1 Facility Assessment Report S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank, or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 1, $1,, Addition 1,0 $,1,1 SITE $1,, Campus Total 10, $1,0, Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video EA $1, Exterior Doors - Exterior Steel Door EA $, Exterior Doors - Exterior Wood Door EA $, Exterior Doors - Overhead Rolling/ Garage Door EA $, Exterior Doors - Transom Lite 1 EA $ Exterior Doors - Transom Lite EA $11, Exterior Stairs - Concrete 0 LF $, Exterior Stairs - Concrete 1,0 LF $10,0 Power Door Operator and Controls 1 EA Ramp Handrail - Steel_Ramp Handrail 1 LF $1,1 Ramps - Concrete LF $1, Stair Handrail - Steel_Stair Handrail LF $,1 Foundation Lighting Foundation - Concrete,1 LF Superstructure - Steel with Clay Tile Arch, SF Exterior Lighting - Parapet or Roof Mounted 1 EA $10,1 WILLIAMS HS Page 1 of Assessment Date: 11//01
2 Category: Building Exterior Lighting S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Exterior Lighting - Wall Mounted EA $1,0 Roof System Walls Windows Chimney - Brick Chimney- Concrete/ Mortar Liner LF $,0 Coping - Stone,0 LF $10,11 Downspouts - Exterior Downspouts LF $ Downspouts - Interior Downspouts 1 LF $,1 Parapet - 1" - 0" Height LF $, Parapet - Parapet > 0", LF $0,10 Roof - Metal 1 SF $, Roof - Modified Bitumen 11,1 SF $1,1,0 Roof Structure - Steel with Clay Tile Arch 11, SF Cheek-Wall - Stone SF $,1 Exterior Walls - Brick 100, SF $,0 Exterior Walls - Stone-Cast,0 SF $,0 Guard - Guards perforated 10, SF $1,0 Lintels - Steel, LF $10, Skylite - Glass Single-Pane SF $,1 Windows - Sash Aluminum Double-pane,0 SF $, Building Exterior Subtotal: $,0, Building: Main Category: Electrical System Emergency System Automatic Transfer Switch EA $1 Emergency A/C Power - Auditoium and Aisle Lighting, SF $, Emergency A/C Power - Corridors and Stairs 1, SF $, Emergency A/C Power - Gym 10,1 SF $, Emergency A/C Power - Lunchrooms, SF $, Emergency A/C Power - Students Toilets, SF $, Emergency Battery Packs - Auditoium and Aisle Lighting EA $ Emergency Battery Packs - Corridors and Stairs 1 EA $0 WILLIAMS HS Page of Assessment Date: 11//01
3 Category: Electrical System Emergency System S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Emergency Battery Packs - Gym 1 EA $0 Emergency Generator- Outdoor- Diesel KW 1 EA Exit Signs - Auditoium 0 EA $, Exit Signs - Corridors and Stairs 101 EA $1, Exit Signs - Gym 10 EA $1, Exit Signs - Lunchroom EA $1,1 Exit Signs - Pool EA $ Security System - CCTV, SF $1,00 Security System - Intrusion Detection, SF $,11 Main Service Power Distribution Independent Electrical Service for emergency power 1 EA Main Electrical Service A 0//PH EA $1, Main Electrical Service to 000 A 0//PH 1 EA $10, PA System, SF $, Lighting and Power Panels A 1 EA $,1 Lighting and Power Panels A 1 EA Lighting and Power Panels - Above 100 A 1 EA $,0 Lighting and Power Panels - Above 100 A EA Main Distribution Panels amp EA $,1 Main Distribution Panels amp EA Main Distribution Panels - Greater than 00 amp EA Transformers - /0-0/0 EA $, Electrical System Subtotal: $, Building: Main Category: Safty System Fire Alarm Fire Alarm Panel 1 EA $, Fire Alarm Strobe Lights, SF $,1 Fire Alarm_System, SF $1,1 Safty System Subtotal: $11,0 WILLIAMS HS Page of Assessment Date: 11//01
4 Category: Mechanical System Air Handling Systems S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Air Handling Unit- Built Up- Single Zone- Steam Coils cfm 1 EA $, Air Handling Unit- Built Up- Single Zone w/ Air Tunnel- Steam Coils cfm EA $, Air Handling Unit- Built Up- Single Zone w/ Air Tunnel- Steam Coils - Greater than 000 cfm 1 EA $1,1 Air Handling Unit- Built Up-Multi Zone- Steam Coils cfm EA $1, Air Handling Unit- Built Up-Multi Zone- Steam Coils cfm 1 EA $0,00 Air Intake EA $1, Auxiliaries cfm EA $1, Auxiliaries cfm EA $,0 Auxiliaries cfm 1 EA $,1 Auxiliaries - Greater than 000 cfm 1 EA $,1 Reheat Boxes - Reheat Boxes with Steam Coil EA $1, Return Duct Work - Indoor- Vertical Shaft and Ducts 00 LF $, Zone Dampers 1 EA $0, Boiler Systems Heating Devices Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler HP 1 EA $, Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - Greater than 00 HP EA $,0 Chemical Feeder 1 EA $1,0 Combustion Dampers EA $1, Condensate Pump EA $1,1 Feed Water Pumps and Tank 1 EA $,0 on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler HP 1 EA $10, on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - Greater than 00 EA $, HP Piping - Condensate Pipe- Steel 1,000 LF $1, Piping - Steam Pipe- Steel 1,000 LF $1, Steam Traps 00 EA $,0 Cabinet Heaters - With Steam Coil 1 EA $,1 Cabinet Heaters - With Steam Coil EA $, Cabinet Heaters - With Steam Coil 1 EA $ Fin Tube - Steam LF $, Radiators - Steam 10 EA $,000 Radiators - Steam EA $, Unit Heater - Electric EA $1, Wall Heater - Electric 1 EA $ Wall Heater - Electric EA $1 WILLIAMS HS Page of Assessment Date: 11//01
5 Category: Mechanical System Temperature Control S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Pneumatic System, SF $1,, Thermostats - Pneumatic 1 EA $, Thermostats - Pneumatic 10 EA Unit Ventilation Ventilation Unit Ventilators- Floor Mounted- Steam Heating Coils Only EA $, Exhaust Fans- Indoor CFM EA $1,1 Exhaust Fans- Indoor CFM 11 EA $,1 Exhaust Fans- Indoor - Less than 00 CFM EA $ Exhaust Fans- Roof Mounted CFM EA $,0 Exhaust Fans- Roof Mounted CFM 1 EA $ Exhaust Fans- Roof Mounted - Greater than 000 CFM 1 EA $ Exhaust Fans- Roof Mounted - Less than 00 CFM EA $ Lab Exhaust Hood EA $,00 Type I Exhaust Hood- Kitchen EA $, Type II Exhaust Hood- Warming Kitchen EA $1, Mechanical System Subtotal: $,0,0 Building: Main Category: Plumbing System Hot Water Steam Heat Exchanger 1 EA $,1 Steam Storage Tank Gallons 1 EA $, Piping Domestic Piping-Cold Water from Risers to Fixtures, SF $,00 Domestic Piping-Cold Water Horizontal Lines, SF $0, Domestic Piping-Cold Water Risers, SF $, Domestic Piping-Hot Water from Risers to Fixtures, SF $,1 Domestic Piping-Hot Water Horizontal Lines, SF $, Domestic Piping-Hot Water Return Lines, SF $, Domestic Piping-Hot Water Return Risers, SF $, Sanitary Piping, SF $1,,10 Storm Piping, SF $1,, WILLIAMS HS Page of Assessment Date: 11//01
6 Category: Plumbing System Piping S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Vent Piping, SF $1, Pool Systems Pumps Pool Drain Piping 100 LF $, Pool Filtration System including Pump 1 EA $,0 Pool Hot Water Heater - Steam Heat Exchanger 1 EA $,0 Pool Supply and Return Piping 00 LF $,10 Pumps - Domestic Booster Pump-Duplex 1 EA $1,1 Pumps - Ejector-Duplex EA $, Pumps - Sump-Simplex EA $11, Plumbing System Subtotal: $,0, Building: Main Category: Classrooms Art Room ( rooms) Casework LF $0 Ceiling - Plaster/Drywall SF $,0 Ceiling - Splined 1,0 SF $ Chalk Board 1 LF $1, Doors - Wood Doors inclu hw EA $1,0 Floor - Tile SF $,0 Floor - Wood 1,0 SF $,01 Lighting - Pendent/Surface EA Marker Board LF $1 Storage/ Closet 0 SF $ Walls - Concrete Block 1,0 SF $, Walls - Plaster/Drywall 1,0 SF $, Wireless System 1 EA Choral Room (1 room) Casework LF $0 Ceiling - Splined 1, SF $1,1 Chalk Board LF $1,10 Doors - Transom Window 1 SF $0 WILLIAMS HS Page of Assessment Date: 11//01
7 Category: Classrooms Choral Room (1 room) S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Doors - Wood Doors inclu hw EA Floor - Wood 1, SF $, Instrument Storage Casework LF Lighting - Pendent/Surface EA Marker Board 1 LF $ Walls - Plaster/Drywall 1, SF $,10 Computer Lab ( rooms) Dance Room ( rooms) AC Units EA $, Casework LF $1,1 Ceiling - Lay-in,1 SF $1, Ceiling - Splined 1,0 SF $1, Chalk Board 0 LF $, Chalk Board LF $1 Doors - Transom Window SF $ Doors - Wood Doors inclu hw 11 EA $,11 Floor - Carpet SF $1, Floor - Tile SF $, Floor - Tile, SF $,10 Floor - Wood,01 SF $1,1 Lighting - Lay-in EA Lighting - Pendent/Surface EA Marker Board 1 LF $00 Storage/ Closet 0 SF $1,1 Walls - Concrete Block 1,1 SF $,1 Walls - Plaster/Drywall,1 SF $1,0 Wireless System 1 EA $ Wireless System EA Work Sink EA $1,1 AC Units 1 EA $ Ceiling - Lay-in SF $,0 Ceiling - Splined 1,0 SF $1 Chalk Board LF $1,10 Doors - Transom Window 1 SF $0 Doors - Wood Doors inclu hw EA $1,0 Floor - Wood 1, SF $,0 WILLIAMS HS Page of Assessment Date: 11//01
8 Category: Classrooms Dance Room ( rooms) S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Lighting - Lay-in 1 EA Lighting - Pendent/Surface 0 EA Marker Board LF $1 Storage/ Closet SF $0 Wall Mirrors EA Walls - Plaster/Drywall 1, SF $,0 Walls - Structural Glazed Tile SF $1,1 Faculty Lounge ( rooms) Health (1 room) Music Room ( rooms) AC Units 1 EA $ Casework LF $0 Ceiling - Lay-in SF $,1 Ceiling - Splined 1,0 SF $1,1 Chalk Board 10 LF $, Doors - Transom Window SF $1 Doors - Wood Doors inclu hw EA $1,0 Floor - Wood, SF $1, Lighting - Lay-in EA Lighting - Pendent/Surface EA Marker Board LF $1 Storage/ Closet 0 SF $1 Walls - Plaster/Drywall,1 SF $, AC Units 1 EA $ Casework LF $0 Ceiling - Lay-in SF $, Chalk Board LF $,0 Doors - Transom Window 1 SF $0 Doors - Wood Doors inclu hw EA Floor - Wood SF $,1 Lighting - Lay-in 1 EA Marker Board LF $1 Storage/ Closet SF $ Walls - Plaster/Drywall 1,0 SF $, AC Units EA $1 Casework LF $ WILLIAMS HS Page of Assessment Date: 11//01
9 Category: Classrooms Music Room ( rooms) S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Ceiling - Lay-in, SF $10, Ceiling - Splined SF Chalk Board 0 LF $, Chalk Board LF $1,01 Doors - Transom Window 1 SF $0 Doors - Wood Doors inclu hw EA $1,0 Floor - Tile, SF $, Floor - Wood SF $, Lighting - Lay-in EA Lighting - Pendent/Surface EA Storage/ Closet 1 SF $1,1 Walls - Concrete Block 1,0 SF $, Walls - Plaster/Drywall,1 SF $,1 Office ( rooms) AC Units 1 EA $ Casework LF $0 Ceiling - Lay-in 1, SF $,01 Chalk Board 0 LF $, Doors - Transom Window 1 SF $0 Doors - Wood Doors inclu hw EA $0 Floor - Tile SF $1,0 Floor - Wood SF $, Lighting - Lay-in EA Marker Board LF $11 Storage/ Closet 0 SF $ Walls - Concrete Block 1 SF $, Walls - Plaster/Drywall 1,0 SF $, Other Instructional Use ( rooms) AC Units EA $1, Casework LF $1, Ceiling - Plaster/Drywall 1, SF $, Ceiling - Splined 0 SF $ Chalk Board LF $,0 Doors - Transom Window 1 SF $0 Doors - Wood Doors inclu hw EA $1,0 Floor - Tile 1, SF $,11 WILLIAMS HS Page of Assessment Date: 11//01
10 Category: Classrooms Other Instructional Use ( rooms) ( rooms) Science Classroom ( rooms) S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Floor - Wood 0 SF $, Lighting - Pendent/Surface EA Marker Board LF $1 Storage/ Closet 0 SF $0 Walls - Concrete Block 1, SF $, Walls - Plaster/Drywall 1,1 SF $,0 Work Sink EA $1,1 AC Units 1 EA $,0 Casework LF $,0 Ceiling - Lay-in 1, SF $, Ceiling - Plaster/Drywall, SF $,11 Ceiling - Splined,0 SF $, Chalk Board LF $, Doors - Transom Window SF $, Doors - Wood Doors inclu hw EA $1, Floor - Carpet 0 SF $1, Floor - Tile, SF $, Floor - Tile,1 SF $1, Floor - Wood 1,0 SF $, Lighting - Lay-in EA Lighting - Pendent/Surface 0 EA Marker Board LF $10, Storage/ Closet SF $,1 Walls - Concrete Block,1 SF $1, Walls - Concrete Block,11 SF $1, Walls - Plaster/Drywall 1, SF $1, Walls - Plaster/Drywall, SF $1,01 Work Sink EA $1,1 AC Units 1 EA $ Casework LF $1, Ceiling - Plaster/Drywall 1,00 SF $, Doors - Wood Doors inclu hw EA $0 Floor - Tile 1,00 SF $,1 Lighting - Pendent/Surface 1 EA WILLIAMS HS Page 10 of Assessment Date: 11//01
11 Category: Classrooms Science Classroom ( rooms) Science Lab Level 1 ( rooms) Science Lab Level (1 room) Science Lab Level ( rooms) S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Marker Board 1 LF $ Storage/ Closet 1 SF $10 Walls - Concrete Block 1, SF $, Casework 0 LF $ Ceiling - Lay-in,1 SF $, Doors - Transom Window SF $ Doors - Wood Doors inclu hw EA $1,0 Eye Wash Station 1 EA $ Floor - Tile,1 SF $,00 Gas Line EA $1,01 Lighting - Lay-in 0 EA Marker Board 0 LF $1, Science Lab Elements,1 SF $1,1 Storage/ Closet 1 SF $11 Walls - Concrete Block, SF $, Work Sink EA $1, Casework 0 LF $ Ceiling - Lay-in 1,0 SF $,0 Doors - Transom Window SF $ Doors - Wood Doors inclu hw EA Floor - Tile 1,0 SF $, Lighting - Lay-in 1 EA Marker Board 0 LF $ Storage/ Closet 1 SF $11 Walls - Concrete Block 1, SF $,0 Work Sink EA $ AC Units EA $1, Casework LF $,1 Ceiling - Lay-in, SF $11,0 Chalk Board LF $1,01 Doors - Transom Window 1 SF $0 Doors - Wood Doors inclu hw EA $,10 Eye Wash Station 1 EA $ WILLIAMS HS Page 11 of Assessment Date: 11//01
12 Category: Classrooms Science Lab Level ( rooms) Special Education ( rooms) S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Floor - Tile, SF $, Floor - Wood SF $,0 Fume Hood 1 EA $1 Gas Line EA $,0 Lighting - Lay-in EA Marker Board LF $1,1 Science Lab Elements, SF $,1 Science Lab Shower 1 EA $ Storage/ Closet 1 SF $1,01 Walls - Concrete Block 1,0 SF $,1 Walls - Plaster/Drywall,0 SF $,0 Work Sink EA $, AC Units EA $1 Casework 0 LF $ Ceiling - Plaster/Drywall 1, SF $, Chalk Board 1 LF $1, Doors - Wood Doors inclu hw EA $0 Floor - Carpet SF $, Floor - Tile SF $0 Lighting - Pendent/Surface EA Marker Board 0 LF $ Storage/ Closet SF $1 Walls - Concrete Block 1, SF $, Work Sink EA $ Vacant (1 room) Ceiling - Lay-in SF $, Chalk Board LF $, Doors - Wood Doors inclu hw 1 EA $01 Floor - Tile SF $1,0 Lighting - Lay-in EA Storage/ Closet SF $1 Walls - Concrete Block SF $, Classrooms Subtotal: $1,0, WILLIAMS HS Page of Assessment Date: 11//01
13 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS AC Unit 1 EA $,0 Ceiling - Lay-in 1 SF $0 Ceiling - Lay-in,00 SF $,01 Ceiling - Plaster/Drywall SF $,1 Ceiling - Plaster/Drywall,01 SF $,0 Ceiling - Splined,11 SF $1, Doors - Side-lite SF $1 Doors - Transom Window SF $,1 Doors - Wood Doors inclu hw EA $10, Floor - Carpet 1,1 SF $, Floor - Carpet,1 SF $, Floor - Tile SF $,01 Floor - Tile 1, SF $,0 Floor - Wood 1,1 SF $11,10 Lighting - Lay-in EA Lighting - Pendent/Surface 1 EA Power Distribution EA $0,1 Storage/ Closet SF $1,10 Walls - Concrete Block 10 SF $1,0 Walls - Concrete Block,1 SF $, Walls - Plaster/Drywall, SF $1, Walls - Plaster/Drywall, SF $11, Walls - Structural Glazed Tile SF $1, Work SInk 1 EA $0 Auditorium & Theater Balcony Seating EA $, Ceiling - Plaster/Drywall, SF $, Doors - Wood Doors inclu hw 1 EA $,1 Floor - Carpet,1 SF $,1 Floor - Concrete,1 SF $,1 Lighting - Chandelier, Incandescent 1 EA $,1 Lighting - Wall Mounted 1 EA $1,11 Main Floor Seating 1,00 EA $0,00 Sound System 1 EA $10,1 Stage SF $, Stage Curtain 10 EA Stage Lighting System 1 EA $,0 WILLIAMS HS Page 1 of Assessment Date: 11//01
14 Category: Rooms (Other Than Classrooms) Auditorium & Theater S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Stage-Stairs - Wood 10 LF $11 Stairs - Terrazzo 10 LF $ Walls - Plaster/Drywall, SF $,1 Gymnasia Kitchen Library Locker/Shower Room Bleacher Seating 00 EA $, Ceiling - Splined 1, SF $, Doors - Transom Window SF $ Doors - Wood Doors inclu hw 1 EA $,1 Floor - Wood 1, SF $111,0 Lighting - Metal Halide/ High Pressure Sodium 0 EA $10, Lighting - Pendent/Surface 0 EA Scoreboards EA $, Walls - Structural Glazed Tile 1, SF $,1 Ceiling - Plaster/Drywall 1,111 SF $, Doors - Wood Doors inclu hw EA Floor - Terrazzo 1,111 SF $,1 Lighting - Pendent/Surface 0 EA Storage/ Closet SF $00 Walls - Plaster/Drywall 1, SF $, AC Unit EA $1, Casework LF $, Ceiling - Plaster/Drywall 1,0 SF $, Doors - Transom Window 1 SF $0 Doors - Wood Doors inclu hw EA $0 Floor - Carpet 1,0 SF $, Lighting - Pendent/Surface EA Storage/ Closet 1 SF $ Walls - Plaster/Drywall 1,0 SF $, Walls - Vinyl Coated Gypsum Panel 1,0 SF $, Accessories, SF $, Benches, ped mounted LF $,11 Ceiling - Plaster/ Drywall, SF $1,1 WILLIAMS HS Page 1 of Assessment Date: 11//01
15 Category: Rooms (Other Than Classrooms) Locker/Shower Room Lunch & Multipurpose Room S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Doors - Steel Doors incl hw EA $, Floor - Tile Ceramic/ Porcelain, SF $1, Floor Drain 0 EA $1,1 Lavatory EA $1, Lighting - Pendent/Surface 1 EA Partitions EA $,0 Showers EA $1, Student Lockers - One Tier 10 EA $ Student Lockers - Two Tier 1 EA $, Urinals EA $1,00 Walls - Plaster/Drywall 1, SF $, Walls - Structural Glazed Tile 1, SF $,1 Walls - Tile Ceramic/ Porcelain, SF $, Water Closet EA $, Ceiling - Lay-in 10,1 SF $1, Ceiling - Plaster/Drywall 1, SF $, Doors - Transom Window SF $ Doors - Wood Doors inclu hw 1 EA $,1 Floor - Terrazzo 1, SF $,1 Floor - Tile 10,1 SF $,00 Lighting - Lay-in 11 EA Lighting - Pendent/Surface EA Serving Line LF $, Walls - Plaster/Drywall 1,1 SF $,1 MDF_IDF AC Unit EA $1 Doors - Wood Doors inclu hw 1 EA $01 Finishes 1 SF $1,0 Mechanical/ Service Rooms Janitor's Closet 0 SF $0 Mechanical/ Service Rooms 1,11 SF $,10 Storage Room, SF $, Vaults SF $1 WILLIAMS HS Page 1 of Assessment Date: 11//01
16 Category: Rooms (Other Than Classrooms) Pool & atatorium S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Accessories 1, SF $1, Bleachers Seating/Plank Seating EA $1,1 Ceiling - Lay-In 1, SF $, Doors - Steel Doors incl hw EA Floor - Tile Ceramic/ Porcelain 1, SF $, Lighting - Metal Halide/ High Pressure Sodium EA Pool Basin 1,0 SF $,0 Pool Deck 0 SF $,1 Pool Deck Drains EA $,0 Walls - Tile Ceramic/ Porcelain,101 SF $, Restroom Accessories, SF $1, Ceiling - Plaster/Drywall, SF $,1 Ceiling - Splined 100 SF $ Doors - Transom Window SF $10 Doors - Wood Doors inclu hw EA $, Floor - Tile SF $ Floor - Tile SF $ Floor - Tile Ceramic/ Porcelain, SF $1,1 Floor Drain EA $,10 Lavatory EA $,10 Lighting - Pendent/Surface EA $ Lighting - Pendent/Surface 10 EA Partitions 1 EA $1,1 Showers 1 EA $11 Urinals EA $,1 Walls - Plaster/Drywall 1 SF $1, Walls - Plaster/Drywall 0 SF $ Walls - Structural Glazed Tile,0 SF $, Walls - Tile Ceramic/ Porcelain SF $0 Water Closet 1 EA $,0 Water Closet EA Rooms (Other Than Classrooms) Subtotal: $1,,11 Building: Main WILLIAMS HS Page 1 of Assessment Date: 11//01
17 Category: Building Interior Corridor S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Ceiling - Splined,0 SF $10,1 Doors - Wood Doors include hw EA $1,0 Drinking Fountains - Single Fountain 1 EA $, Floor - Terrazzo,0 SF $1, Floor - Tile/Sheet,0 SF $1, Lighting - Lay-in EA Lighting - Pendent/Surface 0 EA $11,11 Lighting - Pendent/Surface 10 EA Student Lockers - One Tier 1, EA $0,0 Walls - Plaster/Drywall 1, SF $, Walls - Structural Glazed Tile 1, SF $, Safety Stairs Vertical Conveyance Camera Viewing Station EA $,0 Security Cameras EA $,1 Ceiling - Splined,0 SF $1,1 Floor - Terrazzo,0 SF $,10 Handrails 1,0 LF $1, Lighting - Pendent/Surface EA Stairs - Terrazzo LF $,0 Walls - Plaster/Drywall,0 SF $,00 Walls - Structural Glazed Tile,0 SF $,10 Elevator - Elevator- Roped Holeless Hydraulic EA $, Elevator - Elevator- Traction 1 EA $1, Building Interior Subtotal: $,1 Total Building Cost $1,, Building: Addition Category: Building Exterior Entrance Exterior Doors - Exterior Steel Door EA $, Exterior Doors - Side lite 1 EA $1 WILLIAMS HS Page 1 of Assessment Date: 11//01
18 Building: Addition Category: Building Exterior Entrance S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Exterior Stairs - Concrete LF $1,1 Exterior Stairs - Concrete LF $, Ramp Handrail - Steel_Ramp Handrail 1 LF $1, Ramps - Concrete LF $10,1 Stair Handrail - Steel_Stair Handrail LF $ Foundation Lighting Roof System Walls Windows Foundation - Concrete LF Superstructure - Concrete,0 SF Exterior Lighting - Parapet or Roof Mounted EA $, Exterior Lighting - Wall Mounted EA $1, Coping - Stone LF $0, Downspouts - Interior Downspouts 1 LF $, Parapet - Parapet > 0" LF $, Roof - Modified Bitumen 1, SF $1, Roof Structure - Concrete, SF Roof Structure - Heavy Timber, SF Exterior Walls - Brick,0 SF $0,0 Exterior Walls - Stone-Cast,00 SF $1, Guard - Guards perforated,0 SF $, Lintels - Steel LF $1, Windows - Sash Aluminum Double-pane,0 SF $0,10 Building Exterior Subtotal: $, Building: Addition Category: Electrical System Emergency System Emergency A/C Power - Corridors and Stairs, SF $, Emergency A/C Power - Gym, SF $1,0 WILLIAMS HS Page 1 of Assessment Date: 11//01
19 Building: Addition Category: Electrical System Emergency System S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Emergency Battery Packs - Gym 1 EA $0 Exit Signs - Corridors and Stairs EA Exit Signs - Gym EA Security System - CCTV,0 SF $11,0 Security System - Intrusion Detection,0 SF $, Main Service Power Distribution Independent Electrical Service for emergency power 1 EA PA System,0 SF $, Lighting and Power Panels A EA $, Lighting and Power Panels A EA Lighting and Power Panels - Above 100 A EA Main Distribution Panels amp 1 EA Main Distribution Panels - Greater than 00 amp 1 EA $1,10 Electrical System Subtotal: $0, Building: Addition Category: Safty System Fire Alarm Fire Alarm Strobe Lights,0 SF $, Fire Alarm_System,0 SF $,1 Safty System Subtotal: $, Building: Addition Category: Mechanical System Air Handling Systems Air Handling Unit- Built Up- Single Zone- Steam Coils cfm 1 EA $,0 Air Handling Unit- Built Up- Single Zone w/ Air Tunnel- Steam Coils cfm 1 EA $,00 Air Intake EA $11, Auxiliaries cfm 1 EA $1, Auxiliaries cfm 1 EA $,0 WILLIAMS HS Page 1 of Assessment Date: 11//01
20 Building: Addition Category: Mechanical System Air Handling Systems S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Indoor Return Fans- Centrifugal Squirrel Cage CFM 1 EA $, Reheat Boxes - Reheat Boxes with Steam Coil EA $,0 Return Duct Work - Indoor- Vertical Shaft and Ducts 00 LF $1, Zone Dampers EA $,0 Boiler Systems Heating Devices Temperature Control Ventilation Condensate Pump 1 EA $1,1 Piping - Condensate Pipe- Steel 0 LF $ Piping - Steam Pipe- Steel 0 LF $ Steam Traps 10 EA $1, Cabinet Heaters - With Steam Coil EA $,1 Wall Heater - Electric EA $,1 Pneumatic System,0 SF $11,1 Thermostats - Pneumatic 1 EA $1, Thermostats - Pneumatic 11 EA Exhaust Fans- Indoor CFM 1 EA $ Exhaust Fans- Roof Mounted CFM EA $, Exhaust Fans- Roof Mounted CFM 1 EA $ Mechanical System Subtotal: $, Building: Addition Category: Plumbing System Piping Domestic Piping-Cold Water from Risers to Fixtures,0 SF Domestic Piping-Cold Water Horizontal Lines,0 SF $, Domestic Piping-Cold Water Risers,0 SF Domestic Piping-Hot Water from Risers to Fixtures,0 SF Domestic Piping-Hot Water Horizontal Lines,0 SF $, Domestic Piping-Hot Water Return Lines,0 SF $, Domestic Piping-Hot Water Return Risers,0 SF Sanitary Piping,0 SF $,0 WILLIAMS HS Page 0 of Assessment Date: 11//01
21 Building: Addition Category: Plumbing System Piping S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Storm Piping,0 SF $,1 Vent Piping,0 SF $, Pumps Pumps - Domestic Booster Pump-Simplex 1 EA $,1 Pumps - Sump-Duplex 1 EA $, Plumbing System Subtotal: $,1 Building: Addition Category: Classrooms Art Room (1 room) Ceiling - Plaster/Drywall 0 SF $, Doors - Wood Doors inclu hw EA Floor - Tile 0 SF $,11 Lighting - Pendent/Surface EA Storage/ Closet SF $ Walls - Concrete Block 1,0 SF $, Faculty Lounge (1 room) Laboratory/Shop (1 room) AC Units 1 EA $ Casework LF $0 Ceiling - Plaster/Drywall 10 SF $, Chalk Board LF $, Doors - Wood Doors inclu hw 1 EA $01 Floor - Tile 10 SF $1, Lighting - Pendent/Surface 1 EA Storage/ Closet SF $ Walls - Concrete Block SF $,1 AC Units 1 EA $ Casework LF $ Ceiling - Lay-in SF $,1 Doors - Transom Window SF $ Doors - Wood Doors inclu hw 1 EA $01 Floor - Tile SF $1,1 WILLIAMS HS Page 1 of Assessment Date: 11//01
22 Building: Addition Category: Classrooms Laboratory/Shop (1 room) (1 rooms) Science Classroom (1 room) S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Lighting - Lay-in 1 EA Marker Board LF $ Storage/ Closet SF $ Walls - Plaster/Drywall SF $, AC Units EA $1, Casework LF $,01 Ceiling - Lay-in,0 SF $1,1 Ceiling - Plaster/Drywall,01 SF $1, Chalk Board 0 LF $, Doors - Wood Doors inclu hw 1 EA $,1 Floor - Tile 10, SF $,0 Lighting - Lay-in EA Lighting - Pendent/Surface 1 EA $1, Lighting - Pendent/Surface 1 EA Marker Board LF $1,11 Storage/ Closet 1 SF $1,0 Walls - Concrete Block,10 SF $, Casework LF $0 Ceiling - Plaster/Drywall 1 SF $, Doors - Wood Doors inclu hw EA Floor - Tile 1 SF $,1 Lighting - Pendent/Surface EA Marker Board LF $1 Walls - Concrete Block 1, SF $,0 Special Program (1 room) Ceiling - Lay-in 1,00 SF $, Doors - Transom Window 1 SF $0 Doors - Wood Doors inclu hw EA Floor - Tile 1,00 SF $, Lighting - Lay-in 1 EA Marker Board 0 LF $ Storage/ Closet 1 SF $11 Walls - Concrete Block 1, SF $, WILLIAMS HS Page of Assessment Date: 11//01
23 Building: Addition Category: Classrooms S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Classrooms Subtotal: $0, Building: Addition Category: Rooms (Other Than Classrooms) Gymnasia Mechanical/ Service Rooms Ceiling - Plaster/Drywall, SF $1,1 Doors - Wood Doors inclu hw EA $1,0 Floor - Wood, SF $1,0 Lighting - Metal Halide/ High Pressure Sodium 1 EA $, Stage SF $, Stage Lighting System 1 EA $, Stage-Stairs - Wood 10 LF $11 Storage/ Closet SF Walls - Concrete Block 1, SF $, Walls - Structural Glazed Tile 1, SF $, Storage Room SF $, Restroom Accessories 0 SF $ Ceiling - Plaster/Drywall 0 SF $10 Doors - Steel Doors incl hw 1 EA $01 Floor - Tile Ceramic/ Porcelain 0 SF $ Lavatory 1 EA $0 Lighting - Wall Mounted 1 EA $ Partitions 1 EA $ Walls - Structural Glazed Tile SF $ Water Closet 1 EA $ Rooms (Other Than Classrooms) Subtotal: $0,0 Building: Addition Category: Building Interior Corridor Ceiling - Splined,01 SF $,1 WILLIAMS HS Page of Assessment Date: 11//01
24 Building: Addition Category: Building Interior Corridor S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Floor - Tile/Sheet,01 SF $, Lighting - Pendent/Surface 0 EA Walls - Plaster/Drywall,11 SF $0,1 Walls - Structural Glazed Tile,11 SF $1,0 Safety Stairs Security Cameras EA $1, Ceiling - Splined 1, SF $,1 Floor - Terrazzo 1, SF $10,1 Handrails 0 LF $,0 Lighting - Pendent/Surface EA Stairs - Terrazzo 10 LF $1,00 Walls - Plaster/Drywall 0 SF $1, Walls - Structural Glazed Tile 0 SF $, Building Interior Subtotal: $,1 Total Building Cost $,1,1 SITE Category: Site Athletic Civil/Drainage Fencing Metal Bleachers LF $, Surface - Asphalt,00 SF $,01 Surface - atural 1,0 SF $11,0 Civil/ Drainage - Catch Basin 1 EA $1, Civil/ Drainage - Site Manhole 0 EA $, Fencing - Chain Link, LF $, Fencing - Guard Rail LF $, Fencing - ew Standard Ornamental 1, LF $, Fencing - Wood Fencing w/ Steel Frame 1 LF $ WILLIAMS HS Page of Assessment Date: 11//01
25 SITE Category: Site Landscape Parking Lot Sidewalks Signage S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Benches EA $,0 Irrigation 1,0 SF $, Landscape - Grass,00 SF $, Landscape - Hardscape- Concrete SF $,1 Landscape - Hardscape- Concrete,0 SF $1, Parkway trees 1 EA $, Planting Beds/ Area SF $ Play Area - Asphalt/ Hardscape,00 SF $,0 Retaining Wall - Concrete 0 SF $1, Trash Receptacles EA $1,1 Concrete Curbs 1,01 LF $1,00 Interior Plantings 1 LF $,1 Surface - Asphalt, SF $1, Trash Compactor 1 EA Trash Enclosure - Chain Links 1,10 SF $0,1 Vehicular Screening LF $, Sidewalks - Internal Walks LF $, Sidewalks - Internal Walks LF $, Sidewalks - Perimeter Sidewalks, SF $, Flag Pole - Flag Pole 1 EA $1, Marquee - Free Standing Back Lighted 1 EA Monument - Building Mounted Cut Letter Sign 1 EA Site Subtotal: $1,, Total Site Cost $1,, Campus Total ² ³ $1,0, ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in this report; by the time the report is compiled, they have been resolved. WILLIAMS HS Page of Assessment Date: 11//01
26 S Wabash Ave Chicago, IL 01 Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. WILLIAMS HS Page of Assessment Date: 11//01
27 S Wabash Ave Chicago, IL 01 Classroom Summary Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Art Room Art Room Choral Room Computer Lab Computer Lab Computer Lab Computer Lab Computer Lab Computer Lab Dance Room Dance Room Faculty Lounge Faculty Lounge Faculty Lounge Health Music Room Music Room Music Room Music Room Office Office Other Instructional Use Other Instructional Use Other Instructional Use Computer Lab Computer Lab Computer Lab Computer Lab Computer Lab Dance Room Dance Room Music Room Music Room Music Room Office Science Classroom ,0 1, 1 1, 1,0 1,0 1,0,00 1, , WILLIAMS HS Page of Assessment Date: 11//01
28 S Wabash Ave Chicago, IL 01 Classroom Summary Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Science Classroom Science Classroom Science Lab Level 1 Science Lab Level 1 Science Lab Level Science Lab Level Science Lab Level Science Lab Level Science Lab Level Special Education Science Lab Level 1 Science Lab Level 1 Science Lab Level Science Lab Level Science Lab Level Science Lab Level Science Lab Level A A ,0 1,0 1,10 1, WILLIAMS HS Page of Assessment Date: 11//01
29 S Wabash Ave Chicago, IL 01 Classroom Summary Co-locating on this campus are SHABAZZ - DUSABLE HS, BROZEVILLE HS and WILLIAMS HS Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Special Education Vacant Special Education Addition Art Room Faculty Lounge Laboratory/Shop Science Classroom Special Program Office Laboratory/Shop B A , WILLIAMS HS Page of Assessment Date: 11//01
Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationWendell E Green Elementary School 1150 W 96th St Chicago, IL 60643
11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationMahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620
W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationEmmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationFriedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657
39 Wolcott Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationPhilip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645
34 Washtenaw Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationCharles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617
S Cregier Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationLorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationFrederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622
2 W Rice St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationWilliam Rainey Harper High School 6520 S Wood St Chicago, IL 60636
0 S Wood St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationFranklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610
22 W Evergreen Ave Chicago, IL 1 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationWilliam H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609
S Hermitage Ave Chicago, IL 9 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationHarriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationJoseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationCharles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationPerspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653
33 S Wabash Ave Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationPaul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620
82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationJohann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647
3 Rockwell St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationHiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationManley Career Academy High School 2935 W Polk St Chicago, IL 60612
293 W Polk St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationJames Shields Middle School 2611 W 48th St Chicago, IL 60632
2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationEllen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612
33 W Ohio St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJosefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623
3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This
More informationNathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609
athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the
More informationJoseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623
3 W 3st St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationMarcus Moziah Garvey Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationUniversity of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL
Facility Assessment Report 9 E 4th St Chicago, IL 03 This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationAmos Alonzo Stagg Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationEPIC Academy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629
3 W th St Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationJames Otis Elementary School 525 N Armour St Chicago, IL 60642
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationJohn Milton Gregory Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDaniel S Wentworth Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationPhilip Rogers Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationGeorge Washington Elementary School 3611 E 114th St Chicago, IL 60617
3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up
More informationJohn Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641
Kilbourn Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationSTEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationWendell Phillips Academy High School 244 E Pershing Rd Chicago, IL 60653
E Pershing Rd Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationThomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK
Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the
More informationThomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608
W Roosevelt Rd Chicago, IL 8 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationA.N. Pritzker School 2009 W Schiller St Chicago, IL 60622
A.. Pritzker School 2009 W Schiller St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document
More informationJackie Robinson Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCharles Allen Prosser Career Academy High School 2148 N Long Ave Chicago, IL 60639
28 Long Ave Chicago, IL 39 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationCharles N Holden Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWendell Smith Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRichard J Oglesby Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWilliam Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631
W Bryn Mawr Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationAlexander Graham Bell Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJames Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647
W Schubert Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationJohn Harvard Elementary School of Excellence
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationMorton School of Excellence
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRufus M Hitch Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationFrancis W Parker Elementary Community Academy 6800 S Stewart Ave Chicago, IL Co-locating on this campus are AMANDLA and PARKER
Facility Assessment Report S Stewart Ave Chicago, IL 2 Co-locating on this campus are AMADLA and PARKER This report contains a summary of the results from the facility assessment completed on the date
More informationJohn Spry Elementary Community School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationBetty Shabazz Intl Charter - DuSable Leadership
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJonathan Burr Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWilliam J Onahan Elementary School 6634 W Raven St Chicago, IL 60631
3 W Raven St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationEverett McKinley Dirksen Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationArchitecture, Construction, and Engineering Technical Charter
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRobert Fulton Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNorth Lawndale College Prep Charter - Collins
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDisney II Magnet High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAndrew Carnegie Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWilliam Penn Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationKIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn F Kennedy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationGeorge Washington High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDisney II Magnet School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationLangston Hughes Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationTheodore Roosevelt High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationUniversity of Chicago Charter - Carter G Woodson
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCyrus H McCormick Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationArthur E Canty Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationBrian Piccolo Elementary Specialty School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationGeorge W Tilton Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJoseph E Gary Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationUniversity of Chicago Charter - NKO
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNorman A Bridge Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Hancock College Preparatory High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAmandla Charter High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationUrban Prep Academy for Young Men - West
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationGeorge Washington Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRichard T Crane Medical Preparatory HS
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationPhoenix Military Academy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationLegacy Charter Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationArthur A Libby Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWalt Disney Magnet Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationMulticultural Academy of Scholarship
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAcademy for Global Citizenship Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationHenry H Nash Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationBowen High School. Definitions EXTERIOR E 89th St Chicago, IL Co-locating on This Campus: Bowen HS and Noble St Chtr-Orange
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn L Marsh Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWilliam Howard Taft High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationOCPS Submittal Register for Product Data and Shop Drawing Reviews
OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationU of I Facilities Standards Updates for 2017
U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),
More informationBUILDING PLAN REVIEW REQUIREMENTS
TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings
More informationBUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS
Building and Development Permit Applications Definitions: Type A Residential Projects: All projects related to one and two unit dwellings Type B Residential Projects: All projects related to Apartments,
More informationOLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN
KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12