1 Exhibit D-4 AMES COMMUNIY SCHOOL DISRIC SAWYER ELEMENARY Schematic Development Project Manual June 25th 2014 RDG Planning & Design 301 Grand Avenue Des Moines, Iowa 50309
2 architectural narrative Summarized in this booklet is the Schematic Design Phase of the design for the remodeled Sawyer Elementary School, serving grades K-5. his existing 46,575 square foot three section facility will be remodeled and expanded to current district educational specification standards. he proposed expansion is approximately 19,365 square feet. he expansion is made up of four additions. An addition is planned to the west which will include a new gymnasium, art room, music, success rooms, and storage spaces. An addition is planned for the existing west wing which will include a new kindergarten room. he addition planned for the existing east wing will add a third grade classroom and second/third grade activity space. An addition is planned to be added to the south of what is now the administrative offices. his addition and renovation of the administrative offices will be the new media center. he planned additions will provide a shared activity area for kindergarten/first grade, second/third grade, and fourth/fifth grade. he administration office will be placed at the main entry across the corridor from the cafeteria. his will provided visibility to the front of the school as well as a new secured entrance. he kitchen will be expanded and the cafeteria updated with new windows and finishes. New windows will be installed in the far east wing housing the fourth and fifth grade classrooms. his design overview is organized in terms of: owner review & approval, floor plan organization & features, primary interior finishes, and exterior design & materials. Owner Review and Approval of this Design Phase: he Schematic Design Phase has established a design concept which has been developed in concert with the District Steering Committee and District staff. Approval of the design at this phase covers the site plan layout of key elements (building, parking, circulation, playgrounds, and play areas), floor plan arrangement (size and location of spaces), and exterior design character (general shape and composition of the building and its principal materials). Submitted with this booklet are narratives from the design team which provide descriptions of recommended systems and elements for the building. A project budget and schedule are also included, reflecting the current status of each at this milestone. he next phase, Design Development, includes detailed development of the design to complete and confirm the project design. In this phase, power & technology details are finalized, and interior details are addressed (millwork, finishes/colors). Although design changes can be made at a later time, such changes could result in schedule, fee, or construction cost impacts. As we move, with your permission, into the Design Development Phase, the design will be developed and finalized in continued partnership with the District Steering Committee and District Staff. Our team is committed to bringing the Ames Community School District with an elementary school building that is programmatically and aesthetically efficient. We believe this Schematic Design proposal is a responsible design solution that meets the expectations of program, site, budget, and schedule and can well serve its community for years to come. 7
3 landscape architectural he Sawyer Elementary site is approximately 11.4 acres. he site design overview consists of a building addition connected to the west and south sides of the existing building, vehicular access, pedestrian access, play spaces and site plantings. he site design will consist of the elementary school building addition located on the western portion of the site with smaller additions located on the south side of the existing building. Delivery and service access will be provided near the north side of the building. Vehicular access consists of two drop-offs located on site. he western drop-off will be used for bus drop off. wo new entry drives will be installed along North Dakota Avenue. he north entry drop-off will be used for parent drop-off and is directly adjacent to 25 new parking stalls for visitors and staff. he proposed design will accommodate 75 total parking spaces compared to an existing 67 parking stalls. he parking and drives are proposed to be either new asphalt or an asphalt mill and overlay in locations where existing paving can be repurposed with the new site layout. For schematic design purposes, it can be assumed that 6 depth asphalt over a 6 depth aggregate base will be used for the new asphalt drives and parking lots. Depths will be verified once a geotechnical report is complete. Pedestrian access will be provided with sidewalks parallel on the east side of the bus dropoff and on the south side of the parent drop-off connecting to walks to the west and north entries of the elementary building. he existing sidewalk from the southeast corner of the site will be preserved for easy access from the residential neighborhood. Sidewalks will also be provided for emergency egress at points throughout the building as needed along the new additions. Play spaces will remain in the same locations. he hard surface play area will have an asphalt mill and overlay and will be replaced as needed in areas of new building or utility construction. New basketball hoops will be provided as needed to replace old. he existing 6 tall chain link fence will be preserved along the south, east and portions of the west sides of the site to separate the play areas from North Dakota Avenue and local residents. 4 tall, galvanized, chain link fencing will be provided as needed to separate stormwater detention from the play areas. Site plantings include seed for open green space and trees and shrubs as needed. Native grasses and wildflower seeding is proposed for storm water detention. Owner will provide and install site benches and trash receptacles. 11
4 area program summary 30
5 area program summary
6 area program summary 32
7 schedule 41
8 ONARIO SREE RELOCAED CY-RIDE SHELER SAFF AND VISIOR PARKING, 25 SALLS BIKE RACKS PAREN PICK-UP AND DROP-OFF MAIN ENRY EXISING SAWYER ELEMENARY SCHOOL ACCESS DRIVE PLAYSPACE CHAIN LINK FENCING OPEN GREEN SPACE EXISING SOFBALL INFIELD PLAYSPACE SO R ASPHAL MILL AND OVERLAY EXSING PLAY SURFACING ER D EE N ION MWA BUS PICK-UP AND DROP-OFF NORH DAKOA AVENUE SAFF PARKING, 50 SALLS
9 100% SCHEMAIC DESIGN SAWYER ELEMENARY SCHOOL MECH 254 SF MUSIC 1169 SF PE SOR 309 SF PO SOR 113 SF PE OFFICE 117 SF GYMNASIUM 6376 SF M 150 SF M 160 SF SOR. 81 SF AR 979 SF SAFF WOMENS SUCCESS RESOURCE 214 SF ASC SOR 59 SF KILN 81 SF SF 305 SF 302 SF J S JAN 158 SF K S SAFF MENS LEVEL K/1 ACIVIY 1346 SF KICHEN 686 SF GIRLS JAN. BOYS CAFEERIA 2500 SF BOOKS 222 SF MEDIA CENER 2150 SF SPEECH 154 SF I 102 SF GUIDANCE 311 SF OFFICE 287 SF PRINCIPAL 284 SF RECEP 373 SF GIRLS JAN. BOYS NURSE 341 SF WKRM 264 SF CONF RM 332 SF MECH 720 SF FLEX 2.3 SAFF WKRM 386 SF LEVEL 2 LEVEL 2 ACADEMIC 606 SF 672 SF F MECH 351 SF ESL 472 SF SF 4/5 ACIVIY 1249 SF SF ELP 443 SF SF SF LEVEL SF SF SF JAN. BOYS GIRLS MECHANICAL PENHOUSE 874 SF K SOR 85 SF K SF C C K SOR 85 SF K SF C K SF SF 3.3 2/3 ACIVIY 1145 SF FLOOR PLAN 0' 16' 32' 64' 06/25/2014
10 SAWYER ELEMENARY SCHOOL 100% SCHEMAIC DESIGN PRECAS CONCREE PANELS NEW ALUMINUM WINDOWS IN EXISING OPENINGS, YP. FACE BRICK SANDING SEAM MEAL ROOF ALUMINUM WINDOW SYSEM 1 ELEVAION - NORH 1/32" = 1'-0" SANDING SEAM MEAL ROOF FACE BRICK ALUMINUM WINDOW SYSEM PRECAS CONCREE PANELS 2 ELEVAION - EAS 1/32" = 1'-0" PRECAS CONCREE PANELS SANDING SEAM MEAL ROOF ALUMINUM WINDOW SYSEM, YP. FACE BRICK 3 ELEVAION - SOUH 1/32" = 1'-0" SANDING SEAM MEAL ROOF FACE BRICK FEMA WINDOW, YP. PRECAS CONCREE PANELS ELEVAIONS 4 ELEVAION - WES 1/32" = 1'-0" 0' 16' 32' 64' 06/25/2014
11 100% SCHEMAIC DESIGN SAWYER ELEMENARY SCHOOL 1 BIRD'S EYE VIEW 2 BIRD'S EYE VIEW PERSPECIVES 06/25/2014
12 AMES SAWYER COS - RDG PROJECION CONCEP 5 - May 15, Jun-14 3 SECION SAR 2015 COMPLEE SPRING 2016 UNOCCUPIED DURING CONSRUCION MICHELL ADJUS 3% SAWYER 5R GENL GENL GENERAL MECH MECH MECH ELEC ELEC ELEC SQ. F $/SF $/SF INFLAION $/SF CONS. COS $/SF $/SF $/SF SIE SUBOAL $ 1,086,461 $ 1,086,461 DESIGN BID CON 4% $ 44,545 $ 44,545 SIE OAL $ 1,131,006 $ 1,131,006 REMODEL BLDG $ $ 2.12 $ 3.10 $ $ 4,964, % $ $ 1,941, % $ $ 1,936, % $ $ 1,092,197 NEW BLDG $ $ (2.41) $ 5.08 $ $ 3,260, % $ $ 2,086, % $ $ 749, % $ $ 423,841 BLDG SUB OAL $ $ 8,224, % $ $ 4,027, % $ $ 2,686, % $ $ 1,516,038 DESIGN BID CON 4% $ 5.17 $ 337,219 $ 165,137 $ 110,128 $ 62,158 BLDG OAL $ $ 8,562, % $ $ 4,192, % $ $ 2,796, % $ $ 1,578,195 CONSRUCION BID ESIMAE $ 9,693,071 CONSRUCION CONINGENCY 3% $ 290,792 OAL CONSRUCION COS $ 9,983,863 BUDGE $ 8,835,050 RDG Mitchell adjustment for Sawyer Remodel Remodel Addition Remodel Scope $ 278,625 Move Out $ (150,000) $ (25,000) VE 50% $ (30,000) $ (20,000) $ 98,625 $ (45,000) $/SF $ 2.12 $ (2.41) OK ESIMAE 27-May-14 CONS. COS GENL GENL GENERAL MECH MECH MECH ELEC ELEC ELEC SIE $ 1,226,928 $ 1,226, BLDG 65,279 SF $ 122 $ 7,951, % $ $ 4,935, % $ $ 2,158, % $ $ 856, CONSRUCION BID ESIMAE includes 8% bid/est contingency $ 9,178,082 CONSRUCION CONINGENCY??? OAL CONSRUCION COS??? Printed2:05 PM6/10/2014 I:\Projects\2012\ Ames CSD - Sawyer Elementary\ext\0 Proj Adm & Info\0.16 Budget & Cost Estimates\Sawyer Cost Projection.xlsx
CAPITAL IMPROVEMENT PROGRAM
CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:
More informationSt. John Paul II Catholic Parish
St. John Paul II Catholic Parish 167th & Ridgeview Road Olathe, Kansas Master Plan Town Hall October 30, 2018 Purpose [ The Church s ] mission consists essentially in offering people an opportunity not
More informationHorace Mann Elementary
2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are
More informationState College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationAdams Spanish Immersion 615 Chatsworth Street South
Project Summary: Adams Spanish Immersion is an international education without the travel expense. Our school is a place where families and staff value the opportunities gained from learning a second language.
More informationouglas Intermediate School
ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion
More informationGREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study
GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study New Lebanon School (K-5) 25 Mead Avenue, Greenwich, CT 20 March 2014 KSQ Architects PC 20 March 2014 GREENWICH PUBLIC SCHOOLS NEW LEBANON
More informationGREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM
Date of Meeting: March 20, 2014 GREENWICH PUBLIC SCHOOLS Greenwich, Connecticut Title of Item: New Lebanon School Pre-Feasibility Study Policy Reference: E - 051 REQUEST FOR BOARD ACTION OR PRESENTATION
More information24' - 0" 99' - 0" B15 B16 B17 B18 B19 SLOPE SLOPE BIKE STOR. / SERVICE 2 ACCESSIBLE COMMUNITY ACCESIBLE BIKE BIKE STORAGE ROOM STORAGE
5' ' 6 /4" RETAINING WALL ALONG BOUNDARY ILLUMINATED SIGNAGE TBD MOUNTED TO TOP AND/OR FACE OF RETAININGS WALL PROPERTIES FENCE TO REMAIN SIDEWALK ENTRY TIE NEW SIDE WALK INTO EXISTING SIDEWALKS AS CURRENTLY
More informationAshby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update
Ashby, Pepperell, Townsend North Middlesex Regional High School Feasibility Study Update June 6, 2013 AGENDA Preliminary Design Program (PDP) District Capacity Analysis Preferred Schematic Report (PSR)
More informationMarcus Moziah Garvey Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationCORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS)
Classrooms 2-3 scientists Morrison Maierle Classrooms K-1 Specials 146 planners Support surveyors 870 SF RR 147 148 RR 149 engineers 839 SF 150 COPYRIGHT (C) MORRISON-MAIERLE, INC., 2017 Admin Phone: 406.752.2216
More informationMEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013
Seattle World School SWS SDAT Workshop 3 2 December 203 SPS SWS at TT Minor TCF Architecture Project Number: 203 002 MEETING MINUTES Attendance: Name Representing Role Paul Wight Seattle Public Schools
More informationPlanning and Zoning Application & Checklist
City of Driggs, Idaho Planning & Zoning 60 S. Main Street PO Box 48 Driggs, ID 83422 Ph: (208) 354-2362 Fax: (208) 354-8522 www.driggs.govoffice.com Planning and Zoning Application & Checklist DESIGN REVIEW
More information1001 Feehanville Drive Phone Mt. Prospect, IL Fax
NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 November 29, 2016 Community Unit School District 200 130 West Park Avenue Wheaton, IL 60189
More informationWEST HOLLYWOOD PARK MASTER PLAN 2004
WEST HOLLYWOOD PARK MASTER PLAN 2004 Total of 5.23 acres of uninterrupted grass and trees including playground areas and tree-lined promenades compared with only 1.86 acres of park open space in the existing
More informationDASD Loganville Springfield Elementary School Site Feasibility Review. Background For This Work
DASD Loganville Springfield Elementary School Site Feasibility Review Prepared by: Site Design Concepts, Inc. March 30, 2016 Background For This Work No architectural programming or investigation was completed
More informationCheney Building & Bennet Academy Town of Manchester Phase 1 Study Presentation - April 10, 2013 DRAFT
Cheney Building & Bennet Academy own of Manchester Phase 1 Study Presentation - April 10, 2013 Schools Modernization & Reinvestment eam Revisited Board of Directors Board of Education DRAF ai Soo Kim Partners
More informationPROJECT ENTITLEMENT APPLICATION
GENERAL REQUIREMENTS (Print or Type) Name of Proposed Project: Location of Project: Legal Description of Project (Assessor s Parcel/Allotment No., Township/Range/Section): Staff Use Only CASE NO.: RELATED
More informationPBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017
PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017 ARCHITECTURE \\ ENGINEERING \\ PLANNING \\ INTERIORS \\ TECHNOLOGY
More informationCity of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT
City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,
More informationJohn A Johnson Elementary School
740 York Avenue Project Summary: An Acheivement Plus school John A Johnson is located adjacent to the East Side YMCA, jointly serving their communities educational, recreation, and wellness needs. The
More information11/29/12. Des Moines Social Club Urban Design Review Project Narrative
11/9/1 Des Moines Social Club Urban Design Review Project Narrative Strategically located at 9th and Walnut, the Des Moines Social Club (DMSC) will become a critical link between the Court Avenue Entertainment
More informationDESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN
209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN *** IMPORTANT INFORMATION Please
More informationHuntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y
Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program
More informationNEW LEBANON ELEMENTARY SCHOOL
NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL November 10, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL
More informationArchitectural Design Process
Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation
More informationNEW LEBANON ELEMENTARY SCHOOL
NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL October 9, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL
More informationCentral High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015
275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.
More informationDESIGN REVIEW PROCESS AND APPLICATION
DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring
More informationNON-RESIDENTIAL DEVELOPMENT
GENERAL REQUIREMENTS (Print or Type) Name of Proposed Project: Location of Project: Legal Description of Project (Assessor s Parcel No. or T, R,S): Staff Use Only FILE NO.: RELATED FILES: Applicant s Name:
More informationMinor Site Plan Application
Section 496-11.3.6 of the City Code: Minor Site Plan Review allows for review of the site design of routine development applications that are eligible to be processed administratively. Procedure 1. If
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationDEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION
DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION 220 Clay Street Cedar Falls, Iowa 50613 General Information: Applications for developing a commercial, multi-family, or residential (in an overlay
More informationAPPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT
209 South Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT *** IMPORTANT
More informationHarding Senior High School
1540 Sixth Street East Project Summary:, located in the Eastview area of St. Paul, offers students in grades 9 through 12 a wide range of curriculum options ranging from International Baccalaureate to
More informationMajor Site Plan Application
Procedure Section 496-11.3.7 of the City Code: Major Site Plan Review allows for the discretionary review of the site configuration and architectural design of projects which, due to their magnitude, are
More informationADMINISTRATIVE DESIGN REVIEW Information
Information The following information summarizes the City s Administrative Design Review (ADR) provisions. If you have any questions, please contact the Planning and Development Services Department at
More informationGUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS
Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are made to the University's Board of Trustees in February,
More informationContinuing Education Credit
BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP
More informationJackie Robinson Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWhat Plans Do I Need for a Building Permit?
What Plans Do I Need for a Building Permit? 6 CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1900 SW 4th Avenue, Por tland, Oregon 97201 503-823-7300 www.portlandoregon.gov/bds This brochure
More informationCS2.0 COVER SHEET VOL. 2
ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:
More informationLARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)
3966 Archer Pkwy Cheyenne, WY 82009 planning@laramiecounty.com Phone (307) 633-4303 Fax (307) 633-4616 SITE PLAN REVIEW PROCESS 1. Pre-Application Meeting: The applicant shall meet with a Laramie County
More informationPacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC
Design Rationale On behalf of our client, Necessary Homes Inc, we have prepared a Development Permit application for a unit rental multi-family building at The site area of the property is 9 SM and is
More informationINCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $
CITY OF PORT ORCHARD Permit Center Office located at 720 Prospect Street Mailing address: 216 Prospect Street Port Orchard, WA 98366 (360) 874-5533 permitcenter@cityofportorchard.us COMMERCIAL or MULTI-FAMILY
More informationA201 SCALE: 1" = 10'-0"
A B C D E F G G.5 H I J 0' - 0" 8' - 6" 7' - 0" 5 6 7 8 9 0 4 4 77' - 0" 6' - 0" UNEXCAVATED 7' - 6" 4 0 BELOW GRADE PARKING VP 9 (4 STALLS) 8 6 NON- COMPLIANT BIKE PARKING STALLS 7 ARCHITECTURE ENGINEERING
More informationPRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.
MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD
More informationWILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305
WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal
More informationSite Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)
1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone
More informationGENERAL REQUIREMENTS (Print or Type) PROJECT DESCRIPTION OWNER CERTIFICATION
GENERAL REQUIREMENTS (Print or Type) Name of Proposed Project: Location of Project: Legal Description of Project (Assessor s Parcel No. or T, R S,): Staff Use Only CASE NO.: RELATED FILES: Applicant s
More informationAPPLICATION DESIGN REVIEW Please Print or Type
www.srcity.org ZONING ADMINISTRATOR (ZA) APPLICATION DESIGN REVIEW Please Print or Type DESIGN REVIEW BOARD File # Related Files: LOCATION OF PROJECT (ADDRESS) ASSESSOR S PARCEL NUMBER(S) EXISTING ZONING
More informationINTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:
SECTION 13-400 ADMINISTRATIVE SITE PLAN 13-401 INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development: A. All development on vacant land
More informationExhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule
Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample
More informationLast Name: First Name: M.I:
ARCHITECTURE DESIGN REVIEW BOARD APPLICATION OFFICE USE ONLY APPLICATION # Permit # Fee Collected $ 1. Filing Status Initial Submission Amendment Withdrawal 2. Cost of Construction (Industry Standards)
More informationSITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS
INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with
More informationOperating Standards Attachment to Development Application
Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS
More informationMarch 1, Buildings for Our Future: 2016 Update
March 1, 2016 Buildings for Our Future: 2016 Update Buildings For Our Future: Project Objectives Transform five elementary schools in poor and worsening condition into 21st century centers of learning
More informationBRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB
BRYANT HERITAGE PLAZA, AB RE-ISSUED FOR BUILDING PERMIT May 9, 206 L I S T O F D R A W I N G S HD ENGINEERING SERVICES LTD. D.B.K. ENGINEERING LTD. D.B.K. ENGINEERING LTD. JUBILEE ENGINEERING CONSULTANTS
More informationCITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION
CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION Christine S. Primiano, Principal Planner Room 14, City Hall, Jay Street SCHENECTADY, NY 12305-1938 518.382.5147 cprimiano@schenectadyny.gov www.cityofschenectady.com
More informationMinor Site Plan Review Process
Minor Site Plan Review Process Pre-Application Conference Community Meeting (optional) Submit Application Determination of Completeness Staff Report (optional) Technical Review Committee Decision Notice
More informationPLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material
PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS Per the provisions
More informationElementary Grade Configuration School Current Recommendation
To: Board of Education From: Mark P Duerwaechter, Superintendent Date: January 7, 2019 Re: Action Team Recommendation Workshop Information and Discussion Only The Master Planning Action Team met on December
More informationCITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)
CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA 98040 (206) 275-7605 SUBMITTAL REQUIREMENTS FOR DESIGN COMMISSION APPROVAL & SIGNAGE APPROVAL PURPOSE: Design Commission
More informationThe Bluffs at Eagle. Design Review Application. Date Bluffs Lot Number Street Address. Address. and/or fax. Address. Owner (if different) Phone
Design Review Application Bluffs Lot Number Street Applicant Contact Person Email and/or fax Owner (if different) Architect/Designer (if different) Contractor Contact Person Email and/or fax Lot Area (SF)
More informationA Southglen Center. Site Plan scale: 1" = 60'-0" Overland Park, Kansas. a preliminary plan for. 119th & Metcalf. Lot 8 Southglen Center
Lo 8 Souhglen Cener Zoning CP- Lo Parcel Legend Lo a c il A Lo 5 n 0 saces Lo 3 3,00 sq. f. 5 saces Lo 4 5,30 sq. f. 97 saces Lo 5 3,46 sq. f. 43 saces Lo 6 6,90 sq. f. 55 saces Lo 6A 3,97 sq. f. 4 saces
More informationAPPLICATION FOR COMMERCIAL/OFFICE/INDUSTRIAL DEVELOPMENT PERMITS
FOR OFFICE USE ONLY APPLICATION FOR COMMERCIAL/OFFICE/INDUSTRIAL DEVELOPMENT PERMITS Fee Submitted File Number Date of Receipt Receipt # Name of Email Mailing Address Postal Code Telephone (B) (H) Fax
More informationAUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes
AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes Meeting No. 4 Date: 5/12/2018 Job No. Meeting Location: AVS Conference Room The following notes were taken during a meeting on
More informationTHE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM:
4900 Lang Ave NE Albuquerque, NM 87109 505-348-4000 phone 505-348-4055 fax Meeting Minutes Project: Valley View Elementary School Owner: Valley View Public Schools / PSFA Albuquerque Colorado Springs Denver
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More informationApplying for a Site Development Review
Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.
More informationSUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT
SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will
More informationCAC MEETING, FEB. 28 TH, 2017 NADAAA
ADAMS STREET BRANCH LIBRARY PROGRAMMING STUDY FOR CITY OF BOSTON BOSTON PUBLIC LIBRARY AND PUBLIC FACILITY DEPARTMENT CAC MEETING, FEB. 28 TH, 2017 NADAAA 1 AGENDA 1.0 SCHEDULE 2.0 SUMMARY OF PROJECT GOAL
More informationCITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET
CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES
More informationDEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3
DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3 Unified Development Code (UDC) Article 2, Applications, Procedures and Criteria provides the steps for applying the Unified Development Code standards to
More informationMULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST
MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be
More informationLOT 1 PARKING FACILITY PLANNING COMMISSION HEARING Stadium Authority of the City of Pittsburgh April 5, 2016 WTW ARCHITECTS
LOT 1 PARKING FACILITY PLANNING COMMISSION HEARING Stadium Authority of the City of Pittsburgh April 5, 2016 WTW ARCHITECTS Project Introduction Address: Chuck Noll Way & West General Robinson Street Zoning
More informationTOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE
TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist
More informationRezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation
Development Permit Application Rezoning/OCP Amendment Application Zoning DP Area yes no Variances Requested Development Details Property Size (m² or ha) Current Zoning Current OCP Designation Proposed
More informationSCARSDALE PUBLIC SCHOOLS
SCARSDALE PUBLIC SCHOOLS GREENACRES FEASIBILITY STUDY PROGRESS REPORT BOARD OF EDUCATION Mary Beth Gose Leila Shames Maude Lewis Leone, Jr. Christopher Morin William Natbony Suzanne Seiden Scott E. Silberfein
More informationOwner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review
Step 1: Request for Conditional Approval, page 1 of 5 Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review I,, the Property Owner, or Owner
More informationA-1. CDP and Use Permit Amendment. Title Sheet. the. Attachment. 1. Railing a soffit: trex Composite d in tree hous. 2. storefro BRonze ano aluminum F
the Arri. Railing a soffit: trex Composite d in tree hous. storefro BRonze ano aluminum F 3. glulam t Wood stain White (sw3 4. landscap Walls: Boa ConCRete 5. exterior a Wall: shou Ban Wood p CDP and Use
More informationDOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION
This application, including the Conceptual Review Presentation, must be completed and submitted to the Downtown Development Review Board (DDRB) Staff twenty (20) business days prior to the upcoming DDRB
More informationMELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma.
MELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma. Hoover, Winthrop and Horace Mann Elementary Schools September 27, 2016 Tappe Architects Inc. HOOVER ELEMENTARY SCHOOL - SITE PLAN REMOVE EXISITNG
More informationEverett McKinley Dirksen Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCommunity & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS
Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project
More informationSMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)
REVIEW TYPE: PRELIMINARY FINAL LANDSCAPE ABBREVIATED ADDITION COLOR BOARD Application Form* X X X X X Design Review Fee* X X X Registered Survey** X Site Plan X X X X X Floor Plans X X X Elevations X X
More informationStaff Review Date: May 11, 2016 HDC PID#
Charlotte Historic District Commission Application for a Certificate of Appropriateness Staff Review Date: May 11, 2016 HDC 2016-086 PID# 07102333 LOCAL HISTORIC DISTRICT: PROPERTY ADDRESS: SUMMARY OF
More informationFor Office Use: Filing Date: Case Number: Zoning District: LIST ALL ADDRESSES INVOLVED IN YOUR PROJECT:
City of Syracuse Zoning Administration Application for CHANGE OF OCCUPANCY Review by the Planning Commission City Hall Commons * Room 101 * 201 E. Washington Street * Syracuse, NY 13202-1426 * 315-448-8640
More informationSummerland Planning Advisory Committee
Summerland Planning Advisory Committee SunPAC Meeting #32 May 10, 2011 1 SunPAC Meeting Agenda Call to Order Agenda Item: 1 Item 1: Pledge of allegiance and roll call Item 2: Public comment period Item
More informationPLANNING Development Services Department
PLANNING Development Services Department Date Stamp APPLICATION SUBMITTAL CHECKLIST for Design Review Case Number: I acknowledge that the City of Glendale requires the following items be submitted before
More informationTo: Holly J. Godard Meeting Date: September 4, 2014 City of Seattle
MEETING MINUTES To: Holly J. Godard Meeting Date: City of Seattle Seattle Project No. 3018266 700 Fifth Avenue, Suite 1800 Project No.: PO Box 34019 Task No.: 11/31/41 Seattle, WA 98124-4019 holly.godard@seattle.gov
More informationApril 7, Notice of Project Change Hyde Park Avenue, Jamaica Plain Phase C Rental Portion of Parcel U. Dear Director Golden:
April 7, 16 Mr. Brian Golden, Director Boston Redevelopment Authority One City Hall Square, Ninth Floor 021 Attn: Phil D. Cohen, Project Manager Re: Notice of Project Change nue, Jamaica Plain Phase C
More informationAllan Hancock College
Allan Hancock College Project Planning Board Workshop February 17, 2009 Agenda Objective Funding Allocation Space Demand Analysis Project Overview Bond Measure I Program Schedule Charge: To review funding
More informationAmerican Institute of Architects New Hampshire Chapter High School Design Competition Program
American Institute of Architects New Hampshire Chapter 2009 2010 High School Design Competition Program Educational Objectives To increase your awareness of the relationships between space, human scale
More informationINDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX
INDEX OF SHEETS SHT. DWG. SHEET TITLE GENERAL 1 G1 COVER SHEET, VICINITY MAP, PROJECT DESCRIPTION 43 A402 INTERIOR ELEVATIONS WOMENS 44 A403 INTERIOR ELEVATIONS MENS 45 A404 INTERIOR ELEVATIONS BUILDING-PLUMBING
More informationTHE GUTHRIE PRICING SET
DRAWINGS FOR: FOR REVIEW ONLY. Sitework, Planting and Irrigation VICINIY MAP A PROJEC BY INDEX OF SHEES OWNER: ARGYLE RESIDENIAL LANDSCAPE ARCHIEC: BG Partners Reference CONAC: John Burnham 1601 S Mopac
More informationSITE PLAN Application Packet (Required For All Non-Residential Development Projects)
SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,
More informationApplying for a Site Development Review (Sign CVCBD only)
Guide Applying for a Site Development Review (Sign CVCBD only) What is it? Site Development Review ensures that new buildings or land uses are compatible with their sites and with the surrounding environment,
More information