Ashby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update

Size: px
Start display at page:

Download "Ashby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update"

Transcription

1 Ashby, Pepperell, Townsend North Middlesex Regional High School Feasibility Study Update June 6, 2013

2 AGENDA Preliminary Design Program (PDP) District Capacity Analysis Preferred Schematic Report (PSR) Project Costs Factors That Impact Construction Costs Next Steps

3 Existing HS MSBA Guidelines for 870 Students GROSS AREA: Actual 197,377 sf 175,740 sf Classrooms / Teaching Spaces Number of classrooms sized smaller than 850 sf (54%) 0 Number of science rooms sized smaller than 1440 sf 10 (100%) 0 Auditorium Size Gymnasium Size Custodial/Maintenance 3,700 sf 5,800 sf 10,050 sf 7,780 sf 17,830 sf 12,000 sf 6,414 sf 2278 sf

4

5

6

7 Existing High School ( ) 9-12 Peter Fitzpatrick (1938) Leased by SPED Collaborative Varnum Brook (1977) K-4 Squannacook (1989) Pre-K Nissitissit (2002) 5-8 Gross Area (sq ft) Required Area (sq ft) Core Classroom Space Deficiencies Qualifiers 197,377 gsf =(20,000)* 46 =9 Refer to Building Due-diligence Report and Building Survey Presentation on 4/22/13 80,442 gsf =(114,558) 33 =(4) All auxiliary spaces vastly undersized 31% & 18% of MSBA 26% & 37% of MSBA 136,047 gsf =(58,953) 31 =(6) All auxiliary spaces undersized (except cafeteria) of MSBA 56% of MSBA 58,400 gsf =(136,600) 19 =(18) All auxiliary spaces undersized No Auditorium 127,577 gsf =(67,423) 37 =(0) 69% of MSBA 40% of MSBA 67% + 54% of MSBA *After space and adjacency correction 37 core classrooms required at High School Parking Capacity Fields +/ track & football field with stadium seating 1 baseball field 1 softball field 4 soccer/lacrosse /practice fields Septic/Sewer On-Site Septic Systems +/ informal field Town sewer +/ tennis courts, 6 gen. playfields, 3 basketball courts, 5 baseball/softball +/ tennis courts, 1 baseball, 1 softball, 3 playfields +/ Baseball Field, 4 Soccer Fields Town sewer Closing down treatment plant New septic system Town sewer

8 CONCEPTUAL OPTIONS REVIEWED Option 1 Option 2a Option 2b.2 Option 2c Option 3a Option 3b Option 3c Option 3d

9 CONCEPTUAL OPTIONS REVIEWED Option 1 Option 2a Option 2b.2 Option 2c Option 3a Option 3b Option 3c Option 3d

10 Option 2b.2 - Site Addition / Renovation

11 Auditorium Art Art Main Entrance Gym expansion Music SPED Courtyard Admin Guidance Cafeteria Library Media Kitchen Maint Service Cust LGI Classrooms SPED Bus Entrance Option 2b.2 - Floor Plan Addition / Renovation

12 ADD/RENOVATION OPTION 2B.2 Existing Building 197,377 gsf Proposed 190,656 gsf MSBA Guidelines 175,740 gsf PROS (BUILDING) Moderate ability to close off non-public areas Admin is at hub of activity Improved organization (STEM Wing) PROS (SITE) Main entry is close to main parking area Opportunity for public plaza Separate bus/parent drop-offs CONS (BUILDING) Challenging phasing and distribution 50% of classrooms are older wing CONS (SITE) Main entrance faces away from Rt.119 No Admin oversight at bus drop-off Pros and Cons

13 CONCEPTUAL OPTIONS REVIEWED Option 1 Option 2a Option 2b.2 Option 2c Option 3a Option 3b Option 3c Option 3d

14 Option 3a Full Educational Program - New Construction

15 Option 3a Site Plan Full Educational Program - New Construction

16 Fitness Gymnasium Main Entrance Admin Service Entrance Lockers Custodian Maintenanc e Kitchen SPED Commons Library/Media Auditorium Music Music Art Art Tech LGI STEM Classrooms Humanities Classrooms Option 3a Floor Plan Full Educational Program - New Construction

17 NEW BUILDING OPTION 3A PROS (BUILDING) Existing Building 197,377 gsf New Building 192,005 gsf MSBA Guidelines 175,740 gsf Meets full educational program Revised location avoids need for temporary trailers; No Demo Required PROS (SITE) Renovates in place track and field complex (minimized costs and impact on athletics) Set back from both roads and associated noise Creates comprehensive site circulation layout CONS (SITE) Interferes with existing septic Backs onto trees (loss of trees) Pros and Cons

18 CONCEPTUAL OPTIONS REVIEWED Option 1 Option 2a Option 2b.2 Option 2c Option 3a Option 3b Option 3c Option 3d

19 Option 3d Reduced Educational Program - New Construction

20 Option 3d Site Plan Reduced Educational Program - New Construction

21 Fitness Gymnasium Main Entrance Admin Service Entrance Lockers Custodian Maintenanc e Kitchen SPED Commons Library/Media Auditorium Music Music Art Art Tech LGI STEM Classrooms Humanities Classrooms Option 3d Floor Plan Reduced Educational Program - New Construction

22 OPTION 3A VS. 3D COMPARISON 5/31/2013 Revisions net change in SF Comments General Classrooms reduce from 29 to sf Large Group Instruction reduce from 2 to 1 2,000 sf Computer Lab reduce from 1 to 0 1,000 sf no computer labs in school Language Lab reduce from 1 to 0 1,000 sf no language lab in school, assume on a cart School Store (run by Life Skills Students) reduce from 1 to sf Store to be incorporated into Life Skills classroom (kiosk) Art Graphics Lab (Mac) reduce from 1 to 0 1,200 sf incorporate curriculum into Voc / Tech classroom w/ technology Music office reduce from 1 to sf assume room to come from teacher planning allowance Business Classroom reduce from 1200 to sf Business Technology Lab reduce from 1200 to sf Service Program (Garden support room) reduce from 500 to sf Sink and small storage only tools in outdoor shed 7,650 sf 11,475 sf 1.5 multiplier

23 NEW BUILDING OPTION 3D PROS (BUILDING) Meets the goals of the educational program Existing Building 197,377 gsf New Building 180,530 gsf MSBA Guidelines 175,740 gsf Revised location avoids need for temporary trailers; No Demo Required PROS (SITE) Renovates in place track and field complex (minimized costs and impact on athletics) Set back from both roads and associated noise Creates comprehensive site circulation layout CONS (SITE) Interferes with existing septic Backs onto trees (loss of trees) Pros and Cons

24 CONCEPTUAL OPTIONS SCHEDULE Add/Reno Option 2b.2 3 years Spring 2018* New Option 3a 2.8 years Spring 2017* New Option 3d 2.8 years Spring 2017* Preliminary Schematic Report (PSR) *Assumes start of construction March 2015

25 CONCEPTUAL PROJECT COSTS & TAX IMPACT MSBA base reimbursement rate of 57.11% Tax rate based on Fiscal 2013 assessed valuation of a $75 -$90M construction cost per $100,000 of home value Average Annual Tax Impact per $100,000 Pepperell Townsend Ashby $ $97.81 $ $ $ $92.37

26 FACTORS THAT IMPACT CONSTRUCTION COSTS Reduce Scope Reduce program area Reduce limit of work e.g. no work on fields, no work on parking lot Reduce areas of renovation e.g. minimal work in auditorium Reduce areas of AC Eliminate modulars use existing district buildings Reduce Quality Reduce all building & engineering systems Reduce overall level of finish Cost Quality Scope

27 Example of Scope Reduction

28 Cost for Temporary Modulars 2b.2 - $1.5M 2c - $2.5M Cost to upgrade Peter Fitzpatrick to accommodate Grade 9 $1.437M Offsetting Cost of Temporary Classrooms

29 Interior Finishes Example

30 CMU Brick Stone Arriscraft (Thin set MFD stone) Metal Panel Composite Wood Panel Terracotta Channel Glass Low $/sf $/sf $/sf $/sf $/sf High $/sf $/sf $/sf $/sf $/sf Exterior Closure Materials

31 NEXT STEPS Submit PSR Preferred Schematic Report Ongoing Meetings with Building Committee and Community MSBA facility advisory study committee 6/26/13 or 7/10/13 MSBA board meeting to approve preferred schematic 7/31/13 Schematic Design 8/1/ /12/2013 MSBA Review 12/13/2013 1/29/2014 MSBA Board Meeting 1/29/2014 Annual Town Meeting Vote Spring 2014

32 OTHER PROGRAMS TO CONSIDER? Central Administration - no* Culinary Arts Program - no Community Uses for NMRHS - inherent Teen Center - inherent Maintenance Facility - yes *Options for central admin still under discussion

33 DISTRICT MAINTENANCE & STORAGE REQUIREMENTS Existing: Exterior Shed 2,000 sf Old Central Office 3,500 sf Interior Old Wood Shop 3,015 sf Interior Custodian Shop 1,020 sf Proposed: 9,535 sf Single Stand Alone Facility? ±10,000 sf Cost Range $2-3M Building & Grounds Two Trucks, Tractor, Lawn Mowers Buildings & Grounds Athletic Exterior Equipment Storage, High Jumps etc. Surplus Furniture Storage Drama Sceneries Project Graduation Materials Custodian Workshop Truck Storage Does not include on site storage boxes for athletics.

34 UPCOMING MEETINGS June 6 th (TBD) - Joint meeting of the BC, School Com, Selectman Boards and Fin Com June 10 th - Building Committee Meeting June 13 th - Submit PSR June 17 th - Building Committee Meeting at Nissitissit Middle School June 17 th - Community Meeting

35 Thank you

ouglas Intermediate School

ouglas Intermediate School ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion

More information

Harding Senior High School

Harding Senior High School 1540 Sixth Street East Project Summary:, located in the Eastview area of St. Paul, offers students in grades 9 through 12 a wide range of curriculum options ranging from International Baccalaureate to

More information

Presentation for. Raymond E. Shaw Elementary School Building Committee

Presentation for. Raymond E. Shaw Elementary School Building Committee Presentation for Raymond E. Shaw Elementary School Building Committee 11.01.2018 AGENDA 1. School Tour Penn Brook School 2. Design Options with Cost 3. Schedule School Tour Penn Brook School, Georgetown,

More information

MEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013

MEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013 Seattle World School SWS SDAT Workshop 3 2 December 203 SPS SWS at TT Minor TCF Architecture Project Number: 203 002 MEETING MINUTES Attendance: Name Representing Role Paul Wight Seattle Public Schools

More information

The Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee. Clinton Town Hall January 20, 2011

The Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee. Clinton Town Hall January 20, 2011 The Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee Clinton Town Hall January 20, 2011 Tonight s Agenda History of Morgan School and of the Building

More information

1001 Feehanville Drive Phone Mt. Prospect, IL Fax

1001 Feehanville Drive Phone Mt. Prospect, IL Fax NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 November 29, 2016 Community Unit School District 200 130 West Park Avenue Wheaton, IL 60189

More information

Eastern Lebanon County School District Ad Hoc Committee: High School Renovation Project

Eastern Lebanon County School District Ad Hoc Committee: High School Renovation Project Ad Hoc Committee: High School Renovation Project Wednesday, October 11, 2017 High School LGI Room, 6:00pm Instructional Focus for 2017-2018 Equitable Access to Rigorous Learning Results Focused Accountability

More information

Horace Mann Elementary

Horace Mann Elementary 2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are

More information

Cherokee Heights Elementary School

Cherokee Heights Elementary School 694 Charlton Street Project Summary: Cherokee Heights Elementary is about to start its exciting transition to a Montessori learning model. The school is connected to the Baker Center which is currently

More information

CAC MEETING, FEB. 28 TH, 2017 NADAAA

CAC MEETING, FEB. 28 TH, 2017 NADAAA ADAMS STREET BRANCH LIBRARY PROGRAMMING STUDY FOR CITY OF BOSTON BOSTON PUBLIC LIBRARY AND PUBLIC FACILITY DEPARTMENT CAC MEETING, FEB. 28 TH, 2017 NADAAA 1 AGENDA 1.0 SCHEDULE 2.0 SUMMARY OF PROJECT GOAL

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12

More information

PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017

PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017 PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017 ARCHITECTURE \\ ENGINEERING \\ PLANNING \\ INTERIORS \\ TECHNOLOGY

More information

NEW LEBANON ELEMENTARY SCHOOL

NEW LEBANON ELEMENTARY SCHOOL NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL November 10, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL

More information

NEW LEBANON ELEMENTARY SCHOOL

NEW LEBANON ELEMENTARY SCHOOL NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL October 9, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL

More information

Continuing Education Credit

Continuing Education Credit BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP

More information

New Braunfels ISD. Comprehensive and Strategic Facilities Planning Committee Meeting Tuesday, March 27, 2018

New Braunfels ISD. Comprehensive and Strategic Facilities Planning Committee Meeting Tuesday, March 27, 2018 New Braunfels ISD Comprehensive and Strategic Facilities Planning Committee Meeting Tuesday, March 27, 2018 Facilities Committee Bond Proposal! Total Projected Bond Proposal = $84,000,000*! New Middle

More information

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015 275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.

More information

AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes

AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes Meeting No. 4 Date: 5/12/2018 Job No. Meeting Location: AVS Conference Room The following notes were taken during a meeting on

More information

San Francisco Unified School District Beyond the Talk: Modernizing our Schools to Inspire Learning. September 27, Raoul Wallenberg High School

San Francisco Unified School District Beyond the Talk: Modernizing our Schools to Inspire Learning. September 27, Raoul Wallenberg High School San Francisco Unified School District Beyond the Talk: Modernizing our Schools to Inspire Learning September 27, 2011 Raoul Wallenberg High School Summer of 2011 Continuing the task to fix, repair, make

More information

John A Johnson Elementary School

John A Johnson Elementary School 740 York Avenue Project Summary: An Acheivement Plus school John A Johnson is located adjacent to the East Side YMCA, jointly serving their communities educational, recreation, and wellness needs. The

More information

LOS ANGELES UNIFIED SCHOOL DISTRICT EDUCATIONAL SPECIFICATION - HIGH SCHOOL

LOS ANGELES UNIFIED SCHOOL DISTRICT EDUCATIONAL SPECIFICATION - HIGH SCHOOL No. Academic Area Drawing No. Issue Date Drawing Title General Campus 000 General Campus Organizational Model GCOM1.1 A. ACADEMIC AREAS LOS ANGELES UNIFIED SCHOOL DISTRICT EDUCATIONAL SPECIFICATION - HIGH

More information

DASD Loganville Springfield Elementary School Site Feasibility Review. Background For This Work

DASD Loganville Springfield Elementary School Site Feasibility Review. Background For This Work DASD Loganville Springfield Elementary School Site Feasibility Review Prepared by: Site Design Concepts, Inc. March 30, 2016 Background For This Work No architectural programming or investigation was completed

More information

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:

More information

GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS

GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are made to the University's Board of Trustees in February,

More information

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin. MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD

More information

Adams Spanish Immersion 615 Chatsworth Street South

Adams Spanish Immersion 615 Chatsworth Street South Project Summary: Adams Spanish Immersion is an international education without the travel expense. Our school is a place where families and staff value the opportunities gained from learning a second language.

More information

ROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL

ROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL ROBERT TURER COLLEGE AD CAREER HIGH SCHOOL SCHEMATIC DESIG PRESETATIO 23 MAY 2017 Project Milestones Schematic Design..... March May 2017 SD Presentation to Board of Trustees...... 23 May, 2017 Design

More information

ADAMS STREET BRANCH LIBRARY DESIGN PHASE CITY OF BOSTON

ADAMS STREET BRANCH LIBRARY DESIGN PHASE CITY OF BOSTON ADAMS STREET BRANCH LIBRARY DESIGN PHASE CITY OF BOSTON MARTIN J. WALSH, MAYOR BOSTON PUBLIC LIBRARY AND PUBLIC FACILITIES DEPARTMENT DAVID LEONARD, PRESIDENT, BOSTON PUBLIC LIBRARY PATRICK I. BROPHY,

More information

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program

More information

For questions or feedback please contact Perspective Views

For questions or feedback please contact Perspective Views NORTHEAST NORTHEAST NORTHEAST NORTHEAST - EAST EAST 3 - EAST 3 - EAST SOUTHWEST SOUTHWEST SOUTHWEST SOUTHWEST - WEST WEST - WEST For questions or feedback please contact memberfeedback@centralparktennisclub.com.

More information

GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study

GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study New Lebanon School (K-5) 25 Mead Avenue, Greenwich, CT 20 March 2014 KSQ Architects PC 20 March 2014 GREENWICH PUBLIC SCHOOLS NEW LEBANON

More information

PACIFICA LIBRARIES OPPORTUNITIES

PACIFICA LIBRARIES OPPORTUNITIES City of Pacifica PACIFICA LIBRARIES OPPORTUNITIES Library Advisory Committee August 9, 2017 AGENDA 1. Call to Order 2. Approval of July 12, 2017 Meeting Minutes 3. Oral Communications 4. Project Schedule

More information

SCARSDALE PUBLIC SCHOOLS. Greenacres Feasibility Study

SCARSDALE PUBLIC SCHOOLS. Greenacres Feasibility Study SCARSDALE PUBLIC SCHOOLS Greenacres - 2015 Feasibility Study Committee List Lee Maude Scott Silberfein Stuart Mattey John Trenholm Liz Marrinan Sharon Hill Paul Berger Karen Guardino Carole Phillips Joan

More information

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD ALBANY UNIFIED SCHOOL DISTRICT DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD BOARD OF EDUCATION PRESENTATION JANUARY 22, 2019 DOUG ESPLAND Sr. Precon Manager & Project Director

More information

Perspective Views NORTHEAST VIEW 1 SOUTHWEST VIEW 2 AERIAL VIEW - EAST AERIAL VIEW - WEST NORTHEAST VIEW SOUTHWEST VIEW AERIAL VIEW - WEST

Perspective Views NORTHEAST VIEW 1 SOUTHWEST VIEW 2 AERIAL VIEW - EAST AERIAL VIEW - WEST NORTHEAST VIEW SOUTHWEST VIEW AERIAL VIEW - WEST NORTHEAST NORTHEAST NORTHEAST NORTHEAST - EAST EAST 3 SOUTHWEST SOUTHWEST SOUTHWEST SOUTHWEST - WEST WEST - EAST 3 - EAST - WEST - WEST Perspective Views Annual Meeting June, 7 Northeast View Interior

More information

Allan Hancock College

Allan Hancock College Allan Hancock College Project Planning Board Workshop February 17, 2009 Agenda Objective Funding Allocation Space Demand Analysis Project Overview Bond Measure I Program Schedule Charge: To review funding

More information

St. John Paul II Catholic Parish

St. John Paul II Catholic Parish St. John Paul II Catholic Parish 167th & Ridgeview Road Olathe, Kansas Master Plan Town Hall October 30, 2018 Purpose [ The Church s ] mission consists essentially in offering people an opportunity not

More information

Bartlett High School MASTER PLAN May 25, 2017

Bartlett High School MASTER PLAN May 25, 2017 Bartlett High School MASTER PLAN May 25, 2017 Facility Assessment Summary I. I.1 - Site Appraisal Site Appraisal The current high school was built in multiple phases, which presents challenges in layout

More information

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. Target Value Design Case Study

More information

FAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN

FAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN KBE APPROVAL DATE: APRIL 2017 FAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN DFP REVISIONS FINDING. NO. 1: APRIL 2018 BOLD NEXT DFP DUE: APRIL 2021 PLAN OF SCHOOL ORGANIZATION 1. Current Plan P, P-5, K-5,

More information

COMPONENT FLOW CHART & SEQUENCING DIAGRAMS

COMPONENT FLOW CHART & SEQUENCING DIAGRAMS Oak Park and River Forest High School Master Facilities Plan COMPONENT FLOW CHART & SEQUENCING DIAGRAMS The following is a narrative intended to accompany the component flow chart and sequencing diagrams

More information

GREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM

GREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM Date of Meeting: March 20, 2014 GREENWICH PUBLIC SCHOOLS Greenwich, Connecticut Title of Item: New Lebanon School Pre-Feasibility Study Policy Reference: E - 051 REQUEST FOR BOARD ACTION OR PRESENTATION

More information

Linwood Monroe Upper 810 Palace Avenue

Linwood Monroe Upper 810 Palace Avenue 810 Palace Avenue Project Summary: Spanning a child s first classroom experience all the way through middle school, Linwood Monroe s Plus lays a foundation for creativity and exploration in the arts. Accelerated

More information

CITY OF SALINAS EL GABILAN BRANCH LIBRARY

CITY OF SALINAS EL GABILAN BRANCH LIBRARY CITY OF SALINAS EL GABILAN BRANCH LIBRARY City Council Meeting November 7, 2017 Introduction & Agenda Review Where We Are (Work Plan Review) Goals for This Evening Summary of Key Input from Community Schematic

More information

CS2.0 COVER SHEET VOL. 2

CS2.0 COVER SHEET VOL. 2 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:

More information

Elementary Grade Configuration School Current Recommendation

Elementary Grade Configuration School Current Recommendation To: Board of Education From: Mark P Duerwaechter, Superintendent Date: January 7, 2019 Re: Action Team Recommendation Workshop Information and Discussion Only The Master Planning Action Team met on December

More information

WEST HOLLYWOOD PARK MASTER PLAN 2004

WEST HOLLYWOOD PARK MASTER PLAN 2004 WEST HOLLYWOOD PARK MASTER PLAN 2004 Total of 5.23 acres of uninterrupted grass and trees including playground areas and tree-lined promenades compared with only 1.86 acres of park open space in the existing

More information

ELLIS. Ellis Research Center PROPERTY HIGHLIGHTS BRIAN CARR, CCIM LEE CLYBURN. Research Triangle Park North Carolina.

ELLIS. Ellis Research Center PROPERTY HIGHLIGHTS BRIAN CARR, CCIM LEE CLYBURN. Research Triangle Park North Carolina. ELLIS Research Triangle Park North Carolina Ellis Research Center Office and Lab PROPERTY HIGHLIGHTS 2400 Ellis Rd RTP, NC 27709 Size 331,898 RSF Floors 4 Parking Power 519 Shared parking spaces 480/277

More information

FULL TEXT OF MEASURE K ORANGE UNIFIED SCHOOL DISTRICT

FULL TEXT OF MEASURE K ORANGE UNIFIED SCHOOL DISTRICT FULL TEXT OF MEASURE K ORANGE UNIFIED SCHOOL DISTRICT The following is the full proposition presented to the voters by the Orange Unifi ed School Dirict. To repair or replace aging, outdated high school

More information

American Institute of Architects New Hampshire Chapter High School Design Competition Program

American Institute of Architects New Hampshire Chapter High School Design Competition Program American Institute of Architects New Hampshire Chapter 2009 2010 High School Design Competition Program Educational Objectives To increase your awareness of the relationships between space, human scale

More information

Campus Non Educ and General RCV /3/2010. Sightlines Institutional Function

Campus Non Educ and General RCV /3/2010. Sightlines Institutional Function SINCLAIR FARM 13617 MISSOURI INNOVATION CENTE N 10,755.56 98.38 1,058,133.06 13618 SINCLAIR MO OFFICE BLDG. N 13,145.66 208.03 2,734,629.86 13620 ANIMAL BUILDING N 510.13 125.74 64,142.83 13630 ANIMAL

More information

SMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)

SMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application) REVIEW TYPE: PRELIMINARY FINAL LANDSCAPE ABBREVIATED ADDITION COLOR BOARD Application Form* X X X X X Design Review Fee* X X X Registered Survey** X Site Plan X X X X X Floor Plans X X X Elevations X X

More information

GAZEBO BELMONT PUBLIC LIBRARY MAIN STREET TOWN OF BELMONT TOWN HALL 12/14/2018 EXISTING CONDITIONS

GAZEBO BELMONT PUBLIC LIBRARY MAIN STREET TOWN OF BELMONT TOWN HALL 12/14/2018 EXISTING CONDITIONS GAZEBO BELMONT LIBRARY STREET TOWN OF BELMONT TOWN HALL EXISTING CONDITIONS DRIVING LANE 6 4 WELLFARE 378 SF TOWN CLERK 800 SF LOBBY 256 SF COMMON SPACES 665 SF LG MEETING RM 600 SF DRIVING LANE TOWN ADMIN.

More information

CORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS)

CORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS) Classrooms 2-3 scientists Morrison Maierle Classrooms K-1 Specials 146 planners Support surveyors 870 SF RR 147 148 RR 149 engineers 839 SF 150 COPYRIGHT (C) MORRISON-MAIERLE, INC., 2017 Admin Phone: 406.752.2216

More information

SCARSDALE PUBLIC SCHOOLS

SCARSDALE PUBLIC SCHOOLS SCARSDALE PUBLIC SCHOOLS GREENACRES FEASIBILITY STUDY PROGRESS REPORT BOARD OF EDUCATION Mary Beth Gose Leila Shames Maude Lewis Leone, Jr. Christopher Morin William Natbony Suzanne Seiden Scott E. Silberfein

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

Town of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019

Town of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019 Town of Belmont, NH Town Space Needs and Feasibility Study January 10, 2019 Police Department EXISTING POLICE DEPARTMENT FULLER STREET MEETING HOUSE SARGENT STREET TOWN OF BELMONT POLICE DEPARTMENT EXISTING

More information

ASHLAND SCHOOL BOARD REGULAR MEETING MINUTES HEFFERNAN MEDIA CENTER ASHLAND ELEMENTARY SCHOOL, ASHLAND December 1, 2015

ASHLAND SCHOOL BOARD REGULAR MEETING MINUTES HEFFERNAN MEDIA CENTER ASHLAND ELEMENTARY SCHOOL, ASHLAND December 1, 2015 Unapproved ASHLAND SCHOOL BOARD REGULAR MEETING MINUTES HEFFERNAN MEDIA CENTER ASHLAND ELEMENTARY SCHOOL, ASHLAND December 1, 2015 MEMBERS PRESENT MEMBERS ABSENT ADMINISTRATORS PRESENT ADMINISTRATORS ABSENT

More information

11/29/12. Des Moines Social Club Urban Design Review Project Narrative

11/29/12. Des Moines Social Club Urban Design Review Project Narrative 11/9/1 Des Moines Social Club Urban Design Review Project Narrative Strategically located at 9th and Walnut, the Des Moines Social Club (DMSC) will become a critical link between the Court Avenue Entertainment

More information

AMES COMMUNITY SCHOOL DISTRICT SAWYER ELEMENTARY

AMES COMMUNITY SCHOOL DISTRICT SAWYER ELEMENTARY Exhibit D-4 AMES COMMUNIY SCHOOL DISRIC SAWYER ELEMENARY Schematic Development Project Manual June 25th 2014 RDG Planning & Design 301 Grand Avenue Des Moines, Iowa 50309 architectural narrative Summarized

More information

Southern Oregon University

Southern Oregon University Southern Oregon University Public Meeting Notice August 5, 05 TO: FROM: RE: Southern Oregon University Board of Trustees, Finance Committee Sabrina Prud homme, University Board Secretary Notice of special

More information

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation Development Permit Application Rezoning/OCP Amendment Application Zoning DP Area yes no Variances Requested Development Details Property Size (m² or ha) Current Zoning Current OCP Designation Proposed

More information

Buildings and Grounds Supervisor, EASD. CG Schmidt, Sr. Project Manager

Buildings and Grounds Supervisor, EASD. CG Schmidt, Sr. Project Manager MEETING MINUTES August 25, 2015 Colleen O'Meara EUA, Project Manager Bill Trewyn Mike Datza Jason Tadlock Dave Stebnitz Ross Eggert Bob Vajgrt Business Manager, EAST Buildings and Grounds Supervisor, EASD

More information

AVAILABLE FOR LEASE OFFICE AND LABORATORY SPACE Approximately 322,384 RSF

AVAILABLE FOR LEASE OFFICE AND LABORATORY SPACE Approximately 322,384 RSF AVAILABLE FOR LEASE AND SPACE Approximately 322,384 RSF 2400 Ellis Road Research Triangle Park, North Carolina www.goellisresearchcenter.com PROPERTY DESCRIPTION Administrative Wing Cafeteria Lobby/Atrium

More information

Cheney Building & Bennet Academy Town of Manchester Phase 1 Study Presentation - April 10, 2013 DRAFT

Cheney Building & Bennet Academy Town of Manchester Phase 1 Study Presentation - April 10, 2013 DRAFT Cheney Building & Bennet Academy own of Manchester Phase 1 Study Presentation - April 10, 2013 Schools Modernization & Reinvestment eam Revisited Board of Directors Board of Education DRAF ai Soo Kim Partners

More information

ARCHITECTURE CADD Course Syllabus

ARCHITECTURE CADD Course Syllabus 6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

George Sexton and Associates are the installation and lighting designers.

George Sexton and Associates are the installation and lighting designers. FAQ: The Chrysler Museum s Expansion and Renovation What exactly does the expansion/renovation project include? The Chrysler s 210,000-square-foot home on the Hague Inlet of the Elizabeth River is regularly

More information

Michael D. Sapraicone President Brian W. Fagan Vice President John DelGiudice - Trustee Linda Hurley Trustee. Richard G.

Michael D. Sapraicone President Brian W. Fagan Vice President John DelGiudice - Trustee Linda Hurley Trustee. Richard G. AUGUST 20, 2009 PAGE 1 A Special Meeting of the Board of Education, Seaford Union Free School District, was held on Thursday, August 20, 2009, in the Board of Education Conference Room located in the Seaford

More information

FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #15 Notes

FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #15 Notes FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #15 Notes Meeting Date: 26 April 2018 9:30 AM Meeting Location: FCPS Central Office Building, Board Room Current Design Phase:

More information

EXISTING SITE PLAN. Consultants: Civil: Evans Engineering, Inc Old Post Rd. Harrisburg, PA (717) Harrisburg, PA 17110

EXISTING SITE PLAN. Consultants: Civil: Evans Engineering, Inc Old Post Rd. Harrisburg, PA (717) Harrisburg, PA 17110 330 orth Third St. Architecture Renovations to: O. DESCRIPTIO DATE SGA PROJECT UMBER: EXISTIG SITE PLA Drawing umber: EX00 SCHEMATIC DESIG D D0 OFFICIAL'SVESTIBULE LOCKER D03 D04 D02 COACHES D05 GYMASIUM

More information

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206) CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA 98040 (206) 275-7605 SUBMITTAL REQUIREMENTS FOR DESIGN COMMISSION APPROVAL & SIGNAGE APPROVAL PURPOSE: Design Commission

More information

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION This application, including the Conceptual Review Presentation, must be completed and submitted to the Downtown Development Review Board (DDRB) Staff twenty (20) business days prior to the upcoming DDRB

More information

Oak Park and River Forest High School District North Scoville Avenue Oak Park, IL

Oak Park and River Forest High School District North Scoville Avenue Oak Park, IL Oak Park and River Forest High School District 200 201 North Scoville Avenue Oak Park, IL 60302-2296 To: Board of Education From: Tod Altenburg, CSBO Phil Prale, ASCI Date: August 16, 2016 Re: Requested

More information

Irvin L. Young Memorial Library Expansion Project. Frequently Asked Questions

Irvin L. Young Memorial Library Expansion Project. Frequently Asked Questions Irvin L. Young Memorial Library Expansion Project Frequently Asked Questions We ve been asked many questions about the proposed expansion of the library. It has been our intent to explore many different

More information

Chapel Farm House OAKHANGER I HAMPSHIRE I GU35 9JB

Chapel Farm House OAKHANGER I HAMPSHIRE I GU35 9JB Chapel Farm House OAKHANGER I HAMPSHIRE I GU35 9JB 6 Bedrooms 2 Bathrooms Shower Room Drawing Room Dining Room Family Room Study Barn Room Kitchen/Breakfast Room Laundry/Boot Room Cellar Garden Store Extensive

More information

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS

More information

NON-RESIDENTIAL DEVELOPMENT

NON-RESIDENTIAL DEVELOPMENT GENERAL REQUIREMENTS (Print or Type) Name of Proposed Project: Location of Project: Legal Description of Project (Assessor s Parcel No. or T, R,S): Staff Use Only FILE NO.: RELATED FILES: Applicant s Name:

More information

March 1, Buildings for Our Future: 2016 Update

March 1, Buildings for Our Future: 2016 Update March 1, 2016 Buildings for Our Future: 2016 Update Buildings For Our Future: Project Objectives Transform five elementary schools in poor and worsening condition into 21st century centers of learning

More information

Industrial Technology Education

Industrial Technology Education Final Report: 2003-2004 INDEPENDENT SCHOOL DISTRICT #2397 LE SUEUR-HENDERSON PUBLIC SCHOOLS Industrial Technology Education COMMITTEE MEMBERS Staff Members: Jim Carstens Milen Lovich Mark Vrklan Administrative

More information

CASE STUDY DOORS AND HARDWARE SEPTEMBER 2006

CASE STUDY DOORS AND HARDWARE SEPTEMBER 2006 CASE STUDY Main entrance to Forest Hills Eastern Middle/High School centers on the Great Hall area that forms the hub of school activity and traffic flow. double doors open from classrooms into spacious

More information

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy

More information

This Addendum #5 to the subject RFP is issued to provide answers to vendor questions received.

This Addendum #5 to the subject RFP is issued to provide answers to vendor questions received. TO: Prospective Bidders FROM: Phil Trayer Director of Finance DATE: February 1, 2018 SUBJECT: Addendum # 5 RFP 010262018-1100: Security Camera This Addendum #5 to the subject RFP is issued to provide answers

More information

Index. 1 Introduction. 2 Executive Summary. 3 Long-Range Facility Master Plan

Index. 1 Introduction. 2 Executive Summary. 3 Long-Range Facility Master Plan Index 1 Introduction 2 Executive Summary Existing Facility Inventory and Assessment Preliminary Space Needs Projections Master Plan Conclusions Project Recommendations 3 Long-Range Facility Master Plan

More information

IT'S ALL ABOUT ATMOSPHERE ARTIST S RENDERING. FINISHED PRODUCT MAY VARY.

IT'S ALL ABOUT ATMOSPHERE ARTIST S RENDERING. FINISHED PRODUCT MAY VARY. IT'S ALL ABOUT ATMOSPHERE ARTIST S RENDERING. FINISHED PRODUCT MAY VARY. MIAMI MIAMI BEACH SOUTH BEACH FISHER ISLAND KEY BISCAYNE STAR ISLAND PORT OF MIAMI VENETIAN ISLANDS BAYSIDE DOWNTOWN MIAMI BRICKELL

More information

CHAPTER A-15 INTERIOR DESIGN INDEX

CHAPTER A-15 INTERIOR DESIGN INDEX CHAPTER A-15 INTERIOR DESIGN Revised December 2011 INDEX 15.1 GENERAL 15.1.1 Scope 15.1.2 Quality 15.1.3 Sustainable Design 15.1.4 Multiple Buildings 15.1.5 Site Adapting 15.1.6 Renovations 15.2 APPLICABLE

More information

SYSTEMS+ ACOUSTIC REQUIREMENTS INNOVATIVE SYSTEMS SOLUTIONS USGBORAL.COM

SYSTEMS+ ACOUSTIC REQUIREMENTS INNOVATIVE SYSTEMS SOLUTIONS USGBORAL.COM USGBORAL.COM SYSTEMS+ B 2 B 3 B 4 B 6 B 8 INTRODUCTION MULTI-RESIDENTIAL BUILDINGS COMMERCIAL BUILDINGS EDUCATIONAL FACILITIES HEALTH CARE BUILDINGS B ACOUSTIC REQUIREMENTS INNOVATIVE SYSTEMS SOLUTIONS

More information

FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes

FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes Meeting Date: 15 March 2018 9:30 AM Meeting Location: Rock Creek School, Media Center Current Design Phase: Schematic

More information

Where To Start: Collegiate Space Needs & Planning Standards

Where To Start: Collegiate Space Needs & Planning Standards Where To Start: Collegiate Space Needs & Planning Standards Where To Start: Space Needs & Planning Standards Stephen E. DeHekker, AIA, LEED AP BD+C Senior Vice President James Gabel, AIA, LEED AP Senior

More information

Presentation to the Mahwah Board of Education June 14, 2017

Presentation to the Mahwah Board of Education June 14, 2017 Presentation to the Mahwah Board of Education June 14, 2017 STEM OR STEAM: WHAT S THE DIFFERENCE? STEM education integrates concepts that are usually taught as separate subjects in different classes and

More information

Summerland Planning Advisory Committee

Summerland Planning Advisory Committee Summerland Planning Advisory Committee SunPAC Meeting #32 May 10, 2011 1 SunPAC Meeting Agenda Call to Order Agenda Item: 1 Item 1: Pledge of allegiance and roll call Item 2: Public comment period Item

More information

Marcus Moziah Garvey Elementary School

Marcus Moziah Garvey Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

To: Holly J. Godard Meeting Date: September 4, 2014 City of Seattle

To: Holly J. Godard Meeting Date: September 4, 2014 City of Seattle MEETING MINUTES To: Holly J. Godard Meeting Date: City of Seattle Seattle Project No. 3018266 700 Fifth Avenue, Suite 1800 Project No.: PO Box 34019 Task No.: 11/31/41 Seattle, WA 98124-4019 holly.godard@seattle.gov

More information

Appendix A Site Reconnaissance Photographs

Appendix A Site Reconnaissance Photographs Appendix A Site Reconnaissance Photographs PHOTOGRAPH 1. Access to the Site from the intersection of 7 th Street and Michigan Avenue Direction : West PHOTOGRAPH 2. Access to the Site from the intersection

More information

MARSHALL. Comprehensive Long Range Facility Study / Plan. Facility Planning Committee Meeting 4 INDEPENDENT SCHOOL DISTRICT 413

MARSHALL. Comprehensive Long Range Facility Study / Plan. Facility Planning Committee Meeting 4 INDEPENDENT SCHOOL DISTRICT 413 Comprehensive Long Range Facility Study / Plan INDEPENDENT SCHOOL DISTRICT 413 MARSHALL Facility Planning Committee Meeting 4 Facilitated by ATS&R representatives: David Maroney and Eric Anderson Jul 14,

More information

Space Needs Summary: SPS/Health Center

Space Needs Summary: SPS/Health Center 3.3.1 Program Summary: SPS/Health Center 167 Space Needs Summary: SPS/Health Center PROGRAM ELEMENT PROPOSED NOTES No. (N) Type Name s Area Sub. ASF Total ASF STN. 10.0 Special Programs & Services / Project

More information

ARB ACTION MEMO. Mr. Missel called the meeting to order at 1:01 p.m. and established a quorum.

ARB ACTION MEMO. Mr. Missel called the meeting to order at 1:01 p.m. and established a quorum. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 (434) 296-5823 Fax (434) 972-4012 Date: Time: 1:00 PM Meeting Room: Room #241

More information

Minnewaska Area Schools. e Technology Plan

Minnewaska Area Schools. e Technology Plan Minnewaska Area Schools e 2020 Technology Plan We believe that a STRONG and PROGRESSIVE school is CONNECTED! Technology enhances connections and will better prepare MAS graduates for a technology-based

More information

ASSIGNMENT 04: Library Massing + Program

ASSIGNMENT 04: Library Massing + Program ASSIGNMENT 04: Library Massing + Program THE IMPORTANCE OF PROGRAM AND MASSING DIAGRAMMING: Program and Massing diagrams are critical tools used to visually describe the relationship between the way a

More information