1 athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank 2, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main , $2,9, SITE $32, Campus Total 2, $3,2,30 Building: Main Category: Building Exterior Entrance Entrance Control - Audio EA $3,9 Entrance Control - Audio EA $,9 Exterior Doors - Exterior FRP Door EA $2,2 Exterior Doors - Exterior Steel Door EA $,9 Exterior Doors - Side lite EA $,23 Exterior Doors - Store Front 3 EA $,099 Exterior Doors - Transom Lite EA $3, Foundation Lighting Roof System Foundation - Concrete,0 LF Superstructure - Metal Deck/ Concrete Topping 2, SF Exterior Lighting - Wall Mounted 2 EA $ Exterior Lighting - Wall Mounted 3 EA $3, Chimney - Metal Flue 3 LF $,3 Coping - Stone,20 LF $,0 Downspouts - Interior Downspouts,20 LF $,2 Parapet - " - 30" Height 0 LF $,90 GREEE Page of Assessment Date: /2/20
2 Category: Building Exterior Roof System athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Parapet - Parapet > 30",200 LF $,0 Roof - Modified Bitumen 33, SF $3,2 Roof Structure - Steel / Metal Deck/ Concrete Topping 33, SF Walls Windows Canopy - Metal 20 SF $3,3 Exterior Walls - Brick 20 SF $3,293 Exterior Walls - Brick 3,90 SF $29,33 Exterior Walls - Stone-Cast 0 SF $ Exterior Walls - Stone-Cast,3 SF $3,2 Clerestory - Glass Double-Pane 20 SF $2,3 Guard - Guards perforated 2,90 SF $3,92 Lintels - Steel, LF $33,093 Windows - Louver 20 SF $, Windows - Sash Aluminum Double-pane,00 SF $0,03 Building Exterior Subtotal: $9, Building: Main Category: Electrical System Emergency System Automatic Transfer Switch EA $ Emergency A/C Power - Corridors and Stairs,39 SF $,23 Emergency A/C Power - Gym,0 SF $,3 Emergency A/C Power - Lunchrooms 3,920 SF $, Emergency A/C Power - Students Toilets 2,90 SF $ Emergency Battery Packs - Corridors and Stairs 30 EA $,0 Emergency Battery Packs - Gym EA $,03 Emergency Battery Packs - Lunchrooms EA $, Emergency Battery Packs - Students Toilets 0 EA $2,02 Exit Signs - Corridors and Stairs EA 2 $2,20 Exit Signs - Gym 3 EA 2 $,3 Exit Signs - Lunchroom 2 EA 2 $,09 Security System - CCTV 2, SF $2, Security System - Intrusion Detection 2, SF $2, GREEE Page 2 of Assessment Date: /2/20
3 Category: Electrical System Emergency System athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Main Service Power Distribution Independent Electrical Service for emergency power EA $2,92 Main Electrical Service A 2/0/3PH 2 EA PA System 2, SF $2,9 Lighting and Power Panels - 00 A EA $299 Lighting and Power Panels - Above 00 A 2 EA Main Distribution Panels amp 3 EA Transformers - 2/0-20/20 EA Electrical System Subtotal: $20,3 Building: Main Category: Safty System Fire Alarm Fire Alarm Panel EA Fire Alarm Strobe Lights 2, SF Fire Alarm_System 2, SF Fire Pump Controller EA $,23 Pump Room Assembly Sprinkler System Fire Pump hp EA $, Jockey Pump EA $ Sprinkler Heads 2, SF Sprinkler Piping 2, SF Wet Sprinkler System 2, SF Safty System Subtotal: $,39 Building: Main Category: Mechanical System GREEE Page 3 of Assessment Date: /2/20
4 Category: Mechanical System Air Conditioning Air Handling Systems Boiler Systems Heating Devices Mechanical Plumbing athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Chiller-Air Cooled- Recipricating-Roof Mounted tons EA $3,9 Condensing Unit- Ground Mounted - Less than tons EA $3,33 Glycol Feed EA $90 Pipes - Chilled Water Pipe- Copper 00 LF Pipes - Chilled Water Pipe- Steel 0 LF Air Handling Unit- Package Multi Zone- Indoor- Hot Water and Chilled Water Coils EA $3, cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils EA $3, cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils EA $3, cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - Greater EA $3,30 than 30,000 cfm Air Intake 3 EA Fan Power Box - Fan Power Box with Hot Water Coil EA $,23 Indoor Return Fans- Centrifugal Inline CFM EA $, Indoor Return Fans- Centrifugal Inline CFM EA $, Indoor Return Fans- Centrifugal Inline - Greater than CFM EA $2,33 Make Up Air Unit- Roof Mounted- Gas Heating ,000 cfm EA $,302 VAV Box 2 EA $,2 Zone Dampers EA $, Boiler Auxiliary- on Condensing Hot Water MBH EA $3, Combustion Dampers 2 EA $ Glycol Feed System EA $39 on Condensing- Water Tube- Flexible Tube- Force Draft- Hot Water Boiler EA $,9 MBH Piping - Dual Temperature Pipes- Copper 0 LF $, Piping - Dual Temperature Pipes- Steel 20 LF $2 Cabinet Heaters - With Hot Water Coil EA $, Radiator Panels - Hot Water 0 EA $2, Unit Heater - Hot Water EA $,39 Chilled Water Pump HP 2 EA $2, Daul Temperature Pump HP 2 EA $2, GREEE Page of Assessment Date: /2/20
5 Category: Mechanical System Mechanical Plumbing athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Hot Water Pump HP 2 EA $2, Temperature Control Ventilation DDC System 2, SF $3,9 Thermostats - DDC EA Exhaust Fans- Indoor CFM EA $92 Exhaust Fans- Roof Mounted CFM EA $2,30 Type I Exhaust Hood- Kitchen 3 EA Type II Exhaust Hood- Warming Kitchen EA Mechanical System Subtotal: $9,9 Building: Main Category: Plumbing System Hot Water Electric Heater KW EA $2 Gas Heater BTU/HR 2 EA $20 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures 2, SF Domestic Piping-Cold Water Horizontal Lines 2, SF Domestic Piping-Cold Water Risers 2, SF Domestic Piping-Hot Water from Risers to Fixtures 2, SF Domestic Piping-Hot Water Horizontal Lines 2, SF Domestic Piping-Hot Water Return Lines 2, SF Domestic Piping-Hot Water Return Risers 2, SF Sanitary Piping 2, SF Storm Piping 2, SF Vent Piping 2, SF Pumps - Domestic Booster Pump-Duplex EA $,9 Pumps - Sump-Simplex EA $ Plumbing System Subtotal: $,02 GREEE Page of Assessment Date: /2/20
6 Category: Classrooms Art Room ( room) athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Casework LF $,3 Ceiling - Lay-in,0 SF $3,2 Chalk Board 2 LF $2,203 Doors - Side-lite SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet,0 SF $,09 Lighting - Lay-in EA Storage/ Closet 90 SF $3 Walls - Concrete Block 00 SF $2,3 Walls - Plaster/Drywall SF $,3 Work Sink EA $39 Computer Lab ( room) Faculty Lounge ( room) Casework 0 LF $2,2 Ceiling - Lay-in,00 SF $3,3 Chalk Board 2 LF $3 Doors - Side-lite SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet,00 SF $,0 Lighting - Lay-in 2 EA Storage/ Closet SF $3 Walls - Concrete Block 20 SF $2 Walls - Plaster/Drywall 3 SF $2,32 Work Sink EA $39 Casework 3 LF $909 Ceiling - Lay-in 0 SF $2,3 Chalk Board 2 LF $2,203 Doors - Side-lite SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet 0 SF $ Lighting - Lay-in 2 EA Storage/ Closet SF $3 Walls - Concrete Block 2 SF $2,292 Walls - Plaster/Drywall 2 SF $20 Work Sink EA $39 GREEE Page of Assessment Date: /2/20
7 Category: Classrooms ( rooms) athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Casework 232 LF $,9 Ceiling - Lay-in,23 SF $2, Chalk Board LF $,09 Doors - Side-lite SF $02 Doors - Transom Window SF $3 Doors - Wood Doors inclu hw EA $2,0 Floor - Tile/Sheet,23 SF $,20 Lighting - Lay-in 0 EA $2,9 Storage/ Closet 0 SF $3,23 Walls - Concrete Block,3 SF $,9 Walls - Plaster/Drywall 2,90 SF $,023 Work Sink 9 EA $,20 Music Room ( room) Casework LF $0 Ceiling - Lay-in,00 SF $3,3 Chalk Board 2 LF $2,203 Doors - Side-lite SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet,00 SF $,0 Lighting - Lay-in 2 EA Storage/ Closet SF $3 Walls - Concrete Block 20 SF $2 Walls - Plaster/Drywall 3 SF $2,32 (20 rooms) Casework 39 LF $,3 Ceiling - Lay-in SF $ Ceiling - Lay-in,2 SF $9,9 Chalk Board 3 LF $3,2 Chalk Board 2 LF $3 Doors - Side-lite 0 SF $2, Doors - Wood Doors inclu hw 20 EA $,020 Floor - Carpet 90 SF $2,0 Floor - Tile/Sheet,2 SF $, Lighting - Lay-in 2 EA $2, Lighting - Lay-in 20 EA Marker Board 2 LF GREEE Page of Assessment Date: /2/20
8 Category: Classrooms (20 rooms) Science Classroom ( room) Special Education ( room) athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Storage/ Closet 2 SF $,3 Walls - Concrete Block 2, SF $3, Walls - Metal Panel 0 SF $,0 Walls - Plaster/Drywall,2 SF $20, Work Sink EA $,3 Casework 0 LF $, Ceiling - Lay-in,2 SF $3,3 Chalk Board 2 LF $2,203 Doors - Side-lite SF $2 Doors - Wood Doors inclu hw 2 EA 2 Floor - Tile/Sheet,93 SF $,9 Lighting - Lay-in EA Storage/ Closet SF $3 Walls - Concrete Block 29 SF $ Walls - Plaster/Drywall SF $2,3 Work Sink 3 EA $,3 Casework 2 LF $2 Ceiling - Lay-in SF $, Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet SF $ Lighting - Lay-in EA $ Marker Board 2 LF $2 Walls - Concrete Block 2 SF $,23 Walls - Plaster/Drywall 39 SF $,093 Classrooms Subtotal: $3,2 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Lay-in,39 SF $3,090 Doors - Side-lite SF $3 Doors - Steel Doors incl hw 3 EA $903 GREEE Page of Assessment Date: /2/20
9 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Doors - Wood Doors inclu hw 0 EA $3,00 Floor - Carpet 2, SF $,2 Floor - Terrazzo 3 SF $9 Floor - Tile/Sheet,0 SF $,023 Lighting - Lay-in 3 EA $,9 Lighting - Lay-in EA Power Distribution 2 EA Storage/ Closet 0 SF $ Walls - Concrete Block, SF $3, Walls - Plaster/Drywall,03 SF $3,9 Work SInk 2 EA $,0 Gymnasia Kitchen Library Bleacher Seating EA $2, Ceiling - Exposed, SF $,3 Doors - Steel Doors incl hw 2 EA 2 Floor - Wood, SF $29,2 Lighting - Metal Halide/Sodium Vapor EA $2, Lighting - Pendent/Surface 2 EA $, Sound System EA $, Storage/ Closet 0 SF $,0 Walls - Concrete Block, SF $2,90 Ceiling - Lay-in,9 SF $,22 Doors - Steel Doors incl hw 2 EA 2 Floor - Concrete Epoxy/ Painted,9 SF $92 Lighting - Lay-in EA $2, Serving Line 3 LF $2,02 Storage/ Closet SF $,0 Walls - Concrete Block 2,9 SF $,3 Casework LF $,39 Ceiling - Lay-in 2, SF $,20 Doors - Side-lite SF $2 Doors - Wood Doors inclu hw 2 EA 2 Floor - Carpet 2, SF $, Lighting - Lay-in 3 EA GREEE Page 9 of Assessment Date: /2/20
10 Category: Rooms (Other Than Classrooms) Library athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Walls - Concrete Block,200 SF $3, Walls - Plaster/Drywall 20 SF $2,23 Locker/Shower Room Accessories SF $9 Ceiling - Lay-In SF $3 Doors - Steel Doors incl hw 2 EA 2 Floor - Concrete SF $9 Floor Drain 2 EA $2, Lavatory 2 EA $39 Lighting - Lay-in 2 EA $23 Partitions 2 EA $9 Student Lockers - One Tier 0 EA $92 Walls - Concrete Block 32 SF $9 Walls - Tile Ceramic/ Porcelain 32 SF $3 Water Closet 2 EA $2 Lunch & Multipurpose Room Ceiling - Exposed 3,30 SF $,9 Ceiling - Lay-in SF $, Doors - Wood Doors inclu hw 3 EA $903 Floor - Tile/Sheet 3,92 SF $3,92 Lighting - Pendent/Surface 20 EA $2, Walls - Concrete Block,3 SF $2,3 MDF_IDF AC Unit EA $9 Doors - Wood Doors inclu hw EA $30 Finishes 3 SF $,092 Ventilation and Cooling EA $, Mechanical/ Service Rooms Boiler Room 2,0 SF $,0 Janitor's Closet 3 SF $, Loading Docks 9 SF $23 Mechanical/ Service Rooms,9 SF $, Storage Room 2 SF $,9 Restroom Accessories 2,0 SF $23,2 GREEE Page 0 of Assessment Date: /2/20
11 Category: Rooms (Other Than Classrooms) Restroom athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Ceiling - Lay-in 3 SF $20 Ceiling - Lay-in,09 SF $3,20 Ceiling - Plaster/Drywall, SF $,039 Doors - Wood Doors inclu hw 0 EA $3,00 Floor - Terrazzo 2,0 SF $,0 Floor Drain 30 EA $3, Lavatory EA $,02 Lighting - Lay-in 2 EA $3,33 Lighting - Lay-in 2 EA Partitions 32 EA $9,02 Urinals EA $,3 Urinals EA $3,9 Walls - Structural Glazed Tile,9 SF $23, Walls - Tile Ceramic/ Porcelain, SF $3,2 Water Closet 2 EA $, Rooms (Other Than Classrooms) Subtotal: $,23 Building: Main Category: Building Interior Corridor Ceiling - Exposed 20 SF $2 Ceiling - Lay-in 3,29 SF $39,93 Doors - Steel Doors incl hw 2 EA $3,2 Doors - Transom Window 2 EA $, Drinking Fountains - Double Water Cooler EA $3 Drinking Fountains - Single Fountain EA $,930 Floor - Terrazzo 3, SF $,0 Lighting - Lay-in 3 EA $,93 Lighting - Lay-in EA Lighting - Pendent/Surface 2 EA $3,9 Walls - Concrete Block,00 SF $23, Walls - Structural Glazed Tile 3,0 SF $, Safety Camera Viewing Station 2 EA $,3 GREEE Page of Assessment Date: /2/20
12 Category: Building Interior Safety athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Security Cameras EA $ Stairs Vertical Conveyance Ceiling - Lay-in SF $2,23 Floor - Terrazzo, SF $,0 Handrails 32 LF $2,0 Lighting - Lay-in EA $2,2 Stairs - Terrazzo LF $, Walls - Concrete Block,0 SF $2,9 Walls - Structural Glazed Tile 2,0 SF $,9 Elevator - Hydraulic Elevator EA $9,23 Building Interior Subtotal: $33, Total Building Cost $2,9, SITE Category: Site Civil/Drainage Fencing Landscape Civil/ Drainage - Catch Basin EA $,9 Civil/ Drainage - Site Manhole EA $,9 Fencing - ew Standard Ornamental 0 LF $,2 Fencing - ew Standard Ornamental, LF $,9 Benches EA $,20 Landscape - Grass 0,2 SF $,99 Landscape - Hardscape- Concrete,30 SF $, Lighting - Pole Mounted 2 EA $,0 Lighting - Pole Mounted 3 EA $3,2 Parkway trees 20 EA $3,20 Planting Beds/ Area 0, SF $,20 Trash Receptacles EA $32 GREEE Page 2 of Assessment Date: /2/20
13 athanael Greene Elementary School 32 S Honore St Chicago, IL 009 SITE Category: Site Parking Lot Sidewalks Signage Concrete Curbs 90 LF $0, Lighting - Pole Mounted EA $,2 Lighting - Pole Mounted 2 EA $2,90 Surface - Asphalt,20 SF $3,2 Surface - Concrete 90 SF $2, Trash Enclosure - Wood 0 SF $30,92 Sidewalks - Internal Walks,020 LF $2,22 Sidewalks - Perimeter Sidewalks 9,0 SF $9,9 Flag Pole - Flag Pole EA $, Monument - Sign EA Site Subtotal: $32, Total Site Cost $32, Campus Total ² ³ $3,2,30 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). GREEE Page 3 of Assessment Date: /2/20
14 athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. GREEE Page of Assessment Date: /2/20
15 athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Art Room Computer Lab Faculty Lounge Music Room Science Classroom Special Education Art Room Office st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor ,0,00 0,092,092,092,092,092,092 2, , GREEE Page of Assessment Date: /2/20
Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationMahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620
W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationWendell E Green Elementary School 1150 W 96th St Chicago, IL 60643
11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationPaul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620
82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationJames Shields Middle School 2611 W 48th St Chicago, IL 60632
2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJosefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623
3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This
More informationThomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK
Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the
More informationCharles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationGeorge Washington Elementary School 3611 E 114th St Chicago, IL 60617
3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up
More informationCharles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617
S Cregier Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationMarcus Moziah Garvey Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationUniversity of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL
Facility Assessment Report 9 E 4th St Chicago, IL 03 This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationThomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608
W Roosevelt Rd Chicago, IL 8 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationWilliam H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609
S Hermitage Ave Chicago, IL 9 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationJackie Robinson Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAmos Alonzo Stagg Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationA.N. Pritzker School 2009 W Schiller St Chicago, IL 60622
A.. Pritzker School 2009 W Schiller St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document
More informationFriedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657
39 Wolcott Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationPhilip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645
34 Washtenaw Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationJohann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647
3 Rockwell St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationEmmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationHiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationFranklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610
22 W Evergreen Ave Chicago, IL 1 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationWendell Smith Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationEllen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612
33 W Ohio St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationHarriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationJames Otis Elementary School 525 N Armour St Chicago, IL 60642
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationEPIC Academy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationFrederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622
2 W Rice St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJohn Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641
Kilbourn Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJoseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623
3 W 3st St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJoseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationLorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationLangston Hughes Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationEverett McKinley Dirksen Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationSTEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationPerspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653
33 S Wabash Ave Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationArchitecture, Construction, and Engineering Technical Charter
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629
3 W th St Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationDisney II Magnet School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJames Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647
W Schubert Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationAndrew Carnegie Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationGeorge Washington Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationPhilip Rogers Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWilliam Rainey Harper High School 6520 S Wood St Chicago, IL 60636
0 S Wood St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationCharles N Holden Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRobert Fulton Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDaniel S Wentworth Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNorth Lawndale College Prep Charter - Collins
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationKIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWilliam J Onahan Elementary School 6634 W Raven St Chicago, IL 60631
3 W Raven St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJonathan Burr Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationMorton School of Excellence
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAlexander Graham Bell Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRufus M Hitch Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Spry Elementary Community School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Milton Gregory Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Harvard Elementary School of Excellence
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationSITE $1,539,659. Item - Type Quantity Unit Rank Cost. Entrance Control - Audio and Video 2 EA Exterior Doors - Exterior Wood Door 2 EA
Facility Assessment Report S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS This report contains a summary of the results from the facility
More informationRichard J Oglesby Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationUniversity of Chicago Charter - NKO
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWendell Phillips Academy High School 244 E Pershing Rd Chicago, IL 60653
E Pershing Rd Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationManley Career Academy High School 2935 W Polk St Chicago, IL 60612
293 W Polk St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationUniversity of Chicago Charter - Carter G Woodson
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWilliam Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631
W Bryn Mawr Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJohn Hancock College Preparatory High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDisney II Magnet High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCharles Allen Prosser Career Academy High School 2148 N Long Ave Chicago, IL 60639
28 Long Ave Chicago, IL 39 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationWilliam Penn Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationArthur A Libby Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWalt Disney Magnet Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationMulticultural Academy of Scholarship
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationFrancis W Parker Elementary Community Academy 6800 S Stewart Ave Chicago, IL Co-locating on this campus are AMANDLA and PARKER
Facility Assessment Report S Stewart Ave Chicago, IL 2 Co-locating on this campus are AMADLA and PARKER This report contains a summary of the results from the facility assessment completed on the date
More informationJohn L Marsh Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationUrban Prep Academy for Young Men - West
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationArthur E Canty Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn F Kennedy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCyrus H McCormick Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAcademy for Global Citizenship Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationGeorge Washington High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationGeorge W Tilton Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNorman A Bridge Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationBrian Piccolo Elementary Specialty School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationPhoenix Military Academy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJoseph E Gary Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationTheodore Roosevelt High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAmandla Charter High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRichard T Crane Medical Preparatory HS
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationHenry H Nash Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWilliam Howard Taft High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationBetty Shabazz Intl Charter - DuSable Leadership
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationLegacy Charter Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationBowen High School. Definitions EXTERIOR E 89th St Chicago, IL Co-locating on This Campus: Bowen HS and Noble St Chtr-Orange
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationOCPS Submittal Register for Product Data and Shop Drawing Reviews
OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition
More informationOLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN
KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12
More informationCS2.0 COVER SHEET VOL. 2
ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:
More informationBUILDING PLAN REVIEW REQUIREMENTS
TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings
More informationDesign Deliverables. Summary. A. Expectations for Design Deliverables:
Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations
More information