1 July 3, 2013 CASCO Project Managers St. Louis, Missouri PETSMART STORES 13K Q Prototype Narrative (Delta 5) Bulletin No. Five CHANGES TO THE DRAWINGS: 1. Sheet A0.0, Revision No. 5: Revised project titles to 13K Q Sheet F1.0, Revision No. 5: Revised elevation reference for Fish Equipment in Millwork Blocking Schedule. Revised electrical panel wall, equipment and fixtures layout in Receiving. Indicated Marineland Fish Equipment layout option. Revised layout of Bathing and Drying area. Revised Miscellaneous blocking schedule for Bathing and Drying. Deleted Bathing elevation 12/A8.0 plywood blocking from Millwork blocking schedule. Revised Banfield area blocking. Revised layout of Banfield area and added Feline room. 3. Sheet F2.0, Revision No. 5: Updated Required Vendor contact information. Revised model numbers for soap, tissue and towel dispensers. Added contact information and product to schedule with designer note for Solar Window Shades. 4. Sheet A0.1, Revision No. 5: Revised key notes G68, G76 and G117. Removed X-ray viewer key note B21. Revised key note B38 to B21. Removed Bid Alternate from key notes B34, B35 and B36. Revised Key note G116 to paintable caulk at top of tile. Added key note G118 for wall mounted light fixture. Revised key note G8 to Not Used. Revised key notes G103, G104 and G105 for Bathing and Drying equipment. Revised key note G100 & B31 to Not Used. Revised key note G60, G92 & G100 to Not Used. Revised key note G8. Revised key note G47. Revised key note B Sheet A1.0, Revision No. 5: Adjusted Receiving area single row rack height to 16-0 max. Removed Bid Alternate from title of Medical Gas criteria. Adjusted areas. Revised electrical panel wall, equipment and fixtures layout in Receiving. Revised layout of Bathing and Drying area. Revised layout of Banfield area and added Feline room. Revised location of fire alarm annunciator and pull station in vestibule. Adjusted occupant square footage to match plan layout changes. 6. Sheet A2.0, Revision No. 4: Replaced ceramic tile in toilet rooms, drinking fountain alcove and Salon with Polished concrete. Revised floor finish in Receiving to be polished and sealed with Seal Hard by Land Construction Chemical. Revised electrical panel wall, equipment and fixtures layout in Receiving. Removed Alternate bid, and incorporated ceramic tile in Banfield as base bid. Revised layout of Bathing and Drying area. Revised layout of Banfield area and added Feline room. 7. Sheet A2.1, Revision No. 5: Corrected keynote reference for time clock in Computer/Copy to G106. Shifted bulletin board in Office. Revised wall type for wall between Salon and Drying to W1C. Revised wall type for wall between Salon and Drying to W3B. Renumbered wall type W12A to W11A at Bathing. Revised layout of Bathing and Drying area. Shifted wall between Salon and Drying. Rotated elevation reference 1/A8.1 in Vestibule. Added Designer note for window shades. Page 1
2 8. Sheet A2.2, Revision No. 5: Removed X-ray viewer from Accessible Exam room 3. Renumbered wall type W14A to W13A at X-ray. Renumbered wall types W13C to W12C at X-ray. Revised electrical panel wall equipment and fixtures layout in Receiving. Shifted door 112B and compactor pad. Moved Ct cabinet and gas meter outside Receiving. Indicated Marineland Fish Equipment layout option. Revised layout of Banfield area and added Feline room. 9. Sheet A3.0, Revision No. 5: Removed blanket insulation from Computer/Copy room ceiling. Revised layout of Bathing and Drying area. Revised layout of Banfield area and added Feline room. Added C-5 for gyp. bd. ceiling. Revised lights in Receiving to 4-0 fluorescent strips. 10. Sheet A4.0, Revision No. 5: Revised eye-bolt layout for banners on front elevation. Moved Ct cabinet, gas meter and generator access panel. Shifted door 112B and trash dumpsters. Revised Designer Note regarding parapet height. 11. Sheet A5.0, Revision No. 5: Shifted scavenger vent away from roof ladder. Adjusted roof cricket at RTU-8. Indicated bird deterrent system at entry canopy parapet on roof plan. Revised downspout spacing at rear of Receiving. 12. Sheet A6.0, Revision No. 5: Revised vision panel in door type 6G to 22 wide. Removed louver in door type 6G. Indicated 1 undercut door at doors 121 and 127. Removed cut out from protection plate at Hardware groups 9 and 12. Revised Hardware group 6 for protection plate to be on room side. Revised Isolation door from a floor stop to a wall stop at hardware group 9. Removed floor stop from Treatment door hardware group 6. Added Hardware Group 17. Revised Associate Resources door 111 to Hardware group 17. Added door 132 for Feline. Added hardware groups 20 and 21. Added a door to X-ray. Revised opening sizes for 122B and 131. Deleted door 123B. Added door type 7. Revised quantity of protection plates at Hardware group Sheet A6.1, Revision No. 5: Added Designer Note for Hurricane zones. Added Glass type 5 for X-ray door. 14. Sheet A7.0, Revision No. 5: Added WB-3 to wall #2 in Sales. Revise wall with glazing indication at Treatment and Surgery. Revised Wallboard to WB-4 at Isolation and Maintenance/Kennel. Revises paint color in Exam room #2 at key plan. Added Floor Base note 6 regarding rubber base note for Kennels. Clarified rooms with WB-4 in Designer note for wallboard type concepts. Revised base at toilet rooms, Hall and Salon to FB-4. Deleted FB-5 no longer used and renumbered FB-6 and FB-7 to FB-5 and FB-6. Added BP-7 Georgian Green and renumbered former BP-7 to BP-8 to Banfield paint schedule. Revised Comfort Exam room accent wall to Georgian Green. Removed Bid Alternate from ceramic tile in Banfield rooms. Added ceramic tile to Reception and Hall B. Added Feline room 132. Revised interior paint product to Glidden Lifemaster Eggshell # Sheet A8.0, Revision No. 5: Revised height of outlets in Salon reception counter to 24 AFF. Revised key note at Salon, Pet Training and toilet rooms for joint at wall and floor. Revised key note at Salon and toilet rooms for joint at wall and floor. Indicated ceramic tile base at Banfield Reception on elevation 1. Adjusted Banfield area at elevation 1. Revised layout of Bathing and Drying elevations. Adjusted length of Salon elevations. Indicated G37 at toilet elevation Sheet A8.1, Revision No. 5: Adjusted height of time clock outlets at Computer/Copy elevation 8. Added key note for light switch at Vault elevation 5. Indicated thermostat at Vault elevation 5. Indicated thermostat at Office elevation 7. Renumbered keynote for Novar to G76. Indicated keynote G47 at bottom of tile at Hall elevation 3. Revised key note at drinking fountain alcove and Pet Training for joint at wall and floor. Revised key note at drinking fountain alcove for joint at wall and floor. Revised key note for wall mounted light fixtures in Fish Equipment. Indicated clear dimension between wall grilles in Pet Training at elevation 19. Revised vestibule elevation 1 to side wall to new location of fire alarm annunciator panel. 17. Sheet A8.2, Revision No. 5: Revised vision glass in doors for the bottom to be 42 AFF to match door types. Revised vision glass width and deleted door louver at Surgery door in elevations 2, 5 and 21. Deleted X-ray viewer at exam room elevation 17. Revised key note for X-ray disconnect to B21 at elevation 27. Indicated keynote G21 for shelving at Pharmacy elevation 24. Relocated light switch next to door at Exam rooms 3 and 4. Revised wall base to ceramic tile on wallboard and rubber on millwork. Removed alternate. Revised elevations per revised layout of Banfield area and added Feline room. Revised Exam Table Blocking detail 29. Page 2
3 18. Sheet A9.0, Revision No. 4: Corrected base detail cuts at wall type W12. Deleted reference of room finish schedule for suspended ceiling call out at wall types. Clarified Fire Retardant Treated CDX plywood at wall type W##. Revised Wall Type General Note #2 for defined wet areas. Deleted wall type 11, and renumbered wall types to 12 and 13. Added General Notes for wallboard. Added/revised notes at Wall Type General Notes for wallboard. Added Wall Type W14 for X-ray. 19. Sheet A10.0, Revision No. 4: Added note for GC to provide and coordinate access for power to sign at entry tower. 20. Sheet A11.0, Revision No. 4: Expanded viewport to read notes at detail 7. Revised details 13, 14 and 15 to indicate beads of Sikaflex below stud track. Added embedded angle at edge of loading dock slab. 21. Sheet A12.0, Revision No. 5: Added note to detail 2 for No exposed screws. 22. Sheet S2.0, Revision No. 5: Revised Foundation Plan at Receiving and at Bathing and Drying for new layout. Revised Foundation Plan for increased Dumpster Pad dimensions. Moved floor drain in Receiving. 23. Sheet S2.1, Revision No. 5: Added perimeter L3x3x1/4 edge angle at the truck dock wall detail 6. Revised the section key on detail 8 to reference detail 15 on S Sheet S3.1, Revision No. 5: Revised note on detail 10 to indicate HSS8x4x1/4 from line 1.8 thru Sheet M1.0, Revision No. 5: Revised outside air quantities in the Rooftop Unit Schedule to pressurize building. Revised size of ceiling heaters 1 and 2 to 1.5 KW from 3 KW (interior rooms added EUH 4 for the feline room. Added S7 and S8 to Diffuser Schedule. Revised manufacturer in motorized damper schedule to match detail on M2.0. Added Feline room to HVAC Operating Temperatures Schedule. Updated Design Criteria to match ventilation values used in documents (2009 IMC). Removed Office motorized damper, renumbered motorized dampers, added MD-5 to Feline room. Revised EF-2, 4 and 5 from belt drive to direct drive fans. Removed MD-1 from Motorized Damper Schedule. Revised MD numbers in the Motorized Damper Schedule to match plan. 26. Sheet M1.1, Revision No. 5: Revised motorized damper note by column line B, removed MD-2. Added volume damper to Computer/Copy duct. Revised CFM of Office supply and return diffuser to 200 from 300. Changed supply diffuser to S7. Added 50 CFM to two Vestibule diffusers. Revised diffuser locations in Banfield to match revised grid. Revised location of Pet Trailing wall grilles and ductwork to coordinate with new electric panel. 27. Sheet M1.2, Revision No. 5: Rebalanced CFM in Treatment to accommodate addition of Feline Room. Added supply and exhaust diffuser in Feline Room. Revised Transfer Grille location and ductwork for Maintenance/Kennel. 28. Sheet M2.0, Revision No. 4: Revised number of MD s in detail. 29. Sheet P0.1, Revision No. 2: Removed alternate bid on medical gas piping material. 30. Sheet P1.0, Revision No. 5: Revised Receiving area piping to reflect fixture plan changes. Re-routed vent for Bathing Bunker up in wall. 31. Sheet P1.1, Revision No. 4: Revised pipe routing and fixtures locations in Receiving area to match new fixture plan. Revised pipe routing and fixtures locations in Banfield area to match new fixture plan. Removed SS-1 from schedule and from Fish. Increased Hot Water Return Line to ¾ from ½ to minimize recirculation pump runtime. 32. Sheet P2.0, Revision No. 4: Added clarification to note 2 on Water Heater detail # 7 in regards to valve material. 33. Sheet P3.0, Revision No. 5: Changed SS-1 to FS-1 in Fish, revised sanitary, vent and water to coordinate with fixture plan changes. Added/moved MD in Vault, added thermafuser. Page 3
4 34. Sheet E0.1, Revision No. 4: Revised keyed notes. Changed key note #10 to read key note #22. Changed key note #22 to read key note #10. Deleted key note #25. Changed key note #28 to read key note #25. Revised key note #5 and #14. Created key note #28. Revised One-Line diagram to include the Mobile Generator Box and connection. Revised Fault Calculation Table. Revised symbol list block descriptions. 35. Sheet E0.2, Revision No. 5: Revised panel HA circuits 4 and 6. Revised panel GA circuits 10,11,14 and 16. Revised panel FC circuits 6,13,20,21,22,23,24,26,28 and 30. Revised panel LA circuits 2,9,13,16,19,21,25,26,27,30 and 40. Revised panel LB circuits 4,7,10,16,18,19 and 20. Revised panel VA circuits 2 and 34. Deleted all 18 mounting height notation on plans. 18 mounting height is standard on all outlets. Labeled 36. Sheet E1.0, Revision No. 4: Removed MD-1 from Office 103. Revised Light Fixture Schedule notes in the remarks column. Revised detail numbers from E1 to read E1.0 on details 1,2,3 and 4. Revised detail 2/E1.0. Revised Pet Training room number from 129 to 119. Labeled Sales area with room number tag 101. Labeled Reception area with room number tag 130. Labeled Hall B area with room number tag 131. Revised label Hall 101A to read Hall A 101A. Revised lighting circuit numbers in Fish Equipment area. Revised type G lighting fixture in Receiving 112 room from 8 fixtures to 4 fixtures. Revised type G light fixture catalog number and lamp type from 4 lamps to 2 lamps. Revised type E1 and type S light fixture. Added type R1 can light fixtures to Feline room and Exam #2. Created key note no. E28. Deleted all 18 mounting height notation on plans. 18 mounting height is standard on all outlets. Labeled mounting heights next to devices on plans. Revised location of CT Cabinet and Meter. Revised detail 3 to show the uni-strut turned upside down on the detail. 37. Sheet E2.0, Revision No. 5: Revised detail numbers from E2 to read E2.0 on details 1 and 2. Revised detail no. 3 along with the detail number changing it from E2 to read E2.0. Revised label Hall 101A to read Hall A 101A. Revised circuit on MD-1 and MD-2 from FC-20 to FC-26. Revised circuits on EUH-1 from FC-28,30 to FC-21,23. Revised circuits on EUH-2 from FC-24,26 to FC-22,24. Revised Maint./Kennel room number from 128 to 129. Revised drawing note from Diagram E3 to read Diagram E0.1. Revised circuit on MD-3 & MD- 4 from VA-2 to VA-34. Added room labels for Pharmacy 122 and Hall B 131. Revised Breather Area room number from 127 to 116. Revised Drying Area room number from 128 to 117. Revised Pets Training room number from 129 to 119. Revised Salon room number from 126 to 115. Revised exterior sign J-Box locations. Computer Copy 105 room changed to Office 103. Office 103 room changed to Computer/Copy 105. MD-3 became MD-2 and MD-4 became MD-3. Revised circuit on MD-1 from LB-7 to LB-4. Revised circuit for Door Buzzer System from GA-16 to GA-10. Removed MD-2 from Office 103. Added MD-5 to Feline area. Renumbered MD s to coordinate with Mechanical. Added MD-5 and connected to VA-34. Revised location of CT Cabinet, Meter and battery charger disconnect. Removed j-box at roof structure for security. 38. Sheet E2.1, Revision No. 4: Revised time clock receptacle mounting height on detail no. 2. Revised mounting heights on time clock outlets on plan. Revised outlet heights at the Salon reception counter millwork. Revised outlet locations and quantities to conform with revised Bathing and Drying area equipment layout. Revised Bird Deterrent System Charger circuit number from LB-10 to LB-20. Deleted dimensions from plans because architectural elevation has been created. Revised Soda Cooler from LB-4 to LB-18. Added key note 16 to two power pole locations. Revised Door Security circuit number from LB-25 to LB-7. Added a room label for Sales 101. Added a room label for Pet Training 119. Removed Taymac Cover outlet in Pet Training and provided standard outlet in place. Revised notes on detail 7. Revised location of Annunciator and Pull Station at front door. Revised note on detail no. 5. Deleted all 18 mounting height notation on plans. 18 mounting height is standard on all outlets. Labeled 39. Sheet E2.2, Revision No. 5: Detail 4 became Detail 3. Detail 3 became Detail 2. Detail 2 became Detail 4. Revised room tag Hall 131 to read Hall B 131. Deleted X-Ray panel and key note from Exam # Revised RP-1 circuit number from LA-11 to LA-13. Revised Door Security J-Box to new location shown. Deleted mounting heights from (3) outlets. Revised circuit numbers in Receiving, Associate Resources, Holding #1 and Holding #2. Revised outlet locations to coordinate with the floor plan revisions of Maintenance/Kennel and Pharmacy. Added a detail note to Detail no. 2. Revised Detail no. 3. Page 4
5 Revised location of CT Cabinet, Meter and TTB. Deleted j-box for future data drops at aquarium. Provided new design layout for alternate fish equipment vendor. Revised outlet location for scrubber in Receiving Sheet EM1, Revision No. 4: Added key notes 1 and 7 to riser diagram. Revised sheet detail no. from EM2 to EM1 on all details. Revised sheet reference numbers on detail 1/EM Sheet EM2, Revision No. 4: Revised Detail sheet reference number from EM3 to EM2. Revised circuit numbers on lighting control riser diagram. Revised R8 Controller note to read Salon Banfield Signage. Revised key notes no. 1 and no. 5. Revised detail number on note from 3/EM2 to 3/EM Sheet ETD, Revision No. 4: Revised outlet mounting height at Salon reception counter. Revised Salon room number from 126 to 115. Revised Breathing Area room number from 127 to 116. Revised Drying Area room number from 128 to 117. Revised Pet Training room number from 129 to 119. Revised label Hall 101A to read Hall A 101A. Revised Maint./Kennel room from 124 to 129. Revised Exam #3 118 room to read Exam # Revised label Hall 131 to read Hall B 131. Revised Reception room number from 132 to 130. Revised Isolation 121 room to read Surgery 127. Revised X-ray room number from 115 to 128. Revised Exam #4 116 room to read Exam # Revised Exam #2 117 room to read Exam # Revised detail note designation from 2/E2.2 to 3/E2.2. End of Bulletin cc: JLH, KLB, MGB, BMW, KMC File Page 5
DOCUMENT NARRATIVE PETSMART # 3131 GREEN VALLEY SAHUARITA, ARIZONA Construction Change Directive #1 (CCD-1) / September 22, 2017
These documents, indicated as Construction Change Directive #1 with a delta - 1, supersede the previous issue and should be inserted into the Construction Documents. The tags in the column indicate which
More informationTHE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE
231 THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' THE CHURCH OF BISHOPS' HOURS Monday-Friday P.M. - X:00 A.M. X:00 Saturday P.M. - X:00 A.M. X:00 J ESUS CHRIST OF LATTER-DAY SAINTS HOME STORAGE
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationOCPS Submittal Register for Product Data and Shop Drawing Reviews
OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL
SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01
More informationBUILDING PLAN REVIEW REQUIREMENTS
TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationHall of Waters List of Historic Drawings
List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral
More informationThis Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein.
Revision No. 01 Issued February 19, 2016 Page 1 This Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein. This Revision
More informationWayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009
ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town
More informationMahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620
W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationMarcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationCYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL
T Architecture Interiors Planning 1165 BRITTMOORE RD. HOUSTON, TEXAS 7704 (T) 71.626.400 (F) 71.626.401 in association with: www.garnerfritsche.com CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL An HCA Affiliated
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D
HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS
More informationHiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationNathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609
athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the
More informationLangston Hughes Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDesign Deliverables. Summary. A. Expectations for Design Deliverables:
Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations
More informationJohann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647
3 Rockwell St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationMarcus Moziah Garvey Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department October 25, 2010 Addendum No. 09.R INVITATION FOR BID NO.: 11-05 Modernization of Classroom Building 300 Chabot
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationCharles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617
S Cregier Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationEverett McKinley Dirksen Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAmos Alonzo Stagg Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCHAPTER 5 ARCHITECTURE
CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1
More informationWendell E Green Elementary School 1150 W 96th St Chicago, IL 60643
11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationCSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct
More informationSTEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWilliam H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609
S Hermitage Ave Chicago, IL 9 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.
More informationBidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.
ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall
More informationPhilip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645
34 Washtenaw Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationEPIC Academy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWendell Smith Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAddendum Number: 1 WT White HS Additions and Renovations, Dallas ISD
Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications
More information1. Name the horizontal member that rests on the foundation wall to support other wood members.
Student Name: Teacher: Date: District: Rowan Assessment: 9_12 T and I IC62 - Drafting - Architr II Test 1 Description: Unit C - Floorplans - Test 3 (ALL) Form: 501 1. Name the horizontal member that rests
More informationSECTION MECHANICAL IDENTIFICATION
Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600
More informationCKBD Peakes Bath Scoresheet
CKBD Peakes Bath Scoresheet Part I: Graphics & Presentation Standards Each question pertains to all four drawing documents: Floor Plan, Mechanical, Construction Plan, and Elevation Drawing unless specifically
More informationTri-County Commercial Application Checklist
TRI-COUNTY SERVICE CENTER TRI-COUNTY SERVICE CENTER State of Oregon Clackamas Multnomah Washington C O U N T I E S Tri-County Commercial Application Checklist Department of Consumer & Business Services
More informationAlexander Graham Bell Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDaniel S Wentworth Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationApril 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593
April 7, 2016 City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 393 RE: Conditional Use Arby s Restaurant Multi-Tenant Development 631 Hometown Circle-Lot 6
More informationA/E REVIEW CHECKLIST HVAC
A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,
More informationJonathan Burr Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationGeorge Washington Elementary School 3611 E 114th St Chicago, IL 60617
3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up
More informationJackie Robinson Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCity of Thousand Oaks
TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity
More informationHarriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationPhilip Rogers Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationEllen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612
33 W Ohio St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationPROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT
ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon 97132 OWNER ARCHITECT X CONSULTANT OWNER: DATE OF ISSUANCE:
More informationRobert Fulton Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationFriedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657
39 Wolcott Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationSUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013
SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,
More informationSECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section
More informationRENOVATION OF THE FARMERS MARKET Reference Number:
RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:
More informationNEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER
NEW SEVICE CENTER VINITA, OK 70 9 S. 7th St. VINITA, OK 70 06 W. 2nd St., Joplin, MO 680 Phone: 7-62- Fax: 7-782-678 GENERAL G0.0 COVER CIVIL C.0 SITE DEMO C. SITE PLAN C.2 GRADING PLAN (FORTHCOMING) ARCHITECTURAL
More informationCharles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationDisney II Magnet School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationMorton School of Excellence
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationArchitecture, Construction, and Engineering Technical Charter
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending
More informationNon-Residential and Multi-Family Plan Check Submittal Requirements
Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail: www.comptoncity.org City of Compton Building & Safety Department Non-Residential and Multi-Family Plan Check Submittal Requirements The purpose of this
More informationNorth Lawndale College Prep Charter - Collins
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More information03/7/12 Issuance UTD Section Page 1 of 5 Electrical General
SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and
More informationJohn Harvard Elementary School of Excellence
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationOnce you select a model from the model list you will see the following index.
2010 Parts Catalog In the 2010 Parts Catalog, you will be seeing a reproduction of our actual engineering drawings. This new format will require that you use our web tools a little differently. Our drawings
More informationExcavating, Backfilling, and Compaction for Utilities Piping (Plumbing).
SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required
More informationJames Shields Middle School 2611 W 48th St Chicago, IL 60632
2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationUniversity of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL
Facility Assessment Report 9 E 4th St Chicago, IL 03 This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationTO WHOM IT MAY CONCERN:
TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit
More information실내디자인스튜디오 1. 11Elevation
1101 실내디자인스튜디오 1 11Elevation 1102 실내디자인스튜디오 1 Process 1 2 3 4 5 실내디자인전개방법과과정에대한개요 주거공간디자인의사례조사 주거공간디자인의사례조사 Bubble diagram 의작성과동선계획 Block layout 의작성과 idea Sketch 6 Human Factors & Ergonomics 7 Floor Plan
More information4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118
PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended
More informationMSU Barnard Hall 105 Cleanroom Installation PPA # Page 1
ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,
More informationQuality Control Checklist - Design Drawings
Quality Control Checklist - Design Drawings Date Company Name Address Telephone Fax Email Job Number 1) Drawing Set a) Drawing one is site/location/incoming power i) Should contain location map if not
More informationSt. John s United Methodist Church Facility Stewardship Plan Last update: 9 May 2011
As responsible stewards of our facility, this list is maintained by the trustees to identify tasks we need to have completed to keep our church well groomed and attractive to present a welcoming, safe,
More informationMarshall Truck Station Laboratory Addition Project No. TZ MnDOT
Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:
More information2250 S LOCUST APARTMENT IMPROVEMENTS EXPENSES
APT #1 APT #1 11/12/2014 NEW GARAGE LOCKS $ 89.00 11/12/2014 NEW LOCKS $ 169.80 1/11/2015 GARAGE KEY COPIES $ 6.47 1/23/2015 PLUMBING REPAIRS REPLACED MAIN BATH SINK PIPES $ 299.76 2/2/2015 PAINTING $
More informationAddendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.
!!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This
More informationSECTION MECHANICAL IDENTIFICATION
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1.02 REFERENCES 1.
More informationJoseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationJohn Spry Elementary Community School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAndrew Carnegie Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJohn Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION
July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,
More informationPiping & Equipment Identification
Piping & Equipment Identification Part 1 General 1.01 Description of Work A. Work in this section includes: Identification materials, including necessary accessories indicated on Contract Documents and
More informationJosefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623
3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This
More informationTELEPHONE: (215) Addendum No. 01
THE SCHOOL DISTRICT OF PHILADELPHIA BOARD OF EDUCATION Office of Capital Programs 0 North Broad Street, Third Floor - Suite Philadelphia, PA 0-0 TELEPHONE: () 00-0 Addendum No. 0 Subject: Location: Potter
More informationELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationIndustrial Pipe Marking
Industrial Pipe Marking Pipe and Valve Identification Specialists SPECIFICATIONS ASME (ANSI) Standard A13.1-2007 The ASME (ANSI) Standard for pipe identification is a widely used guideline in determining
More informationKidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:
KidsAbility Guelph Hub Renovation ADDENDUM #2 This Addendum amends and forms part of the Bidding and Contract Documents for the above Project as follows: CLARIFICATIONS Q1. Is it possible to set up a secondary
More informationFrederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622
2 W Rice St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationCyrus H McCormick Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More information2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationPaul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620
82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings
MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.
More informationThomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK
Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the
More information