- Ross Ray
- 6 years ago
- Views:
Transcription
1 Ashby, Pepperell, Townsend North Middlesex Regional High School Feasibility Study Update June 6, 2013
2 AGENDA Preliminary Design Program (PDP) District Capacity Analysis Preferred Schematic Report (PSR) Project Costs Factors That Impact Construction Costs Next Steps
3 Existing HS MSBA Guidelines for 870 Students GROSS AREA: Actual 197,377 sf 175,740 sf Classrooms / Teaching Spaces Number of classrooms sized smaller than 850 sf (54%) 0 Number of science rooms sized smaller than 1440 sf 10 (100%) 0 Auditorium Size Gymnasium Size Custodial/Maintenance 3,700 sf 5,800 sf 10,050 sf 7,780 sf 17,830 sf 12,000 sf 6,414 sf 2278 sf
4
5
6
7 Existing High School ( ) 9-12 Peter Fitzpatrick (1938) Leased by SPED Collaborative Varnum Brook (1977) K-4 Squannacook (1989) Pre-K Nissitissit (2002) 5-8 Gross Area (sq ft) Required Area (sq ft) Core Classroom Space Deficiencies Qualifiers 197,377 gsf =(20,000)* 46 =9 Refer to Building Due-diligence Report and Building Survey Presentation on 4/22/13 80,442 gsf =(114,558) 33 =(4) All auxiliary spaces vastly undersized 31% & 18% of MSBA 26% & 37% of MSBA 136,047 gsf =(58,953) 31 =(6) All auxiliary spaces undersized (except cafeteria) of MSBA 56% of MSBA 58,400 gsf =(136,600) 19 =(18) All auxiliary spaces undersized No Auditorium 127,577 gsf =(67,423) 37 =(0) 69% of MSBA 40% of MSBA 67% + 54% of MSBA *After space and adjacency correction 37 core classrooms required at High School Parking Capacity Fields +/ track & football field with stadium seating 1 baseball field 1 softball field 4 soccer/lacrosse /practice fields Septic/Sewer On-Site Septic Systems +/ informal field Town sewer +/ tennis courts, 6 gen. playfields, 3 basketball courts, 5 baseball/softball +/ tennis courts, 1 baseball, 1 softball, 3 playfields +/ Baseball Field, 4 Soccer Fields Town sewer Closing down treatment plant New septic system Town sewer
8 CONCEPTUAL OPTIONS REVIEWED Option 1 Option 2a Option 2b.2 Option 2c Option 3a Option 3b Option 3c Option 3d
9 CONCEPTUAL OPTIONS REVIEWED Option 1 Option 2a Option 2b.2 Option 2c Option 3a Option 3b Option 3c Option 3d
10 Option 2b.2 - Site Addition / Renovation
11 Auditorium Art Art Main Entrance Gym expansion Music SPED Courtyard Admin Guidance Cafeteria Library Media Kitchen Maint Service Cust LGI Classrooms SPED Bus Entrance Option 2b.2 - Floor Plan Addition / Renovation
12 ADD/RENOVATION OPTION 2B.2 Existing Building 197,377 gsf Proposed 190,656 gsf MSBA Guidelines 175,740 gsf PROS (BUILDING) Moderate ability to close off non-public areas Admin is at hub of activity Improved organization (STEM Wing) PROS (SITE) Main entry is close to main parking area Opportunity for public plaza Separate bus/parent drop-offs CONS (BUILDING) Challenging phasing and distribution 50% of classrooms are older wing CONS (SITE) Main entrance faces away from Rt.119 No Admin oversight at bus drop-off Pros and Cons
13 CONCEPTUAL OPTIONS REVIEWED Option 1 Option 2a Option 2b.2 Option 2c Option 3a Option 3b Option 3c Option 3d
14 Option 3a Full Educational Program - New Construction
15 Option 3a Site Plan Full Educational Program - New Construction
16 Fitness Gymnasium Main Entrance Admin Service Entrance Lockers Custodian Maintenanc e Kitchen SPED Commons Library/Media Auditorium Music Music Art Art Tech LGI STEM Classrooms Humanities Classrooms Option 3a Floor Plan Full Educational Program - New Construction
17 NEW BUILDING OPTION 3A PROS (BUILDING) Existing Building 197,377 gsf New Building 192,005 gsf MSBA Guidelines 175,740 gsf Meets full educational program Revised location avoids need for temporary trailers; No Demo Required PROS (SITE) Renovates in place track and field complex (minimized costs and impact on athletics) Set back from both roads and associated noise Creates comprehensive site circulation layout CONS (SITE) Interferes with existing septic Backs onto trees (loss of trees) Pros and Cons
18 CONCEPTUAL OPTIONS REVIEWED Option 1 Option 2a Option 2b.2 Option 2c Option 3a Option 3b Option 3c Option 3d
19 Option 3d Reduced Educational Program - New Construction
20 Option 3d Site Plan Reduced Educational Program - New Construction
21 Fitness Gymnasium Main Entrance Admin Service Entrance Lockers Custodian Maintenanc e Kitchen SPED Commons Library/Media Auditorium Music Music Art Art Tech LGI STEM Classrooms Humanities Classrooms Option 3d Floor Plan Reduced Educational Program - New Construction
22 OPTION 3A VS. 3D COMPARISON 5/31/2013 Revisions net change in SF Comments General Classrooms reduce from 29 to sf Large Group Instruction reduce from 2 to 1 2,000 sf Computer Lab reduce from 1 to 0 1,000 sf no computer labs in school Language Lab reduce from 1 to 0 1,000 sf no language lab in school, assume on a cart School Store (run by Life Skills Students) reduce from 1 to sf Store to be incorporated into Life Skills classroom (kiosk) Art Graphics Lab (Mac) reduce from 1 to 0 1,200 sf incorporate curriculum into Voc / Tech classroom w/ technology Music office reduce from 1 to sf assume room to come from teacher planning allowance Business Classroom reduce from 1200 to sf Business Technology Lab reduce from 1200 to sf Service Program (Garden support room) reduce from 500 to sf Sink and small storage only tools in outdoor shed 7,650 sf 11,475 sf 1.5 multiplier
23 NEW BUILDING OPTION 3D PROS (BUILDING) Meets the goals of the educational program Existing Building 197,377 gsf New Building 180,530 gsf MSBA Guidelines 175,740 gsf Revised location avoids need for temporary trailers; No Demo Required PROS (SITE) Renovates in place track and field complex (minimized costs and impact on athletics) Set back from both roads and associated noise Creates comprehensive site circulation layout CONS (SITE) Interferes with existing septic Backs onto trees (loss of trees) Pros and Cons
24 CONCEPTUAL OPTIONS SCHEDULE Add/Reno Option 2b.2 3 years Spring 2018* New Option 3a 2.8 years Spring 2017* New Option 3d 2.8 years Spring 2017* Preliminary Schematic Report (PSR) *Assumes start of construction March 2015
25 CONCEPTUAL PROJECT COSTS & TAX IMPACT MSBA base reimbursement rate of 57.11% Tax rate based on Fiscal 2013 assessed valuation of a $75 -$90M construction cost per $100,000 of home value Average Annual Tax Impact per $100,000 Pepperell Townsend Ashby $ $97.81 $ $ $ $92.37
26 FACTORS THAT IMPACT CONSTRUCTION COSTS Reduce Scope Reduce program area Reduce limit of work e.g. no work on fields, no work on parking lot Reduce areas of renovation e.g. minimal work in auditorium Reduce areas of AC Eliminate modulars use existing district buildings Reduce Quality Reduce all building & engineering systems Reduce overall level of finish Cost Quality Scope
27 Example of Scope Reduction
28 Cost for Temporary Modulars 2b.2 - $1.5M 2c - $2.5M Cost to upgrade Peter Fitzpatrick to accommodate Grade 9 $1.437M Offsetting Cost of Temporary Classrooms
29 Interior Finishes Example
30 CMU Brick Stone Arriscraft (Thin set MFD stone) Metal Panel Composite Wood Panel Terracotta Channel Glass Low $/sf $/sf $/sf $/sf $/sf High $/sf $/sf $/sf $/sf $/sf Exterior Closure Materials
31 NEXT STEPS Submit PSR Preferred Schematic Report Ongoing Meetings with Building Committee and Community MSBA facility advisory study committee 6/26/13 or 7/10/13 MSBA board meeting to approve preferred schematic 7/31/13 Schematic Design 8/1/ /12/2013 MSBA Review 12/13/2013 1/29/2014 MSBA Board Meeting 1/29/2014 Annual Town Meeting Vote Spring 2014
32 OTHER PROGRAMS TO CONSIDER? Central Administration - no* Culinary Arts Program - no Community Uses for NMRHS - inherent Teen Center - inherent Maintenance Facility - yes *Options for central admin still under discussion
33 DISTRICT MAINTENANCE & STORAGE REQUIREMENTS Existing: Exterior Shed 2,000 sf Old Central Office 3,500 sf Interior Old Wood Shop 3,015 sf Interior Custodian Shop 1,020 sf Proposed: 9,535 sf Single Stand Alone Facility? ±10,000 sf Cost Range $2-3M Building & Grounds Two Trucks, Tractor, Lawn Mowers Buildings & Grounds Athletic Exterior Equipment Storage, High Jumps etc. Surplus Furniture Storage Drama Sceneries Project Graduation Materials Custodian Workshop Truck Storage Does not include on site storage boxes for athletics.
34 UPCOMING MEETINGS June 6 th (TBD) - Joint meeting of the BC, School Com, Selectman Boards and Fin Com June 10 th - Building Committee Meeting June 13 th - Submit PSR June 17 th - Building Committee Meeting at Nissitissit Middle School June 17 th - Community Meeting
35 Thank you
ouglas Intermediate School
ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion
More informationHarding Senior High School
1540 Sixth Street East Project Summary:, located in the Eastview area of St. Paul, offers students in grades 9 through 12 a wide range of curriculum options ranging from International Baccalaureate to
More informationPresentation for. Raymond E. Shaw Elementary School Building Committee
Presentation for Raymond E. Shaw Elementary School Building Committee 11.01.2018 AGENDA 1. School Tour Penn Brook School 2. Design Options with Cost 3. Schedule School Tour Penn Brook School, Georgetown,
More informationMEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013
Seattle World School SWS SDAT Workshop 3 2 December 203 SPS SWS at TT Minor TCF Architecture Project Number: 203 002 MEETING MINUTES Attendance: Name Representing Role Paul Wight Seattle Public Schools
More informationThe Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee. Clinton Town Hall January 20, 2011
The Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee Clinton Town Hall January 20, 2011 Tonight s Agenda History of Morgan School and of the Building
More information1001 Feehanville Drive Phone Mt. Prospect, IL Fax
NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 November 29, 2016 Community Unit School District 200 130 West Park Avenue Wheaton, IL 60189
More informationEastern Lebanon County School District Ad Hoc Committee: High School Renovation Project
Ad Hoc Committee: High School Renovation Project Wednesday, October 11, 2017 High School LGI Room, 6:00pm Instructional Focus for 2017-2018 Equitable Access to Rigorous Learning Results Focused Accountability
More informationHorace Mann Elementary
2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are
More informationCherokee Heights Elementary School
694 Charlton Street Project Summary: Cherokee Heights Elementary is about to start its exciting transition to a Montessori learning model. The school is connected to the Baker Center which is currently
More informationCAC MEETING, FEB. 28 TH, 2017 NADAAA
ADAMS STREET BRANCH LIBRARY PROGRAMMING STUDY FOR CITY OF BOSTON BOSTON PUBLIC LIBRARY AND PUBLIC FACILITY DEPARTMENT CAC MEETING, FEB. 28 TH, 2017 NADAAA 1 AGENDA 1.0 SCHEDULE 2.0 SUMMARY OF PROJECT GOAL
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationOLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN
KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12
More informationPBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017
PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017 ARCHITECTURE \\ ENGINEERING \\ PLANNING \\ INTERIORS \\ TECHNOLOGY
More informationNEW LEBANON ELEMENTARY SCHOOL
NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL November 10, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL
More informationNEW LEBANON ELEMENTARY SCHOOL
NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL October 9, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL
More informationContinuing Education Credit
BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP
More informationNew Braunfels ISD. Comprehensive and Strategic Facilities Planning Committee Meeting Tuesday, March 27, 2018
New Braunfels ISD Comprehensive and Strategic Facilities Planning Committee Meeting Tuesday, March 27, 2018 Facilities Committee Bond Proposal! Total Projected Bond Proposal = $84,000,000*! New Middle
More informationCentral High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015
275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.
More informationAUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes
AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes Meeting No. 4 Date: 5/12/2018 Job No. Meeting Location: AVS Conference Room The following notes were taken during a meeting on
More informationSan Francisco Unified School District Beyond the Talk: Modernizing our Schools to Inspire Learning. September 27, Raoul Wallenberg High School
San Francisco Unified School District Beyond the Talk: Modernizing our Schools to Inspire Learning September 27, 2011 Raoul Wallenberg High School Summer of 2011 Continuing the task to fix, repair, make
More informationJohn A Johnson Elementary School
740 York Avenue Project Summary: An Acheivement Plus school John A Johnson is located adjacent to the East Side YMCA, jointly serving their communities educational, recreation, and wellness needs. The
More informationLOS ANGELES UNIFIED SCHOOL DISTRICT EDUCATIONAL SPECIFICATION - HIGH SCHOOL
No. Academic Area Drawing No. Issue Date Drawing Title General Campus 000 General Campus Organizational Model GCOM1.1 A. ACADEMIC AREAS LOS ANGELES UNIFIED SCHOOL DISTRICT EDUCATIONAL SPECIFICATION - HIGH
More informationDASD Loganville Springfield Elementary School Site Feasibility Review. Background For This Work
DASD Loganville Springfield Elementary School Site Feasibility Review Prepared by: Site Design Concepts, Inc. March 30, 2016 Background For This Work No architectural programming or investigation was completed
More informationCAPITAL IMPROVEMENT PROGRAM
CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:
More informationGUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS
Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are made to the University's Board of Trustees in February,
More informationPRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.
MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD
More informationAdams Spanish Immersion 615 Chatsworth Street South
Project Summary: Adams Spanish Immersion is an international education without the travel expense. Our school is a place where families and staff value the opportunities gained from learning a second language.
More informationROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL
ROBERT TURER COLLEGE AD CAREER HIGH SCHOOL SCHEMATIC DESIG PRESETATIO 23 MAY 2017 Project Milestones Schematic Design..... March May 2017 SD Presentation to Board of Trustees...... 23 May, 2017 Design
More informationADAMS STREET BRANCH LIBRARY DESIGN PHASE CITY OF BOSTON
ADAMS STREET BRANCH LIBRARY DESIGN PHASE CITY OF BOSTON MARTIN J. WALSH, MAYOR BOSTON PUBLIC LIBRARY AND PUBLIC FACILITIES DEPARTMENT DAVID LEONARD, PRESIDENT, BOSTON PUBLIC LIBRARY PATRICK I. BROPHY,
More informationHuntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y
Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program
More informationFor questions or feedback please contact Perspective Views
NORTHEAST NORTHEAST NORTHEAST NORTHEAST - EAST EAST 3 - EAST 3 - EAST SOUTHWEST SOUTHWEST SOUTHWEST SOUTHWEST - WEST WEST - WEST For questions or feedback please contact memberfeedback@centralparktennisclub.com.
More informationGREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study
GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study New Lebanon School (K-5) 25 Mead Avenue, Greenwich, CT 20 March 2014 KSQ Architects PC 20 March 2014 GREENWICH PUBLIC SCHOOLS NEW LEBANON
More informationPACIFICA LIBRARIES OPPORTUNITIES
City of Pacifica PACIFICA LIBRARIES OPPORTUNITIES Library Advisory Committee August 9, 2017 AGENDA 1. Call to Order 2. Approval of July 12, 2017 Meeting Minutes 3. Oral Communications 4. Project Schedule
More informationSCARSDALE PUBLIC SCHOOLS. Greenacres Feasibility Study
SCARSDALE PUBLIC SCHOOLS Greenacres - 2015 Feasibility Study Committee List Lee Maude Scott Silberfein Stuart Mattey John Trenholm Liz Marrinan Sharon Hill Paul Berger Karen Guardino Carole Phillips Joan
More informationDESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD
ALBANY UNIFIED SCHOOL DISTRICT DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD BOARD OF EDUCATION PRESENTATION JANUARY 22, 2019 DOUG ESPLAND Sr. Precon Manager & Project Director
More informationPerspective Views NORTHEAST VIEW 1 SOUTHWEST VIEW 2 AERIAL VIEW - EAST AERIAL VIEW - WEST NORTHEAST VIEW SOUTHWEST VIEW AERIAL VIEW - WEST
NORTHEAST NORTHEAST NORTHEAST NORTHEAST - EAST EAST 3 SOUTHWEST SOUTHWEST SOUTHWEST SOUTHWEST - WEST WEST - EAST 3 - EAST - WEST - WEST Perspective Views Annual Meeting June, 7 Northeast View Interior
More informationAllan Hancock College
Allan Hancock College Project Planning Board Workshop February 17, 2009 Agenda Objective Funding Allocation Space Demand Analysis Project Overview Bond Measure I Program Schedule Charge: To review funding
More informationSt. John Paul II Catholic Parish
St. John Paul II Catholic Parish 167th & Ridgeview Road Olathe, Kansas Master Plan Town Hall October 30, 2018 Purpose [ The Church s ] mission consists essentially in offering people an opportunity not
More informationBartlett High School MASTER PLAN May 25, 2017
Bartlett High School MASTER PLAN May 25, 2017 Facility Assessment Summary I. I.1 - Site Appraisal Site Appraisal The current high school was built in multiple phases, which presents challenges in layout
More informationPlease comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at
Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. Target Value Design Case Study
More informationFAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN
KBE APPROVAL DATE: APRIL 2017 FAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN DFP REVISIONS FINDING. NO. 1: APRIL 2018 BOLD NEXT DFP DUE: APRIL 2021 PLAN OF SCHOOL ORGANIZATION 1. Current Plan P, P-5, K-5,
More informationCOMPONENT FLOW CHART & SEQUENCING DIAGRAMS
Oak Park and River Forest High School Master Facilities Plan COMPONENT FLOW CHART & SEQUENCING DIAGRAMS The following is a narrative intended to accompany the component flow chart and sequencing diagrams
More informationGREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM
Date of Meeting: March 20, 2014 GREENWICH PUBLIC SCHOOLS Greenwich, Connecticut Title of Item: New Lebanon School Pre-Feasibility Study Policy Reference: E - 051 REQUEST FOR BOARD ACTION OR PRESENTATION
More informationLinwood Monroe Upper 810 Palace Avenue
810 Palace Avenue Project Summary: Spanning a child s first classroom experience all the way through middle school, Linwood Monroe s Plus lays a foundation for creativity and exploration in the arts. Accelerated
More informationCITY OF SALINAS EL GABILAN BRANCH LIBRARY
CITY OF SALINAS EL GABILAN BRANCH LIBRARY City Council Meeting November 7, 2017 Introduction & Agenda Review Where We Are (Work Plan Review) Goals for This Evening Summary of Key Input from Community Schematic
More informationCS2.0 COVER SHEET VOL. 2
ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:
More informationElementary Grade Configuration School Current Recommendation
To: Board of Education From: Mark P Duerwaechter, Superintendent Date: January 7, 2019 Re: Action Team Recommendation Workshop Information and Discussion Only The Master Planning Action Team met on December
More informationWEST HOLLYWOOD PARK MASTER PLAN 2004
WEST HOLLYWOOD PARK MASTER PLAN 2004 Total of 5.23 acres of uninterrupted grass and trees including playground areas and tree-lined promenades compared with only 1.86 acres of park open space in the existing
More informationELLIS. Ellis Research Center PROPERTY HIGHLIGHTS BRIAN CARR, CCIM LEE CLYBURN. Research Triangle Park North Carolina.
ELLIS Research Triangle Park North Carolina Ellis Research Center Office and Lab PROPERTY HIGHLIGHTS 2400 Ellis Rd RTP, NC 27709 Size 331,898 RSF Floors 4 Parking Power 519 Shared parking spaces 480/277
More informationFULL TEXT OF MEASURE K ORANGE UNIFIED SCHOOL DISTRICT
FULL TEXT OF MEASURE K ORANGE UNIFIED SCHOOL DISTRICT The following is the full proposition presented to the voters by the Orange Unifi ed School Dirict. To repair or replace aging, outdated high school
More informationAmerican Institute of Architects New Hampshire Chapter High School Design Competition Program
American Institute of Architects New Hampshire Chapter 2009 2010 High School Design Competition Program Educational Objectives To increase your awareness of the relationships between space, human scale
More informationCampus Non Educ and General RCV /3/2010. Sightlines Institutional Function
SINCLAIR FARM 13617 MISSOURI INNOVATION CENTE N 10,755.56 98.38 1,058,133.06 13618 SINCLAIR MO OFFICE BLDG. N 13,145.66 208.03 2,734,629.86 13620 ANIMAL BUILDING N 510.13 125.74 64,142.83 13630 ANIMAL
More informationSMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)
REVIEW TYPE: PRELIMINARY FINAL LANDSCAPE ABBREVIATED ADDITION COLOR BOARD Application Form* X X X X X Design Review Fee* X X X Registered Survey** X Site Plan X X X X X Floor Plans X X X Elevations X X
More informationGAZEBO BELMONT PUBLIC LIBRARY MAIN STREET TOWN OF BELMONT TOWN HALL 12/14/2018 EXISTING CONDITIONS
GAZEBO BELMONT LIBRARY STREET TOWN OF BELMONT TOWN HALL EXISTING CONDITIONS DRIVING LANE 6 4 WELLFARE 378 SF TOWN CLERK 800 SF LOBBY 256 SF COMMON SPACES 665 SF LG MEETING RM 600 SF DRIVING LANE TOWN ADMIN.
More informationCORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS)
Classrooms 2-3 scientists Morrison Maierle Classrooms K-1 Specials 146 planners Support surveyors 870 SF RR 147 148 RR 149 engineers 839 SF 150 COPYRIGHT (C) MORRISON-MAIERLE, INC., 2017 Admin Phone: 406.752.2216
More informationSCARSDALE PUBLIC SCHOOLS
SCARSDALE PUBLIC SCHOOLS GREENACRES FEASIBILITY STUDY PROGRESS REPORT BOARD OF EDUCATION Mary Beth Gose Leila Shames Maude Lewis Leone, Jr. Christopher Morin William Natbony Suzanne Seiden Scott E. Silberfein
More informationPLANNING AND DEVELOPMENT
OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing
More informationTown of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019
Town of Belmont, NH Town Space Needs and Feasibility Study January 10, 2019 Police Department EXISTING POLICE DEPARTMENT FULLER STREET MEETING HOUSE SARGENT STREET TOWN OF BELMONT POLICE DEPARTMENT EXISTING
More informationASHLAND SCHOOL BOARD REGULAR MEETING MINUTES HEFFERNAN MEDIA CENTER ASHLAND ELEMENTARY SCHOOL, ASHLAND December 1, 2015
Unapproved ASHLAND SCHOOL BOARD REGULAR MEETING MINUTES HEFFERNAN MEDIA CENTER ASHLAND ELEMENTARY SCHOOL, ASHLAND December 1, 2015 MEMBERS PRESENT MEMBERS ABSENT ADMINISTRATORS PRESENT ADMINISTRATORS ABSENT
More information11/29/12. Des Moines Social Club Urban Design Review Project Narrative
11/9/1 Des Moines Social Club Urban Design Review Project Narrative Strategically located at 9th and Walnut, the Des Moines Social Club (DMSC) will become a critical link between the Court Avenue Entertainment
More informationAMES COMMUNITY SCHOOL DISTRICT SAWYER ELEMENTARY
Exhibit D-4 AMES COMMUNIY SCHOOL DISRIC SAWYER ELEMENARY Schematic Development Project Manual June 25th 2014 RDG Planning & Design 301 Grand Avenue Des Moines, Iowa 50309 architectural narrative Summarized
More informationSouthern Oregon University
Southern Oregon University Public Meeting Notice August 5, 05 TO: FROM: RE: Southern Oregon University Board of Trustees, Finance Committee Sabrina Prud homme, University Board Secretary Notice of special
More informationRezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation
Development Permit Application Rezoning/OCP Amendment Application Zoning DP Area yes no Variances Requested Development Details Property Size (m² or ha) Current Zoning Current OCP Designation Proposed
More informationBuildings and Grounds Supervisor, EASD. CG Schmidt, Sr. Project Manager
MEETING MINUTES August 25, 2015 Colleen O'Meara EUA, Project Manager Bill Trewyn Mike Datza Jason Tadlock Dave Stebnitz Ross Eggert Bob Vajgrt Business Manager, EAST Buildings and Grounds Supervisor, EASD
More informationAVAILABLE FOR LEASE OFFICE AND LABORATORY SPACE Approximately 322,384 RSF
AVAILABLE FOR LEASE AND SPACE Approximately 322,384 RSF 2400 Ellis Road Research Triangle Park, North Carolina www.goellisresearchcenter.com PROPERTY DESCRIPTION Administrative Wing Cafeteria Lobby/Atrium
More informationCheney Building & Bennet Academy Town of Manchester Phase 1 Study Presentation - April 10, 2013 DRAFT
Cheney Building & Bennet Academy own of Manchester Phase 1 Study Presentation - April 10, 2013 Schools Modernization & Reinvestment eam Revisited Board of Directors Board of Education DRAF ai Soo Kim Partners
More informationARCHITECTURE CADD Course Syllabus
6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing
More informationState College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationGeorge Sexton and Associates are the installation and lighting designers.
FAQ: The Chrysler Museum s Expansion and Renovation What exactly does the expansion/renovation project include? The Chrysler s 210,000-square-foot home on the Hague Inlet of the Elizabeth River is regularly
More informationMichael D. Sapraicone President Brian W. Fagan Vice President John DelGiudice - Trustee Linda Hurley Trustee. Richard G.
AUGUST 20, 2009 PAGE 1 A Special Meeting of the Board of Education, Seaford Union Free School District, was held on Thursday, August 20, 2009, in the Board of Education Conference Room located in the Seaford
More informationFCPS Rock Creek School Replacement and Final Site Selection Design Meeting #15 Notes
FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #15 Notes Meeting Date: 26 April 2018 9:30 AM Meeting Location: FCPS Central Office Building, Board Room Current Design Phase:
More informationEXISTING SITE PLAN. Consultants: Civil: Evans Engineering, Inc Old Post Rd. Harrisburg, PA (717) Harrisburg, PA 17110
330 orth Third St. Architecture Renovations to: O. DESCRIPTIO DATE SGA PROJECT UMBER: EXISTIG SITE PLA Drawing umber: EX00 SCHEMATIC DESIG D D0 OFFICIAL'SVESTIBULE LOCKER D03 D04 D02 COACHES D05 GYMASIUM
More informationCITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)
CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA 98040 (206) 275-7605 SUBMITTAL REQUIREMENTS FOR DESIGN COMMISSION APPROVAL & SIGNAGE APPROVAL PURPOSE: Design Commission
More informationDOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION
This application, including the Conceptual Review Presentation, must be completed and submitted to the Downtown Development Review Board (DDRB) Staff twenty (20) business days prior to the upcoming DDRB
More informationOak Park and River Forest High School District North Scoville Avenue Oak Park, IL
Oak Park and River Forest High School District 200 201 North Scoville Avenue Oak Park, IL 60302-2296 To: Board of Education From: Tod Altenburg, CSBO Phil Prale, ASCI Date: August 16, 2016 Re: Requested
More informationIrvin L. Young Memorial Library Expansion Project. Frequently Asked Questions
Irvin L. Young Memorial Library Expansion Project Frequently Asked Questions We ve been asked many questions about the proposed expansion of the library. It has been our intent to explore many different
More informationChapel Farm House OAKHANGER I HAMPSHIRE I GU35 9JB
Chapel Farm House OAKHANGER I HAMPSHIRE I GU35 9JB 6 Bedrooms 2 Bathrooms Shower Room Drawing Room Dining Room Family Room Study Barn Room Kitchen/Breakfast Room Laundry/Boot Room Cellar Garden Store Extensive
More informationSUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV
COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS
More informationNON-RESIDENTIAL DEVELOPMENT
GENERAL REQUIREMENTS (Print or Type) Name of Proposed Project: Location of Project: Legal Description of Project (Assessor s Parcel No. or T, R,S): Staff Use Only FILE NO.: RELATED FILES: Applicant s Name:
More informationMarch 1, Buildings for Our Future: 2016 Update
March 1, 2016 Buildings for Our Future: 2016 Update Buildings For Our Future: Project Objectives Transform five elementary schools in poor and worsening condition into 21st century centers of learning
More informationIndustrial Technology Education
Final Report: 2003-2004 INDEPENDENT SCHOOL DISTRICT #2397 LE SUEUR-HENDERSON PUBLIC SCHOOLS Industrial Technology Education COMMITTEE MEMBERS Staff Members: Jim Carstens Milen Lovich Mark Vrklan Administrative
More informationCASE STUDY DOORS AND HARDWARE SEPTEMBER 2006
CASE STUDY Main entrance to Forest Hills Eastern Middle/High School centers on the Great Hall area that forms the hub of school activity and traffic flow. double doors open from classrooms into spacious
More informationPermits (Submitted to Permit Counter) APPLICATION CHECKLIST
Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy
More informationThis Addendum #5 to the subject RFP is issued to provide answers to vendor questions received.
TO: Prospective Bidders FROM: Phil Trayer Director of Finance DATE: February 1, 2018 SUBJECT: Addendum # 5 RFP 010262018-1100: Security Camera This Addendum #5 to the subject RFP is issued to provide answers
More informationIndex. 1 Introduction. 2 Executive Summary. 3 Long-Range Facility Master Plan
Index 1 Introduction 2 Executive Summary Existing Facility Inventory and Assessment Preliminary Space Needs Projections Master Plan Conclusions Project Recommendations 3 Long-Range Facility Master Plan
More informationIT'S ALL ABOUT ATMOSPHERE ARTIST S RENDERING. FINISHED PRODUCT MAY VARY.
IT'S ALL ABOUT ATMOSPHERE ARTIST S RENDERING. FINISHED PRODUCT MAY VARY. MIAMI MIAMI BEACH SOUTH BEACH FISHER ISLAND KEY BISCAYNE STAR ISLAND PORT OF MIAMI VENETIAN ISLANDS BAYSIDE DOWNTOWN MIAMI BRICKELL
More informationCHAPTER A-15 INTERIOR DESIGN INDEX
CHAPTER A-15 INTERIOR DESIGN Revised December 2011 INDEX 15.1 GENERAL 15.1.1 Scope 15.1.2 Quality 15.1.3 Sustainable Design 15.1.4 Multiple Buildings 15.1.5 Site Adapting 15.1.6 Renovations 15.2 APPLICABLE
More informationSYSTEMS+ ACOUSTIC REQUIREMENTS INNOVATIVE SYSTEMS SOLUTIONS USGBORAL.COM
USGBORAL.COM SYSTEMS+ B 2 B 3 B 4 B 6 B 8 INTRODUCTION MULTI-RESIDENTIAL BUILDINGS COMMERCIAL BUILDINGS EDUCATIONAL FACILITIES HEALTH CARE BUILDINGS B ACOUSTIC REQUIREMENTS INNOVATIVE SYSTEMS SOLUTIONS
More informationFCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes
FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes Meeting Date: 15 March 2018 9:30 AM Meeting Location: Rock Creek School, Media Center Current Design Phase: Schematic
More informationWhere To Start: Collegiate Space Needs & Planning Standards
Where To Start: Collegiate Space Needs & Planning Standards Where To Start: Space Needs & Planning Standards Stephen E. DeHekker, AIA, LEED AP BD+C Senior Vice President James Gabel, AIA, LEED AP Senior
More informationPresentation to the Mahwah Board of Education June 14, 2017
Presentation to the Mahwah Board of Education June 14, 2017 STEM OR STEAM: WHAT S THE DIFFERENCE? STEM education integrates concepts that are usually taught as separate subjects in different classes and
More informationSummerland Planning Advisory Committee
Summerland Planning Advisory Committee SunPAC Meeting #32 May 10, 2011 1 SunPAC Meeting Agenda Call to Order Agenda Item: 1 Item 1: Pledge of allegiance and roll call Item 2: Public comment period Item
More informationMarcus Moziah Garvey Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationTo: Holly J. Godard Meeting Date: September 4, 2014 City of Seattle
MEETING MINUTES To: Holly J. Godard Meeting Date: City of Seattle Seattle Project No. 3018266 700 Fifth Avenue, Suite 1800 Project No.: PO Box 34019 Task No.: 11/31/41 Seattle, WA 98124-4019 holly.godard@seattle.gov
More informationAppendix A Site Reconnaissance Photographs
Appendix A Site Reconnaissance Photographs PHOTOGRAPH 1. Access to the Site from the intersection of 7 th Street and Michigan Avenue Direction : West PHOTOGRAPH 2. Access to the Site from the intersection
More informationMARSHALL. Comprehensive Long Range Facility Study / Plan. Facility Planning Committee Meeting 4 INDEPENDENT SCHOOL DISTRICT 413
Comprehensive Long Range Facility Study / Plan INDEPENDENT SCHOOL DISTRICT 413 MARSHALL Facility Planning Committee Meeting 4 Facilitated by ATS&R representatives: David Maroney and Eric Anderson Jul 14,
More informationSpace Needs Summary: SPS/Health Center
3.3.1 Program Summary: SPS/Health Center 167 Space Needs Summary: SPS/Health Center PROGRAM ELEMENT PROPOSED NOTES No. (N) Type Name s Area Sub. ASF Total ASF STN. 10.0 Special Programs & Services / Project
More informationARB ACTION MEMO. Mr. Missel called the meeting to order at 1:01 p.m. and established a quorum.
COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 (434) 296-5823 Fax (434) 972-4012 Date: Time: 1:00 PM Meeting Room: Room #241
More informationMinnewaska Area Schools. e Technology Plan
Minnewaska Area Schools e 2020 Technology Plan We believe that a STRONG and PROGRESSIVE school is CONNECTED! Technology enhances connections and will better prepare MAS graduates for a technology-based
More informationASSIGNMENT 04: Library Massing + Program
ASSIGNMENT 04: Library Massing + Program THE IMPORTANCE OF PROGRAM AND MASSING DIAGRAMMING: Program and Massing diagrams are critical tools used to visually describe the relationship between the way a
More information