A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14
|
|
- Rosemary Snow
- 5 years ago
- Views:
Transcription
1 BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2) FOR EXTERIOR FINISH MATERIALS. 4. FINISH SPECIFICATIONS ARE BY CONSTRUCTION MANAGER. 5. INDICATES TOP OF SLAB OR DOUBLE TEE (U). ELEVATIONS DO T REFLECT THE CAST-IN-PLACE WASH AREAS (U). 6. INDICATES FLOOR DRAIN (SEE MEP'S). 7. INDICATES STANDPIPE. 8. INDICATES CONCRETE FILLED 5" DIAMETER STEEL PIPE BOLLARD. 9. INDICATES STRIPING FOR N PARKING AREA. 10. SEE S2.1 - S2.3 FOR CAST-IN-PLACE WASH LOCATIONS. 11. SEE G2.1 FOR GENERAL TES. 1. 'CAPITOL BIKE RACK' FROM FORMS+SURFACES OR APPROVED EQUAL TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS AND SAINT LOUIS CITY ORDINANCE BARRIER GATE SYSTEM (MANUFACTURER SHALL SUBMIT SHOP DRAWINGS TO ARCHITECT PRIOR TO FABRICATION) 3. TRAFFIC CONTROL UNIT 4. TICKET DISPENSER / CARD READER 5. N-COMBUSTIBLE INFILL WALL: 600S " OC OR CMU WALL. CONSTRUCTION MANAGER TO SELECT WALL CONSTRUCTION TYPE AND FINISHES. VAN VAN VAN VAN FLOOR PLAN - LEVEL 1 A1.1
2 BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2) FOR EXTERIOR FINISH MATERIALS. 4. FINISH SPECIFICATIONS ARE BY CONSTRUCTION MANAGER. 5. INDICATES TOP OF SLAB OR DOUBLE TEE (U). ELEVATIONS DO T REFLECT THE CAST-IN-PLACE WASH AREAS (U). 6. INDICATES FLOOR DRAIN (SEE MEP'S). 7. INDICATES STANDPIPE. 8. INDICATES CONCRETE FILLED 5" DIAMETER STEEL PIPE BOLLARD. 9. INDICATES STRIPING FOR N PARKING AREA. 10. SEE S2.1 - S2.3 FOR CAST-IN-PLACE WASH LOCATIONS. 11. SEE G2.1 FOR GENERAL TES. FLOOR PLAN - LEVEL 2 A1.2
3 BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2) FOR EXTERIOR FINISH MATERIALS. 4. FINISH SPECIFICATIONS ARE BY CONSTRUCTION MANAGER. 5. INDICATES TOP OF SLAB OR DOUBLE TEE (U). ELEVATIONS DO T REFLECT THE CAST-IN-PLACE WASH AREAS (U). 6. INDICATES FLOOR DRAIN (SEE MEP'S). 7. INDICATES STANDPIPE. 8. INDICATES CONCRETE FILLED 5" DIAMETER STEEL PIPE BOLLARD. 9. INDICATES STRIPING FOR N PARKING AREA. 10. SEE S2.1 - S2.3 FOR CAST-IN-PLACE WASH LOCATIONS. 11. SEE G2.1 FOR GENERAL TES. FLOOR PLAN - LEVEL 3 A1.3
4 BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2) FOR EXTERIOR FINISH MATERIALS. 4. FINISH SPECIFICATIONS ARE BY CONSTRUCTION MANAGER. 5. INDICATES TOP OF SLAB OR DOUBLE TEE (U). ELEVATIONS DO T REFLECT THE CAST-IN-PLACE WASH AREAS (U). 6. INDICATES FLOOR DRAIN (SEE MEP'S). 7. INDICATES STANDPIPE. 8. INDICATES CONCRETE FILLED 5" DIAMETER STEEL PIPE BOLLARD. 9. INDICATES STRIPING FOR N PARKING AREA. 10. SEE S2.1 - S2.3 FOR CAST-IN-PLACE WASH LOCATIONS. 11. SEE G2.1 FOR GENERAL TES. FLOOR PLAN - LEVEL 4 A1.4
5 BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2) FOR EXTERIOR FINISH MATERIALS. 4. FINISH SPECIFICATIONS ARE BY CONSTRUCTION MANAGER. 5. INDICATES TOP OF SLAB OR DOUBLE TEE (U). ELEVATIONS DO T REFLECT THE CAST-IN-PLACE WASH AREAS (U). 6. INDICATES FLOOR DRAIN (SEE MEP'S). 7. INDICATES STANDPIPE. 8. INDICATES CONCRETE FILLED 5" DIAMETER STEEL PIPE BOLLARD. 9. INDICATES STRIPING FOR N PARKING AREA. 10. SEE S2.1 - S2.3 FOR CAST-IN-PLACE WASH LOCATIONS. 11. SEE G2.1 FOR GENERAL TES. FLOOR PLAN - LEVEL 5 A1.5
6 STAIR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE WALL (U). 2. ALL WALLS SHOWN ARE 8" PRECAST CONCRETE (U). SEE PRECAST SHOP DRAWINGS FOR MORE INFORMATION. 3. SEE STAIR SECTIONS (A5.1-A5.2) FOR WALL HEIGHTS & FLOOR TO FLOOR HEIGHTS. 4. ALL HANDRAILS TO BE 1 1/2" SQUARE TUBE ON BOTH SIDES OF STAIRS & RUN 1'-0" BEYOND TOP & BOTTOM OF STAIR FLIGHTS, EXCEPT AT CONTINUOUS HANDRAILS AT INSIDE TURNS OF STAIRS PER ICC (U). FABRICATOR SHALL SUBMIT HANDRAIL AND GUARDRAIL SHOP DRAWINGS TO ARCHITECT FOR APPROVAL PRIOR TO COMMENCING WORK. 5. INDICATES STANDPIPE. 6. PER IBC SECTION PROVIDE SIGNAGE AT FLOOR LANDINGS OF EXIT ENCLOSURES (STAIR 'A' - 'D') DESIGNATING THE FLOOR LEVEL, TERMINUS OF TOP AND BOTTOM OF THE EXIT ENCLOSURE, IDENTIFICATION OF THE STAIR, STORY OF AND DIRECTION TO THE EXIT DISCHARGE, AND THE AVAILABILITY OF ROOF ACCESS FROM THE ENCLOSURE. REFER TO IBC FOR DETAILED REQUIREMENTS SUCH AS SIZE, LOCATION, AND LETTERING. 7. VERIFY ELEVATOR HOISTWAY & OPENING DIMENSIONS WITH ELEVATOR MANUFACTURER'S REQUIREMENTS & INSTALLERS SHOP DRAWINGS. ELEVATOR SHOP DRAWINGS ARE TO BE SUBMITTED TO ARCHITECT & EOR FOR APPROVAL PRIOR TO INSTALLATION. 8. INDICATES MANEUVERING CLEARANCES AS REQUIRED BY ICC A FIGURE ALL ACCESSIBLE ROUTES SHALL MAINTAIN SLOPE AND CROSS SLOPE AS REQUIRED BY ICC A SECTION 303 (CHANGES IN LEVEL) AND SECTION 403 (WALKING SURFACES). 10. SEE G2.1 FOR GENERAL TES. ROOF PLAN TES: 1. ALL ROOFING IS EPDM MEMBRANE OVER 3 1 2" RIGID INSULATION (R-20) (U). 2. INSTALL ALL ROOFING, FLASHING, CAPS, AND ANTS IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION REQUIREMENTS. 3. COORDINATE ALL ROOF PENETRATIONS WITH MECHANICAL, ELECTRICAL, AND PLUMBING TRADES. PROVIDE AND INSTALL ALL FLASHING, CURBS, BLOCKING, AND OTHER RELATED ITEMS IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS TO ACHIEVE A WATER-TIGHT INSTALLATION. KEY TES: 1. 1'-0" x 4" OPENING FOR WATER DRAINAGE TO ROOF BELOW w/ 3" ROUND SECONDARY DRAIN 2" ABOVE ROOF INSULATION 2. BUILT-UP FOAM CRICKETS 3. INTERNAL DRAIN (SEE MEP) ENLARGED STAIR & ELEVATOR PLANS A2.1
7 STAIR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE WALL (U). 2. ALL WALLS SHOWN ARE 8" PRECAST CONCRETE (U). SEE PRECAST SHOP DRAWINGS FOR MORE INFORMATION. 3. SEE STAIR SECTIONS (A5.1-A5.2) FOR WALL HEIGHTS & FLOOR TO FLOOR HEIGHTS. 4. ALL HANDRAILS TO BE 1 1/2" SQUARE TUBE ON BOTH SIDES OF STAIRS & RUN 1'-0" BEYOND TOP & BOTTOM OF STAIR FLIGHTS, EXCEPT AT CONTINUOUS HANDRAILS AT INSIDE TURNS OF STAIRS PER ICC (U). FABRICATOR SHALL SUBMIT HANDRAIL AND GUARDRAIL SHOP DRAWINGS TO ARCHITECT FOR APPROVAL PRIOR TO COMMENCING WORK. 5. INDICATES STANDPIPE. 6. PER IBC SECTION PROVIDE SIGNAGE AT FLOOR LANDINGS OF EXIT ENCLOSURES (STAIR 'A' - 'D') DESIGNATING THE FLOOR LEVEL, TERMINUS OF TOP AND BOTTOM OF THE EXIT ENCLOSURE, IDENTIFICATION OF THE STAIR, STORY OF AND DIRECTION TO THE EXIT DISCHARGE, AND THE AVAILABILITY OF ROOF ACCESS FROM THE ENCLOSURE. REFER TO IBC FOR DETAILED REQUIREMENTS SUCH AS SIZE, LOCATION, AND LETTERING. 7. VERIFY ELEVATOR HOISTWAY & OPENING DIMENSIONS WITH ELEVATOR MANUFACTURER'S REQUIREMENTS & INSTALLERS SHOP DRAWINGS. ELEVATOR SHOP DRAWINGS ARE TO BE SUBMITTED TO ARCHITECT & EOR FOR APPROVAL PRIOR TO INSTALLATION. 8. INDICATES MANEUVERING CLEARANCES AS REQUIRED BY ICC A FIGURE ALL ACCESSIBLE ROUTES SHALL MAINTAIN SLOPE AND CROSS SLOPE AS REQUIRED BY ICC A SECTION 303 (CHANGES IN LEVEL) AND SECTION 403 (WALKING SURFACES). 10. SEE G2.1 FOR GENERAL TES. ROOF PLAN TES: 1. ALL ROOFING IS EPDM MEMBRANE OVER 3 1 2" RIGID INSULATION (R-20) (U). 2. INSTALL ALL ROOFING, FLASHING, CAPS, AND ANTS IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION REQUIREMENTS. 3. COORDINATE ALL ROOF PENETRATIONS WITH MECHANICAL, ELECTRICAL, AND PLUMBING TRADES. PROVIDE AND INSTALL ALL FLASHING, CURBS, BLOCKING, AND OTHER RELATED ITEMS IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS TO ACHIEVE A WATER-TIGHT INSTALLATION. KEY TES: 1. 1'-0" x 4" OPENING FOR WATER DRAINAGE TO ROOF BELOW w/ 3" ROUND SECONDARY DRAIN 2" ABOVE ROOF INSULATION 2. BUILT-UP FOAM CRICKETS 3. INTERNAL DRAIN (SEE MEP) ENLARGED STAIR & ELEVATOR PLANS A2.2
8 STAIR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE WALL (U). 2. ALL WALLS SHOWN ARE 8" PRECAST CONCRETE (U). SEE PRECAST SHOP DRAWINGS FOR MORE INFORMATION. 3. SEE STAIR SECTIONS (A5.1-A5.2) FOR WALL HEIGHTS & FLOOR TO FLOOR HEIGHTS. 4. ALL HANDRAILS TO BE 1 1/2" SQUARE TUBE ON BOTH SIDES OF STAIRS & RUN 1'-0" BEYOND TOP & BOTTOM OF STAIR FLIGHTS, EXCEPT AT CONTINUOUS HANDRAILS AT INSIDE TURNS OF STAIRS PER ICC (U). FABRICATOR SHALL SUBMIT HANDRAIL AND GUARDRAIL SHOP DRAWINGS TO ARCHITECT FOR APPROVAL PRIOR TO COMMENCING WORK. 5. INDICATES STANDPIPE. 6. PER IBC SECTION PROVIDE SIGNAGE AT FLOOR LANDINGS OF EXIT ENCLOSURES (STAIR 'A' - 'D') DESIGNATING THE FLOOR LEVEL, TERMINUS OF TOP AND BOTTOM OF THE EXIT ENCLOSURE, IDENTIFICATION OF THE STAIR, STORY OF AND DIRECTION TO THE EXIT DISCHARGE, AND THE AVAILABILITY OF ROOF ACCESS FROM THE ENCLOSURE. REFER TO IBC FOR DETAILED REQUIREMENTS SUCH AS SIZE, LOCATION, AND LETTERING. 7. VERIFY ELEVATOR HOISTWAY & OPENING DIMENSIONS WITH ELEVATOR MANUFACTURER'S REQUIREMENTS & INSTALLERS SHOP DRAWINGS. ELEVATOR SHOP DRAWINGS ARE TO BE SUBMITTED TO ARCHITECT & EOR FOR APPROVAL PRIOR TO INSTALLATION. 8. INDICATES MANEUVERING CLEARANCES AS REQUIRED BY ICC A FIGURE ALL ACCESSIBLE ROUTES SHALL MAINTAIN SLOPE AND CROSS SLOPE AS REQUIRED BY ICC A SECTION 303 (CHANGES IN LEVEL) AND SECTION 403 (WALKING SURFACES). 10. SEE G2.1 FOR GENERAL TES. ROOF PLAN TES: 1. ALL ROOFING IS EPDM MEMBRANE OVER 3 1 2" RIGID INSULATION (R-20) (U). 2. INSTALL ALL ROOFING, FLASHING, CAPS, AND ANTS IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION REQUIREMENTS. 3. COORDINATE ALL ROOF PENETRATIONS WITH MECHANICAL, ELECTRICAL, AND PLUMBING TRADES. PROVIDE AND INSTALL ALL FLASHING, CURBS, BLOCKING, AND OTHER RELATED ITEMS IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS TO ACHIEVE A WATER-TIGHT INSTALLATION. KEY TES: 1. 1'-0" x 4" OPENING FOR WATER DRAINAGE TO ROOF BELOW w/ 3" ROUND SECONDARY DRAIN 2" ABOVE ROOF INSULATION 2. BUILT-UP FOAM CRICKETS 3. INTERNAL DRAIN (SEE MEP) ENLARGED STAIR PLANS A2.3
9 FINISH ELEVATION TES: 1. SEE STRUCTURAL ELEVATIONS (S3.1) & BLDG SECTIONS (A4.1-A5.2) FOR WALL HEIGHTS, FLOOR-TO-FLOOR HEIGHTS, PARAPET DIMENSIONS, ETC. 2. CONSTRUCTION MANAGER TO SELECT EXTERIOR FINISH COLORS. 3. SEE S3.1 (STRUCTURAL ELEVATIONS) FOR T/SLAP & B/FOOTING ELEVATIONS. 4. SEE G2.1 FOR GENERAL TES. KEY TES: 1. PRE-MANUFACTURED AWNING 2. THIN BRICK SYSTEM 3. ACCENT SCORING 4. T USED 5. ACCENT LIGHTING (SEE MEP) EXTERIOR ELEVATIONS A3.1
10 KEY TES: 1. PROVIDE ALLOWANCE FOR SECURITY SCREENING IN THIS AREA 2. SECURITY GRILLE ROLL UP DOOR 3. BLACK VINYL COATED CHAIN-LINK FENCE GARAGE SECURITY ELEVATIONS A3.2
11 BUILDING SECTION TES: 1. ALL DIMENSIONS ARE TO CONCRETE (U). 2. ANT & FLASHING SYSTEMS TO BE SELECTED BY CONSTRUCTION MANAGER & INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 3. INDICATES OPENINGS BETWEEN PRE-CAST PANELS, PROVIDE FENCE OR GUARD 42" AFF ON BOTH SIDES (CONSTRUCTION MANAGER TO SELECT TYPE). BUILDING SECTIONS A4.1
12 BUILDING SECTION TES: 1. ALL DIMENSIONS ARE TO CONCRETE (U). 2. ANT & FLASHING SYSTEMS TO BE SELECTED BY CONSTRUCTION MANAGER & INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. BUILDING SECTIONS A4.2
13 BUILDING SECTION TES: 1. ALL DIMENSIONS ARE TO CONCRETE (U). 2. ANT & FLASHING SYSTEMS TO BE SELECTED BY CONSTRUCTION MANAGER & INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. BUILDING SECTIONS A4.3
14 BUILDING SECTION TES: 1. ALL DIMENSIONS ARE TO CONCRETE (U). 2. ANT & FLASHING SYSTEMS TO BE SELECTED BY CONSTRUCTION MANAGER & INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. BUILDING SECTIONS A4.4
15 BUILDING SECTION TES: 1. ALL DIMENSIONS ARE TO CONCRETE (U). 2. ANT & FLASHING SYSTEMS TO BE SELECTED BY CONSTRUCTION MANAGER & INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. STAIR SECTIONS A5.1
16 BUILDING SECTION TES: 1. ALL DIMENSIONS ARE TO CONCRETE (U). 2. ANT & FLASHING SYSTEMS TO BE SELECTED BY CONSTRUCTION MANAGER & INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. STAIR SECTIONS A5.2
17 FINISH DETAIL TES: 1. ALL DIMENSIONS ARE TO CONCRETE (U). 2. ANT & FLASHING SYSTEMS TO BE SELECTED BY CONSTRUCTION MANAGER & INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. FINISH DETAILS A6.1
ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)
ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.
More informationBRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB
BRYANT HERITAGE PLAZA, AB RE-ISSUED FOR BUILDING PERMIT May 9, 206 L I S T O F D R A W I N G S HD ENGINEERING SERVICES LTD. D.B.K. ENGINEERING LTD. D.B.K. ENGINEERING LTD. JUBILEE ENGINEERING CONSULTANTS
More informationMontclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017
Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,
More informationTravis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock
Travis County ESD #1 Information Bulletin Building Plan Submittals Fire Marshal Hancock Effective Date 12/12/2018 Table of Contents INTRODUCTION 3 SECTION I. SUPPORTING DOCUMENTATION 4 SECTION II. GENERAL
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationBUILDING PLAN REVIEW REQUIREMENTS
TOWNSHIP OF NORTH FAYETTE BUILDING DEPARTMENT COMMERCIAL PLAN REVIEW REQUIREMENTS BUILDING PLAN REVIEW REQUIREMENTS In order to perform a thorough Building Plan Review, the following specifications, drawings
More informationMTJ Outdoor Baggage Claim
MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,
More informationNEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING
NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes
More informationF-5-1a. Concrete Bollards (Detail 1 of 2) WEIGHT: 166kg. WEIGHT: 227kg. WEIGHT: 113kg. WEIGHT: 212kg
Contents F-5-1a Concrete Bollards F-5-1b Concrete Bollards F-5-2 Concrete Bollards with City Logo F-5-3 Cast Iron Bollards F-5-4 Decorative Steel Bollard F-5-5 Swivel P Gate Steel Bollard F-5-6 Steel Bollard
More information24' - 0" 99' - 0" B15 B16 B17 B18 B19 SLOPE SLOPE BIKE STOR. / SERVICE 2 ACCESSIBLE COMMUNITY ACCESIBLE BIKE BIKE STORAGE ROOM STORAGE
5' ' 6 /4" RETAINING WALL ALONG BOUNDARY ILLUMINATED SIGNAGE TBD MOUNTED TO TOP AND/OR FACE OF RETAININGS WALL PROPERTIES FENCE TO REMAIN SIDEWALK ENTRY TIE NEW SIDE WALK INTO EXISTING SIDEWALKS AS CURRENTLY
More informationWALKS AND SIDEWALKS REQUIREMENTS:
DOUBLE PARKING STALLS DIAGONAL PARKING STALLS EXTERIOR ROUTES OF TRAVEL: From accessible parking spaces, provide most practical direct accessible route of travel to all building entrances and exteriorground
More informationWINDY HILL PROPERTY VENTURES
A Planning Application For: RD AVENUE & RAILROAD AVENUE SAN MATEO, CA 0 PROJECT DATA PROJECT TEAM OWNER NAME: PROJECT ADDRESS: RD AVENUE & RAILROAD AVENUE SAN MATEO, CA 0 BUILDING AREA, OFFICE: TOTAL RESIDENTIAL
More informationCHAPTER 5 ARCHITECTURE
CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1
More informationApril 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593
April 7, 2016 City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 393 RE: Conditional Use Arby s Restaurant Multi-Tenant Development 631 Hometown Circle-Lot 6
More informationSPARTAN DAY CAMP 4814 FREEDOM RING RD
484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS
More informationDOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES
DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET
More informationEMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL
EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid
More informationPost & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS
Post & Rail Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail STAGGER RAIL ENDS FOR GREATER STRENGTH ALLOW 1-1/2" GAP ON HINGE SIDE OF GATE AND 1-1/4" ON LATCH SIDE OF GATE HARDWARE DIG HOLES 30" MINIMUM
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More informationCHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS
CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS The Commission on Chicago Landmarks reviews all permit applications for work to designated and proposed Chicago Landmarks and
More informationA REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS
WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS Per: 2006 B.C.B.C. Part 9 DISCLAIMER THE INFORMATION CONTAINED IN THIS DOCUMENT REPRESENTS CURRENT WOOD FRAME
More informationTO WHOM IT MAY CONCERN:
TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit
More informationGLOSSARY OF TERMS SECTION 8
GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the
More informationResidential Room Addition / Remodel Submittal Requirement Checklist
City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY
More informationSTANDARD AND EXAMPLE DRAWINGS
STANDARD AND EXAMPLE DRAWINGS DRAWING ISSUE TITLE GENERAL CA01-1-1 E EXAMPLE CATCHMENT PLAN - DESIGN BASIS CA01-1-2 D EXAMPLE PRESSURE MAIN CHARACTERISTIC CURVE CA01-1-3-1 B TYPE 10, 40 AND 90 PUMPING
More informationDimension Below are the critical settings in AutoCAD. Other software should follow the same settings.
8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff
More information214 Wilshire Blvd., Suite 102 Santa Monica California 90401
Wilshire Blvd., Suite 0 Santa Monica California 900 7 W a l l a c e P l. C a l i f o r n i a 9 8 t e l : 0 7 7 N ND COURT PROPERTY LINE 0.00' THE RENOVATION AND CHANGE OF USE OF AN EXISTING BOOK STORE
More information2015 Feeney (8/15) # D. Aluminum Railing Systems
2015 Feeney (8/15) #2012-425D Aluminum Railing Systems Aluminum Railing Systems Searching For a Complete Railing System? Look No Further. DesignRail by feeney aluminum railing frame systems combine the
More informationWhat Plans Do I Need for a Building Permit?
What Plans Do I Need for a Building Permit? 6 CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1900 SW 4th Avenue, Por tland, Oregon 97201 503-823-7300 www.portlandoregon.gov/bds This brochure
More informationNEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER
NEW SEVICE CENTER VINITA, OK 70 9 S. 7th St. VINITA, OK 70 06 W. 2nd St., Joplin, MO 680 Phone: 7-62- Fax: 7-782-678 GENERAL G0.0 COVER CIVIL C.0 SITE DEMO C. SITE PLAN C.2 GRADING PLAN (FORTHCOMING) ARCHITECTURAL
More informationINSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN
MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE
More informationManhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard
More informationGeneral Layout. Eng. Maha Moddather
General Layout Eng. Maha Moddather mahamoddather@eng.cu.edu.eg Introduction Concrete Beam subjected to Bending Moment around Major Axis M x Compression d Concrete tensile strength is neglected A S Tension
More informationPLANNING Development Services Department
PLANNING Development Services Department Date Stamp APPLICATION SUBMITTAL CHECKLIST for Design Review Case Number: I acknowledge that the City of Glendale requires the following items be submitted before
More informationBest Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.
Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy
More informationTRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal
TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal Complete sets of plans are required. Plans shall be stamped and wet signed by the architect or engineer. (signed and accompanied with letter from Homeowners
More informationOCPS Submittal Register for Product Data and Shop Drawing Reviews
OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition
More informationATI Evaluation Service A Division of Architectural Testing Certification Services Code Compliance Research Report
ATI Evaluation Service A Division of Architectural Testing Certification Services Subject to Renewal: 04/15/2016 Issued: 06/24/2014 Visit www.ati-es.com for current Revised: 09/24/2014 Page 1 of 21 Maine
More informationATI Evaluation Service A Division of Architectural Testing Certification Services
ATI Evaluation Service A Division of Architectural Testing Certification Services Subject to Renewal: 10/13/2016 Issued: 12/17/2014 Visit www.ati-es.com for current status Revised: 06/05/2015 Page 1 of
More informationBarrier posts of steel tube Ø 76 mm, Ø 89 mm, 70 x 70 mm
of steel tube Ø 76 mm, Ø 89 mm, 70 x 70 mm Steel tube Ø 76, Ø 89, 70 x 70 mm with welded steel cap approx. 900 mm above ground, total length 1400 mm hot-dip galvanized and yellow coated with black stripes
More informationNew Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:
#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the
More informationSTANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018
SYMBOLS STANDARD DRAWINGS INDEX No Statewide Standard - Use Regional A3 Legend Detail Sheet BRIDGE AND STRUCTURES B-08.00 Bin Walls 1 CONSTRUCTION-BARRICADES AND SIGNING C-04.12 Location of Double Traffic
More information50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges
50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:
More informationGRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO
PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,
More informationBUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS
Building and Development Permit Applications Definitions: Type A Residential Projects: All projects related to one and two unit dwellings Type B Residential Projects: All projects related to Apartments,
More informationContemporary Collection
HZ5E Gas Fireplace Model HZ5E-NG1 HZ5E-LP1 Fuel Type Natural Gas Propane Gas Minimum Supply Pressure 5 W.C.(1.5 kpa) 1 W.C. (.98 kpa) Manifold Pressure - High 3.5 W.C. (.87 kpa) 1 W.C. (.9 kpa) Manifold
More informationPASON OFFICE BUILDING
Construction Company, Inc. Copyrights and infringements will be enforced and prosecuted. 0 0-0-0 GOLDEN SDP - rd SUBMITTAL 0--0 GOLDEN SDP - nd SUBMITTAL SITE DEVELOPMENT PLAN 0-0-0 CTC DRC DEVELOPMENT
More informationA. Submit manufacturer's technical data and installation for each type of sign required.
SECTION 10425 PART ONE GENERAL 1.1 SECTION INCLUDES A. Interior Building Signage. B. Handicapped parking signs. C. Permanent Project Sign. 1.2 DESCRIPTION A. Signage shall consist of room number and room
More informationPermits (Submitted to Permit Counter) APPLICATION CHECKLIST
Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy
More information2013 Feeney (2/14) # B. Aluminum Railing Systems
2013 Feeney (2/14) #2012-425B Aluminum Railing Systems Aluminum Railing Systems Searching For a Complete Railing System? Look No Further. DesignRail by feeney aluminum railing frame systems combine the
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationAssignment 1.5 Pre-Design Base Building Model Investment Bank ARCH 5901 Instructor: Glenn Hill Fall 2013
Assignment 1.5 Pre-Design Base Building Model Investment Bank ARCH 5901 Instructor: Glenn Hill Fall 2013 TASK: Develop a 3d digital model of a Pre-Design Base Building for a typical Bank Building using
More informationARCH 405bL SPRING 2016 LUCY EGBE + NICK HALSEY + KELLY LYNCH ERIN YAMASHITA ISSUED 04/26/16. Site Plan. Site Plan 1" = 50'-0" 1" = 50'-0" SCALE A-500
04/6/6 Site Plan " = 50'-0" Site Plan " = 50'-0" A-500 LOWLINE PARK WARHOL MUSEUM BASEMENT 6.67% Up 6.67% Down 03/0/6 Level P /3" = '-0" UP TYPICAL PARKING PLAN /3" = '-0" A-50P ESSEX ST. MARKET WARHOL
More informationDesign Deliverables. Summary. A. Expectations for Design Deliverables:
Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations
More informationThis specification describes the minimum requirements for structural steel drawings.
1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING
INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationA. Submit properly identified manufacturer's literature before starting work.
SECTION 10400 IDENTIFYING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor and materials required for installation of plaque, school name and address numbers, directional signage, signage
More information11SIXTY5 Weaver Dairy Road
SITEPLAN NOTES 2 C-2.0 BICYCLE RACK NTS Weaver Dairy Road Job Number: 1529 WLR, MTC, VJC WLR, VJC 11-30-17 STAIR SITE PLAN 1 C-2.0 SITE PLAN 1" = 30' 0 15 30 60 3 C-2.0 PLAZA DETAIL PLAN 1" = 20' 0 10
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationS T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1" = 10' - 0" SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD
\\CANDELA\projects\-Chabad Center\Current Drawings\Chabad - -A-.0-extg-demo-site-plan.dwg, 0/0/0 :: PM, DWG To PDF.pc A-.0 SITE PLAN SCALE: " = 0' - 0" NORTH GENERAL NOTES: Site/Roof Drainage Plan. THE
More informationID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:
CONTACT INFORMATION: SHEET INDEX: DISCLOSURES: DOCUMENT GENERAL NOTES: CLIENT ARDENT RESIDENTIAL 5453 BURNET RD. SUITE 203 AUSTIN, TX 78756 ARCHITECT DAVIES COLLABORATIVE 5453 BURNET RD. SUITE 202 AUSTIN,
More informationATI Evaluation Service A Division of Architectural Testing Certification Services
ATI Evaluation Service A Division of Architectural Testing Certification Services Subject to Renewal: 11/15/2011 Issued: 11/15/2010 Visit for current status Page 1 of 16 Maine Ornamental LLC 933 U.S. Route
More informationContemporary Collection
HZ30E - 10 Gas Fireplace Model HZ30E-NG10 HZ30E-LP10 Fuel Type Natural Gas Propane Gas Minimum Supply Pressure Manifold Pressure - High 5 W.C. (1.5 kpa) 3.5 W.C. (0.87 kpa) 11 W.C. (.74 kpa) 10 W.C. (.49
More informationFLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS
DIVISION 23 FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS Part I General 1.1 Related Documents A. All terms and general provisions of contract, General and Supplementary Conditions, and Specification
More informationDW HORIZONTAL INSTALLATION
AR-PJ-01-DW2H 2" HORIZONTAL PANEL JOINT AR-PJ-02-DW2H 2" VERTICAL PANEL JOINT AR-PJ-03-DW2H 3" HORIZONTAL PANEL JOINT AR-PJ-04-DW2H 3" VERTICAL PANEL JOINT AR-PJ-05-DW2H CUSTOM REVEAL AR-PJ-06-DW2H DW-2000S
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationPLANNED SIGN PROGRAM CHECKLIST
Planning and Building Agency Planning Division 20 Civic Center Plaza P.O. Box 1988 (M-20) Santa Ana, CA 92702 (714) 647-5804 PLANNED SIGN PROGRAM CHECKLIST Applicant, please return this checklist with
More informationSECTION IDENTIFYING DEVICES
SECTION 10400 IDENTIFYING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor and materials required for installation of plaque, school name and address numbers, directional signage, signage
More informationChapter 4. Accessible Routes
ICC/ANSI A117.1-2003 401 General 401.1 Scope. Accessible routes required by the scoping provisions adopted by the administrative authority shall comply with the applicable provisions of Chapter 4. 402
More information2012 IMC Performing Commercial Mechanical Inspections
2012 IMC Performing Commercial Mechanical Inspections Based Primarily on the 2012 International Mechanical Code (IMC ) and the 2012 International Fuel Gas Code (IFGC ) as applicable. ` Welcome I am You
More informationINSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL
WOOD PIVOTING CIRCLE/ OVAL READ SPECIFIC INSTALLATION INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Failure to install and maintain our product according to these instructions will VOID any
More informationCode Compliance Research Report CCRR-0155
Code Compliance Research Report CCRR-0155 Issue Date: 03-25-2011 Revision Date: 04-18-2018 Renewal Date: 03-26-2019 DIVISION: 06 00 00 WOOD, PLASTICS AND COMPOSITES Section: 06 63 00 Plastic Railings REPORT
More informationTooker Family Residence
110 25 90 E B M U D (N) POP-UP DRAIN + DRAIN ROCK BASIN DISCHARGE OF SURFACE DRAINS AND DOWNSPOUTS - SHEET FLOW ACROSS LANDSCAPE NOTE: SEE SHEET S2.0.1 FOR FOUNDATION + RAIN WATER DRAINAGE DESIGN 143.57'
More information*********************************************************************************************************
10400 IDENTIFYING DEVICES ********************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 10 14 00 *********************************************************************************************************
More informationTypical Drawings for Schools
0.85 1.7 0.85 3 3 0.6 3 3 0.85 1.7 0.85 0.3 4 4 1 1 2 2 0.425 0.425 0.425 0.425 1.2 2.4 1.2 0.6 0.6 4 4 1 1 3 3 0.4 0.6 0.3 0.3 3 3 4 4 0.4 4 4 1 1 2 2 Detail of (W 1.2 x 0.4 m) Detail of (W0.6 x 0.4 m)
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More information2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard
More informationINSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions
More informationDECK PERMIT APPLICATION PACKET
Building Division 865 SE Barrington Dr Oak Harbor, WA 98277 Ph 360.279.4510 Fax 360.279.4519 DECK PERMIT APPLICATION PACKET SUBMITTAL FORMS INDEX Basic Deck Submittal Checklist Residential Deck Submittal
More informationAPPLICATION FOR A BUILDING PERMIT
APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all
More informationDuteau Creek Water Treatment Plant UV Upgrades. Regional District of North Okanagan ADDENDUM # 3 ISSUE FOR TENDER
Project Client Tender No. Duteau Creek Water Treatment Plant UV Upgrades Regional District of North Okanagan 2017-E372.09.04 Date August 09, 2017 ADDENDUM # 3 ISSUE FOR TENDER INSTRUCTIONS Tenderers are
More informationInformation package for obtaining a building permit
Information package for obtaining a building permit To apply for a building permit, you must be a licensed contractor or the legal property owner. Electrical, Mechanical, Plumbing and the Roofing subcontractors
More information(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS
Thank you for selecting C l i m a t e G u a r d products. Attached are our recommended installation instructions for Vinyl windows with an integral (2400-02) will not affect application of the ClimateGuard
More informationC.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit
Horizontal battens between verticals at soffit 2 C.04 600 600 600 600 Cavity batten at 600 mm centres 1 C.03 Batten fixing points 1 C.04 1 C.07 1 C.12 1 C.13 1 C.14 Meter Box Window 1 C.08 1 C.09 800 800
More informationWINDOW INSTALLATION GUIDE
WINDOW INSTALLATION GUIDE SAWDAC is not responsible for or liable for any use or misuse of the information contained in this window installation guide. Window Installation Guide This guide provides basic
More informationSTEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch
Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted
More informationINSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September
More informationI N T E R N A T I O N A L R E S I D E N T I A L CO D E
I N T E R N A T I O N A L R E S I D E N T I A L CO D E 2006 STAIR BUILDING CODE Portions of this document reproduce sections from the 2006 International Residential Code, International Code Council, Falls
More informationWendell E Green Elementary School 1150 W 96th St Chicago, IL 60643
11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationCROSSBAR RAFTER ISOMETRIC
Super Sky Products' typical glazing system consists of glass panels or "lites" which are attached to the main framing members using extruded aluminum "retainers" or "pressure plates". These retainers are
More informationMarshall Truck Station Laboratory Addition Project No. TZ MnDOT
Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:
More informationThe Carving Studio. A Woodworker s Paradise
The Carving Studio A Woodworker s Paradise We remodeled this Carving Studio out of an existing garage. The original house was built over 85 years ago. The garage was a mere 10 6 wide, which is not effective
More informationINSTALLATION GUIDELINES: X25 SERIES using perimeter installation fin
INSTALLATION GUIDELINES: X25 SERIES using perimeter installation fin Wall systems designed to manage water or that have been upgraded to manage water are important for a trouble free installation. Site
More informationPrecast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado
October 17-19, 2016 ATLANTA, GEORGIA Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado Case Study Overview Explore BIM requirements of
More informationAnti-Trust Statement
Anti-Trust Statement http://www.concrete-pipe.org/ A joint effort of the Texas Concrete Pipe Association and the Texas Department of Transportation What brought this about? The TxDOT organization consists
More informationMAISON VICTORIA SENIORS
VIEW FACING WEST SENIORS JUNE 12, 28 NORR JOB NO: NCCA-17-21 ISSUED FOR DEVELOPMENT PERMIT DISCIPLINE (SURVEY) POLARIS LAND SURVEYING INC. PO BOX 261 BRENTWOOD BAY, BRITISH COLUMBIA, V8M 1R3 DISCIPLINE
More informationSECTION PROJECT COORDINATION VIA BIM
SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationINSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12
INSTALLATION INSTRUCTIONS Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12 LEVEL RAIL WITH CAP The testing was performed in accordance with procedures and methods referenced
More information