1 NICHOLAS & ASSOCIATES, INC Feehanville Drive Phone Mt. Prospect, IL Fax November 29, 2016 Community Unit School District West Park Avenue Wheaton, IL Re: Master Planning Preliminary Cost Estimates for: Elementary Schools (Capital and Educational) Middle Schools (Capital and Educational) New Early Learning Center at Jefferson Site (Educational) ELEMENTARY SCHOOLS Capital Needs at Elementary Schools: $37,100,000 Secured Entries at 7 Elementary Schools: $1,750,000 - Bower/Johnson/Lowell/Pleasant Hill/Washington: Secured Entry Only - Sandburg and Whittier: Secured Entry plus Office Relocation LLCs at ALL Elementary Schools: $5,050,000 - All Elementary Schools minus Washington: LLC Only - Washington: LLC plus Gym Renovation Total Elementary School Value: $43,900,000 MIDDLE SCHOOLS Capital Needs at Middle Schools: $34,200,000 Edison Project: $6,400,000 Franklin Project: $26,300,000 Monroe Project: $14,100,000 Total Middle School Value: $81,000,000 Note: For further detailed cost information, see preliminary construction estimates below within this document. HIGH SCHOOLS Capital Needs at High Schools: $12,300,000 WWS LLC: $400,000 WN Tech Lab: $300,000 Total High School Value: $13,000,000 NEW EARLY LEARNING CENTER New ELC at Jefferson Site: $16,600,000 Note: For further detailed cost information, see preliminary construction estimates below within this document. Total Value: $154,500,000 Note: Slight reduction due to Franklin Revised Components distributed on

2 Edison Middle School Component Area Work 01 - Main office Reconfiguration 1,775 sf Med. Reno Student Services Suite 1,536 sf Med. Reno Hallway Collaboration Zones (ea) 90 sf Med. Reno FACS reconfiguration 1,343 sf Med. Reno Locker Room Renovation 3,734 sf Light Reno Commons Reconfiguration 1,604 sf Light Reno Music Offices & Practice Room 490 sf Light Reno Science Renovation, Expansion 7,844 sf Heavy Reno Renovate LLC 5,564 sf Med. Reno LLC Corridor 900 sf Light Reno New SPED Classroom & Offices 1,108 sf Med. Reno Outdoor Learning Space Allow 13 - Reconfigure Science Classrooms For STD 2,773 sf Light Reno. Total 28,761 sf Edison Improvements Breakdown Administration Office Project: 01 - Main office Reconfiguration 1,775 sf Med. Reno. $266, Student Services Suite 1,536 sf Med. Reno. $230, New SPED Classroom & Offices 1,108 sf Med. Reno. $166,200 Sub-Total $ 662,850 Furniture, Fixtures, & Equipment Contingency $ 30,000 5% Design Contingency $ 33,143 10% Construction Contingency $ 66,285 Total Construction $ 792,278 General Conditions $ 79,228 Bond $ 7,923 Insurance $ 5,467 CM Fee (6%) $ 47,537 A/E Fee (8%) $ 63,382 On-Site Called Inspections $ 5,000 TOTAL PROJECT $ 1,000,815 2

3 Science Project: 08 - Science Renovation, Expansion 7,844 sf Heavy Reno. $1,568, Reconfigure Science Classrooms For STD 2,773 sf Light Reno. $249,570 Sub-Total $ 1,818,370 Furniture, Fixtures, & Equipment Contingency $ 75,000 5% Design Contingency $ 90,919 10% Construction Contingency $ 181,837 Total Construction $ 2,166,126 General Conditions $ 216,613 Bond $ 21,661 Insurance $ 14,946 CM Fee (6%) $ 129,968 A/E Fee (8%) $ 173,290 On-Site Called Inspections $ 7,000 TOTAL PROJECT $ 2,729,604 Stand-Alone Improvements Project: 03 - Hallway Collaboration Zones (ea) 90 sf Med. Reno. $13, FACS reconfiguration 1,343 sf Med. Reno. $ Locker Room Renovation 3,734 sf Light Reno. $336, Commons Reconfiguration 1,604 sf Light Reno. $144, Music Offices & Practice Room 490 sf Light Reno. $44, Renovate LLC 5,564 sf Med. Reno. $834, LLC Corridor 900 sf Light Reno. $81, Outdoor Learning Space Allow $175,000 Sub-Total $ 1,830,070 Furniture, Fixtures, & Equipment Contingency $ 85,000 5% Design Contingency $ 91,504 10% Construction Contingency $ 183,007 Total Construction $ 2,189,581 General Conditions $ 218,958 Bond $ 21,896 Insurance $ 15,108 CM Fee (6%) $ 131,375 A/E Fee (8%) $ 175,166 On-Site Called Inspections $ 7,000 TOTAL PROJECT $ 2,759,084 3

4 Improvements Combined Project: 01 - Main office Reconfiguration 1,775 sf Med. Reno. $266, Student Services Suite 1,536 sf Med. Reno. $230, Hallway Collaboration Zones (ea) 90 sf Med. Reno. $13, FACS reconfiguration 1,343 sf Med. Reno. $201, Locker Room Renovation 3,734 sf Light Reno. $336, Commons Reconfiguration 1,604 sf Light Reno. $144, Music Offices & Practice Room 490 sf Light Reno. $44, Science Renovation, Expansion 7,844 sf Heavy Reno. $1,568, Renovate LLC 5,564 sf Med. Reno. $834, LLC Corridor 900 sf Light Reno. $81, New SPED Classroom & Offices 1,108 sf Med. Reno. $166, Outdoor Learning Space Allow $175, Reconfigure Science Classrooms For STD 2,773 sf Light Reno. $249,570 Sub-Total $ 4,311,290 Furniture, Fixtures, & Equipment Contingency $ 180,000 5% Design Contingency $ 215,564 10% Construction Contingency $ 431,129 Total Construction $ 5,137,983 General Conditions $ 513,798 Bond $ 51,380 Insurance $ 35,452 CM Fee (5%) $ 256,899 A/E Fee (8%) $ 411,039 On-Site Called Inspections $ 10,000 TOTAL PROJECT $ 6,416,551 4

5 Franklin Middle School Component Area Work 01 - West Addition 12,383 sf Addition 02 - East Addition 9,745 sf Addition 03 - North Classroom Wing Renovation 13,000 sf Heavy Reno Classroom Renovations (1 st Floor) 7,410 sf Md. Reno Classroom Renovations (2 nd Floor) 11,250 sf Md. Reno Classroom Renovations (3 rd Floor) 11,575 sf Md. Reno Music Classrooms Renovations 5,719 sf Md. Reno Locker Room Renovation 1,475 sf Md. Reno Accessible South Entry Allow 10 - LLC Reorg 3,500 sf Md. Reno Cafeteria Renovation 5,684 sf Lt Reno Auditorium & Choral 7,379 sf Md. Reno.+ Total 89,120 sf 5

6 Franklin Improvements Breakdown Expansion & Renovation Project (Improvements Combined): 01 - West Addition 12,383 sf Addition $2,786, East Addition 9,745 sf Addition $2,192, North Classroom Wing Renovation 13,000 sf Heavy Reno + $2,925, Classroom Renovations (1 st Floor) 7,410 sf Md. Reno.+ $1,296, Classroom Renovations (2 nd Floor) 11,250 sf Md. Reno.+ $1,968, Classroom Renovations (3 rd Floor) 11,575 sf Md. Reno.+ $2,025, Music Classrooms Renovations 5,719 sf Md. Reno.+ $1,000, Locker Room Renovation 1,475 sf Md. Reno.+ $258, Accessible South Entry Allow $285, LLC Reorg 3,500 sf Md. Reno.+ $612, Cafeteria Renovation 5,684 sf Lt Reno.+ $539, Auditorium & Choral 7,379 sf Md. Reno.+ $1,291,325 Site Work Allow TBD $1,000,000 -Site Grading/Excavation -Site Utilities -Site Concrete -Asphalt Pavement and Striping -Misc. Steel -Fencing -Landscaping -Etc. Sub-Total $ 18,182,680 Furniture, Fixtures, & Equipment Contingency $ 600,000 5% Design Contingency $ 909,134 10% Construction Contingency $ 1,818,268 Total Construction $ 21,510,082 General Conditions $ 1,736,527 Bond $ 215,101 Insurance $ 148,420 CM Fee (4%) $ 860,403 A/E Fee (8%) $ 1,720,807 On-Site Called Inspections $ 50,000 Geotechnical Report $ 20,000 Site Surveying $ 15,000 TOTAL PROJECT $ 26,276,340 6

7 Monroe Middle School Component Area Work 01 - New Performing Arts Addition 12,607 sf Addition 02 - Locker Room Renovation 5,048 sf Med. Reno. 03-6th Grade Commons Renovation 2,129 sf Light Reno Auditorium Renovation 1,969 sf Light Reno. 05-8th Grade Commons Expansion 2,829 sf Md. Reno Reconfigure existing Science Classrooms 5,581 sf Med. Reno Science Classroom relocation 7,013 sf Md. Reno LLC Reconfiguration 7,871 sf Light Reno. 09-6th Grade Science Labs 4,450 sf Md. Reno Reconfigure Current Music Classrooms 3,902 sf Md. Reno.+ Total Monroe Improvements Breakdown Science and Performing Arts Project: 53,399 sf 01 - New Performing Arts Addition 12,607 sf Addition $3,151, Reconfigure existing Science Classrooms 5,581 sf Med. Reno. $837, Science Classroom relocation 7,013 sf Md. Reno.+ $1,227, Reconfigure Current Music Classrooms 3,902 sf Md. Reno.+ $682,850 Site Work Allow TBD $500,000 -Site Grading/Excavation -Site Utilities -Site Concrete -Asphalt Pavement and Striping -Misc. Steel -Fencing -Landscaping -Etc. Sub-Total $ 6,399,025 Furniture, Fixtures, & Equipment Contingency $ 180,000 5% Design Contingency $ 319,951 10% Construction Contingency $ 639,903 Total Construction $ 7,538,879 General Conditions $ 753,888 Bond $ 75,389 Insurance $ 52,018 CM Fee (5%) $ 376,944 A/E Fee (8%) $ 603,110 On-Site Called Inspections $ 12,000 Geotechnical Report $ 15,000 Site Surveying $ 10,000 TOTAL PROJECT $ 9,437,228 7

8 Performing Arts Project: 01 - New Performing Arts Addition 12,607 sf Addition $3,151,750 Site Work Allow TBD $500,000 -Site Grading/Excavation -Site Utilities -Site Concrete -Asphalt Pavement and Striping -Misc. Steel -Fencing -Landscaping -Etc. Sub-Total $ 3,651,750 Furniture, Fixtures, & Equipment Contingency $ 75,000 5% Design Contingency $ 182,588 10% Construction Contingency $ 365,175 Total Construction $ 4,274,513 General Conditions $ 427,451 Bond $ 42,745 Insurance $ 29,494 CM Fee (6%) $ 256,471 A/E Fee (8%) $ 341,961 On-Site Called Inspections $ 12,000 Geotechnical Report $ 10,000 TOTAL PROJECT $ 5,394,635 Stand-Alone Improvements Project: 02 - Locker Room Renovation 5,048 sf Med. Reno. $757, th Grade Commons Renovation 2,129 sf Light Reno. $191, Auditorium Renovation 1,969 sf Light Reno. $177, th Grade Commons Expansion 2,829 sf Md. Reno.+ $495, LLC Reconfiguration 7,871 sf Light Reno. $708, th Grade Science Labs 4,450 sf Md. Reno.+ $778,750 Sub-Total $ 3,108,235 Furniture, Fixtures, & Equipment Contingency $ 175,000 5% Design Contingency $ 155,412 10% Construction Contingency $ 310,824 Total Construction $ 3,749,471 General Conditions $ 374,947 Bond $ 37,495 Insurance $ 25,871 CM Fee (6%) $ 224,968 A/E Fee (8%) $ 299,958 On-Site Called Inspections $ 12,000 Geotechnical Report $ 10,000 Site Surveying $ 10,000 TOTAL PROJECT $ 4,744,710 8

9 Improvements Combined Project: 01 - New Performing Arts Addition 12,607 sf Addition $3,151, Locker Room Renovation 5,048 sf Med. Reno. $757, th Grade Commons Renovation 2,129 sf Light Reno. $191, Auditorium Renovation 1,969 sf Light Reno. $177, th Grade Commons Expansion 2,829 sf Md. Reno.+ $495, Reconfigure existing Science Classrooms 5,581 sf Med. Reno. $837, Science Classroom relocation 7,013 sf Md. Reno.+ $1,227, LLC Reconfiguration 7,871 sf Light Reno. $708, th Grade Science Labs 4,450 sf Md. Reno.+ $778, Reconfigure Current Music Classrooms 3,902 sf Md. Reno.+ $682,850 Site Work Allow TBD $500,000 -Site Grading/Excavation -Site Utilities -Site Concrete -Asphalt Pavement and Striping -Misc. Steel -Fencing -Landscaping -Etc. Sub-Total $ 9,507,260 Furniture, Fixtures, & Equipment Contingency $ 350,000 5% Design Contingency $ 475,363 10% Construction Contingency $ 950,726 Total Construction $ 11,283,349 General Conditions $ 1,128,335 Bond $ 112,833 Insurance $ 77,855 CM Fee (5%) $ 564,167 A/E Fee (8%) $ 902,668 On-Site Called Inspections $ 25,000 Geotechnical Report $ 15,000 Site Surveying $ 10,000 TOTAL PROJECT $ 14,119,207 9

10 New Early Learning Center (ELC) at Jefferson Site Scope of Work Estimated Cost 01 - Site Construction (Includes Building Demolition) $2,100, Building Concrete $750, Masonry $900, Steel $932, Woods & Plastics $875, Thermal & Moisture Protection $905, Doors and Windows $815, Finishes $1,200, Specialties $98, Equipment Not Applicable 11 - Furnishings $17, Conveying Systems Not Applicable 13 - Fire Suppression $132, Plumbing $540, HVAC $1,800, Electrical $1,250,000 Note: -Total Classrooms: 16 -Total SF = 45,271 -Storm Shelter Requirements Included (Reinforcement, Upgraded Window Systems, etc.) Sub-Total $ 12,315,733 Furniture, Fixtures, & Equipment Contingency $ 350,000 Technology $ 150,000 LEED Impact $ 175,000 Project Contingency $ 1,000,000 Total Construction $ 13,990,733 General Conditions $ 600,000 Bond $ 139,907 Insurance $ 96,536 CM Fee (4.5%) $ 629,583 A/E Fee (7.2%) $ 1,007,333 On-Site Called Inspections $ 50,000 Geotechnical Report $ 15,000 Site Surveying $ 10,000 TOTAL PROJECT $ 16,539,092 General Notes: Note 1: Specialty Consultant Fees, outside of basic architectural services, are to be determined. Note 2: 3 rd Party Drawing Reviews are to be determined. Note 3: Local Permitting Costs are to be determined. Note 4: Builder s Risk Premium not included in above estimates. Note 5: Estimates above represent a mid-range concept. If you have questions regarding the above or you need additional information, please do not hesitate to contact our office. Sincerely, Joe Papanicholas Nicholas & Associates, Inc. Vice-President 10

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:

More information

Harding Senior High School

Harding Senior High School 1540 Sixth Street East Project Summary:, located in the Eastview area of St. Paul, offers students in grades 9 through 12 a wide range of curriculum options ranging from International Baccalaureate to

More information

Cherokee Heights Elementary School

Cherokee Heights Elementary School 694 Charlton Street Project Summary: Cherokee Heights Elementary is about to start its exciting transition to a Montessori learning model. The school is connected to the Baker Center which is currently

More information

NEW LEBANON ELEMENTARY SCHOOL

NEW LEBANON ELEMENTARY SCHOOL NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL November 10, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL

More information

NEW LEBANON ELEMENTARY SCHOOL

NEW LEBANON ELEMENTARY SCHOOL NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL October 9, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL

More information

Ashby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update

Ashby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update Ashby, Pepperell, Townsend North Middlesex Regional High School Feasibility Study Update June 6, 2013 AGENDA Preliminary Design Program (PDP) District Capacity Analysis Preferred Schematic Report (PSR)

More information

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12

More information

John A Johnson Elementary School

John A Johnson Elementary School 740 York Avenue Project Summary: An Acheivement Plus school John A Johnson is located adjacent to the East Side YMCA, jointly serving their communities educational, recreation, and wellness needs. The

More information

Horace Mann Elementary

Horace Mann Elementary 2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are

More information

ouglas Intermediate School

ouglas Intermediate School ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion

More information

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015 275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.

More information

CS2.0 COVER SHEET VOL. 2

CS2.0 COVER SHEET VOL. 2 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:

More information

Continuing Education Credit

Continuing Education Credit BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP

More information

Linwood Monroe Upper 810 Palace Avenue

Linwood Monroe Upper 810 Palace Avenue 810 Palace Avenue Project Summary: Spanning a child s first classroom experience all the way through middle school, Linwood Monroe s Plus lays a foundation for creativity and exploration in the arts. Accelerated

More information

New Denver, BC FEASIBILITY REPORT OCTOBER 2018 BOSUN HALL. p f

New Denver, BC FEASIBILITY REPORT OCTOBER 2018 BOSUN HALL.   p f BOSUN HALL New Denver, BC FEASIBILITY REPORT OCTOBER 2018 www.coverac.ca p. 250.354.4445 f. 250.352.0017 OVERVIEW Bosun Hall is the heart of New Denver community life, and provide space for events such

More information

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample

More information

Buildings and Grounds Supervisor, EASD. CG Schmidt, Sr. Project Manager

Buildings and Grounds Supervisor, EASD. CG Schmidt, Sr. Project Manager MEETING MINUTES August 25, 2015 Colleen O'Meara EUA, Project Manager Bill Trewyn Mike Datza Jason Tadlock Dave Stebnitz Ross Eggert Bob Vajgrt Business Manager, EAST Buildings and Grounds Supervisor, EASD

More information

Architectural Design Process

Architectural Design Process Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation

More information

Allan Hancock College

Allan Hancock College Allan Hancock College Project Planning Board Workshop February 17, 2009 Agenda Objective Funding Allocation Space Demand Analysis Project Overview Bond Measure I Program Schedule Charge: To review funding

More information

MELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma.

MELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma. MELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma. Hoover, Winthrop and Horace Mann Elementary Schools September 27, 2016 Tappe Architects Inc. HOOVER ELEMENTARY SCHOOL - SITE PLAN REMOVE EXISITNG

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

COMPONENT FLOW CHART & SEQUENCING DIAGRAMS

COMPONENT FLOW CHART & SEQUENCING DIAGRAMS Oak Park and River Forest High School Master Facilities Plan COMPONENT FLOW CHART & SEQUENCING DIAGRAMS The following is a narrative intended to accompany the component flow chart and sequencing diagrams

More information

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin. MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes

AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes Meeting No. 4 Date: 5/12/2018 Job No. Meeting Location: AVS Conference Room The following notes were taken during a meeting on

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

Tri-County Commercial Application Checklist

Tri-County Commercial Application Checklist TRI-COUNTY SERVICE CENTER TRI-COUNTY SERVICE CENTER State of Oregon Clackamas Multnomah Washington C O U N T I E S Tri-County Commercial Application Checklist Department of Consumer & Business Services

More information

Measure I Bond Program Schedule: Additional Options for Consideration

Measure I Bond Program Schedule: Additional Options for Consideration Measure I Bond Program Schedule: Additional Options for Consideration 24 March 2015 Dr. Robert Clark Chief Business Officer From March 10, 2015 Meeting District staff presented a draft project schedule

More information

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM:

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM: 4900 Lang Ave NE Albuquerque, NM 87109 505-348-4000 phone 505-348-4055 fax Meeting Minutes Project: Valley View Elementary School Owner: Valley View Public Schools / PSFA Albuquerque Colorado Springs Denver

More information

March 1, Buildings for Our Future: 2016 Update

March 1, Buildings for Our Future: 2016 Update March 1, 2016 Buildings for Our Future: 2016 Update Buildings For Our Future: Project Objectives Transform five elementary schools in poor and worsening condition into 21st century centers of learning

More information

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620 W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

ROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL

ROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL ROBERT TURER COLLEGE AD CAREER HIGH SCHOOL SCHEMATIC DESIG PRESETATIO 23 MAY 2017 Project Milestones Schematic Design..... March May 2017 SD Presentation to Board of Trustees...... 23 May, 2017 Design

More information

November 30, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227

November 30, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 November 30, 2016 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Abernethy Elementary School 2421 SE Orange

More information

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET

More information

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643 11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Safety (OSHA 10 hour)

Safety (OSHA 10 hour) Construction Technology Core and Sustainable Construction Subject Code: 178000 Students will learn principles in basic safety (10-hr OSHA), construction math, hand and power tool are and operation, blueprint

More information

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program

More information

MEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013

MEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013 Seattle World School SWS SDAT Workshop 3 2 December 203 SPS SWS at TT Minor TCF Architecture Project Number: 203 002 MEETING MINUTES Attendance: Name Representing Role Paul Wight Seattle Public Schools

More information

Cheney Building & Bennet Academy Town of Manchester Phase 1 Study Presentation - April 10, 2013 DRAFT

Cheney Building & Bennet Academy Town of Manchester Phase 1 Study Presentation - April 10, 2013 DRAFT Cheney Building & Bennet Academy own of Manchester Phase 1 Study Presentation - April 10, 2013 Schools Modernization & Reinvestment eam Revisited Board of Directors Board of Education DRAF ai Soo Kim Partners

More information

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC Design Rationale On behalf of our client, Necessary Homes Inc, we have prepared a Development Permit application for a unit rental multi-family building at The site area of the property is 9 SM and is

More information

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607 Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Marcus Moziah Garvey Elementary School

Marcus Moziah Garvey Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SPARTAN DAY CAMP 4814 FREEDOM RING RD

SPARTAN DAY CAMP 4814 FREEDOM RING RD 484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS

More information

Jackie Robinson Elementary School

Jackie Robinson Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

March 1, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227

March 1, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 March 1, 2017 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Sunnyside School 3421 SE Salmon Street Portland,

More information

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2311

More information

CHAPTER 5 ARCHITECTURE

CHAPTER 5 ARCHITECTURE CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1

More information

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document. Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2603

More information

CORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS)

CORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS) Classrooms 2-3 scientists Morrison Maierle Classrooms K-1 Specials 146 planners Support surveyors 870 SF RR 147 148 RR 149 engineers 839 SF 150 COPYRIGHT (C) MORRISON-MAIERLE, INC., 2017 Admin Phone: 406.752.2216

More information

Elementary Grade Configuration School Current Recommendation

Elementary Grade Configuration School Current Recommendation To: Board of Education From: Mark P Duerwaechter, Superintendent Date: January 7, 2019 Re: Action Team Recommendation Workshop Information and Discussion Only The Master Planning Action Team met on December

More information

John Milton Gregory Elementary School

John Milton Gregory Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

U of I Facilities Standards Updates for 2017

U of I Facilities Standards Updates for 2017 U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),

More information

Delivering Reliability. Services. Strength You Can Count On. oldcastleprecast.com/services

Delivering Reliability. Services. Strength You Can Count On. oldcastleprecast.com/services Delivering Reliability A Strength You Can Count On SERVICES TENANT IMPROVEMENTS Above And Below Ground Solutions Strength You Can Count On Oldcastle Precast is well trained and knowledgeable in all aspects

More information

GREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM

GREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM Date of Meeting: March 20, 2014 GREENWICH PUBLIC SCHOOLS Greenwich, Connecticut Title of Item: New Lebanon School Pre-Feasibility Study Policy Reference: E - 051 REQUEST FOR BOARD ACTION OR PRESENTATION

More information

AMES COMMUNITY SCHOOL DISTRICT SAWYER ELEMENTARY

AMES COMMUNITY SCHOOL DISTRICT SAWYER ELEMENTARY Exhibit D-4 AMES COMMUNIY SCHOOL DISRIC SAWYER ELEMENARY Schematic Development Project Manual June 25th 2014 RDG Planning & Design 301 Grand Avenue Des Moines, Iowa 50309 architectural narrative Summarized

More information

EPIC Academy High School

EPIC Academy High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

EXISTING SITE PLAN. Consultants: Civil: Evans Engineering, Inc Old Post Rd. Harrisburg, PA (717) Harrisburg, PA 17110

EXISTING SITE PLAN. Consultants: Civil: Evans Engineering, Inc Old Post Rd. Harrisburg, PA (717) Harrisburg, PA 17110 330 orth Third St. Architecture Renovations to: O. DESCRIPTIO DATE SGA PROJECT UMBER: EXISTIG SITE PLA Drawing umber: EX00 SCHEMATIC DESIG D D0 OFFICIAL'SVESTIBULE LOCKER D03 D04 D02 COACHES D05 GYMASIUM

More information

James Shields Middle School 2611 W 48th St Chicago, IL 60632

James Shields Middle School 2611 W 48th St Chicago, IL 60632 2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622 A.. Pritzker School 2009 W Schiller St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document

More information

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy

More information

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study

GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study New Lebanon School (K-5) 25 Mead Avenue, Greenwich, CT 20 March 2014 KSQ Architects PC 20 March 2014 GREENWICH PUBLIC SCHOOLS NEW LEBANON

More information

John Spry Elementary Community School

John Spry Elementary Community School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Charles N Holden Elementary School

Charles N Holden Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the

More information

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB 18-14 PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB MODIFICATIONS: BONDING REQUIREMENTS: Due to the complexity of the scope of work, MCPS is requiring bonding for this bid. The following bonds are

More information

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC GREENVILLE, SC TYPE: MUNICIPAL ADDRESS: CUSTOM RESIDENTIAL XXX STREET GREENVILLE SC, 9607 A E J P T : OWNER:, LLC TAX MAP #: PROPERTY AREA: ZONING DISTRICT: BUILDING MATERIAL: BUILDING HEIGHT: FOUNDATION

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

New Braunfels ISD. Comprehensive and Strategic Facilities Planning Committee Meeting Tuesday, March 27, 2018

New Braunfels ISD. Comprehensive and Strategic Facilities Planning Committee Meeting Tuesday, March 27, 2018 New Braunfels ISD Comprehensive and Strategic Facilities Planning Committee Meeting Tuesday, March 27, 2018 Facilities Committee Bond Proposal! Total Projected Bond Proposal = $84,000,000*! New Middle

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

Union Station Tunnel Overall DBE Goal Calculation

Union Station Tunnel Overall DBE Goal Calculation Bi-State Development Agency of the Missouri-Illinois Metropolitan District Union Station Tunnel Overall DBE Goal Calculation Federal Transit Administration Prepared by: Francoise Lyles-Wiggins Bi-State

More information

Everett McKinley Dirksen Elementary School

Everett McKinley Dirksen Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION

More information

Construction Drawings: A Cost/Benefit Case Study of Weather and Tear Resistant Drawings

Construction Drawings: A Cost/Benefit Case Study of Weather and Tear Resistant Drawings Construction Drawings: A Cost/Benefit Case Study of Weather and Tear Resistant Drawings Bruce W. Smith, CPC and C. Ben Farrow Auburn University Auburn, AL Construction drawings are vital tools that contractors

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657 39 Wolcott Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-1220

More information

City of Santa Paula Planning Department

City of Santa Paula Planning Department City of Santa Paula Planning Department INSTRUCTIONS FOR SUBMITTING APPLICATIONS DESIGN REVIEW, PLANNED DEVELOPMENT PERMITS, CONDITIONAL USE PERMITS AND VARIANCES A. ITEMS / DOCUMENTS REQUIRED FOR SUBMITTAL:

More information

Robert Fulton Elementary School

Robert Fulton Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

Wendell Smith Elementary School

Wendell Smith Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Developer Design Review Submittal Requirements - SECTION 5

Developer Design Review Submittal Requirements - SECTION 5 Developer Design Review Submittal Requirements - SECTION 5 5.0 Developer Design Review 1.0 Procedures for Submittals - All Housing Types 1. Submittals shall be by the Guest Builder or authorized agent

More information

Amos Alonzo Stagg Elementary School

Amos Alonzo Stagg Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

PAR AG presentation. May ROCKVILLE PIKE ELEMENTARY & PRESCHOOL BUILDING

PAR AG presentation. May ROCKVILLE PIKE ELEMENTARY & PRESCHOOL BUILDING PAR AG presentation May 8 2018 agenda 1 project scope 2 site design 3 building design 4 budget and schedule 5 questions & answers A beautiful site project key data o o o o Capacity: 700 students Class

More information

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636 0 S Wood St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Andrew Carnegie Elementary School

Andrew Carnegie Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

ARCHITECTURE CADD Course Syllabus

ARCHITECTURE CADD Course Syllabus 6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing

More information

FULL TEXT OF MEASURE K ORANGE UNIFIED SCHOOL DISTRICT

FULL TEXT OF MEASURE K ORANGE UNIFIED SCHOOL DISTRICT FULL TEXT OF MEASURE K ORANGE UNIFIED SCHOOL DISTRICT The following is the full proposition presented to the voters by the Orange Unifi ed School Dirict. To repair or replace aging, outdated high school

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the New Kensington High School (CAPA) ULCS# 5520 Building

More information

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION For Office Use Only Date Received: Approved: ARC Non-Refundable Fees ARC Refundable Deposit Pd: For Office Use Only Plat Name: Lot # Street Address: New Construction Alteration Preliminary Final ARCHITECTURAL

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612 33 W Ohio St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.

More information