1 PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education

2 PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does it constitute, legal or professional advice. PMA does not warrant that adherence to, or compliance with, any recommendations, best practices, checklists, or guidelines will result in a particular outcome. In no event will PMA or any of its subsidiaries or affiliates be liable in tort or in contract to anyone who has access to or uses this information. PMA does not warrant that the information in this document constitutes a complete and finite list of each and every item or procedure related to the topics or issues referenced herein. Furthermore, federal, state or local laws, regulations, standards or codes may change from time to time and the reader should always refer to the most current requirements.

3 This presentation will address mostly, common information pertaining to commercial for larger projects. While it does not address residential buildings as a rule the principles are still true. This presentation will discuss why it is important to understand how to read and interpret? Do the job right the first time Save time on the job Justify your work Protect yourself

4 There are many reasons why it is important to correctly read and interpret commercial. Just a few of these reasons are: We generally are required to estimate the cost of a job prior to being hired to perform the work on the project. This is often called the pre job bid process. We use the to determine what the project will require in material, equipment and labor. Drawings, and our understanding of material, equipment, and labor needs, are used to plan and schedule the work. This will help us save time on the job.

5 There may be a need to justify the work done,and a clear understanding of the will greatly help in the justification of work. As important as understanding the details of the work, is knowing the information regarding the dates of revisions and changes. Changes in a construction project almost always occur and must be addressed. Knowing the and the Dates of Revisions in relation to the time when the work is performed can justify the work done and verify the dates of a task and the for that task. Changes made to construction plans happen all the time. If we are unable to verify our timeline of construction against the timeline of the changes we may not be able to receive change order payments for changes to a project.

6 Ultimately commercial are used to gather information from architects and engineers about the owner s desires and requirements for a building. These are used to schedule, plan, and perform the work which is done on a construction project. The work to be done has been priced, to do only one time. If there are changes that are made during a project, these changes may reflect a change in the cost of the work done. This change in cost may be either a deduction or require additional money to complete the change. Without an understanding of the timeline of changes and the work preformed, cost changes to the contract will be difficult to justify. By correctly understanding the we can do a proper job of planning, scheduling and purchasing.

7 Course Objectives Identify the drawing groups that make up a set of construction Identify the different parts of a drawing Understand Schedules, Keys & Legends Understand Isometric & Riser Diagrams Use these for a material take-off

8 A complete set of commercial consists of in different groups, usually by different engineers or architects, placed together to achieve a complete set of. Proper planning, scheduling, and installation can truly occur only when the complete set of is available. It is important to understand the different, and specific information in each of the different groups. It is also important to understand the relationship between these different groups as well as who is responsible for drawing them.

9 As an example: The different drawing groups, which, when combined make up a complete set of construction are; C- A- S- M- P- E- FP- FA- LS- The Different Drawing Groups

10 C- C- refer to a set of known as Civil these are sometimes called plot plans or site plans. Civil show where a building will stand on the property, will show the boundaries of the property, and will also show where site utilities are located, such as water mains, sewer and storm drains, and gas lines. Civil also will show us where we are not allowed to build, by indicating setbacks in easements Civil will be drawn by a civil engineer The Different Drawing Groups C- A- S- M- P- E- FP- FA- LS-

11 A- A- refer to a set of by the architect known as Architectural. They indicate how the architecture of the building or structure is to look. With the specific measurements in the space within the building. Architectural will give us specific dimensions generally measured from column lines. Dimensions of walls as well as thicknesses of walls. Types of doors, and windows. Heights of walls, and heights to ceiling. Architectural are also where we would find any number of elevation, as well as floor plans. Architectural will be drawn by an architect based on the information he has collected from the owner The Different Drawing Groups C- A- S- M- P- E- FP- FA- LS-

12 S- S- refer to the set of which are structural. Where architectural shows how the building will look, Structural show us how the building will be built. There can be a lot of details in the structural. Showing the different types of material which will be used in the structure as well as details on how these materials and corners and joints shall be made. Structural often show us the foundation. Structural are drawn by structural engineers who understand the complexities of helping a building to stand. The Different Drawing Groups C- A- S- M- P- E- FP- FA- LS-

13 M- M-Drawings Refer to Mechanical. The mechanical trade installs building air conditioning and heating as well as exhaust and ventilation. Mechanical should show us where mechanical equipment is to be located, the size and routing of mechanical piping systems and duct work. The area that is to be served as well as information on CFMs is information that is required for the inside environmental conditioning of the space These are drawn by mechanical engineers who understand airflow regulations, and the requirements of the building. The amount of sunlight through the glass, and the different factors that can affect the interior environment of a building. The Different Drawing Groups C- A- S- M- P- E- FP- FA- LS-

14 P- P- refer to the plumbing which give the information for the plumbing systems, and fixtures in a building. These should also give you locations for plumbing equipment such as water heaters and electric watercoolers. While plumbing give us information on fixtures and details regarding those fixtures the plumbing were not what we would use for dimensions in placing of pipe and fixtures, either in an underground installation or in wall rough. Those dimensions are given to us more accurately in the architectural. These are drawn by plumbing engineers who are familiar with occupancy loads for buildings and the requirements of fixture loads on pipe. As well as how the codes will address the pipe fall and the location of the equipment The Different Drawing Groups C- A- S- M- P- E- FP- FA- LS-

15 E- E- refer to the electrical. On these we would find the location of light fixtures, power outlets, electrical switch gears, transformers and anything that the electrical contractor would be responsible for. It will also give the information regarding home run of electrical power back to circuit panels as well as in the specific information regarding the electrical work of the building. Electrical are drawn by electrical engineers familiar with electrical code. The desired use of different areas of the buildings and the effects of different lighting fixtures on inside the building. Also the requirements for all heavy electric equipment The Different Drawing Groups C- A- S- M- P- E- FP- FA- LS-

16 FP- and FA- These refer to fire protection and or fire alarm. Sometimes these are included in one set of. Other times they may be separated into two separate groups FP fire protection and FA fire alarm. This may be determined predominately perhaps by whether that contractor is responsible for both fire protection and fire alarms. However this is not always the case. These are drawn by individuals who may be engineers but who are specifically familiar with requirements for fire sprinkler protection and fire alarm systems, with relation to the location of pull stations strobes and sirens The Different Drawing Groups C- A- S- M- P- E- FP- FA- LS-

17 LS- LS- refer to life safety or plan. These are present in most medical facility. These will exist to show the emergency exit routes and life safety systems that are required by specific buildings. These will also give us the location of fire rated walls, if that information is not included in architectural. These may be drawn by the architect or other individuals who are familiar with the layout of the building for emergencies and situations regarding life safety The Different Drawing Groups C- A- S- M- P- E- FP- FA- LS-

18 These different drawing groups represent technical drawing groups for a set of commercial. There may be other drawing groups that are in a set of. There may be a set of that don t necessarily include all of these drawing groups. These drawing groups are compiled by the different individuals or companies who are putting together a set of which will be compiled to complete a set of commercial for a building. There may be some demolition work in an existing building in which case any one of these drawing groups that we have discussed might be proceeded with the letter D. to designate a demolition drawing. For example demolition architectural D-A, demolition plumbing D-P, demolition electrical D-E. The Different Drawing Groups C- A- S- M- P- E- FP- FA- LS-

19 The in the different drawing groups we have discussed, will contain different parts to each drawing. An understanding of various parts of a drawing and specific information each part gives, help make clear the scope of the work to be done. This discussion of the different parts of should help recognize these parts, and improve understanding of the information that can be found there. Parts of a Drawing

20 Title Box The title box is usually located on the right hand side of the sheet, often in the lower right hand corner. The title box will give information that is pertinent to this drawing. It will tell who was the person who made the drawing, who was the person who approve the drawing, when was the drawing made. Information to a specific for area of the building. If this is a revision, of revision number and the date of that revision. Parts of a Drawing Title Box In the title blocks you ll find the drawing number. The number will have a designation of one of the drawing groups. (A drawing, C drawing, P. drawing< and so forth) as well as drawing number, In this case 4030 represents a job number the drawing number is also a M3.07 that tells us that it is a mechanical drawing 3.07

21 Keys and legends keys and legends are found usually on the first page or perhaps the title page of a set of. Each group will have a key or legend which gives information to help interpret the. Each draftsman will use specific symbols and abbreviations in the drawing to convey certain information. We need to know and understand the use of these symbols and abbreviations. Not everyone uses the same symbol or the same abbreviation for every drawing. Sometimes even compiled in the same building or by the same company are done by different individuals and not necessarily consistent in how they use symbols and/or abbreviations. When looking at a drawing, it is imperative that we understand the key or the legend for each drawing we are using. Parts of a Drawing Title Box Keys & Legends

22 Parts of a Drawing Title Box Keys & Legends This is a small example of a plumbing legend

23 The drawing below would indicate a valve in a line of pipe. It could be a ball valve, or any other type. Not every draftsman uses the symbol to mean the same type valve. Using the key or legend to understand the symbols will save you time and money, or going back to replace a valve because you installed the wrong type. Remember the symbols are not used consistently across the board. Find the key or legend and be familiar with the ones used by the draftsman who has prepared your. Parts of a Drawing Title Box Keys & Legends

24 However there are a few symbols that seem to be used consistently and they are as follows: Is a symbol used to show a turn in the pipe. In this case the pipe turns to face you. This symbol is used from you. to show a pipe turns away Parts of a Drawing Title Box Keys & Legends Using the two symbols above, this symbol represents a trap. The pipe turns away from you and then turns back toward you. These are probably the only consistent symbols you may find in plumbing. The key or legend however will still show you this information.

25 Schedules Schedules are provided in the to give specific information about the equipment or fixtures in the building. In the plumbing it is not uncommon to find fixtures listed as a P-1 for plumbing fixture one and you would reference the schedule for the plumbing to find what a P-1 fixture is. Schedules may be found at the beginning of a group of or may be found at the end of a group of. Schedules provide information on various fixtures and equipment and may be grouped in a manner which may be displayed in more than one schedule for each set of. Parts of a Drawing Title Box Keys & Legends Schedules

26 To find more information on P-2 (seen below), you would reference the plumbing fixture schedule. Parts of a Drawing Title Box Keys & Legends Schedules

27 Parts of a Drawing Title Box Keys & Legends Schedules

28 Special notes appear on to give us some specific information on a drawing that is referenced by a trigger. A trigger may be a number or a letter that is inside of a circle or some specifically shaped box. As in the schedules the letter or number will correspond to the same number or letter of special notes, and often appear on the same page of the drawing where the trigger is located. It is very important to pay attention to special notes as they may refer to one piece of the plumbing system that may be different than similar situations in the same building. Parts of a Drawing Title Box Keys & Legends Schedules Special Notes

29 Parts of a Drawing Title Box Keys & Legends Schedules Special Notes

30 Details in a drawing are given to explain in detail, specific information about objects which may appear too small on the drawing. The detail will enlarge a specific area and give in detail what is required. Details also have their own specific reference like schedules and special notes. Parts of a Drawing Title Box Keys & Legends Schedules Special Notes Details

31 Details may also be called out in a drawing Details as of specific locations may be called out in a drawing by enclosing of that area with a specific mark and touching into that mark a reference to another drawing to give its detail Area called out Reference to another drawing Find the drawing A 1.3 and look for detail number 4 Parts of a Drawing Title Box Keys & Legends Schedules Special Notes Details

32 This detail number is 4. Drawing A 1.3 shows the dimensions for this room that are not in the plumbing or the floor plan Parts of a Drawing Title Box Keys & Legends Schedules Special Notes Details Drawing page A 1.3 detail number 4

33 Drawings are given in two views, one is called plan view and the other an elevation view. The plan view gives the perspective of looking down from above. An elevation view gives the perspective of looking at a wall from the side. Parts of a Drawing Title Box Keys & Legends Schedules Special Notes Details Plan View 4 A 3.5 This example indicates an elevation view of the area in the direction it points. To find the elevation view of the wall or area find drawing page A 3.5 and look for an elevation drawing 4.

34 Plan View Parts of a Drawing Title Box Keys & Legends Schedules Special Notes Details Plan View

35 Elevation View Parts of a Drawing Title Box Keys & Legends Schedules Special Notes Details Plan View Elevation View

36 There are other types of that will be present in commercial drawing sets. Some of these will be parts of the detail and some will be additional information. In some detailed, you may find riser diagrams, which would be single line detail. You may also find orthographic and oblique, which are three dimensional in nature and give you information about size and shape of objects. Single line are not three dimensional, however, if drawn in what is called an isometric drawing. An isometric drawing is drawn on an angle to give the impression of a three dimensional drawing. Isometric are drawn with horizontal pipes on a 30 angle from horizontal, and the vertical lines remain vertical. When this is the way a drawing is presented, it gives the impression of a three dimensional view. Types of Drawings

37 Single line Single line are sometimes called schematics they can indicate the order for equipment and how the flow is between the equipment. Generally it is a line from point A to point B. and then to point C. and so forth. Single line are also used for riser diagrams, especially for plumbing systems and mechanical systems in multistory buildings. VTR EWC EWC Types of Drawings Single line Orthographic and oblique Isometric SW EWC

38 Orthographic and oblique Orthographic and oblique are pictorial by nature giving a three dimensional view of an object. Types of Drawings Single line Orthographic and oblique Isometric

39 Isometric Isometric are drawn on a 30 angle from horizontal. Using isometric graph paper will be the easiest way to do this. Isometric give us the opportunity to look at a single line drawing with a perspective of a three dimensional view. In this view it is very easy to size pipe and to take off fittings. Types of Drawings Single line Orthographic and oblique Isometric

40 Isometric Types of Drawings Using specific graph paper for isometric, which give the 30 degree offset from horizontal. DRAWN Name CHECKED Name ENGINEER Name APPROVED Name SCALE SIZE REV - DWG NUMBER SHEET Single line Orthographic and oblique Isometric

41 Isometric Types of Drawings Begin with a vertical pipe and draw a system using the graph paper. Single line Orthographic and oblique Isometric DRAWN Name CHECKED Name ENGINEER Name APPROVED Name SCALE SIZE REV - DWG NUMBER SHEET

42 Isometric Types of Drawings Using the angle, add a line to represent a horizontal pipe. Single line Orthographic and oblique Isometric DRAWN Name CHECKED Name ENGINEER Name APPROVED Name SCALE SIZE REV - DWG NUMBER SHEET

43 Isometric Types of Drawings Here, add a vertical line for another vertical pipe. Single line Orthographic and oblique Isometric DRAWN Name CHECKED Name ENGINEER Name APPROVED Name SCALE SIZE REV - DWG NUMBER SHEET

44 Isometric Types of Drawings Another vertical pipe Single line Orthographic and oblique Isometric DRAWN Name CHECKED Name ENGINEER Name APPROVED Name SCALE SIZE REV - DWG NUMBER SHEET

45 Isometric Types of Drawings Single line Horizontal pipe connecting Orthographic and oblique Isometric DRAWN Name CHECKED Name ENGINEER Name APPROVED Name SCALE SIZE REV - DWG NUMBER SHEET

46 Isometric Types of Drawings Single line Continue to draw the system. Orthographic and oblique Isometric DRAWN Name CHECKED Name ENGINEER Name APPROVED Name SCALE SIZE REV - DWG NUMBER SHEET

47 Isometric Types of Drawings Finally, add branches and you can size the pipe and take off the fittings required for this DWV battery. Single line Orthographic and oblique Isometric DRAWN Name CHECKED Name ENGINEER Name APPROVED Name SCALE SIZE REV - DWG NUMBER SHEET

48 Isometric Using the isometric drawing figure 1 list pipe sizes for the following; A B C D E F G H I J K L M N O P Q R S T U W X Whet is the fitting at Y What is the total DFUs at pipe A Types of Drawings Single line Orthographic and oblique Isometric

49 Specifications serve several purposes: They spell out the provisions of the contract and the responsibilities of the architect, the owner, the contractor, and the subcontractor. They supplement the working with detailed technical information about the work to be done and the material to be used. They support the and become part of the contract documents. Documentation TECHNICAL SPECIFICATIONS

50 Performance specifications specify the outcome of the construction activity and allow the contractor to decide how to perform the work. Documentation Technical Specifications Performance Specifications

51 Descriptive specifications tell the contractor exactly how to do a particular task. Documentation Technical Specifications Performance Specifications Descriptive Specifications

52 Standard (Reference) Specifications are developed by a party other than the project architect. Documentation Technical Specifications Performance Specifications Descriptive Specifications Standard Specifications

53 Documentation was once a secondary activity for the supervisor, but during the past decade, documentation has grown to become one of the most important tasks. The reason is simple: documentation is vital to a successful business. Documentation

54 The primary documents a contractor may require a supervisor to maintain are: Project communication Daily logs or reports Meeting minutes Photographs Schedule updates Time cards As-built Documentation

55 There are also certain closeout documents that must be completed at the end of a project before the owner accepts the final work. They include: Certificate of Occupancy Certificate of Substantial Completion Punch list Operation and maintenance manuals Warranties and guarantees Documentation

56 Criteria for Good Documentation Documentation 1. The documentation should be accurate. 2. The documentation should be objective. 3. The documentation should be complete. 4. The documentation should be uniform. 5. The documentation should be credible. 6. The documentation should be timely.

57 Throughout every project, supervisors have to communicate their thoughts, ideas, and actions to others. Verbal communication makes for poor documentation because it forces the parties involved to depend on their memories to recall facts and issues that may have been discussed months earlier. Supervisors should therefore use written correspondence when transmitting information to the owner, architectural engineer, contractors, and vendors. Documentation Communication

58 Correspondence includes formal letters, speed messages, memos, and other documents authorized by the company. A Request for Information (RFI), is written correspondence to request clarification about a problem. Documentation Communication

59 Other types of information that should be in writing are: Notification of delays Disruption of scheduled work activities Changes in project schedule Changes to and specifications Any problem that may result in a claim Documentation Communication

60 As-built are developed to show changes to the project as it is being built. These should be clearly identified, kept at the job site, and kept separate from other job. At the completion of the project, the asbuilt are submitted to the architectural engineer as part of the closeout documents. Documentation As-built

61 Documentation Noted in red on this As-Built the 4 Sanitary line has been moved. As-built

62 The daily log provides the following information on a daily basis: Facts about the work Work progress Special requirements or problems Notice of equipment and material deliveries Company and subcontractor personnel on site Visitors to the job, including the owner, architects, inspectors, testing agents, and anyone else who is not employed by the company Documentation Daily Log

63 The project schedule is an estimate of the time and the sequence of events necessary to get the job done and is critical to the timely completion of work. Documentation Schedule

64 Daily time reports should be completed every day and should contain information such as: Hours worked Areas or activities worked on Production rates Documentation Daily Time Reports

65 After construction has been completed, the project closeout documents still must be completed. Among the closeout documents usually required are: Certificate of Occupancy Certificate of Substantial Completion (Punch list) Operation and maintenance manuals Warranties and guarantees Documentation Closeout Documents

66 In summary, we need to understand the information given in a set of commercial. By understanding the information completely and correctly we save time and money. Reading commercial is an activity we get better at, the more we practice. It will be difficult to pick up a set of, and the first time be able to completely understand the information given. If used properly, and understood completely, can help a contractor to be successful in they re work on any project. Summary

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

1. Land survey Work. 2. Civil and Structural engineering services.

1. Land survey Work. 2. Civil and Structural engineering services. SECTION 01050 FIELD ENGINEERING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division-1 Specification

More information

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS INTRODUCTION In this lesson, you ll learn about the different types of drawings used in the construction industry, and how to read floor plans, section drawings,

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

A/E REVIEW CHECKLIST HVAC

A/E REVIEW CHECKLIST HVAC A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

Entry Level Assessment Blueprint Architectural Drafting

Entry Level Assessment Blueprint Architectural Drafting Entry Level Assessment Blueprint Architectural Drafting Test Code: 4004 / Version: 01 Specific Competencies and Skills Tested in this Assessment: Preparing to Draw Identify drafting tools, materials, and

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

A. Section includes administrative and procedural requirements for project record documents, including the following:

A. Section includes administrative and procedural requirements for project record documents, including the following: SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax: City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information

Tri-County Commercial Application Checklist

Tri-County Commercial Application Checklist TRI-COUNTY SERVICE CENTER TRI-COUNTY SERVICE CENTER State of Oregon Clackamas Multnomah Washington C O U N T I E S Tri-County Commercial Application Checklist Department of Consumer & Business Services

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

Architectural Floor Plan Symbols

Architectural Floor Plan Symbols Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section

More information

SECTION OPERATION AND MAINTENANCE DATA

SECTION OPERATION AND MAINTENANCE DATA SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.

More information

RIT CAD Specifications

RIT CAD Specifications RIT CAD Specifications The design team shall provide RIT with Revit, AutoCAD, and PDF files that capture the construction conditions of the associated project. This document outlines requirements for submitting

More information

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers Addendum to Description of Services for Building and Planning, 2012 8.4 Digital Design 2016 The Association of of Consulting Engineers FRI and DANSKE ARK Addendum to Description of Services for Building

More information

Drawing Types & Construction Drawings

Drawing Types & Construction Drawings Drawing Types & Construction Drawings Building projects require several types of specialised drawings. This collection of drawings, known as a project set, includes: Location Plan Site Plan Floor Plan

More information

Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products

Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products Plumbing Plans Introduction Classifications of piping: Industrial Carries liquids and gases used in the manufacture of products Residential (i.e., plumbing) Carries fresh water, gas, liquid, solid waste

More information

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos BIM Introduction Building Information Management Definitions, Applications and general information Betty Bezos betty@bezos.com 9/1/2017 1 9/1/2017 2 Innovations in BIM 3D Design: 3D visualizations allow

More information

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. DESIGN REQUIREMENTS 1. CONTRACT DOCUMENT FORMAT: 1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. 1.2 The Electronic Drafting Program used for the Contract Drawings

More information

3 Basic Code Enforcement, Part 3

3 Basic Code Enforcement, Part 3 Study Session 3 Basic Code Enforcement, Part 3 Technical Aspects of Code Enforcement OBJECTIVE: To become familiar with the technical aspects of code enforcement: first, by learning to recognize the basic

More information

Architectural Drafting

Architectural Drafting Measuring What Matters in Job Ready Assessment Blueprint Architectural Drafting Test Code: 4004 / Version: 01 Copyright 2012 General Assessment Information Blueprint Contents General Assessment Information

More information

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

Vanderbilt University Standard Specification Revised 2/6/08

Vanderbilt University Standard Specification Revised 2/6/08 SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 RELATED SECTIONS A. Section 01 77 00 Closeout Procedures B. Section 01 78 39 Project Record Documents 1.02 SUMMARY A. This section provides

More information

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document. Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer

More information

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

UDS OVERVIEW Uniform Drawing System

UDS OVERVIEW Uniform Drawing System UDS OVERVIEW Uniform Drawing System The Construction Specifications Institute 601 Madison Street Alexandria, VA 1994 CSI began development of UDS Organization and presentation of drawing sets Organization

More information

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL T Architecture Interiors Planning 1165 BRITTMOORE RD. HOUSTON, TEXAS 7704 (T) 71.626.400 (F) 71.626.401 in association with: www.garnerfritsche.com CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL An HCA Affiliated

More information

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon 97132 OWNER ARCHITECT X CONSULTANT OWNER: DATE OF ISSUANCE:

More information

PORTAGE COUNTY WATER RESOURCES DRAFTING STANDARDS. Date: January 26, 2001

PORTAGE COUNTY WATER RESOURCES DRAFTING STANDARDS. Date: January 26, 2001 PORTAGE COUNTY WATER RESOURCES DRAFTING STANDARDS Date: January 26, 2001 Portage County Water Resources Drafting Standards. AutoCad 2000/Land Development Desktop R2 Friday, January 26, 2001 Preface: Part

More information

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX INDEX OF SHEETS SHT. DWG. SHEET TITLE GENERAL 1 G1 COVER SHEET, VICINITY MAP, PROJECT DESCRIPTION 43 A402 INTERIOR ELEVATIONS WOMENS 44 A403 INTERIOR ELEVATIONS MENS 45 A404 INTERIOR ELEVATIONS BUILDING-PLUMBING

More information

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,

More information

The CAD Technician s Role in Office Practice and Procedure

The CAD Technician s Role in Office Practice and Procedure COMMERCIAL DRAFTING AND DETAILING 4TH EDITION JEFFERIS SOLUTIONS MANUAL Full download at: https://testbankreal.com/download/commercial-drafting-detailing-4th-editionjefferis-solutions-manual/ Chapter 2

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone: CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA 50311 Phone: 515-283-4200 Minor Site Plan list This checklist should be used as a guide in the preparation of

More information

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD SECTION 01 10 12 DESIGN AFTER AWARD 1. DESIGN RESPONSIBILITY The Contractor shall furnish and be responsible for a complete set of design documents as called for in specification section 01 10 10 DESIGN

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

SPARTAN DAY CAMP 4814 FREEDOM RING RD

SPARTAN DAY CAMP 4814 FREEDOM RING RD 484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS

More information

Architectural Design Process

Architectural Design Process Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation

More information

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A CHL ASSOCIATES ARCHITECTURE 1 5 7 0 R I V E R R O A D, M A R I E T T A, P E N N S Y L V A N I A 1 7 5 4 7 HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E 1 0 2 L A N C A

More information

Simonson Design Lab, Inc. Design Agreement

Simonson Design Lab, Inc. Design Agreement 2016-2017 Simonson Design Lab, Inc. The Terms Consultation Time: The time you spend working directly with a designer either with or without your builder. We highly recommend you use the A Guide to Designing

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address: #506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the

More information

National BIM Standard - United States Version 3

National BIM Standard - United States Version 3 National BIM Standard - United States Version 3 5 Practice Documents 5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination Requirements for Construction Installation

More information

Standard Drawing Conventions

Standard Drawing Conventions TRADE OF Pipefitting PHASE 2 Module 5 Technical Drawing UNIT: 2 Produced by In cooperation with subject matter expert: Finbar Smith SOLAS 2014 Table of Contents Unit Objective... 1 Learning Outcome...

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS 510.1 Emergency responder radio coverage in new buildings. Approved radio coverage for emergency responders shall be provided within all buildings meeting any one of the following conditions: 1. There

More information

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS Building and Development Permit Applications Definitions: Type A Residential Projects: All projects related to one and two unit dwellings Type B Residential Projects: All projects related to Apartments,

More information

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015 Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015 Special Notes API publications necessarily address problems

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

Using Engineer and Architect Scales

Using Engineer and Architect Scales Using Engineer and Architect Scales NOTE: When PRINTING this document, be sure the pull down menu next to Print Scaling in the Print Dialog window is set to None. This will ensure the sample drawings will

More information

Piping & Equipment Identification

Piping & Equipment Identification Piping & Equipment Identification Part 1 General 1.01 Description of Work A. Work in this section includes: Identification materials, including necessary accessories indicated on Contract Documents and

More information

Engineering Drawing System

Engineering Drawing System LPR 7320.1 Effective Date: February 2, 2010 Expiration Date: February 2, 2015 Langley Research Center Engineering Drawing System National Aeronautics and Space Administration Responsible Office: Systems

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

Drawing Standards & Conventions for IDD

Drawing Standards & Conventions for IDD Drawing Standards & Conventions for IDD This document consists of a set of standards that have been developed to maintain a consistency in Interior Decoration and Design students work. The standards are

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION This Page Intentionally Left Blank Date Received Receipt Number Approved Date Date: Zoning: Intended Use of Structure: Home

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

Strengthened Technical-Vocational Education Program COURSE DESIGN

Strengthened Technical-Vocational Education Program COURSE DESIGN COURSE DESIGN COURSE TITLE : DRAFTING TECHNOLOGY NOMINAL DURATION : 1200 HOURS QUALIFICATION LEVEL : NC II COURSE DESCRIPTION : This course is designed to enhance the knowledge, skills, and positive attitudes

More information

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

Estimated Cost of Project Contractor License No. Contractor Qualifier No. Building, Safety and Zoning Department COMMERCIAL Application for Building Permit Owners and/or Contractors: Please fill out all the information listed below and submit those documents needed for your

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

What Plans Do I Need for a Building Permit?

What Plans Do I Need for a Building Permit? What Plans Do I Need for a Building Permit? 6 CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1900 SW 4th Avenue, Por tland, Oregon 97201 503-823-7300 www.portlandoregon.gov/bds This brochure

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Listed below are the competencies required and examples from the aforementioned job:

Listed below are the competencies required and examples from the aforementioned job: 1. Technical Analysis Instructions: Describe a project for which you collected and interpreted or analyzed technical data for development of engineering designs and drawings from concepts and specifications.

More information

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota

More information

Bidders for the Oak Brook Park District Family Locker Room Renovation

Bidders for the Oak Brook Park District Family Locker Room Renovation BIDDING & CONTRACT REQUIREMENTS Document 00901 Addendum No. 1 Date: June 1, 2017 From: To: Wight Construction Services, Inc. 2500 Frontage Road Darien, IL 60561 Bidders for the Oak Brook Park District

More information

Safety (OSHA 10 hour)

Safety (OSHA 10 hour) Construction Technology Core and Sustainable Construction Subject Code: 178000 Students will learn principles in basic safety (10-hr OSHA), construction math, hand and power tool are and operation, blueprint

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

For crossing under a railroad, contact the specific railroad company's engineering department.

For crossing under a railroad, contact the specific railroad company's engineering department. PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure

More information

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards] SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each

More information