March 23, 2015 Total Project Cost 18,553,027
|
|
- Veronica Hill
- 5 years ago
- Views:
Transcription
1 Executive Summary Charles City CSD Middle School Addition 25% CD Up April 3, 205 Project Approach This up to be considered recap of changes since March 23, 205 budget. It is intended to reflect significant design development, and modifications that have affected previous budget information. The cost indicated below is as previously presented, summary of items follows. March 23, 205 Total Project Cost 8,553,027 Summary of major modifications since up: Following items represent cost impacts that have affected the previous budget & at next up will be included in form of detailed estimate: Board approval to increase competition gymnasium size by approximately,258 SF. 300,000 2 Wood roof decking at commons in lieu of acoustical metal deck. 4,935 3 Provide (240) openings of lockers on (2) mobile units. 90,755 4 Provide resinous flooring in locker rooms in lieu of sealed concrete floor. 9,846 5 Provide,500 SF of tectum sound absorbing panels at gymnasium. 8,000 6 Changes in casework design in learning area. (27,000) 7 Removal of (2) borrowed lites in learning area. (9,500) 8 Storefront window system adjustment. 28,600 9 Roof overhang reduction at Studio courtyard. (33,200) 0 Lower quantity of base design bleacher seats, down to 572 from 640 (6,800) Soil test pits conducted indicate on-site soils cannot be used for fill under roadways & parking areas. 50,000 2 Site utility adjustment per new civil design. 3,600 25% CD Project Budget 9,002,263 Page of 5
2 Executive Summary Charles City CSD Middle School Addition 25% CD Up April 3, 205 New Budget Summary 3/23/205 DD Estimate 3/23 Board Established Budget 4/3/205 25% CD Estimate Variance Total Project Costs 8,553,027 8,800,000 9,002, ,263 Cost Reduction Ideas: The following scope changes are proposed as cost reduction ideas to be applied to base budget. Remove clerestory windows and lower roof at second level learning area. (32,300) 2 Remove windows East of display case area at East elevation of learning corridor. (4,700) 3 Change all areas of metal panel siding to fiber cement panels. (66,600) 4 Remove windows at East elevation of Gymnasium (7,800) 5 Remove Balcony at exterior of second level Info Commons (27,600) Total Cost Reduction Ideas (249,000) Page 2 of 5
3 Executive Summary Charles City CSD Middle School Addition 25% CD Up April 3, 205 Smart Choice Options: The following options are not included in the base ; they are inclusive of Design & CM fees. Decision on each is required prior to completion of bid documents. 2 New For Board Consideration Provide fortification of Media Rooms and Toilet Rooms at st level only of Learning Area, and both Locker Rooms at Gymnasium via fully grouted and reinforced CMU walls. ADD 53,400 Provide (4) heavy duty specialty doors & hardware at fortified areas noted above. ADD 22,500 Recommend Removing from Consideration Provide masonry walls at learning wing (per plan) outside of stairwells and large restrooms in lieu of gypsum board partitions included in base budget. ADD 48,562 Phase 2 Considerations Provide landscaping allowance for non-turf plantings and trees. ADD 50,000 2 Provide allowance for exterior monument sign. (Lettering on building is included in budget) ADD 8,659 3 Vegetated approx. 960 SF to include: "edible depth" soil & trays, guardrails, exterior door & hardware. ADD 42,400 Page 3 of 5
4 Executive Summary Charles City CSD Middle School Addition 25% CD Up April 3, 205 Alternate Bid Items: Per Board action, these items are high priority after base scope of work. Amended from March 23, 205 for bidder appeal in order to provide best value. Provide (9) skylights at gymnasium, including curbs, flashings, and steel support frames. ADD 30,000 2 Provide glass operable partitions in lieu of non-glass operable partitions. ADD 266,500 3 Provide additional 320 gym bleacher seats, athletic equipment, and athletic area lockers. ADD 233,000 4 Provide South connector gravel road to include grading, fill, and seeding work from new to old parking. ADD 257,000 5 Provide approximately 369 linear feet of exterior sunshades integral to storefront system. ADD 80,700 6 Provide amplification system at (20) labs/ classrooms. ADD 74,65 7 Provide motorized (236) square feet of window shades in lieu of manually operated shades. ADD 2,500 Alternate Bid Item Total 963,35 Page 4 of 5
5 Executive Summary Charles City CSD Middle School Addition 25% CD Up April 3, 205 Remaining Costs for Consideration st Avenue Extension has not been included. Cost to be determined upon design input. Range $300,000 to $700,000 depending on scope and size. Final scope required to refine budget. Status: Final scope needed for refined cost range. Final Energy Rebate value is to be determined. Early indications suggest a rebate between $75,000 to $90,000 is attainable with systems as currently designed. Status: Awaiting additional information from energy consultant (current estimated savings of $75,000). Conclusions and Recommendations Determine final scope of, incorporate Smart Choice Options into base, Alternate bid, or revisit after bids for consideration. Complete early phase construction documents, prepare bid notices, and issue for bid. Detail FFE and Technology, Telecom, and Security allowances to determine actual cost impact to. Page 5 of 5
6 BLDD Architects, Inc., Davenport, IA Charles City Middle School Addition Charles City CSD, Charles City, IA Project Schedule Constru uction Documents April 3, 2055 Schematic Design... Aug. 3, 204 Oct. 27, 204 Topographic Survey (if required)... Oct., Oct. 5, 204 Items to Estes for Initial SD Estimate... Oct. 6, 204 SD submittal to MEP... Oct 6, 204 Board packet submittal... Oct. 23, 204 Board Approval of SD... Oct. 27, 204 Design Development Oct 28, 204 Feb. 9, 205 MEP/Civil Coordination meeting (Davenport office of BLDD)... Nov. 2, % DD submittal to Estes for pricing... Nov. 20, % DD Board packet submittal... Dec. 4, % DD Board review... Dec. 5, 204 Board packet submittal... Jan. 8, 205 Board Meeting... Jan. 2, 205 MEP Coordination meeting... week of Jan 2, 205 BLDD QAQC Review... Jan. 9, 204 Jan. 20, 205 DD submittal to Estes for pricing... Jan. 23, 205 Board packet submittal... Feb. 6, 205 Board Approval of DD... Feb. 9, 205 Construction Documents... Feb. 0, 205 May 26, 205 MEP Coordination meeting... TBD Board packet submittal... Feb. 20, 205 Board Meeting... Feb. 23, 205 MEP Coordination meeting... Mar. 6, 205 Board packet submittal... Mar. 9, 205 BOE meeting... Mar. 23, 205 Submittal to Estes for pricing... Mar. 26, 205 MEP coordination meeting Apr., 205 Board packet submittal... Apr. 0, 205 Board of Education Meeting approve documents... Apr. 3, % CD / Early Bid package completion... Apr. 7, 205 MEP Coordination meeting... week of April 20 Early Bid Package Pre Bid Meeting... Apr. 28, 205 MEP Coordination meeting... week of May 4 Early Bid Package Bids Received... May 6, 205 Board packet submittal... May 8, % CD Board of Education Meeting approve early y bids... May, % CD submittal to Estes for pricing... May 22, 205
7 BLDD QAQC review... May 22, 205 May 27, 205 Board packet submittal... June 5, % CD Board Review... June 8, 205 Bidding and Negotiation... June 9, 205 July 7, 205 Bid document Printing... June 9, 205 June 0, 205 Bid Document Seals & Signatures... Jun., 205 Project out for Bids... Jun., 205 Bids Due... July 9, 205 Pre-award Interviews... July 4, 205 Jul. 20, 205 Board of Education Meeting... Jul. 20, 205 Notice to Proceed... Jul. 2, 205 Construction... July 205 July 206
8 ELEC 246 SF 500 SF LAUNDRY 4 SF PHASE - FIRST FLOOR PLAN " = 40'-0" 58,248 SF BOYS ATHLETIC 88 SF GIRLS ATHLETIC 88 SF 464 SF GYMNASIUM 4,52 SF 464 SF 4/9/205 :40:52 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt 09 SF BOYS PE 256 SF 80 SF GIRLS PE 256 SF 80 SF VEST 280 SF COMMONS 4,547 SF 09 SF VEST 64 SF SERVING 5 SF 88 SF MUSIC RESOURCE,30 SF 02 SF 02 SF FCS/ IND TECH RESOURCE,35 SF 29 SF 62 SF 82 SF RECEPTION 508 SF DESIGN,094 SF LISTEN 80 SF CAMP 70 SF SPEC ED FLEX 27 SF 78 SF GATHER 2,953 SF PRAC 97 SF MEDIA EXPLORE 596 SF,03 SF PLAN 30 SF 546 SF MECH 493 SF AEA 4 SF LOUNGE / WORK 397 SF FILES 65 SF NURSE 234 SF PRINCIPAL 203 SF CONFERENCE 249 SF W/D LISTEN 80 SF 72 SF CALM 72 SF GATHER PRAC 2,949 SF 97 SF MEDIA 596 SF PLAN 546 SF CAFE VEST 625 SF 86 SF UP CAMP 69 SF CALM DESIGN,094 SF FLEX 78 SF EXPLORE,03 SF ART RESOURCE 49 SF 62 SF 86 SF ELEC 22 SF MECH 8 SF TMR FIRST FLOOR PLAN A00 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system,
9 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, OPEN TO BELOW 4/9/205 :4:42 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt OPEN TO BELOW TREEHOUSE 275 SF 62 SF 83 SF 53 SF 30 SF INFO COMMONS,738 SF DESIGN,094 SF CAMP 63 SF FLEX 722 SF GATHER 3,064 SF EXPLORE,06 SF COUNSELING 299 SF 6 SF 6 SF IT 44 SF 235 SF SPEC ED 27 SF CALM 72 SF PRAC 97 SF PLAN 546 SF LISTEN 80 SF MEDIA 596 SF W/D CONTROL 74 SF CAFE 72 SF LISTEN 80 SF MEDIA 596 SF CALM 72 SF PRAC 97 SF PLAN 546 SF GATHER 3,058 SF CAMP 65 SF DESIGN,094 SF FLEX 722 SF EXPLORE,06 SF 62 SF 83 SF 53 SF 34 SF TMR SECOND FLOOR PLAN PHASE - SECOND FLOOR PLAN " = 40'-0" 29,33 SF, 4,384 SF MEZZANINE A002
10 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, 3 A03 BOYS ATHLETIC 88 SF ELEC 246 SF 500 SF DW LAUNDRY 4 SF 4 A03 GIRLS ATHLETIC 88 SF 4/9/205 2:59:02 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt GYMNASIUM 4,52 SF 464 SF 464 SF 6 SF BOYS PE 256 SF GIRLS PE 256 SF 6 SF 80 SF 80 SF 09 SF 09 SF VEST 280 SF BOYS 652 SF 65 SF COMMONS 4,547 SF GIRLS 823 SF ELEV EQUIP 40 SF A00 NURSE 234 SF RECEPTION 508 SF VEST 64 SF SERVING 5 SF NURSE 62 SF FILES 65 SF CONFERENCE 249 SF 56 SF AEA 4 SF LOUNGE / WORK 397 SF 56 SF PRINCIPAL 203 SF CEK FIRST FLOOR - AREA A PHASE - FIRST FLOOR PLAN - AREA A 3/64" = '-0" A003
11 3 A04 PHASE - FIRST FLOOR PLAN - AREA B 3/64" = '-0" 4/9/205 :42:55 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt MUSIC RESOURCE 30 SF,30 SF FLEX 78 SF DESIGN,094 SF EXPLORE,03 SF FCS/ IND TECH RESOURCE,35 SF BOYS 62 SF GIRLS 92 SF 88 SF 02 SF 02 SF 29 SF 62 SF CAMP 70 SF 82 SF 53 SF GATHER 2,953 SF PLAN 546 SF 2 A04 49 SF LISTEN 80 SF SPEC ED W/D 27 SF CALM 68 SF 72 SF PRAC 97 SF MEDIA 596 SF CONTROL 74 SF CAFE 625 SF LISTEN 80 SF 27 SF CALM 72 SF PRAC 97 SF MEDIA 596 SF 49 SF PLAN 546 SF 3 A00 ART RESOURCE 49 SF UP 62 SF DESIGN,094 SF CAMP 69 SF FLEX GATHER 78 SF 2,949 SF 86 SF EXPLORE,03 SF 53 SF BOYS 50 SF GIRLS 78 SF VEST 86 SF A04 ELEC 22 SF MECH 8 SF TMR FIRST FLOOR - AREA B A004 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system,
12 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, 4/9/205 :43:56 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt OPEN TO BELOW OPEN TO BELOW TREEHOUSE 275 SF 6 SF 299 SF 6 SF INFO COMMONS,738 SF COUNSELING IT 44 SF 235 SF CEK SECOND FLOOR - AREA A PHASE - SECOND FLOOR PLAN - AREA A 3/64" = '-0" A005
13 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, DESIGN,094 SF FLEX 722 SF EXPLORE,06 SF 30 SF 4/9/205 :44:33 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt 42 SF 62 SF CAMP 63 SF GATHER 3,064 SF 83 SF 53 SF BOYS 63 SF GIRLS 9 SF PLAN 546 SF 49 SF LISTEN 80 SF LISTEN 80 SF SPEC ED 27 SF W/D 68 SF CALM 72 SF CALM 72 SF PRAC 97 SF PRAC 97 SF MEDIA 596 SF MEDIA 596 SF CONTROL 74 SF CAFE 72 SF IT 27 SF 49 SF 40 SF GATHER 3,058 SF PLAN 546 SF 62 SF CAMP 65 SF 83 SF 53 SF BOYS 52 SF GIRLS 77 SF DESIGN,094 SF FLEX 722 SF EXPLORE,06 SF 34 SF A06 TMR SECOND FLOOR - AREA B PHASE - SECOND FLOOR PLAN - AREA B 3/64" = '-0" A006
14 ATHLETIC LOCKERS PE LOCKERS 2 /4" = '-0" /4" = '-0" 3 4 WATER HEATER F.E.C. F.E.C. IF LARGER LOCKERS ARE PREFERRED, THIS ROW COULD BECOME LARGE DOUBLE TIERS BOYS ATHLETIC ENLARGED PLAN - BOYS LOCKER ROOM /8" = '-0" WATER HEATER GIRLS ATHLETIC IF LARGER LOCKERS ARE PREFERRED, THIS ROW COULD BECOME LARGE DOUBLE TIERS ENLARGED PLAN - GIRLS LOCKER ROOM /8" = '-0" 4/9/205 :34:2 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt 6' MB 6' MB LOCKER COUNTS 20 Athletic lockers 8"w x 24"d x 60"h triple tier 70 lockers: 8"w x 24"d x 36"h 40 lockers: 8"w x 24"d x 2"h BOYS PE 6' MB 6' MB GIRLS PE 38 PE lockers 2"w x 2"d x 60"h double tier & 5 tier 8 lockers: 2"w x 2"d x 30"h 20 lockers: 2"w x 2"d x 2"h VEST 8 Coach lockers 2"w x 5"d x 60"h double tier 8 lockers: 2"w x 5"d x 30"h VEST 8' TB 8' TB F.E.C. DRY LOCKER ROOMS A03 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system,
15 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, ART RESOURCE UP 4/0/205 9:45:34 AM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt XYLOPHONES / CHIMES MUSIC RESOURCE BRASS WOODWIND UNIFORM STRINGS MOBILE SHEET MUSIC RACKS PERCUSSION MOBILE GUITAR RACKS KEYBOARDS FCS/ IND TECH RESOURCE DRY RESOURCE ROOMS ENLARGED PLAN - ART RESOURCE /8" = '-0" 3 2 ENLARGED PLAN - MUSIC RESOURCE /8" = '-0" ENLARGED PLAN - FCS RESOURCE /8" = '-0" A04
16 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, 32' - 0" 50' - 0" 32' - 0" 7' - /2" 50' - 0" 7' - /2" (ALTERNATE) FIXED BLEACHERS, 7 ROWS, +/- 374 SEATS TELESCOPING BLEACHERS, ROWS, +/- 572 SEATS W/ 8 WHEELCHAIR-ACCESSIBLE SEATS (BASE BID) +/- 572 TOTAL SEATS INCLUDING 8 WHEELCHAIR SPACES (WITH MEZZANINE & EAST BLEACHERS) +/-,892 TOTAL SEATS INCLUDING 6 WHEELCHAIR SPACES (ALTERNATE) TELESCOPING BLEACHERS, ROWS, +/- 572 SEATS W/ 8 WHEELCHAIR- ACCESSIBLE SEATS (ALTERNATE) FIXED BLEACHERS, 7 ROWS, +/- 374 SEATS 4/9/205 :35:23 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt 8' - 7 /2" 84' - 0" 8' - 6" CEK GYMNASIUM GYMNASIUM - OVERALL /6" = '-0" A05
17 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, BOYS ATHLETIC BOYS PE 0' - 6" 4' - 0" 8' - 0" 4' - 0" 2' - 0" 4' - 0" 8' - 0" 4' - 0" 0' - 6" TELESCOPING BLEACHERS, 3 ROWS OPEN, +/- 56 SEATS GYMNASIUM 4' - 0 /8" 84' - 0" 4' - 0 /8" ELEC LAUNDRY TELESCOPING BLEACHERS, 3 ROWS OPEN, +/- 56 SEATS 7' - 0 7/8" 50' - 0" 7' - 0" 50' - 0" 7' - 0" BLEACHERS IN STACKED POSITION GIRLS PE GIRLS ATHLETIC 4/9/205 :35:47 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt CEK GYMNASIUM GYMNASIUM /6" = '-0" A05a
18 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, 4/9/205 :36:2 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt EXPLORE BOYS GIRLS CEK 2ND FLOOR AGE ROOM ENLARGED PLAN - 2ND FLOOR EXPLORE/ AGE ROOM /8" = '-0" A06
19 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, 4/0/205 0:26:03 AM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt DRY INTERIOR IMAGES A07
20 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, 4/0/205 0:26:28 AM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt DRY INTERIOR IMAGES A08
21 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, 4/0/205 0:26:54 AM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt DRY INTERIOR IMAGES A09
22 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, 4/0/205 0:28:29 AM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt DRY INTERIOR IMAGES A020
23 BLDD Architects, Inc. 583 Utica Ridge Road, Storm Shelter Requirements **The District is not required to provide an ICC-500 Compliant Shelter Storm Built into the Must comply with Flood Elevation Criteria Fire extinguishers - per shelter space Min 5 sf per person of usable floor area ( 0 sf for those in wheelchairs) First Aid Kits - areas with >50 occupants Requires additional cost, incorporated but can easily be Shelter enclosure passes tornado missile test - provide fully grouted 6" CMU with #4 bars in each cell or fully grouted 8" CMU with #5 40" o.c. max 250 mph basic wind speed - Roof live load 00 psf minimum Doors/Windows Designed for Debris Impact at designated wind speed Automatic Shutoffs of Gas or other Hazardous Lines H:\DAV\ Charles City New MS\Drawings\PDF's\50% Construction Documents\ BOE\Storm Shelter Construction Requirements.docx
24 BLDD Architects, Inc. 583 Utica Ridge Road, Requires additional design work and cost, but can be incorporated if desired Emergency Escape Opening that opens inward and can be opened without a key Sanitation facilities within shelter (for lesss than 50 occupants toilet, no hand washing; for greater than 50 occupants, 2 toilets, hand washing) Atmospheric Pressure Change (APC) venting areaa = sf / 000 cubic eet of shelter volume ( otherwisee design for greaterr internal pressure) Requires significant additional design work and cost 2 hour minimum period of occupancy - provide critical support systems with emergency power 2 hour Fire Wall Separation at the Perimeter - modify structural framing to provide structural isolation and fire separation of shelter spaces Proper Signage and Labeling - signage indicating storm shelter Structural - Special Quality Assurance Plans and Inspections, Inspection of Fabricators Structural Observation Report by Structural Engineer H:\DAV\ Charles City New MS\Drawings\PDF's\50% Construction Documents\ BOE\Storm Shelter Construction Requirements.docx
25 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, 3 A03 BOYS ATHLETIC 88 SF ELEC 246 SF 500 SF DW LAUNDRY 4 SF 4 A03 GIRLS ATHLETIC 88 SF 4/9/205 2:59:02 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt GYMNASIUM 4,52 SF 464 SF 464 SF 6 SF BOYS PE 256 SF GIRLS PE 256 SF 6 SF 80 SF 80 SF 09 SF 09 SF VEST 280 SF BOYS 652 SF 65 SF COMMONS 4,547 SF GIRLS 823 SF ELEV EQUIP 40 SF A00 NURSE 234 SF RECEPTION 508 SF VEST 64 SF SERVING 5 SF NURSE 62 SF FILES 65 SF CONFERENCE 249 SF 56 SF AEA 4 SF LOUNGE / WORK 397 SF 56 SF PRINCIPAL 203 SF CEK FIRST FLOOR - AREA A PHASE - FIRST FLOOR PLAN - AREA A 3/64" = '-0" A003
26 3 A04 PHASE - FIRST FLOOR PLAN - AREA B 3/64" = '-0" 4/9/205 :42:55 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt MUSIC RESOURCE 30 SF,30 SF FLEX 78 SF DESIGN,094 SF EXPLORE,03 SF FCS/ IND TECH RESOURCE,35 SF BOYS 62 SF GIRLS 92 SF 88 SF 02 SF 02 SF 29 SF 62 SF CAMP 70 SF 82 SF 53 SF GATHER 2,953 SF PLAN 546 SF 2 A04 49 SF LISTEN 80 SF SPEC ED W/D 27 SF CALM 68 SF 72 SF PRAC 97 SF MEDIA 596 SF CONTROL 74 SF CAFE 625 SF LISTEN 80 SF 27 SF CALM 72 SF PRAC 97 SF MEDIA 596 SF 49 SF PLAN 546 SF 3 A00 ART RESOURCE 49 SF UP 62 SF DESIGN,094 SF CAMP 69 SF FLEX GATHER 78 SF 2,949 SF 86 SF EXPLORE,03 SF 53 SF BOYS 50 SF GIRLS 78 SF VEST 86 SF A04 ELEC 22 SF MECH 8 SF TMR FIRST FLOOR - AREA B A004 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system,
27 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, 4/9/205 :43:56 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt OPEN TO BELOW OPEN TO BELOW TREEHOUSE 275 SF 6 SF 299 SF 6 SF INFO COMMONS,738 SF COUNSELING IT 44 SF 235 SF CEK SECOND FLOOR - AREA A PHASE - SECOND FLOOR PLAN - AREA A 3/64" = '-0" A005
28 COPYRIGHT 204 BY BLDD ARCHITECTS, INC. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information or storage retrieval system, DESIGN,094 SF FLEX 722 SF EXPLORE,06 SF 30 SF 4/9/205 :44:33 PM C:\Revit_TEMP\_Charles City MS addition_new 2.7.4_Central_cek.rvt 42 SF 62 SF CAMP 63 SF GATHER 3,064 SF 83 SF 53 SF BOYS 63 SF GIRLS 9 SF PLAN 546 SF 49 SF LISTEN 80 SF LISTEN 80 SF SPEC ED 27 SF W/D 68 SF CALM 72 SF CALM 72 SF PRAC 97 SF PRAC 97 SF MEDIA 596 SF MEDIA 596 SF CONTROL 74 SF CAFE 72 SF IT 27 SF 49 SF 40 SF GATHER 3,058 SF PLAN 546 SF 62 SF CAMP 65 SF 83 SF 53 SF BOYS 52 SF GIRLS 77 SF DESIGN,094 SF FLEX 722 SF EXPLORE,06 SF 34 SF A06 TMR SECOND FLOOR - AREA B PHASE - SECOND FLOOR PLAN - AREA B 3/64" = '-0" A006
CAPITAL IMPROVEMENT PROGRAM
CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:
More informationState College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationCS2.0 COVER SHEET VOL. 2
ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:
More informationouglas Intermediate School
ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationArchitectural Design Process
Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation
More informationContinuing Education Credit
BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP
More informationOCPS Submittal Register for Product Data and Shop Drawing Reviews
OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition
More informationBASEBALL PLAYER FACILITIES CLEMSON, SOUTH CAROLINA
THROUGH THE YEARS THROUGH THE YEARS VIEW FROM RIGHT FIELD VIEW FROM DUGOUT VIEW FROM NEW GRANDSTAND EXISTING CONDITIONS EXTERIOR PHOTOS PLAYER S LOUNGE LOCKER ROOM TRAINING AREA COACH S OFFICE CORRIDOR
More informationGRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO
PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More information1001 Feehanville Drive Phone Mt. Prospect, IL Fax
NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 November 29, 2016 Community Unit School District 200 130 West Park Avenue Wheaton, IL 60189
More informationFebruary 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida
February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following
More informationTRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal
TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal Complete sets of plans are required. Plans shall be stamped and wet signed by the architect or engineer. (signed and accompanied with letter from Homeowners
More informationCOMPONENT FLOW CHART & SEQUENCING DIAGRAMS
Oak Park and River Forest High School Master Facilities Plan COMPONENT FLOW CHART & SEQUENCING DIAGRAMS The following is a narrative intended to accompany the component flow chart and sequencing diagrams
More informationDESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD
ALBANY UNIFIED SCHOOL DISTRICT DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD BOARD OF EDUCATION PRESENTATION JANUARY 22, 2019 DOUG ESPLAND Sr. Precon Manager & Project Director
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationA-1. CDP and Use Permit Amendment. Title Sheet. the. Attachment. 1. Railing a soffit: trex Composite d in tree hous. 2. storefro BRonze ano aluminum F
the Arri. Railing a soffit: trex Composite d in tree hous. storefro BRonze ano aluminum F 3. glulam t Wood stain White (sw3 4. landscap Walls: Boa ConCRete 5. exterior a Wall: shou Ban Wood p CDP and Use
More informationTo the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603
ENDUM NO. 2 To the Drawings and/or Specifications for Gilbert Architects Youth s Benefit Elementary School - #0729 626 N. Charlotte St. Board of Education of Harford County Lancaster, PA 17603 June 2,
More information11/29/12. Des Moines Social Club Urban Design Review Project Narrative
11/9/1 Des Moines Social Club Urban Design Review Project Narrative Strategically located at 9th and Walnut, the Des Moines Social Club (DMSC) will become a critical link between the Court Avenue Entertainment
More informationMEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013
Seattle World School SWS SDAT Workshop 3 2 December 203 SPS SWS at TT Minor TCF Architecture Project Number: 203 002 MEETING MINUTES Attendance: Name Representing Role Paul Wight Seattle Public Schools
More informationHuntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y
Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program
More informationSt. John Paul II Catholic Parish
St. John Paul II Catholic Parish 167th & Ridgeview Road Olathe, Kansas Master Plan Town Hall October 30, 2018 Purpose [ The Church s ] mission consists essentially in offering people an opportunity not
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationAddendum Number: 1 WT White HS Additions and Renovations, Dallas ISD
Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications
More informationJames Shields Middle School 2611 W 48th St Chicago, IL 60632
2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationChecklist for Minor Plan Modification
Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,
More informationARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)
ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.
More information5. The design team is working towards a submittal to the Division of the State Architect (DSA) in June 2010.
PALO ALTO HIGH SCHOOL Palo Alto Unified School District SCHEMATIC DESIGN TO DESIGN DEVLOPMENT TRANSITION MEETING DATE: SUBJECT: 27 January 2010, 3:30 5:00 pm ATTENDEES: Paul Kandell, Paly English Esther
More informationBuildings and Grounds Supervisor, EASD. CG Schmidt, Sr. Project Manager
MEETING MINUTES August 25, 2015 Colleen O'Meara EUA, Project Manager Bill Trewyn Mike Datza Jason Tadlock Dave Stebnitz Ross Eggert Bob Vajgrt Business Manager, EAST Buildings and Grounds Supervisor, EASD
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2 Owner: San Francisco Unified School District Date: Dec. 10, 2014 135 Van Ness Avenue
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More informationCORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS)
Classrooms 2-3 scientists Morrison Maierle Classrooms K-1 Specials 146 planners Support surveyors 870 SF RR 147 148 RR 149 engineers 839 SF 150 COPYRIGHT (C) MORRISON-MAIERLE, INC., 2017 Admin Phone: 406.752.2216
More informationGUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS
Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are made to the University's Board of Trustees in February,
More informationOLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN
KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12
More informationMULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST
MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More informationOperating Standards Attachment to Development Application
Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org SITE DEVELOPMENT
More informationNon-Residential and Multi-Family Plan Check Submittal Requirements
Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail: www.comptoncity.org City of Compton Building & Safety Department Non-Residential and Multi-Family Plan Check Submittal Requirements The purpose of this
More informationPRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.
MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD
More informationMahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620
W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More information754 Sir Francis Drake Boulevard
APN: 006-09 - 39 Town of San Anselmo Submittal Number : April 06 Revised June 0, 06 PROJECT TEAM INDEX TO DRAWINGS APPLICANT MONFREDINI PROPERTIES LLC South San Francisco, California 94080 (650) 873-0440
More informationWendell E Green Elementary School 1150 W 96th St Chicago, IL 60643
11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationAdams Spanish Immersion 615 Chatsworth Street South
Project Summary: Adams Spanish Immersion is an international education without the travel expense. Our school is a place where families and staff value the opportunities gained from learning a second language.
More informationS T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1" = 10' - 0" SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD
\\CANDELA\projects\-Chabad Center\Current Drawings\Chabad - -A-.0-extg-demo-site-plan.dwg, 0/0/0 :: PM, DWG To PDF.pc A-.0 SITE PLAN SCALE: " = 0' - 0" NORTH GENERAL NOTES: Site/Roof Drainage Plan. THE
More informationHANSCOM FIELD ARFF AND CBP BUILDING
HANSCOM FIELD ARFF AND CBP BUILDING AERIAL VIEW OF AIRFIELD PROJECT SITE HANSCOM AIR FIELD CIVIL AIR TERMINAL HANSCOM AIR FORCE BASE 95 AIRFIELD MAIN ENTRY SITE AERIAL PLAN VIEW OF AIRFIELD N MASSACHUSETTS
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationSUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS
SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped
More informationCHAPTER 5 ARCHITECTURE
CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1
More informationA0.0 ABBREVIATIONS SYMBOLS PLANNING DATA SATELLITE VIEW PROJECT DIRECTORY BUILDING CODE DATA DRAWING INDEX SCOPE OF WORK PLUMBING FIXTURES
PLANNING DATA SATELLITE VIEW DATE SYMBOLS BAUKUNST 58 Fairlawn Avenue, Daly City, CA 94015 T: 650.455.1207 F: 650.755.1093 E: baukunst2000@yahoo.com W:baukunstarchitecture.com ISSUED FOR PROJECT DIRECTORY
More informationExhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule
Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationEllen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612
33 W Ohio St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationChecklist for Tentative Subdivision Map
Checklist for Tentative Subdivision Map All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,
More informationBRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB
BRYANT HERITAGE PLAZA, AB RE-ISSUED FOR BUILDING PERMIT May 9, 206 L I S T O F D R A W I N G S HD ENGINEERING SERVICES LTD. D.B.K. ENGINEERING LTD. D.B.K. ENGINEERING LTD. JUBILEE ENGINEERING CONSULTANTS
More informationSPRINKLER SF. Stair 190 SF WOMEN SF LOBBY SF MECH/ELEC CONCESSIONS SF 225 SF STORAGE SF
1JACKSON MSC TEMPSTAR W/DT-3-LR TABLE PACKAGE WAREWASHER, DOOR TYPE W/ DISHTABLES ARCHITECTURE & INTERIOR DESIGN Montgomery Dothan WWW.SSLARCH.COM (M) 334. 263. 5162 (D) 334. 791. 5248 No. Revision Date
More informationADDENDUM NO 1 Bid Package 3
ADDENDUM NO 1 Bid Package 3 Addendum No.: Addendum 1 Bid Package 3 Issue Date: October 10, 2014 Project: Walker Natatorium Kirkwood High School Kirkwood School District Kirkwood, MO 63122 Project Number:
More informationLinwood Monroe Upper 810 Palace Avenue
810 Palace Avenue Project Summary: Spanning a child s first classroom experience all the way through middle school, Linwood Monroe s Plus lays a foundation for creativity and exploration in the arts. Accelerated
More informationDIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS
DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication
More informationMADISON PUBLIC LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 11 / 09 / 2017
MADISON LIBRARY PINNEY PINNEY LIBRARY COMMUNITY UPDATE 11 / 09 / 2017 MADISON LIBRARY PINNEY CURRENT TIMELINE TIMELINE MADISON LIBRARY PINNEY MING/ PRE-DESIGN 1 SCHEMATIC DESIGN 2 DESIGN DEVELOPMENT 3
More informationHorace Mann Elementary
2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationAUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes
AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes Meeting No. 4 Date: 5/12/2018 Job No. Meeting Location: AVS Conference Room The following notes were taken during a meeting on
More informationDESIGN REVIEW PROCESS AND APPLICATION
DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring
More informationTHE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM:
4900 Lang Ave NE Albuquerque, NM 87109 505-348-4000 phone 505-348-4055 fax Meeting Minutes Project: Valley View Elementary School Owner: Valley View Public Schools / PSFA Albuquerque Colorado Springs Denver
More information24' - 0" 99' - 0" B15 B16 B17 B18 B19 SLOPE SLOPE BIKE STOR. / SERVICE 2 ACCESSIBLE COMMUNITY ACCESIBLE BIKE BIKE STORAGE ROOM STORAGE
5' ' 6 /4" RETAINING WALL ALONG BOUNDARY ILLUMINATED SIGNAGE TBD MOUNTED TO TOP AND/OR FACE OF RETAININGS WALL PROPERTIES FENCE TO REMAIN SIDEWALK ENTRY TIE NEW SIDE WALK INTO EXISTING SIDEWALKS AS CURRENTLY
More informationVillage of Glenview Appearance Commission
Village of Glenview Appearance Commission STAFF REPORT June 13, 2018 TO: Chairman and Appearance Commissioners FROM: Community Development Department CASE #: A2018-062 LOCATION: PROJECT NAME: 1533 Waukegan
More informationPacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC
Design Rationale On behalf of our client, Necessary Homes Inc, we have prepared a Development Permit application for a unit rental multi-family building at The site area of the property is 9 SM and is
More informationSUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT
SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will
More information3 Basic Code Enforcement, Part 3
Study Session 3 Basic Code Enforcement, Part 3 Technical Aspects of Code Enforcement OBJECTIVE: To become familiar with the technical aspects of code enforcement: first, by learning to recognize the basic
More informationMailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:
/ Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax
More informationAMES COMMUNITY SCHOOL DISTRICT SAWYER ELEMENTARY
Exhibit D-4 AMES COMMUNIY SCHOOL DISRIC SAWYER ELEMENARY Schematic Development Project Manual June 25th 2014 RDG Planning & Design 301 Grand Avenue Des Moines, Iowa 50309 architectural narrative Summarized
More informationCITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:
CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA 50311 Phone: 515-283-4200 Minor Site Plan list This checklist should be used as a guide in the preparation of
More informationRequired Supporting Information and Documentation for Historic Preservation Certification Applications
Required Supporting Information and Documentation for Historic Preservation Certification Applications Part 1 Submittal- Evaluation of Significance Descriptive Information Describe the major features of
More informationTravis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock
Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL
More informationINDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:
INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING
INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY
More informationDRAFT FOR INTERNAL DISCUSSION ONLY
Jameson St. 2 Riser Room Cistern Base Men's Locker Room Women's Locker Room Mud Room Stair Elev. Entry Lobby Shipping and Receiving Stair EO/IO Breakdown A40 Shop / Warehouse Alley Gilman Pl. Storage Room
More information***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)
DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB
More informationROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL
ROBERT TURER COLLEGE AD CAREER HIGH SCHOOL SCHEMATIC DESIG PRESETATIO 23 MAY 2017 Project Milestones Schematic Design..... March May 2017 SD Presentation to Board of Trustees...... 23 May, 2017 Design
More informationDeacon Corp. Three Week Schedule
Procurement / submittals X X Union Holiday VAV & valves delivered X X X X X X X X X CA Mechanical FCU's delivered X X X X X X X X X CA Mechanical CMU X X X X X X X X X X Amato Masonry Scaffolding X X X
More informationCLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.
June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total
More informationSUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV
COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS
More informationCAC MEETING, FEB. 28 TH, 2017 NADAAA
ADAMS STREET BRANCH LIBRARY PROGRAMMING STUDY FOR CITY OF BOSTON BOSTON PUBLIC LIBRARY AND PUBLIC FACILITY DEPARTMENT CAC MEETING, FEB. 28 TH, 2017 NADAAA 1 AGENDA 1.0 SCHEDULE 2.0 SUMMARY OF PROJECT GOAL
More informationESR-1129 Reissued June 1, 2011 This report is subject to renewal in two years.
ICC-ES Evaluation Report ESR-1129 Reissued June 1, 2011 This report is subject to renewal in two years. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council DIVISION:
More informationTHE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE
231 THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' THE CHURCH OF BISHOPS' HOURS Monday-Friday P.M. - X:00 A.M. X:00 Saturday P.M. - X:00 A.M. X:00 J ESUS CHRIST OF LATTER-DAY SAINTS HOME STORAGE
More informationInformation package for obtaining a building permit
Information package for obtaining a building permit To apply for a building permit, you must be a licensed contractor or the legal property owner. Electrical, Mechanical, Plumbing and the Roofing subcontractors
More informationSUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS
SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped
More informationAddendum #1 - Bid Package #
Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction
More informationADDENDUM NO. 1 November 10, 2016
COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding
More informationEPIC Academy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationA1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14
BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2)
More informationFIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION
PERMITS AND INSPECTIONS FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION 911 Assigned PROJECT Subdivision: Lot: Blk: Sec: PROJECT New Construction Addition/Remodel Demolition Other: Number of
More informationWhat Plans Do I Need for a Building Permit?
What Plans Do I Need for a Building Permit? 6 CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1900 SW 4th Avenue, Por tland, Oregon 97201 503-823-7300 www.portlandoregon.gov/bds This brochure
More informationCOTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC
GREENVILLE, SC TYPE: MUNICIPAL ADDRESS: CUSTOM RESIDENTIAL XXX STREET GREENVILLE SC, 9607 A E J P T : OWNER:, LLC TAX MAP #: PROPERTY AREA: ZONING DISTRICT: BUILDING MATERIAL: BUILDING HEIGHT: FOUNDATION
More informationTO WHOM IT MAY CONCERN:
TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit
More informationFCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes
FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes Meeting Date: 15 March 2018 9:30 AM Meeting Location: Rock Creek School, Media Center Current Design Phase: Schematic
More informationA201 SCALE: 1" = 10'-0"
A B C D E F G G.5 H I J 0' - 0" 8' - 6" 7' - 0" 5 6 7 8 9 0 4 4 77' - 0" 6' - 0" UNEXCAVATED 7' - 6" 4 0 BELOW GRADE PARKING VP 9 (4 STALLS) 8 6 NON- COMPLIANT BIKE PARKING STALLS 7 ARCHITECTURE ENGINEERING
More informationPLAN CEILING FRAMING PLAN CEILING JOIST SCHEDULE. Tenant Improvements. UNLV Police Station Maryland Parkway.
TYPICAL HEADER, SEE DETAIL 3/ 4 1 6 2 CEILING FRAMING PLAN SCALE: 3/16" = 1'-0" 2 2 4 600S162-43 FLAT BRACE, 4 CEILING JOIST, SEE SCHEDULE, BOXED BEAM: (2) 600S162-54 + (2)14GA TRACKS 2 CEILING JOIST SCHEDULE
More informationSTEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More information