CS2.0 COVER SHEET VOL. 2

Size: px
Start display at page:

Download "CS2.0 COVER SHEET VOL. 2"

Transcription

1 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND tel: fax: ARCHITECT HORD COPLAN MACHT, INC. 750 E. PRATT STREET, SUITE 1100 BALTIMORE, MARYLAND tel: fax: CIVIL MK CONSULTING ENGINEERS, LLC 301 CENTRAL AVE GLYNDON, MARYLAND tel: STRUCTURAL FAISANT ASSOCIATES, INC. 810 LIGHT STREET, SUITE 100 BALTIMORE, MARYLAND tel: M/E/P/IT ALBAN ENGINEERING, INC. 303 INTERNATIONAL CIRCLE, SUITE 450 HUNT VALLEY, MARYLAND tel: FIRE PROTECTION KOFFEL ASSOCIATES, INC CENTRE PARK DRIVE, SUITE 200 COLUMBIA, MARYLAND tel: fax: FOOD SERVICE NYIKOS ASSOCIATES, INC A FLOWER HILL WAY GAITHERSBURG, MARYLAND tel: fax: VOLUME 1 OF 2 1 Hord Coplan Macht, Inc. 750 E. Pratt St, Suite 1100 Baltimore, MD p f STRUCTURAL ENGINEER Faisant Associates, Inc. 810 Light St, Suite 100 Baltimore, MD p M/E/P/IT ENGINEER Alban Engineering, Inc. 303 International Cir, Suite 450 Hunt Valley, MD p CIVIL ENGINEER MK Consulting Engineers, LLC 301 Central Ave Glyndon, MD p BUILDING DATA ALTERNATES LIST SITE VICINITY MAP FIRE PROTECTION ENGINEER Koffel Associates, Inc Centre Park Dr, Suite 200 p Columbia, MD f EXISTING GSF DEMOLITION GSF ADDITION GSF 42,110 SF (2,871 SF) 35,229 SF ALTERNATE NO. 1: GYMNASIUM FLOORING (Reference A10.01) Base Bid: Provide poured rubber floor in Gymnasium 192. Alternate: Provide floating athletic wood floor in Gymnasium 192. FOOD SERVICE Nyikos Associates, Inc A Flower Hill Way p Gaithersburg, MD f DRAWING LIST VOLUME 1 COVER SHEET CS1.0 COVER SHEET VOL. 1 CIVIL C1.00 KEY SHEET C1.01 EXISTING CONDITION/ DEMOLITION PLAN C2.00 SITE & GRADING PLAN C3.00 SITE DETAILS C3.01 SITE DETAILS C3.02 SITE DETAILS C4.00 GEOMETRY PLAN C5.00 PAVING PLAN C6.00 STRIPING AND SIGNAGE PLAN C7.00 STORM DRAIN DRAINAGE AREA MAP C7.01 UTILITY PLAN C7.02 UTILITY PROFILES C7.03 UTILITY PROFILES C7.04 UTILITY PROFILES C7.05 UTILITY PROFILES C8.00 EROSION & SEDIMENT CONTROL PLAN SECTION 1 (ESC PHASE 1) C8.01 EROSION & SEDIMENT CONTROL PLAN SECTION 1 (ESC PHASE 2) C8.02 EROSION & SEDIMENT CONTROL PLAN SECTION 1 (ESC PHASE 3) C8.03 EROSION & SEDIMENT CONTROL PLAN SECTION 2 (ESC PHASE 1) C8.04 EROSION & SEDIMENT CONTROL PLAN SECTION 2 (ESC PHASE 2) C8.05 EROSION & SEDIMENT CONTROL PLAN SECTION 2 (ESC PHASE 3) C8.06 EROSION & SEDIMENT CONTROL DETAILS C8.07 EROSION & SEDIMENT CONTROL NOTES C8.08 EROSION & SEDIMENT CONTROL D.A. MAP SECTION 1 (EXISTING) C8.09 EROSION & SEDIMENT CONTROL D.A. MAP SECTION 1 (INTERIM) C8.10 EROSION & SEDIMENT CONTROL D.A. MAP SECTION 1 (PROPOSED) C8.11 EROSION & SEDIMENT CONTROL D.A. MAP SECTION 2 (EXISTING) C8.12 EROSION & SEDIMENT CONTROL D.A. MAP SECTION 2 (INTERIM) C8.13 EROSION & SEDIMENT CONTROL D.A. MAP SECTION 2 (PROPOSED) C9.00 STORMWATER MANAGEMENT RESOURCE MAP C9.01 EXISTING CONDITIONS STORMWATER MANAGEMENT DRAINAGE AREA MAP C9.02 PROPOSED CONDITIONS STORMWATER MANAGEMENT DRAINAGE AREA MAP C9.03 STORMWATER MANAGEMENT FACILITIES DRAINAGE AREA MAP C9.04 STORMWATER MANAGEMENT MICRO BIORETENTION FACILITY #1 C9.05 STORMWATER MANAGEMENT MICRO BIORETENTION FACILITIES #2 & #3 C9.06 STORMWATER MANAGEMENT MICRO BIORETENTION FACILITIES #4 & #5 C9.07 STORMWATER MANAGEMENT MICRO BIORETENTION FACILITIES #6 &7 C9.08 STORMWATER MANAGEMENT MICRO BIORETENTION FACILITY #8 C9.09 STORMWATER MANAGEMENT MICRO BIORETENTION FACILITY #9 C9.10 STORMWATER MANAGEMENT MICRO BIORETENTION FACILITY #10 C9.11 STORMWATER MANAGEMENT MICRO BIORETENTION FACILITY #11 C9.12 STORMWATER MANAGEMENT MICRO BIORETENTION FACILITY #12 C9.13 STORMWATER MANAGEMENT NOTES AND DETAILS C9.14 STORMWATER MANAGEMENT MICRO BIORETENTION INSPECTION CHECKLIST C10.00 SOIL BORINGS L1.01 LANDSCAPE PLAN L2.01 LANDSCAPE DETAILS STRUCTURAL S1.00 GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS S1.01 LOWER FOUNDATION PLAN PHASE 1 S1.02 LOWER FOUNDATION PLAN PHASE 1 S1.03 LOWER FOUNDATION & UPPER FLOOR FRAMING PLANS PHASE 2 S1.04 UPPER FOUNDATION PLAN PHASE 3 S1.05 LOWER FOUNDATION PLAN PHASE 4 S2.01 LOW ROOF FRAMING PLAN PHASE 1 S2.02 LOW ROOF FRAMING PLAN PHASE 1 S2.03 LOW ROOF FRAMING PLAN PHASE 2 S2.04 LOW ROOF FRAMING PLAN PHASE 3 S2.05 LOW ROOF FRAMING PLAN PHASE 4 S2.06 GYM & LOBBY ROOF FRAMING PLAN PHASE 1 S2.07 HIGH ROOF FRAMING PLAN PHASE 1 S2.08 MECHANICAL PENTHOUSE ROOF FRAMING PLAN PHASE 2/3 S2.09 MECHANICAL PENTHOUSE ROOF FRAMING PLAN PHASE 4 S3.01 BUILDING SECTIONS S3.02 BUILDING SECTIONS S3.03 ELEVATIONS & DETAILS S4.01 WALL SECTIONS S4.02 WALL SECTIONS S4.03 WALL SECTIONS S4.04 WALL SECTIONS S4.05 WALL SECTIONS S4.06 WALL SECTIONS S4.07 SECTIONS & DETAILS S4.08 SECTIONS & DETAILS S4.09 WALL SECTIONS S5.01 TYPICAL DETAILS S5.02 TYPICAL DETAILS S5.03 TYPICAL DETAILS S5.04 TYPICAL DETAILS S5.05 TYPICAL DETAILS S6.01 SCHEDULES & DETAILS S7.01 JOIST DIAGRAM ARCHITECTURAL A0.00 GENERAL PROJECT INFORMATION A0.01 ARCHITECTURAL SITE PLAN A0.02 WALL, ROOF, AND FLOOR ASSEMBLY TYPES A1.00 CODE ANALYSIS A1.01 LIFE SAFETY PLANS AND CODE ANALYSIS A1.11 PHASING PLANS A1.12 PHASING PLANS A1.13 TEMPORARY EGRESS DEMO AND NEW WORK A1.21 DEMOLITION PLAN CRAWL SPACE NORTH A1.22 DEMOLITION PLAN CRAWL SPACE SOUTH A1.23 DEMOLITION PLAN MAIN FLOOR PLAN PHASE 2 A1.24 DEMOLITION PLAN MAIN FLOOR PLAN PHASE 3 A1.25 DEMOLITION PLAN MAIN FLOOR PLAN PHASE 4 A1.26 DEMOLITION PLAN OVERRALL ROOF PLAN A2.01 OVERALL FIRST FLOOR PLAN A2.02 OVERALL ROOF PLAN A2.11 PARTIAL FLOOR PLAN A PHASE 1 A2.12 PARTIAL FLOOR PLAN B PHASE 1 A2.13 PARTIAL FLOOR PLAN PHASE 2 A2.14 PARTIAL FLOOR PLAN PHASE 3 A2.15 PARTIAL FLOOR PLAN PHASE 4 A2.16 SITE BUILDING A2.17 CLERESTORY PLAN A3.11 PARTIAL RCP A PHASE 1 A3.12 PARTIAL RCP B PHASE 1 A3.13 PARTIAL RCP PHASE 2 A3.14 PARTIAL RCP PHASE 3 A3.15 PARTIAL RCP PHASE 4 A3.20 CEILING DETAILS A3.21 CEILING DETAILS A3.22 CEILING DETAILS A4.01 EXTERIOR ELEVATIONS A4.02 EXTERIOR ELEVATIONS A4.03 EXTERIOR ELEVATIONS COURTYARD A5.01 BUILDING SECTIONS A5.02 BUILDING SECTIONS A5.03 BUILDING SECTIONS A5.10 WALL SECTIONS A5.11 WALL SECTIONS A5.12 WALL SECTIONS A5.13 WALL SECTIONS A5.14 WALL SECTIONS A5.15 WALL SECTIONS A5.16 WALL SECTIONS A5.17 WALL SECTIONS A5.20 DETAILS A5.21 DETAILS A5.22 DETAILS A5.23 DETAILS A5.24 DETAILS A5.25 DETAILS A5.26 DETAILS A5.27 DETAILS A5.28 DETAILS A5.29 DETAILS A5.30 DETAILS A5.31 MECHANICAL DOG HOUSE DETAILS A5.32 PLAN DETAILS A5.33 PLAN DETAILS A5.34 PLAN DETAILS A5.35 PLAN DETAILS A5.40 SITE DETAILS A5.41 ENLARGED COURTYARD A6.01 CASEWORK SCHEDULE A6.02 TEACHING STATIONS & CASEWORK DETAILS A6.03 RECEPTION DESKS A6.04 MILLWORK DETAILS A6.11 ENLARGED ADMINISTRATION A6.12 ENLARGED FACULTY LOUNGE / SP. ED. RESOURCE A6.13 ENLARGED HEALTH A6.14 ENLARGED BEFORE/AFTER CARE TOTAL BUILDING GSF 74,468 SF APPLICABLE CODES BUILDING: 2015 INTERNATIONAL BUILDING CODE with Anne Arundel County amendments FIRE PREVENTION: 2015 NFPA 1 LIFE SAFETY: 2015 NFPA 101 PLUMBING CODE: 2015 INTERNATIONAL PLUMBING CODE MECHANICAL CODE: 2015 INTERNATIONAL MECHANICAL CODE with Anne Arundel County amendments ELECTRICAL CODE: 2014 NATIONAL ELECTRICAL CODE GAS CODE: 2015 INTERNATIONAL FUEL GAS CODE ENERGY EFFICIENCY: 2015 INTERNATIONAL ENERGY CONSERVATION CODE with Anne Arundel County amendments EXISTING BUILDING: 2015 INTERNATIONAL EXISTING BUILDING CODE ACCESSIBILITY: ACCESSIBLE AND USEABLE BUILDINGS AND FACILITIES ICC A SPRINKLER CODE: 2013 NFPA 13 FIRE ALARM CODE: 2013 NFPA 72 NATIONAL FIRE ALARM CODE 1 A6.15 ENLARGED GYMNASIUM A6.16 ENLARGED GYMNASIUM ELEVATIONS A6.17 ENLARGED GYMNASIUM ELEVATIONS A6.18 ENLARGED STAGE/CAFETERIA & FOOD SERVICE A6.19 ENLARGED STAGE/CAFETERIA & FOOD SERVICE A6.20 ENLARGED STAGE/CAFETERIA & FOOD SERVICE A6.21 ENLARGED MUSIC CLASSROOMS A6.22 ENLARGED LEARNING STUDIO A6.23 ENLARGED RESOURCE ROOMS A6.24 ENLARGED COMPUTER LAB A6.25 ENLARGED LIBRARY READING ROOM A6.26 ENLARGED LIBRARY READING ROOM ELEVATIONS A6.27 ENLARGED ART CLASSROOM A6.28 ENLARGED EARLY CHILDHOOD CLASSROOM A6.29 ENLARGED EARLY CHILDHOOD CLASSROOM A6.30 ENLARGED SPECIAL EDUCATION CLASSROOMS A6.31 ENLARGED CLASSROOMS A6.32 ENLARGED CLASSROOMS A6.33 ENLARGED CLASSROOMS A6.34 ENLARGED CLASSROOMS A6.35 ENLARGED CLASSROOMS A6.40 CORRIDOR ELEVATIONS A6.41 CORRIDOR ELEVATIONS A6.42 CORRIDOR ELEVATIONS A6.43 CORRIDOR ELEVATIONS A7.01 ENLARGED TOILET ROOM PLANS/ELEVATIONS A7.02 ENLARGED TOILET ROOM PLANS/ELEVATIONS A7.03 ENLARGED TOILET ROOM PLANS/ELEVATIONS A7.04 ENLARGED TOILET ROOM PLANS/ELEVATIONS A8.01 PERFORMANCE PLATFORM RAMP & STAIR A9.01 DOOR SCHEDULE A9.02 STOREFRONT & CURTAINWALL SCHEDULE ADDITION A9.03 STOREFRONT & CURTAINWALL SCHEDULE EXISTING BUILDING A9.04 INTERIOR STOREFRONT SCHEDULE A9.05 MOTORIZED AND MANUAL SHADE SCHEDULE A9.06 SIGNAGE SCHEDULE AND DETAILS A10.01 FINISH LEGEND A10.02 FINISH SCHEDULE A10.11 FLOOR FINISH PLAN A PHASE 1 A10.12 FLOOR FINISH PLAN B PHASE 1 A10.13 FLOOR FINISH PLAN PHASE 2 A10.14 FLOOR FINISH PLAN PHASE 3 A10.15 FLOOR FINISH PLAN PHASE 4 A10.21 FLOOR FINISH PLAN A PHASE 1 ALT 2A+3 A10.22 FLOOR FINISH PLAN B PHASE 1 ALT 2A+3 A10.23 FLOOR FINISH PLAN PHASE 2 ALT 2A+3 A10.24 FLOOR FINISH PLAN PHASE 3 ALT 2A+3 A10.25 FLOOR FINISH PLAN PHASE 4 ALT 2A+3 A10.31 FLOOR FINISH PLAN A PHASE 1 ALT 2B A10.32 FLOOR FINISH PLAN B PHASE 1 ALT 2B A10.41 FLOOR FINISH PLAN A PHASE 1 ALT 2B + 3 A10.42 FLOOR FINISH PLAN B PHASE 1 ALT 2B + 3 VOLUME 2 COVER SHEET CS2.0 COVER SHEET VOL. 2 KITCHEN K1.01 KITCHEN EQUIPMENT PLAN K1.02 BUILDING CONDITIONS & VENTILATION PLAN K1.03 PLUMBING ROUGH IN PLAN K1.04 ELECTRICAL ROUGH IN PLAN K5.01 FABRICATION DETAILS K5.02 EXHAUST CANOPY DETAILS MECHANICAL MP0.01 MECHANICAL & PLUMBING SITE PLAN M1.01 PARTIAL CRAWL SPACE PLAN PHASE 2 DEMOLITION M1.02 PARTIAL CRAWL SPACE PLAN PHASE 3 DEMOLITION M1.03 PARTIAL CRAWL SPACE PLAN PHASE 4 DEMOLITION M1.04 PARTIAL FLOOR PLAN PHASE 2 DEMOLITION M1.05 PARTIAL FLOOR PLAN PHASE 3 DEMOLITION M1.06 PARTIAL FLOOR PLAN PHASE 4 DEMOLITION M1.07 ROOF PLAN DEMOLITION M2.01 PARTIAL CRAWL SPACE PLAN PHASE 2 M2.02 PARTIAL CRAWL SPACE PLAN PHASE 3 M2.03 PARTIAL CRAWL SPACE PLAN PHASE 4 M2.04 PARTIAL FLOOR PLAN A PHASE 1 M2.05 PARTIAL FLOOR PLAN B PHASE 1 M2.06 PARTIAL FLOOR PLAN PHASE 2 M2.07 PARTIAL FLOOR PLAN PHASE 3 ALTERNATE NO. 2: FLOORING IN ADDITION CORRIDORS (Reference A10.01) Base Bid: Provide VCT (Vinyl Composition Tile) flooring in corridors in building addition. Alternate A: Provide SVT (Solid Vinyl Tile) flooring in corridors in building additions. Alternate B: Provide Epoxy Terrazzo flooring, TZ 2, in corridors in building additions. ALTERNATE NO. 3: FLOORING IN CLASSROOMS (Reference A10.01) Base Bid: Provide VCT (Vinyl Composition Tile) flooring in classrooms. Alternate: Provide SVT (Solid Vinyl Tile) flooring in classrooms. ALTERNATE NO. 4: COURTYARD BENCHES AND PAVERS (Reference A5.41) Base Bid: Provide concrete sidewalks and landscaping. No courtyard benches, pavers, or outdoor teaching wall. Alternate: Provide concrete sidewalks and landscaping and provide courtyard benches, pavers, and outdoor teaching wall. ALTERNATE NO. 5: SOLID SURFACE COUNTERTOPS (Reference 6 series and 10 series) Base Bid: Provide solid surface countertops at sink areas and reception counters, and plastic laminate at all other countertops, unless noted otherwise in the contract documents. Alternate: Provide solid surface at all countertops in lieu of plastic laminate countertops. ALTERNATE NO. 6: SOD (Reference Civil drawings) Base Bid: Provide seed at all grass planting areas. Alternate: Provide sod in lieu of seed at all grass planting areas. M2.08 PARTIAL FLOOR PLAN PHASE 4 M2.09 ROOF PLAN M3.01 PART PLANS BOILER ROOM M5.01 SECTIONS BOILER ROOM M5.02 SECTIONS GYM, CAFETERIA & LIBRARY M7.01 DUAL TEMPERATURE WATER PLANT DETAILS M7.02 HYDRONIC PIPING DETAILS M7.03 AIR DISTRIBUTION DETAILS M7.04 EQUIPMENT & SUPPORT DETAILS M7.05 VRF SYSTEM & MISCELLANEOUS DETAILS M7.06 AIR HANDLING UNIT DETAILS M8.01 DUAL TEMPERATURE PLANT CHILLED WATER SYSTEM CONTROL DIAGRAM M8.02 DUAL TEMPERATURE PLANT HEATING WATER SYSTEM CONTROL DIAGRAM M8.03 DOAS AHU CONTROL DIAGRAM M8.04 LIBRARY, CAFETERIA & GYM AHU CONTROL DIAGRAM M8.05 TERMINAL UNIT CONTROL DIAGRAMS M8.06 MISCELLANEOUS CONTROL DIAGRAMS M8.07 OVERALL FLOOR PLAN AUTOMATIC TEMPERATURE CONTROLS M9.01 AIR HANDLING UNIT & DUAL TEMPERATURE PLANT EQUIPMENT SCHEDULES M9.02 TERMINAL UNIT EQUIPMENT SCHEDULES M9.03 MECHANICAL EQUIPMENT NOTES, VRF SYSTEM SCHEDULES & LEGEND PLUMBING P1.01 PARTIAL CRAWL SPACE PLAN PHASE 2 DEMOLITION P1.02 PARTIAL CRAWL SPACE PLAN PHASE 3 DEMOLITION P1.03 PARTIAL CRAWL SPACE PLAN PHASE 4 DEMOLITION P1.04 PARTIAL FLOOR PLAN PHASE 2 DEMOLITION P1.05 PARTIAL FLOOR PLAN PHASE 3 DEMOLITION P1.06 PARTIAL FLOOR PLAN PHASE 4 DEMOLITION P1.07 ROOF PLAN DEMOLITION P2.01 PARTIAL FOUNDATION PLAN A PHASE 1 P2.02 PARTIAL FOUNDATION PLAN B PHASE 1 P2.03 PARTIAL CRAWL SPACE PLAN PHASE 2 P2.04 PARTIAL CRAWL SPACE PLAN PHASE 3 P2.05 PARTIAL CRAWL SPACE PLAN PHASE 4 P2.06 PARTIAL FLOOR PLAN A PHASE 1 P2.07 PARTIAL FLOOR PLAN B PHASE 1 P2.08 PARTIAL FLOOR PLAN PHASE 2 P2.09 PARTIAL FLOOR PLAN PHASE 3 P2.10 PARTIAL FLOOR PLAN PHASE 4 P2.11 ROOF PLAN P6.01 SANITARY/VENT RISER DIAGRAMS P6.02 DOMESTIC WATER RISER DIAGRAMS P6.03 DOMESTIC WATER & NATURAL GAS RISER DIAGRAMS P7.01 PIPING, SUPPORT, AND EQUIPMENT DETAILS P7.02 PLUMBING FIXTURE PIPING DETAILS P7.03 MISCELLANEOUS PLUMBING DETAILS P9.01 PLUMBING SCHEDULES, NOTES, & LEGEND ELECTRICAL E0.01 ELECTRICAL LEGEND, ABBREVIATIONS, & CONVENTIONS E0.02 LIGHT FIXTURE SCHEDULE E0.03 ELECTRICAL DEMOLITION SITE PLAN E0.04 ELECTRICAL SITE PLAN E0.05 ELECTRICAL PHASING PLAN ED1.01 PARTIAL FLOOR PLAN PHASE 2 DEMOLITION ED1.02 PARTIAL FLOOR PLAN PHASE 3 DEMOLITION ED1.03 PARTIAL FLOOR PLAN PHASE 4 DEMOLITION ED1.04 CRAWL SPACE DEMOLITION ELECTRICAL ED1.05 ROOF PLAN DEMOLITION E1.01 PARTIAL FLOOR PLAN A PHASE 1 POWER E1.02 PARTIAL FLOOR PLAN B PHASE 1 POWER E1.03 PARTIAL FLOOR PLAN PHASE 2 POWER E1.04 PARTIAL FLOOR PLAN PHASE 3 POWER E1.05 PARTIAL FLOOR PLAN PHASE 4 POWER E1.06 ROOF PLAN E2.01 PARTIAL FLOOR PLAN A PHASE 1 LIGHTING E2.02 PARTIAL FLOOR PLAN B PHASE 1 LIGHTING E2.03 PARTIAL FLOOR PLAN PHASE 2 LIGHTING E2.04 PARTIAL FLOOR PLAN PHASE 3 LIGHTING E2.05 PARTIAL FLOOR PLAN PHASE 4 LIGHTING E2.06 CRAWL SPACE LIGHTING E3.01 PARTIAL FLOOR PLAN A PHASE 1 SECURITY E3.02 PARTIAL FLOOR PLAN B PHASE 1 SECURITY E3.03 PARTIAL FLOOR PLAN PHASE 2 SECURITY E3.04 PARTIAL FLOOR PLAN PHASE 3 SECURITY E3.05 PARTIAL FLOOR PLAN PHASE 4 SECURITY E4.01 KITCHEN PART PLAN E5.01 SCHEMATIC POWER RISER DIAGRAM E5.02 TELECOMMUNICATIONS & SECURITY RISER DIAGRAMS E6.01 ELECTRICAL DETAILS E6.02 ELECTRICAL DETAILS E6.03 ELECTRICAL DETAILS E6.04 ELECTRICAL DETAILS E6.05 ELECTRICAL DETAILS E7.01 PANELBOARD SCHEDULES E7.02 PANELBOARD SCHEDULES E7.03 PANELBOARD SCHEDULES E7.04 PANELBOARD SCHEDULES E7.05 MECHANICAL CONNECTION SCHEDULES E7.06 LIGHTING CONTROLS SCHEDULE E7.07 CORRIDOR LIGHTING CONTROL ZONES FIRE SUPPRESSION FS0.0 FIRE SUPPRESSION NOTES, SYMBOLS AND ABBREVIATIONS FS2.0 FIRE SUPPRESSION COMPOSITE PLAN NEW WORK FS2.1 FIRE SUPPRESSION PLAN A PHASE 1 NEW WORK FS2.2 FIRE SUPPRESSION PLAN B PHASE 1 NEW WORK FS2.3 FIRE SUPPRESSION PLAN PHASE 2 NEW WORK FS2.4 FIRE SUPPRESSION PLAN PHASE 3 NEW WORK FS2.5 FIRE SUPPRESSION PLAN PHASE 4 NEW WORK FS5.0 FIRE SUPPRESSION DETAILS FS5.1 FIRE SUPPRESSION DETAILS FS5.2 FIRE SUPPRESSION DETAILS FIRE ALARM FA0.0 FIRE ALARM NOTES, SYMBOLS AND ABBREVIATIONS FA1.0 FIRE ALARM PLAN DEMOLITION FA2.0 FIRE ALARM COMPOSITE PLAN NEW WORK FA2.1 FIRE ALARM PLAN A PHASE 1 NEW WORK FA2.2 FIRE ALARM PLAN B PHASE 1 NEW WORK FA2.3 FIRE ALARM PLAN PHASE 2 NEW WORK FA2.4 FIRE ALARM PLAN PHASE 3 NEW WORK FA2.5 FIRE ALARM PLAN PHASE 4 NEW WORK FA5.0 FIRE ALARM RISER FA5.1 FIRE ALARM GRAPHIC MAP DETAIL MAIN LOBBY FA5.2 FIRE ALARM GRAPHIC MAP DETAIL LOBBY 007 A B C D E F G H J K L M N 5/15/2017 3:08:05 PM C:\Users\srineer\Documents\ George Cromwell ES 2016_srineer.rvt ANNE ARUNDEL COUNTY PUBLIC SCHOOLS GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland ARCHITECTURE LANDSCAPE ARCHITECTURE PLANNING INTERIOR DESIGN PROFESSIONAL CERTIFICATION: I CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MARYLAND LICENSE NUMBER: EXPIRATION DATE: 1 05/16/17 Addendum 1 no. date revision Project Name GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION Project Number Date Scale 3/8" = 1' 0" Drawing - - COVER SHEET - VOL. 1 CS1.0 BID SET Hord Coplan Macht, Inc.

2

3

4

5

6

7

8

9

10

11

12

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603 ENDUM NO. 2 To the Drawings and/or Specifications for Gilbert Architects Youth s Benefit Elementary School - #0729 626 N. Charlotte St. Board of Education of Harford County Lancaster, PA 17603 June 2,

More information

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

ouglas Intermediate School

ouglas Intermediate School ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion

More information

OCPS Submittal Register for Product Data and Shop Drawing Reviews

OCPS Submittal Register for Product Data and Shop Drawing Reviews OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications

More information

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.

More information

Chuck Caesar. VIA: /Webposting April 27, 2017

Chuck Caesar. VIA:  /Webposting April 27, 2017 VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John

More information

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address: #506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643 11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Tri-County Commercial Application Checklist

Tri-County Commercial Application Checklist TRI-COUNTY SERVICE CENTER TRI-COUNTY SERVICE CENTER State of Oregon Clackamas Multnomah Washington C O U N T I E S Tri-County Commercial Application Checklist Department of Consumer & Business Services

More information

RECORD GROUP NUMBER 156

RECORD GROUP NUMBER 156 DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION HOSPITAL AND SCHOOL FOR THE RETARDED ARLINGTON, TENN. BLUEPRINTS, 1965 RECORD GROUP NUMBER 156 Processed by: David R. Sowell Archival Technical Services

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620 W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Marcus Moziah Garvey Elementary School

Marcus Moziah Garvey Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620 82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

James Shields Middle School 2611 W 48th St Chicago, IL 60632

James Shields Middle School 2611 W 48th St Chicago, IL 60632 2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Amos Alonzo Stagg Elementary School

Amos Alonzo Stagg Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Continuing Education Credit

Continuing Education Credit BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP

More information

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Langston Hughes Elementary School

Langston Hughes Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Morton School of Excellence

Morton School of Excellence Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Jackie Robinson Elementary School

Jackie Robinson Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

CPM revision date: 8/5/2018 page 1

CPM revision date: 8/5/2018 page 1 University of Minnesota CPM Design Deliverables The University of Minnesota s (U of MN) Design Deliverables outlines the information and minimum level of development anticipated with the standard contracted

More information

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609 athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the

More information

Andrew Carnegie Elementary School

Andrew Carnegie Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

RENOVATION OF THE FARMERS MARKET Reference Number:

RENOVATION OF THE FARMERS MARKET Reference Number: RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:

More information

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the

More information

3100 WEST LAKE STREET APARTMENTS 3100 WEST LAKE STREET MINNEAPOLIS, MN TITLE SHEET W Lake St 3100 MSP, LLC

3100 WEST LAKE STREET APARTMENTS 3100 WEST LAKE STREET MINNEAPOLIS, MN TITLE SHEET W Lake St 3100 MSP, LLC 3100 WEST LAKE STREET APARTMENTS 3100 WEST LAKE STREET MINNEAPOLIS, MN SYMBOLS LEGEND SECTION AND ELEVATION REF ETERIOR ELEVATION KEYNOTE REF A. INTERIOR ELEVATION REF DETAIL REF ROOM ROOM NAME AND NUMBER

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

Wendell Smith Elementary School

Wendell Smith Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Architecture, Construction, and Engineering Technical Charter

Architecture, Construction, and Engineering Technical Charter Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Everett McKinley Dirksen Elementary School

Everett McKinley Dirksen Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12

More information

Philip Rogers Elementary School

Philip Rogers Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647 3 Rockwell St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

George Washington Elementary School 3611 E 114th St Chicago, IL 60617 3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up

More information

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Disney II Magnet School

Disney II Magnet School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118 PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended

More information

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

George Washington Elementary School

George Washington Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL Facility Assessment Report 9 E 4th St Chicago, IL 03 This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

CHAPTER 5 ARCHITECTURE

CHAPTER 5 ARCHITECTURE CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1

More information

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

EPIC Academy High School

EPIC Academy High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641

John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641 Kilbourn Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

1001 Feehanville Drive Phone Mt. Prospect, IL Fax

1001 Feehanville Drive Phone Mt. Prospect, IL Fax NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 November 29, 2016 Community Unit School District 200 130 West Park Avenue Wheaton, IL 60189

More information

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617 S Cregier Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

COPYRIGHT ARCHITECT SUSAN DESKO-AIA

COPYRIGHT ARCHITECT SUSAN DESKO-AIA B:\03 ACAD Files\2 200.02.2 This Is It\DESIGN REVIEW\DR-0-.dwg 7/3/200 0:4 AM COVERED DROP-OFF 2 RECEPTION 3 LOBBY [2,800 SF] 4 WAITING AREA [450 SF] 5 FRONT DOOR & PATIO 6 VESTIBULE & AFTER HOURS ELEVATOR

More information

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 34 Washtenaw Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Hall of Waters List of Historic Drawings

Hall of Waters List of Historic Drawings List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral

More information

Horace Mann Elementary

Horace Mann Elementary 2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are

More information

SPARTAN DAY CAMP 4814 FREEDOM RING RD

SPARTAN DAY CAMP 4814 FREEDOM RING RD 484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS

More information

Charles N Holden Elementary School

Charles N Holden Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612 33 W Ohio St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:

More information

University of Chicago Charter - Carter G Woodson

University of Chicago Charter - Carter G Woodson Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608 W Roosevelt Rd Chicago, IL 8 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

A/E REVIEW CHECKLIST HVAC

A/E REVIEW CHECKLIST HVAC A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,

More information

BRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB

BRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB BRYANT HERITAGE PLAZA, AB RE-ISSUED FOR BUILDING PERMIT May 9, 206 L I S T O F D R A W I N G S HD ENGINEERING SERVICES LTD. D.B.K. ENGINEERING LTD. D.B.K. ENGINEERING LTD. JUBILEE ENGINEERING CONSULTANTS

More information

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623 3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This

More information

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information

U of I Facilities Standards Updates for 2017

U of I Facilities Standards Updates for 2017 U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),

More information

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX INDEX OF SHEETS SHT. DWG. SHEET TITLE GENERAL 1 G1 COVER SHEET, VICINITY MAP, PROJECT DESCRIPTION 43 A402 INTERIOR ELEVATIONS WOMENS 44 A403 INTERIOR ELEVATIONS MENS 45 A404 INTERIOR ELEVATIONS BUILDING-PLUMBING

More information

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013 SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,

More information

Alexander Graham Bell Elementary School

Alexander Graham Bell Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

James Otis Elementary School 525 N Armour St Chicago, IL 60642

James Otis Elementary School 525 N Armour St Chicago, IL 60642 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Rufus M Hitch Elementary School

Rufus M Hitch Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Addendum #1 - Bid Package #

Addendum #1 - Bid Package # Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction

More information

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS Building and Development Permit Applications Definitions: Type A Residential Projects: All projects related to one and two unit dwellings Type B Residential Projects: All projects related to Apartments,

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

754 Sir Francis Drake Boulevard

754 Sir Francis Drake Boulevard APN: 006-09 - 39 Town of San Anselmo Submittal Number : April 06 Revised June 0, 06 PROJECT TEAM INDEX TO DRAWINGS APPLICANT MONFREDINI PROPERTIES LLC South San Francisco, California 94080 (650) 873-0440

More information

Jonathan Burr Elementary School

Jonathan Burr Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 1 November 10, 2016 COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding

More information

North Lawndale College Prep Charter - Collins

North Lawndale College Prep Charter - Collins Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

John Harvard Elementary School of Excellence

John Harvard Elementary School of Excellence Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607 Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

1.01 NOTICE TO BIDDERS

1.01 NOTICE TO BIDDERS ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School

More information

John Milton Gregory Elementary School

John Milton Gregory Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

University of Chicago Charter - NKO

University of Chicago Charter - NKO Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653 33 S Wabash Ave Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Operating Standards Attachment to Development Application

Operating Standards Attachment to Development Application Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org SITE DEVELOPMENT

More information

James Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647

James Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647 W Schubert Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

www.cad-designers.com Staffing Services Cad Designers is an established staffing company that specializes in providing professional support for the A/E/C industry. All candidates are screened with a complete

More information