1 T Architecture Interiors Planning 1165 BRITTMOORE RD. HOUSTON, TEXAS 7704 (T) (F) in association with: CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL An HCA Affiliated Hospital An HCA Affiliated Hospital Steepletop Drive Houston, TX C-SECTION ROOM RENOVATION 2nd Floor C-SECTION RENOVATION Second Floor Steepletop Drive Houston, Texas S GI RE T E MA S T A T E RED RK G. 12 H E 4 7 OF I AR T K C A M P H I T EC T E X A S REVISIONS FACILITIES SERVICES GROUP HEITKAMP SWIFT ARCHITECTS BENNETT DESIGN GROUP GARNER FRITSCHE ENGINEERING, INC. HENDERSON ROGERS PROJECT MANAGER CONSULTING ARCHITECT INTERIORS MEP ENGINEER STRUCTURAL ENGINEER NO. ISSUE DATE Sheet Information DATE 04/09/2018 JOB NUMBER 1719 TITLE COVER SHEET CVR Copyright C 2018 Heitkamp Swift Architects
2 T 6 GENERAL NOTES A. CEILING HEIGHT IS TO MATCH EXISTING ON FLOOR (8'-0", EXCEPT ROOM 206. CEILING GRID SHALL BE CENTERED IN ROOMS, UNLESS NOTED OR DIMENSIONED OTHERWISE. B. THE CONTRACTOR SHALL COORDINATE THE REFLECTED CEILING PLAN WITH THE MEP PLANS FOR ELECTRICAL LIGHTING, MECHANICAL SUPPLY, RETURN AND EXHAUST DEVICES. COORDINATE WITH THE SPRINKLER HEAD LAYOUT AS WELL. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT. C. SPRINKLER SYSTEM MODIFICATION, DESIGN AND INSTALLATION IS PART OF THE SCOPE OF WORK. VERIFY THE STATE AND EXTENT OF THE EXISTING SPRINKLER SYSTEM. DESIGN NEW AND/OR RELOCATED HEADS IN ACCORDANCE WITH APPLICABLE CODES AND NFPA. FLUSH SPRINKLER HEADS TO MATCH EXISTING IN STYLE AND COLOR. RAISE AND/OR RELOCATE ALL REQUIRED PIPING IN ORDER TO ACCOMMODATE NEW EQUIPMENT DUCTWORK AND CABLING ABOVE CEILING IN ROOM 206. D. CENTER RECESSED DOWNLIGHTS, WALL WASHERS, SPRINKLER HEADS, STROBES, OCCUPANCY SENSORS AND OTHER CEILING MOUNTED DEVICES IN THE INDICATED CEILING TILES, UNLESS NOTED OR DIMENSIONED OTHERWISE. E. LOCATE LIGHT SWITCHES, THERMOSTATS, LIFE SAFETY, OR OTHER DEVICES ADJACENT TO DOORWAYS U.NO.. MULTIPLE DEVICE LOCATIONS TO BE GANGED UNDER A SINGLE COVER PLATE. STACK BANKS OF MORE THAN FOUR DEVICES. RE: ELEVATIONS AND FINISH PLANS FOR ADDITIONAL INFORMATION FOR SPECIFIC LOCATIONS. F. EXIT SIGNS, ANNUNCIATORS, EMERGENCY LIGHTING, AND STROBES ARE BUILDING STANDARD, UNLESS NOTED OTHERWISE. RE: MEP DOCUMENTS FOR ADDITIONAL INFORMATION. Architecture Interiors Planning 1165 BRITTMOORE RD. HOUSTON, TEXAS 7704 (T) (F) in association with: 6 G. RE: MEP DOCUMENTS FOR SPECIFICATIONS OF HVAC CONTROLS AND SYSTEMS, LIGHTING FIXTURES, AND OTHER ELEMENTS AND APPLICABLE SYSTEMS. H. DIFFUSER AND LIGHT FIXTURE FINAL LOCATIONS ARE TO NOT BE IN CONTACT WITH MILLWORK. COORDINATE WITH ARCHITECT OF ANY CONFLICTS. I. CAULK JOINT AT CEILING GRID WALL ANGLE TO WALL TRANSITION. LEGEND TO SHEET 2 NOTE TO DRAWING EXISTING TO REMAIN ; OUTSIDE SCOPE OF WORK UNLESS NOTED. 6 2'-0" X 2'-0" CEILING GRID WITH ACOUSTICAL CEILING TILE ACT-1, ARMSTRONG, NON-TEGULAR, FINE FISSURED #1728, 24"X24"X 5 8" IS TYPICAL CEILING TILE, U.N.O.; GRID TO BE 15/16" EXPOSED TEE, WHITE An HCA Affiliated Hospital Steepletop Drive Houston, TX EQUAL EQUAL 2'-0" X 4'-0" LED LIGHT FIXTURE EQUAL EQUAL 6 LED SHOWER LIGHT 2' X 2' LED LIGHT FIXUTRE OVER LAVATORY LIGHT FIXTURE 2nd Floor C-SECTION RENOVATION 2' X 4' HCA STANDARD PRIMATIC LENS LIGHT FIXTURE 2 CEILING MOUNTED NURSE CALL LIGHT '-2" 1'-0" EQUAL " 2'-0" " 1'-0" 5 X/AX.0X CEILING HEIGHT INDICATION ABOVE FLOOR FINISH ; 9'-0" UNLESS NOTED OTHERWISE DETAIL SECTION DESIGNATION S GI RE T E MA RED RK G. H E I AR T K C A M P H I T EC 2 2 EQUAL EQUAL '-2" 6" '-1" 4'-0" 1'-0" NOTES TO SHEET 1 2 WALL MOUNTED LIGHT FIXTURE. REFER TO ELEVATION FOR HEIGHT AFF. CENTER CEILING GRID THIS DIRECTION. NEW GYPSUM BOARD CEILING; PAINT ALL GYPSUM BOARD CEILING, NEW AND EXISTING, WITHIN THE SCOPE OF WORK AS SCHEDULED. REVISIONS S T A T E OF T E X A S 2 1 '-2" O V A 7 EQUAL 4'-2" 11'-" ORIGIN OF GRID TO BE A FULL CEILING TILE CEILING MOUNTED O.R. LIGHT FIXTURE, OFCI CEILING MOUNTED MED GAS COLUMN, OFCI EXISTING SOFFIT NO. ISSUE DATE Sheet Information 7 8 CEILING MOUNTED RETRACTABLE GAS HOSE DROPS, REFER TO PLUMBING DRAWINGS. CEILING MOUNTED ELECTRICAL DROP, ALIGN WITH ADJACENT LIGHT FIXTURES, REFER TO ELECTRICAL DRAWINGS. DATE JOB NUMBER 04/09/ TITLE REFLECTED CEILING PLAN PLAN NORTH TRUE NORTH SHEET A.01 REFELCTED CEILING PLAN 1/4" : 1'-0" 4 Copyright C 2018 Heitkamp Swift Architects
3
4
5
6
7
8
9
10
11
12
DR. FAKHOURI SKIN CARE SPECIALISTS WEST GRAND PARKWAY SOUTH SUITE 420 SUGAR LAND, TX 77479
AREA MAP DR. FAKHOURI SKIN CARE SPECIALISTS 750 WEST GRAND PARKWAY SOUTH SUITE 20 SUGAR LAND, TX 7779 DRAWING LIST G00 G002 G00 G00 G005 G00 G007 G008 A0 A02 A0 00 0 02 0 0 05 Cover Sheet General Conditions
More information실내디자인스튜디오 1. 11Elevation
1101 실내디자인스튜디오 1 11Elevation 1102 실내디자인스튜디오 1 Process 1 2 3 4 5 실내디자인전개방법과과정에대한개요 주거공간디자인의사례조사 주거공간디자인의사례조사 Bubble diagram 의작성과동선계획 Block layout 의작성과 idea Sketch 6 Human Factors & Ergonomics 7 Floor Plan
More informationID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:
CONTACT INFORMATION: SHEET INDEX: DISCLOSURES: DOCUMENT GENERAL NOTES: CLIENT ARDENT RESIDENTIAL 5453 BURNET RD. SUITE 203 AUSTIN, TX 78756 ARCHITECT DAVIES COLLABORATIVE 5453 BURNET RD. SUITE 202 AUSTIN,
More informationPROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT
ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon 97132 OWNER ARCHITECT X CONSULTANT OWNER: DATE OF ISSUANCE:
More informationDOCUMENT NARRATIVE PETSMART # 3131 GREEN VALLEY SAHUARITA, ARIZONA Construction Change Directive #1 (CCD-1) / September 22, 2017
These documents, indicated as Construction Change Directive #1 with a delta - 1, supersede the previous issue and should be inserted into the Construction Documents. The tags in the column indicate which
More informationPROJECT DIRECTORY SIGNET, INC. 375 GHENT RD AKRON, OH TEL: (330) CONTACT: DESIGNER NAME ELECTRICAL ENGINEER
PROJECT DIRECTORY REVISION HISTORY DRAWING INDEX LANDLORD DESIGNER T1.0 TITLE SHEET / CODE DATA / RESPONSIBILITIES PICK UP PERMIT AND FEES RESPONSIBILITY IF ITEM IS TO BE PURCHASED FROM T.C.H., CONTACT:
More informationSPARTAN DAY CAMP 4814 FREEDOM RING RD
484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS
More informationNEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER
NEW SEVICE CENTER VINITA, OK 70 9 S. 7th St. VINITA, OK 70 06 W. 2nd St., Joplin, MO 680 Phone: 7-62- Fax: 7-782-678 GENERAL G0.0 COVER CIVIL C.0 SITE DEMO C. SITE PLAN C.2 GRADING PLAN (FORTHCOMING) ARCHITECTURAL
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationSECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE:
ADDENDUM #01 PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : 2018-04600 DATE: 2018.04.27 This Addendum shall be considered part of the specifications for the construction of
More informationArchitecture Firm ID 439 Contract Design I Due: May 4, 2015
Architecture Firm ID 439 Contract Design I Due: May 4, 2015 Project Objectives: 1) To engage in multi-disciplinary collaboration 2) To understand sustainability as it pertains to building methods, materials,
More informationWayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009
ADDENDUM NO 2 OWNER: Wayne State University DATE: January 4 th, 2019 PROJECT: NM Project Number: 18113.0 ARCHITECT: ENGINEER: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009 IMEG 26200 Town
More informationA. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationCity of Thousand Oaks
TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity
More informationHAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A
CHL ASSOCIATES ARCHITECTURE 1 5 7 0 R I V E R R O A D, M A R I E T T A, P E N N S Y L V A N I A 1 7 5 4 7 HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E 1 0 2 L A N C A
More informationArchitectural Floor Plan Symbols
Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section
More informationPMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education
PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does
More informationWoodWORKS Channeled Plank
CEILING&WALL SYSTEMS Between us, ideas become reality WoodWORKS Channeled Plank Assembly and Installation Instructions 1. General 1.1 Product Description WoodWorks Channeled acoustical ceiling and wall
More informationArchitectural Alliance Incorporated KEYPLAN SCALE:N.T.S. SECOND FLOOR DEMOLITION FLOOR PLAN 2 SCALE:1/4" = 1'-0"
KEYPLAN SCALE:N.T.S. SECOND FLOOR DEMOLITION FLOOR PLAN SCALE:/4" = '-0" SECOND FLOOR DEMOLITION FLOOR PLAN SCALE:/4" = '-0" P P 08 /A30 KEYNOTES. ALTERNATE # RE-LAMINATE CABINET.. NEW BLINDS 3. WRAP HEAD,
More informationCHAPTER 5 ARCHITECTURE
CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationTAHFM Interlink Prefab is FAB?
TAHFM Interlink 2015 Prefab is FAB? Panelists PRESENTERS: Nemours/Alfred I. Dupont Hospital for Children PRESENTERS: Jeff Kent, Managing Director of Corporate Facilities, Nemours Foundation Skanska FKP
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationSECTION D BIM COORDINATION DRAWINGS - CONTRACTORS
END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,
More informationDESIGN INSTRUCTIONS TO ARCHITECTS AND ENGINEERS [ ] SCHEMATICS [ ] DESIGN [ ] CONSTRUCTION
DEPARTMENT OF VETERANS AFFAIRS DESIGN INSTRUCTIONS TO ARCHITECTS AND ENGINEERS LOCATION : VAMC, PROJECT TITLE : PROJECT NO. : [ ] SCHEMATICS [ ] DESIGN [ ] CONSTRUCTION DEVELOPMENT DOCUMENTS EQUIPMENT
More informationSECTION PROJECT COORDINATION VIA BIM
SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1
A R C H I T E C T S, I n c. TO: ALL PLAN HOLDERS FROM: NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, 2018 PROJECT: Lea County General Service Building PROJECT NO: 18-142 ADDENDUM NO: 1 PAGES: 10
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL
SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01
More informationFIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND
HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION
More informationMSU Barnard Hall 105 Cleanroom Installation PPA # Page 1
ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,
More informationADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center
ADDENDUM THREE Addendum Three (AD.03) to the drawings and specifications prepared by Gibraltar Design for Curtis G. Shake Learning Resources Center for Vincennes University, Vincennes, Indiana. All Contractors
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More informationX X X X X - Finalize drawing list X X B. Project Description
Design Submittals, Details Submittal Requirements General For all LAWA issued projects, the Construction Document plans and specifications shall include all information in previous submittals plus all
More information4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118
PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended
More informationTravis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock
Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL
More informationELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationNILES RENOVATION PHASE IV
DRAWINGS PREPARED FOR: GENERAL NOTES A. SHOULD A CONTRACTOR FIND DISCREPANCIES OR AMBIGUITIES IN OR OMISSIONS FROM THE DRAWINGS OR SPECIFICATIONS, OR BE IN DOUBT ABOUT THEIR MEANING, HE SHALL NOTIFY THE
More information2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.
PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
1 CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Facilities Planning & Management Department August 11, 2010 Addendum No. 2 INVITATION FOR BID NO.: 11-07 Industrial Technology Center, Buildings 1400/1600
More informationBid No. B14-02 Building 100 HVAC Improvements
Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building
More informationPROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:
DRAWING INDEX GENERAL C. PROJECT COVER G-WING A/V IMPROVEMENTS.0 AREA PLAN ST FLOOR SOUTH. TYP. PROJECTOR MOUNTING & PROJECTOR NOTES.2 G-WING TECHNOLOGY CABINET ELEVATIONS.3 G-WING WIRING DIAGRAM.4 G-WING
More informationAutodesk Revit MEP Fundamentals
Autodesk Revit MEP Fundamentals Course Length: 4 days To take full advantage of Building Information Modeling, the Autodesk Revit MEP: Fundamentals training course has been designed to teach the concepts
More informationSECTION MECHANICAL IDENTIFICATION
SECTION 15190 MECHANICAL IDENTIFICATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe Markers. 1.02 SUBMITTALS A. Submit valve chart and schedule,
More informationBUILDING PLAN REVIEW REQUIREMENTS
TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings
More informationA. This Section includes plumbing fixtures and related components.
SECTION 224200 PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationA/E REVIEW CHECKLIST HVAC
A/E CHECKLIST HVAC Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection,
More informationRevit Revit A step by step guide. 11/14/2011 jimmy boone
Revit 2012 Revit A step by step guide 11/14/2011 jimmy boone Contents Environment settings... 4 Setting up a new MEP models... 5 Step 1, beginning from an architectural model... 5 Step 2 (if using a separate
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationKitchen and Bath Design Planner
2017 Kitchen and Bath Design Planner How to Measure Your Kitchen or Bath for New Cabinets Measuring your space is a critical step in determining your room layout. Having accurate measurements of your kitchen
More informationNCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice
NCIDQ Restroom Drawing Answers to the most common questions about this drawing for the Practicum. 2016 Qpractice Table of Contents This is a summary guide of most frequently asked questions about the Practicum
More informationCOTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC
GREENVILLE, SC TYPE: MUNICIPAL ADDRESS: CUSTOM RESIDENTIAL XXX STREET GREENVILLE SC, 9607 A E J P T : OWNER:, LLC TAX MAP #: PROPERTY AREA: ZONING DISTRICT: BUILDING MATERIAL: BUILDING HEIGHT: FOUNDATION
More informationSECTION PROJECT MANAGEMENT AND COORDINATION
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More information03/7/12 Issuance UTD Section Page 1 of 5 Electrical General
SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and
More informationAddress: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:
Community Development Department 10 N. Water Street Monday Friday 847 741 3894 8:30 a.m. 5:00 p.m. 847 741 3959 FAX www.southelgin.com BASEMENT REMODEL APPLICATION PROPERTY INFORMATION South Elgin, IL
More informationB. The designated coverage areas shall include both indoor and outdoor coverage.
Page 1 of 8 This Wi-Fi Section shall be included in the Contract Specifications, unless directed by the University Project Manager. Contact the UW Project Manager to determine if the design for Wi-Fi outlet
More informationADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.
ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationAutodesk Revit MEP Learning Essentials Training Course Outline
Module 00 Revit in a Nutshell Interactive exercise on creating and documenting a basic building Module 01 Introduction to the Principles of BIM Simple Truths Behind the hype The benefits of BIM What will
More informationSUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013
SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,
More informationFLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS
DIVISION 23 FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS Part I General 1.1 Related Documents A. All terms and general provisions of contract, General and Supplementary Conditions, and Specification
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More informationSHEET INDEX PROJECT LOCATION. ARCHITECTS FORUM 8555 North River Road, Suite 220 Indianapolis, Indiana [P] [F]
TRANSWESTERN 900 West Loop South, Suite 00 Houston, Texas 7707 [P] 7.70.7700 [F] 7.70.685 SYSTEM 8465 Keystone Crossing, Suite 0 4640 [P] 7.46.5544 ARCHITECTS FORUM 8555 North River Road, Suite 0 4640
More informationAddendum #1 - Bid Package #
Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction
More informationJuly 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.
July 3, 2013 CASCO Project Managers St. Louis, Missouri PETSMART STORES 13K Q2 2013 Prototype Narrative (Delta 5) Bulletin No. Five CHANGES TO THE DRAWINGS: 1. Sheet A0.0, Revision No. 5: Revised project
More informationChuck Caesar. VIA: /Webposting April 27, 2017
VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John
More informationWWRC, Inc W. 7th Clovis, NM (575) Fax (575) SIERRA MIDDLE SCHOOL ADDITION & RENOVATIONS ROSWELL INDEPENDENT SCHOOL DIST.
WWRC, Inc. 1716 W. 7th Clovis, NM 88101 (575)769-2618 Fax (575)742-3209 November 10, 2008 SIERRA MIDDLE SCHOOL ADDITION & RENOVATIONS ROSWELL INDEPENDENT SCHOOL DIST. MEETING MINUTES DATE OF MEETING: Tuesday
More informationCONTRACTOR(S) SHALL VERIFY EXISTING CONDITIONS AND CORRELATE DIMENSIONS PRIOR TO PROVIDING THE WORK DETAILED IN THESE DRAWINGS, AND SHALL PROMPTLY NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. COPYRIGHT SBLM,
More informationBUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS
Building and Development Permit Applications Definitions: Type A Residential Projects: All projects related to one and two unit dwellings Type B Residential Projects: All projects related to Apartments,
More informationAddendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers
Addendum to Description of Services for Building and Planning, 2012 8.4 Digital Design 2016 The Association of of Consulting Engineers FRI and DANSKE ARK Addendum to Description of Services for Building
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationMETALWORKS Wings Accent and Acoustical Clouds Installation Instructions
CEILING SYSTEMS Between us, ideas become reality METALWORKS Wings Accent and Acoustical Clouds Installation Instructions 1. GENERAL 1.1. Product Description MetalWorks Wings is a decorative ceiling element
More informationADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON
The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR
More informationWOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General
CEILING SYSTEMS Between us, ideas become reality WOODWORKS Installation Instructions Linear Solid Panels 1. General 1.1 Product Description WoodWorks Linear features a solid wood ceiling system in 1' x
More informationSECTION WIREWAYS FOR RADIOLOGY EQUIPMENT
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable
More informationNotre Dame High Addition/Renovation Addendum 3 Page 1
School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)
More informationTHE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE
231 THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' THE CHURCH OF BISHOPS' HOURS Monday-Friday P.M. - X:00 A.M. X:00 Saturday P.M. - X:00 A.M. X:00 J ESUS CHRIST OF LATTER-DAY SAINTS HOME STORAGE
More informationJan H: ARCHITECTURAL WOODWORK (06410-H)
2101 Commonwealth Blvd, Suite B Ann Arbor, MI 48105-5759 www.med.umich.edu/facilities/plan/ 064040-H: ARCHITECTURAL WOODWORK (06410-H) GENERAL In general, follow the guidelines below when designing and
More informationAddendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.
!!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This
More informationNational BIM Standard - United States Version 3
National BIM Standard - United States Version 3 5 Practice Documents 5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination Requirements for Construction Installation
More informationFACILITIES MANAGEMENT. AutoCAD Guidelines & Standards May 2015
FACILITIES MANAGEMENT AutoCAD Guidelines & Standards May 2015 PLEASE NOTE: Changes in the 2015 guidelines appear in these sections; 1.1, 3.2, and 5.2. SECTION 1: General Guideline Table of Contents 1.1
More informationThe GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.
Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer
More informationSpecifications: Other: sign in sheet
To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015
More information12560 W. Cedar Drive Lakewood, CO Barry Himmelman President
Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM
More informationADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016
ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620
More informationThis Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein.
Revision No. 01 Issued February 19, 2016 Page 1 This Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein. This Revision
More informationCommercial Infill Project Guide
Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING
INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY
More informationStaff Review Date: May 11, 2016 HDC PID#
Charlotte Historic District Commission Application for a Certificate of Appropriateness Staff Review Date: May 11, 2016 HDC 2016-086 PID# 07102333 LOCAL HISTORIC DISTRICT: PROPERTY ADDRESS: SUMMARY OF
More informationCI/SfB. October RockLink Integra. Installation system
CI/SfB (35) Xh2 October 2008 RockLink Integra Installation system RockLink Integra 1 6 Rockfon tiles with the E15 straight edge detail are suitable for installation using this system. 6 2 6 The following
More informationREQUEST FOR INFORMATION
Ardmore, PA Atlantic City, NJ REQUEST FOR INFORMATION PROJECT: 1845 - Renaissance Hotel Renovations RFI NUMBER: 10.0 JONATHAN NEHMER & ASSOC ATTN: Lauren Maccherone Dacey 7361 Calhoun Place Suite 310 Rockville,
More informationThe following information supplements and/or supersedes the bid documents issued on July 10, 2017.
Addendum No. 02 ADDENDUM Pages 2 Project No. 1706 Date: July 21, 2017 Project: West End Lofts 44 MacDonald Street, Arnprior, ON The following information supplements and/or supersedes the bid documents
More informationCKBD Peakes Bath Scoresheet
CKBD Peakes Bath Scoresheet Part I: Graphics & Presentation Standards Each question pertains to all four drawing documents: Floor Plan, Mechanical, Construction Plan, and Elevation Drawing unless specifically
More informationADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.
ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL
More information214 Wilshire Blvd., Suite 102 Santa Monica California 90401
Wilshire Blvd., Suite 0 Santa Monica California 900 7 W a l l a c e P l. C a l i f o r n i a 9 8 t e l : 0 7 7 N ND COURT PROPERTY LINE 0.00' THE RENOVATION AND CHANGE OF USE OF AN EXISTING BOOK STORE
More information11SIXTY5 Weaver Dairy Road
SITEPLAN NOTES 2 C-2.0 BICYCLE RACK NTS Weaver Dairy Road Job Number: 1529 WLR, MTC, VJC WLR, VJC 11-30-17 STAIR SITE PLAN 1 C-2.0 SITE PLAN 1" = 30' 0 15 30 60 3 C-2.0 PLAZA DETAIL PLAN 1" = 20' 0 10
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING
INFORMATION BULLETIN / PUBLIC - GENERAL INFORMATION REFERENCE NO.: Effective: 10-01-99 DOCUMENT NO. P/GI 2002-008 Revised: 11-01-02 Previously Issued As: IB ST-4 DOCUMENT SUBMITTAL REQUIREMENTS FOR AN
More informationMTJ Outdoor Baggage Claim
MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,
More informationFacility Services Subgroup Preface for Divisions 21` through 28
Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design
More information