To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603
|
|
- Hubert Lewis
- 5 years ago
- Views:
Transcription
1 ENDUM NO. 2 To the Drawings and/or Specifications for Gilbert Architects Youth s Benefit Elementary School - # N. Charlotte St. Board of Education of Harford County Lancaster, PA June 2, 2014 Project Architect: Kenneth Johnson Revisions and modifications contained in this Addendum supersede the previously issued Documents for the above referenced Project. DRAWING REVISIONS Item SD2-1 Item SD2-2 DRAWING S1.1 STRUCTURAL NOTES Add Structural Design Criteria Note #11 ROOF TRUSS MANUFACTURER SHALL CALCULATE SNOW DRIFT LOADS AND DESIGN TRUSSES ACCORDINGLY. DRAWING S2.1 FOUNDATION PLAN AREA A Delete 2 piers P3 at doors A101-A and B. Item SD2-3 DRAWING S2.7 S2.16 Delete note 12 of the ROOF FRAMING PLAN NOTES on all applicable sheets. Item SD2-4 DRAWING S2.9 FOUNDATION PLAN AREA E Delete cloud at bottom left hand corner of drawings. Item SD2-5 DRAWING S2.10 FOUNDATION PLAN AREA F Delete cloud at top of plan 1/S2.10. Item SD2-6 Item SD2-7 Item SD2-8 Item SD2-9 Item SD2-10 DRAWING S2.12 MEZZANINE FLOOR/ROOF FRAMING PLAN AREA C Delete cloud at bottom left hand corner of drawings. DRAWING S2.14 MEZZANINE FLOOR & ROOF FRAMING PLANS AREA E 1/S Cut section 6/S4.1 similar at exterior wall of mechanical mezzanine E301. 3/S2.14 Cut section 4/S4.1 two places at west wall of mechanical mezzanine and along east wall between the mechanical mezzanine and stair. DRAWING S2.15 MEZZANINE FLOOR & ROOF FRAMING PLANS AREA F 1/S Cut section 6/S4.1 similar at exterior wall of mechanical mezzanine F301. DRAWING S4.3 FRAMING SECTIONS 15/S4.3 Trim vertical wall reinforcing at top of wall. 16/S4.3 Add 4 depth dimension for end overhung portion of beam. DRAWING S4.5 FRAMING SECTIONS 11/S4.5 Add shear connection to beam to beam connection. 13/S4.5 Add metal roof deck bearing on top angle. 14/S4.5 Stud anchors on joist bearing plate shall be ¾ diameter x 6 long at 1-4 c/c. 15/S4.5 Connection of metal stud blocking or truss is by the truss manufacturer. ENDUM NO. 1 - Page 1
2 Item SD2-11 DRAWING S6.2 Typical Details 13/S6.2 Revise 10 dimension to 12. Revise two 4 dimensions to 8. Lintel Schedule Revise the lintels schedule per the following: o Delete all PL5 bearing plate references. These lintels are to bear directly on wall with anchor rod to cmu. o Add 10 interior wall section as follows: - Spans UP TO 4-4 (3) L5x3x5/16 - GRTR THAN 4-4 TO ) L5x3x3/8 - GRTR THAN 6-8 TO 12-0 W8x28 + 3/8 PL and anchor - GRTR THAN 4-4 TO 6-8 W8x35 + 3/8 PL and anchor o Replace 12 interior wall for 12 ft to 15 ft spans to be W8x35 + 3/8 PL and anchor o Replace 16 interior wall for 12 ft to 15 ft spans to be W8x48 + 3/8 PL and anchor o Replace 20 interior wall for 6-8 ft to 12 ft spans to be W8x48 + 3/8 PL and anchor o Replace 20 interior wall for 12 ft to 15 ft spans to be W8x57 + 3/8 PL and anchor o Replace 8 CMU + Veneer exterior wall for 12 ft to 15 ft spans to be W8x48 + 3/8 PL and anchor o Replace 12 CMU + Veneer exterior wall for 12 ft to 15 ft spans to be W8x57 + 3/8 PL and anchor o Under Misc. Lintels, delete references to details 9/S6.2, 10/S6.2 and 11/S6.2 and add anchors to these lintels. END OF STRUCTURAL ENDUM ENDUM NO. 1 - Page 2
3 ENDUM NO. 2 To Drawings and/or Specifications for Gilbert Architects The New Youth s Benefit Elementary School - # N. Charlotte St. Board of Education of Harford County Lancaster, PA June 2, 2014 Project Manager: Ken Johnson Revisions and modifications contained in this Addendum supersede the previously issued documents for the above referenced Project. DRAWING REVISIONS Item D2-M1 M2.6 SECOND FLOOR PART PLAN AREA B Heating water supply and return run out piping to VAV Refer to sketch SK-M Item D2-M2 M3.1 MECHANICAL ROOM A119 Designation of Secondary Heating Water Pumps to read Heating Water Pump P-1 & Heating Water Pump P-2. Associated VSD designations to read (P-1) & (P-2) Heating water piping layout. Refer to sketch SK-M Item D2-M3 DELETE ME0.1 MECHANICAL/ELECTRICAL SITE PLAN Utility depth installation chat in lower left hand corner. This was for coordination for design purposes only. Contractor shall install utilities per details, code requirements, utility company requirements and field conditions. Location of 4 sanitary from Water Storage Building. 4 sanitary shall exit the Water Storage Building approximately 65-6, plan east of location shown on Bid Documents. END OF ENDUM No. 2 Addendum No. 2 - Page 1
4 THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL M2.6 SECOND FLOOR PART PLAN - AREA B DATE 06/02/2014 PROJECT NO CAD NO M2.6 TMF ENDUM No. 2
5 THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL M3.1 MECHANICAL ROOM A113 - UPPER LEVEL DATE 06/02/2014 PROJECT NO CAD NO M3.1 TMF ENDUM No. 2
6 ENDUM NO. 2 To Drawings and/or Specifications for Gilbert Architects The New Youth s Benefit Elementary School - # N. Charlotte St. Board of Education of Harford County Lancaster, PA June 2, 2014 Project Manager: Ken Johnson Revisions and modifications contained in this Addendum supersede the previously issued documents for the above referenced Project. DRAWING REVISIONS Item D2-P1 P2.1 FIRST FLOOR PART PLAN AREA A FCU-1 reference and associated condensate piping. Refer to sketch SK-P Item D2-P2 P2.6 SECOND FLOOR PART PLAN AREA B FCU-2 reference and associated condensate piping. Refer to sketch SK-P Item D2-P3 P2.1, P2.2, P2.3, P2.4, P2.9, P2.10 PLUMBING PART FLOOR PLANS General Note No. 2 to the following: UNLESS OTHERWISE NOTED, ALL STORM WATER DOWNSPOUTS SHALL DISCHARGE TO STORM WATER BOOTS PER DETAIL NO. 30 AND BE CONNECTED TO PIPING BELOW GRADE. REFER TO CIVIL DWGS FOR ITIONAL INFORMATION. END OF ENDUM No. 2 Addendum No. 2 - Page 1
7 SOAP STOR. A 111 RECEIVING A 114 THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL P2.1 FIRST FLOOR PART PLAN - AREA A DATE 06/02/2014 PROJECT NO. CAD NO P2.1 TMF ENDUM No. 2
8 THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL P2.6 SECOND FLOOR PART PLAN - AREA B DATE 06/02/2014 PROJECT NO. CAD NO P2.6 TMF ENDUM No. 2
9 ENDUM NO. 2 To Drawings and/or Specifications for Gilbert Architects The New Youth s Benefit Elementary School - # N. Charlotte St. Board of Education of Harford County Lancaster, PA June 2, 2014 Project Manager: Ken Johnson Revisions and modifications contained in this Addendum supersede the previously issued documents for the above referenced Project. DRAWING REVISIONS ITEM D2-E1: E0.1 LEGEND, ABBREVIATIONS & GENERAL NOTES Video drop symbol and description per Sketch SK-E ITEM D2-E2: E0.1 LEGEND, ABBREVIATIONS & GENERAL NOTES Floor box student data drop symbol and description per Sketch SK-E ITEM D2-E3: E0.1 LEGEND, ABBREVIATIONS & GENERAL NOTES DELETE Projector low drop symbol and description. ITEM D2-E4: E0.2 FIRST FLOOR PART PLAN AREA A LIGHTING Fixture F1: Add wire guard option to the fixture description as well as WGL to the fixture s model number ITEM D2-E5: E0.3 PHASE 1 ELECTRICAL SITE PLAN Electrical and telecommunication cabling, per re-issued drawing E0.3. ITEM D2-E6: E0.4 PHASE 2 ELECTRICAL SITE PLAN Electrical and telecommunication cabling, per re-issued drawing E0.4. ITEM D2-E7: E0.5 PHASE 3 ELECTRICAL SITE PLAN Electrical and telecommunication cabling, per re-issued drawing E0.5. ITEM D2-E8: E0.6 PHASE 4 ELECTRICAL SITE PLAN Electrical and telecommunication cabling, per re-issued drawing E0.6. ITEM D2-E9: E1.1 FIRST FLOOR PART PLAN AREA A LIGHTING Occupancy Sensor(s) in the following rooms/areas: Two (2) in Kitchen A102 Addendum No. 2 - Page 1
10 One (1) in Locker A105 One (1) in Receiving A114 Three (3) in Cafeteria A101 One (1) in Corridor A117 Four (4) in Corridor A128 ITEM D2-E10: E1.1 FIRST FLOOR PART PLAN AREA A LIGHTING Vacancy Occupancy Sensor in Dishwash A110 ITEM D2-E11: E1.1 FIRST FLOOR PART PLAN AREA A LIGHTING Switch in Dishwash A110 to a low voltage type switch. ITEM D2-E12: E1.1 FIRST FLOOR PART PLAN AREA A LIGHTING DELETE Key Switch on west wall of Girls Toilets A119. ITEM D2-E13: E1.1 FIRST FLOOR PART PLAN AREA A LIGHTING Two (2) exit signs above doors A102B & A102C in Kitchen A102. ITEM D2-E14: E1.1 FIRST FLOOR PART PLAN AREA A LIGHTING DELETE Two (2) exit signs above doors A101A & A101B in Cafeteria A101. ITEM D2-E15: E1.1 FIRST FLOOR PART PLAN AREA A LIGHTING DELETE The occupancy sensor with subscript AV located in Storage A103. ITEM D2-E16: E1.2 FIRST FLOOR PART PLAN AREA B LIGHTING Occupancy Sensor(s) in the following rooms/areas: Six (6) in Gym B142 One (1) in Corridor B117 One (1) in Corridor B118 One (1) in Corridor B119 Three (3) in Corridor B124 Three (3) in Corridor B131 ITEM D2-E17: E1.2 FIRST FLOOR PART PLAN AREA B LIGHTING An additional Vacancy Occupancy Sensor(s) symbol in the following rooms/areas: One (1) in Kindergarten Classroom B101 One (1) in Kindergarten Classroom B104 One (1) in Kindergarten Classroom B106 One (1) in Kindergarten Classroom B111 One (1) in Kindergarten Classroom B113 One (1) in Kindergarten Classroom B116 ITEM D2-E18: E1.2 FIRST FLOOR PART PLAN AREA B LIGHTING Addendum No. 2 - Page 2
11 An additional Emergency Transfers Relay(s) in the following rooms/areas. The emergency transfer relay will be for the lighting fixture(s) on emergency that currently does not show an emergency transfer relay next to it: One (1) in Kindergarten Classroom B101 One (1) in Kindergarten Classroom B104 One (1) in Kindergarten Classroom B106 One (1) in Kindergarten Classroom B111 One (1) in Kindergarten Classroom B113 One (1) in Kindergarten Classroom B116 Three (3) in Gymnasium B142 ITEM D2-E19: E1.2 FIRST FLOOR PART PLAN AREA B LIGHTING One (1) additional Emergency Transfers Relay symbols in Gymnasium B142, one for each lighting fixture on emergency that currently does not have an emergency transfer next to it. ITEM D2-E20: E1.2 FIRST FLOOR PART PLAN AREA B LIGHTING CLARIFY Matchline Text is shifted, so work in Corridor B131 can be seen, per Sketch SK-E ITEM D2-E21: E1.3 FIRST FLOOR PART PLAN AREA C LIGHTING Occupancy Sensor(s) in the following rooms/areas: Three (3) in Corridor C114 One (1) in Lobby C102 One (1) in Vestibule C101 ITEM D2-E22: E1.3 FIRST FLOOR PART PLAN AREA C LIGHTING An additional Vacancy Occupancy Sensor(s) in the following rooms/areas: One (1) in Pre-Kindergarten Classroom C110 One (1) in Pre-Kindergarten Classroom C113 ITEM D2-E23: E1.3 FIRST FLOOR PART PLAN AREA C LIGHTING An additional Emergency Transfers Relay(s) in the following rooms/areas. The emergency transfer relay will be for the lighting fixture(s) on emergency that currently does not show an emergency transfer relay next to it: One (1) in Pre-Kindergarten Classroom C110 One (1) in Pre-Kindergarten Classroom C113 One (1) in Cots C104 ITEM D2-E24: E1.4 FIRST FLOOR PART PLAN AREA D LIGHTING Occupancy Sensor(s) in the following rooms/areas: Two (2) in Passage D121 Two (2) in Corridor D122 One (1) in Vestibule D109 ITEM D2-E25: E1.4 FIRST FLOOR PART PLAN AREA D LIGHTING Addendum No. 2 - Page 3
12 An additional Emergency Transfers Relay(s) in Art Classroom D107. The emergency transfer relay will be for the lighting fixture(s) on emergency that currently does not show an emergency transfer relay next to it. ITEM D2-E26: E1.4 FIRST FLOOR PART PLAN AREA D LIGHTING Fixture F1 and lighting switch in Closet D114. ITEM D2-E27: E1.4 FIRST FLOOR PART PLAN AREA D LIGHTING Two (2) exit signs above doors D121A & D121B in Passage D121. ITEM D2-E28: E1.5 SECOND FLOOR PART PLAN AREA A LIGHTING Four (4) Occupancy Sensors in Corridor A211. ITEM D2-E29: E1.5 SECOND FLOOR PART PLAN AREA A LIGHTING Subscript V to the Occupancy Sensor symbol in Special Education Classroom A201. ITEM D2-E30: E1.6 SECOND FLOOR PART PLAN AREA B LIGHTING Occupancy Sensor(s) in the following rooms/areas: One (1) in Corridor B214 Two (2) in Corridor B215 One (1) in Corridor B216 Three (3) in Corridor B217 Three (3) in Corridor B220 ITEM D2-E31: E1.7 SECOND FLOOR PART PLAN AREA C LIGHTING Occupancy Sensor(s) in the following rooms/areas: Four (4) in Corridor C201 One (1) in Corridor C216 One (1) in Corridor C246 ITEM D2-E32: E1.8 SECOND FLOOR PART PLAN AREA D LIGHTING Occupancy Sensor(s) in the following rooms/areas: One (1) in Corridor D202 One (1) in Media Center D209 One (1) in Corridor D216 ITEM D2-E33: E1.8 SECOND FLOOR PART PLAN AREA D LIGHTING An additional Emergency Transfers Relay(s) in the following rooms/areas. The emergency transfer relay will be for the lighting fixture(s) on emergency that currently does not show an emergency transfer relay next to it: One (1) in Computer Lab D211 One (1) in TV Studio D206 Five (5) in Media Center D209 Addendum No. 2 - Page 4
13 Two (2) in Office Workroom D207 ITEM D2-E34: E1.9 SECOND FLOOR PART PLAN AREA E LIGHTING Occupancy Sensor(s) in the following rooms/areas: One (1) in Corridor E209 One (1) in Corridor E211 Three (3) in Corridor E212 Two (2) in Corridor E238 One (1) in Corridor E239 One (1) in Corridor E240 Four (4) in Corridor E241 ITEM D2-E35: E1.9 SECOND FLOOR PART PLAN AREA E LIGHTING The lighting fixture closest to the exterior door to a normal/emergency type in both Fifth Grade Classroom E229 & E230. ITEM D2-E36: E1.9 SECOND FLOOR PART PLAN AREA E LIGHTING An additional Emergency Transfers Relay(s) in the following rooms/areas. The emergency transfer relay will be for the lighting fixture(s) on emergency that currently does not show an emergency transfer relay next to it: One (1) in Third Grade Classroom E202 One (1) in Fifth Grade Classroom E224 One (1) in Fifth Grade Classroom E225 One (1) in Fifth Grade Classroom E226 One (1) in Fifth Grade Classroom E227 One (1) in Fifth Grade Classroom E228 One (1) in Fifth Grade Classroom E229 One (1) in Fifth Grade Classroom E230 ITEM D2-E37: E1.9 SECOND FLOOR PART PLAN AREA E LIGHTING CLARIFY Matchline is shifted, so work can be seen, per Sketch SK-E ITEM D2-E38: E1.10 SECOND FLOOR PART PLAN AREA F LIGHTING Occupancy Sensor(s) in the following rooms/areas: One (1) in Corridor F208 One (1) in Corridor F210 Three (3) in Corridor F211 ITEM D2-E39: E1.10 SECOND FLOOR PART PLAN AREA F LIGHTING The lighting fixture closest to the exterior door to a normal/emergency type in Fourth Grade Classroom F201. ITEM D2-E40: E1.10 SECOND FLOOR PART PLAN AREA F LIGHTING An additional Emergency Transfers Relay(s) in Fourth Grade Classroom F201. The emergency transfer relay will be for the lighting fixture(s) on emergency that currently does not show an Addendum No. 2 - Page 5
14 emergency transfer relay next to it. ITEM D2-E41: E1.10 SECOND FLOOR PART PLAN AREA F LIGHTING CLARIFY Matchline is shifted, so work can be seen, per Sketch SK-E ITEM D2-E42 E1.11 MECHANICAL MEZZANINE PLANS LIGHTING An additional lighting switch by the door for the control of the lighting fixtures on the emergency circuit in the following rooms/areas: Mechanical Mezzanine A212 Mechanical Mezzanine B301 Mechanical Mezzanine C301 Mechanical Mezzanine E301 Mechanical Mezzanine E302 Mechanical Mezzanine F301 ITEM D2-E43: E2.2 FIRST FLOOR PART PLAN AREA B POWER The symbol circuited to CP1B-37 and located in Teacher Planning Area B120 from V in a box to DS in a box. ITEM D2-E44: E2.2 FIRST FLOOR PART PLAN AREA B POWER The two student drops, counter height receptacle, and counter height data drop circuited CP1B-17 and located in Kindergarten Classroom B107 shall be shifted north down the west wall. ITEM D2-E45: E2.2 FIRST FLOOR PART PLAN AREA B POWER The two student drops, counter height receptacle, and counter height data drop circuited CP1B-21 and located in Kindergarten Classroom B106 shall be moved from the west wall to the north wall. ITEM D2-E46: E2.2 FIRST FLOOR PART PLAN AREA B POWER Power connections to Motorized Bleachers in the Gymnasium B142, per Sketch SK-E ITEM D2-E47: E2.3 FIRST FLOOR PART PLAN AREA C POWER CP1B-4. The projector wall drop in Pre-Kindergarten C113 shall be circuited to CP1B-6 instead of ITEM D2-E48: E2.3 FIRST FLOOR PART PLAN AREA C POWER CP1B-10. The projector wall drop in Pre-Kindergarten C110 shall be circuited to CP1B-12 instead of ITEM D2-E49: E2.3 FIRST FLOOR PART PLAN AREA C POWER The under slab conduits associated with the teacher floor box in Conference C124 shall be revised to include one (1) 3/4"C for power, one (1) 1 C for data and voice, and one (1) 1-1/4 C for A/V Addendum No. 2 - Page 6
15 cabling.. ITEM D2-E50: E2.4 FIRST FLOOR PART PLAN AREA D POWER The under slab conduits associated with the teacher floor box in Conference D120 shall be revised to include one (1) 3/4"C for power, one (1) 1 C for data and voice, and one (1) 1-1/4 C for A/V cabling. ITEM D2-E51: E2.4 FIRST FLOOR PART PLAN AREA D POWER Two (2) Digital Signage symbols (DS in a box), one over each display case in Corridor D108. Both symbols shall be circuited to CP1B-64. ITEM D2-E52: E2.6 SECOND FLOOR PART PLAN AREA B POWER Receptacle to the east of the sink from a standard receptacle to a GFI type receptacle in Second Grade Classroom B207. ITEM D2-E53: E2.6 SECOND FLOOR PART PLAN AREA B POWER The teacher drop symbol (T in a box) on the west wall of Reading Room B221 to a clerical drop (C in a box). ITEM D2-E54: E2.8 SECOND FLOOR PART PLAN AREA D POWER CLARIFY The under slab conduits associated with the student and clerical floor boxes in Media Center D209 shall be sized as follows: 3/4 C for power circuits and 1 C for telecom cabling. ITEM D2-E55: E2.10 SECOND FLOOR PART PLAN AREA F POWER Receptacle to the east of the sink from a standard receptacle to a GFI type receptacle in the following rooms/areas: Fourth Grade Classroom F217 Fourth Grade Classroom F218 Fourth Grade Classroom F219 ITEM D2-E56: E4.1 PART PLANS ELECTRICAL & IDF ROOMS Door controllers for the Access Control System on the west wall of MDF A118. Also provide the additional associated circuits ERP2-78,80,82&84 for power to the door controllers. ITEM D2-E57: E4.3 PART PLAN MECHANICAL COURTYARD Two (2) fire alarm pull stations and two (2) fire alarm horn strobes in the Fire Pump Building. One (1) pull station and horn strobe shall be located next to each exterior door on opposite ends of the building. ITEM D2-E58: E4.3 PART PLAN MECHANICAL COURTYARD The one (1) 1 conduit to the FACP to one (1) 2 conduit to the FACP. Addendum No. 2 - Page 7
16 ITEM D2-E59: E5.1 POWER RISER DIAGRAM Dry Type Transformer Schedule: The primary wiring for Transformers TRP1A, TCP1B, & TCP2B shall be revised from 3#3/0 + 1#6GW 2 C to 3#1/0 + 1#6GW 2 C. ITEM D2-E60: E5.1 POWER RISER DIAGRAM Quantity of conduits for BGE primary from (2) 5 conduits to (3) 5 conduits. ITEM D2-E61: E5.1 POWER RISER DIAGRAM Quantity of conduits for BGE secondary ductbank from 10-way to 12-way. ITEM D2-E62: E5.1 POWER RISER DIAGRAM Quantity of conduits for BGE ductbank going to the fire pump building from 2-way to 3-way. ITEM D2-E63: E5.2 VOICE/DATA/VIDEO RISER DIAGRAM On the Voice/Data/Video Riser Diagram, revise all the video drops symbol (V in a box) with a digital signage drop symbol (DS in a box). ITEM D2-E64: E5.2 VOICE/DATA/VIDEO RISER DIAGRAM Drawing Note No. 8: Change the quantity of both the Cat 6 cabling and RG-6 cabling from one (1) to two (2) sets. ITEM D2-E65: E6.2 ELECTRICAL DETAILS Detail No. 10 Generator Ductbank, per sketch SK-E ITEM D2-E66: E6.3 ELECTRICAL DETAILS Digital Signage Drop, Teacher Drop, and Floor Box details, per re-issued drawing E6.3. ITEM D2-E67: E6.3 ELECTRICAL DETAILS Teacher Floor Box and Document Camera Drop details, per re-issued drawing E6.3. ITEM D2-E68: E6.4 ELECTRICAL DETAILS Access Control Diagram detail, per sketch SK-E ITEM D2-E69: E6.5 ELECTRICAL DETAILS Disconnect mounting on roof detail per sketch SK-E Addendum No. 2 - Page 8
17 ITEM D2-E70: E6.5 ELECTRICAL DETAILS Receptacle mounting on roof detail per sketch SK-E ITEM D2-E71: E7.1 PANELBOARD SCHEDULES Panelboard LP1A: Circuit 24 from Spare to SITE SIGN 1P-20A 2#8+#10GW in 1 C. ITEM D2-E72: E7.1 PANELBOARD SCHEDULES Panelboard RP1B: Circuit 85 from Space to MOTORIZED BLEACHERS 3P-20A 4#12+#12GW in 3/4 C. ITEM D2-E73: E7.1 PANELBOARD SCHEDULES Panelboard RP1B: Circuit 91 from Space to MOTORIZED BLEACHERS 3P-20A 4#12+#12GW in 3/4 C. ITEM D2-E74: E7.2 PANELBOARD SCHEDULES in 3/4 C. Panelboard CP1B: Circuit 64 from Spare to DIGITAL SIGNAGE 1P-20A 2#12+#12GW ITEM D2-E75: E7.2 PANELBOARD SCHEDULES Panelboard ERP2: Circuits 78,80,82,&84 from Space to DOOR CONTROLLER 1P-20A 2#12+#12GW in 3/4 C. END OF ENDUM No. 2 Addendum No. 2 - Page 9
18 Gilbert Architects Inc Mill Run Circle, Suite 400 Owings Mills, MD P: F: North Charlotte Street Lancaster, PA17603 P: F: South Broad Street, Suite A Middletown, DE P: F: THIS DRAWING AND THE DESIGN & CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO GIPE ASSOCIATES, INC. & SHALL NOT BE ALTERED OR REUSED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF GIPE ASSOCIATES, INC. COPYRIGHT PSC # REVISION DATE(S) CAD NO. PROJECT NO SHEET NO. DATE 05/05/14 PHASE 1 - ELECTRICAL SITE PLAN THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL BOARD OF EDUCATION OF HARFORD COUNTY HARFORD COUNTY, MARYLAND
19 Gilbert Architects Inc Mill Run Circle, Suite 400 Owings Mills, MD P: F: North Charlotte Street Lancaster, PA17603 P: F: South Broad Street, Suite A Middletown, DE P: F: THIS DRAWING AND THE DESIGN & CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO GIPE ASSOCIATES, INC. & SHALL NOT BE ALTERED OR REUSED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF GIPE ASSOCIATES, INC. COPYRIGHT PSC # REVISION DATE(S) CAD NO. PROJECT NO SHEET NO. DATE 05/05/14 PHASE 2 - ELECTRICAL SITE PLAN THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL BOARD OF EDUCATION OF HARFORD COUNTY HARFORD COUNTY, MARYLAND
20 DATE PROJECT NO. BOARD OF EDUCATION OF HARFORD COUNTY HARFORD COUNTY, MARYLAND YOUTH'S BENEFIT ELEMENTARY SCHOOL THE NEW: PHASE 3 - ELECTRICAL SITE PLAN 100 South Broad Street, Suite A Middletown, DE P: F: North Charlotte Street Lancaster, PA17603 P: F: Mill Run Circle, Suite 400 Owings Mills, MD P: F: Gilbert Architects Inc. THIS DRAWING AND THE DESIGN & CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO GIPE ASSOCIATES, INC. & SHALL NOT BE ALTERED OR REUSED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF GIPE ASSOCIATES, INC. COPYRIGHT PSC # REVISION DATE(S) CAD NO SHEET NO. 05/05/14
21 DATE PROJECT NO. P BOARD OF EDUCATION OF HARFORD COUNTY HARFORD COUNTY, MARYLAND YOUTH'S BENEFIT ELEMENTARY SCHOOL THE NEW: PHASE 4 - ELECTRICAL SITE PLAN P O ST STOP STOP O ST OP ST 100 South Broad Street, Suite A Middletown, DE P: F: North Charlotte Street Lancaster, PA17603 P: F: Mill Run Circle, Suite 400 Owings Mills, MD P: F: Gilbert Architects Inc. THIS DRAWING AND THE DESIGN & CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO GIPE ASSOCIATES, INC. & SHALL NOT BE ALTERED OR REUSED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF GIPE ASSOCIATES, INC. COPYRIGHT PSC # REVISION DATE(S) CAD NO SHEET NO. 05/05/14 STO P
22 Gilbert Architects Inc Mill Run Circle, Suite 400 Owings Mills, MD P: F: North Charlotte Street Lancaster, PA17603 P: F: South Broad Street, Suite A Middletown, DE P: F: THIS DRAWING AND THE DESIGN & CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO GIPE ASSOCIATES, INC. & SHALL NOT BE ALTERED OR REUSED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF GIPE ASSOCIATES, INC. COPYRIGHT PSC # REVISION DATE(S) CAD NO. PROJECT NO SHEET NO. DATE 05/05/14 ELECTRICAL DETAILS THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL BOARD OF EDUCATION OF HARFORD COUNTY HARFORD COUNTY, MARYLAND
23 THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL E0.1 LEGEND,ABBREVIATIONS & NOTES DATE 06/02/2014 PROJECT NO. CAD NO E0.1 LHD ENDUM No. 2
24 STOR. F 215 TEACHER PLANNING AREA F 213 STAIR F-1 TLT. F 214 THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL E1.10 SECOND FLOOR PLAN - AREA 'F' - LIGHTING DATE 06/02/2014 PROJECT NO CAD NO E10.1 LHD ENDUM No. 2
25 EQUIP. STOR. D 105 ART STOR. D 106 RAMP B-2 ART CLASSROOM D 107 CORRIDOR B 131 CORRIDOR D 108 VEST. D 109 STAIR B-3 COMPUTER LAB D 110 CL. D 114 SPEECH OFFICE D 115 ITIN. TEACH. DIAG./PSYCH. D 111 THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL E1.2 FIRST FLOOR PART PLAN - AREA 'B' - LIGHTING DATE 06/02/2014 PROJECT NO. CAD NO E1.2 LHD ENDUM No. 2
26 ART CLASSROOM E 218 CORRIDOR E 217 ELEC. E 216 TLT E 215 STAIR E-1 THIRD GRADE CLASSROOM E TEACHER PLANNING AREA E 214 STOR. E 213 THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL E1.9 SECOND FLOOR PLAN - AREA 'E' - LIGHTING DATE 06/02/2014 PROJECT NO. CAD NO E1.9 LHD ENDUM No. 2
27 THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL E6.2 ELECTRICAL DETAILS DATE 06/02/2014 PROJECT NO. CAD NO E6.2 LHD ENDUM No. 2
28 THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL E6.4 ELECTRICAL DETAILS DATE 06/02/2014 PROJECT NO. CAD NO E6.4 LHD ENDUM No. 2
29 THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL E6.5 ELECTRICAL DETAILS DATE 06/02/2014 PROJECT NO. CAD NO E6.5 LHD ENDUM No. 2
30 THE NEW: YOUTH'S BENEFIT ELEMENTARY SCHOOL E6.5 ELECTRICAL DETAILS DATE 06/02/2014 PROJECT NO. CAD NO E6.5 LHD ENDUM No. 2
CS2.0 COVER SHEET VOL. 2
ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationDOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES
DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationSUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013
SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,
More informationCHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06
CGLS A R C H I T E C T S CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. 2500 Cumberland Parkway Suite 350 Atlanta, Georgia 30339 404.733.5493 (voice) 404.733.6804 (fax) www.cglsarchitects.com ARCHITECT
More informationWayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009
ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town
More informationBUILDING PLAN REVIEW REQUIREMENTS
TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More informationAddendum Number: 1 WT White HS Additions and Renovations, Dallas ISD
Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications
More informationADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings
MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.
More informationRECORD GROUP NUMBER 156
DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION HOSPITAL AND SCHOOL FOR THE RETARDED ARLINGTON, TENN. BLUEPRINTS, 1965 RECORD GROUP NUMBER 156 Processed by: David R. Sowell Archival Technical Services
More information4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118
PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING
INFORMATION BULLETIN / PUBLIC - GENERAL INFORMATION REFERENCE NO.: Effective: 10-01-99 DOCUMENT NO. P/GI 2002-008 Revised: 11-01-02 Previously Issued As: IB ST-4 DOCUMENT SUBMITTAL REQUIREMENTS FOR AN
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot
More informationArchitectural Floor Plan Symbols
Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationThe following information supplements and/or supersedes the bid documents issued on July 10, 2017.
Addendum No. 02 ADDENDUM Pages 2 Project No. 1706 Date: July 21, 2017 Project: West End Lofts 44 MacDonald Street, Arnprior, ON The following information supplements and/or supersedes the bid documents
More informationouglas Intermediate School
ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion
More information2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING
INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY
More informationADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016
ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620
More informationMahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620
W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationMarshall Truck Station Laboratory Addition Project No. TZ MnDOT
Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:
More informationDimension Below are the critical settings in AutoCAD. Other software should follow the same settings.
8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff
More informationMarcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More informationHall of Waters List of Historic Drawings
List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral
More informationPROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT
ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon 97132 OWNER ARCHITECT X CONSULTANT OWNER: DATE OF ISSUANCE:
More informationADDENDUM NO 1 Bid Package 3
ADDENDUM NO 1 Bid Package 3 Addendum No.: Addendum 1 Bid Package 3 Issue Date: October 10, 2014 Project: Walker Natatorium Kirkwood High School Kirkwood School District Kirkwood, MO 63122 Project Number:
More informationOCPS Submittal Register for Product Data and Shop Drawing Reviews
OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition
More informationHAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A
CHL ASSOCIATES ARCHITECTURE 1 5 7 0 R I V E R R O A D, M A R I E T T A, P E N N S Y L V A N I A 1 7 5 4 7 HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E 1 0 2 L A N C A
More informationWALKS AND SIDEWALKS REQUIREMENTS:
DOUBLE PARKING STALLS DIAGONAL PARKING STALLS EXTERIOR ROUTES OF TRAVEL: From accessible parking spaces, provide most practical direct accessible route of travel to all building entrances and exteriorground
More informationCHAPTER 5 ARCHITECTURE
CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1
More informationADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.
ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority
More informationTHE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE
231 THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' THE CHURCH OF BISHOPS' HOURS Monday-Friday P.M. - X:00 A.M. X:00 Saturday P.M. - X:00 A.M. X:00 J ESUS CHRIST OF LATTER-DAY SAINTS HOME STORAGE
More informationKidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:
KidsAbility Guelph Hub Renovation ADDENDUM #2 This Addendum amends and forms part of the Bidding and Contract Documents for the above Project as follows: CLARIFICATIONS Q1. Is it possible to set up a secondary
More informationAddendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.
!!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More information03/7/12 Issuance UTD Section Page 1 of 5 Electrical General
SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and
More information1. Name the horizontal member that rests on the foundation wall to support other wood members.
Student Name: Teacher: Date: District: Rowan Assessment: 9_12 T and I IC62 - Drafting - Architr II Test 1 Description: Unit C - Floorplans - Test 3 (ALL) Form: 501 1. Name the horizontal member that rests
More informationADDENDUM NO. 1 November 10, 2016
COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding
More informationPaul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620
82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationBidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.
ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall
More informationADDENDUM No. 4 Page 1 of 8 (includes attachment)
ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J
More informationPhilip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645
34 Washtenaw Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationMontclair, NJ ADDENDUM NO. 2 Issue Date: June 18, Request for Proposal # 898 Finley Hall Renovation
Montclair, NJ 07043 ADDENDUM NO. 2 Issue Date: June 18, 2010 Request for Proposal # 898 Finley Hall Renovation Number of Pages: 14 (plus attachment) Date of Original Bidding Documents: April 28, 2010 INTENT:
More informationThe following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.
ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless
More informationEPIC Academy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNon-Residential and Multi-Family Plan Check Submittal Requirements
Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail: www.comptoncity.org City of Compton Building & Safety Department Non-Residential and Multi-Family Plan Check Submittal Requirements The purpose of this
More informationNotre Dame High Addition/Renovation Addendum 3 Page 1
School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D
HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS
More informationPermits (Submitted to Permit Counter) APPLICATION CHECKLIST
Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy
More informationCUTTING, NOTCHING, AND BORING OF WOOD FRAMING MEMBERS (Unless an alternate design is provided by a licensed Engineer or Architect)
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: 91.2320 Effective: 5-23-00 DOCUMENT NO. P/BC 2002-007 Revised: 2-01-01 Previously Issued As: IB ST-14 CUTTING, NOTCHING, AND BORING OF WOOD
More informationWendell E Green Elementary School 1150 W 96th St Chicago, IL 60643
11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationThis specification describes the minimum requirements for structural steel drawings.
1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient
More informationFCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes
FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes Meeting Date: 15 March 2018 9:30 AM Meeting Location: Rock Creek School, Media Center Current Design Phase: Schematic
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More informationCAPITAL IMPROVEMENT PROGRAM
CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:
More informationRENOVATION OF THE FARMERS MARKET Reference Number:
RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:
More informationCarpentry/Carpenter CIP Task Grid
1 Secondary Task List 100 SAFETY/OCCUPATIONAL ORIENTATION 101 Identify and follow all basic safety practices and procedures. 102 Identify and follow all lab safety practices and procedures. 103 Identify
More informationSUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS
SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped
More informationS T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1" = 10' - 0" SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD
\\CANDELA\projects\-Chabad Center\Current Drawings\Chabad - -A-.0-extg-demo-site-plan.dwg, 0/0/0 :: PM, DWG To PDF.pc A-.0 SITE PLAN SCALE: " = 0' - 0" NORTH GENERAL NOTES: Site/Roof Drainage Plan. THE
More informationArchitecture, Construction, and Engineering Technical Charter
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJackie Robinson Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationSECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION
SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.
More informationQuestions. Paul Ross Wallach V7198. Published by Hearlihy P.O. Box 1747 Pittsburg, KS
Questions for Blueprint-Reading Exams Paul Ross Wallach Published by Hearlihy P.O. Box 1747 Pittsburg, KS 66762 866-622-1003 www.hearlihy.com 81861 V7198 Copyright 2007 by Hearlihy. Except for making transparencies
More informationINVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2
FINANCE, RISK AND BUSINESS PLANNING Supply Chain Management May 17, 2016 INVITATION TO TENDER ITT No. PS20160468 FIRE HALL 5 + HOUSING CONSTRUCTION ADDENDUM No. 2 and AMENDMENT No. 2 RE: Various additions
More informationEverett McKinley Dirksen Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAmos Alonzo Stagg Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON
The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationWilliam H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609
S Hermitage Ave Chicago, IL 9 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationSTEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCharles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617
S Cregier Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationNIAGARA REGIONAL HOUSING MZE FILE NO
M A C D O N A L D Z U B E R E C E N S S L E N A rch it ects I nc. NRH NEW DEVELOPMENT PROJECT 527 CARLTON ST., ST. CATHARINES, ONTARIO NIAGARA REGIONAL HOUSING MZE FILE NO. 16-44 Project No. 16-44 April
More informationJosefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623
3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This
More informationARCHITECTURE CADD Course Syllabus
6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing
More informationTELEPHONE: (215) Addendum No. 1
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, Third Floor - Suite 371 Philadelphia, PA 19130-4015 TELEPHONE: (215) 400-4730 Addendum No.
More informationBUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS
Building and Development Permit Applications Definitions: Type A Residential Projects: All projects related to one and two unit dwellings Type B Residential Projects: All projects related to Apartments,
More informationPMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education
PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does
More informationChuck Caesar. VIA: /Webposting April 27, 2017
VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John
More informationADDENDUM NO. 3. Ellis County Elections Building
AUSTIN ARCHITEXAS DALLAS ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. December 8, 2014 to the BIDDING DOCUMENTS for Ellis County Elections Building Waxahachie, Texas By ARCHITEXAS
More informationIFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1
IFB 18-14 PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB MODIFICATIONS: BONDING REQUIREMENTS: Due to the complexity of the scope of work, MCPS is requiring bonding for this bid. The following bonds are
More informationPrintreading for Residential Construction
Printreading for Residential Construction Chapter 1 1. What are the five types of working drawings? Plot plans, floor plans, elevations, sections, and details 2. What information is typically available
More informationJoseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623
3 W 3st St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationHarriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationNathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609
athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the
More informationLEGENDS, DETAILS, & NOTES - TELECOM
55 urnet Road, Suite 0 Austin, Texas 78756 5.85.0 05 eltway Dr. Addison, TX 7500 97-66-887 COMMUNICATIONS SYSTEM LEGEND FRONT FACE OF WALL OR HOUR FIRE RATED GYPSUM WALL OARD ASSEMLY MAXIMUM /8" CLEARANCE
More informationwww.cad-designers.com Staffing Services Cad Designers is an established staffing company that specializes in providing professional support for the A/E/C industry. All candidates are screened with a complete
More informationPhilip Rogers Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJames Shields Middle School 2611 W 48th St Chicago, IL 60632
2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJuly 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.
July 3, 2013 CASCO Project Managers St. Louis, Missouri PETSMART STORES 13K Q2 2013 Prototype Narrative (Delta 5) Bulletin No. Five CHANGES TO THE DRAWINGS: 1. Sheet A0.0, Revision No. 5: Revised project
More informationQuality Control Checklist - Design Drawings
Quality Control Checklist - Design Drawings Date Company Name Address Telephone Fax Email Job Number 1) Drawing Set a) Drawing one is site/location/incoming power i) Should contain location map if not
More informationThis Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein.
Revision No. 01 Issued February 19, 2016 Page 1 This Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein. This Revision
More informationThomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK
Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the
More information