DECK PERMIT APPLICATION PACKET

Size: px
Start display at page:

Download "DECK PERMIT APPLICATION PACKET"

Transcription

1 Building Division 865 SE Barrington Dr Oak Harbor, WA Ph Fax DECK PERMIT APPLICATION PACKET SUBMITTAL FORMS INDEX Basic Deck Submittal Checklist Residential Deck Submittal Requirements SFR Plot Plan & Drainage Requirements SFR Alteration/Addition Permit Application

2 Use this checklist to ensure that all necessary information is provided for review of your project. Requirements for Submittal Two (2) completed SFR Alteration/Addition Permit Applications Two (2) accurate fully dimensioned plot plans Two (2) sets of construction drawings Two (2) sets of engineered drawings and calculations (If required) Verification or photocopy of current Washington State Contractor License APPLICATIONS ARE ONLY CONSIDERED COMPLETE IF ALL INFORMATION REQUESTED ON FORMS IS FILLED IN. Page 2 of 8 Rev 12.11

3 A. FEES DUE AT TIME OF PERMIT APPLICATION The following non-refundable fees will be collected at the time of application for all residential projects. 1. Building Plan Check Fee B. CODES The following codes apply to Residential Decks National Codes International Building Code (IBC) International Residential Code (IRC) Washington State Amendments 1. WAC Washington State Building Code 2. WAC Washington State Residential Code C. CITY OF OAK HARBOR DESIGN REQUIREMENTS Design Wind Speed: 85 miles per hour (IBC Figure 1609) Ground Snow Load: 20 pounds per square foot (IBC Figure ) Seismic Zone: D2 Frost Line Depth: 12 inches Termite Damage Slight to Moderate Decay Slight to Moderate Winter Design Temp 27 F Flood Hazard 1979 FIRM Air Freezing Index 113 Mean Annual Temp 52 F Soil Bearing Capacity: 1,500 ppsf unless a Geo-Technical Report is provided. A Geo-Technical Report may be required for residential construction on steep or difficult lots. D. PLANS AND DRAWINGS Submit two (2) complete sets of drawings and plans. Drawings and plans must be submitted on minimum 18 X 24, or maximum 30 X 42 paper. All sheets are to be the same size and sequentially labeled. Plans are required to be clearly legible, with scaled dimensions, in indelible ink, blue line, or other professional media. Plans will not be accepted that are marked preliminary or not for construction, that have red lines, cut and paste details or those that have been altered after the design professional has signed the plans. Page 3 of 8 Rev 12.11

4 Please Note: A separate submittal of plans is required for each building or structure. DETAILED SUBMITTAL REQUIREMENTS Mark each box to designate that the information has been provided. Please submit this checklist as part of your submittal documents A. SITE PLAN REQUIRED WITH ALL SUBMITTALS (see Attachment A) 1. Two (2) copies, scaled 1 = 20, sets of plans on 8.5 X 11 paper which reflect all of the information noted in the Site Improvement and Drainage Plan Requirements for Residential Construction. B. FRAMING & FOUNDATIONS PLAN (Minimum ¼ Scale) 1. Dimension of deck. 2. Footing size and thickness (e.g. 18 X 18 X 12 deep) 3. Joist size, species, span, spacing and direction. 4. Decking material, size, span and direction. 5. Post location, timber species, span, and spacing. 6. Beam size, timber species, span and spacing (submit beam calculations) 7. Indicate the timber species and grade of all lumber. 8. Identify pressure treated or naturally decay resistant wood. 9. Dimension required landings at the top and bottom of stairs. 10. Show required lighting at top and bottom of stair landings. C. SECTION & ELEVATION VIEW (Minimum ¼ Scale) 1. Footing detail for posts. 2. Guard detail (a guard is required to protect falls greater than 30 ), openings in the guard must be spaced that a 4 sphere may not pass through, minimum guard height 36, able to withstand a 200 load in any direction at the top of the guard. 3. Windows or doors within 5 feet of the side above or below the deck. Show windows that will be safety glazed due too proximity to stairs or floor D. CONSTRUCTION DETAILS 1. Connection of the deck to the existing structure (i.e. ledger size, with detail of fastener or bolt type, size and spacing, ect.). 2. Connection of posts and beams (i.e. post cap and post footing connector). 3. Stair step rise and run (7 ¾ maximum rise and 10 minimum run permitted for residential use). Open risers are permitted provided the opening between the treads does not permit the passage of a 4 diameter sphere. Page 4 of 8 Rev 12.11

5 4. Stair landing (36 minimum stair width for residential) 5. Handrail required for four or more stair risers (handrail must be graspable 1-1/4 min to 2 maximum in cross section and placed 34 to 38 above the nosing of the stair. E. MISCELLANEOUS INFORMATION 1. Wood exposed to weather must be pressure treated or naturally resistant to decay. 2. Decks attached to exterior walls shall be positively anchored for vertical and lateral loads. Attachments by toenails or nails are not permitted. If positive connection cannot be accomplished decks are required to be self-supporting pursuant to IRC R Decks shall be fastened to the structure with fasteners not subject to withdrawal per IRC R Fasteners for pressure treated wood shall be of hot dipped galvanized steel, all metal in contact must be galvanized. Exception - anchor bolts ½ or larger. The building permit does not include any mechanical, electrical or plumbing work. These permits are issued separately and require a separate permit application. To ensure that you have the most current information, please contact the City of Oak Harbor Building Department at (360) Applications delivered by courier or mail will not be accepted. Incomplete applications will not be accepted. I acknowledge that all items designated as submittal requirements must accompany my Building Permit Application to be considered a complete submittal. Signature: Date: Owner/Owner s Representative Company: Phone: Page 5 of 8 Rev 12.11

6 Plot Plan and Drainage Plan Requirements for SFR Construction The applicant shall submit two (2) copies of a plot plan and Drainage Plan on 8.5 X 11 paper showing ALL of the following. General 1. Name, address and phone number of owner and/or contact person. 2. North arrow, 1 = 20 scale, date, lot number and plat, address and street name fronting proposed structure. 3. Location and finished floor elevation of all proposed structures and any existing structures on the site in relation to lot lines and corners. 4. All trees 6 diameter or greater are to specifically plotted in relationship to property corners; include size, species and intention to save or remove. Provide the drip line of trees to be saved. 5. Any sidewalk fronting the property and whether or not the street is improved or unimproved. Indicate whether the driveway apron will be modified, relocated or repaired. 6. Proposed elevation contours (2 interval) on the subject property along with existing contours or spot elevations. Indicate any slopes greater than two (2) feet horizontal to one (1) foot vertical. 7. Provide location of all silt fences. 8. Indicate any proposed rockery and/or retaining wall construction including associated drainage. 9. Note any existing walls or rockeries along with finished floor elevations or grades on adjacent lots. Water/Sewer 1. The location and dimensions of any existing utility easements (sewer, water, ect.) either public or private. 2. The proposed location of the sanitary sewer line including cleanouts and the proposed location of the water line along with the proposed connection points to the City s systems. Stormwater 1. Location and size of all wetlands, streams or drainage channels located within 25 feet of the site, which may involve or affect drainage of then site to be developed. Indicate swales, dips and pipes and provide a cross-section of the areas. If culvert pipes are proposed, indicate size, type and inlet/outlet information. 2. Indicate proposed location of foundation and roof drains along with appropriate cleanouts. 3. Indicate direction and location of surface water runoff entering the site from adjacent properties. After review of this plan, a list of site-specific requirements will be issued. A temporary erosion/sedimentation plan may be required in addition to this plan. Page 6 of 8 Rev 12.11

7 THIS APPLICATION TO BE USED FOR ONE AND TWO DWELLING UNITS RESIDENTIAL STRUCTURES. THIS APPLICATION MUST BE ACCOMPANIED BY TWO (2) SETS OF CONSTRUCTION DRAWINGS, TWO (2) ACCURATE, FULLY DIMENSIONED PLOT PLANS AND TWO (2) SETS OF ENERGY CODE APPLICATIONS. TYPE OF PERMIT: ( ) Residential Addition ( ) Residential Alteration ( ) Plumbing ( ) Mechanical Project Address: Parcel ID #: Lot #: Subdivision: Project Description: Valuation: Owner: Contact Person: Cell Phone: Fax: Building Area (Sq Ft): 1 st Floor: 2 nd Floor: 3 rd floor: Deck: Garage/Carport: Basement: Project Valuation: Contractor: Contractor s License Number: Expiration: Plumbing Contractor: Contractor s License Number: Expiration: Mechanical Contractor: Contractor s License Number: Expiration: I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the abovedescribed property will be in accordance with the laws, rules and regulation of the State of Washington. Applicants Signature Date Print Applicants Name Page 7 of 8 Rev 12.11

8 Page 8 of 8 Rev 12.11

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped

More information

When is a Building Permit Required? Deck Details: What Must be Submitted with a Building Permit Application?

When is a Building Permit Required? Deck Details: What Must be Submitted with a Building Permit Application? P.O. Box 1190, Fort Collins, Colorado 80522-1190, Planning (970) 498-7683, Building (970) 498-7700, Larimer.org When is a Building Permit Required? A permit is required if ANY of the following is true:

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information

What Plans Do I Need for a Building Permit?

What Plans Do I Need for a Building Permit? What Plans Do I Need for a Building Permit? 6 CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1900 SW 4th Avenue, Por tland, Oregon 97201 503-823-7300 www.portlandoregon.gov/bds This brochure

More information

APPLICATION FOR A BUILDING PERMIT

APPLICATION FOR A BUILDING PERMIT APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all

More information

TO WHOM IT MAY CONCERN:

TO WHOM IT MAY CONCERN: TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

DECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.

DECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7. DECKS Max. riser height-7 ¾ Min. tread depth-10 Landings required at (R311.7.5.1) (R311.7.5.2) top and bottom of stairs (R311.7.6) Notched guardrail post NOT allowed Graspable handrail required Spacing

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

SECTION: 15 ZONING RULE LOT AREA 6134 S.F S.F. BUILDING AREA (FOOTPRINT) LOT COVERAGE 20.2% 24.86' FRONT YARD SIDE YARD 8.

SECTION: 15 ZONING RULE LOT AREA 6134 S.F S.F. BUILDING AREA (FOOTPRINT) LOT COVERAGE 20.2% 24.86' FRONT YARD SIDE YARD 8. PROPOSED 1ST FLOOR PROPOSED 2ND FLOOR Anthony Hatziioannou Architect, P.C. EXISTING 1ST FLOOR ZONING CALCULATION JURISDICTION: TOWN OF OYSTER BAY SECTION: 15 BLOCK: 71 LOT: ZONE: RESIDENCE R1-7 PERMITTED

More information

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

RESIDENTIAL BUILDING PERMIT REQUIREMENTS RESIDENTIAL BUILDING PERMIT REQUIREMENTS Before a building permit is issued for any new construction, addition or accessory building, the following items must be supplied to the Building Inspector for

More information

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS When submitting your application for Commercial projects please include the following: 1. Completed Building Permit Application with page 2 stamped

More information

Checklist for Tentative Subdivision Map

Checklist for Tentative Subdivision Map Checklist for Tentative Subdivision Map All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: DOCUMENT NO.: P/GI 2014-009 Previously Issued As: P/GI 2011-009 Effective: 01-01-2014 Revised : DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY

More information

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.

More information

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $ CITY OF PORT ORCHARD Permit Center Office located at 720 Prospect Street Mailing address: 216 Prospect Street Port Orchard, WA 98366 (360) 874-5533 permitcenter@cityofportorchard.us COMMERCIAL or MULTI-FAMILY

More information

FREDERICK COUNTY USBC/IRC 2015

FREDERICK COUNTY USBC/IRC 2015 8/1/2018 FREDERICK COUNTY USBC/IRC 2015 IS DECK SUPPORTED AT HOUSE WALL W/LEDGER BOARD WITH REQUIRED LATERAL BRACING? YES NO OR IS DECK FREE STANDING WITH TWO GIRDERS (Free Standing)? YES NO EXTERIOR GROUND

More information

dpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?

dpd client assistance memo CAM   Plot Plan Requirements Basic Plot Plan What is a Plot Plan? dpd Seattle Department of Planning and Development formerly the Department of Design, Construction and Land Use CAM 103 client assistance memo Plot Plan Requirements November 2001 Applications for City

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for

More information

24" max from each end of the ledger. See detail 6A & 6B, typ. both ends IRC R Ledger R507.2

24 max from each end of the ledger. See detail 6A & 6B, typ. both ends IRC R Ledger R507.2 NOTE: All exposed lumber to be pressure treated (P.T.) or decay resistant. Fasteners for P.T. wood shall be hot-dipped galv. or stainless steel, typical. see pages 2 & 5 for footings 8'-0" -10'-0" Beam

More information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects) SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,

More information

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248) White Lake Township Building Dept. 7525 Highland Rd. (248) 698-3300 SUBMITTAL REQUIREMENTS FOR SINGLE FAMILY HOMES, ADDITIONS, GARAGES AND RENOVATIONS --NEW-- Package for new residences must include $

More information

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP) Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP) 415 W 6 th ST ~ Vancouver, WA 98660 PO Box 1995 ~ Vancouver, WA 98668 Phone (360) 487-7800 www.cityofvancouver.us Type Of Work Type I

More information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee) MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW

More information

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project

More information

ONE AND TWO FAMILY DWELLINGS Uncovered Decks July, 2007

ONE AND TWO FAMILY DWELLINGS Uncovered Decks July, 2007 ONE AND TWO FAMILY DWELLINGS Uncovered Decks July, 2007 In the City of Lee s Summit, the construction of uncovered decks with a floor surface more than 30 inches above the adjacent grade level requires

More information

NEW SINGLE FAMILY HOMES

NEW SINGLE FAMILY HOMES NEW SINGLE FAMILY HOMES Your submission must include the following to be accepted as a complete application: 1 copy of the deed and / or purchase and sales agreement if you have owned the property less

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST The purpose of this form is to inform applicants of: 1) the requirements for building permits and stormwater permits for residential demolition projects;

More information

Subdivision Application Checklist

Subdivision Application Checklist City of Portsmouth, New Hampshire Subdivision Application Checklist This subdivision application checklist is a tool designed to assist the applicant in the planning process and for preparing the application

More information

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS Per the provisions

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

Promontory Architectural Review Committee

Promontory Architectural Review Committee Promontory Architectural Review Committee Design Review Application Purpose The Design Review Process and Application have been established to insure that a proposed project is compatible with historical,

More information

OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION

OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION Application information below to be completed by Applicant/Agent//Owner APN PROPERTY ADDRESS PROPERTY LOCATION (if no address) APPLICANT S NAME

More information

Minor Site Plan Review Process

Minor Site Plan Review Process Minor Site Plan Review Process Pre-Application Conference Community Meeting (optional) Submit Application Determination of Completeness Staff Report (optional) Technical Review Committee Decision Notice

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING INFORMATION BULLETIN / PUBLIC - GENERAL INFORMATION REFERENCE NO.: Effective: 10-01-99 DOCUMENT NO. P/GI 2002-008 Revised: 11-01-02 Previously Issued As: IB ST-4 DOCUMENT SUBMITTAL REQUIREMENTS FOR AN

More information

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements. MINOR SUBDIVISION 190-69. Minor subdivisions. In addition to the requirements indicated in 190-67 (SEE BELOW), the information below shall be shown on the plans for all minor subdivision applications.

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

BUILDING PLANS. BUILDING DEPARTMENT

BUILDING PLANS. BUILDING DEPARTMENT BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,

More information

Deck Design Guide. One and Two Family Residential Dwellings

Deck Design Guide. One and Two Family Residential Dwellings Deck Design Guide One and Two Family Residential Dwellings The City of Lake Oswego is providing this information to help you design your deck, obtain a building permit and pass inspections. The standards

More information

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION For Office Use Only Date Received: Approved: ARC Non-Refundable Fees: ARC Refundable Deposit Pd: For Office Use Only Plat Name: Lot # Street Address: New Construction Alteration Preliminary Final ARCHITECTURAL

More information

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

Estimated Cost of Project Contractor License No. Contractor Qualifier No. Building, Safety and Zoning Department COMMERCIAL Application for Building Permit Owners and/or Contractors: Please fill out all the information listed below and submit those documents needed for your

More information

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax: City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS

More information

Applying for a Site Development Review

Applying for a Site Development Review Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

Last Name: First Name: M.I:

Last Name: First Name: M.I: ARCHITECTURE DESIGN REVIEW BOARD APPLICATION OFFICE USE ONLY APPLICATION # Permit # Fee Collected $ 1. Filing Status Initial Submission Amendment Withdrawal 2. Cost of Construction (Industry Standards)

More information

CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS

CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS Development Services Department Building Division 500 East Third Street, Suite 110 Loveland, CO 80537 (970) 962-2505 FAX (970)

More information

CONCEPT REVIEW GUIDELINES

CONCEPT REVIEW GUIDELINES Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS Development Services Department, 3363 West Park Place, Pensacola, Fl 32505 (850) 595-3475 CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS All Construction Plan Submittal Packages shall contain

More information

Grease Interceptor Design Checklist

Grease Interceptor Design Checklist CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private

More information

Clear Creek County Site Development

Clear Creek County Site Development Clear Creek County Annex Community Development Clear Creek County Site Development The Clear Creek Board of County Commissioners has adopted design standards for the construction of driveways. These design

More information

Mussey Township Building Department. 135 N. Main, P.O. Box 118 Capac, MI Phone: Fax:

Mussey Township Building Department. 135 N. Main, P.O. Box 118 Capac, MI Phone: Fax: 135 N. Main, P.O. Box 118 Capac, MI 48014 Phone: 810-395-4915 Fax: 810-395-7182 www.musseytownship.org Building Administrator: Cindy Zehnder Mussey Township: 810-395-4915 Building Inspector: James Newberry

More information

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota

More information

Checklist for Minor Plan Modification

Checklist for Minor Plan Modification Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION This Page Intentionally Left Blank Date Received Receipt Number Approved Date Date: Zoning: Intended Use of Structure: Home

More information

Lateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later

Lateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later Lateral Support Decks over 24 above grade require lateral support* *Exceptions to be discussed later Decking Types of Decking: -2x4s & 2x6s -five quarter span rated decking boards -Wood plastic composite

More information

POOL/SPA PERMIT APPLICATION

POOL/SPA PERMIT APPLICATION CITY OF CHELAN P.O. BOX 1669 135 E. JOHNSON ST. CHELAN, WA 98816 (509)682-8017 (509)682-8050 (FAX) POOL/SPA PERMIT APPLICATION I n order to process and review permit applications in a timely fashion, the

More information

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN *** IMPORTANT INFORMATION Please

More information

Town of Skowhegan Application For Development Review

Town of Skowhegan Application For Development Review Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:

More information

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES

More information

1.1 GENERAL RECORD DRAWING REQUIREMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has

More information

Land Use & Development Application

Land Use & Development Application Salt Lake County Public Works Department Planning and Development Services Division 2001 S. State Street #N-3600, Salt Lake City, UT 84190-4050 Phone 385-468-6700 FAX: 385-468-6674 Visit our web site:

More information

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,

More information

SITE PLAN APPLICATION

SITE PLAN APPLICATION SITE PLAN APPLICATION SECTION 1. APPLICANT/OWNER INFORMATION Please Print or Type Applicant/Developer: City: State: Zip: Telephone: Fax: E-mail: Applicant s Status: (Check One) Owner Tenant Prospective

More information

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) 190-66. General procedure for completeness review. A. In order to be determined complete for review by the Board, all of the required information must

More information

On-Site Sewage Disposal Application Packet

On-Site Sewage Disposal Application Packet On-Site Sewage Disposal Application Packet This packet of materials should include all you need to begin your residential or commercial application for on-site sewage disposal: Site feasibility Installation

More information

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION For Office Use Only Date Received: Approved: ARC Non-Refundable Fees ARC Refundable Deposit Pd: For Office Use Only Plat Name: Lot # Street Address: New Construction Alteration Preliminary Final ARCHITECTURAL

More information

PROJECT ADDRESS: PERMIT #

PROJECT ADDRESS: PERMIT # Residential Building/Mechanical/Plumbing Permit Checklist Community Development 6000 Main St. SW Lakewood, WA 98499 Phone (253) 512-2261 permits@cityoflakewood.us PROJECT ADDRESS: PERMIT # Plans shall

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

Oil-Water Separator Design Checklist

Oil-Water Separator Design Checklist CHECKLIST C3 Revised 5/2/2016 Oil-Water Separator Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private oil-water

More information

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED. CHECK LIST MOBILEHOME PERMANENT FOUNDATION BUILDING PERMIT SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 BUSINESS PHONE: (209) 468-3121 INSPECTION REQUEST-24

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

Rezoning Application for Planning Commission

Rezoning Application for Planning Commission 36725 Division Road, P.O. Box 457, Richmond, MI 48062 Building and Planning Department 586-727-7571 ext. 128 586-727-2489 Fax Rezoning Application for Planning Commission For a complete list of application

More information

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206) CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA 98040 (206) 275-7605 SUBMITTAL REQUIREMENTS FOR DESIGN COMMISSION APPROVAL & SIGNAGE APPROVAL PURPOSE: Design Commission

More information

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS DEVELOPMENT APPLICATION PROCESS I. Technical Advisory Committee (TAC) 1. Submit TAC Review Application (See Page 3 for TAC Review Application Requirements) 2. Review of TAC Review Application by Technical

More information

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must

More information

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION 220 Clay Street Cedar Falls, Iowa 50613 General Information: Applications for developing a commercial, multi-family, or residential (in an overlay

More information

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation)

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation) REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation) The following materals shall be submitted and reviewed

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

BUILDING & SAFETY DIVISION 110 E. LA HABRA BLVD. LA HABRA, CA Rev. 06/17

BUILDING & SAFETY DIVISION 110 E. LA HABRA BLVD. LA HABRA, CA Rev. 06/17 STANDARD OPEN PATIO COVER (PLEASE NOTE: These are general guidelines, not to be used in lieu of actual code requirements for final design. Your final design will be subject to plan review.) BUILDING &

More information

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT 209 South Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT *** IMPORTANT

More information

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Authorized Agent: City of Manassas Check List Attached: Contact:   Address: Phone Number: Fax Number: Developer s Name: Phone Number: CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT

More information

OAK RUN BUILDING PERMIT

OAK RUN BUILDING PERMIT OAK RUN BUILDING PERMIT (DOCK APPLICATION) ALL PERMIT APPLICATIONS MUST BE SUBMITTED AT THE POA OFFICE A MINIMUM OF 48 HOURS BEFORE THE SCHEDULED MEETING. ALL INFORMATION MUST BE SUPPLIED AND HAVE PROPER

More information

Deck Evaluation Checklist

Deck Evaluation Checklist Date: Reported By: Project Name/Client: Year Deck was Built: I. Stairs A. Not Applicable B. Are there any visible signs of cracks, decay or over-notching? No Yes 1. If yes, where? C. Stairway width: (Hint:

More information

B17. Sewer Site Plans BULLETIN

B17. Sewer Site Plans BULLETIN BULLETIN B17 Revised 5/2/2016 Sewer Site Plans Public Works This bulletin is designed to assist you in submitting the required documentation for sewer site plans to the Pierce County Sewer Division in

More information

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

3. The PAC (Permit Application Center) will notify the design professional of plan review results. Planning and Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731-1706 Phone: 803-329-5515 FAX: 803-329-7228 www.cityofrockhill.com AS-BUILT

More information

IMPORTANT NOTICE TO ALL TERRAMAR PROPERTY OWNERS AND BUILDERS REQUIREMENTS TO BUILD. REVISED July 15, 2017

IMPORTANT NOTICE TO ALL TERRAMAR PROPERTY OWNERS AND BUILDERS REQUIREMENTS TO BUILD. REVISED July 15, 2017 IMPORTANT NOTICE TO ALL TERRAMAR PROPERTY OWNERS AND BUILDERS REQUIREMENTS TO BUILD REVISED July 15, 2017 By virtue of authority granted to the Architectural Control Committee in covenants set forth in

More information