET SF LEVEL 01 DUGOUT SF LEVEL 01 TOILET MAINT SF LEVEL 01 WALK IN SF LEVEL 01 COOLER SF LEVEL 01 TRAINING SF LEVEL 01 UMP. WET SF LEVEL 01 COUNTING SF LEVEL 01 DOCTOR EXAM SF LEVEL 01 TRAINER SF LEVEL 01 VESTIBULE SF LEVEL 01 DATA/ SF LEVEL 01 TELECOM HEAD COACH SF LEVEL 01 DUGOUT SF LEVEL 01 JANITOR SF LEVEL 01 DUGOUT SF LEVEL 01 SMALL COACH SF LEVEL 01 SMALL UMP SF LEVEL 01 COACH WET SF LEVEL 01 CORRIDOR SF LEVEL 01 HITTING SF LEVEL 01 FACILITY STAIR # SF LEVEL 01 STAIR # SF LEVEL 01 THERMAL & SF LEVEL 01 WATER ENTRY WOMEN'S CLUB SF LEVEL 01 REST LARGE UMP SF LEVEL 01 COACH WET SF LEVEL 01 UMP. WET SF LEVEL 01 TICKETING SF LEVEL 01 LOBBY SF LEVEL 01 CORRIDOR SF LEVEL 01 MUD / SF LEVEL 01 BAT SWING 12TH MAN TV SF LEVEL 01 MEN'S CLUB SF LEVEL 01 REST SF LEVEL 01 LAUNDRY LOBBY SF LEVEL 01 VISITOR WET SF LEVEL 01 MALE STAFF SF LEVEL 01 MAIN SF LEVEL 01 ELECTRICAL FEMALE STAFF SF LEVEL 01 LARGE COACH SF LEVEL 01 HYDROTHERAP SF LEVEL 01 Y CORR SF LEVEL 01 MUD / SF LEVEL 01 BAT SWING VISITOR SF LEVEL 01 CORRIDOR SF LEVEL 01 MEP SF LEVEL SF LEVEL 01 WET PREMIUM FOOD SF LEVEL 01 SERVICE SF LEVEL 01 EQUIPMENT TRAINING SF LEVEL SF LEVEL 01 PLAYER VIDEO SF LEVEL 01 PLAYER LOUNGE LOBBY SF LEVEL 01 CATERING SF LEVEL 01 KITCHEN VISITOR SF LEVEL 01 DUGOUT HOME DUGOUT SF LEVEL 01 1, SF LEVEL 01 FIELD 1, SF LEVEL 01 MAINTENANCE CORRIDOR 1, SF LEVEL 01 CLUB 3, SF LEVEL 01 HITTING 6, SF LEVEL 01 FACILITY LEVEL 01 35, SF UNIVERSITY ATHLETICS DEPARTMENT 756 HOUSTON STREET COLLEGE STATION, TX FACILITIES DEPARTMENT 301 TARROW STREET COLLEGE STATION, TX Two Lincoln Centre 5420 LBJ Freeway Suite 1100 Dallas, TX United States MEP Engineering Aguirre Roden N. Central Expwy 6th Floor Dallas, TX Tel Fax xxx.xxx.xxxx Structural / Civil Engineering Jaster-Quintanilla 2105 Commerce Street Suite 300 Dallas, TX Tel Fax xxx.xxx.xxxx Date Seal / Signature Project Name Project Number Description Scale Description Tel Fax NOT FOR CONSTRUCTION SOFTBALL FACILITY FIELD LEVEL PLAN 1/16" = 1'-0" A Gensler

20 02 - CONCOURSE LEVEL - SCHEDULE Name Area Level 5 LEVEL 02 TLT SF LEVEL 02 ELEC SF LEVEL 02 ELEC SF LEVEL 02 SERVICE ELEV SF LEVEL 02 PASS. ELEV SF LEVEL 02 FAM. TLT SF LEVEL 02 FAM. TLT SF LEVEL 02 JAN SF LEVEL 02 JAN SF LEVEL 02 DATA SF LEVEL 02 DATA SF LEVEL 02 ELEC SF LEVEL 02 ELEC SF LEVEL 02 ASST. COACH SF LEVEL 02 ASST. COACH SF LEVEL 02 SOFTBALL OPS SF LEVEL 02 VOLUNTEER SF LEVEL 02 COACH GA SF LEVEL 02 FIRST AID SF LEVEL 02 EXIT STAIR # SF LEVEL 02 BREAK SF LEVEL 02 CONF SF LEVEL 02 HEAD COACH SF LEVEL 02 STAIR # SF LEVEL 02 STAIR # SF LEVEL 02 RETAIL SF LEVEL 02 GUEST SF LEVEL 02 SERVICES EXIT STAIR # SF LEVEL 02 RECEPTION SF LEVEL 02 CORRIDOR SF LEVEL 02 MEN SF LEVEL 02 MEN SF LEVEL 02 CONCESSION SF LEVEL 02 CONCESSION SF LEVEL 02 WOMEN SF LEVEL 02 WOMEN SF LEVEL 02 MEP SF LEVEL 02 CONCOURSE 11, SF LEVEL 02 BOWL 11, SF LEVEL 02 LEVEL 02 32, SF UNIVERSITY ATHLETICS DEPARTMENT 756 HOUSTON STREET COLLEGE STATION, TX FACILITIES DEPARTMENT 301 TARROW STREET COLLEGE STATION, TX Two Lincoln Centre 5420 LBJ Freeway Suite 1100 Dallas, TX United States MEP Engineering Aguirre Roden N. Central Expwy 6th Floor Dallas, TX Tel Fax xxx.xxx.xxxx Tel Fax BREAK 190 SF RECEPTION 379 SF VOLUNTEER GA COACH SOFTBALL 120 SF 120 SF OPS 120 SF ASST. COACH 120 SF CORRIDOR 389 SF ASST. COACH 120 SF HEAD COACH 211 SF Structural / Civil Engineering Jaster-Quintanilla 2105 Commerce Street Suite 300 Dallas, TX Tel Fax xxx.xxx.xxxx TLT. 47 SF MEP 805 SF CONF. 195 SF FIRST AID 138 SF P WOMEN 706 SF N M ELEC. 115 SF MEN 427 SF DATA 91 SF Date Description L GUEST SERVICES 280 SF CONCESSION 689 SF J.9 K 10 9 JAN. 81 SF FAM. TLT. 80 SF J STAIR #1 215 SF PASS. ELEV. 76 SF ELEC. 63 SF CONCOURSE SF BOWL SF 1 2 H.1 H F 3 Seal / Signature 12/22/2015 1:51:13 PM \\gensler.ad\projects\revitusermodels\23385\ _central_tamu_softball_23385.rvt F.9 G ELEC. 63 SF SERVICE ELEV. 76 SF STAIR #2 215 SF FAM. TLT. 80 SF JAN. 81 SF E.1 E CONCESSION 689 SF D RETAIL 280 SF ELEC. 115 SF DATA 91 SF C MEN 427 SF B WOMEN 701 SF A 4 Project Name Project Number Description Scale NOT FOR CONSTRUCTION SOFTBALL FACILITY CONCOURSE LEVEL PLAN 1/16" = 1'-0" A Gensler

21 03 - PRESS LEVEL SCHEDULE Name Area Level LEVEL 03 Room SF LEVEL 03 ELEC SF LEVEL 03 ELEC SF LEVEL 03 PASS. ELEV SF LEVEL 03 SERVICE ELEV SF LEVEL 03 Room SF LEVEL 03 MEDIA STOR SF LEVEL 03 SCOREBOARD/ SF LEVEL 03 VIDEO/ PA SF LEVEL SF LEVEL 03 TV SF LEVEL 03 STAIR # SF LEVEL 03 STAIR # SF LEVEL 03 RADIO SF LEVEL 03 RADIO SF LEVEL 03 WRITING PRESS SF LEVEL 03 SUITE SF LEVEL 03 SUITE SF LEVEL 03 CORRIDOR 1, SF LEVEL 03 LEVEL 03 5, SF UNIVERSITY ATHLETICS DEPARTMENT 756 HOUSTON STREET COLLEGE STATION, TX FACILITIES DEPARTMENT 301 TARROW STREET COLLEGE STATION, TX Two Lincoln Centre 5420 LBJ Freeway Suite 1100 Dallas, TX United States Tel Fax HITTING FACILITY ROOF SLOPE 1/4" / 1'-0" TO ROOF DRAINS 5 MEP Engineering Aguirre Roden N. Central Expwy 6th Floor Dallas, TX Tel Fax xxx.xxx.xxxx Structural / Civil Engineering Jaster-Quintanilla 2105 Commerce Street Suite 300 Dallas, TX Tel Fax xxx.xxx.xxxx P N M FAN AMMENITIES ROOF SLOPE 1/4" / 1'-0" TO ROOF DRAINS Date Description L FH K J SF SUITE 592 SF J STAIR #1 215 SF PASS. ELEV. 76 SF ELEC. 63 SF MEDIA STOR. 152 SF WRITING PRESS 417 SF SCOREBOARD/ VIDEO/ PA 167 SF TV 215 SF 1 2 H.1 CORRIDOR 1391 SF Room 95 SF RADIO 220 SF Room 50 SF RADIO 230 SF SUITE 592 SF 3 Seal / Signature 12/22/2015 1:51:16 PM \\gensler.ad\projects\revitusermodels\23385\ _central_tamu_softball_23385.rvt F.9 G ELEC 63 SF SERVICE ELEV. 76 SF STAIR #2 215 SF 210 SF E.1E D C FAN AMMENITIES ROOF SLOPE 1/4" / 1'-0" TO ROOF DRAINS B A 4 Project Name Project Number Description Scale NOT FOR CONSTRUCTION SOFTBALL FACILITY PRESS LEVEL PLAN 1/16" = 1'-0" A Gensler

22 West Campus PLayer Development Center Home Bullpens Hitting Facility Home Dugout Visiting Dugout Softball Stadium Visiting Bullpens Entry Plaza Site Plan Texas A&M University New Softball Stadium College Station, Texas November 25, Gensler. All rights reserved.

23 Home Plate Entry Aerial Texas A&M University Softball Stadium Study College Station, TX November 25, Gensler. All rights reserved.

24 Outfield Aerial Texas A&M University Softball Stadium Study College Station, TX November 25, Gensler. All rights reserved.

25 Outfield Aerial Texas A&M University Softball Stadium Study College Station, TX November 25, Gensler. All rights reserved.

26 Home Plate Entry Texas A&M University Softball Stadium Study College Station, TX November 25, Gensler. All rights reserved.

27 View from Right Field Corner Texas A&M University Softball Stadium Study College Station, TX November 25, Gensler. All rights reserved.

28 View from Left Field Texas A&M University Softball Stadium Study College Station, TX November 25, Gensler. All rights reserved.

29 Council for the Built Environment Facilities Utilization and Planning Sub-Council March 3, 2016 MEMORANDUM To: Dr. Karan Watson Provost & Executive Vice President Co-Chair, Council for the Built Environment Dr. Jerry Strawser Vice President for Finance & Administration and Chief Financial Officer Co-Chair, Council for the Built Environment From: Subject: Dr. J. Martin Scholtz Executive Associate Vice President for Research Chair, CBE-Facilities Utilization and Planning Sub-Council Softball Complex RECOMMENDATION The Council for the Built Environment s (CBE) Facilities Utilization and Planning subcouncil (Fsc) recommends that the CBE support the request by the athletic department to build a softball complex and add the facility to the Capital Plan. SCOPE The Fsc considered the request to recommend approving the building of a new stateof-the-art softball complex. The request describes the facilities to be housed in the complex as well as the location. The Athletic District Plan is being followed and funding is being provided by donors. We are pleased to offer this recommendation and welcome further inquiries related to this analysis. CC: CBE-Fsc members

30 - DIVISION OF STUDENT AFFAIRS AM!~~~ ~ ~~M Office of the Vice President for Student Affairs MEMORANDUM TO: Dr. Karan Watson Co-chair, Council on the Built Environment Dr. Jerry Strawser Co-chair, Council on the Built Environment FROM: Chair, CBE Technical Review Sub-council DATE: March 14, 2016 SUBJECT: CBE TRsc Recommendation: Softball Complex On March 7, 2016, Kevin Hurley, Associate Athletic Director presented to the CBE's Technical Review Sub-council on the proposed Softball Complex. The new 74,000 square foot softball facility will house areas for skill development, medical care, locker rooms, coach's offices, playing field, fan seating and amenities, press box and service areas. Recommendation The Technical Review Sub-council supports the proposed Softball Complex and recommends approval, provided the following issues/concerns are addressed and funded. Capital Financial Planning: Funding has been reviewed and confirmed. Facilities Services: SSC supports the TAMU Athletic Department's plans to build the Softball Complex. The project teams should ensure that the facility is designed in accordance with all applicable laws, regulations and codes, including the Life Safety Code and the Americans with Disabilities Act. The project teams need to ensure that the project does not increase the rate of storm runoff into local creeks. The project teams shall ensure that the facility is designed to minimize, as much as practical, the effort needed for future maintenance. It is preferred that items requiring maintenance be easy to service, be 117 Koldus Student Services Building 1256TAMU College Station, TX Tel Fax

31 easily accessible from ground or floor level, have generous clearances and be easy to isolate from energy sources with.minimal impact to the rest of the facility. Elevated items requiring maintenance that are difficult to service by ladder or lift should have permanent maintena~ce access platforms with permanent stairs or ladders, built-in fall prevention, and davits for hoisting parts and tools. The project teams should coordinate with sse Grounds Management for landscaping issues to ensure the proposed plants and hardscape are viable and can be maintained. FCOR/GIS: FCOR supports the project and requests that floor plans be provided in native CADD format for all new construction. Transportation Services: Transportation Services recommends that setbacks from Penberthy Blvd. be looked at in order to maintain a corridor for future widening of the road. Utilities: TAMU UES personnel have reviewed the proposed location and have identified some possible utility conflicts as well as the need to design and develop a new utility corridor to deliver commodities to the site. TAMU UES is looking forward to working with the project design team to select routing and confirm relocation I modification of any existing systems. The project and design team will need to follow the applicable TAMU UES Design Standardshttps :1/util ities. tam u. ed u/ design-standards/. The project and design team will need to follow the TAMU policy on digging on campus- prior to any excavation - httes://utilities_.tam u.edu/digging-g!m pusl TAMU UES looks forward to working closely with the project and design team to ensure that all campus requirements are met and that the project is successful. EHS and SASE. CIS. Procurement. Utility & Energy Services. Student Affairs. Telecommunications, University Police: No concerns. Xc: CBE Technical Review Sub-council CBE Support Staff

CBE Recommendation: Outdoor Track & Field Complex

CBE Recommendation: Outdoor Track & Field Complex COUNCIL FOR THE BUlL T ENVIRONMENT Co-Chairs: Dr. Karan L. Watson, Provost and Executive Vice President Dr. Jerry R. Strawser, Vice President for Finance and Administration March 31, 2016 MEMORANDUM TO:

More information

BASEBALL PLAYER FACILITIES CLEMSON, SOUTH CAROLINA

BASEBALL PLAYER FACILITIES CLEMSON, SOUTH CAROLINA THROUGH THE YEARS THROUGH THE YEARS VIEW FROM RIGHT FIELD VIEW FROM DUGOUT VIEW FROM NEW GRANDSTAND EXISTING CONDITIONS EXTERIOR PHOTOS PLAYER S LOUNGE LOCKER ROOM TRAINING AREA COACH S OFFICE CORRIDOR

More information

ouglas Intermediate School

ouglas Intermediate School ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion

More information

11/29/12. Des Moines Social Club Urban Design Review Project Narrative

11/29/12. Des Moines Social Club Urban Design Review Project Narrative 11/9/1 Des Moines Social Club Urban Design Review Project Narrative Strategically located at 9th and Walnut, the Des Moines Social Club (DMSC) will become a critical link between the Court Avenue Entertainment

More information

Richardson olmsted complex core project Community Presentation. buffalo, new york

Richardson olmsted complex core project Community Presentation. buffalo, new york Richardson olmsted complex core project Community Presentation buffalo, new york 20 AUGUST 2013 DESIGN TEAM ARCHITECT Consulting design ARCHITECT consulting historic Preservation ARCHITECT Landscape ARCHITECT

More information

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:

More information

Proposed Hotel, Restaurant. and Banquet Facility

Proposed Hotel, Restaurant. and Banquet Facility Proposed Hotel, Restaurant PROJECT # : 60-0 and Banquet Facility ARCHITECTURAL 7 Logy Bay Road P.O. Box 09 St. John's, NL, Canada AA 5B T: (709) 79-80 F: (709) 7-80 E: info@fougeremenchenton.ca Issued

More information

GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS

GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are made to the University's Board of Trustees in February,

More information

Southern Oregon University

Southern Oregon University Southern Oregon University Public Meeting Notice August 5, 05 TO: FROM: RE: Southern Oregon University Board of Trustees, Finance Committee Sabrina Prud homme, University Board Secretary Notice of special

More information

PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017

PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017 PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017 ARCHITECTURE \\ ENGINEERING \\ PLANNING \\ INTERIORS \\ TECHNOLOGY

More information

St. John Paul II Catholic Parish

St. John Paul II Catholic Parish St. John Paul II Catholic Parish 167th & Ridgeview Road Olathe, Kansas Master Plan Town Hall October 30, 2018 Purpose [ The Church s ] mission consists essentially in offering people an opportunity not

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

Continuing Education Credit

Continuing Education Credit BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP

More information

BAYCARE BLOOMINGDALE HEALTH CENTER Bloomingdale Ave. Valrico, FL RETAIL SPACE FOR LEASE

BAYCARE BLOOMINGDALE HEALTH CENTER Bloomingdale Ave. Valrico, FL RETAIL SPACE FOR LEASE PROPERTY HIGHLIGHTS Retail Space Available: 876 SF -,000 SF Located on Bloomingdale Ave. just east of the signalized intersection of Bloomingdale Ave. and Lithia Pinecrest Rd. Brand new state-of-the-art

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

A201 SCALE: 1" = 10'-0"

A201 SCALE: 1 = 10'-0 A B C D E F G G.5 H I J 0' - 0" 8' - 6" 7' - 0" 5 6 7 8 9 0 4 4 77' - 0" 6' - 0" UNEXCAVATED 7' - 6" 4 0 BELOW GRADE PARKING VP 9 (4 STALLS) 8 6 NON- COMPLIANT BIKE PARKING STALLS 7 ARCHITECTURE ENGINEERING

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin. MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

Prototype Design Guide

Prototype Design Guide 2015 Choice Hotels International, Inc. All rights reserved. 06/2015/1,000. CAM-PROTO-15 CAMBRIADEVELOPMENT.COM Prototype Design Guide A fresh strategy. An untapped market. A smart new prototype. Insightful

More information

Cohasset Town Hall - Programming Study REVIEW SET 7/07/2017 NOT FOR CONSTRUCTION. 41 Highland Ave. Cohasset, MA LOCUS MAP

Cohasset Town Hall - Programming Study REVIEW SET 7/07/2017 NOT FOR CONSTRUCTION. 41 Highland Ave. Cohasset, MA LOCUS MAP - REVIEW SET 7/07/07 Highland Ave. Sheet Number DRAWING LIST Sheet Name A0.0 Cover A0. Site Plan - Existing A.0 Existing Basement Plan A. Existing First Floor Plan A. Existing Second Floor Plan A.0 Site

More information

CS2.0 COVER SHEET VOL. 2

CS2.0 COVER SHEET VOL. 2 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:

More information

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015 275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.

More information

AVAILABLE FOR LEASE OFFICE AND LABORATORY SPACE Approximately 322,384 RSF

AVAILABLE FOR LEASE OFFICE AND LABORATORY SPACE Approximately 322,384 RSF AVAILABLE FOR LEASE AND SPACE Approximately 322,384 RSF 2400 Ellis Road Research Triangle Park, North Carolina www.goellisresearchcenter.com PROPERTY DESCRIPTION Administrative Wing Cafeteria Lobby/Atrium

More information

Oak Park and River Forest High School District North Scoville Avenue Oak Park, IL

Oak Park and River Forest High School District North Scoville Avenue Oak Park, IL Oak Park and River Forest High School District 200 201 North Scoville Avenue Oak Park, IL 60302-2296 To: Board of Education From: Tod Altenburg, CSBO Phil Prale, ASCI Date: August 16, 2016 Re: Requested

More information

American Institute of Architects New Hampshire Chapter High School Design Competition Program

American Institute of Architects New Hampshire Chapter High School Design Competition Program American Institute of Architects New Hampshire Chapter 2009 2010 High School Design Competition Program Educational Objectives To increase your awareness of the relationships between space, human scale

More information

ELLIS. Ellis Research Center PROPERTY HIGHLIGHTS BRIAN CARR, CCIM LEE CLYBURN. Research Triangle Park North Carolina.

ELLIS. Ellis Research Center PROPERTY HIGHLIGHTS BRIAN CARR, CCIM LEE CLYBURN. Research Triangle Park North Carolina. ELLIS Research Triangle Park North Carolina Ellis Research Center Office and Lab PROPERTY HIGHLIGHTS 2400 Ellis Rd RTP, NC 27709 Size 331,898 RSF Floors 4 Parking Power 519 Shared parking spaces 480/277

More information

SPRINKLER SF. Stair 190 SF WOMEN SF LOBBY SF MECH/ELEC CONCESSIONS SF 225 SF STORAGE SF

SPRINKLER SF. Stair 190 SF WOMEN SF LOBBY SF MECH/ELEC CONCESSIONS SF 225 SF STORAGE SF 1JACKSON MSC TEMPSTAR W/DT-3-LR TABLE PACKAGE WAREWASHER, DOOR TYPE W/ DISHTABLES ARCHITECTURE & INTERIOR DESIGN Montgomery Dothan WWW.SSLARCH.COM (M) 334. 263. 5162 (D) 334. 791. 5248 No. Revision Date

More information

City of Thousand Oaks

City of Thousand Oaks TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity

More information

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and

More information

754 Sir Francis Drake Boulevard

754 Sir Francis Drake Boulevard APN: 006-09 - 39 Town of San Anselmo Submittal Number : April 06 Revised June 0, 06 PROJECT TEAM INDEX TO DRAWINGS APPLICANT MONFREDINI PROPERTIES LLC South San Francisco, California 94080 (650) 873-0440

More information

Town of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019

Town of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019 Town of Belmont, NH Town Space Needs and Feasibility Study January 10, 2019 Police Department EXISTING POLICE DEPARTMENT FULLER STREET MEETING HOUSE SARGENT STREET TOWN OF BELMONT POLICE DEPARTMENT EXISTING

More information

ROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL

ROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL ROBERT TURER COLLEGE AD CAREER HIGH SCHOOL SCHEMATIC DESIG PRESETATIO 23 MAY 2017 Project Milestones Schematic Design..... March May 2017 SD Presentation to Board of Trustees...... 23 May, 2017 Design

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

WALDEN ATHLETIC COMPLEX ATLANTA, GA

WALDEN ATHLETIC COMPLEX ATLANTA, GA EDGEWOOD WALKER ALY NEIGORHOOD CONTEXT Neighborhood Profile: Sweet Auburn Investment Area Typology: Trending Total Single Family Parcels Total Multi-Family Parcels Total Commercial/Industrial/Public Parcels

More information

DRAFT FOR INTERNAL DISCUSSION ONLY

DRAFT FOR INTERNAL DISCUSSION ONLY Jameson St. 2 Riser Room Cistern Base Men's Locker Room Women's Locker Room Mud Room Stair Elev. Entry Lobby Shipping and Receiving Stair EO/IO Breakdown A40 Shop / Warehouse Alley Gilman Pl. Storage Room

More information

INTERIOR SIGNAGE MANUAL

INTERIOR SIGNAGE MANUAL INTERIOR SIGNAGE MANUAL ➊ Purpose ➋ Procedures ➌ ADA Requirements INTERIOR SIGNAGE MANUAL ➍ Text, Braille, Pictograms and Color ➎ Families of Interior Signage ➏ Mounting Guidelines ➐ Signage Diagrams ➑

More information

RESTAURANT AND RETAIL SPACE AVAILABLE FOR LEASE

RESTAURANT AND RETAIL SPACE AVAILABLE FOR LEASE RESTAURANT AND RETAIL SPACE AVAILABLE FOR LEASE 1 DOWNTOWN EAST RETAIL A CHANGING LANDSCAPE WITHIN THE DOWNTOWN CORE The Downtown East development presents an exceptional opportunity for restaurants and

More information

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206) CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA 98040 (206) 275-7605 SUBMITTAL REQUIREMENTS FOR DESIGN COMMISSION APPROVAL & SIGNAGE APPROVAL PURPOSE: Design Commission

More information

The NEW Inner Harbor... Underway!!! Architects: QPK Design & Dalpos Architects Rendering: Spine 3D

The NEW Inner Harbor... Underway!!! Architects: QPK Design & Dalpos Architects Rendering: Spine 3D The NEW Inner Harbor... Underway!!! Architects: QPK Design & Dalpos Architects Rendering: Spine 3D TRUE PROJECT KEY 1. MIXED-USE RETAIL / RESIDENTIAL 2. MIXED-USE RETAIL / RESIDENTIAL 3. LUXURY APARTMENTS

More information

WOODWARD BUILDING. Join a Corporate Community that Inspires

WOODWARD BUILDING. Join a Corporate Community that Inspires WOODWARD BUILDING Join a Corporate Community that Inspires EXPERIENCE The Ballantyne Advantage Abundant active green spaces Best access to extensive nearby talent pool for recruiting, retention and productivity

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593 April 7, 2016 City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 393 RE: Conditional Use Arby s Restaurant Multi-Tenant Development 631 Hometown Circle-Lot 6

More information

CONCEPT SITE PLAN HOLLAND MIDDLE SCHOOL ADDITIONS & RENOVATIONS COUNCIL ROCK SCHOOL DISTRICT 400 EAST HOLLAND ROAD HOLLAND, PA 18966

CONCEPT SITE PLAN HOLLAND MIDDLE SCHOOL ADDITIONS & RENOVATIONS COUNCIL ROCK SCHOOL DISTRICT 400 EAST HOLLAND ROAD HOLLAND, PA 18966 COCEPT SITE PLA Scale: MECH. BAD CHORAL PRIC. SEC. COF. COPY/MAIL/ WORK MAI CLER. URSE SUITE COF. U. CLASS KITCHE TECH. TECH. CLASS CLASS STAGE AUDITORIUM 450 seats COTROL LARGE GRO 1150 SF CLASS LOBBY

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program

More information

Green Line Extension Project Station Design Meeting Washington Street & Union Square Stations

Green Line Extension Project Station Design Meeting Washington Street & Union Square Stations Green Line Extension Project Station Design Meeting Washington Street & Union Square Stations Wednesday, February 8, 2012 Holiday Inn 30 Washington Street, Somerville, MA 6:30 pm 8:30pm #1 June 22 nd and

More information

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES: CONTACT INFORMATION: SHEET INDEX: DISCLOSURES: DOCUMENT GENERAL NOTES: CLIENT ARDENT RESIDENTIAL 5453 BURNET RD. SUITE 203 AUSTIN, TX 78756 ARCHITECT DAVIES COLLABORATIVE 5453 BURNET RD. SUITE 202 AUSTIN,

More information

W 21st St. Lavaca St. State Capitol

W 21st St. Lavaca St. State Capitol San Gabriel St W 22nd St Rio Grande St Nueces St San Antonio St W 21st St University of Texas [ 40 AC ] TRANSIT TIMES State Capitol UT Campus ABIA.5 miles / 11 min walk.5 miles / 11 min walk 8.6 miles

More information

WALKS AND SIDEWALKS REQUIREMENTS:

WALKS AND SIDEWALKS REQUIREMENTS: DOUBLE PARKING STALLS DIAGONAL PARKING STALLS EXTERIOR ROUTES OF TRAVEL: From accessible parking spaces, provide most practical direct accessible route of travel to all building entrances and exteriorground

More information

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

MEDICI ARTIST LOFTS. An affordable housing project by DFA dev. Artifex West Studio. 34 units - 7ea 3 bed, 17ea 2 bed & 10ea 1 bed

MEDICI ARTIST LOFTS. An affordable housing project by DFA dev. Artifex West Studio. 34 units - 7ea 3 bed, 17ea 2 bed & 10ea 1 bed MEDICI ARTIST LOFTS An affordable housing project by DFA dev. 34 units - 7ea 3 bed, 7ea bed & 0ea bed The proposed, 34 unit, affordable housing and et rate project is located at the intersection of N Sutter

More information

CORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS)

CORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS) Classrooms 2-3 scientists Morrison Maierle Classrooms K-1 Specials 146 planners Support surveyors 870 SF RR 147 148 RR 149 engineers 839 SF 150 COPYRIGHT (C) MORRISON-MAIERLE, INC., 2017 Admin Phone: 406.752.2216

More information

Proximity to Employee Housing and Centers of commerce. 2 Minutes to Georgetown. 3 Minutes to The Pentagon

Proximity to Employee Housing and Centers of commerce. 2 Minutes to Georgetown. 3 Minutes to The Pentagon Proximity to Employee Housing and Centers of commerce 270 95 2 Minutes to Georgetown 3 Minutes to The Pentagon 4 Minutes to K Street 8 Minutes to Reagan National 9 Minutes to The White House 11 Minutes

More information

11SIXTY5 Weaver Dairy Road

11SIXTY5 Weaver Dairy Road SITEPLAN NOTES 2 C-2.0 BICYCLE RACK NTS Weaver Dairy Road Job Number: 1529 WLR, MTC, VJC WLR, VJC 11-30-17 STAIR SITE PLAN 1 C-2.0 SITE PLAN 1" = 30' 0 15 30 60 3 C-2.0 PLAZA DETAIL PLAN 1" = 20' 0 10

More information

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION This application, including the Conceptual Review Presentation, must be completed and submitted to the Downtown Development Review Board (DDRB) Staff twenty (20) business days prior to the upcoming DDRB

More information

ICONIC LAKEWOOD THEATER 1825 ABRAMS RD, DALLAS, TX 75214

ICONIC LAKEWOOD THEATER 1825 ABRAMS RD, DALLAS, TX 75214 FOR LEASE ICONIC LAKEWOOD THEATER 1825 ABRAMS RD, DALLAS, TX 75214 PROPERTY INFO + + Best parking available in Lakewood! More than 95 dedicated spaces 80 additional dedicated spaces reserved for valet

More information

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603 ENDUM NO. 2 To the Drawings and/or Specifications for Gilbert Architects Youth s Benefit Elementary School - #0729 626 N. Charlotte St. Board of Education of Harford County Lancaster, PA 17603 June 2,

More information

A-1. CDP and Use Permit Amendment. Title Sheet. the. Attachment. 1. Railing a soffit: trex Composite d in tree hous. 2. storefro BRonze ano aluminum F

A-1. CDP and Use Permit Amendment. Title Sheet. the. Attachment. 1. Railing a soffit: trex Composite d in tree hous. 2. storefro BRonze ano aluminum F the Arri. Railing a soffit: trex Composite d in tree hous. storefro BRonze ano aluminum F 3. glulam t Wood stain White (sw3 4. landscap Walls: Boa ConCRete 5. exterior a Wall: shou Ban Wood p CDP and Use

More information

Vandalia Branch Library Project Details for Artists A Dayton Metro Library RFP for Artwork

Vandalia Branch Library Project Details for Artists A Dayton Metro Library RFP for Artwork Vandalia Branch Library Project Details for Artists A Dayton Metro Library RFP for Artwork Open To: Regional Artists (250 mile radius of Dayton, OH) Commission Amount: $40,000 is budgeted for all artworks

More information

RFQ Question and Answer List State of Ohio Standard Forms and Documents

RFQ Question and Answer List State of Ohio Standard Forms and Documents RFQ Question and Answer List State of Ohio Standard Forms and Documents Project Name University Hall Renovation Project Number BGU-565 Project Location Bowling Green State University Date posted: June

More information

PARAGON BUSINESS CENTER

PARAGON BUSINESS CENTER FOR LEASE OFFICE, INDUSTRIAL & FLEX 25020, 25030, 25031, 25060 & 25061 AVENUE STANFORD VALENCIA, CA 91355 FOR MORE INFORMATION, PLEASE CONTACT: JOHN ERICKSON Senior Vice President Lic. 00977578 661.253.5202

More information

Memorandum. Dear Ms. Allen,

Memorandum. Dear Ms. Allen, RhoadesPlanningGroup Memorandum To: Shannon Allen, AICP, Principal Planner From: Rhoades Planning Group Date: June 10, 2015 Re: Response to Incomplete Letter, 1900 Fourth Street Dear Ms. Allen, This letter

More information

Horace Mann Elementary

Horace Mann Elementary 2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are

More information

PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION

PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION INTRODUCTION Planning permission was granted by the City of London on th February 0 for a scheme by Hugh Broughton Architects to refurbish and extend the Treasury Building in the Inner Temple. The project

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD ALBANY UNIFIED SCHOOL DISTRICT DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD BOARD OF EDUCATION PRESENTATION JANUARY 22, 2019 DOUG ESPLAND Sr. Precon Manager & Project Director

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

24' - 0" 99' - 0" B15 B16 B17 B18 B19 SLOPE SLOPE BIKE STOR. / SERVICE 2 ACCESSIBLE COMMUNITY ACCESIBLE BIKE BIKE STORAGE ROOM STORAGE

24' - 0 99' - 0 B15 B16 B17 B18 B19 SLOPE SLOPE BIKE STOR. / SERVICE 2 ACCESSIBLE COMMUNITY ACCESIBLE BIKE BIKE STORAGE ROOM STORAGE 5' ' 6 /4" RETAINING WALL ALONG BOUNDARY ILLUMINATED SIGNAGE TBD MOUNTED TO TOP AND/OR FACE OF RETAININGS WALL PROPERTIES FENCE TO REMAIN SIDEWALK ENTRY TIE NEW SIDE WALK INTO EXISTING SIDEWALKS AS CURRENTLY

More information

QUICK FACTS. The restaurants have their own exterior entrances, with guests having the option of using either valet or convenient self-parking

QUICK FACTS. The restaurants have their own exterior entrances, with guests having the option of using either valet or convenient self-parking R E S T A U R A N T O P P O R T U N I T I E S THE OPPORTUNITY CBRE is pleased to present this very special opportunity to secure a ground floor restaurant location at the new Westin Anaheim Resort in Anaheim,

More information

CHASE #55459 IGNACIO BLVD & ALAMEDA DEL PRADO STANDARD PALETTE 402 IGNACIO BLVD. NOVATO, CA SITE INFORMATION LEGEND VICINITY MAP

CHASE #55459 IGNACIO BLVD & ALAMEDA DEL PRADO STANDARD PALETTE 402 IGNACIO BLVD. NOVATO, CA SITE INFORMATION LEGEND VICINITY MAP SITE INFORMATION SCOPE OF WORK SITE AREA: CONTACT INFORMATION: PROPERTY OWNER: CIVIL ENGINEER PROJECT APPLICANT / OWNER: LANDSCAPE ARCHITECT: ARCHITECT: ZONING: BUILDING INFORMATION: SETBACKS: LANDSCAPING:

More information

NOW LEASING NOW LEASING DOWNTOWN VANCOUVER GRANVILLE ISLAND

NOW LEASING NOW LEASING DOWNTOWN VANCOUVER GRANVILLE ISLAND TO 25,300 SQUARE FEET OF NEW BUILD PREMISES IN THE WESTSIDE OF VANCOUVER 1296 W BROADWAY Burrard Street Burrard Bridge Granville Street Bridge DOWNTOWN VANCOUVER GRANVILLE ISLAND W 4th Avenue W 6th Avenue

More information

SPARTAN DAY CAMP 4814 FREEDOM RING RD

SPARTAN DAY CAMP 4814 FREEDOM RING RD 484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS

More information

COPYRIGHT ARCHITECT SUSAN DESKO-AIA

COPYRIGHT ARCHITECT SUSAN DESKO-AIA B:\03 ACAD Files\2 200.02.2 This Is It\DESIGN REVIEW\DR-0-.dwg 7/3/200 0:4 AM COVERED DROP-OFF 2 RECEPTION 3 LOBBY [2,800 SF] 4 WAITING AREA [450 SF] 5 FRONT DOOR & PATIO 6 VESTIBULE & AFTER HOURS ELEVATOR

More information

Bluerock Center LONE TREE WAY > ANTIOCH, CA > OFFICE > RETAIL

Bluerock Center LONE TREE WAY > ANTIOCH, CA > OFFICE > RETAIL Project Summary BLUEROCK CENTER in Antioch, CA is a Class A medical, office and retail project consisting of 121,000 square feet of state of the art buildings in a campus setting. The project is located

More information

3647 N SOUTHPORT AVE CHICAGO, IL 60613

3647 N SOUTHPORT AVE CHICAGO, IL 60613 DEVELOPER P.O. BOX 1041 EVANSTON, ILLINOIS 60204 P: (773) 529-3700 P: (773) 977-8072 C O P Y R I G H T 2 0 1 7, S U L L I V A N G O U L E T T E W I L S O N, L T D. ARCHITECT SULLIVAN GOULETTE & WILSON,

More information

March 23, 2015 Total Project Cost 18,553,027

March 23, 2015 Total Project Cost 18,553,027 Executive Summary Charles City CSD Middle School Addition 25% CD Up April 3, 205 Project Approach This up to be considered recap of changes since March 23, 205 budget. It is intended to reflect significant

More information

TUSCAN VILLAGE - MASTERPLAN

TUSCAN VILLAGE - MASTERPLAN CONCEPTUAL MASTER PLAN FOR TUSCAN VILLAGE TUSCAN VILLAGE - MASTERPLAN 11-21-2017 Salem, New Hampshire PRELLWITZ CHILINSKI ASSOCIATES 221 Hampshire Street Cambridge MA 02139 t: 617-547-8120 f: 617-661-4986

More information

$20.00 PSF GROSS POST OAK CENTRAL II. Contact us: Accelerating success. Asking Price: FOR SUBLEASE 1980 POST OAK BOULEVARD, HOUSTON I TEXAS 77056

$20.00 PSF GROSS POST OAK CENTRAL II. Contact us: Accelerating success. Asking Price: FOR SUBLEASE 1980 POST OAK BOULEVARD, HOUSTON I TEXAS 77056 VIEW ONLINE Asking Price: $20.00 PSF GROSS Contact us: Jay Kyle Principal & Director I Houston +1 713 830 2138 jay.kyle@colliers.com Lic. No. 80101 Corbin Janssen Vice President I Houston +1 713 830 2197

More information

High Traffic Retail and Restaurant Space in the Heart of Downtown Oakland s Business Center.

High Traffic Retail and Restaurant Space in the Heart of Downtown Oakland s Business Center. Oakland City Center High Traffic Retail and Restaurant Space in the Heart of Downtown Oakland s Business Center. Convenient and convivial, Oakland City Center has a variety of retail and restaurant opportunities

More information

ATLAS. $12.00 psf NNN 5,937 SF RETAIL FOR LEASE: 2929 California Plaza Omaha, Nebraska * * CERTIFIED *

ATLAS. $12.00 psf NNN 5,937 SF RETAIL FOR LEASE: 2929 California Plaza Omaha, Nebraska * * CERTIFIED * FOR LEASE: ATLAS 2929 California Plaza Omaha, Nebraska $12.00 psf NNN 5,937 SF HIGHLIGHTS Great opportunity to be located on the first floor of a new development with over 700 apartments underway! Join

More information

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal Complete sets of plans are required. Plans shall be stamped and wet signed by the architect or engineer. (signed and accompanied with letter from Homeowners

More information

April 7, Notice of Project Change Hyde Park Avenue, Jamaica Plain Phase C Rental Portion of Parcel U. Dear Director Golden:

April 7, Notice of Project Change Hyde Park Avenue, Jamaica Plain Phase C Rental Portion of Parcel U. Dear Director Golden: April 7, 16 Mr. Brian Golden, Director Boston Redevelopment Authority One City Hall Square, Ninth Floor 021 Attn: Phil D. Cohen, Project Manager Re: Notice of Project Change nue, Jamaica Plain Phase C

More information

AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes

AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes Meeting No. 4 Date: 5/12/2018 Job No. Meeting Location: AVS Conference Room The following notes were taken during a meeting on

More information

FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes

FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes Meeting Date: 15 March 2018 9:30 AM Meeting Location: Rock Creek School, Media Center Current Design Phase: Schematic

More information

DESERT MOUNTAIN MEDICAL PLAZA

DESERT MOUNTAIN MEDICAL PLAZA DESERT MOUNTAIN MEDICAL PLAZA FOR LEASE Generous Tenant Improvement Allowance Contact Broker for details PROPERTY RENOVATIONS COMPLETE UPDATED AREAS INCLUDE: New furnishings and artwork in lobbies Fully

More information

Harding Senior High School

Harding Senior High School 1540 Sixth Street East Project Summary:, located in the Eastview area of St. Paul, offers students in grades 9 through 12 a wide range of curriculum options ranging from International Baccalaureate to

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

At Fair Lakes Office Park, you will discover an environment that helps your business attract and

At Fair Lakes Office Park, you will discover an environment that helps your business attract and 12450 12500 12600 12700 12750 12701 12730 FAIR LAKES CIRCLE FAIRFAX VA Overview Office Park At Fair Lakes Office Park, you will discover an environment that helps your business attract and 25 retain top

More information

Chuck Caesar. VIA: /Webposting April 27, 2017

Chuck Caesar. VIA:  /Webposting April 27, 2017 VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John

More information

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES I. PURPOSE AND COMPLIANCE In implementing City Code, Chapter 8, Section 815, the City Council of the City of Pine City (the City ) finds that

More information

Architectural Design Process

Architectural Design Process Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation

More information

RESOLUTION NO. R VILLAGE OF SHOREWOOD HILLS A RESOLUTION APPROVING A SPECIFIC DEVELOPMENT PLAN FOR PROPERTY LOCATED AT 2801 MARSHALL COURT

RESOLUTION NO. R VILLAGE OF SHOREWOOD HILLS A RESOLUTION APPROVING A SPECIFIC DEVELOPMENT PLAN FOR PROPERTY LOCATED AT 2801 MARSHALL COURT RESOLUTION NO. R-2018-8 VILLAGE OF SHOREWOOD HILLS A RESOLUTION APPROVING A SPECIFIC DEVELOPMENT PLAN FOR PROPERTY LOCATED AT 2801 MARSHALL COURT RECITALS 1. The Village of Shorewood Hills ("Village")

More information

BAY MEADOWS SPECIFIC PLAN

BAY MEADOWS SPECIFIC PLAN BAY MEADOWS SPECIFIC PLAN Adopted by the San Mateo City Council April 22, 1997 Amended March 4, 2002, November 4, 2005 and January 4, 2010 BAY MEADOWS SPECIFIC PLAN Adopted by the San Mateo City Council

More information

Operating Standards Attachment to Development Application

Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

HANSCOM FIELD ARFF AND CBP BUILDING

HANSCOM FIELD ARFF AND CBP BUILDING HANSCOM FIELD ARFF AND CBP BUILDING AERIAL VIEW OF AIRFIELD PROJECT SITE HANSCOM AIR FIELD CIVIL AIR TERMINAL HANSCOM AIR FORCE BASE 95 AIRFIELD MAIN ENTRY SITE AERIAL PLAN VIEW OF AIRFIELD N MASSACHUSETTS

More information

Non-Residential and Multi-Family Plan Check Submittal Requirements

Non-Residential and Multi-Family Plan Check Submittal Requirements Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail: www.comptoncity.org City of Compton Building & Safety Department Non-Residential and Multi-Family Plan Check Submittal Requirements The purpose of this

More information

675 Sierra Rose Drive Reno Quail Executive Suites. Suite 201 1,006 SF $.95/MG 2 large corner offices, reception and running water

675 Sierra Rose Drive Reno Quail Executive Suites. Suite 201 1,006 SF $.95/MG 2 large corner offices, reception and running water 675 Sierra Rose Drive Reno Quail Executive Suites OFFICE SPACE AVAILABLE Garrett Hallenbeck CCIM, CPM Suite 103 198 SF $875/month Suite 105 228 SF $1,000/month Suite 106 181 SF $800/month Suite 110 193

More information