1 Bartlett High School MASTER PLAN May 25, 2017

2 Facility Assessment Summary I.

3 I.1 - Site Appraisal Site Appraisal The current high school was built in multiple phases, which presents challenges in layout and programming of the space. Most of the original buildings are over 40 years old, with some as old as 100 years. The original auditorium was built in 1917 and the Varsity Gymnasium and Building E Classroom Building were built in 1950 and 1951, respectively. The buildings on the west end of campus were built in 1963 and were originally designed as an elementary school. The last major building additions were completed in 1978 completing the campus to what we see today. The total building square footage is approximately 324,240ft 2 housed in 10 separate buildings. Currently the campus houses approximately 1,600 students along with 100 faculty and staff members. The school is located on approximately 25± acres between Woodlawn Road and Blackwell Street in Bartlett, Tennessee. The existing baseball, softball and tennis facilities are located off-site. Ideally all of these facilities would be located on the high school campus. The surrounding land use is primarily residential with religious and senior care to the south. The land on the western side of the campus is currently leased to Durham School Services for a bus lot for the district. The site is located on the western side of the city limits of Bartlett and is removed from undesirable businesses and excessive traffic. Good pedestrian access to the school property is available through sidewalks along surrounding streets. The onsite athletic areas do not have sufficient solid surface parking and have a problematic entrances and exits. Site Safety Student loading areas for the buses are not isolated from vehicle traffic or carpool pickup. This presents a safety hazard as some students going to the bus or their car must walk through the parking lot between vehicles, buses and lanes of traffic. The sidewalks along Woodlawn Road and Blackwell Street are adequate and provide good access to the site. Pedestrian sidewalks through the parking lots to parked vehicles are inadequate. Currently there are no traffic lights adjacent to the school, there are school zone signs and flashing signal signs on Woodlawn Road and Blackwell Street. There are no signals at any of the entrances or exits to the school. Current entrance and exit configurations do not promote safe traffic management and create unnecessary congestion on-site as well as interaction between pedestrians and vehicles. A loop road with segregated bus / car / drop off lanes is desirable. Increasing the enrollment by 800 students will worsen this problem. The tennis, baseball and softball facilities are located off-site which creates additional safety concerns. Bartlett High School Master Plan 7

4 Summary of Appraisal for Bartlett High School Buildings I.2 - Summary of Building Appraisals Main Building Eastern Annex Science Building Band Building Softball & Baseball Gym Basketball Gym Western Annex Average Score Possible Points Building A Building B Building C Section 2.0 Structural & Mechanical 73% 73% 76% 70% 77% 75% 76% 70% 69% 74% 73% 200 Section 3.0 Plant Maintainability 64% 61% 54% 59% 66% 65% 65% 62% 64% 65% 63% 100 Section 4.0 Building Safety & Security 79% 79% 81% 73% 78% 79% 82% 79% 73% 80% 78% 160 Section 5.0 Educational Adequacy 68% 60% 72% 72% 68% 58% 72% 60% 68% 66% 66% 50 Section 6.0 Environment for Education 57% 57% 56% 56% 56% 56% 58% 56% 56% 64% 57% 200 Total Score 63% 63% 63% 60% 64% 64% 65% 62% 61% 66% 63% 710 Rating by Category 1-29% 30-49% 50-69% 70-89% % Very Inadequate Poor Borderline Satisfactory Excellent Bartlett High School Master Plan 9

5 I.3 - Executive Summary Executive Summary, Conclusions & Recommendations Fleming Architects was hired by the Bartlett School District to conduct a preliminary facility condition assessment, create a preliminary building program and perform a preliminary facility site assessment of the Bartlett High School campus. These tasks were performed to understand at a high level the physical condition of each building and to assess the feasibility of expanding the current Bartlett High School campus to meet its future space program needs. The school is located at 5688 Woodlawn Street in Bartlett, Tennessee. The current school campus was designed for an enrollment of 2,200 students, and houses approximately 2,120 students and 150 teachers and staff. The school is expected to grow to 2,300 students in 2015 and up to 3,000 students within the next 4 years thereafter. This assessment seeks to identify the major deficiencies within the existing buildings under the current student load, and also determine the feasibility for expansion of the high school to accommodate the anticipated future growth. The first step in the process was to determine the condition of the existing building and athletic facilities at the campus. In order to determine the condition of the facilities, Fleming utilized the Guide for School Facility Appraisal published by The Council of Facility Planners, International (CEFPI). This industry-recognized evaluation tool provided an objective scoring approach to determine the viability of the campus long-term use. The evaluation of the facility included participation from architectural, structural, mechanical, plumbing, fire protection and electrical engineering professionals. The Fleming assessment team, comprised of architects and engineers, visited the buildings along with Mr. David Stephens, Superintendent, and Mr. Ken Demetriou, Director of Operations. The Fleming assessment team visually observed at a high level the aesthetics, building envelope / energy efficiency, handicap accessibility and amenities, structural and seismic adequacy, sufficient services / utilities for the buildings and the programs therein as well as the condition, types and functionality of the building systems serving each structure. Also, the Fleming team met with Mr. Jeff Waller, Plant Manager of the High School, to hear first-hand the deficiencies of the campus. In reviewing the campus, it was determined that all existing code deficiencies found in the buildings are grandfathered under their respective building and life-safety codes; therefore, they do not require updating to meet current codes until such time when work is done to the buildings. This will remain the case as long as the yearly code comments and corrections lists provided by the State Fire Marshal are addressed or until major renovations are made. 10 Fleming Architects Bartlett City Schools

6 The study found that all of the buildings on campus are considered to be Borderline according to CEFPI standards in their ability to function as educational facilities. A combination of demolition and replacement, renovation and new construction will be needed to bring the individual buildings into a more satisfactory condition to serve the current and increased student enrollment. The study also found that the existing site is too small to accommodate the necessary buildings, parking and athletic fields needed to support a 3,000 student campus. Currently some students are parking off-site and some athletic fields are located off-site. In order for the existing Bartlett High School campus to meet the needs of a 3,000 student enrollment, additional acreage must be secured and developed in order to add the buildings and parking required to support Bartlett High s programs, as well as improve the vehicular and pedestrian circulation and safety on campus. Conclusions and Recommendations #1) The current buildings on the Bartlett High School Campus are Borderline in their ability to adequately serve the current 2,200 student enrollment. Continued growth to 3,000 students will only exacerbate the problem. #2) The current 25± acre Bartlett High School site is not large enough to accommodate the programs for a 3,000 student enrollment. #3) The existing Bartlett High School campus must be expanded to adequately serve its current and future student enrollment through a logical, phased plan including the demolition, replacement and/or renovation of existing buildings and the construction of new buildings on the current campus. Also, the campus must expand onto additional acreage to serve the projected growth. #4) The campus must be redeveloped to improve vehicular and pedestrian circulation and safety. I.3 - Executive Summary #5) The next step is to develop a detailed space program for 3,000 students, conduct a more thorough facility condition assessment, and create a phased master plan including cost by phase incorporating potential adjacent land acquisition and building expansion. Bartlett High School Master Plan 11

7 Survey Responses II.

8 II.1 - Public Survey Responses BARTLETT CITY SCHOOLS Survey Results - Tuesday, October 18, 2016 Powered by Bartlett High School Master Plan 15

9 II.1 - Public Survey Responses 163 Total Responses Date Created: Thursday, August 18, 2016 Complete Responses: 163 Powered by 16 Fleming Architects Bartlett City Schools

10 II.1 - Public Survey Responses Q1: I am a... Answered: 163 Skipped: 0 Powered by Bartlett High School Master Plan 17

11 II.1 - Public Survey Responses Q2: I am a resident of Bartlett: Answered: 163 Skipped: 0 Powered by 18 Fleming Architects Bartlett City Schools

12 II.1 - Public Survey Responses Q3: I am employed bybartlett City Schools: Answered: 163 Skipped: 0 Powered by Bartlett High School Master Plan 19

13 Q4: I am a parent with a child (children) in the following grade(s), (check all that apply): Answered: 138 Skipped: 25 II.1 - Public Survey Responses Powered by 20 Fleming Architects Bartlett City Schools

14 Q4: I am a parent with a child (children) in the following grade(s), (check all that apply): Answered: 138 Skipped: 25 II.1 - Public Survey Responses Powered by Bartlett High School Master Plan 21

15 Q5: For each of the following categories, give a value from a low of 1 (extremely low priority for the school) to a high of 5 (extremely high priority for the school) so that we can consider your input as we plan for future space needs at the Bartlett High School. Answered: 163 Skipped: 0 II.1 - Public Survey Responses Powered by 22 Fleming Architects Bartlett City Schools

16 Q5: For each of the following categories, give a value from a low of 1 (extremely low priority for the school) to a high of 5 (extremely high priority for the school) so that we can consider your input as we plan for future space needs at the Bartlett High School. Answered: 163 Skipped: 0 II.1 - Public Survey Responses Powered by Bartlett High School Master Plan 23

17 Q5: For each of the following categories, give a value from a low of 1 (extremely low priority for the school) to a high of 5 (extremely high priority for the school) so that we can consider your input as we plan for future space needs at the Bartlett High School. (cont.) Answered: 163 Skipped: 0 II.1 - Public Survey Responses Powered by 24 Fleming Architects Bartlett City Schools

18 Q5: For each of the following categories, give a value from a low of 1 (extremely low priority for the school) to a high of 5 (extremely high priority for the school) so that we can consider your input as we plan for future space needs at the Bartlett High School. (cont.) Answered: 163 Skipped: 0 II.1 - Public Survey Responses Powered by Bartlett High School Master Plan 25

19 Q5: For each of the following categories, give a value from a low of 1 (extremely low priority for the school) to a high of 5 (extremely high priority for the school) so that we can consider your input as we plan for future space needs at the Bartlett High School. (cont.) Answered: 163 Skipped: 0 II.1 - Public Survey Responses Powered by 26 Fleming Architects Bartlett City Schools

20 II.1 - Public Survey Responses Powered by Bartlett High School Master Plan 27

21 II.1 - Public Survey Responses Powered by 28 Fleming Architects Bartlett City Schools

22 II.1 - Public Survey Responses Powered by Bartlett High School Master Plan 29

23 Q9: There is very limited space on the Bartlett High School campus, so Bartlett City Schools is considering options for the location of the 9th Grade Academy. Would you prefer to have a stand-alone 9th Grade Academy relocated to the existing High School site along with the other grades, even if it meant relocating the existing football stadium off site? Answered: 157 Skipped: 6 II.1 - Public Survey Responses Powered by 30 Fleming Architects Bartlett City Schools

24 II.2 - Student Group Responses BARTLETT HIGH SCHOOL MASTER PLAN SUMMARY OF STUDENT GROUP RESPONSES IN-PERSON INTERVIEWS WITH STUDENTS Bartlett High School Master Plan 31

25 II.2 - Student Group Responses WHAT DO YOU LIKE MOST ABOUT THE BHS CAMPUS & FACILITIES? Open can go outside breath of fresh air Older brick; historical Good technology inside Separate functions Colors Match Bartlett Station/Historical District Historic 1917 Plaque in Auditorium Reminds you where you are from IN THEIR WORDS: WORDS TO DESCRIBE THE CURRENT CAMPUS: Gloomy Scary Dull Creeped out Cluttered WHEN TALKING TO FRIENDS WHO ATTEND OTHER SCHOOLS, WHAT IS THE PERCEPTION THEY HAVE OF BHS? Can t wait to come to Bartlett High School Get me away from Bartlett High School Atmosphere has improved Need sports facilities o Sports Center at Freeman Park o Activity bus for transportation 32 Fleming Architects Bartlett City Schools

26 II.2 - Student Group Responses WHAT DO YOU THINK NEEDS THE MOST IMPROVEMENT ON THE BHS CAMPUS? Noise buses, cars playing loud music are disruptive in classrooms Sustainability/recycling options No covering in some areas for when it rains. Far to go from one side of campus to the other Too open to public (safety concern) No big problems security Bigger classrooms not enough seats Upgrade drinking fountains o Add bottle fillers to water fountains Accessibility (elevators) The tunnel is creepy (dark, confined circulation spaces) Buildings/Architecture not coherent Buildings need to look like they belong together The metal building (Building C) is the most unattractive building on campus. Think down on ourselves because in a bad place Better lighting Clean windows Improved site lighting Cafeteria too small Auditorium too small Need more parking; better flow; two ways out New parking lot Gym can t fit whole school too small (can only fit one grade at a time) NW gym (Building F) has mold and plumbing problems Bathrooms need work (trash cans and soap) Need dedicated parents drop off lane Front drive potholes We want to be proud of school Need interactive classrooms promethean board Technical integration classrooms organized around technology/promethean board Bike rack; improve pedestrian access Band room is too small Practice football field is split between multiple sports o Track, Football, Band, Lacrosse all use practice field Need lined field for lacrosse Bartlett High School Master Plan 33

27 II.2 - Student Group Responses Need lined field for lacrosse Need bathrooms at soccer field Combine attendance and main office (improve wayfinding for parents and visitors) SAFETY & SECURITY: Add ID badges for students? All the doors easy to access makes uneasy 168 outside doors o Locked, inconvenient Feel safe because of security personnel and camera People come on campus and get confused Improve circulation and wayfinding Dodging cars kids hit by car GOOD CASE STUDIES Centrally located similar to Bolton s outdoor space between Main and East building. Courtyard at CBHS Rotunda at Arlington (photo op spot) Houston High School has a park 34 Fleming Architects Bartlett City Schools

28 II.2 - Student Group Responses IN THEIR WORDS: WORDS TO DESCRIBE A DREAM CAMPUS: More natural lighting large Trees Landscape Garden Clean windows Vibrant Inviting Green Exciting Powerful Beautiful Outstanding Expanded/advanced Colorful All specific classes in same place Picnic area; outside eating Sports area at Freeman Park Gathering Area o Outdoor areas o More intimate o Vending machines and water fountains o Coffee Shop o Garden o Positive environment o Inspiring/inviting o Open o Grass o Natural light/windows Bartlett High School Master Plan 35

29 Building Space Program III.

30 Bartlett High School Building Program Grades for 2,250 Students updated 5/23/2017 III.1 - Building Program Group NAME OF SPACE # FT FT NET SF TOTAL NET SF SPACES W D EACH AREA AREA FACULTY COMMENTS/REQUESTS ADJACENCY EXISTING NET SF DEFFICENCY (NEW SF STANDARD ACADEMIC S Classrooms ,440 reduce due to dual role of Journalism class Total SF 61,440 46,180 15,260 SPECIAL EDUCATION General Special Education Classroom ,248 7,488 Sensory Room ,248 1,248 Special Education Toilet (HC) Storage for SE Classroom Family Living Center ,536 1,536 Administrative SE Clerical SE admin spaces need to be near SE classrooms SE Conference SE Records SE Storage SE Nurse SE Counseling Total SF 12,793 4,788 8,005 SPECIAL FUNCTION S Journalism Classroom ,200 1,200 Journalism Offices (Advisor + Editor) Journalism Storage In School Suspension (ISS) Classroom Toilet Room for ISS Resource Classroom - Speech Resource Classroom - Sensory OT/PT Resource Classroom - Home Resource Classroom - Base Storage for Resource Classrooms (2 per room) Total SF 5, ,613 Bartlett High School Master Plan 39

31 Bartlett High School Building Program Grades for 2,250 Students updated 5/23/2017 III.1 - Building Program Group NAME OF SPACE # FT FT NET SF TOTAL NET SF SPACES W D EACH AREA AREA FACULTY COMMENTS/REQUESTS ADJACENCY EXISTING NET SF DEFFICENCY (NEW SF LIBRARY Circulation Area ,500 6,500 library of the future; flexible seating; flexible use of space centrally located, near public restrooms Conference Room ,064 Work Room Study Room breakout space at perimeter of library Book Storage General Storage Total SF 8,532 6,073 2,459 Computer Labs (Business/Marketing, Computer Science) Instructional Computer Lab ,080 1, workstations Computer Science Lab ,368 1, students Computer Lab ,368 1, students Storage cubical style storage Total SF 4,416 2,641 1,775 SCIENCE LABS Chemistry Labs ,344 2, students Biology/Life Science ,344 2, students Special Projects Lab (AP) ,344 1,344 Physics/Physical Science ,344 1,344 Lab Storage & Prep Spaces ,680 chemistry prep, biology prep, physics prep, Special Project Lab prep adjacent to labs Total SF 9,744 9, Fleming Architects Bartlett City Schools

32 Bartlett High School Building Program Grades for 2,250 Students updated 5/23/2017 III.1 - Building Program Group NAME OF SPACE # FT FT NET SF TOTAL NET SF SPACES W D EACH AREA AREA FACULTY COMMENTS/REQUESTS ADJACENCY EXISTING NET SF DEFFICENCY (NEW SF VARISTY GYMNASIUM AND PHYSICAL EDUCATION GYMNASIUM Varsity/Competition Varsity Gymnasium (2,500 seats) ,280 20,280 3,500 seats requested; Basketball, volleyball courts Equipment Storage ,050 Tournament Gymnasium Tournament Gymnasium (1,500 seats) ,650 13,650 1,500 seats (similar to existing gym) Equipment Storage Physical Education Physical Education Gym ,260 7,260 rubber flooring PE Gym Storage Wrestling Room Wrestling Area/Activities ,000 6,000 Locker Areas Men Physical Education share with off season sports, visiting basketball teams Women Physical Education share with off season sports, visiting basketball teams Men Football Varsity ,200 1, lockers Men Football Visitor lockers Men Basketball Varsity/JV Women Basketball Varsity/JV lockers Women Volleyball Men Wrestling Men Toilets & Showers Women Toilets & Showers Laundry Room Common Athletic Spaces Bartlett High School Master Plan 41

33 Bartlett High School Building Program Grades for 2,250 Students updated 5/23/2017 III.1 - Building Program Group NAME OF SPACE # FT FT NET SF TOTAL NET SF SPACES W D EACH AREA AREA FACULTY COMMENTS/REQUESTS ADJACENCY EXISTING NET SF DEFFICENCY (NEW SF Football Weight Lifting Room ,400 2, boys Auxiliary Weight Lifting Room ,500 1,500 Weight Storage Training Room Film Room ,250 1,250 seating for 50 Athletic Conference/Hospitality Room combine with other athletic/common space Football Stadium Concessions existing on site is ok Coaches Offices Head Coach Offices (w shower/rr) football, wrestling, volleyball, boys basketball, girls basketball Head Coach Toilet/Shower (M/W) Football Assistant Coaches assistant coaches (cubicles) Football Assistant Coaches Toilet/Shower Basketball Assistant Coaches assistant coaches Basketball Assistant Coaches Toilet/Shower (M/W) Storage Spaces Team Storage football, boys BB, girls BB, volleyball, wrestling, baseball, softball, track in or near coach's offices Total SF 66,799 47,280 19,519 LOBBY AREA Main/Entry Lobby ,275 2,275 Gym/Auditorium Lobby ,220 2,220 lobby shared with athletics and auditorium Concession Area includes storage Men's Toilet ,024 Women's Toilet ,024 Ticket Sales Room Total SF 5,028 2,597 2, Fleming Architects Bartlett City Schools

34 Bartlett High School Building Program Grades for 2,250 Students updated 5/23/2017 III.1 - Building Program Group NAME OF SPACE # FT FT NET SF TOTAL NET SF SPACES W D EACH AREA AREA FACULTY COMMENTS/REQUESTS ADJACENCY EXISTING NET SF DEFFICENCY (NEW SF AUDITORIUM Auditorium (Seating for 1000) ,800 10,800 provide control booth and (2) areas for spot lights (8'x8') Stage/Back stage ,320 4,320 stage (min) size: 90'Wx40'D; stage height: 65' (inc. fly loft); proscenium opening: 35' Orchestra Pit Prop Storage ,000 1,000 min. dimensions - 25'x25' (625 SF) Dressing rooms (includes toilets) needs room for 30 students in each; provide restroom and shower in each Costume Storage Room min. dimensions - 25'x25' (625 SF); repair space Drama Classroom w Mini-Stage for 30 students; min. dimensions - 35'x35' (1,225 SF) near public toilets Storage for Drama Classroom Fine Arts/Theater offices; 10'x10' (100 SF) each near theater classroom Office and scene shop Fine Arts Office Work Area Black Box Theater (75 seats) ,000 1,000 Total SF 20,484 8,475 12,009 Bartlett High School Master Plan 43

35 Bartlett High School Building Program Grades for 2,250 Students updated 5/23/2017 III.1 - Building Program Group NAME OF SPACE # FT FT NET SF TOTAL NET SF SPACES W D EACH AREA AREA FACULTY COMMENTS/REQUESTS FINE ARTS ROOMS Visual Arts Art Classrooms ,209 3,627 4 classrooms, 30 students each ADJACENCY EXISTING NET SF DEFFICENCY (NEW SF Art Storage min. 20'x20' (400 SF) each Art Kiln Room near exit Art Office TV Studio ,640 4,640 include/revise? - BCS to advise TV Classroom include/revise? - BCS to advise Vocal Music Vocal Music ,520 1, students near public toilets Vocal Music Storage common music library (band, Vocal Music Office Instrumental Music Instrumental Music Large (290 students) ,150 7, 'x65' (7150 SF) for 290 students requested Small Instrumental Music/Ensemble (Shared) ,588 3, students Instrumental Music Storage instruments Color guard storage Uniform storage uniforms String Music ,000 2, students String Music Storage instrument lockers Guitar Storage store 35 instruments Practice Rooms - Small instrumental practice rooms; 4-6 strings practice rooms for 8 people near public toilets Practice Rooms - Medium Instrumental Music Office Common Fine Arts Spaces Music Technology Lab ,344 1, keyboard/midi/computer workstations Music Library (band, choir, strings) Total SF 29,091 10,565 18, Fleming Architects Bartlett City Schools

36 Bartlett High School Building Program Grades for 2,250 Students updated 5/23/2017 III.1 - Building Program Group NAME OF SPACE # FT FT NET SF TOTAL NET SF SPACES W D EACH AREA AREA FACULTY COMMENTS/REQUESTS ADJACENCY EXISTING NET SF DEFFICENCY (NEW SF CAFETERIA AND KITCHEN Dining area (750 seats) ,000 14,000 BCS to advise Kitchen ,980 1,980 3 steamers Dish wash Area Dry Storage Area Freezer Refrigerator Pot/Pan Storage Cafeteria Manager Office Cafeteria Worker's Locker Locker Toilet Area Teacher Dining Area teachers Serving Line Areas ,400 5 serving lines Chair Storage Janitor Total SF 20,707 11,001 9,706 ADMINISTRATIVE OFFICES Reception Area waiting Principal small conference space (8-12 people) Principal Toilet Room Vice-Principal small conference space (8-12 people) Assistant Principals currently, may need to be 5; 3 discipline with waiting areas; attendance is bigger with toilet and conference area Financial Secretary larger with safe area; extra files and counter space Payroll Sec near guidance Bartlett High School Master Plan 45

37 Bartlett High School Building Program Grades for 2,250 Students updated 5/23/2017 III.1 - Building Program Group NAME OF SPACE # FT FT NET SF TOTAL NET SF SPACES W D EACH AREA AREA FACULTY COMMENTS/REQUESTS ADJACENCY EXISTING NET SF DEFFICENCY (NEW SF General Office Records Room Conference Room - Large Auxiliary Conference Room - Medium people Vault Area Copy Room/Work Room Supply Storage Room Staff Break Room Staff Toilets Total SF 3,473 4, GUIDANCE AREA Reception Area waiting for 5-10 Counselor Offices counselor offices needed + 1 Conference Room - Medium college & career people Conference Room - Large Records Room Copy Room/Work Area Break Room Staff Toilets Vice Principal Suite Supplies/Storage Total SF 2,394 2, ATTENDANCE OFFICE & CLINIC Attendance/Reception waiting for 3-7 Conference Room - small Clerical Office smaller offices for secretaries Copy Room/Work Area Clinic Clinic Toilet Nurse Office Medical Records Clerk Office Clinic Storage (Medicine) Staff Toilets Total SF 2,180 1, Fleming Architects Bartlett City Schools

38 Bartlett High School Building Program Grades for 2,250 Students updated 5/23/2017 III.1 - Building Program Group NAME OF SPACE # FT FT NET SF TOTAL NET SF SPACES W D EACH AREA AREA FACULTY COMMENTS/REQUESTS ADJACENCY EXISTING NET SF DEFFICENCY (NEW SF MISCELLANEOUS SPACES Study Hall ,700 2, students Student Restrooms ,960 IT Tech Repair Area near library IT Tech Storage Supply Store Room near marketing classroom Teacher Work Areas TWA , teachers each; printing and coke/snack vending areas Toilets TWA SRO Offices waiting area for 2-4 Textbook Storage Rooms ,144 2 spread around campus; space for 3,000 textbooks General Storage Rooms ,144 Janitorial/Custodial Plant Manager's Office Storage Room (Maintenance) Mechanical - Main Mechanical - Small/AHU Electrical Plumbing/Fire Pump IDF/Server/IT Elevator Equipment Room (not including elevator) Total SF 16,843 8,681 8,162 STEM PROGRAM Labs ,280 2,560 locate STEM labs/classes near CTE classes Lab Prep Area Classrooms ,280 2,560 Storage Total SF 5, ,760 Bartlett High School Master Plan 47

39 Bartlett High School Building Program Grades for 2,250 Students updated 5/23/2017 III.1 - Building Program Group NAME OF SPACE # FT FT NET SF TOTAL NET SF SPACES W D EACH AREA AREA FACULTY COMMENTS/REQUESTS ADJACENCY EXISTING NET SF DEFFICENCY (NEW SF VOCATIONAL-TECHNICAL EDUCATION CTE Health Sciences & Technology Education ,304 2 CR currently, 3 classrooms requested Health Sciences & Technology Education Lab ,344 1,344 2 CR currently, 3 classrooms requested Fashion (Sewing Lab) ,344 1,344 Child Development Human Studies Classroom Human Studies Kitchen Lab ,344 1,344 Digital Arts & Design Classroom/Lab ,344 1,344 Web Design Classroom ,344 1,344 1 CR currently, 2 classrooms requested Criminal Justice Classroom ,536 Culinary Arts Classroom Culinary Arts Lab (Commercial Kitchen) ,800 1,800 Culinary Arts Café Culinary Arts Storage Early Childhood Education Classroom Early Childhood Education Lab (preschool) ,100 2,100 kitchen, laundry, child restroom, outdoor areas Auto Shop ,000 6,000 Auto Classroom ,008 1,008 Welding (Lab/Shop) ,100 2,100 Welding Storage Welding/Machining Classroom Machining & Advanced Manufacturing (Lab/Class ,100 2,100 Machining & Advanced Manufacturing Storage storage for long materials (20'+) Cosmetology ,100 2,100 CTE Storage Areas ,800 Total SF 38,326 39,776-1,450 Sub Grand Total 313, , ,617 Circulation at 30%* 93,987 61,702 32,285 GRAND TOTAL FOR HIGH SCHOOL 407, , , , Fleming Architects Bartlett City Schools

40 Bartlett High School Building Program Grades for 2,250 Students updated 5/23/2017 III.1 - Building Program Group NAME OF SPACE # FT FT NET SF TOTAL NET SF SPACES W D EACH AREA AREA FACULTY COMMENTS/REQUESTS ADJACENCY EXISTING NET SF DEFFICENCY (NEW SF *Circulation factor includes corridors, stairs, lobbies, toilets, etc. ATHLETIC FIELDS Football Stadium Football Field Bleachers Running Track Football Support Building (concessions, restrooms) Existing on site Existing on site Existing on site Existing on site Baseball Softball Soccer Tennis Lacrosse Practice Fields Baseball Stadium Softball Stadium Soccer Field Tennis Courts Lacrosse Field Located off-site at Freeman Park Located off-site at Freeman Park Located off-site at Shelby St. Athletic Fields Located off-site Located off-site Football On campus required if turf field? Band On campus PARKING Visitor Parking 20 Staff Parking 150 Student Parking 750 TOTAL PARKING 920 Bartlett High School Master Plan 49

41 Master Plan Concept IV.

42 IV.1 - Master Plan Concept - Aerial Bartlett High School Master Plan 53

43 IV.2 - Final Concept Plan - First Floor PARKING SUMMARY (NW) Main Student Lot (NE) Faculty Lot South Visitor/Bus Southeast Lot Gymnasium West Parking Lot On-Site Parking BUMC North Lot 120 Total Available Parking Fleming Architects Bartlett City Schools

44 IV.3 - Final Concept Plan - Second Floor Bartlett High School Master Plan 55

45 IV.4 - Scope Diagram - First Floor 3B 2 80 R0 1/3 43 2" 7A 2B 1A 2C 4C 5 R4 '- 4B 2A 3C 5 R2 3A 1A R5 R1 R1 6 R2 6 Demolition Renovation New Construction R5 4A R5 6 6 R6 1B Note: please reference Cost and Phasing document on p. 96 for information regarding phase number. Bartlett High School Master Plan 57

46 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING A EXISTING BUILDING CONSTRUCTION DATE 1973 EXISTING BUILDING SIZE (GROSS SF) 1ST FLOOR: 18,850 SF 2ND FLOOR: 19,125 SF PROPOSED ADDITION SIZE(GROSS SF) 1ST FLOOR: 18,497 SF TOTAL PROPOSED BUILDING SIZE (GROSS SF) 1ST FLOOR: 37,347 SF 2ND FLOOR: 19,125 SF REF. HOMEMAKING A SF REF. GRAPHIC ARTS A SF REF. 117 SF DARK ROOM 102 SF 262 SF 280 SF FOOD MANAGEMENT PRODUCTION A SF DINING AREA CULINARY ARTS A SF JAN. 45 SF MECH. 82 SF REF. TLT. 120 SF 28 SF REF. CARE/GUIDANCE OF CHILDREN A13 GIRLS 362 SF ELEV. EQUIP. ROOM 85 SF BOYS 323 SF 1251 SF VEST. 34 SF 77 SF ELEV. 40 SF 333 SF 298 SF STG./WORK ROOM 216 SF TLT. 77 SF ATTENDANCE OFFICE COSMETOLOGY A SF 28 SF TESTING EQUIP./ A12 OFFICE 131 SF RECEPTION 415 SF CONFERENCE ROOM 220 SF F D B G 604 SF OFFICE 163 SF OFFICE 125 SF OFFICE 175 SF W S M E A C KEY PLAN SHEET NUMBER 1 A-CTE-FIRST FLOOR 1/8" = 1'-0" AA1.1 5/23/2017 7:48:55 PM Bartlett High School - Master Plan Bartlett City Schools BUILDING A (CTE) - 1ST FLOOR EXISTING 58 Fleming Architects Bartlett City Schools

47 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING A WELDING/MACHINING SHOP 2015 SF WELDING/MACHINING 705 SF WELDING/MACHING 250 SF ADVANCED MANUFACTURING 705 SF ADVANCED MANUFACTURING 250 SF ADVANCED MANUFACTURING LAB 2057 SF EXISTING BUILDING CONSTRUCTION DATE 1973 EXISTING BUILDING SIZE (GROSS SF) 1ST FLOOR: 18,850 SF 2ND FLOOR: 19,125 SF PROPOSED ADDITION SIZE(GROSS SF) 1ST FLOOR: 18,497 SF TOTAL PROPOSED BUILDING SIZE (GROSS SF) 1ST FLOOR: 37,347 SF 2ND FLOOR: 19,125 SF HUMAN STUDIES 1141 SF REF. Department Legend REF. AUTOMOTIVE TECHNOLOGY STANDARD ACADEMIC HUMAN STUDIES 2173 SF REF. DIGITAL ARTS & DESIGN 2495 SF DARK ROOM 1150 SF CTE CIRCULATION CULINARY ARTS LAB 1389 SF CULINARY ARTS 674 SF CTE 180 SF REF. REF. DINING AREA EARLY CHILDHOOD EDUCATION 1251 SF CTE 180 SF AUTOMOTIVE TECHNOLOGY SHOP 5500 SF VESTIBULE VESTIBULE 333 SF COSMETOLOGY LAB 1994 SF EARLY CHILDHOOD EDUCATION 2046 SF 1 A-CTE-FIRST FLOOR - Phase I 1/8" = 1'-0" 5/23/2017 7:48:07 PM Bartlett High School - Master Plan Bartlett City Schools SHEET NUMBER AA1.2 BUILDING A (CTE) - 1ST FLOOR PROPOSED Bartlett High School Master Plan 59

48 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING A EXISTING BUILDING CONSTRUCTION DATE 1973 EXISTING BUILDING SIZE (GROSS SF) 1ST FLOOR: 18,850 SF 2ND FLOOR: 19,125 SF PROPOSED ADDITION SIZE(GROSS SF) 1ST FLOOR: 18,497 SF TOTAL PROPOSED BUILDING SIZE (GROSS SF) 1ST FLOOR: 37,347 SF 2ND FLOOR: 19,125 SF PC COMPUTER LAB (KEYBOARDING) A SF PC COMPUTER LAB A SF GENERAL EDUCATION SF 317 SF Room 148 SF Room 131 SF 303 SF TLT. 28 SF TLT. RECORDS 29 SF 59 SF OFFICE 96 SF COLLEGE & CAREER 90 SF COUNSELOR 95 SF JAN. 45 SF COUNSELOR 115 SF Room 64 SF VICE-PRINCIPAL 193 SF CONFERENCE ROOM 241 SF RECORDS 157 SF 70 SF RECEPTION 750 SF GUIDANCE OFFICE COUNSELOR 120 SF COUNSELOR 118 SF GIRLS 355 SF ELEV. EQUIP. ROOM 85 SF ELEV 40 SF BOYS 333 SF HEALTH SCIENCE A SF Room 26 SF Room 51 SF 390 SF OFFICE/RECORDS 175 SF Room 89 SF 409 SF Room GENERAL EDUCATION A SF CTE A SF TESTING A SF 127 SF HEALTH SCIENCE A SF F D B G Room 143 SF S W M E A C KEY PLAN SHEET NUMBER 1 A-CTE-SECOND FLOOR 1/8" = 1'-0" AA1.3 5/23/2017 7:37:02 PM Bartlett High School - Master Plan Bartlett City Schools BUILDING A (CTE) - 2ND FLOOR EXISTING 60 Fleming Architects Bartlett City Schools

49 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING A EXISTING BUILDING CONSTRUCTION DATE 1973 EXISTING BUILDING SIZE (GROSS SF) 1ST FLOOR: 18,850 SF 2ND FLOOR: 19,125 SF PROPOSED ADDITION SIZE(GROSS SF) 1ST FLOOR: 18,497 SF ROOF BELOW TOTAL PROPOSED BUILDING SIZE (GROSS SF) 1ST FLOOR: 37,347 SF 2ND FLOOR: 19,125 SF Department Legend CTE MISCELLANEOUS FASHION SEWING LAB 1482 SF WEB DESIGN 1716 SF HEALTH SCIENCE 1425 SF CIRCULATION 317 SF 303 SF 14' - 3 5/8" 21' - 8" 23' - 0" ROOF BELOW TWA 434 SF CRIMINAL JUSTICE 842 SF CRIMINAL JUSTICE 905 SF HEALTH SCIENCE LAB 1349 SF 390 SF 2485 SF 409 SF CTE (CHILD DEVELOPMENT) 857 SF CTE (HEALTH SCIENCE) 1405 SF CTE (HEALTH SCIENCE) 1396 SF SHEET NUMBER 1 A-CTE-SECOND FLOOR - Phase I 1/8" = 1'-0" AA1.4 5/23/2017 7:49:37 PM Bartlett High School - Master Plan Bartlett City Schools BUILDING A (CTE) - 2ND FLOOR PROPOSED Bartlett High School Master Plan 61

50 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING E MECH. 334 SF KITCHEN 1074 SF MAN. OFFICE 81 SF TLT. 23 SF DRESSING ROOM JAN. TLT. 68 SF 51 SF 20 SF Room 80 SF EXISTING BUILDING CONSTRUCTION DATE 1951 (SOUTH S) 1973 (NORTH CAFETERIA, LIBRARY, STUDY HALL) EXISTING BUILDING SIZE (GROSS SF) SOUTH 1ST FLOOR: 16,375 SF SOUTH 2ND FLOOR: 11,675 SF NORTH 1ST FLOOR: 12,775 SF NORTH 2ND FLOOR: 10,450 SF DISHES 311 SF STOR. 65 SF SERVING 532 SF 230 SF STOR. 100 SF FOOD 224 SF CAFETERIA ANNEX 2225 SF CAFETERIA 6011 SF COURTYARD GEN. ED SF MARKETING /SCHOOL SUPPLY STORE SF GIRLS 318 SF BOYS 317 SF BOILER ROOM 361 SF TLT. TLT. 37 SF 38 SF PLANT MANAGER 212 SF GEN. ED SF TLT. GEN. ED SF GEN. ED SF 52 SF OFFICE 170 SF MECH. 315 SF GEN. ED SF GEN. ED SF F D B G ASST. PRINCIPAL 115 SF S W M E A C KEY PLAN SHEET NUMBER 1 E-EAST ANNEX-FIRST FLOOR 1/8" = 1'-0" AE1.1 5/23/2017 7:37:08 PM Bartlett High School - Master Plan Bartlett City Schools BUILDING E (EAST ANNEX) - 1ST FLOOR EXISTING 62 Fleming Architects Bartlett City Schools

51 IV.5 - Master Plan Floor Plans by Building MECHANICAL 334 SF CONFERENCE 612 SF WORK ROOM 540 SF JAN. 51 SF SERVICE Department Legend ADMINISTRATION ATHLETICS/PE STANDARD ACADEMIC CORE FUNCTION CTE MISCELLANEOUS CIRCULATION NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING E EXISTING BUILDING CONSTRUCTION DATE 1951 (SOUTH S) 1973 (NORTH CAFETERIA, LIBRARY, STUDY HALL) EXISTING BUILDING SIZE (GROSS SF) SOUTH 1ST FLOOR: 16,375 SF SOUTH 2ND FLOOR: 11,675 SF NORTH 1ST FLOOR: 12,775 SF NORTH 2ND FLOOR: 10,450 SF SERVICE VESTIBULE 365 SF STUDY 82 SF LIBRARY 5296 SF STUDY 81 SF 767 SF 896 SF STUDY 81 SF STUDY 81 SF 896 SF CONFERENCE 445 SF BOOK 376 SF GENERAL 232 SF COURTYARD 706 SF 706 SF WOMEN MEN MECH. 361 SF TEACHER WORK AREA 212 SF 702 SF LOBBY 704 SF 704 SF VICE-PRINCIPAL 170 SF MECH. 315 SF 704 SF 702 SF 1747 SF VESTIBULE 115 SF SHEET NUMBER 1 E-EAST ANNEX-FIRST FLOOR - Phase I 1/8" = 1'-0" AE1.2 5/23/2017 7:51:44 PM Bartlett High School - Master Plan Bartlett City Schools BUILDING E (EAST ANNEX) - 1ST FLOOR PROPOSED Bartlett High School Master Plan 63

52 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING E Room 151 SF Room 141 SF Room 124 SF Room 124 SF Room 103 SF MECH. 192 SF EXISTING BUILDING CONSTRUCTION DATE 1951 (SOUTH S) 1973 (NORTH CAFETERIA, LIBRARY, STUDY HALL) EXISTING BUILDING SIZE (GROSS SF) SOUTH 1ST FLOOR: 16,375 SF SOUTH 2ND FLOOR: 11,675 SF NORTH 1ST FLOOR: 12,775 SF NORTH 2ND FLOOR: 10,450 SF LIBRARY 5429 SF STUDY HALL 3090 SF WOMEN'S 320 SF MEN'S 317 SF SF 717 SF 696 SF 712 SF RR 34 SF JAN. 39 SF SF SF TEACHER'S LOUNGE 567 SF MECH. 364 SF SF SF F D S B G W M E A C KEY PLAN 1 E-EAST ANNEX-SECOND FLOOR 1/8" = 1'-0" SHEET NUMBER AE1.3 5/23/2017 7:37:15 PM Bartlett High School - Master Plan Bartlett City Schools BUILDING E (EAST ANNEX) - 2ND FLOOR EXISTING 64 Fleming Architects Bartlett City Schools

53 IV.5 - Master Plan Floor Plans by Building MECHANICAL 151 SF Room 192 SF NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING E EXISTING BUILDING CONSTRUCTION DATE 1951 (SOUTH S) 1973 (NORTH CAFETERIA, LIBRARY, STUDY HALL) STEM 885 SF STEM 843 SF EXISTING BUILDING SIZE (GROSS SF) SOUTH 1ST FLOOR: 16,375 SF SOUTH 2ND FLOOR: 11,675 SF NORTH 1ST FLOOR: 12,775 SF NORTH 2ND FLOOR: 10,450 SF LAB PREP 139 SF 141 SF 141 SF LAB PREP 139 SF Department Legend STEM LAB 1257 SF STEM LAB 1258 SF ROOF BELOW STANDARD ACADEMIC CTE SCIENCE/STEM MISCELLANEOUS CIRCULATION 2404 SF SERVICE 764 SF 859 SF COURTYARD BELOW - ENGLISH 717 SF - ENGLISH 717 SF - ENGLISH 696 SF - ENGLISH 712 SF 186 SF LANDING 2528 SF 262 SF LANDING 413 SF OPEN TO BELOW - ENGLISH 715 SF - ENGLISH 715 SF TEACHER'S WORK AREA 567 SF MECH. 364 SF - ENGLISH 715 SF - ENGLISH 712 SF OPEN TO BELOW 1 E-EAST ANNEX-SECOND FLOOR - Phase I 1/8" = 1'-0" SHEET NUMBER AE1.4 5/23/2017 7:52:21 PM Bartlett High School - Master Plan Bartlett City Schools BUILDING E (EAST ANNEX) - 2ND FLOOR PROPOSED Bartlett High School Master Plan 65

54 IV.5 - Master Plan Floor Plans by Building 236 SF UNIFORM 236 SF VOCAL MUSIC 1695 SF Department Legend FINE ARTS CIRCULATION SERVICE NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING F EXISTING BUILDING CONSTRUCTION DATE 1963 EXISTING BUILDING SIZE (GROSS SF) 1ST FLOOR: 10,775 SF 106 SF 106 SF ENSEMBLE REHEARSAL 983 SF 155 SF 155 SF STRING MUSIC 2171 SF PRACTICE PRACTICE 101 SF 77 SF GYMNASIUM 7923 SF INSTRUMENTAL MUSIC - LARGE REHEARSAL 5852 SF PRACTICE PRACTICE 101 SF 77 SF SMALL REHEARSAL/ENSEMBLE 3001 SF RR 72 SF RR 72 SF STG. OFFICE 155 SF STG. 66 SF RESTROOM STG. 67 SF RESTROOM OFFICE 155 SF STG. VESTIBULE Room 40 SF VESTIBULE 425 SF ROOM 40 SF 425 SF MEN'S 542 SF JAN./HOT WATER 48 SF ELEC./ROOF ACCESS 43 SF WOMEN'S 524 SF BOYS 516 SF JAN./W.H. ELEC. GIRLS 498 SF RISER 14 SF RISER 1 BUILDING F - FIRST FLOOR EXISTING 1/8" = 1'-0" 2 BUILDING F - FIRST FLOOR PROPOSED 1/8" = 1'-0" F D B G S W M E A C KEY PLAN 5/23/2017 7:52:55 PM Bartlett High School - Master Plan Bartlett City Schools SHEET NUMBER AF1.1 BUILDING F (SMALL GYM) - FIRST FLOOR 66 Fleming Architects Bartlett City Schools

55 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE VOCAL STG. 126 SF BUILDING DATA: FINE ARTS BUILDING PROPOSED BUILDING SIZE (GROSS SF) 1ST FLOOR: 17,860 SF VOCAL MUSIC 1695 SF VOCAL OFFICE UNIFORM 111 SF ART 287 SF ART 1264 SF 236 SF 106 SF 106 SF ENSEMBLE REHEARSAL 155 SF 983 SF 155 SF STRING MUSIC 2171 SF ART 287 SF ART 1264 SF PRACTICE PRACTICE 101 SF 77 SF PRACTICE 77 SF PRACTICE 101 SF INSTRUMENTAL MUSIC - LARGE REHEARSAL 5852 SF Redundant Room Department Legend CORE FUNCTION FINE ARTS PRACTICE PRACTICE 101 SF 77 SF PRACTICE 77 SF PRACTICE 101 SF SPECIAL EDUCATION CIRCULATION ART 287 SF ART 1264 SF SERVICE STG. 23 SF OFFICE 155 SF STG. 66 SF RESTROOM 72 SF STG. 67 SF RESTROOM 72 SF OFFICE 155 SF STG. 23 SF SMALL REHEARSAL/ENSEMBLE 3001 SF ART OFFICE KILN ROOM 78 SF 133 SF BOYS 516 SF JAN./W.H. 48 SF ELEC. 43 SF GIRLS 498 SF FINE ARTS LIBRARY/WORK ROOM RISER 14 SF 481 SF 1 F-FINE ARTS-FIRST FLOOR - Phase I 1/8" = 1'-0" 5/23/2017 7:53:22 PM Bartlett High School - Master Plan Bartlett City Schools SHEET NUMBER AF1.2 FINE ARTS BUILDING - PROPOSED Bartlett High School Master Plan 67

56 IV.5 - Master Plan Floor Plans by Building Room 184 SF STAFF MEETING ROOM 213 SF SHOWERS 188 SF 222 SF OFFICE 169 SF MEN'S 279 SF SHOWERS 181 SF TRAINING ROOM 806 SF Room 67 SF STOR. 54 SF LOCKER ROOM 1415 SF 12' - 2 1/2" 105' - 1" LOCKER ROOM 3585 SF RR 185 SF HEAD COACH 182 SF JR. HIGH COACH 189 SF LOBBY 495 SF BOILER ROOM 490 SF 1202 SF GYNAMSIUM SF 99' - 2" 843 SF UNEXCAVATED WEIGHT ROOM 606 SF WEIGHT ROOM 1898 SF 329 SF CONS. OFFICE 169 SF WOMEN 290 SF TRAINING ROOM 809 SF 67 SF 1 G-GYMNASIUM BASEMENT 1/8" = 1'-0" 2 G-GYMNASIUM-FIRST FLOOR 1/8" = 1'-0" NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING G F D B G EXISTING BUILDING CONSTRUCTION DATE 1950 EXISTING BUILDING SIZE (GROSS SF) BASEMENT: 11,845 SF 1ST FLOOR: 15,766 SF KEY PLAN W S M E A C 5/23/2017 7:54:06 PM Bartlett High School - Master Plan Bartlett City Schools SHEET NUMBER AG1.1 BUILDING G (GYMNASIUM) - FLOOR PLANS EXISTING 68 Fleming Architects Bartlett City Schools

57 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING G EXISTING BUILDING CONSTRUCTION DATE 1950 EXISTING BUILDING SIZE (GROSS SF) BASEMENT: 11,845 SF 1ST FLOOR: 15,766 SF Department Legend SHOWERS S ATHLETICS/PE MISCELLANEOUS MEN 279 SF BOYS SHOWERS 181 SF BOYS PE LOCKERS 806 SF S 133 SF CIRCULATION SERVICE WRESTLING LOCKER ROOM 1415 SF FRESHMEN/VISITOR LOCKER ROOM 3585 SF WRESTLING COACH 189 SF AUXILIARY GYM LOBBY 2351 SF 495 SF BOILER 490 SF CONCESSIONS 147 SF AUXILIARY/PE GYM SF 843 SF Department Legend ATHLETICS/PE WEIGHT ROOM 606 SF CORE FUNCTION CIRCULATION SERVICE UNEXCAVATED AUXILIARY WEIGHT ROOM 1898 SF S 329 SF WOMEN 290 SF GIRLS SHOWERS 176 SF GIRLS PE LOCKERS 809 SF S 191 SF 1 G-GYMNASIUM BASEMENT- Phase I G-GYMNASIUM-FIRST FLOOR - Phase I 2 1/8" = 1'-0" 1/8" = 1'-0" 5/23/2017 7:54:34 PM Bartlett High School - Master Plan Bartlett City Schools SHEET NUMBER AG1.2 BUILDING G (GYMNASIUM) - FLOOR PLANS PROPOSED Bartlett High School Master Plan 69

58 IV.5 - Master Plan Floor Plans by Building?? OFFICE M SF DRAMA (TAPING) M SF NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING M TV/FILM EDITING M SF TV/FILM EDITING M SF BOYS M SF M SF VESTIBULE M SF GIRLS M SF GEN. ED. (DRAMA) M SF EXISTING BUILDING CONSTRUCTION DATE 1917 (AUDITORIUM) 1978 (MAIN BUILDING) EXISTING BUILDING SIZE (GROSS SF) AUDITORIUM & LOBBY - 1ST FLOOR: 16,375 SF AUDITORIUM & LOBBY - 2ND FLOOR: 13,112 SF M SF M SF M SF STAGE M SF M SF M SF MECH. M SF MAIN BUILDING - 1ST FLOOR: 23,338 SF MAIN BUILDING - 2ND FLOOR: 15,215 SF PROPOSED ADDITION SIZE(GROSS SF) MAIN ENTRY/LOBBY & STUDENT COMMONS - 1ST FLOOR: 12,230 SF NEW CIRCULATION (NORTH/SOUTH AND EAST/WEST MAIN HALLS) - 1ST FLOOR: 17,300 SF M SF COOLING TOWER 912 SF AUDITORIUM M SF??? M SF JANITOR M138 M SF M104 M SF 124 SF GYMNASIUM M SF GIRLS LOCKER ROOM M SF GIRLS M SF 290 SF TICKETS M SF MECH M SF GEN. ED. M SF GEN. ED. M SF GEN. ED. M SF BOOK M SF BOYS LOCKER ROOM BOYS M SF M SF LOBBY M101 GYM M SF OFFICE M SF JANITOR M SF 1547 SF GEN. ED. GEN. ED. PHONE ROOM M SF PHONE ROOM M SF CLOS. M121 TLT. M120 MEN M118 PE COACH M SF MECH. M SF MAIN OFFICE RECEPTION 822 SF M141/ SF M145/ SF M SF 6 SF 36 SF 52 SF M SF M114 TEACHER WORK AREA M SF PRINCIPAL M SF 104 SF WOMEN M SF SECRETARY BOOKKEEPER BOOKKEEPER M119 M117 M SF 173 SF 185 SF F D S B G W M E A C KEY PLAN 1 M-MAIN BUILDING-FIRST FLOOR 3/32" = 1'-0" SHEET NUMBER AM1.1 5/23/2017 7:37:28 PM Bartlett High School - Master Plan Bartlett City Schools BUILDING M (MAIN) - 1ST FLOOR EXISTING 70 Fleming Architects Bartlett City Schools

59 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING M EXISTING BUILDING CONSTRUCTION DATE 1917 (AUDITORIUM) 1978 (MAIN BUILDING) STUDENT COMMONS EXISTING BUILDING SIZE (GROSS SF) AUDITORIUM & LOBBY - 1ST FLOOR: 16,375 SF AUDITORIUM & LOBBY - 2ND FLOOR: 13,112 SF MAIN BUILDING - 1ST FLOOR: 23,338 SF MAIN BUILDING - 2ND FLOOR: 15,215 SF PROPOSED ADDITION SIZE(GROSS SF) MAIN ENTRY/LOBBY & STUDENT COMMONS - 1ST FLOOR: 12,230 SF NEW CIRCULATION (NORTH/SOUTH AND EAST/WEST MAIN HALLS) - 1ST FLOOR: 17,300 SF Department Legend ADMINISTRATION STUDY HALL 1954 SF ATHLETICS/PE STANDARD ACADEMIC CORE FUNCTION SCIENCE/STEM MISCELLANEOUS CIRCULATION SERVICE AUXILIARY GYMNASIUM 8736 SF 596 SF GIRLS 209 SF UP ELEV. MECH. 186 SF CONFERENCE 283 SF GUIDANCE RECEPTION 363 SF TLT. COUNSELOR COUNSELOR 48 SF V.P. 110 SF COUNSELOR 110 SF COUNSELOR 176 SF STG. 110 SF 110 SF 16 SF CONF. WORK COUNSELOR COUNSELOR 147 SF 181 SF 113 SF 115 SF BOYS 210 SF CONFERENCE 339 SF CONFERENCE 237 SF WORK OFFICE 112 SF 113 SF RECORDS TLT. TLT. 72 SF 61 SF 61 SF TLT 60 SF TLT 61 SF NURSE 97 SF MECH. CONFERENCE 134 SF 124 SF RECORDS 122 SF ATTENDANCE RECEPTION 518 SF CONF. 176 SF OFFICE 110 SF RECORDS 184 SF BREAK 132 SF MEDS/STG. 73 SF CLINIC 355 SF LOBBY 2076 SF PHONE PHONE TEACHER WORK AREA STG. TLT. TLT. TLT. 104 SF PRINCIPAL 291 SF SECRETARY BOOKKEEPER BOOKKEEPER 174 SF 173 SF 185 SF MAIL/COPY MAIN OFFICE RECEPTION 860 SF SF 237 SF VESTIBULE 1579 SF 1 M-MAIN BUILDING-FIRST FLOOR - Phase I 3/32" = 1'-0" SHEET NUMBER AM1.2 5/23/2017 7:56:20 PM Bartlett High School - Master Plan Bartlett City Schools BUILDING M (MAIN) - 1ST FLOOR PROPOSED Bartlett High School Master Plan 71

60 $AUDIT _BAD_ BLOCK IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE MECH. BUILDING DATA: BUILDING M 137 SF COMPUTER LAB M SF STOR. M SF CHOIR ROOM SF M SF STOR. M SF M SF M SF JAN. M SF ORCHESTRA EXISTING BUILDING CONSTRUCTION DATE 1917 (AUDITORIUM) 1978 (MAIN BUILDING) EXISTING BUILDING SIZE (GROSS SF) AUDITORIUM & LOBBY - 1ST FLOOR: 16,375 SF AUDITORIUM & LOBBY - 2ND FLOOR: 13,112 SF SF CORR. M SF CORR. M SF SF MAIN BUILDING - 1ST FLOOR: 23,338 SF MAIN BUILDING - 2ND FLOOR: 15,215 SF UPPER STAGE PROPOSED ADDITION SIZE(GROSS SF) MAIN ENTRY/LOBBY & STUDENT COMMONS - 1ST FLOOR: 12,230 SF M SF STOR. M SF STOR. M SF M SF ROOF BELOW NEW CIRCULATION (NORTH/SOUTH AND EAST/WEST MAIN HALLS) - 1ST FLOOR: 17,300 SF ROOF BELOW OPEN TO BELOW ACCESS M SF BALCONY M SF ACCESS M SF M SF ROOF BELOW M SF CONTROL BOOTH M SF M SF EQUIPMENT ROOM M SF JANITOR M SF OPEN TO BELOW 8736 SF COMP. LAB M SF M SF GIRLS M SF M SF M SF MECH. M SF ELEV. 40 SF GEN. ED. M SF GEN. ED. M SF GEN. ED. M SF BOOK M SF BOYS M SF BOYS M222 GIRLS 154 SF LOBBY M SF SF STOR. M SF M SF TEACHER'S WORK AREA ART ROOM KILN M SF KILN M SF ART ROOM MECH. M SF JAN. M214 M SF OPEN TO BELOW M SF M SF M SF M SF 89 SF M SF I.S.S. M SF GEN. ED. M SF M SF COMPUTER LAB M SF M SF F D S B G W M E A C 1 M-MAIN BUILDING-SECOND FLOOR 3/32" = 1'-0" KEY PLAN 5/23/2017 7:37:40 PM Bartlett High School - Master Plan Bartlett City Schools SHEET NUMBER AM1.3 BUILDING M (MAIN) - 2ND FLOOR EXISTING 72 Fleming Architects Bartlett City Schools

61 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING M EXISTING BUILDING CONSTRUCTION DATE 1917 (AUDITORIUM) 1978 (MAIN BUILDING) EXISTING BUILDING SIZE (GROSS SF) AUDITORIUM & LOBBY - 1ST FLOOR: 16,375 SF AUDITORIUM & LOBBY - 2ND FLOOR: 13,112 SF MAIN BUILDING - 1ST FLOOR: 23,338 SF MAIN BUILDING - 2ND FLOOR: 15,215 SF PROPOSED ADDITION SIZE(GROSS SF) MAIN ENTRY/LOBBY & STUDENT COMMONS - 1ST FLOOR: 12,230 SF NEW CIRCULATION (NORTH/SOUTH AND EAST/WEST MAIN HALLS) - 1ST FLOOR: 17,300 SF OPEN TO BELOW Department Legend STANDARD ACADEMIC COMPUTER LAB MISCELLANEOUS CIRCULATION SERVICE COMPUTER LAB 1312 SF DN MECH. 665 SF 667 SF 667 SF 263 SF OPEN TO GYMNASIUM BELOW ELEV. 2ND FLOOR LOBBY 117 SF TEACHER WORK AREA 559 SF /JOURNALISM 950 SF OFFICE 665 SF 661 SF LANDING MECH. JAN. LANDING 850 SF OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW 666 SF 656 SF COMPUTER LAB 1330 SF 9' - 10" 6' - 6" 9' - 10" 9' - 8 1/2" 6' - 6" 9' - 9" M-MAIN BUILDING-SECOND FLOOR - Phase I 1 3/32" = 1'-0" SHEET NUMBER AM1.4 5/23/2017 7:57:10 PM Bartlett High School - Master Plan Bartlett City Schools BUILDING M (MAIN) - 2ND FLOOR PROPOSED Bartlett High School Master Plan 73

62 IV.5 - Master Plan Floor Plans by Building LAB/BOOK 325 SF LAB/BOOK 337 SF NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING S EXISTING BUILDING CONSTRUCTION DATE 1978 EXISTING BUILDING SIZE (GROSS SF) 1ST FLOOR: 10,578 SF PROPOSED ADDITION SIZE(GROSS SF) 1ST FLOOR: 11,200 SF BIOLOGY LAB SF SF ENV. SCIENCE/BIOLOGY SF BOYS 222 SF JANITOR 82 SF Not Enclosed JANITOR 125 SF STOR. 39 SF STOR. 42 SF GIRLS 197 SF CHEMISTRY LAB SF CHEMISTRY LAB SF 730 SF 1 S-SCIENCE-FIRST FLOOR 1/8" = 1'-0" F D B G S W M E A C KEY PLAN 5/23/2017 7:57:38 PM Bartlett High School - Master Plan Bartlett City Schools SHEET NUMBER AS1.1 BUILDING S (SCIENCE) - 1ST FLOOR EXISTING 74 Fleming Architects Bartlett City Schools

63 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING S EXISTING BUILDING CONSTRUCTION DATE 1978 EXISTING BUILDING SIZE (GROSS SF) 1ST FLOOR: 10,578 SF PROPOSED ADDITION SIZE(GROSS SF) 1ST FLOOR: 11,200 SF LAB /PREP 344 SF LAB /PREP 325 SF LAB /PREP 337 SF Department Legend 1147 SF JAN. 123 SF ATHLETICS/PE STANDARD ACADEMIC CORE FUNCTION FINE ARTS SPECIAL PROJECTS LAB 1336 SF BIOLOGY/LIFE SCIENCE LAB 1339 SF BIOLOGY/LIFE SCIENCE LAB 1339 SF SCIENCE/STEM MISCELLANEOUS CIRCULATION BOYS SCIENCE 859 SF SERVICE LAB /PREP 138 SF JANINTOR JANITOR STG. STG. PHYSICS LAB 1326 SF LAB /PREP 165 SF GIRLS CHEMISTRY LAB 1314 SF STUDY HALL 1954 SF CHEMISTRY LAB 1314 SF LAB /PREP 730 SF 6' - 0" 1 S-SCIENCE-FIRST FLOOR - Phase I 1/8" = 1'-0" 5/23/2017 7:58:16 PM Bartlett High School - Master Plan Bartlett City Schools SHEET NUMBER AS1.2 BUILDING S - 1ST FLOOR PROPOSED Bartlett High School Master Plan 75

64 D IV.5 - Master Plan Floor Plans by Building JAN. 49 SF SCIENCE LAB Room GIRLS? SF 145 SF? 791 SF 256 SF STOR. BOOK 110 SF 268 SF SCIENCE LAB SF SP. ED. SP. ED. OFFICE OFFICE 238 SF 181 SF SP. ED SF TLT. 87 SF TLT. 87 SF SP. ED SF NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING W EXISTING BUILDING CONSTRUCTION DATE 1963 EXISTING BUILDING SIZE (GROSS SF) BUILDING W (SOUTH) - 1ST FLOOR: 22,549 SF BUILDING W (SOUTH) - 2ND FLOOR: 23,352 SF GEN. ED SF 252 SF SP. ED SF 795 SF 903 SF TLT. 87 SF GEN. ED SF 206 SF MECH. 387 SF BOYS 211 SF JAN. 38 SF SP. ED SF TLT. 87 SF OFFICE 77 SF OFFICECONFERENCE 72 SF 185 SF OFFICE 108 SF Room 69 SF CONFERENCE 318 SF Room 331 SF Room TLT. TLT. 69 SF 18 SF 20 SF Room 31 SF Room Room 150 SF 97 SF BREAK ROOM 222 SF CONFERENCE 250 SF TLT. Redundant Room VEST. 78 SF TLT. 42 SF OFFICE 117 SF 218 SF OFFICE OFFICE OFFICE 1315 SF 96 SF 98 SF 90 SF OFFICE 91 SF VEST. OFFICE 270 SF 314 SF 95 SF OFFICE Room 105 SF 64 SF OFFICE OFFICE OFFICE 95 SF 95 SF 128 SF OFFICE OFFICE Room 148 SF 110 SF 67 SF OFFICE 78 SF 94 SF OFFICE 194 SF OFFICE OFFICE OFFICE OFFICE OFFICE 113 SF 114 SF 95 SF 96 SF 94 SF LOBBY 1556 SF BOYS CENTRAL 176 SF OFFICE CENTRAL TLT. 293 SF OFFICE 25 SF GIRLS 401 SF 180 SF TLT. 275 SF 39 SF JAN. SUPPLIES TLT. 55 SF 25 SF 110 SF ASST. PRIN. OFFICE TLT. 201 SF ASST. PRIN. STUDENT 25 SF OFFICE SERVICES STUDENT 264 SF 264 SF RESOURCE SERVICES OFFICER 404 SF 168 SF W REF. SP. ED SF 1443 SF SP. ED. FAMILY LIVING CENTER SF GEN. ED SF NURSE/CLINIC 366 SF GEN. ED SF GEN. ED SF VEST. 132 SF GEN. ED SF F D B G 1 W-WEST ANNEX-FIRST FLOOR 3/32" = 1'-0" M W S E A C KEY PLAN 5/23/2017 7:59:08 PM Bartlett High School - Master Plan Bartlett City Schools SHEET NUMBER AW1.1 BUILDING W (WEST ANNEX) - 1ST FLOOR EXISTING 76 Fleming Architects Bartlett City Schools

65 D IV.5 - Master Plan Floor Plans by Building SMALL REHEARSAL/ENSEMBLE 3001 SF FINE ARTS LIBRARY/WORK ROOM 481 SF NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING W EXISTING BUILDING CONSTRUCTION DATE 1963 EXISTING BUILDING SIZE (GROSS SF) BUILDING W (SOUTH) - 1ST FLOOR: 22,549 SF BUILDING W (SOUTH) - 2ND FLOOR: 23,352 SF SPECIAL EDUCATION 697 SF Room JAN. GIRLS SPECIAL EDUCATION 694 SF SPECIAL EDUCATION SPECIAL EDUCATION 699 SF 691 SF ROOM ROOM SPECIAL EDUCATION SENSORY ROOM SPECIAL EDUCATION 698 SF 1579 SF BOYS MECH. 387 SF SPECIAL EDUCATION 681 SF JAN. Department Legend ADMINISTRATION STANDARD ACADEMIC CORE FUNCTION FINE ARTS SCIENCE/STEM 945 SF 823 SF 994 SF SPECIAL EDUCATION MISCELLANEOUS CIRCULATION SERVICE STG. BREAKOUT BREAKOUT BREAKOUT STG. ISS 825 SF BOYS 808 SF 808 SF 803 SF GIRLS 10' - 0" VESTIBULE 31' - 6 7/8" 915 SF 29' - 0" 780 SF 24' - 8 3/8" 770 SF 24' - 6" SPECIAL EDUCATION ADMIN. 264 SF RECORDS 110 SF SPECIAL EDUCATION ADMIN. 404 SF JAN. 55 SF ASSISSTANT PRINCIPAL 264 SF VESTIBULE 201 SF SCHOOL RESOURCE OFFICER 168 SF W REF. SPECIAL EDUCATION FAMILY LIVING CENTER 1204 SF 808 SF 799 SF LOBBY 2076 SF SHEET NUMBER W-WEST ANNEX-FIRST FLOOR - Phase I 1 3/32" = 1'-0" AW1.2 5/23/2017 7:59:41 PM Bartlett High School - Master Plan Bartlett City Schools BUILDING W - 1ST FLOOR PROPOSED Bartlett High School Master Plan 77

66 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING W GEN. ED SF SCIENCE 163 SF GIRLS 148 SF 284 SF JAN. 105 SF GEN. ED SF EXISTING BUILDING CONSTRUCTION DATE 1963 EXISTING BUILDING SIZE (GROSS SF) BUILDING W (SOUTH) - 1ST FLOOR: 22,549 SF BUILDING W (SOUTH) - 2ND FLOOR: 23,352 SF GEN. ED SF SCIENCE BOOK RECEPTION 167 SF 165 SF 172 SF GEN. ED SF GEN. ED SF Room 36 SF TWA 490 SF TLT. TLT. 34 SF 35 SF GEN. ED SF PSYCHOLOGY OFFICE SF 249 SF BOYS 169 SF Room 53 SF 2262 SF GEN. ED SF 281 SF GEN. ED. MEN'S 263 SF GEN. ED. GEN. ED. GEN. ED. 283 SF SF WOMEN'S 256 SF SF SF SF ROOF BELOW JANITOR 23 SF 1744 SF GEN. ED SF BOOK ROOM 394 SF GEN. ED SF GEN. ED SF GEN. ED SF GEN. ED SF F D B G 1 W-WEST ANNEX-SECOND FLOOR 3/32" = 1'-0" M W S E A C KEY PLAN 5/23/2017 7:38:06 PM Bartlett High School - Master Plan Bartlett City Schools SHEET NUMBER AW1.3 BUILDING W (WEST ANNEX) - 2ND FLOOR EXISTING 78 Fleming Architects Bartlett City Schools

67 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: BUILDING W EXISTING BUILDING CONSTRUCTION DATE 1963 EXISTING BUILDING SIZE (GROSS SF) BUILDING W (SOUTH) - 1ST FLOOR: 22,549 SF BUILDING W (SOUTH) - 2ND FLOOR: 23,352 SF 792 SF 163 SF GIRLS JAN. 793 SF 792 SF Room 167 SF BOOK 165 SF 172 SF 793 SF Room TWA Room 490 SF 792 SF 793 SF TLT. TLT. BOYS 774 SF Room 777 SF Department Legend STANDARD ACADEMIC CORE FUNCTION MISCELLANEOUS CIRCULATION SERVICE 778 SF 793 SF 795 SF 792 SF BOYS GIRLS ROOF BELOW JAN. 799 SF 394 SF 795 SF 795 SF 795 SF 799 SF SHEET NUMBER W-WEST ANNEX-SECOND FLOOR - Phase I 1 3/32" = 1'-0" AW1.4 5/23/2017 8:00:30 PM Bartlett High School - Master Plan Bartlett City Schools BUILDING W - 2ND FLOOR PROPOSED Bartlett High School Master Plan 79

68 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: FOOTBALL FIELD HOUSE FIELDHOUSE BUILDING PROPOSED BUILDING SIZE (GROSS SF) 1ST FLOOR: 11,500 SF FOOTBALL COACH 232 SF Department Legend FILM/CONF. 564 SF FOOTBALL WEIGHT ROOM 2429 SF FOOTBALL LOCKER ROOM 1875 SF AUXILIARY GYM LOBBY 2351 SF ATHLETICS/PE CORE FUNCTION CIRCULATION SERVICE COACH'S DRESSING ROOM 447 SF TRAINING 388 SF TOILET 459 SF ATHLETICS OPEN WORK AREA 806 SF ATHLETICS WORK HEAD COACH HEAD COACH HEAD COACHEAD COACHEAD COACHEAD COACH HEAD COACHEAD COACHCONCESSIONS ROOM 122 SF 122 SF 122 SF 122 SF 122 SF 122 SF 122 SF 122 SF 147 SF 240 SF 1 M-FIELD HOUSE-FIRST FLOOR - Phase I 3/32" = 1'-0" 5/23/2017 8:01:10 PM Bartlett High School - Master Plan Bartlett City Schools SHEET NUMBER AX1.1 FIELD HOUSE - 1ST FLOOR PROPOSED 80 Fleming Architects Bartlett City Schools

69 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: VARSITY GYM PROPOSED BUILDING SIZE (GROSS SF) 1ST FLOOR: 24,175 SF Department Legend STOR. 107 SF TLT. 54 SF OFFICE 174 SF BOYS LOCKER ROOM 815 SF TRAINING 456 SF GIRLS LOCKER ROOM 748 SF OFFICE 128 SF VEST. TLT. 29 SF 29 SF ATHLETICS/PE CORE FUNCTION CIRCULATION SERVICE STG. 20 SF BOYS TOILET 292 SF WHIRLPOOL 110 SF GIRLS TOILET 283 SF STG. LAUNDRY 29 SF 29 SF BOYS 362 SF STUDENT COMMONS VESTIBULE 116 SF ELEC. 56 SF CONCESSIONS 551 SF VARSITY GYMNASIUM SF STO. 56 SF VESTIBULE 116 SF Room 135 SF GIRLS 337 SF VOLLEYBALL LOCKER ROOM 557 SF TOILET 255 SF VISITOR GIRLS 278 SF 489 SF TOILET 256 SF VISITOR BOYS 284 SF OFFICE 104 SF OFFICE 122 SF 1 M-VARSITY GYM-FIRST FLOOR - Phase I 3/32" = 1'-0" 5/23/2017 8:02:06 PM Bartlett High School - Master Plan Bartlett City Schools SHEET NUMBER AX1.2 VARSITY GYMNASIUM - 1ST FLOOR PROPOSED Bartlett High School Master Plan 81

70 18x36-4T 18x36-4T 18x36-4T 18x36-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T G 24x48-4T G 24x48-4T IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: CAFETERIA & KITCHEN PROPOSED BUILDING SIZE (GROSS SF) 1ST FLOOR: 20,500 SF Department Legend SF ATHLETICS/PE CORE FUNCTION FINE ARTS JAN. 110 SF LOCKERS 111 SF POT/PAN 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 119 SF CHAIR 347 SF TWA 743 SF REF.REF. SCIENCE/STEM CIRCULATION SERVICE TLT. 59 SF TLT. 60 SF DISHES 797 SF TRAY DROP 52 SF VESTIBULE 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T FREEZER 203 SF COOLER 203 SF 24x48-4T 24x48-4T 24x48-4T 24x48-4T KITCHEN 1713 SF SERVING AREA 2078 SF 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T 18x48-4T DRY 18x48-4T 18x48-4T 18x48-4T 18x48-4T 422 SF OFFICE 106 SF STUDENT COMMONS SF 1 M-CAFETERIA - Phase I 3/32" = 1'-0" 5/23/2017 8:05:00 PM Bartlett High School - Master Plan Bartlett City Schools SHEET NUMBER AX1.3 CAFETERIA - 1ST FLOOR PROPOSED 82 Fleming Architects Bartlett City Schools

71 IV.5 - Master Plan Floor Plans by Building NOTE: EXISTING SPACES OR MINOR RENOVATIONS ARE SHOWN HALFTONE BUILDING DATA: AUDITORIUM BUILDING PROPOSED BUILDING SIZE (GROSS SF) 1ST FLOOR: 23,200 SF RESTROOM 324 SF PROP 1054 SF BACKSTAGE HALL 337 SF BACKSTAGE HALL 576 SF AUDITORIUM SF RESTROOM 324 SF THEATER OFFICE 111 SF DRESSING 208 SF DRESSING 215 SF COSTUME 236 SF TLT. 42 SF 89 SF THEATER WORK ROOM 212 SF TLT. 42 SF BLACK BOX THEATER 1332 SF DRAMA 812 SF Department Legend STANDARD ACADEMIC CORE FUNCTION FINE ARTS SCIENCE/STEM CIRCULATION SERVICE M-AUDITORIUM-FIRST FLOOR - Phase I 1 3/32" = 1'-0" SHEET NUMBER 5/23/2017 8:06:15 PM AX1.4 Bartlett High School - Master Plan Bartlett City Schools AUDITORIUM - 1ST FLOOR PROPOSED Bartlett High School Master Plan 83

72 IV.6 - Master Plan Features A. DEMOLISH DEFUNCT BUILDINGS a Auditorium, 1978 fine arts classrooms and main lobby (Main Building) b CTE/Vocational building (Building B) c Pre-engineered metal classroom building (Building C) d Band building (Building D) B. CORE SPACES a. Varsity Gymnasium i. Spectator seating for 2,500 b. Cafeteria & Kitchen i. Seating capacity for around 650 (could reduce number of lunch periods required) ii. New production kitchen with increased capacity iii. Large windows with view to football field and plaza allow ample access to natural light iv. Taller ceilings and open space allow for multi-purpose use v. Connection to football field/plaza and student commons allow the cafeteria to be used as a hospitality or community space c. Auditorium i. Audience Seating for 1,000 ii. Sloped and stadium seating iii. New lighting and audio/visual systems iv. Increased stage size, dressing rooms, storage and support spaces d. Library i. Existing Cafeteria becomes Library ii. Expanded and upgraded Library in first floor location across new courtyard from new entry hall iii. New windows looking into courtyard improve natural light and views e. Student Commons i. Heart of the campus - Centrally located student gathering area near major circulation arteries and major core functions (gym, cafeteria, auditorium) ii. Pre-function space for Varsity Gymnasium and Auditorium iii. Connects Main Entry on Woodlawn Street, rear entry from student parking lot, and access to the football stadium iv. Natural Light f. New Entry & Lobby i. New entry lobby and main hall create clear and secure entry point for students and visitors ii. Main Hall creates an organizing spine for the campus, creating clear circulation paths 84 Fleming Architects Bartlett City Schools

73 III.6 - Master Plan Features C. ACADEMIC SPACES a. Net increase of 17 classrooms or CTE/Vocational spaces b. Existing Cafeteria Annex and existing Central Office spaces become 8 new classrooms c. Science & STEM i. 2 new science labs ii. 2 new STEM labs iii. 2 new STEM classrooms d. CTE/Vocational spaces i. Existing Attendance and Guidance Offices in Building A become 3 new CTE classrooms ii. New CTE addition with Automotive Technology shop, Welding shop, Advanced Manufacturing Lab, and classrooms iii. Increased storage for CTE e. Fine Arts i. Expanded and relocated band room (in existing Building F Gym) 1. Larger rehearsal space for full band 2. 2 offices 3. Storage 4. Renovated restrooms ii. New choir room with office and storage spaces iii. New strings rehearsal space iv. Common music library v. Common small ensemble rehearsal space vi. 8 individual practice rooms (common) vii. 3 new art classrooms with storage viii. Art office and kiln room ix. New Drama Classroom, Theater office, and Theater Work Room adjacent new Auditorium. f. Special Education i. Expanded administrative spaces ii. Additional SE classrooms (with restrooms) iii. Sensory Room g. Miscellaneous i. Relocated study hall Bartlett High School Master Plan 85

74 IV.6 - Master Plan Features D. ADMINISTRATIVE SPACES a. Major offices (Main, Attendance, Guidance) centrally located adjacent to main entrance b. Expanded Main Office i. Increased meeting spaces c. Expanded Attendance Office d. Expanded Guidance Office e. Expanded Special Education Offices E. ATHLETIC SPACES a. New Varsity Gymnasium i. Spectator seating for 2,500 ii. Regulation 94 main court with (2) 94 cross courts for practice b. Existing Varsity Gymnasium becomes Auxiliary/PE Gymnasium i. Existing football locker room becomes freshman/visitor football locker room ii. Existing locker room becomes wrestling locker room iii. Existing weight room becomes auxiliary weight room c. New common training room for all sports d. New locker rooms for girls basketball, boys basketball, volleyball, and visitors adjacent to new Varsity Gymnasium e. New Football Fieldhouse i. New varsity football locker room ii. New varsity football weight room iii. Common film/conference room iv. Athletic Coaches offices f. New Stadium Plaza with gathering spaces for tailgating, events, and football games g. Football stadium improvements h. New turf playing surface at football field 86 Fleming Architects Bartlett City Schools

75 IV.6 - Master Plan Features F. EXTERIOR a. Safety & Security i. New secure auxiliary entry lobbies to enclose connections between existing buildings along Woodlawn Street b. Façade improvements i. New façade treatments and windows at buildings along Woodlawn Street to create unified look to existing buildings c. Site/Landscaping Improvements i. Remove automobile access to interior of campus; add landscaped courtyards ii. Align curbs and sidewalks at buildings along Woodlawn Street and extend landscaping d. Additional Parking i. Increase on-site parking capacity from around 400 to Remove existing bus parking lot from NE corner of campus; add 200+ spaces 2. Reconfigure and expand student parking to accommodate over 400 parking spaces; add landscaping Bartlett High School Master Plan 87

76 IV.7 - Master Plan Graphics Front Entrance 88 Fleming Architects Bartlett City Schools

77 IV.7 - Master Plan Graphics Commons Bartlett High School Master Plan 89

78 IV.7 - Master Plan Graphics Cafeteria 90 Fleming Architects Bartlett City Schools

79 IV.7 - Master Plan Graphics Gymnasium Bartlett High School Master Plan 91

80 IV.7 - Master Plan Graphics Auditorium 92 Fleming Architects Bartlett City Schools

81 IV.7 - Master Plan Graphics Back Entrance Bartlett High School Master Plan 93

82 Master Plan Cost and Phasing V.

83 V.1 - Project Cost Estimate and Phasing (BASED ON FLEMING MASTER PLAN DATED MARCH 30, 2017) PHASING & PROJECT COST ESTIMATE 19-Apr-17 SEQUENCE PROJECT COMMENTS SIZE (SQUARE FEET) EXISTING BUILDING 324,240 COST PER SF TOTAL COST DEMOLITION 1A DEMOLISH BUILDING C (EAST S) 9,160 $7 $64,120 1A DEMOLISH BUILDING D (BAND) 4,195 $7 $29,365 2A DEMOLISH BUILDING B (CTE) 25,050 $7 $175,350 3A DEMOLISH EXISTING AUDITORIUM & MAIN ENTRY 29,487 $7 $206,409 DEMOLITION SUBTOTALS 67,892 $475,244 EXISTING BUILDINGS TO REMAIN existing minus demo 256,348 NEW CONSTRUCTION BUILD NEW CTE ADDITION auto, welding, 1B manufacturing, classrooms 18,500 $155 $2,867,500 2B BUILD NEW AUDITORIUM 23,200 $245 $5,684,000 2C BUILD NEW FINE ARTS BUILDING choral, strings, practice, visual art 17,900 $200 $3,580,000 4A BUILD NEW MAIN ENTRY/LOBBY 4,230 $245 $1,036,350 4B BUILD NEW STUDENT COMMONS 8,000 $245 $1,960,000 4C BUILD NEW CIRCULATION north/south and east/west main halls 17,300 $180 $3,114,000 3B BUILD NEW CAFETERIA & KITCHEN 20,500 $200 $4,100,000 3C BUILD NEW VARSITY GYMNASIUM 24,175 $170 $4,109,750 football locker room, 7A football weight room, BUILD FOOTBALL FIELD HOUSE athletics 11,500 $180 $2,070,000 5 BUILD SCIENCE BUILDING 2 science labs, study ADDTION hall, circulation 11,200 $200 $2,240,000 6 BUILD AUXILIARY SECURE ENTRY LOBBIES 7,050 $245 $1,727,250 7B FOOTBALL PLAYING FIELD (ALLOWANCE) $850,000 NEW CONSTRUCTION SUBTOTALS 163,555 $33,338, Fleming Architects Bartlett City Schools

84 V.1 - Project Cost Estimate and Phasing SEQUENCE PROJECT COMMENTS SIZE (SQUARE FEET) COST PER SF TOTAL COST RENOVATION R5 EXISTING BUILDING SYSTEMS UPGRADES (ALLOWANCE) $2,000,000 SITE WORK in conjunction with R7 lobby additions and façade improvements; rework parking (ALLOWANCE) $2,000,000 COURTYARDS 61,400 $35 $2,149,000 R7 EXISTING BUILDING SOUTH FAÇADE IMPROVEMENTS 24,290 $35 $850,150 R7 EXISTING BUILDING SOUTH FAÇADE WINDOW REPLACMENT 4,000 $90 $360,000 R0 RENOVATE BUILDING 'F' (WEST new (acoustical) floors, ceilings, wall GYM) TO BECOME BAND ROOM treatments 10,775 (NOT INCLUDED) R8 FOOTBALL STADIUM IMPROVEMENTS (ALLOWANCE) $400,000 R1 CONVERT DISTRICT OFFICES INTO S 7,500 $75 $562,500 R1 CONVERT DISTRICT OFFICES (W ISS classroom BUILDING) INTO ADMIN 1,000 $75 $75,000 R5 R5 R6 R2 R2 R3 R4 R5 RELOCATE/REMODEL GUIDANCE OFFICE TO MAIN BLDG. 3,150 $75 $236,250 RELOCATE/REMODEL ATTENDANCE OFFICE TO MAIN BLDG. 2,025 $75 $151,875 CONVERT BUILDING A OFFICES AND S INTO CTE S 6,075 $75 $455,625 CONVERT OLD CAFETERIA TO LIBRARY 10,000 $75 $750,000 CONVERT OLD CAFETERIA TO CR 2,300 $75 $172,500 CONVERT OLD LIBRARY TO STEM S 9,100 $100 $910,000 CONVERT NW BUILDING CR TO adds 2 special S.E. CR education classrooms (with RR) & sensory room 3,550 $75 $266,250 MAIN OFFICE EXPANSION adds 2 conf. rooms, 2 offices, waiting area 2,055 $75 $154,125 RENOVATION SUBTOTALS 85,820 $11,493,275 Bartlett High School Master Plan 97

85 V.1 - Project Cost Estimate and Phasing SEQUENCE PROJECT COMMENTS SIZE (SQUARE FEET) COST PER SF TOTAL COST TOTAL BUILDING SIZE existing to remain plus new construction 419,903 CONSTRUCTION COST SUBTOTAL $45,307,369 CONSTRUCTION CONTINGENCY (8%) $3,624,590 CONSTRUCTION TOTAL $48,931,959 NOTES: 1. The estimate for each project assumes that the project will be completed together (along with all other phase items) in 1 construction project. 2. This estimate is preliminary and requires additional pricing/review by a General Contractor. 3. Testing, removal, and/or abatement of asbestos-containing materials is not included in this estimate. 4. Excludes poor soils conditions. 98 Fleming Architects Bartlett City Schools

86 102 Fleming Architects Bartlett City Schools V.1 - Master Plan Presentation

Ashby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update

Ashby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update Ashby, Pepperell, Townsend North Middlesex Regional High School Feasibility Study Update June 6, 2013 AGENDA Preliminary Design Program (PDP) District Capacity Analysis Preferred Schematic Report (PSR)

More information

Southern Oregon University

Southern Oregon University Southern Oregon University Public Meeting Notice August 5, 05 TO: FROM: RE: Southern Oregon University Board of Trustees, Finance Committee Sabrina Prud homme, University Board Secretary Notice of special

More information

ouglas Intermediate School

ouglas Intermediate School ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion

More information

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12

More information

Harding Senior High School

Harding Senior High School 1540 Sixth Street East Project Summary:, located in the Eastview area of St. Paul, offers students in grades 9 through 12 a wide range of curriculum options ranging from International Baccalaureate to

More information

ROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL

ROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL ROBERT TURER COLLEGE AD CAREER HIGH SCHOOL SCHEMATIC DESIG PRESETATIO 23 MAY 2017 Project Milestones Schematic Design..... March May 2017 SD Presentation to Board of Trustees...... 23 May, 2017 Design

More information

Horace Mann Elementary

Horace Mann Elementary 2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are

More information

St. John Paul II Catholic Parish

St. John Paul II Catholic Parish St. John Paul II Catholic Parish 167th & Ridgeview Road Olathe, Kansas Master Plan Town Hall October 30, 2018 Purpose [ The Church s ] mission consists essentially in offering people an opportunity not

More information

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:

More information

COMPONENT FLOW CHART & SEQUENCING DIAGRAMS

COMPONENT FLOW CHART & SEQUENCING DIAGRAMS Oak Park and River Forest High School Master Facilities Plan COMPONENT FLOW CHART & SEQUENCING DIAGRAMS The following is a narrative intended to accompany the component flow chart and sequencing diagrams

More information

ELLIS. Ellis Research Center PROPERTY HIGHLIGHTS BRIAN CARR, CCIM LEE CLYBURN. Research Triangle Park North Carolina.

ELLIS. Ellis Research Center PROPERTY HIGHLIGHTS BRIAN CARR, CCIM LEE CLYBURN. Research Triangle Park North Carolina. ELLIS Research Triangle Park North Carolina Ellis Research Center Office and Lab PROPERTY HIGHLIGHTS 2400 Ellis Rd RTP, NC 27709 Size 331,898 RSF Floors 4 Parking Power 519 Shared parking spaces 480/277

More information

MEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013

MEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013 Seattle World School SWS SDAT Workshop 3 2 December 203 SPS SWS at TT Minor TCF Architecture Project Number: 203 002 MEETING MINUTES Attendance: Name Representing Role Paul Wight Seattle Public Schools

More information

Mount Vernon Township High School Signage Specifications. Monday, May 16, 2016

Mount Vernon Township High School Signage Specifications. Monday, May 16, 2016 Mount Vernon Township High School Signage Specifications Monday, May 16, 2016 INTRODUCTION: Brandmarks Used: Brandmarks and their consistent usage is an important part of cultivating a brand. To be a good

More information

11/29/12. Des Moines Social Club Urban Design Review Project Narrative

11/29/12. Des Moines Social Club Urban Design Review Project Narrative 11/9/1 Des Moines Social Club Urban Design Review Project Narrative Strategically located at 9th and Walnut, the Des Moines Social Club (DMSC) will become a critical link between the Court Avenue Entertainment

More information

Town of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019

Town of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019 Town of Belmont, NH Town Space Needs and Feasibility Study January 10, 2019 Police Department EXISTING POLICE DEPARTMENT FULLER STREET MEETING HOUSE SARGENT STREET TOWN OF BELMONT POLICE DEPARTMENT EXISTING

More information

LOS ANGELES UNIFIED SCHOOL DISTRICT EDUCATIONAL SPECIFICATION - HIGH SCHOOL

LOS ANGELES UNIFIED SCHOOL DISTRICT EDUCATIONAL SPECIFICATION - HIGH SCHOOL No. Academic Area Drawing No. Issue Date Drawing Title General Campus 000 General Campus Organizational Model GCOM1.1 A. ACADEMIC AREAS LOS ANGELES UNIFIED SCHOOL DISTRICT EDUCATIONAL SPECIFICATION - HIGH

More information

PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017

PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017 PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017 ARCHITECTURE \\ ENGINEERING \\ PLANNING \\ INTERIORS \\ TECHNOLOGY

More information

GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study

GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study New Lebanon School (K-5) 25 Mead Avenue, Greenwich, CT 20 March 2014 KSQ Architects PC 20 March 2014 GREENWICH PUBLIC SCHOOLS NEW LEBANON

More information

SPRINKLER SF. Stair 190 SF WOMEN SF LOBBY SF MECH/ELEC CONCESSIONS SF 225 SF STORAGE SF

SPRINKLER SF. Stair 190 SF WOMEN SF LOBBY SF MECH/ELEC CONCESSIONS SF 225 SF STORAGE SF 1JACKSON MSC TEMPSTAR W/DT-3-LR TABLE PACKAGE WAREWASHER, DOOR TYPE W/ DISHTABLES ARCHITECTURE & INTERIOR DESIGN Montgomery Dothan WWW.SSLARCH.COM (M) 334. 263. 5162 (D) 334. 791. 5248 No. Revision Date

More information

Linwood Monroe Upper 810 Palace Avenue

Linwood Monroe Upper 810 Palace Avenue 810 Palace Avenue Project Summary: Spanning a child s first classroom experience all the way through middle school, Linwood Monroe s Plus lays a foundation for creativity and exploration in the arts. Accelerated

More information

Cheney Building & Bennet Academy Town of Manchester Phase 1 Study Presentation - April 10, 2013 DRAFT

Cheney Building & Bennet Academy Town of Manchester Phase 1 Study Presentation - April 10, 2013 DRAFT Cheney Building & Bennet Academy own of Manchester Phase 1 Study Presentation - April 10, 2013 Schools Modernization & Reinvestment eam Revisited Board of Directors Board of Education DRAF ai Soo Kim Partners

More information

Continuing Education Credit

Continuing Education Credit BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP

More information

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015 275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.

More information

BASEBALL PLAYER FACILITIES CLEMSON, SOUTH CAROLINA

BASEBALL PLAYER FACILITIES CLEMSON, SOUTH CAROLINA THROUGH THE YEARS THROUGH THE YEARS VIEW FROM RIGHT FIELD VIEW FROM DUGOUT VIEW FROM NEW GRANDSTAND EXISTING CONDITIONS EXTERIOR PHOTOS PLAYER S LOUNGE LOCKER ROOM TRAINING AREA COACH S OFFICE CORRIDOR

More information

GREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM

GREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM Date of Meeting: March 20, 2014 GREENWICH PUBLIC SCHOOLS Greenwich, Connecticut Title of Item: New Lebanon School Pre-Feasibility Study Policy Reference: E - 051 REQUEST FOR BOARD ACTION OR PRESENTATION

More information

MEMORANDUM. March 31, President Michael K. Young President, Texas A&M University TO: CBE Recommendation: Softball Complex SUBJECT:

MEMORANDUM. March 31, President Michael K. Young President, Texas A&M University TO: CBE Recommendation: Softball Complex SUBJECT: COUNCIL FOR THE BUlL T ENVIRONMENT Co-Chairs: Dr. Karan L. Watson, Provost and Executive Vice President Dr. Jerry R. Strawser, Vice President for Finance and Administration March 31, 2016 MEMORANDUM TO:

More information

SCARSDALE PUBLIC SCHOOLS

SCARSDALE PUBLIC SCHOOLS SCARSDALE PUBLIC SCHOOLS GREENACRES FEASIBILITY STUDY PROGRESS REPORT BOARD OF EDUCATION Mary Beth Gose Leila Shames Maude Lewis Leone, Jr. Christopher Morin William Natbony Suzanne Seiden Scott E. Silberfein

More information

DASD Loganville Springfield Elementary School Site Feasibility Review. Background For This Work

DASD Loganville Springfield Elementary School Site Feasibility Review. Background For This Work DASD Loganville Springfield Elementary School Site Feasibility Review Prepared by: Site Design Concepts, Inc. March 30, 2016 Background For This Work No architectural programming or investigation was completed

More information

AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes

AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes Meeting No. 4 Date: 5/12/2018 Job No. Meeting Location: AVS Conference Room The following notes were taken during a meeting on

More information

GAZEBO BELMONT PUBLIC LIBRARY MAIN STREET TOWN OF BELMONT TOWN HALL 12/14/2018 EXISTING CONDITIONS

GAZEBO BELMONT PUBLIC LIBRARY MAIN STREET TOWN OF BELMONT TOWN HALL 12/14/2018 EXISTING CONDITIONS GAZEBO BELMONT LIBRARY STREET TOWN OF BELMONT TOWN HALL EXISTING CONDITIONS DRIVING LANE 6 4 WELLFARE 378 SF TOWN CLERK 800 SF LOBBY 256 SF COMMON SPACES 665 SF LG MEETING RM 600 SF DRIVING LANE TOWN ADMIN.

More information

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM:

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM: 4900 Lang Ave NE Albuquerque, NM 87109 505-348-4000 phone 505-348-4055 fax Meeting Minutes Project: Valley View Elementary School Owner: Valley View Public Schools / PSFA Albuquerque Colorado Springs Denver

More information

GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS

GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are made to the University's Board of Trustees in February,

More information

Cherokee Heights Elementary School

Cherokee Heights Elementary School 694 Charlton Street Project Summary: Cherokee Heights Elementary is about to start its exciting transition to a Montessori learning model. The school is connected to the Baker Center which is currently

More information

DRAFT FOR INTERNAL DISCUSSION ONLY

DRAFT FOR INTERNAL DISCUSSION ONLY Jameson St. 2 Riser Room Cistern Base Men's Locker Room Women's Locker Room Mud Room Stair Elev. Entry Lobby Shipping and Receiving Stair EO/IO Breakdown A40 Shop / Warehouse Alley Gilman Pl. Storage Room

More information

EXISTING SITE PLAN. Consultants: Civil: Evans Engineering, Inc Old Post Rd. Harrisburg, PA (717) Harrisburg, PA 17110

EXISTING SITE PLAN. Consultants: Civil: Evans Engineering, Inc Old Post Rd. Harrisburg, PA (717) Harrisburg, PA 17110 330 orth Third St. Architecture Renovations to: O. DESCRIPTIO DATE SGA PROJECT UMBER: EXISTIG SITE PLA Drawing umber: EX00 SCHEMATIC DESIG D D0 OFFICIAL'SVESTIBULE LOCKER D03 D04 D02 COACHES D05 GYMASIUM

More information

Cohasset Town Hall. Programming Study A1.0. Town of Cohasset. 41 Highland Ave. Cohasset, MA NOT FOR CONSTRUCTION. Existing Basement Plan

Cohasset Town Hall. Programming Study A1.0. Town of Cohasset. 41 Highland Ave. Cohasset, MA NOT FOR CONSTRUCTION. Existing Basement Plan Vault 008 29 SF Mechanical 002 395 SF 004 45 SF Cell 005 45 SF WATER SERVICE IN Cell 006 55 SF Jail 003 63 SF 007 92 SF Basement 00 740 SF Machine 027 60 SF Hall 009 275 SF 0 SF 00 54 SF Elevator 028 50

More information

USF Downtown August 2016

USF Downtown August 2016 USF Dow ntown August 2 016 93% OF 2015 USF GRADUATES are employed or enrolled in graduate school 45% of USF undergraduate students ARE FROM FIRST-GENERATION OR LOW-INCOME HOUSEHOLDS MAJORITY OF OUR GRADUATES

More information

John A Johnson Elementary School

John A Johnson Elementary School 740 York Avenue Project Summary: An Acheivement Plus school John A Johnson is located adjacent to the East Side YMCA, jointly serving their communities educational, recreation, and wellness needs. The

More information

CORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS)

CORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS) Classrooms 2-3 scientists Morrison Maierle Classrooms K-1 Specials 146 planners Support surveyors 870 SF RR 147 148 RR 149 engineers 839 SF 150 COPYRIGHT (C) MORRISON-MAIERLE, INC., 2017 Admin Phone: 406.752.2216

More information

FAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN

FAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN KBE APPROVAL DATE: APRIL 2017 FAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN DFP REVISIONS FINDING. NO. 1: APRIL 2018 BOLD NEXT DFP DUE: APRIL 2021 PLAN OF SCHOOL ORGANIZATION 1. Current Plan P, P-5, K-5,

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD ALBANY UNIFIED SCHOOL DISTRICT DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD BOARD OF EDUCATION PRESENTATION JANUARY 22, 2019 DOUG ESPLAND Sr. Precon Manager & Project Director

More information

American Institute of Architects New Hampshire Chapter High School Design Competition Program

American Institute of Architects New Hampshire Chapter High School Design Competition Program American Institute of Architects New Hampshire Chapter 2009 2010 High School Design Competition Program Educational Objectives To increase your awareness of the relationships between space, human scale

More information

ASSIGNMENT 04: Library Massing + Program

ASSIGNMENT 04: Library Massing + Program ASSIGNMENT 04: Library Massing + Program THE IMPORTANCE OF PROGRAM AND MASSING DIAGRAMMING: Program and Massing diagrams are critical tools used to visually describe the relationship between the way a

More information

AMES COMMUNITY SCHOOL DISTRICT SAWYER ELEMENTARY

AMES COMMUNITY SCHOOL DISTRICT SAWYER ELEMENTARY Exhibit D-4 AMES COMMUNIY SCHOOL DISRIC SAWYER ELEMENARY Schematic Development Project Manual June 25th 2014 RDG Planning & Design 301 Grand Avenue Des Moines, Iowa 50309 architectural narrative Summarized

More information

29 LARAMIE COUNTY COMMUNITY COLLEGE UNIVERSITY STUDENT CENTER PAPPAS & PAPPAS ARCHITECTS, P.C. + DLR Group. sketches + drawings

29 LARAMIE COUNTY COMMUNITY COLLEGE UNIVERSITY STUDENT CENTER PAPPAS & PAPPAS ARCHITECTS, P.C. + DLR Group. sketches + drawings 29 LARAMIE COUNTY COMMUNITY COLLEGE UNIVERSITY STUDENT CENTER PAPPAS & PAPPAS ARCHITECTS, P.C. + DLR Group DEPARTMENT LEGEND BUILDING SUPPORT CENTRALIZED ASSESSMENT CENTER CIRCULATION COUNSELING & CAMPUS

More information

Public School Facilities Element

Public School Facilities Element Public School Facilities Element GOAL 1: THROUGH PARTNERSHIPS AND EFFECTIVE COLLABORATION AMONG LOCAL GOVERNMENTS AND THE PINELLAS COUNTY SCHOOL DISTRICT, AND BECAUSE OF A SHARED COMMITMENT TO EDUCATIONAL

More information

Jackie Robinson Elementary School

Jackie Robinson Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NEW LEBANON ELEMENTARY SCHOOL

NEW LEBANON ELEMENTARY SCHOOL NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL November 10, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL

More information

NEW LEBANON ELEMENTARY SCHOOL

NEW LEBANON ELEMENTARY SCHOOL NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL October 9, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL

More information

CBE Recommendation: Outdoor Track & Field Complex

CBE Recommendation: Outdoor Track & Field Complex COUNCIL FOR THE BUlL T ENVIRONMENT Co-Chairs: Dr. Karan L. Watson, Provost and Executive Vice President Dr. Jerry R. Strawser, Vice President for Finance and Administration March 31, 2016 MEMORANDUM TO:

More information

Cohasset Town Hall - Programming Study REVIEW SET 7/07/2017 NOT FOR CONSTRUCTION. 41 Highland Ave. Cohasset, MA LOCUS MAP

Cohasset Town Hall - Programming Study REVIEW SET 7/07/2017 NOT FOR CONSTRUCTION. 41 Highland Ave. Cohasset, MA LOCUS MAP - REVIEW SET 7/07/07 Highland Ave. Sheet Number DRAWING LIST Sheet Name A0.0 Cover A0. Site Plan - Existing A.0 Existing Basement Plan A. Existing First Floor Plan A. Existing Second Floor Plan A.0 Site

More information

WEST HOLLYWOOD PARK MASTER PLAN 2004

WEST HOLLYWOOD PARK MASTER PLAN 2004 WEST HOLLYWOOD PARK MASTER PLAN 2004 Total of 5.23 acres of uninterrupted grass and trees including playground areas and tree-lined promenades compared with only 1.86 acres of park open space in the existing

More information

FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes

FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes Meeting Date: 15 March 2018 9:30 AM Meeting Location: Rock Creek School, Media Center Current Design Phase: Schematic

More information

CS2.0 COVER SHEET VOL. 2

CS2.0 COVER SHEET VOL. 2 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:

More information

CAC MEETING, FEB. 28 TH, 2017 NADAAA

CAC MEETING, FEB. 28 TH, 2017 NADAAA ADAMS STREET BRANCH LIBRARY PROGRAMMING STUDY FOR CITY OF BOSTON BOSTON PUBLIC LIBRARY AND PUBLIC FACILITY DEPARTMENT CAC MEETING, FEB. 28 TH, 2017 NADAAA 1 AGENDA 1.0 SCHEDULE 2.0 SUMMARY OF PROJECT GOAL

More information

This Addendum #5 to the subject RFP is issued to provide answers to vendor questions received.

This Addendum #5 to the subject RFP is issued to provide answers to vendor questions received. TO: Prospective Bidders FROM: Phil Trayer Director of Finance DATE: February 1, 2018 SUBJECT: Addendum # 5 RFP 010262018-1100: Security Camera This Addendum #5 to the subject RFP is issued to provide answers

More information

SAN ANTONIO ISD COMMUNITY-BASED TASK FORCE PHASE IV. April 15, 2009

SAN ANTONIO ISD COMMUNITY-BASED TASK FORCE PHASE IV. April 15, 2009 SAN ANTONIO ISD COMMUNITY-BASED TASK FORCE PHASE IV April 15, 2009 The second meeting of the Community-based Task Force Phase IV was held on Wednesday, April 15, 2009, from 6:00 8:30 p.m. at Mission Academy.

More information

Oak Park and River Forest High School District North Scoville Avenue Oak Park, IL

Oak Park and River Forest High School District North Scoville Avenue Oak Park, IL Oak Park and River Forest High School District 200 201 North Scoville Avenue Oak Park, IL 60302-2296 To: Board of Education From: Tod Altenburg, CSBO Phil Prale, ASCI Date: August 16, 2016 Re: Requested

More information

Space Needs Summary: SPS/Health Center

Space Needs Summary: SPS/Health Center 3.3.1 Program Summary: SPS/Health Center 167 Space Needs Summary: SPS/Health Center PROGRAM ELEMENT PROPOSED NOTES No. (N) Type Name s Area Sub. ASF Total ASF STN. 10.0 Special Programs & Services / Project

More information

EVACUATION PLAN E G A C H J. Sligo I.T Campus Layout. Evacuation Plan Assembly Points. Assembly. Point 7. Assembly. Point 8. Assembly.

EVACUATION PLAN E G A C H J. Sligo I.T Campus Layout. Evacuation Plan Assembly Points. Assembly. Point 7. Assembly. Point 8. Assembly. LS LS 143 K Point 7 L Point 8 Point 6 P Point 5 M F E G A C D SOCCER PITCH GAELIC PITCH Point 2 H J B TRAINING AREA Point 3 Sligo I.T Campus Layout Evacuation Plan Points ZONE A5 A/F/5 A/F/4 A/F/3 ZONE

More information

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin. MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD

More information

Adams Spanish Immersion 615 Chatsworth Street South

Adams Spanish Immersion 615 Chatsworth Street South Project Summary: Adams Spanish Immersion is an international education without the travel expense. Our school is a place where families and staff value the opportunities gained from learning a second language.

More information

Hall of Waters List of Historic Drawings

Hall of Waters List of Historic Drawings List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral

More information

Where To Start: Collegiate Space Needs & Planning Standards

Where To Start: Collegiate Space Needs & Planning Standards Where To Start: Collegiate Space Needs & Planning Standards Where To Start: Space Needs & Planning Standards Stephen E. DeHekker, AIA, LEED AP BD+C Senior Vice President James Gabel, AIA, LEED AP Senior

More information

COPYRIGHT ARCHITECT SUSAN DESKO-AIA

COPYRIGHT ARCHITECT SUSAN DESKO-AIA B:\03 ACAD Files\2 200.02.2 This Is It\DESIGN REVIEW\DR-0-.dwg 7/3/200 0:4 AM COVERED DROP-OFF 2 RECEPTION 3 LOBBY [2,800 SF] 4 WAITING AREA [450 SF] 5 FRONT DOOR & PATIO 6 VESTIBULE & AFTER HOURS ELEVATOR

More information

NETWORK CIRCLE SANTA CLARA CA

NETWORK CIRCLE SANTA CLARA CA 4160-4200 & 4050 PALM DRIVE ±302,066 SF Office Space Available For Lease in Silicon Valley ROMY ZEID +1 650 492 5206 romy.zeid@colliers.com CA License No. 01433654 JAKE SMART +1 650 492 5216 jake.smart@colliers.com

More information

3647 N SOUTHPORT AVE CHICAGO, IL 60613

3647 N SOUTHPORT AVE CHICAGO, IL 60613 DEVELOPER P.O. BOX 1041 EVANSTON, ILLINOIS 60204 P: (773) 529-3700 P: (773) 977-8072 C O P Y R I G H T 2 0 1 7, S U L L I V A N G O U L E T T E W I L S O N, L T D. ARCHITECT SULLIVAN GOULETTE & WILSON,

More information

Eastern Lebanon County School District Ad Hoc Committee: High School Renovation Project

Eastern Lebanon County School District Ad Hoc Committee: High School Renovation Project Ad Hoc Committee: High School Renovation Project Wednesday, October 11, 2017 High School LGI Room, 6:00pm Instructional Focus for 2017-2018 Equitable Access to Rigorous Learning Results Focused Accountability

More information

AVAILABLE FOR LEASE OFFICE AND LABORATORY SPACE Approximately 322,384 RSF

AVAILABLE FOR LEASE OFFICE AND LABORATORY SPACE Approximately 322,384 RSF AVAILABLE FOR LEASE AND SPACE Approximately 322,384 RSF 2400 Ellis Road Research Triangle Park, North Carolina www.goellisresearchcenter.com PROPERTY DESCRIPTION Administrative Wing Cafeteria Lobby/Atrium

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-1220

More information

SYSTEMS+ ACOUSTIC REQUIREMENTS INNOVATIVE SYSTEMS SOLUTIONS USGBORAL.COM

SYSTEMS+ ACOUSTIC REQUIREMENTS INNOVATIVE SYSTEMS SOLUTIONS USGBORAL.COM USGBORAL.COM SYSTEMS+ B 2 B 3 B 4 B 6 B 8 INTRODUCTION MULTI-RESIDENTIAL BUILDINGS COMMERCIAL BUILDINGS EDUCATIONAL FACILITIES HEALTH CARE BUILDINGS B ACOUSTIC REQUIREMENTS INNOVATIVE SYSTEMS SOLUTIONS

More information

A201 SCALE: 1" = 10'-0"

A201 SCALE: 1 = 10'-0 A B C D E F G G.5 H I J 0' - 0" 8' - 6" 7' - 0" 5 6 7 8 9 0 4 4 77' - 0" 6' - 0" UNEXCAVATED 7' - 6" 4 0 BELOW GRADE PARKING VP 9 (4 STALLS) 8 6 NON- COMPLIANT BIKE PARKING STALLS 7 ARCHITECTURE ENGINEERING

More information

RESTAURANT AND RETAIL SPACE AVAILABLE FOR LEASE

RESTAURANT AND RETAIL SPACE AVAILABLE FOR LEASE RESTAURANT AND RETAIL SPACE AVAILABLE FOR LEASE 1 DOWNTOWN EAST RETAIL A CHANGING LANDSCAPE WITHIN THE DOWNTOWN CORE The Downtown East development presents an exceptional opportunity for restaurants and

More information

WORKSHOP #2. February 24th, 2010 PORTLAND COMMUNITY COLLEGE. Southeast Campus. February 24th, 2010

WORKSHOP #2. February 24th, 2010 PORTLAND COMMUNITY COLLEGE. Southeast Campus. February 24th, 2010 WORKSHOP #2 Southeast Campus AGENDA Visioning Common Themes Design Principles Community Outreach Review Chinese New Year Celebration Campus Planning Programming Next Steps Analysis Planning Goals Campus

More information

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603 ENDUM NO. 2 To the Drawings and/or Specifications for Gilbert Architects Youth s Benefit Elementary School - #0729 626 N. Charlotte St. Board of Education of Harford County Lancaster, PA 17603 June 2,

More information

Allan Hancock College

Allan Hancock College Allan Hancock College Project Planning Board Workshop February 17, 2009 Agenda Objective Funding Allocation Space Demand Analysis Project Overview Bond Measure I Program Schedule Charge: To review funding

More information

A BEST IN CLASS OFFICE CENTER CAMPUS CREATIVE SPACES AVAILABLE WITH ROOM TO GROW

A BEST IN CLASS OFFICE CENTER CAMPUS CREATIVE SPACES AVAILABLE WITH ROOM TO GROW A BEST IN CLASS OFFICE CENTER CAMPUS CREATIVE SPACES AVAILABLE WITH ROOM TO GROW AVAILABILITIES A VARIETY OF CREATIVE SPACES WITH ROOM TO GROW UP TO 195,000 SF Planned New Cafe & Fitness Center Expo Line

More information

March 23, 2015 Total Project Cost 18,553,027

March 23, 2015 Total Project Cost 18,553,027 Executive Summary Charles City CSD Middle School Addition 25% CD Up April 3, 205 Project Approach This up to be considered recap of changes since March 23, 205 budget. It is intended to reflect significant

More information

Index. 1 Introduction. 2 Executive Summary. 3 Long-Range Facility Master Plan

Index. 1 Introduction. 2 Executive Summary. 3 Long-Range Facility Master Plan Index 1 Introduction 2 Executive Summary Existing Facility Inventory and Assessment Preliminary Space Needs Projections Master Plan Conclusions Project Recommendations 3 Long-Range Facility Master Plan

More information

EDINBURGH COMMUNITY SCHOOL CORPORATION Edinburgh, Indiana January 13, 2014

EDINBURGH COMMUNITY SCHOOL CORPORATION Edinburgh, Indiana January 13, 2014 EDINBURGH COMMUNITY SCHOOL CORPORATION Edinburgh, Indiana January 13, 2014 The Board of School Trustees met in regular session at 6:00 p.m. on this date at the Administration Building, 202 S. Keeley Street,

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the New Kensington High School (CAPA) ULCS# 5520 Building

More information

Proposed Hotel, Restaurant. and Banquet Facility

Proposed Hotel, Restaurant. and Banquet Facility Proposed Hotel, Restaurant PROJECT # : 60-0 and Banquet Facility ARCHITECTURAL 7 Logy Bay Road P.O. Box 09 St. John's, NL, Canada AA 5B T: (709) 79-80 F: (709) 7-80 E: info@fougeremenchenton.ca Issued

More information

Summary of Subarea Workshop Feedback Related to the BART/MTC/Madison Square Blocks

Summary of Subarea Workshop Feedback Related to the BART/MTC/Madison Square Blocks Summary of Workshop Feedback Related to the BART/MTC/Madison Square Blocks Lake Merritt Station Area Plan 1 SUMMARY TABLES Table 1-1 summarizes specific feedback on street improvements by street. Table

More information

NDUS/UND IT Facility Office Building/Data Center

NDUS/UND IT Facility Office Building/Data Center NDUS/UND IT Facility Building/Data Center Building Option 3 $9,133,128 Data Center $4,937,500 Tier 2 to Tier 3 (add on) $1,356,250 Total $15,426,878 Legislative Appropriation $12,500,000 Difference $2,926,878

More information

CASE STUDY DOORS AND HARDWARE SEPTEMBER 2006

CASE STUDY DOORS AND HARDWARE SEPTEMBER 2006 CASE STUDY Main entrance to Forest Hills Eastern Middle/High School centers on the Great Hall area that forms the hub of school activity and traffic flow. double doors open from classrooms into spacious

More information

MELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma.

MELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma. MELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma. Hoover, Winthrop and Horace Mann Elementary Schools September 27, 2016 Tappe Architects Inc. HOOVER ELEMENTARY SCHOOL - SITE PLAN REMOVE EXISITNG

More information

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program

More information

1001 Feehanville Drive Phone Mt. Prospect, IL Fax

1001 Feehanville Drive Phone Mt. Prospect, IL Fax NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 November 29, 2016 Community Unit School District 200 130 West Park Avenue Wheaton, IL 60189

More information

Memorandum. Dear Ms. Allen,

Memorandum. Dear Ms. Allen, RhoadesPlanningGroup Memorandum To: Shannon Allen, AICP, Principal Planner From: Rhoades Planning Group Date: June 10, 2015 Re: Response to Incomplete Letter, 1900 Fourth Street Dear Ms. Allen, This letter

More information

MOST OF OUR CAMPUS IS OUTDOORS

MOST OF OUR CAMPUS IS OUTDOORS GIPA Indoor Drumline Competition Saturday, February 4, 2017 Hosted by North Gwinnett Band Parents Association 20 Level Creek Road Suwanee, Georgia 30024 Thank you for attending the GIPA Indoor Drumline

More information

Pickens. High School. SDPC Building Futures. School District of Pickens County

Pickens. High School. SDPC Building Futures. School District of Pickens County SDPC Building Futures Pickens High School 150 Blue Flame Drive Pickens, South Carolina 29671 phs.pickens.k12.sc.us School District of Pickens County In November 2006, the SDPC Board of Trustees approved

More information

Michael D. Sapraicone President Brian W. Fagan Vice President John DelGiudice - Trustee Linda Hurley Trustee. Richard G.

Michael D. Sapraicone President Brian W. Fagan Vice President John DelGiudice - Trustee Linda Hurley Trustee. Richard G. AUGUST 20, 2009 PAGE 1 A Special Meeting of the Board of Education, Seaford Union Free School District, was held on Thursday, August 20, 2009, in the Board of Education Conference Room located in the Seaford

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2236

More information

Arnolfini Access Statement

Arnolfini Access Statement Arnolfini Access Statement Image 1: Arnolfini from the water About Arnolfini In a fantastic waterside location at the heart of Bristol s harbourside, Arnolfini is one of Europe s leading centres for the

More information

CREATIVE SPACES AVAILABLE WITH ROOM TO GROW

CREATIVE SPACES AVAILABLE WITH ROOM TO GROW CREATIVE SPACES AVAILABLE WITH ROOM TO GROW A BEST-IN-CLASS CREATIVE OFFICE CAMPUS Leasing Inquiries: Valerie James 310.315.4858 valerie.james@cbre.com Jeff Brown 310.315.4700 jeff.brown2@cbre.com AVAILABILITIES

More information

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC Design Rationale On behalf of our client, Necessary Homes Inc, we have prepared a Development Permit application for a unit rental multi-family building at The site area of the property is 9 SM and is

More information

Marcus Moziah Garvey Elementary School

Marcus Moziah Garvey Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620 W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

The Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee. Clinton Town Hall January 20, 2011

The Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee. Clinton Town Hall January 20, 2011 The Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee Clinton Town Hall January 20, 2011 Tonight s Agenda History of Morgan School and of the Building

More information