CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

Size: px
Start display at page:

Download "CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT"

Transcription

1 SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct Lables. 1.2 REFERENCES A. ASME A Scheme for the Identification of Piping Systems. 1.3 SUBMITTALS A. Submit in accordance with Sections and B. Product Data: Indicate model, type, and application usage. C. Submit list of wording, symbols, letter size, letter style, and color coding for each system and vault cover. D. Submit valve numbering scheme, valve chart and schedule, including valve tag number, location, function type, and valve manufacturer s name and model number. 1.4 COORDINATION A. Coordinate with CDCR Representative for preferred color schemes and service abbreviations and valve and equipment numbering schemes prior to submittal review. B. Coordinate installation of identifying devices with completion of covering of surfaces where devices are to be applied. C. Coordinate installation of identifying devices with location of access panels and doors. D. Install identifying devices before installing acoustical ceilings and similar concealment. If not installed before ceiling is installed, the Contractor shall remove ceiling at no additional cost to the Owner and install identifying devices. PART 2 PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS BID SET SEPTEMBER 28, 2011

2 A. Seton Name Plate Corp. B. Brimar. C. Brady. 2.2 PIPE MARKERS A. Markers: ASME A Pressure sensitive vinyl (self sticking) material. 2. Mechanically fastened type: Snap on or strap on. a. For dirty, greasy, or oily pipe where pressure sensitive markers may not perform satisfactorily. 3. All weather film for outdoor exposed piping. 4. Provide 360 degree and pipe flow arrows and fluid being conveyed. 5. Size of letters legend: OUTSIDE DIAMETER OF PIPE OR PIPE COVERING LENGTH OF COLOR FIELD SIZE OF LETTERS AND ARROWS 2.3 VALVE TAGS 3/4 to 1-1/4 inch 8 inch 1/2 inch 1-1/2 to 2 inch 8 inch 3/4 inch 2-1/2 to 6 inch 12 inch 1-1/4 inch 8 to 10 inches 24 inch 2-1/2 inch Over 10 inches 32 inch 3-1/2 inch Ductwork 2-1/2 inch A. Tags: Brass or anodized aluminum type. 1. Brass: Minimum 19 gauge, polished, 2-Inch diameter with following lettering: a. Service: ¼-inch stamped black filled letters. b. Valve numbers: 3/8-inch stamped black filled letters. 2. Aluminum: 2-inch diameter, inch thick, with following lettering: a. Service: 1/4-inch engraved letters. b. Valve numbers: 3/8-inch engraved letters. B. Fasteners: 4 ply copper or monel wire meter seals, brass S hooks or No. 16 brass jack chain. 2.4 EQUIPMENT NAME PLATES A. 1/8-inch rigid plastic or bakelite with 4 edges beveled, with black background and white border and letters. 1. Two 3/8-inch mounting holes. 2. Minimum 1/2-inch high lettering. 3. Commercial quality, rust resisting nuts and bolts with backwashers, self tapping screws or rivets. 2.5 UNDERGROUND MARKING TAPE BID SET SEPTEMBER 28, 2011

3 A. General: Provide underground pipe marking tape on all pipes buried beneath the ground. Provide a continuous length of tape 12 inches below the finished earth surface directly above the buried pipe. Provide a second continuous length of tape 12 inches above the top of the buried pipe if the top of the pipe is lower than 36 inches from the top of the finished earth surface. B. Tape: 5 mil inert plastic film for underground use. C. Resistant to alkalis, acids and other destructive agents found in soil; information in the Geotechnical Report. D. Minimum tensile strength: 120 pounds per 6-inch width. E. Minimum elongation: 500 percent. F. Provide detectable underground tape above all buried pipes on the Project. Provide a continuous printed message repeated every 16 to 36 inches warning of pipe buried below similar to (i.e., CAUTION STEAM LINE BURIED BELOW ). G. Color code: 1. Yellow: Natural gas. H. Provide tape widths of 2, 3, 6, 9, and 12 inches for lines buried 10, 20, 30, 40, and 50 inches or greater, respectively. 2.6 DUCT LABELS A. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/16- inch thick, and having predrilled holes for attachment hardware. B. Letter Color: White. C. Background Color: Black. D. Maximum Temperature: Able to withstand temperatures up to 160 degrees F. E. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4-inch. F. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering. G. Fasteners: Stainless-steel rivets or self-tapping screws. H. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate. I. Duct Label Contents: Include identification of duct service using same designations or abbreviations as used on Drawings, duct size, and an arrow indicating flow direction. 1. Flow-Direction Arrows: Integral with duct system service lettering to accommodate both directions, or as separate unit on each duct label to indicate flow direction. BID SET SEPTEMBER 28, 2011

4 2. Lettering Size: At least 1-1/2 inches high. 2.7 STENSILS A. Stencils: Prepared with letter sizes according to ASME A13.1 for piping; minimum letter height of 1-1/4-inches for ducts; and minimum letter height of 3/4-inch for access panel and door labels, equipment lables, and similar operational instructions.3 1. Stencil Material: Aluminum. 2. Stencil Paint: Exterior, gloss, acrylic enamel black unless otherwise indicated. Paint may be in pressurized spray-can form. 3. Identification Paint: Exterior, acrylic enamel in colors according to ASME A13.1 unless otherwise indicated. 2.8 CHART AND DIAGRAM FRAMES A. Chart and diagram frames: Extruded aluminum with plexiglass or glass windows. 2.9 GAS VAULT A. Provide identification on vault cover. Label cover to read MAIN GAS SETTLEMENT JOINT AND SUMP PUMP. Use 4 inch high helvetica medium upper case letters in black enamel paint stenciled on the vault cover. Contractor to coordinate with CDCR Representative type of identification for vault cover prior to submittal review. PART 3 EXECUTION 3.1 PREPARATION A. Degrease and clean surfaces to receive adhesive for identification materials. 3.2 VALVE AND EQUIPMENT IDENTIFICATION A. Designate all equipment, valves, dampers and terminal units by distinguishing numbers and letters on charts and/or diagrams. 1. Tag and locate following equipment items: a. Valves. b. Dampers. c. All items indicated on equipment schedules except registers, grilles and diffusers. 2. Designation shall match that indicated. B. Install tags on all devices with numbers and letters corresponding to charts. C. Fasten tags securely to devices with tag fasteners in manner for easy reading. D. Attach equipment nameplates in conspicuous location, directly on item of equipment or apparatus such as starters, pumps, fans, HVAC units and control panels. E. For unsuitable surfaces, such as high temperature or lack of space, use copper or brass rings or chains to attach tags. F. Furnish 4 charts. BID SET SEPTEMBER 28, 2011

5 1. Mount 1 chart in frame and secure on wall in location directed by CDCR Representative. 2. Include remaining 3 sets in Operation and Maintenance Manuals. 3. Show valve tag numbers on project as-built drawings. G. Provide safety sign for each piece of exposed mechanical equipment that may start automatically. Comply with the requirements of Section PIPE IDENTIFICATION A. Locate pipe markers as follows: 1. Next to each valve and fitting, except on plumbing fixtures and equipment. 2. At each branch or riser take off. 3. At each passage through walls, floors and ceilings. 4. At each pipe passage to underground. 5. On all horizontal pipe runs every 20 feet, at least once in each room and each story traversed by piping system. 6. Identify piping contents, flow direction, supply and return. B. Install markers with tape color bands over each end of marker, extending around pipe and overlapping a minimum of 30 degrees. 3.4 SERVICE ABBREVIATIONS A. Coordinate with CDCR Representative for preferred color schemes and service abbreviations as indicated below: 1. G (xxx psi) Natural Gas (indicate pressure). 2. REF Refrigerant (exposed) 3.5 INSTALLATION OF UNDERGROUND MARKING TAPE A. Install underground marking tape directly above all outside utility lines. B. Allow 12 inches between tape and line, and install as close to grade level as feasible. 3.6 CONTROL DIAGRAMS AND INSTRUCTIONS A. Provide HVAC control and systems instructions and diagrams in wall mounted frames. Mount framed diagrams in conspicuous, easily accessible places in equipment rooms housing appropriate HVAC system. B. Diagrams and instructions may be reduced in size provided they are legible and lettering is not smaller than elite type of standard typewriter. 3.7 DUCTWORK IDENTIFICATION A. Install self-adhesive duct labels with permanent adhesive on air ducts in the following color codes: 1. Blue: For cold-air supply ducts. 2. Yellow: For hot-air supply ducts. 3. Green: For exhaust-, outside-, relief-, return-, and mixed-air ducts. 4. ASME A13.1 Colors and Designs: For hazardous material exhaust. BID SET SEPTEMBER 28, 2011

6 B. Stenciled Duct Label Option: Stenciled labels, showing service and flow direction, may be provided instead of plastic-laminated duct labels, at Installer s option, if lettering larger than 1-inch high is needed for proper identification because of distance from normal location of required identification. C. Access doors: Provide duct labels or stenciled signs on each access door in ductwork and housings, indicating purpose of access (to what equipment) and other maintenance and operating instructions, and appropriate safety and procedural information. D. Concealed doors: Where access doors are concealed above acoustical ceilings or similar concealment, plasticized tags may be installed for identification in lieu of specified signs, at Installer s option. E. Access doors for fire-dampers, smoke dampers, and fire/smoke dampers: Permanently identify on the exterior by a label with letters not less than 1/2 inch in height reading FIRE DAMPER, SMOKE DAMPER, or FIRE/SMOKE DAMPER. Comply with requirements of CMC. END OF SECTION BID SET SEPTEMBER 28, 2011

Piping & Equipment Identification

Piping & Equipment Identification Piping & Equipment Identification Part 1 General 1.01 Description of Work A. Work in this section includes: Identification materials, including necessary accessories indicated on Contract Documents and

More information

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe markers. 5. Ceiling tacks. 6. Labels. 7. Lockout

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017 SECTION 23 0553 - MECHANICAL SYSTEMS IDENTIFICATION GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

B. Samples: For color, letter style, and graphic representation required for each identification material and device.

B. Samples: For color, letter style, and graphic representation required for each identification material and device. PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

More information

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section

More information

SECTION IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND EQUIPMENT

SECTION IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND EQUIPMENT SECTION 23 05 53 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Plastic Nameplates 2. Tags 3. Plastic Pipe Markers 4. Ceiling Tags 5. Detectable Underground Tape 6. Stencils PART 2 - PRODUCTS 2.1 MANUFACTURERS

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections:

More information

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Nameplates. B. Tags. C. Stencils. D. Pipe Markers. 1.2 RELATED REQUIREMENTS A. Section 099123 - Interior

More information

SECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

SECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers. SECTION 22 05 53 IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes nameplates, tags, stencils and pipe markers. B. Related Sections: 1. Section 09 05 00

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.

More information

SECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

SECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers. SECTION 23 05 53 IDENTIFICATION OF HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes nameplates, tags, stencils and pipe markers. B. Related Sections: 1. Section 09 05 00 Common

More information

Industrial Pipe Marking

Industrial Pipe Marking Industrial Pipe Marking Pipe and Valve Identification Specialists SPECIFICATIONS ASME (ANSI) Standard A13.1-2007 The ASME (ANSI) Standard for pipe identification is a widely used guideline in determining

More information

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT SECTION 21 05 53 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT Display hidden notes to specifier. (Don't know how? Click Here) Copyright 2015-2015 ARCAT, Inc. - All rights reserved PART 1 GENERAL

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION SECTION 15190 MECHANICAL IDENTIFICATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe Markers. 1.02 SUBMITTALS A. Submit valve chart and schedule,

More information

1. ASME A Scheme for the Identification of Piping Systems.

1. ASME A Scheme for the Identification of Piping Systems. SECTION 40 05 53 - IDENTIFICATION FOR PROCESS PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe markers. 5. Labels. 6. Lockout devices. B. Related Requirements:

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1.02 REFERENCES 1.

More information

SECTION COMMON WORK RESULTS FOR HVAC

SECTION COMMON WORK RESULTS FOR HVAC SECTION 23 05 00 COMMON WORK RESULTS FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Ball Valve. 2. Hangers and Supports. 3. Identification Tags and Sleeves. 1.2 INCLUDED SECTIONS A. Section

More information

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15. SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1. Section 09900 -

More information

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Assign unit identification numbers to operating units of equipment within a class or subclass during the design phase of new buildings, additions,

More information

A. Product Data: For each electrical identification product indicated.

A. Product Data: For each electrical identification product indicated. SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

IDENTIFICATION DEPOT, INC. 206 East Second Street Washington, NC PHONE FAX

IDENTIFICATION DEPOT, INC. 206 East Second Street Washington, NC PHONE FAX Engraved Plastic Nameplates 1/16 rigid 2 ply blended acrylic extruded sheet with cap and core permanently fused together. Material is shatterproof and chip resistant. Matte finish meets ASTM D 709 Type

More information

SECTION IDENTIFICATION DEVICES

SECTION IDENTIFICATION DEVICES SECTION 10 14 00 - IDENTIFICATION DEVICES PART 1-GENERAL 1.1 SUMMARY A. Section Includes: 1. Tag, tape and stenciling systems for equipment, piping, valves, pumps, ductwork and similar items, and hazard

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY Section 16195 A. This Section includes electrical identification for the following: 1. Nameplates and labels 2. Wire and cable markers 3. Conduit markers 4. Cable tray markers

More information

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15. SECTION 15190 MECHANICAL IDENTIFICATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Identification of mechanical products installed under Division 15. B. Related Sections: 1. Section 09900 -

More information

Page PRODUCT DESCRIPTION

Page PRODUCT DESCRIPTION Page 1 2004-02-29 PRODUCT FEATURES BASIC USES / RELATED USES Identification bands or markings for facility piping. BradySnap-On / Strap-On Vinyl: For normal duty, mechanically fastened. Custom or Blank

More information

Page PRODUCT DESCRIPTION

Page PRODUCT DESCRIPTION Page 1 2003-02-26 PRODUCT FEATURES! BASIC USES / RELATED USES " Identification bands or markings for facility piping. # (Ultra-mark) Wrap-Around Polyester: For harsh environments, outdoor piping systems,

More information

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700 SECTION 23 3113 - LOW PRESSURE DUCTWORK PART 1 - GENERAL 1.1 SCOPE OF WORK: A. The work required under this section includes all work necessary for a complete installation of ductwork and accessories.

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION-16075 ELECTRICAL IDENTIFICATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Electrical identification to identify all electrical items for easy operation and maintenance including, but not limited

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

A. Submit properly identified manufacturer's literature before starting work.

A. Submit properly identified manufacturer's literature before starting work. SECTION 10400 IDENTIFYING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor and materials required for installation of plaque, school name and address numbers, directional signage, signage

More information

LOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing.

LOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing. SECTION 15841 LOW PRESSURE STEEL DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15180 - Mechanical Systems Insulation. 2. 15940 - Outlets (HVAC). 3. 15991 - Testing and Balancing. 1.02 SUBMITTALS

More information

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows. SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation

More information

SECTION IDENTIFYING DEVICES

SECTION IDENTIFYING DEVICES SECTION 10400 IDENTIFYING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor and materials required for installation of plaque, school name and address numbers, directional signage, signage

More information

Electrical Identification

Electrical Identification Electrical Identification i n n o v a t i o n y o u c a n i d e n t i f y w i t h. MARKING SERVICES INCORPORATED 8 0 0. 2 3 4. 0 1 3 5 8 0 0. 6 2 7. 6 4 3 2 F A X m a r k s e r v. c o m s a l e s @ m a

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

SECTION LOW PRESSURE DUCTWORK

SECTION LOW PRESSURE DUCTWORK SECTION 15841 LOW PRESSURE DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 07270 - Firestopping and Fire and Smoke Barrier Caulking. 2. 15260 - Vibration Isolation. 3. 15280 - Thermal Insulation

More information

Page PRODUCT DESCRIPTION

Page PRODUCT DESCRIPTION Page 1 2004-02-29 PRODUCT FEATURES BASIC USES / RELATED USES Self-adhesive identification bands or markings for facility piping, Self-StickingVinyl Weather-Code Outdoor Pipe Markers Medical Gas Pipe Markers

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 101400 - SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and supplementary Conditions and Division-1 Specification Sections,

More information

SECTION SIGNAGE

SECTION SIGNAGE SECTION 10 14 00 SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-1 specification section, apply

More information

Ductwork Controls and Instrumentation Outlets (HVAC) HVAC Control System.

Ductwork Controls and Instrumentation Outlets (HVAC) HVAC Control System. SECTION 15910 DUCT ACCESSORIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15890 - Ductwork. 2. 15900 - Controls and Instrumentation. 3. 15940 - Outlets (HVAC). 4. 15970 - HVAC Control System.

More information

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations. General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings

More information

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM). PART 1 - GENERAL 1.1 SECTION INCLUDES A. Benches. B. Trash receptacles. C. Bike storage. 1.2 REFERENCE STANDARDS A. Including but not limited to: 1. American Society for Testing and Materials (ASTM). 1.3

More information

The School District of Palm Beach County Project Name SDPBC Project No. SECTION ( ) SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS

The School District of Palm Beach County Project Name SDPBC Project No. SECTION ( ) SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 10441 (10 14 00) SIGNAGE A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-1 specification section,

More information

*********************************************************************************************************

********************************************************************************************************* 10400 IDENTIFYING DEVICES ********************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 10 14 00 *********************************************************************************************************

More information

Design and Construction Standards SECTION ATHLETIC LOCKERS

Design and Construction Standards SECTION ATHLETIC LOCKERS SECTION 10505 ATHLETIC LOCKERS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The provisions of the General Conditions, Supplementary Conditions, and the Sections included under Division 1, General Requirements,

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

TO WHOM IT MAY CONCERN:

TO WHOM IT MAY CONCERN: TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit

More information

SECTION INTERIOR SIGNAGE

SECTION INTERIOR SIGNAGE SECTION 10 14 02 INTERIOR SIGNAGE PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by

More information

1. State that all workmanship must conform to all pertinent laws, ordinances and regulations of all bodies having jurisdiction.

1. State that all workmanship must conform to all pertinent laws, ordinances and regulations of all bodies having jurisdiction. SECTION 230800 GENERAL MECHANICAL REQUIREMENTS 1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: A. General 1. Incorporate,

More information

SECTION PAINTS AND COATINGS

SECTION PAINTS AND COATINGS SECTION 09 90 00 PAINTS AND COATINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Surface preparation. B. Field application of paints and other coatings. 1.2 RELATED SECTIONS A. Division 05 - Metal Fabrications.

More information

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers

More information

SECTION BATHROOM ACCESSORIES

SECTION BATHROOM ACCESSORIES SECTION 10-20-00 BATHROOM ACCESSORIES PART 1 GENERAL 1.01 SCOPE OF WORK A. Include all supplied materials, to complete the work of the above referenced section. 1. SCS to supply bathroom accessories, Finish

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION

More information

SECTION IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY

SECTION IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY SECTION 280553-IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION A. This specification section covers the furnishing and installation of nameplates, labels, wire markers,

More information

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

SCI-FAB Product Specifications. Casework Section 1. Part 1 General SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.

More information

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS DIVISION 23 FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS Part I General 1.1 Related Documents A. All terms and general provisions of contract, General and Supplementary Conditions, and Specification

More information

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410 DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original

More information

PRODUCT DATA CATALOG

PRODUCT DATA CATALOG PRODUCT DATA CATALOG CONTENTS PAGE STANDARD ELEVATIONS 2 STANDARD ELEVATIONS 3 DOOR SPECIFICATIONS 4 LOUVER SPECIFICATIONS 5 GLAZING SPECIFICATIONS 5 DOOR HANDING CHART 6 CLINE STANDARD HARDWARE LOCATIONS

More information

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1 GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers

More information

SECTION SHEET METAL FLASHING AND TRIM

SECTION SHEET METAL FLASHING AND TRIM SECTION 07620 PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Formed roof drainage sheet metal fabrications. 2. Formed low-slope roof sheet metal fabrications. 1.2 SUBMITTALS A. Shop Drawings: Show

More information

Industrial and Transportation Business DISTRIBUTOR PRODUCT LINE

Industrial and Transportation Business DISTRIBUTOR PRODUCT LINE Industrial and Transportation Business DISTRIBUTOR PRODUCT LINE 3900 DUCT TAPE 3900 DUCT TAPE MRO (Maintenance and Repair) Construction Trade Shows and Conventions General Industrial Electrical Aerospace

More information

PRODUCT DATA CATALOG

PRODUCT DATA CATALOG PRODUCT DATA CATALOG CONTENTS PAGE STANDARD ELEVATIONS 2 STANDARD ELEVATIONS 3 DOOR SPECIFICATIONS 4 LOUVER SPECIFICATIONS 5 GLAZING SPECIFICATIONS 5 DOOR HANDING CHART 6 CLINE STANDARD HARDWARE LOCATIONS

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

Mobile Weapons Storage System Specifications

Mobile Weapons Storage System Specifications Mobile Weapons Storage System Specifications Whatever your weapon storage needs, Hi-Density s customized Weapons Storage System will be designed to fit your unique specifications. We recognize that security

More information

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. 1.2 RELATED WORK SPECIFIED ELSEWHERE.1 Installation

More information

A. It is preferred that all submittals to be submitted electronically in PDF format.

A. It is preferred that all submittals to be submitted electronically in PDF format. June 20 2013, Rev 00 10 2800 Toilet, Bath, and Laundry Accessories PART 1. GENERAL 1.01 This Section includes: A. Toilet room accessories: 1.02 Submittals 1. Grab bars 2. Metal framed mirrors 3. Sanitary

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)... INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...

More information

PLANNED SIGN PROGRAM CHECKLIST

PLANNED SIGN PROGRAM CHECKLIST Planning and Building Agency Planning Division 20 Civic Center Plaza P.O. Box 1988 (M-20) Santa Ana, CA 92702 (714) 647-5804 PLANNED SIGN PROGRAM CHECKLIST Applicant, please return this checklist with

More information

CONTINUING EDUC ATION

CONTINUING EDUC ATION 3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com

More information

A. Submit manufacturer's technical data and installation for each type of sign required.

A. Submit manufacturer's technical data and installation for each type of sign required. SECTION 10425 PART ONE GENERAL 1.1 SECTION INCLUDES A. Interior Building Signage. B. Handicapped parking signs. C. Permanent Project Sign. 1.2 DESCRIPTION A. Signage shall consist of room number and room

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018 SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS A. Drawings and General Provisions of Contract, including General and Supplementary Conditions and

More information

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available. SECTION 105113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Model ABV Pressure Independent Automatic Balancing Valve. Application: Standard Construction: Performance: Configurations Available:

Model ABV Pressure Independent Automatic Balancing Valve. Application: Standard Construction: Performance: Configurations Available: Application: Tag: Project: Location: Date: Engineer: Contractor: Architect: Submitted by: The ABV Automatic maintains a constant airflow volume in HVAC applications. The highly engineered damper blade

More information

Installation and Maintenance Manual IM 770-1

Installation and Maintenance Manual IM 770-1 Installation and Maintenance Manual IM 770-1 Group: Applied Air Systems Part Number: IM 770 Date: March 2014 Skyline Outdoor Air Handler Roof Curb Table of Contents General Description... 3 Curb-Ready

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION METAL LOCKERS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION METAL LOCKERS PART 0 A/E INSTRUCTIONS 0.01 GENERAL DESIGN REQUIREMENTS A. Architect shall coordinate with the DPS Project Manager the type, layout and size of lockers required on the project. B. Varsity athletic Lockers

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

SECTION LABORATORY CASEWORK AND EQUIPMENT

SECTION LABORATORY CASEWORK AND EQUIPMENT PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 12 35 53 LABORATORY CASEWORK AND EQUIPMENT A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-10 51 13 (May 2011) ------------------------- Preparing Activity: NAVFAC Superseding UFGS-10 51 13 (July 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

SECTION PLUMBING FIXTURES

SECTION PLUMBING FIXTURES SECTION 224000 - PLUMBING FIXTURES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes 1. Faucets for lavatories and sinks. 2. Flushometers. 3. Toilet seats. 4. Protective shielding guards. 5. Fixture

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

GE Monogram. Installation. Instructions. 36" Vent Hood. Model ZV750. Call anywhere in the US and Canada -

GE Monogram. Installation. Instructions. 36 Vent Hood. Model ZV750. Call anywhere in the US and Canada - at :: rangehoods. com GE Monogram Instructions Model ZV750 GE Monogram at:: rangehoods. com is a division of CAUTION WARNING Before you begin Read these instructions completely and carefully. IMPORTANT:

More information

Product Guide Specification

Product Guide Specification Product Guide Specification Specifier Notes: This product guide specification is written according to the Construction Specifications Institute (CSI) 3-Part Format, including MasterFormat, SectionFormat,

More information

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1 ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,

More information

MANUFACTURING INC. Specifications

MANUFACTURING INC. Specifications Page 1 of 4 GENERAL 11 Aluminum security screen doors must be tested by a recognized testing laboratory to conform to SMA 6001-2002 Proposed American National Standard Specifications for Metal Protection

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Symphony II Adaptable Table System

Symphony II Adaptable Table System Symphony II Adaptable Table System 1.00 General 1.01 Conditions 1.02 Scope of work 1. This section covers all materials, equipment, tools and labor for the supply and installation of the laboratory Symphony

More information

SECTION PRECAST CONCRETE STRUCTURES

SECTION PRECAST CONCRETE STRUCTURES SECTION 02605 PRECAST CONCRETE STRUCTURES PART 1 GENERAL 1.01 DESCRIPTION A. CONTRACTOR shall provide all professional services, labor, materials, equipment and incidentals as shown, specified and required

More information

NORTHWEST FLORIDA STATE COLLEGE MONUMENT SIGNS WITH LED DISPLAYS

NORTHWEST FLORIDA STATE COLLEGE MONUMENT SIGNS WITH LED DISPLAYS PREPARED FOR: FOUNDATION PLAN & STRUCTURAL NOTES DESIGNED BY: NJB DRAWN BY: NJB REVIEWED BY: BLSE S1 PREPARED FOR: FRAMING PLANS DESIGNED BY: NJB DRAWN BY: NJB REVIEWED BY: BLSE S2 PREPARED FOR: SECTION

More information