ROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL

Size: px
Start display at page:

Download "ROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL"

Transcription

1 ROBERT TURER COLLEGE AD CAREER HIGH SCHOOL SCHEMATIC DESIG PRESETATIO 23 MAY 2017

2 Project Milestones Schematic Design..... March May 2017 SD Presentation to Board of Trustees May, 2017 Design Development.... May August 2017 Construction Documents August December 2017 Construction Begins... February 2018 Construction Substantial Completion... March 2019

3 1. Project Scope

4 Bond Scope Diagram Culinary Addition Health Science Renovation Security Vestibule Ag Barn Renovation HVAC and Welding Renovation of Classrooms into Computer Labs

5 2. Site Plan

6 Site Diagram TURER HIGH SCHOOL CAMPUS

7 Site Use Diagram ATHLETICS H.S. AG. PARKIG PARKIG PRACT. GRAZIG

8 Site Use Diagram ATHLETICS PROPOSED AREA H.S. AG. PARKIG PARKIG PRACT. GRAZIG

9 Site Diagram Storm Sewer Concessions and Restroom access Exit Stair Athletics Access Exit Stair Athletics Access Vet Med access CTE entry

10 Proposed Site Plan Future Expansion Service Yard ew Welding and HVAC Program ew Culinary Program Relocated Handicap Parking Ag Barn Expansion Practice Field Grazing

11 3 Design Proposals

12 Existing Overall Plan First Floor Plan Science Kitchen Classrooms Classrooms Health Science JUIOR HIGH SOUTH (ot In Scope) Dining Classrooms Athletics CTE Vet Clinic Library Theatre Gym Gym CTE Dental Auditorium Stage Choir Assistant Principal Counselor Principal Reception Band

13 Proposed Overall Plan First Floor Plan Science PROPOSED WELDIG LAB Kitchen Classrooms REOVATED HEALTH SCIECE Classrooms PROPOSED HVAC LAB JUIOR HIGH SOUTH (ot In Scope) Dining Classrooms Athletics CTE Vet Clinic Library CTE Dental Theatre Gym Gym PROPOSED CULIARY ARTS Auditorium Stage Choir Assistant Principal Counselor Principal Reception Band

14 Proposed Overall Plan Second Floor Plan Science Classroom Mech Existing Computer Labs Classroom Stair Mech Classroom Mech Existing Computer Labs

15 Proposed Overall Plan Second Floor Plan Science Classroom Classroom Mech Stair Mech REOVATED COMPUTER LABS (MIOR UPGRADES) REOVATED COMPUTER LABS (EXISTIG CLASSROOMS) Classroom Mech Existing Computer Labs

16 3.1 Culinary Arts

17 Adjacency Diagram LAB SUPPORT DIIG LAB LAB CLASSROOM The Guthrie Center Spring Branch ISD

18 Proposed CTE Culinary Arts LAUDRY 70 SF LIE 80 SF EQUIPMET STOR. 360 SF EXISTIG VET CLIIC EXISTIG CORRIDOR DRY STORAGE 400 SF COOLER FREEZER 200 SF 206 SF WASH. 450 SF EXISTIG DETAL CLASSRM/ OFFICES 760 SF PASTRY STORAGE 125 SF PASTRY LAB 875 SF CLASSRM/ OFFICES 760 SF CULIARY LAB 1060 SF MECH/ SUPPORT 1100 SF W M CLASSRM/ OFFICES 760 SF CULIARY LAB 1100 SF CAFÉ 660 SF OUTDOOR DIIG ETRY DIIG 1600 SF (SEATS APPROX PEOPLE) CULIARY LAB 1100 SF STORAGE 168 SF SERVIG 375 SF

19 Proposed CTE Culinary Arts LAUDRY 70 SF LIE 80 SF EQUIPMET STOR. 360 SF EXISTIG VET CLIIC EXISTIG CORRIDOR DRY STORAGE 400 SF COOLER FREEZER 200 SF 206 SF WASH. 450 SF PASTRY STORAGE 125 SF EXISTIG DETAL PASTRY LAB 875 SF CULIARY LAB 1060 SF MECH/ SUPPORT 1100 SF W M CULIARY LAB 1100 SF CAFÉ 660 SF OUTDOOR DIIG ETRY DIIG 1600 SF (SEATS APPROX PEOPLE) CULIARY LAB 1100 SF STORAGE 168 SF SERVIG 375 SF

20 Proposed CTE Culinary Arts LAUDRY 70 SF LIE 80 SF EQUIPMET STOR. 360 SF EXISTIG VET CLIIC EXISTIG CORRIDOR DRY STORAGE 400 SF COOLER FREEZER 200 SF 206 SF WASH. 450 SF PASTRY STORAGE 125 SF EXISTIG DETAL PASTRY LAB 875 SF CULIARY LAB 1060 SF MECH/ SUPPORT 1100 SF W M CULIARY LAB 1100 SF CAFÉ 660 SF OUTDOOR DIIG ETRY DIIG 5000 SF (SEATS APPROX. 300 PEOPLE) CULIARY LAB 1100 SF STORAGE 168 SF SERVIG 375 SF

21 3.2 Welding & HVAC Labs

22 Proposed CTE Welding & HVAC Labs ETRY DATA 170 SF ELECTRICAL 170 SF EQUIP. STOR 925 SF CLASSROOM WELDIG 950 SF LAB 1130 SF GAS STORAGE PPE 235 SF OFFICE 173 SF MAKER SPACE 4440 SF WELDIG YARD EXISTIG BUILDIG METAL STORAGE 750 SF STORAGE 335 SF STORAGE 545 SF WELDIG LAB 1130 SF CLASSROOM 840 SF BRAZIG & SOLDERIG 265 SF OFFICE 125 SF COMPUTER LAB 1090 SF HVAC LAB 3600 SF HVAC YARD HVAC UITS AREA EXISTIG BUILDIG

23 3.3 Ag Barn

24 Existing Ag EXISTIG HVAC EXISTIG STORAGE BUILDIG EXISTIG MECH EXISTIG LAMB & GOAT EXISTIG CLASSROOMS EXISTIG MES RESTROOM EXISTIG COCESSIO EXISTIG SHOP EXISTIG WOMES RESTROOM EXISTIG SEATIG CAPACITY: 340 TOTAL SEATS EXISTIG SWIE EXISTIG CATTLE

25 Proposed Ag EXISTIG MECH EXISTIG CLASSROOMS EXISTIG PORTABLE EXISTIG STORAGE EXISTIG BUILDIG STORAGE PORTABLE PROPOSED REOVATED ORTH SWIE WITH EW LOCKERS AD WASH STATIOS EXISTIG ME EXISTIG COCESSIO EXISTIG SHOP EXISTIG WOME PROPOSED SEATIG CAPACITY: 560 TOTAL SEATS PROPOSED REOVATED EAST SWIE WITH EW LOCKERS, WASH STATIOS AD COVERED EXERCISE AREA REOVATED CATTLE WITH EW LOCKERS AD WASH STATIOS PROPOSED EW LAMB & GOAT WITH EW LOCKERS AD WASH STATIOS

26 3.4 Health Science

27 Existing Health Science BUILDI SUPPORT 87 SF SHOWERS/ RESTROOMS LOCKER ROOMS 1000 SF STOR. STORAGE VEST VEST CUST. OFFICE STORAGE 110 SF 100 SF HEALTH SCIECE 1400 SF

28 Proposed Health Science ISTRUCTIOAL ADA TOILET & SHOWER 120 SF BUILDI SUPPORT 87 SF STORAGE 120 SF SCHOOL STORAGE 735 SF OBSERVATIO WIDOW LAUDRY 72 SF (3) LARGE BASIS WITH (2) TAPS EACH CUST. OFFICE 110 SF HEALTH SCIECE 2300

29 3.5 Security Vestibule

30 Existing Security Vestibule Stair Security Attendance Couns Couns Couns Waiting Couns Couns AP Waiting AP Reception Mail Conference AP Sec Kitchen Copy AP Principal Supply Stor AP Bookkeeper Conference Data IT/Rec/ Stor Elec

31 Proposed Security Vestibule Stair Security Attendance Couns Couns Couns Waiting Couns Couns AP Waiting Waiting AP TRASACTIO WIDOW Rec Mail Conference AP Sec Kitchen Copy AP Security vestibule Principal Supply Stor AP Bookkeeper Conference Data IT/Rec/ Stor Elec

32 4 Exterior Development

33 Existing Exterior

34 Proposed Exterior at Culinary Arts

35 Proposed Exterior at Culinary Arts

36 Existing Exterior

37 Proposed Exterior at Welding & HVAC Labs

38 Questions?

EXISTING SITE PLAN. Consultants: Civil: Evans Engineering, Inc Old Post Rd. Harrisburg, PA (717) Harrisburg, PA 17110

EXISTING SITE PLAN. Consultants: Civil: Evans Engineering, Inc Old Post Rd. Harrisburg, PA (717) Harrisburg, PA 17110 330 orth Third St. Architecture Renovations to: O. DESCRIPTIO DATE SGA PROJECT UMBER: EXISTIG SITE PLA Drawing umber: EX00 SCHEMATIC DESIG D D0 OFFICIAL'SVESTIBULE LOCKER D03 D04 D02 COACHES D05 GYMASIUM

More information

PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017

PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017 PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017 ARCHITECTURE \\ ENGINEERING \\ PLANNING \\ INTERIORS \\ TECHNOLOGY

More information

Harding Senior High School

Harding Senior High School 1540 Sixth Street East Project Summary:, located in the Eastview area of St. Paul, offers students in grades 9 through 12 a wide range of curriculum options ranging from International Baccalaureate to

More information

ouglas Intermediate School

ouglas Intermediate School ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion

More information

Southern Oregon University

Southern Oregon University Southern Oregon University Public Meeting Notice August 5, 05 TO: FROM: RE: Southern Oregon University Board of Trustees, Finance Committee Sabrina Prud homme, University Board Secretary Notice of special

More information

MEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013

MEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013 Seattle World School SWS SDAT Workshop 3 2 December 203 SPS SWS at TT Minor TCF Architecture Project Number: 203 002 MEETING MINUTES Attendance: Name Representing Role Paul Wight Seattle Public Schools

More information

CORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS)

CORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS) Classrooms 2-3 scientists Morrison Maierle Classrooms K-1 Specials 146 planners Support surveyors 870 SF RR 147 148 RR 149 engineers 839 SF 150 COPYRIGHT (C) MORRISON-MAIERLE, INC., 2017 Admin Phone: 406.752.2216

More information

Horace Mann Elementary

Horace Mann Elementary 2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are

More information

Town of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019

Town of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019 Town of Belmont, NH Town Space Needs and Feasibility Study January 10, 2019 Police Department EXISTING POLICE DEPARTMENT FULLER STREET MEETING HOUSE SARGENT STREET TOWN OF BELMONT POLICE DEPARTMENT EXISTING

More information

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12

More information

St. John Paul II Catholic Parish

St. John Paul II Catholic Parish St. John Paul II Catholic Parish 167th & Ridgeview Road Olathe, Kansas Master Plan Town Hall October 30, 2018 Purpose [ The Church s ] mission consists essentially in offering people an opportunity not

More information

Continuing Education Credit

Continuing Education Credit BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP

More information

Ashby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update

Ashby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update Ashby, Pepperell, Townsend North Middlesex Regional High School Feasibility Study Update June 6, 2013 AGENDA Preliminary Design Program (PDP) District Capacity Analysis Preferred Schematic Report (PSR)

More information

Cherokee Heights Elementary School

Cherokee Heights Elementary School 694 Charlton Street Project Summary: Cherokee Heights Elementary is about to start its exciting transition to a Montessori learning model. The school is connected to the Baker Center which is currently

More information

Space Needs Summary: SPS/Health Center

Space Needs Summary: SPS/Health Center 3.3.1 Program Summary: SPS/Health Center 167 Space Needs Summary: SPS/Health Center PROGRAM ELEMENT PROPOSED NOTES No. (N) Type Name s Area Sub. ASF Total ASF STN. 10.0 Special Programs & Services / Project

More information

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:

More information

1001 Feehanville Drive Phone Mt. Prospect, IL Fax

1001 Feehanville Drive Phone Mt. Prospect, IL Fax NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 November 29, 2016 Community Unit School District 200 130 West Park Avenue Wheaton, IL 60189

More information

GAZEBO BELMONT PUBLIC LIBRARY MAIN STREET TOWN OF BELMONT TOWN HALL 12/14/2018 EXISTING CONDITIONS

GAZEBO BELMONT PUBLIC LIBRARY MAIN STREET TOWN OF BELMONT TOWN HALL 12/14/2018 EXISTING CONDITIONS GAZEBO BELMONT LIBRARY STREET TOWN OF BELMONT TOWN HALL EXISTING CONDITIONS DRIVING LANE 6 4 WELLFARE 378 SF TOWN CLERK 800 SF LOBBY 256 SF COMMON SPACES 665 SF LG MEETING RM 600 SF DRIVING LANE TOWN ADMIN.

More information

COMPONENT FLOW CHART & SEQUENCING DIAGRAMS

COMPONENT FLOW CHART & SEQUENCING DIAGRAMS Oak Park and River Forest High School Master Facilities Plan COMPONENT FLOW CHART & SEQUENCING DIAGRAMS The following is a narrative intended to accompany the component flow chart and sequencing diagrams

More information

Allan Hancock College

Allan Hancock College Allan Hancock College Project Planning Board Workshop February 17, 2009 Agenda Objective Funding Allocation Space Demand Analysis Project Overview Bond Measure I Program Schedule Charge: To review funding

More information

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program

More information

Bartlett High School MASTER PLAN May 25, 2017

Bartlett High School MASTER PLAN May 25, 2017 Bartlett High School MASTER PLAN May 25, 2017 Facility Assessment Summary I. I.1 - Site Appraisal Site Appraisal The current high school was built in multiple phases, which presents challenges in layout

More information

BASEBALL PLAYER FACILITIES CLEMSON, SOUTH CAROLINA

BASEBALL PLAYER FACILITIES CLEMSON, SOUTH CAROLINA THROUGH THE YEARS THROUGH THE YEARS VIEW FROM RIGHT FIELD VIEW FROM DUGOUT VIEW FROM NEW GRANDSTAND EXISTING CONDITIONS EXTERIOR PHOTOS PLAYER S LOUNGE LOCKER ROOM TRAINING AREA COACH S OFFICE CORRIDOR

More information

John A Johnson Elementary School

John A Johnson Elementary School 740 York Avenue Project Summary: An Acheivement Plus school John A Johnson is located adjacent to the East Side YMCA, jointly serving their communities educational, recreation, and wellness needs. The

More information

Linwood Monroe Upper 810 Palace Avenue

Linwood Monroe Upper 810 Palace Avenue 810 Palace Avenue Project Summary: Spanning a child s first classroom experience all the way through middle school, Linwood Monroe s Plus lays a foundation for creativity and exploration in the arts. Accelerated

More information

RAINIER STATION FINAL DESIGN

RAINIER STATION FINAL DESIGN RAIIER STATIO FIAL DESIG EAST LIK EXTESIO West entry perspective from Rainier Avenue South West upper plaza perspective from upper concourse September 213 RAIIER STATIO FIAL DESIG EAST LIK EXTESIO West

More information

11/29/12. Des Moines Social Club Urban Design Review Project Narrative

11/29/12. Des Moines Social Club Urban Design Review Project Narrative 11/9/1 Des Moines Social Club Urban Design Review Project Narrative Strategically located at 9th and Walnut, the Des Moines Social Club (DMSC) will become a critical link between the Court Avenue Entertainment

More information

DRAFT FOR INTERNAL DISCUSSION ONLY

DRAFT FOR INTERNAL DISCUSSION ONLY Jameson St. 2 Riser Room Cistern Base Men's Locker Room Women's Locker Room Mud Room Stair Elev. Entry Lobby Shipping and Receiving Stair EO/IO Breakdown A40 Shop / Warehouse Alley Gilman Pl. Storage Room

More information

GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS

GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are made to the University's Board of Trustees in February,

More information

AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes

AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes Meeting No. 4 Date: 5/12/2018 Job No. Meeting Location: AVS Conference Room The following notes were taken during a meeting on

More information

KIRKWOOD PERFORMING ARTS CENTER SITE PLAN

KIRKWOOD PERFORMING ARTS CENTER SITE PLAN MOROE AVEUE PARKIG - 15 SPACES (6 ACCESSIBLE) TAYLOR AVEUE EVET LAW TRASH LOADIG DOCK DRIVE FILLMORE AVEUE 5' 1' 2' 4' 6" 1" = 2' SITE PLA SCALE: 1" = 2'-" 197' - 8" 52' - 3" 32' - 6" 78' - 8" 34' - 4"

More information

CONCEPT SITE PLAN HOLLAND MIDDLE SCHOOL ADDITIONS & RENOVATIONS COUNCIL ROCK SCHOOL DISTRICT 400 EAST HOLLAND ROAD HOLLAND, PA 18966

CONCEPT SITE PLAN HOLLAND MIDDLE SCHOOL ADDITIONS & RENOVATIONS COUNCIL ROCK SCHOOL DISTRICT 400 EAST HOLLAND ROAD HOLLAND, PA 18966 COCEPT SITE PLA Scale: MECH. BAD CHORAL PRIC. SEC. COF. COPY/MAIL/ WORK MAI CLER. URSE SUITE COF. U. CLASS KITCHE TECH. TECH. CLASS CLASS STAGE AUDITORIUM 450 seats COTROL LARGE GRO 1150 SF CLASS LOBBY

More information

COPYRIGHT ARCHITECT SUSAN DESKO-AIA

COPYRIGHT ARCHITECT SUSAN DESKO-AIA B:\03 ACAD Files\2 200.02.2 This Is It\DESIGN REVIEW\DR-0-.dwg 7/3/200 0:4 AM COVERED DROP-OFF 2 RECEPTION 3 LOBBY [2,800 SF] 4 WAITING AREA [450 SF] 5 FRONT DOOR & PATIO 6 VESTIBULE & AFTER HOURS ELEVATOR

More information

CITY CENTRE DOWNTOWN ORLANDO DEVELOPMENTS HPA

CITY CENTRE DOWNTOWN ORLANDO DEVELOPMENTS HPA PERSPECTIVE D A LLAS EW YORK CHICAGO EW ORLEAS ORLADO EDMOTO SA RAMO EWPORT BEACH SCOTTSDALE TOROTO CHEAI DUBA I HAOI MOTEVIDEO PERSPECTIVE D A LLAS EW YORK CHICAGO EW ORLEAS ORLADO EDMOTO SA RAMO EWPORT

More information

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015 275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.

More information

WORKSHOP #2. February 24th, 2010 PORTLAND COMMUNITY COLLEGE. Southeast Campus. February 24th, 2010

WORKSHOP #2. February 24th, 2010 PORTLAND COMMUNITY COLLEGE. Southeast Campus. February 24th, 2010 WORKSHOP #2 Southeast Campus AGENDA Visioning Common Themes Design Principles Community Outreach Review Chinese New Year Celebration Campus Planning Programming Next Steps Analysis Planning Goals Campus

More information

Elementary Campus Board Meeting

Elementary Campus Board Meeting Elementary Campus - McFarland, WI Elementary Campus Board Meeting April 17, 2017 2017 Plunkett Raysich Architects, LLP 13 April 2017 # 140062-05 891.46 890.98 891.10 891.82 892.91 892.29 892.08 891.39

More information

EXISTING BUILDING REMODEL

EXISTING BUILDING REMODEL BUILDIG REMODEL LOT 5, BRIDGEPOITE ETER BUILDIG AREA ALULATIOS BUILDIG OSTRUTIO AD LASSIFIATIO: OAY GRO - M (MERATILE, GEERAL RETAIL) FULLY SPRIKLERED - -STORY TYPE OF OSTRUTIO - IIB MAXIMUM BUILDIG HEIGHT

More information

CBE Recommendation: Outdoor Track & Field Complex

CBE Recommendation: Outdoor Track & Field Complex COUNCIL FOR THE BUlL T ENVIRONMENT Co-Chairs: Dr. Karan L. Watson, Provost and Executive Vice President Dr. Jerry R. Strawser, Vice President for Finance and Administration March 31, 2016 MEMORANDUM TO:

More information

Request for Proposal: Wireless System

Request for Proposal: Wireless System Request for Proposal: Wireless System February 24, 2016 Elkhorn Public Schools 20650 Glenn Street Elkhorn, NE 68022 Erate Identifier: Cat2.2016Wireless 1 Table of Contents Overview...3 1.1 Description

More information

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM:

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM: 4900 Lang Ave NE Albuquerque, NM 87109 505-348-4000 phone 505-348-4055 fax Meeting Minutes Project: Valley View Elementary School Owner: Valley View Public Schools / PSFA Albuquerque Colorado Springs Denver

More information

March 23, 2015 Total Project Cost 18,553,027

March 23, 2015 Total Project Cost 18,553,027 Executive Summary Charles City CSD Middle School Addition 25% CD Up April 3, 205 Project Approach This up to be considered recap of changes since March 23, 205 budget. It is intended to reflect significant

More information

ASSIGNMENT 04: Library Massing + Program

ASSIGNMENT 04: Library Massing + Program ASSIGNMENT 04: Library Massing + Program THE IMPORTANCE OF PROGRAM AND MASSING DIAGRAMMING: Program and Massing diagrams are critical tools used to visually describe the relationship between the way a

More information

FIRE ALARM GENERAL NOTES

FIRE ALARM GENERAL NOTES FIRE ALARM EQUIPMET LIST FIRE ALARM (FOR REFERECE OLY) (EXISTIG) SEQUECE OF OPERATIO LIST OF APPLICABLE CODES AD STADARDS FIRE ALARM SCOPE OF DEFERRED APPROVAL OTES: APPLICABLE STADARDS FIRE ALARM SHEET

More information

FAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN

FAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN KBE APPROVAL DATE: APRIL 2017 FAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN DFP REVISIONS FINDING. NO. 1: APRIL 2018 BOLD NEXT DFP DUE: APRIL 2021 PLAN OF SCHOOL ORGANIZATION 1. Current Plan P, P-5, K-5,

More information

A-1. CDP and Use Permit Amendment. Title Sheet. the. Attachment. 1. Railing a soffit: trex Composite d in tree hous. 2. storefro BRonze ano aluminum F

A-1. CDP and Use Permit Amendment. Title Sheet. the. Attachment. 1. Railing a soffit: trex Composite d in tree hous. 2. storefro BRonze ano aluminum F the Arri. Railing a soffit: trex Composite d in tree hous. storefro BRonze ano aluminum F 3. glulam t Wood stain White (sw3 4. landscap Walls: Boa ConCRete 5. exterior a Wall: shou Ban Wood p CDP and Use

More information

ELLIS. Ellis Research Center PROPERTY HIGHLIGHTS BRIAN CARR, CCIM LEE CLYBURN. Research Triangle Park North Carolina.

ELLIS. Ellis Research Center PROPERTY HIGHLIGHTS BRIAN CARR, CCIM LEE CLYBURN. Research Triangle Park North Carolina. ELLIS Research Triangle Park North Carolina Ellis Research Center Office and Lab PROPERTY HIGHLIGHTS 2400 Ellis Rd RTP, NC 27709 Size 331,898 RSF Floors 4 Parking Power 519 Shared parking spaces 480/277

More information

MEMORANDUM. March 31, President Michael K. Young President, Texas A&M University TO: CBE Recommendation: Softball Complex SUBJECT:

MEMORANDUM. March 31, President Michael K. Young President, Texas A&M University TO: CBE Recommendation: Softball Complex SUBJECT: COUNCIL FOR THE BUlL T ENVIRONMENT Co-Chairs: Dr. Karan L. Watson, Provost and Executive Vice President Dr. Jerry R. Strawser, Vice President for Finance and Administration March 31, 2016 MEMORANDUM TO:

More information

RFQ Question and Answer List State of Ohio Standard Forms and Documents

RFQ Question and Answer List State of Ohio Standard Forms and Documents RFQ Question and Answer List State of Ohio Standard Forms and Documents Project Name University Hall Renovation Project Number BGU-565 Project Location Bowling Green State University Date posted: June

More information

Jackie Robinson Elementary School

Jackie Robinson Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

CAC MEETING, FEB. 28 TH, 2017 NADAAA

CAC MEETING, FEB. 28 TH, 2017 NADAAA ADAMS STREET BRANCH LIBRARY PROGRAMMING STUDY FOR CITY OF BOSTON BOSTON PUBLIC LIBRARY AND PUBLIC FACILITY DEPARTMENT CAC MEETING, FEB. 28 TH, 2017 NADAAA 1 AGENDA 1.0 SCHEDULE 2.0 SUMMARY OF PROJECT GOAL

More information

FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes

FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes Meeting Date: 15 March 2018 9:30 AM Meeting Location: Rock Creek School, Media Center Current Design Phase: Schematic

More information

GREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM

GREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM Date of Meeting: March 20, 2014 GREENWICH PUBLIC SCHOOLS Greenwich, Connecticut Title of Item: New Lebanon School Pre-Feasibility Study Policy Reference: E - 051 REQUEST FOR BOARD ACTION OR PRESENTATION

More information

Wendell Smith Elementary School

Wendell Smith Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

ATLAS. $12.00 psf NNN 5,937 SF RETAIL FOR LEASE: 2929 California Plaza Omaha, Nebraska * * CERTIFIED *

ATLAS. $12.00 psf NNN 5,937 SF RETAIL FOR LEASE: 2929 California Plaza Omaha, Nebraska * * CERTIFIED * FOR LEASE: ATLAS 2929 California Plaza Omaha, Nebraska $12.00 psf NNN 5,937 SF HIGHLIGHTS Great opportunity to be located on the first floor of a new development with over 700 apartments underway! Join

More information

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD ALBANY UNIFIED SCHOOL DISTRICT DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD BOARD OF EDUCATION PRESENTATION JANUARY 22, 2019 DOUG ESPLAND Sr. Precon Manager & Project Director

More information

GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study

GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study New Lebanon School (K-5) 25 Mead Avenue, Greenwich, CT 20 March 2014 KSQ Architects PC 20 March 2014 GREENWICH PUBLIC SCHOOLS NEW LEBANON

More information

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Snohomish County Courthouse Renovation + Addition COUNCIL PRESENTATION 6 MARCH 2017

Snohomish County Courthouse Renovation + Addition COUNCIL PRESENTATION 6 MARCH 2017 Review the Process Building Assessment Prioritize into Tiered Matrix Develop Cost Estimate per Scope Items Schematic Design Renovation + Addition Schematic Drawings Interior + Exterior Perspectives Recommendations

More information

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin. MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD

More information

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643 11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

At Fair Lakes Office Park, you will discover an environment that helps your business attract and

At Fair Lakes Office Park, you will discover an environment that helps your business attract and 12450 12500 12600 12700 12750 12701 12730 FAIR LAKES CIRCLE FAIRFAX VA Overview Office Park At Fair Lakes Office Park, you will discover an environment that helps your business attract and 25 retain top

More information

LOS ANGELES UNIFIED SCHOOL DISTRICT EDUCATIONAL SPECIFICATION - HIGH SCHOOL

LOS ANGELES UNIFIED SCHOOL DISTRICT EDUCATIONAL SPECIFICATION - HIGH SCHOOL No. Academic Area Drawing No. Issue Date Drawing Title General Campus 000 General Campus Organizational Model GCOM1.1 A. ACADEMIC AREAS LOS ANGELES UNIFIED SCHOOL DISTRICT EDUCATIONAL SPECIFICATION - HIGH

More information

MAKE THE SMART CONNECTION

MAKE THE SMART CONNECTION MAKE THE SMART CONNECTION Owned By 1765 & 1775 GREENSBORO STATION PLACE, TYSONS CORNER OVERVIEW Boro Station is master-planned Dulles Toll Road Westpark Drive Greensboro Drive to serve the modern professional.

More information

MELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma.

MELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma. MELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma. Hoover, Winthrop and Horace Mann Elementary Schools September 27, 2016 Tappe Architects Inc. HOOVER ELEMENTARY SCHOOL - SITE PLAN REMOVE EXISITNG

More information

LLOYDCREST HOUSE 9390 LLOYDCREST DRIVE LOS ANGELES, CA 90210

LLOYDCREST HOUSE 9390 LLOYDCREST DRIVE LOS ANGELES, CA 90210 DS CODE IFORMATIO SCOPE OF WORK VICIITY MAP ASSESSOR'S MAP COSULTATS ADDRESS/LEGAL SITE ADDRESS 990 W LLOYDCREST DR ZIP CODE 90210 PI UMBER 147B165 25 LOT/PARCEL AREA (CAL.) 10,94.8 (SQ FT) THOMAS BROTHERS

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

SHEET A4.0A SHEET A4.0B 260' - 10" 244' - 2" 19' - 4 1/2" 20 SP 18 SP 8 SP 7 SP 16 SP 247' - 8 1/2" 256' - 11" LL2 OVERALL FLOOR PLAN 3/32" = 1'-0"

SHEET A4.0A SHEET A4.0B 260' - 10 244' - 2 19' - 4 1/2 20 SP 18 SP 8 SP 7 SP 16 SP 247' - 8 1/2 256' - 11 LL2 OVERALL FLOOR PLAN 3/32 = 1'-0 .2.3.4 2 2. 3 3. 4 5 6 7 8 9 0. A4.0A A4.0B 260' - 0" 244' - 2" A B B. C D E F G H J 83' - 6 /2" 8' - 2 /2" 30' - 4 /2" 67' - 8" 37' - 2" 20' - 9" 3' - ". 7' - 7" 2 SP 2 SP 9' - 4 /2" 20 SP 8 SP 8 SP 7

More information

IRVINE USD C o m p r e h e n s i v e F a c i l i t i e s M a s t e r P l a n LPA PARKING (+/- 302) NEW (12) CLASSROOM 2-STORYBUILDING 20,535 SF

IRVINE USD C o m p r e h e n s i v e F a c i l i t i e s M a s t e r P l a n LPA PARKING (+/- 302) NEW (12) CLASSROOM 2-STORYBUILDING 20,535 SF MATH SIEE ORE SHOOL STATISTIS IRVIE USD o m p r e h e n s i v e F a c i l i t i e s M a s t e r P l a n omp omp MEDIA ETER omp EW (12) LASSROOM 2-STORYBUDIG 20,535 SF omp *SAFETY ISSUE: AMPUS WIDE OUTDOOR

More information

HANSCOM FIELD ARFF AND CBP BUILDING

HANSCOM FIELD ARFF AND CBP BUILDING HANSCOM FIELD ARFF AND CBP BUILDING AERIAL VIEW OF AIRFIELD PROJECT SITE HANSCOM AIR FIELD CIVIL AIR TERMINAL HANSCOM AIR FORCE BASE 95 AIRFIELD MAIN ENTRY SITE AERIAL PLAN VIEW OF AIRFIELD N MASSACHUSETTS

More information

USF Downtown August 2016

USF Downtown August 2016 USF Dow ntown August 2 016 93% OF 2015 USF GRADUATES are employed or enrolled in graduate school 45% of USF undergraduate students ARE FROM FIRST-GENERATION OR LOW-INCOME HOUSEHOLDS MAJORITY OF OUR GRADUATES

More information

DASD Loganville Springfield Elementary School Site Feasibility Review. Background For This Work

DASD Loganville Springfield Elementary School Site Feasibility Review. Background For This Work DASD Loganville Springfield Elementary School Site Feasibility Review Prepared by: Site Design Concepts, Inc. March 30, 2016 Background For This Work No architectural programming or investigation was completed

More information

AVAILABLE FOR LEASE OFFICE AND LABORATORY SPACE Approximately 322,384 RSF

AVAILABLE FOR LEASE OFFICE AND LABORATORY SPACE Approximately 322,384 RSF AVAILABLE FOR LEASE AND SPACE Approximately 322,384 RSF 2400 Ellis Road Research Triangle Park, North Carolina www.goellisresearchcenter.com PROPERTY DESCRIPTION Administrative Wing Cafeteria Lobby/Atrium

More information

Marcus Moziah Garvey Elementary School

Marcus Moziah Garvey Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Oak Park and River Forest High School District North Scoville Avenue Oak Park, IL

Oak Park and River Forest High School District North Scoville Avenue Oak Park, IL Oak Park and River Forest High School District 200 201 North Scoville Avenue Oak Park, IL 60302-2296 To: Board of Education From: Tod Altenburg, CSBO Phil Prale, ASCI Date: August 16, 2016 Re: Requested

More information

San Francisco Unified School District Beyond the Talk: Modernizing our Schools to Inspire Learning. September 27, Raoul Wallenberg High School

San Francisco Unified School District Beyond the Talk: Modernizing our Schools to Inspire Learning. September 27, Raoul Wallenberg High School San Francisco Unified School District Beyond the Talk: Modernizing our Schools to Inspire Learning September 27, 2011 Raoul Wallenberg High School Summer of 2011 Continuing the task to fix, repair, make

More information

Architecture, Construction, and Engineering Technical Charter

Architecture, Construction, and Engineering Technical Charter Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Eastern Lebanon County School District Ad Hoc Committee: High School Renovation Project

Eastern Lebanon County School District Ad Hoc Committee: High School Renovation Project Ad Hoc Committee: High School Renovation Project Wednesday, October 11, 2017 High School LGI Room, 6:00pm Instructional Focus for 2017-2018 Equitable Access to Rigorous Learning Results Focused Accountability

More information

Morton School of Excellence

Morton School of Excellence Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

John Spry Elementary Community School

John Spry Elementary Community School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SPRINKLER SF. Stair 190 SF WOMEN SF LOBBY SF MECH/ELEC CONCESSIONS SF 225 SF STORAGE SF

SPRINKLER SF. Stair 190 SF WOMEN SF LOBBY SF MECH/ELEC CONCESSIONS SF 225 SF STORAGE SF 1JACKSON MSC TEMPSTAR W/DT-3-LR TABLE PACKAGE WAREWASHER, DOOR TYPE W/ DISHTABLES ARCHITECTURE & INTERIOR DESIGN Montgomery Dothan WWW.SSLARCH.COM (M) 334. 263. 5162 (D) 334. 791. 5248 No. Revision Date

More information

Elementary Grade Configuration School Current Recommendation

Elementary Grade Configuration School Current Recommendation To: Board of Education From: Mark P Duerwaechter, Superintendent Date: January 7, 2019 Re: Action Team Recommendation Workshop Information and Discussion Only The Master Planning Action Team met on December

More information

North Lawndale College Prep Charter - Collins

North Lawndale College Prep Charter - Collins Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

EPIC Academy High School

EPIC Academy High School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NEW LEBANON ELEMENTARY SCHOOL

NEW LEBANON ELEMENTARY SCHOOL NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL November 10, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL

More information

NEW LEBANON ELEMENTARY SCHOOL

NEW LEBANON ELEMENTARY SCHOOL NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL October 9, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL

More information

Richardson olmsted complex core project Community Presentation. buffalo, new york

Richardson olmsted complex core project Community Presentation. buffalo, new york Richardson olmsted complex core project Community Presentation buffalo, new york 20 AUGUST 2013 DESIGN TEAM ARCHITECT Consulting design ARCHITECT consulting historic Preservation ARCHITECT Landscape ARCHITECT

More information

MADISON PUBLIC LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 11 / 09 / 2017

MADISON PUBLIC LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 11 / 09 / 2017 MADISON LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 11 / 09 / 2017 MADISON LIBRARY PINNEY CURRENT TIMELINE TIMELINE MADISON LIBRARY PINNEY MING/ PRE-DESIGN 1 SCHEMATIC DESIGN 2 DESIGN DEVELOPMENT 3

More information

BAYCARE BLOOMINGDALE HEALTH CENTER Bloomingdale Ave. Valrico, FL RETAIL SPACE FOR LEASE

BAYCARE BLOOMINGDALE HEALTH CENTER Bloomingdale Ave. Valrico, FL RETAIL SPACE FOR LEASE PROPERTY HIGHLIGHTS Retail Space Available: 876 SF -,000 SF Located on Bloomingdale Ave. just east of the signalized intersection of Bloomingdale Ave. and Lithia Pinecrest Rd. Brand new state-of-the-art

More information

Everett McKinley Dirksen Elementary School

Everett McKinley Dirksen Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Amos Alonzo Stagg Elementary School

Amos Alonzo Stagg Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

John Milton Gregory Elementary School

John Milton Gregory Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NJ & PA Availability List

NJ & PA Availability List Availability Report NJ & PA Availability List 135,399 SF Cafe Fitness room Lockers and showers Lower level storage Covered parking On-site management Walking distance to amenities 2012 BOMA TOBY winner

More information

EXISTING ZONING MAP Geneva Webster LLC 550 W. Webster Street Webster Square. Applicant: Project: Date: not to scale Solomon Cordwell Buenz

EXISTING ZONING MAP Geneva Webster LLC 550 W. Webster Street Webster Square. Applicant: Project: Date: not to scale Solomon Cordwell Buenz EXISTIG ZIG MAP 05.12.2010 CPC 09.15.2011 I C R R1C Institutional Commercial/Business Residential Residential + 1st floor Commercial. Geneva Terr. W. Grant Pl. PRJECT SITE W. Webster St.. Larrabee St..

More information

Walt Disney Magnet Elementary School

Walt Disney Magnet Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607 Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629 3 W th St Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

NEW RESIDENCE F.F.L SLIDING GATE CARAVAN PARKING COLORBOND FENCE. 4.5m SETBACK LINE

NEW RESIDENCE F.F.L SLIDING GATE CARAVAN PARKING COLORBOND FENCE. 4.5m SETBACK LINE 10.00 3149 14640 6765 6046 3046 B REV EW BRICK FECE TO BOUDARY EXIST. PATHWAY EW TURF TO VERGE AREA 2440 8080 500 1140 144mm HIGH RETAIIG WALL EXIST. POOL 494mm HIGH RETAIIG WALL 13.770 13.500 13.000 13.420

More information

Addendum #1 - Bid Package #

Addendum #1 - Bid Package # Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction

More information

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC Design Rationale On behalf of our client, Necessary Homes Inc, we have prepared a Development Permit application for a unit rental multi-family building at The site area of the property is 9 SM and is

More information