WWRC, Inc W. 7th Clovis, NM (575) Fax (575) SIERRA MIDDLE SCHOOL ADDITION & RENOVATIONS ROSWELL INDEPENDENT SCHOOL DIST.

Size: px
Start display at page:

Download "WWRC, Inc W. 7th Clovis, NM (575) Fax (575) SIERRA MIDDLE SCHOOL ADDITION & RENOVATIONS ROSWELL INDEPENDENT SCHOOL DIST."

Transcription

1 WWRC, Inc W. 7th Clovis, NM (575) Fax (575) November 10, 2008 SIERRA MIDDLE SCHOOL ADDITION & RENOVATIONS ROSWELL INDEPENDENT SCHOOL DIST. MEETING MINUTES DATE OF MEETING: Tuesday November 4, 2008 In Attendance: James Dunn; J&G Electric Michael A. Green; Van Winkle Roofing, Inc. Scott Hays; WWRC, Inc. Stanley Morris; WWRC, Inc. Joe Baca; RISD Jeff Bishop; RISD Abel Natividad; Studio-D Architects by phone Josie Turner; Sierra Middle School Principal Tyler Drakulich; Armstrong Const. John King; PSFA David Eldridge; RISD Items Discussed: 1. RFI #48 was discussed concerning the existing fence East of the football field. The existing fence does not cover the entire east side of the lot as shown on the drawings. Also, David Eldridge believed that the 40 gates to be installed on the East side needed to be installed on the West side by the new parking lot so that the Portable Bldgs could be moved out. Joe Baca requested that an MCR be submitted to take care of the missing fence and to add an additional 40 gate to the West Side near the parking lot. 2. Stanley informed the Josie that the Fire Sprinkler contractor would be disarming the Fire Sprinkler system during the day to perform their work. The system would be up and running by the end of the day. This could happen throughout the project. 3. Joe Baca stated that the new bleachers for the football field were scheduled to be installed and requested that the Contractor relocate the construction fence approx. 40 to the west.

2 4. James Dunn stated that the new electrical panels have been energized so the Contractor could inform all crew members to be careful working around the panels. With the panels energized this has activated the operation of the parking lot lights in the new parking lot. THREE WEEK LOOK AHEAD: 1. Rough in of Duct work Phase 1 & North Area Phase 2 2. Close in Phase 1 Addition 3. Begin installation of interior Drywall Phase 1 and North Area Phase 2 4. Roofing Phase 1 Addition 5. Installation of Fencing 6. Installation of drywall work in both Phase 1 and North Area Phase 2 7. Installation of ceramic tile 8. Installation of stucco on new addtion B: Items Pending: 1. (19) (SEE PRIOR MINUTES FOR COMPLETE INFO.) (JOE BACA DIRECTED ABEL TO HAVE JASON VERIFY THE TERMINATION PROCEEDURES SHOULD KEERS PRICING BE CONSIDERABLY LOWER THAT GWC. JOE ALSO STATED THAT HE DID NOT RECEIVE SQFT LAYOUT FROM STUDIO D. ABEL STATED THAT IS WAS SENT OUT LAST WEDNESDAY BUT HE WOULD RESEND.) (JOE BACA STATRED THAT EVERYTHING HAS BEEN PROVIDED TO KEERS FOR PRICING. SCOTT STATED THAT THE NEW SCOPE HAS BEEN PROVIDED TO GWC FOR REPRICING ALSO.) (MCR #28 WAS SUBMITTED FOR THE ADDITIONAL COST OF REMOVING THE LATH & PLASTER. JOE BACA STATED THAT THE QUOTE FROM KEERS WAS WELL BELOW THIS COST AND REQUESTED THAT THE CONTRACTOR REVISE MCR#28 TO CANCEL GWC S CONTRACT.) (JOE BACA STATED THAT THE REVISED PRICING WAS RECEIVED FROM KEERS AND HE DID NOT BELIEVE IT WAS A LOW ENOUGH TO WARRANT CANCELLING THE EXISTING CONTRACT. HE STATED THAT THIS WAS SUBMITTED TO THE ARCH. FOR THEIR REVIEW. SCOTT STATED THAT HE WOULD SUPPLY THE CREDIT TO CANCEL THE ABATEMENT WORK FROM THE CONTRACT FOR THE ARCH. TO REVIEW ALONG WITH KEERS QUOTE.) 2. (13) (SEE PRIOR MEETING MINUTES FOR COMPLETE INFO.) (TYLER PRESENTED A NEW RFI CONSERNING GRADES ON THE NEW BUSLANE (RFI#38). HE WILL NEED THIS RFI ANSWERED PRIOR TO COMPLETING THE NEW BUS LANE WHICH HE WOULD LIKE HIS CREWS TO BEGIN TOMMORROW.) (ABEL STATED THAT HE WOULD REVIEW RFI#38 AFTER THE MEETING AND ADISE TYLER OF THE NEW GRADES. SCOTT STATED THAT RFI#40 WAS SUBMITTED QUESTIONING THE XCEL ENERGY LIGHT POLE THAT IS IN THE WAY

3 OF ONE OF THE EXITS. JOE STATED THAT HE HAS CONTACTED XCEL AND INSTRUCTED THEM TO REMOVE THE POLE. TYLER STATED THAT IF XCEL COULD DISCONNECT THE LINES ARMSTRONG WOULD REMOVE THE POLE. DISCUSSION WAS ALSO MADE CONCERNING THE TEMPORARY BUS AND PARENT DROP OFFS. DISCUSSED POSSIBLE REROUTING OF THE BUS ROUTES. JOE AND JOSIE STATED THAT THEY WOULD MONITOR THE SITUATION.) (TYLER STATED THAT THE PAVING FOR THE PARENT DROPOFF IS TO BE COMPLETE BY FRIDAY. JOE DIRECTED TO REMOVE THE SMALL ISLAND FOR THE CANOPY IN THIS AREA PER RFI#46. REQUESTED A CREDIT FOR THE DELETION OF THIS WORK.) (JOSIE STATED THAT THERE WAS STILL HEAVY MACHINERY IN OPERATION DURING THE AFTERNOON DISMISSAL OF CLASSES. TYLER STATED THAT HE WOULD INFORM HIS CREW TO STOP ALL OPERTION OF HEAVY MACHINERY BETWEEN 3:00PM AND 3:30PM.) 3. (5)Scott stated that he would be submitting an RFI concerning range hoods that are shown on the architectural drawings stating see mechanical and are not shown on the mechanical drawings. (RFI#29 AND RFI#30 WERE SUBMITTED.) (AWAITING INFO FROM THE ARCH. ABEL REQUESTED INFO ON THE FUME HOOD FOR THE SCIENCE CLASSROOM.) (AWAITING INFORMATION TO PRICE AN MCR FOR RFI#29 FOR THE RANGE HOODS AND NEED TO KNOW MORE INFORMATION CONCERNING THE EXHAUST FAN AND POSSIBLY AN EXHAUST VALVE FOR THE FUME HOOD.) (STILL AWAITING INFORMATION. STANLEY STATED THAT THE ROOFING WORK ON THIS AREA IS COMPLETE.) 4. (5)Josie Turner issued concerns that she was under the impression that this contract included the addition of electrical outlets to the existing classrooms. Joe stated that the Design contract included this request. Abel stated that he would review the documents and advise. (IT WAS DETERMINED THAT AN MCR WOULD NEED TO BE PRODUCED TO INSTALL ADDITIONAL OUTLETS IN THE EXISTING CLASSROOMS. ABEL WAS GOING TO HAVE HIS ENGINEERS PROVIDE A LAYOUT FOR THE ADDITIONAL OUTLETS AND PANEL BOXES IF REQUIRED.) (AFTER MUCH DISCUSSION, JAMES DUNN SUGGESTED THAT THE SCHOOL DIST. PROVIDE INFORM THE ARCH EXACTLY WHAT IS REQUIRED FOR THE EXISTING CLASSROOM. ONCE A LAYOUT FOR EACH ROOM IS PROVIDED HIS OFFICE COULD PRICE THE REQUIRED PROPOSAL. MCR#16 DELT WITH CLASSROOM A102. THE CLASSROOMS WOULD PROBABLY RESEMBLE THIS WORK.) (JAMES DUNN STATED THAT HE WOULD PROVIDE THE SCHOOL DISTRICT A BALLPARK NUMBER PRIOR TO THE ENGINEER PROVIDING A DESIGN.) (JAMES PROVIDED JOE BACA A BALLPARK FIGURE PRIOR TO THE MEETING. JOE DIRECTED THE ARCH. TO PROCEED WITH ADDITIONAL DESIGN FOR NEW OUTLETS.) 5. (4)Michael McClain with J&G Electric and Jeff Bishop with RISDs Voice/Data systems all attended the meeting to discuss Voice/Data issues on the project. Michael stated that the existing data and fiber optics in the existing building are not installed in cable trays and are just laying on top of the ceiling. There are no

4 plans to install these items in cable trays under this contract. Scott stated that this could be a problem with the demolition of the ceiling in these areas. Jeff was also informed that the School district was responsible for final terminations of the Voice/Data equipment per contract and confirmation of RFI#1. Jeff stated that he knew nothing about that and requested that an MCR be produced for the Special Systems contractor to install. (JEFF STATED THAT HE WOULD REQUIRE A DATA DROP IN THE CUSTODIAL ROOM AND HE BELIEVED THAT HE WOULD NEED AIR CONDITIONING IN THE ELECTRICAL ROOM. JASON STATED HE WOULD REVIEW THE AIR IN THE ELECTRICAL ROOM. STANLEY THOUGHT THAT THE ROOM HAD A TRANSFER AIR GRILLE.) (JOE BACA STATED TO PROCEED WITH PRICING FOR A NEW DATA DROP IN THE JANITORS ROOM ONLY.) 6. (3)Scott stated that RFI#34 & #35 needed to be reviewed and answered concering the SK-1 and Sk-2 sink designations. There is no SK-2 sink scheduled and the SK-1 sinks are scheduled as a single compartment sink and the drawings show a double compartment sink in the designated locations. This needs to be answered so that the plumbing fixtures can be released. (MCR#27 WAS SUBMITTED. SCOTT STATED THAT HE RECEIVED ADDITIONAL INFO FROM THE ENGINEER JUST PRIOR TO THE MEETING WANTING TO CHANGE THE SET UP FOR THESE FIXTURES AND TO STATE THAT THE SK SINKS ARE NOT ADA ACCESSABLE.) (NEW PRICING WILL BE SUBMITTED TO REFLECT THE ENGINEER S CHANGES. SCOTT ASKED THAT ABEL CHECK TO SEE IF SK SINKS NEED TO BE ADA ACCESSABLE AND IF A SOLIDS INTERCEPTOR WOULD BE REQUIRED.) 7. (3)RFI#37 was submitted concerning the existing water meter that is located in the area of the new bus lane. The existing box the meter is locate in is not traffic rated. Joe stated that he would prefer that the meter be relocated. The new bus lane work cannot begin until this RFI is resolved. (SCOTT STATED THAT HIS PLUMBING MANAGER WAS MEETING WI TH THE WATER COMPANY THIS MORNING. AFTER THE MEETING JOE, JASON, SCOTT, STANLEY, TYLER, & ALTON COX MET AT THIS LOCATION AND DETERMINED THAT THE WATER METER WOULD NEED TO BE RELOCATED NORTH OF THE BUS LANE AND THAT ARMSTRONG WOULD CREDIT THE PAVING WORK ON THE NORTH SIDE TO ALLOW 2 LANES OF BUS TRAFFIC TO CONTINUE AS DESIGNED AND TO PROVIDE AN ADDITIONAL CURB AT THIS AREA AND TO ALSO REPLACE THE BROKEN CURB NORTH OF THE EXISTING SIDEWALK.) (THE COST TO RELOCATE THE METER WILL BE REVIEWED AFTER AN ALTERNATE PRICE IS SUBMITTED TO PROVIDE A TRAFFIC RATED BOX ON THE EXISTING METER.) 8. (2)RFI#43 was discussed concerning the lack of a backflow preventer on the new 4 domestic water line. Jason stated that CME stated that a backflow preventer was not required per the Uniform Plumbing Code. He stated that it may be a requirement for the City of Roswell. Scott stated that he would have his Plumbing Manager, Alton Cox, contact the Water Dept. to see if this was a city requirement. The City Water Dept. stated that this was not a requirement but was highly recommended on an line of this size. (SCOTT STATED THAT HE

5 WOULD CONTACT THE MECHANICAL INSPECTOR AND HAVE HIM PROVIDE A WRITTEN DETERMINATION FOR THE SPECIFIC CODE REQUIREMENT.) 9. (2)RFI#42 was discussed. The drawings show connecting to the existing 5 medium pressure gas line for the gas service to the new addition. The existing gas service is not medium pressure it is a low pressure service. Information will need to be provided to PNM to see if they will upgrade the gas service, if not then the gas lines to the new addition will not be large enough to provide the proper service to the new addition. Until this is resolved, there will be no heat in the new addition. (SCOTT STATED THAT ALL BTU INFORMATION WAS PRESENTED TO PNM FOR THERE REVIEW OF POSSIBLY INSTALLING A MEDIUM PRESSURE SERVICE TO THE BUILDING PER THE ENGINEER S DIRECTION. DAVID ELDRIDGE STATED THAT PNM HAS NOT AGREED TO PROVIDE THIS ADDITIONAL SERVICE IN THE PAST. THIS IS A HIGH PRIORTY ISSUE.) 10. (2)Joe Baca stated that he would like the contractor to submit an RFI concerning the lack of a washer and dryer hook ups in the Home Ec. Room. 11. (2)Joe Lovato stated that the pipe bollards by the loading dock were being used as trash cans. Tyler stated that he would have the bollards filled. (THERE IS ONE BOLLARD REMAINING THAT HAS NOT BEEN FILLED.) 12. (2)Scott stated that he still needed information on RFIs #26,29,30,36,&37. (RFI#30 WAS THE ONLY RFI REMAINING UNANSWERED FROM THIS ITEM.) Next Meeting Tuesday 11/11/08 at Sierra Middle School Library located in Portable bldg. Meeting to 9:00 AM.

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM:

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM: 4900 Lang Ave NE Albuquerque, NM 87109 505-348-4000 phone 505-348-4055 fax Meeting Minutes Project: Valley View Elementary School Owner: Valley View Public Schools / PSFA Albuquerque Colorado Springs Denver

More information

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon 97132 OWNER ARCHITECT X CONSULTANT OWNER: DATE OF ISSUANCE:

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does

More information

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL T Architecture Interiors Planning 1165 BRITTMOORE RD. HOUSTON, TEXAS 7704 (T) 71.626.400 (F) 71.626.401 in association with: www.garnerfritsche.com CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL An HCA Affiliated

More information

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin. MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD

More information

TO WHOM IT MAY CONCERN:

TO WHOM IT MAY CONCERN: TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit

More information

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX INDEX OF SHEETS SHT. DWG. SHEET TITLE GENERAL 1 G1 COVER SHEET, VICINITY MAP, PROJECT DESCRIPTION 43 A402 INTERIOR ELEVATIONS WOMENS 44 A403 INTERIOR ELEVATIONS MENS 45 A404 INTERIOR ELEVATIONS BUILDING-PLUMBING

More information

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC GREENVILLE, SC TYPE: MUNICIPAL ADDRESS: CUSTOM RESIDENTIAL XXX STREET GREENVILLE SC, 9607 A E J P T : OWNER:, LLC TAX MAP #: PROPERTY AREA: ZONING DISTRICT: BUILDING MATERIAL: BUILDING HEIGHT: FOUNDATION

More information

Cabinet Planning Guide

Cabinet Planning Guide Cabinet Planning Guide After all the thinking, dreaming and planning, the time has come to get started. The following workbook will assist you with the information you need to start the process. Complete

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12

More information

City of Thousand Oaks

City of Thousand Oaks TENANT IMPROVEMENT SUBMITTAL CHECKLIST SUBMIT THREE SETS OF SCALED DRAWINGS (ONE TO BE A BLACKLINE SET) WITH THE FOLLOWING INFORMATION: 1. 2. 3. 4. 5. 6. 7. 8. 9. SITE PLAN: Show building location (vicinity

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

FUTURE PARKING (5) LEGEND PROPERTY LIMIT CURB & GUTTER EASEMENT BUILDING RETAINING WALL WETLAND LIMITS TREELINE SAWCUT LINE SIGN PIPE BOLLARD NUMBER O

FUTURE PARKING (5) LEGEND PROPERTY LIMIT CURB & GUTTER EASEMENT BUILDING RETAINING WALL WETLAND LIMITS TREELINE SAWCUT LINE SIGN PIPE BOLLARD NUMBER O FUTURE PARKING (5) LEGEND PROPERTY LIMIT CURB & GUTTER EASEMENT BUILDING RETAINING WALL WETLAND LIMITS TREELINE SAWCUT LINE SIGN PIPE BOLLARD NUMBER OF PARKING STALLS PER ROW PROPOSED EXISTING STANDARD

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A CHL ASSOCIATES ARCHITECTURE 1 5 7 0 R I V E R R O A D, M A R I E T T A, P E N N S Y L V A N I A 1 7 5 4 7 HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E 1 0 2 L A N C A

More information

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210) Stantec Architecture Inc. 1344 South Flores Street Suite 201 San Antonio TX 78204-1672 Tel: (210) 223-9588 Fax: (210) 223-9589 ADDENDUM #1 07/11/2014 TO PLANS AND SPECIFICATIONS FOR RENOVATION AND ADDITION

More information

Lincoln County Tax Appraisal Office Project No. RFB

Lincoln County Tax Appraisal Office Project No. RFB Red Bike Architecture, PLLC James M. Ratliff, Architect, NCARB P.O. Box 574, Rutherford College, NC 28671-0574 Phone: 828-413-2276 Email: ratliffarch@outlook.com Addendum #1 July 3, 2018 Project: Interior

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

S T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1" = 10' - 0" SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD

S T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1 = 10' - 0 SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD \\CANDELA\projects\-Chabad Center\Current Drawings\Chabad - -A-.0-extg-demo-site-plan.dwg, 0/0/0 :: PM, DWG To PDF.pc A-.0 SITE PLAN SCALE: " = 0' - 0" NORTH GENERAL NOTES: Site/Roof Drainage Plan. THE

More information

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607 Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623 3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax: City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING PLAN REVIEW REQUIREMENTS TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings

More information

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1 A R C H I T E C T S, I n c. TO: ALL PLAN HOLDERS FROM: NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, 2018 PROJECT: Lea County General Service Building PROJECT NO: 18-142 ADDENDUM NO: 1 PAGES: 10

More information

Emmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637

Emmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

RENOVATION OF THE FARMERS MARKET Reference Number:

RENOVATION OF THE FARMERS MARKET Reference Number: RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:

More information

Bid No. B14-02 Building 100 HVAC Improvements

Bid No. B14-02 Building 100 HVAC Improvements Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building

More information

Bidding Trades shall bring this Addendum to the attention of all sub-trades and suppliers from whom they may be receiving quotations.

Bidding Trades shall bring this Addendum to the attention of all sub-trades and suppliers from whom they may be receiving quotations. Addendum No. 3 Re / Objet: Phase Two Espanola High School Redevelopment Project 147 Spruce Street Espanola, ON YBA Project No.: 1323 `The following information, amendments and revisions shall constitute

More information

OCPS Submittal Register for Product Data and Shop Drawing Reviews

OCPS Submittal Register for Product Data and Shop Drawing Reviews OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition

More information

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards. PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:

More information

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the

More information

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:

More information

Marcus Moziah Garvey Elementary School

Marcus Moziah Garvey Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636 0 S Wood St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

BUILDING DEPARTMENT CURRENT

BUILDING DEPARTMENT CURRENT CITY OF LAPEER FEE SCHEDULE EFFECTIVE 7-1-2018 BUILDING DESCRIPTION BUILDING DEPARTMENT CURRENT FEE Administrative Plan Review Fees Plan Review $81.00 per hour; 1 hr minimum Commercial Plan Review Deposit

More information

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1 ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER NEW SEVICE CENTER VINITA, OK 70 9 S. 7th St. VINITA, OK 70 06 W. 2nd St., Joplin, MO 680 Phone: 7-62- Fax: 7-782-678 GENERAL G0.0 COVER CIVIL C.0 SITE DEMO C. SITE PLAN C.2 GRADING PLAN (FORTHCOMING) ARCHITECTURAL

More information

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address: #506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the

More information

Continuing Education Credit

Continuing Education Credit BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP

More information

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643 11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Wendell Smith Elementary School

Wendell Smith Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M. ADDENDUM NO. TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Health Center Renovation Missouri School for the Blind NO. E60-0 The Bid Opening has not changed it remains December 8, 06 AT :30 P.M. GENERAL

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

George Washington Elementary School 3611 E 114th St Chicago, IL 60617 3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up

More information

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629 3 W th St Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647 3 Rockwell St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609 athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the

More information

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653 33 S Wabash Ave Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

2. The Checklists are to be filled out at each phase and provided with the submittal documents. DESIGN DOCUMENT SUBMITTAL REQUIREMENTS DOCUMENT NUMBER: 00200 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 05-29-15 - Added requirement for image files in.dwg documents 04-28-15 - Clarified

More information

CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS

CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS Development Services Department Building Division 500 East Third Street, Suite 110 Loveland, CO 80537 (970) 962-2505 FAX (970)

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

Everett McKinley Dirksen Elementary School

Everett McKinley Dirksen Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Tri-County Commercial Application Checklist

Tri-County Commercial Application Checklist TRI-COUNTY SERVICE CENTER TRI-COUNTY SERVICE CENTER State of Oregon Clackamas Multnomah Washington C O U N T I E S Tri-County Commercial Application Checklist Department of Consumer & Business Services

More information

UTSA Facilities Condition Assessment. Out Brief August XX, 2009

UTSA Facilities Condition Assessment. Out Brief August XX, 2009 UTSA Facilities Condition Assessment Out Brief August XX, 2009 Agenda Opening Remarks FCA Results Summary by Category Example Deficiencies FCA Results Summary by Building Proposed Project List Potential

More information

CS2.0 COVER SHEET VOL. 2

CS2.0 COVER SHEET VOL. 2 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:

More information

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 34 Washtenaw Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118 PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended

More information

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal Complete sets of plans are required. Plans shall be stamped and wet signed by the architect or engineer. (signed and accompanied with letter from Homeowners

More information

Board Members Present: Bettina M. Martin (Chair), Raymond E. Carlton, Norine H. Clarke, James L. Desjardins. of Meeting)

Board Members Present: Bettina M. Martin (Chair), Raymond E. Carlton, Norine H. Clarke, James L. Desjardins. of Meeting) TOWN OF DIXFIELD Minutes of Meeting Board of Selectmen/Assessors/Overseers of the Poor Monday, July 9, 2007 5:00 p.m., Ludden Memorial Library Board Members Present: Bettina M. Martin (Chair), Raymond

More information

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620 82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE 231 THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' THE CHURCH OF BISHOPS' HOURS Monday-Friday P.M. - X:00 A.M. X:00 Saturday P.M. - X:00 A.M. X:00 J ESUS CHRIST OF LATTER-DAY SAINTS HOME STORAGE

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

Kevin O'Connor Design Kevin O'Connor CKD, CBD, CID

Kevin O'Connor Design Kevin O'Connor CKD, CBD, CID SCOPE OF LABOR GENERAL: SUPPLY AND MANAGE TRASH AND DAILY CLEAN UP PROTECT EXISTING WOOD FLOORING, STAIRS AND DOORWAYS SUPPLY AND MAINTAIN PORTABLE TOILET FOR DURATION OF PROJECT KITCHEN: DEMO EXISTING

More information

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Signs, Canopies & Awnings City of Oshkosh Department of Community Development

Signs, Canopies & Awnings City of Oshkosh Department of Community Development Signs, Canopies & Awnings The following information in this packet is provided to help guide you through the permit application process. This packet will also provide you with information regarding sign

More information

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

Estimated Cost of Project Contractor License No. Contractor Qualifier No. Building, Safety and Zoning Department COMMERCIAL Application for Building Permit Owners and/or Contractors: Please fill out all the information listed below and submit those documents needed for your

More information

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:

More information

Architecture, Construction, and Engineering Technical Charter

Architecture, Construction, and Engineering Technical Charter Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

James Shields Middle School 2611 W 48th St Chicago, IL 60632

James Shields Middle School 2611 W 48th St Chicago, IL 60632 2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program

More information

Lorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647

Lorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

INFORMATION FOR OBTAINING A BUILDING PERMIT

INFORMATION FOR OBTAINING A BUILDING PERMIT INFORMATION FOR OBTAINING A BUILDING PERMIT To apply for a building permit, you must be a licensed contractor or the legal property owner. (Commercial permits can only be obtained by a licensed Contractor).

More information

Measure I Bond Program Schedule: Additional Options for Consideration

Measure I Bond Program Schedule: Additional Options for Consideration Measure I Bond Program Schedule: Additional Options for Consideration 24 March 2015 Dr. Robert Clark Chief Business Officer From March 10, 2015 Meeting District staff presented a draft project schedule

More information

Residential Room Additions

Residential Room Additions Residential Room Additions The purpose of this information sheet is to provide information regarding building code and permit processing requirements for RESIDENTIAL ROOM ADDITION(S) in the City of Poway.

More information

Andrew Carnegie Elementary School

Andrew Carnegie Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information