Industrial Pipe Marking
|
|
- Edwin Ross
- 6 years ago
- Views:
Transcription
1 Industrial Pipe Marking Pipe and Valve Identification Specialists SPECIFICATIONS ASME (ANSI) Standard A The ASME (ANSI) Standard for pipe identification is a widely used guideline in determining pipe identification requirements. The purpose of the standard is to "assist in identification of hazardous materials conveyed in piping systems and their hazards when released into the environment." "Pipes are defined as conduits for the transport of gases, liquids, semi-liquids or fine particulate dust." Supports, brackets and/or other accessories are specifically excluded from the application of this standard. Methods of Identification Pipe marking Plastic pipe marking Engraved Plastic Laminate Signs Stencil Valve Tags Utility Marking Tape Pipe Marking -Identify your pipes with self-adhesive pipe markers. -Pipe labels can be invaluable in an emergency situation, and will also help you comply with A13.1 standards. -Adjust size of marker and letters to accommodate the outside diameter, including insulation, of the pipe identified. Follow the guidelines published in ANSI A13.1 for marker/lettering size and color. -Lettering: Include standard preprinted nomenclature that best describes piping system in each instance, for review by the Architect/Engineer/owner. -Pipe marker with arrows indicate direction of flow, either integrally with piping system service lettering (to accommodate both directions), or as a separate unit of plastic. 1
2 Plastic Pipe Marking -Snap-on or strap-on type vinyl markers with integral flow arrows and factory applied graphics. -No tape or adhesives necessary and no need to clean or degrease pipes. -Arrows are included on every marker and each marker is reversible so you don't need to know the flow direction before you order. -UV resistant inks and heavy vinyl withstand harsh environments. Engraved Plastic Laminate Signs -Provide 1/8 thick plastic laminate engraved with 1/4 high letters, block font, black with white core (letter color). Approximate size: 4-1/2" x 6", or as required to accommodate lettering. -Wording shall indicate device identification number and description. -Attach with stainless steel screws or contact type permanent adhesive where screws should not penetrate the substrate Stencil Painted Identification Materials Types of Stencils Fiberboard Stencil Mylar Plastic Stencil DuraLast: PVC Stencil Brass Stencil Stencil Paint Standard exterior type stenciling enamel; black, except as otherwise indicated; either brushing grade or pressurized spray-can form and grade. -Standard stencils, prepared for required applications with letter sizes generally complying with recommendations of ANSI A13.1 for piping and similar applications but not less than 1-1/4" high letters for ductwork and not less than 3/4 high letters for access door signs and similar operational instructions. Valve Tags Plastic Tags Standard 1-1/2 2 diameter, 3/32" gauge. Economical and very easy to use. Chemical and weather resistant. Customize and color-code on the spot. Have a smooth write-on surface. Not recommended for outdoor use. 2
3 Brass Valve Tags Standard 1-1/2 2 diameter, 19 gauge. Withstand high temperatures up to 1200 degrees Fahrenheit. Relatively inexpensive while providing sufficient stability. Aluminum Tags Standard 1-1/2 2 diameter 18 gauge. Withstand high temperatures up to 1500 degrees Fahrenheit. Impervious to moisture and will not rust. Designed to survive in harsh environments. Stainless Steel Tags Standard 1-1/2 2 diameter, 20 gauge. Withstand about 2700 degrees Fahrenheit. Completely rust resistant. Very strong and can survive in extreme environments. Utility Marking Tape -Alerts excavators that buried utility lines are present. -Underground Warning Tapes come in non detectable polyethylene styles or detectable (metallic tape) that can be located with a metal detector and shall continuously identify the pipe with big, bold, black lettering. 3
4 ADDITIONAL INFORMATION Piping System Identification As a minimum, locate pipe markers as follows: Provide a pipe marker at each valve to indicate proper identification of pipe contents. Where several valves exist on one (1) header, it is necessary to mark only the header. Every 25 feet in exposed and concealed areas on all piping systems. Provide at least one (1) pipe marker in each room on all piping systems. At each branch or riser take off on piping systems, excluding short takeoffs for fixtures and terminal units. Provide a pipe marker and an arrow marker at every point of pipe entry or exit where the pipe penetrates a wall, floor, service column or enclosure. At access doors, manholes and similar access points that permit view of concealed piping. Near major equipment items and other points of origination and termination. 4
5 ASME (ANSI) Color Recommendations -Unmarked pipes mean danger - to both life and property. Numerous injuries have occurred through ignorance of pipe contents, particularly when outside agencies are called in under emergency conditions. -Safety Color Code, ANSI Z535.1 ASME (ANSI) Size Recommendations -The A standard also makes recommendations as to the size of letter height and length of color field for various pipe diameters. -These recommendations are shown in the table. 5
6 Mechanical Equipment Identification -Install an engraved plastic laminate sign on or near each major item of mechanical equipment. 1. Main control and operating valves, including safety devices 2. Meters, gauges, thermometers and similar units 3. Fuel-burning units including boilers, furnaces, and heaters 4. Pumps, compressors, chillers, condensers and similar motor-driven units 5. Heat exchangers, coils, evaporators, cooling towers, heat recovery units and similar equipment 6. Fans, blowers, primary balancing dampers and VAV boxes 7. HVAC central-station and zone-type units 8. Tanks and pressure vessels 9. Air conditioning indoor and outdoor units 10. AFD's and transmitters and Control Boxes 11. Other items as specified by Project Manager Underground Pipe Identification Burial Depths: Maximum detectable burial range is as follows: -Install pipe identification tape 12" above all underground pipe installations. -Install 2"wide tape for pipe 24" deep; 6"wide tape for pipe > 24 deep. Color Code: Blue Brown Green Orange Purple Yellow Red Water & Associated Lines Force Mains & Associated Lines Sanitary & Associated Lines Telecommunications & Telephone Lines Reclaimed Water Lines Gas & Associated Lines Electric & Associated Lines Ductwork Identification -Identify air supply, return, exhaust, intake, and relief ductwork with stenciled signs and arrows, showing ductwork service and direction of flow, in black or white (whichever provides most contrast with ductwork color). -Label all ducts in mechanical equipment rooms and in congested corridors when concealed by ceilings. 6
7 MATERIAL SPECIFICATIONS 7
8 COMMONLY ASKED QUESTIONS -Can I still use my current pipe marking system based on the older version of the standard or do I have to change my color scheme to meet ASME A ? Existing schemes for identification shall be considered as meeting the requirements of the standard if the schemes are described in writing and employees are trained in the operation and hazards of the piping system. -What if I have a pipe smaller than 3/4" diameter? For pipes of less than 3/4" in diameter the use of a permanently legible tag is recommended. -Are particular shades of yellow, green, red and blue required for pipe labels? Yes, ANSI/ASME A13.1- recommends the color code featured in the ANSI Z53.1- Safety Color Code for Marking Physical Hazards. The color shades recommended are intended to give highest level of recognition to employees with both normal and color-deficient vision. -Has this ANSI pipe marking standard been adopted by OSHA? No, it is still considered an industry consensus standard, which is only a recommendation. Even though it has not been specifically adopted by OSHA, industry consensus standards may be evidence that a hazard is recognized and there is a feasible means of correcting such a hazard. If you do not follow a consensus standard, it is possible to be cited under the General Duty Clause. 8
SECTION MECHANICAL IDENTIFICATION
PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections:
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.
More informationSECTION MECHANICAL IDENTIFICATION
Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending
More informationSECTION IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND EQUIPMENT
SECTION 23 05 53 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Plastic Nameplates 2. Tags 3. Plastic Pipe Markers 4. Ceiling Tags 5. Detectable Underground Tape 6. Stencils PART 2 - PRODUCTS 2.1 MANUFACTURERS
More informationSECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationSECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section
More informationCSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct
More informationB. Samples: For color, letter style, and graphic representation required for each identification material and device.
PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
More informationSECTION MECHANICAL IDENTIFICATION
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1.02 REFERENCES 1.
More informationSECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1. Section 09900 -
More informationSECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.
SECTION 22 05 53 IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes nameplates, tags, stencils and pipe markers. B. Related Sections: 1. Section 09 05 00
More informationPiping & Equipment Identification
Piping & Equipment Identification Part 1 General 1.01 Description of Work A. Work in this section includes: Identification materials, including necessary accessories indicated on Contract Documents and
More informationExcavating, Backfilling, and Compaction for Utilities Piping (Plumbing).
SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required
More informationSECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.
SECTION 23 05 53 IDENTIFICATION OF HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes nameplates, tags, stencils and pipe markers. B. Related Sections: 1. Section 09 05 00 Common
More informationSECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Nameplates. B. Tags. C. Stencils. D. Pipe Markers. 1.2 RELATED REQUIREMENTS A. Section 099123 - Interior
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017
SECTION 23 0553 - MECHANICAL SYSTEMS IDENTIFICATION GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT
SECTION 21 05 53 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT Display hidden notes to specifier. (Don't know how? Click Here) Copyright 2015-2015 ARCAT, Inc. - All rights reserved PART 1 GENERAL
More informationPART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES
PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Assign unit identification numbers to operating units of equipment within a class or subclass during the design phase of new buildings, additions,
More informationSECTION MECHANICAL IDENTIFICATION
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe Markers. 1.02 SUBMITTALS A. Submit valve chart and schedule,
More informationA. Product Data: For each electrical identification product indicated.
SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 53 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe markers. 5. Ceiling tacks. 6. Labels. 7. Lockout
More information1. ASME A Scheme for the Identification of Piping Systems.
SECTION 40 05 53 - IDENTIFICATION FOR PROCESS PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe markers. 5. Labels. 6. Lockout devices. B. Related Requirements:
More informationSECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1. Section 09900 -
More informationSECTION IDENTIFICATION DEVICES
SECTION 10 14 00 - IDENTIFICATION DEVICES PART 1-GENERAL 1.1 SUMMARY A. Section Includes: 1. Tag, tape and stenciling systems for equipment, piping, valves, pumps, ductwork and similar items, and hazard
More informationSECTION COMMON WORK RESULTS FOR HVAC
SECTION 23 05 00 COMMON WORK RESULTS FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Ball Valve. 2. Hangers and Supports. 3. Identification Tags and Sleeves. 1.2 INCLUDED SECTIONS A. Section
More informationIDENTIFICATION DEPOT, INC. 206 East Second Street Washington, NC PHONE FAX
Engraved Plastic Nameplates 1/16 rigid 2 ply blended acrylic extruded sheet with cap and core permanently fused together. Material is shatterproof and chip resistant. Matte finish meets ASTM D 709 Type
More informationSECTION ELECTRICAL IDENTIFICATION
SECTION 16075 ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION
PART 1 GENERAL 1.01 SUMMARY Section 16195 A. This Section includes electrical identification for the following: 1. Nameplates and labels 2. Wire and cable markers 3. Conduit markers 4. Cable tray markers
More informationPage PRODUCT DESCRIPTION
Page 1 2004-02-29 PRODUCT FEATURES BASIC USES / RELATED USES Identification bands or markings for facility piping. BradySnap-On / Strap-On Vinyl: For normal duty, mechanically fastened. Custom or Blank
More informationSECTION ELECTRICAL IDENTIFICATION
SECTION-16075 ELECTRICAL IDENTIFICATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Electrical identification to identify all electrical items for easy operation and maintenance including, but not limited
More informationElectrical Identification
Electrical Identification i n n o v a t i o n y o u c a n i d e n t i f y w i t h. MARKING SERVICES INCORPORATED 8 0 0. 2 3 4. 0 1 3 5 8 0 0. 6 2 7. 6 4 3 2 F A X m a r k s e r v. c o m s a l e s @ m a
More informationPage PRODUCT DESCRIPTION
Page 1 2003-02-26 PRODUCT FEATURES! BASIC USES / RELATED USES " Identification bands or markings for facility piping. # (Ultra-mark) Wrap-Around Polyester: For harsh environments, outdoor piping systems,
More informationTechnical Development Program
Technical Development Program COMMERCIAL DISTRIBUTION SYSTEMS PRESENTED BY: Ray Chow Duct Design Level 1 Fundamentals Sales Engineer Menu Section 1 Section 2 Section 3 Section 4 Section 5 Introduction
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL
SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01
More informationPage PRODUCT DESCRIPTION
Page 1 2004-02-29 PRODUCT FEATURES BASIC USES / RELATED USES Self-adhesive identification bands or markings for facility piping, Self-StickingVinyl Weather-Code Outdoor Pipe Markers Medical Gas Pipe Markers
More informationCOMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationBasic Principles and Operation of Transformer
Basic Principles and Operation of Transformer CONSTRUCTIONAL ASPECTS Cores In order to enhance core s magnetic properties, it is constructed from an iron and silicon mixture (alloy). The magnetic core
More informationADDENDUM NO. 4 November 15, Page 1
ADDENDUM NO. 4 November 15, 201 8 Page 1 PROJECT MANUAL FOR CONSTRUCTION OF HVAC REPLACEMENT FOR NORTH OCONEE HIGH SCHOOL FOR OCONEE COUNTY SCHOOLS WATKINSVILLE, GEORGIA DATED: SEPTEMBER 14, 2018 CUNNINGHAM,
More information1. State that all workmanship must conform to all pertinent laws, ordinances and regulations of all bodies having jurisdiction.
SECTION 230800 GENERAL MECHANICAL REQUIREMENTS 1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: A. General 1. Incorporate,
More informationBUILDING PLAN REVIEW REQUIREMENTS
TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings
More informationU of I Facilities Standards Updates for 2017
U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),
More informationA. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.
SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation
More informationHealth and Safety at Work (Hazardous Substances Markings for Pipework Connected to Above Ground Stationary Tanks) Safe Work Instrument 2017
Health and Safety at Work (Hazardous Substances Markings for Pipework Connected to Above Ground Stationary Tanks) Safe Work Instrument 2017 This safe work instrument is approved under section 227 of the
More informationHealth and Safety at Work (Hazardous Substances Markings for Pipework Connected to Above Ground Stationary Tanks) Safe Work Instrument 2017
This safe work instrument is administered by WorkSafe New Zealand. For more information please see: Website: http://www.worksafe.govt.nz Contact phone: 0800 030 040 Contact address: PO Box 165 Wellington
More informationSECTION SIGNAGE
SECTION 10 14 00 SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-1 specification section, apply
More informationPRESTON HEALTH SERVICES ARCHITECT S NO. 2700
SECTION 23 3113 - LOW PRESSURE DUCTWORK PART 1 - GENERAL 1.1 SCOPE OF WORK: A. The work required under this section includes all work necessary for a complete installation of ductwork and accessories.
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More information2012 IMC Performing Commercial Mechanical Inspections
2012 IMC Performing Commercial Mechanical Inspections Based Primarily on the 2012 International Mechanical Code (IMC ) and the 2012 International Fuel Gas Code (IFGC ) as applicable. ` Welcome I am You
More information2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.
General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings
More informationTRANSACTION RECORD TR
COMMON GROUND ALLIANCE BEST PRACTICES COMMITTEE Proposal Form Revision to Best Practice Name: Ralph Graeser Date: 03/09/2015 Affiliation: PA PUC/NAPSR/GPTC Member. Phone: 717-554-3666 E-Mail: rgraeser@pa.gov
More informationFacility Services Subgroup Preface for Divisions 21` through 28
Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationThe School District of Palm Beach County Project Name SDPBC Project No. SECTION ( ) SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 10441 (10 14 00) SIGNAGE A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-1 specification section,
More informationSECTION PROJECT COORDINATION VIA BIM
SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationOCPS Submittal Register for Product Data and Shop Drawing Reviews
OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition
More informationMarking & Identification
Marking & Identification Section Contents Artline Markers 140,141 Scribe Markers 141 Jumbo Markers 140 Refillable Markers 140,142 Paint Markers 143 Ball Marker 142 Stencilling 144 Car Park Stencil Kit
More informationSECTION SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO BROOKFIELD NB-500 EXTREME DUTY OPERATOR
SECTION 084229.33 SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO BROOKFIELD NB-500 EXTREME DUTY OPERATOR PART 1-GENERAL 1.01 DESCRIPTION A. This section describes
More informationSmartZone-2 & SmartZone-4
SmartZone-2 & SmartZone-4 Quick-Start Guide UPDATED 2011-7-26 This guide is intended to give the installer a brief set of instructions about how to set up the XCI Zoning SmartZone System. For more detailed
More informationDIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS
DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication
More informationGE Monogram. Installation. Instructions. 36" Vent Hood. Model ZV750. Call anywhere in the US and Canada -
at :: rangehoods. com GE Monogram Instructions Model ZV750 GE Monogram at:: rangehoods. com is a division of CAUTION WARNING Before you begin Read these instructions completely and carefully. IMPORTANT:
More informationQUALITY ASSURANCE SPECIFICATION
Page 1 of 8 QAS: 2.02 QUALITY ASSURANCE SPECIFICATION REVISION: 0 DATE: 08/29/14 MATERIAL PURCHASING Code Material Purchase Specification for Pipe, Valves, Fitting, and Flanges PAGE 1 OF 8 1.0 Purpose
More informationCHAPTER 6 DUCT SYSTEMS
CHAPTER 6 DUCT SYSTEMS 601.0 Scope General. 601.1 General Applicability. Ducts and plenums that are portions of a heating, cooling, absorption or evaporative cooling, or product-conveying system shall
More informationSECTION LOW PRESSURE DUCTWORK
SECTION 15841 LOW PRESSURE DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 07270 - Firestopping and Fire and Smoke Barrier Caulking. 2. 15260 - Vibration Isolation. 3. 15280 - Thermal Insulation
More informationLOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing.
SECTION 15841 LOW PRESSURE STEEL DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15180 - Mechanical Systems Insulation. 2. 15940 - Outlets (HVAC). 3. 15991 - Testing and Balancing. 1.02 SUBMITTALS
More informationA/E REVIEW CHECKLIST HVAC
A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,
More informationMRI Safety. Stickers. MRI Safe - Do Not Remove From MRI Area - Warning Stickers. Available in Red or Green
Stickers MRI Safe - Do Not Remove From MRI Area - Warning Stickers Die Cut Permanent Adhesive Laminated 6 3 4 1 1/2 1 Available in Red or Green MT-1065 Red - 5 Large, 5 Medium, 5 Small $19.95 pk. MT-1092
More informationSECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL
PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.
More informationTELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18
THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 001 Subject:
More informationPart VIII Electrical GENERAL REQUIREMENTS CHAPTER 33
Part VIII Electrical CHAPTER 33 GENERAL REQUIREMENTS < SECTION E3301 GENERAL E3301.1 Scope. The installation of electrical systems, equipment and components indoors and outdoors that are within the scope
More informationA. Product Description: Stranded conductor insulated wire.
SECTION 16120CPPR CONDUCTORS AND CABLE PART 1 - GENERAL 1.1 SYSTEM DESCRIPTION A. Product Requirements: Provide products as follows: 1. All building wire shall be stranded copper (no aluminum wire). 2.
More information4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118
PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended
More informationProfile Wrapping. TKH-Technical Briefing Note 6. Industrieverband Klebstoffe e.v. Version: March 2009
TKH-Technical Briefing Note 6 Profile Wrapping Version: March 2009 Published by Technische Kommission Holzklebstoffe (TKH) (Technical Committee on Wood Adhesives) of Industrieverband Klebstoffe e.v. (German
More informationBrown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS
SECTION 16461C - DRY TYPE TRANSFORMERS PART 1 - GENERAL 1.1 This section includes design and performance requirements for dry-type transformers rated for use on secondary distribution systems rated 600
More informationHVAC in AutoCAD MEP: New and Improved. David Butts Gannett Fleming MP3724-L. Learning Objectives. At the end of this class, you will be able to:
David Butts Gannett Fleming MP3724-L In the Building Information Modeling (BIM) world, there are still many users who have AutoCAD MEP but aren't ready to make the move to Autodesk Revit for a variety
More informationAddendum No. 1 page 1
Addendum No. 1 page 1 Project: Proj. No: 1634.02 Scottsburg High School HVAC Renovation 2017 Scott County School District 2 Scottsburg, Indiana Date: November 22, 2016 This addendum is a part of the bid
More informationCOMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST
COMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST Two copies of this worksheet/checklist must accompany plans sets submitted with commercial kitchen application. The applicant is responsible for assuring the
More informationComparison that shows the differences between a PFD and P&ID :
Comparison that shows the differences between a PFD and P&ID : PFD P&ID Used during construction? No Yes* Shows all process and service piping? No Yes Indicates presence of all controls? No Yes Shows all
More informationThreadlocking Adhesives
Threadlocking Adhesives Locking of Threaded Fasteners Why use a Threadlocker? threadlocking products prevent self-loosening and secure any threaded fastener against vibration and shock loads. They are
More informationDescription of Item Unit Quantity
Page 1 of 6 a) Façade of Entrance Door (Refer Drawing 11) Providing and fixing in place Aluminum Composite Panel Cladding of approved quality / shade / colour / make (Euroband / Altobond / Alucobond) per
More informationTravis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock
Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL
More informationDOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410
DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original
More informationM1.0 MECHNANICAL FLOOR PLAN
GENERAL NOTES A. CONTRACTORS AND SUB CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY
More informationABCO Laser Wire and Cable Marking Systems
ABCO Laser Wire and Cable Marking Systems GET HIGH-SPEED WIRE AND CABLE LASER MARKING WITH ABCO s OFF-THE-SHELF SOLUTION A Complete Laser Marking System That s Simple to Install, Easy to Use Designed specifically
More informationIndustrial and Transportation Business DISTRIBUTOR PRODUCT LINE
Industrial and Transportation Business DISTRIBUTOR PRODUCT LINE 3900 DUCT TAPE 3900 DUCT TAPE MRO (Maintenance and Repair) Construction Trade Shows and Conventions General Industrial Electrical Aerospace
More informationA. Submit properly identified manufacturer's literature before starting work.
SECTION 10400 IDENTIFYING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor and materials required for installation of plaque, school name and address numbers, directional signage, signage
More informationCablelink Plus Flush Technical
Cablelink Plus Flush Technical 107 technical hotline +44 (0)1268 563720 screeded floor systems is designed to provide power and data distribution highways in screeded floors. The robust system offers a
More informationSolutions AGRICULTURAL LABORATORY & CLASSROOM FURNITURE. Education to Industry. Solutions for Your Workspace & Storage Needs
AGRICULTURAL LABORATORY & CLASSROOM FURNITURE Education to Industry for Your Workspace & Storage Needs www.ageducationalsolutions.com 864-256-0621 info@ageducationalsolutions.com Workbenches Potting Benches
More informationDesign Deliverables. Summary. A. Expectations for Design Deliverables:
Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations
More informationUNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1
GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers
More informationARMA-CHEK SILVER APPLICATION MANUAL. T. +49 (0)
ARMA-CHEK SILVER APPLICATION MANUAL T. +49 (0) 251 7603-0 info@armacell.com www.armacell.eu 02 Arma-Chek Silver Application Manual General application instructions Working with Arma-Chek Silver The installer
More informationELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More information1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.
PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02
More informationSUPPLEMENTARY INSTALLATION INSTRUCTIONS Ventilating Fan (Contractor Pack)
SUPPLEMENTARY INSTALLATION INSTRUCTIONS Ventilating Fan (Contractor Pack) Model No. FV-08VSLA2 Contents Housing Can FV-08VSLA2 General Safety lnformation Unpacking Supplied Accessories Wiring Diagram lnstallation
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More information2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationTO WHOM IT MAY CONCERN:
TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit
More informationUTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1
UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.
More informationGE Ventilated Dry-Type Transformers. Secondary Substation Transformers - 5 and 15kV Class
GE Ventilated Dry-Type Transformers Secondary Substation Transformers - 5 and 15kV Class GE ventilated dry-type transformers are designed for indoor or outdoor applications in schools, hospitals, industrial
More informationBritish Standard Pipe Markers (BS1710-BS4800)
British Standard Pipe Markers (BS1710-BS4800) Why Pipe Marking? Brady pipe markers enhance safety, save time and reduce costs. Enhance safety. Unmarked pipes and valves can cause danger to life and damage
More information