Duteau Creek Water Treatment Plant UV Upgrades. Regional District of North Okanagan ADDENDUM # 3 ISSUE FOR TENDER
|
|
- Abigail Charleen Newman
- 5 years ago
- Views:
Transcription
1 Project Client Tender No. Duteau Creek Water Treatment Plant UV Upgrades Regional District of North Okanagan 2017-E Date August 09, 2017 ADDENDUM # 3 ISSUE FOR TENDER INSTRUCTIONS Tenderers are required to acknowledge this tender addendum on the Form of Tender Section page 3 of 10 - failure to acknowledge may constitute grounds for rejection of Tender. The Tender Closing is extended to 2 pm on August 16, AMENDMENTS The Tender Documents, Tender No. #2017-E , shall be amended as follows: 1.0 SPECIFICATIONS 1. Refer to Section 00100, Tender Solicitation, Clause 1.4, DELETE and REPLACE Tenders will be received up to 2:00 p.m. local time, Thursday, August 10, 2017 to read Tenders will be received up to 2:00 p.m. local time, Wednesday, August 16, Refer to Section 00410, Tender Form Page 4 of 10, Schedule A Tender Price Base Bid, DELETE and REPLACE with enclosed Section 00410, Tender Form Page 4 of DRAWINGS 1. Refer to Drawing C001, DELETE reference to Concrete Cast-in-Place thrust block around existing 900 SS Pipe and REPLACE with Concrete Cast-in-Place thrust block around existing 1200 SS Pipe
2 2. Refer to Drawing S1.0, a. DELETE reference to CONCRETE, Item 10, DELETE??? and REPLACE with Waterproofing and Waterproofing Admixtures. b. DELETE reference to WATERPROOFING AND WATERPROOFING ADMIXTURES, Item 5, Wall Base: GREENSTREAK 643 and REPLACE with Wall Base and Wall Construction Joints: GREENSTREAK Refer to Drawing S1, Note 6 DELETE GRIDS A, G, AND 1 and REPLACE with GRIDS A, D AND Refer to Drawing P804, DELETE reference to Little Giant TE-3-MD and REPLACE with Little Giant TE-5.5-MD-HC complete with integral low flow shutoff switch 5. Refer to Drawing A001, General Notes, DELETE note 'I.' referencing dens-shield board in wet locations.. 6. Refer to Drawing A002, Wall Schedule, Type W1, REVISE the depth of the metal cladding to 38mm. 7. Refer to Drawing A002, Wall Schedule, Type W2, REVISE the depth of the Steel Studs to 152 mm. 8. REPLACE Drawing A005 Architectural Building Sections with the enclosed Drawing A REPLACE Drawing A007 Architectural Details with the enclosed Drawing A Refer to Drawing A008, Division 7, DELETE Sentence 10 and REPLACE with: A. All roofing work to be performed by qualified roofing contractors who are RCABC certified or who are capable of quality work, which will be able to achieve a RCABC ten (10) year guarantee. You are instructed to engage a RCABC approved roofing inspection service to perform inspections during roofing installation. Forward reports to Owner. Copy all reports to the Architect. This is mandatory. NO EXCEPTIONS Refer to Drawing A008, Division 7, ADD 18. Drainage Board: Install (10mm thick min) drainage board to below grade foundation walls unless noted otherwise. Drainage board to have integral filter cloth or be a solid continuous surface to prevent blockage of drainage cavity. Install over dampproofing only after dampproofing installation has been inspected. Reference Product: Superseal Dimpled Membrane.. Tender #2017-E Page 2 of 7
3 12. Refer to Drawing A008, Division 8, DELETE note 6 and REPLACE with: 6. Tubular Daylighting: Supply and install tubular daylighting system as per drawings. Coordinate with structural steel for required roof deck openings and with roofing contractor for membrane and flashing details required by manufacturer. Assemblies to be manufactured to be airtight, watertight and noncombustible c/w integral curb mounting cap and must conform to applicable ASTM and CSA standards. Dome to be transparent, UV and impact resistant acrylic w/ reflecting prism; and interior diffuser to be translucent, acrylic. Provide Extension tubes to bring the tubes below the U/S of trusses. Reference Product: SolaMaster 750 DS by Solatube Refer to Drawing A008, Division 9, DELETE note 4 regarding sandblasting in it's entirety. 14. Refer to Drawing A008, Division 9, DELETE note 6 and REPLACE with 6. Metal Liner Panels: Metal liner panels to be min. 32" wide (or to suit to stud spacing), galvanized, prefinished (Vicwest color bone white or equal), 22 gauge, smooth/flat panels c/w concealed fasteners. Reference Manufacturer: Vicwest, product L-800R Refer to Drawing A008, Division 8, DELETE Sentence 5 and REPLACE with Coiling Overhead Door: Supply and install chain operated, coiling overhead door and related systems such as tracks, and operating hardware. Provide shop drawings for review including structural design loads as well as colour, materials and finishes. Panels to be 15/16" thick and constructed of 22 gauge (min.) sheet steel exterior skin, prefinished w/ standard paint system, over urethane insulation core (R8 min). Guides and brackets to be minimum 3/16" Structural steel angles, with powder coated finish. Weatherstripping required at sill (bottom bar), jamb (guides), head (baffle) and at all panel joints. Provide padlockable chain keeper on guide. Insulated bottom bar to match panel finish. Install door plumb, flush and true to ensure smooth operation. Reference product & manufacturer: Thermiser ESD20 by Cornell REPLACE Drawing A009 Architectural Door and Window Schedules with the enclosed Drawing A Refer to Drawing C002, Civil Site Grading, DELETE SURFACE RESTORATION BETWEEN RESERVOIR & UV BUILDING: PROVIDE 100mm OF 19mm MINUS CRUSH COMPACTED TO 100% STD. PROCTOR DENSITY AND A THIN LAYER OF ROCK (19 mm 25 mm) PLACED ON TOP AT 25mm DEPTH. and REPLACE with SURFACE RESTORATION BETWEEN RESERVOIR & UV BUILDING: PROVIDE 100mm OF TYPE 1 MATERIAL COMPACTED TO 100% STD. PROCTOR DENSITY AND A THIN LAYER OF WASHED CRUSHED ROCK Tender #2017-E Page 3 of 7
4 (19 mm - 25 mm) PLACED ON TOP AT 25mm DEPTH mm WASHED CRUSHED ROCK TO BE ANGULAR MATERIAL WITH LESS THAN 2% PASSING 19 mm SIEVE REPLACE Drawing S1.6 Structural Sections and Details Sheet 4 with the enclosed Drawing S REPLACE Drawing S2 Structural Foundation Plan with the enclosed Drawing S REPLACE Drawing S3 Structural Mezzanine Framing Plan with the enclosed Drawing S REPLACE Drawing S4 Structural Roof Framing Plan with the enclosed Drawing S REPLACE Drawing S5 Structural Frame Elevations with the enclosed Drawing S REPLACE Drawings E001 to E831 with the enclosed drawings. Note all incidental symbols replaced with proper characters. 3.0 QUESTIONS 1. Q: Please confirm temporary shoring requirements and whether they may be permanent? A: Temporary shoring shall be provided as required and approved by the Contractor s engineer as per Section Temporary shoring may be left in place permanently, only upon approval by the Owner or Engineer. 2. Q: In the note on Dwg C002, all slopes steeper than 2H:1V, the contractor is to either provide filter fabric and rip rap, or cable concrete in those areas. Is this to remain upon the completion of the job or is this to be removed and the area redone in hydroseed? A: Slope protection measures described above shall remain in place after construction. 3. Q: What is the cost of the Owner supplied UV Equipment? A: $ 1,243, Q: W2 assembly indicates G1S plywood both sides and a note on A5 section D indicates G1S plywood of the inside of the electrical room up to 2m. What is the desired finish above 2m in the electrical room? A: Note on A5 Section D refers to the exterior walls only. Plywood to be mounted to interior surface of W1 Wall type. Tender #2017-E Page 4 of 7
5 5. Q: Reference to item 14 on addendum 2, is the location of the duct bank shown on Drawing E001 considered a travelled surface? A: Electrical duct bank under asphalt shall be concrete encased. 6. Q: Is provisional item 1, the 1200mm butterfly valve, shown on Drawing C001 at the UV building outlet? A: Provisional item 1 is NOT shown on the Mechanical or Civil Drawings. The provisional 1200mm butterfly valve will be located near point no. 60 on Drawing C Q: Is there any detail available or a description of how you would like to see the proposed drainage swale around the UV building to offsite discharge and also to the proposed headwall? Is the swale to be rip rap or hydroseeded and or lined witth any geofabric? A: Refer to Drawing C004 Detail Q: C001 Note 2 specifies cap and abandon of 1200 HDPE line. Please confirm if concrete cap is acceptable. A: Concrete sandbagging with pour concrete cap is acceptable. 9. Q: Please confirm the type and brand of the electrical distribution panel boards and MCCs. A: The existing distribution panels and MCCs are Siemens. MCC s are TIASTAR model. 10. Q: What type of pipe is required for the 100mm civil conduit pipe. A: Schedule 40 PVC as per Section Detailed Piping Specifications Sheets. 11. Q: What is the material of the 19mm hypochlorite injection diffuser? A: The diffuser shall be constructed of Hastelloy C as per the Saf-T-Flo model number reference on C Q: What plate thickness and embedment depth is required for the marine access hatches? A: Cast-in-place frame and anchorage shall be designed by Contractor\Supplier to meet the pressure rating requirements of the hatch. 13. Q: What is the invert elevation of the lowest drain for the existing reservoir (i.e. Invert elevation to which the water will be drained by the plant operator? A: Assume that the City will handover the system when the water level is at the invert of the reservoir outlet pipe. Tender #2017-E Page 5 of 7
6 14. Q: Can the system be fed directly from the water treatment plant bypassing the reservior A: No. However, the system can be temporarily supplied from an alternate source for up to 6 hours. 15. Q: At what water level within the reservoir is the system deemed shut-down? A: Please assume that the reservoir is empty. 16. Q: Please provide clarity as to how the contractor is expected to complete this work within a 6-hour window. A: The tie-in spools will need to be pre-assemble, pressure testing and disinfected prior to installing. The tie-in locations would then be exposed in advance and the bulk of the effort would then focus on removal of existing and fitup at the restrained fittings. We expected that two crews would need to be working in parallel to complete the tie-ins within the allotted timeframe. The City crews have completed similar scope at one location within a similar timeframe. 17. Q: Please provide information on fill rates for the reservoir and how much time is needed prior to the system being operational? A: The system can be operational immediately following successful fitup. 18. Q: What is the head pressure of the existing TW HDPE line from the reservoir? A: 10 psi. 19. Q: No lighting control is shown for Process Area Lighting Areas A + B. are the lights to be on 24/7? A: The Process Area Lighting is not controlled and is to be ON 24/ Q: The specifications for the Exit Lights show them to be self-powered. The drawings on E-808 show them to be fed 12VDC from the EM Battery Pack. A: The EXIT lights are remote lamps with EXIT sign fed from a common 12VDC Emergency Battery Pack. 21. Q: Does the electrical room require a EM Battery pack? A: Yes. 22. Q: A008 Div. 9 Note 6, reference manufacturer: Metal Building Components. Please confirm that comparable products will be acceptable and this is noted for reference only. A: Approved equivalents will be considered for all reference products and manufacturers listed on the drawings. Tender #2017-E Page 6 of 7
7 23. Q: Section ductwork all ductwork installed shall be aluminum, galvanized steel or stainless steel as indicated on the drawings. Please confirm duct material? A: All ducting to be Galvanized Steel. 24. Q: S1.3 shows the mud slab extending past the footings however S1.4 does not, please confirm which is correct. What MPA is acceptable for the mud slab? A: Mud slab to extend past the footings as per drawing S1.3 on all locations. Mudslab to be 8 MPA as per Secion A/S1.3. Enclosures Section 00410, Tender Form, Page 4 of 10 Electrical Drawings E001 to E831 Drawing A005 Architectural Building Sections Rev B Drawing A007 Architectural Details Rev B Drawing A009 Architectural Door and Window Schedules Rev B Drawing S1.6 Structural Sections and Details Sheet 4 Rev B Drawing S2 Structural Foundation Plan Rev B Drawing S3 Structural Mezzanine Framing Plan Rev B Drawing S4 Structural Roof Framing Plan Rev B Drawing S5 Structural Frame Elevations Rev B The changes, additions, and/or deletions contained herein are hereby made a part of Tender Document #2017-E Contract Documents as fully and completely as if the same were set forth therein. All other terms and conditions shall remain unchanged. END OF ADDENDUM NO. 3. Tender #2017-E Page 7 of 7
CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST
CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,
More informationGRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO
PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More informationNovember 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT
November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated
More information2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.
General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings
More informationMarshall Truck Station Laboratory Addition Project No. TZ MnDOT
Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:
More informationA1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14
BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2)
More informationCity of Regina Standard Construction Specification SECTION 2660 CHAIN LINK FENCE
1.0 GENERAL 1.1 Scope 1.1.1 The work shall consist of supply and installing chain link fence, including braces and gates, as shown on the plans and specifications at the locations designated by the Engineer.
More informationINSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN
MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE
More informationDIVISION 6 WOOD AND PLASTICS
DIVISION 6 WOOD AND PLASTICS PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Wood framing. 2. Wood supports. 3. Wood blocking. 4. Wood cants. 5. Wood nailers. 6. Wood furring.
More informationLarge Scale CalArc Pavers for Sand-Set Pedestrian Use Installations
The following specification refers to the Stepstone, Inc. product known as: Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations Large Scale CalArc Pavers are part of the California Architectural
More informationADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationMANHOLES PART I: GENERAL. A. Precast Concrete Manholes
MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a
More informationAddendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.
!!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This
More informationCONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01
More informationEMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL
EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid
More informationPART MATERIALS. Section Fencing Materials. Description
PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain
More informationNEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING
NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes
More informationSECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP
1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of
More informationTesting. Material testing will be according to applicable AASHTO, ASTM or Department methods as specified.
907.01 Section 907. FENCING MATERIALS 907.01 General Requirements. Materials for use in fencing property, right-of-way and other installations must comply with this section. 907.02 Testing. Material testing
More informationCHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE
More informationSTANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN
CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D ASPHALT 20 GUTTER LINE CONCRETE CURB FINISHED GRADE PRECAST GRADE RINGS, 2 50 100 MAX PRECAST CB LID GROUT ALL AROUND CB LEAD, INSIDE & OUTSIDE OF
More informationTOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL
ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose
More informationREGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV
REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE IFB 2014-014 Rail Expansion (Streetcar) Rampart Street Addendum IV Acknowledge receipt of this addendum in the bid submission. This addendum is a part of the Contract
More informationb. B aluminum and aluminum-alloy extruded bar, rod, wire, shape and tube
MODEL 240I SECTION 08120 FLUSH ALUMINUM DOORS AND FRAMES PART I GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required to deliver and install aluminum doors, frames,
More information2. Wood grounds, nailers, blocking, miscellaneous framing, sleepers, etc.
06100 - ROUGH CARPENTRY PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"
More informationSECTION PRECAST CONCRETE STRUCTURES
SECTION 02605 PRECAST CONCRETE STRUCTURES PART 1 GENERAL 1.01 DESCRIPTION A. CONTRACTOR shall provide all professional services, labor, materials, equipment and incidentals as shown, specified and required
More informationRENOVATION OF THE FARMERS MARKET Reference Number:
RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:
More informationSAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2
SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.
More informationThe Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8
September 2013 Page 1 of 8 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of air release chambers, flushout chambers, valve chambers, meter chambers
More informationThe City of Winnipeg SHINGLE ROOF REPLACEMENT Section Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 Bid Opp. No.
Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 PART 1 GENERAL 1.1 SCOPE OF WORK.1 Total roof area approximately 1,312 m 2. The Work includes, but is not limited to:.1 Removal and disposal
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-12 36 00.00 20 (August 2011) --------------------------------- Preparing Activity: NAVFAC Superseding UFGS-12 36 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON
The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR
More information10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS
10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 WOOD SKID FLOOR FLOOR SYSTEM FOR 10x12 TRICO AND FLORA SHEDS RAW MATERIALS LIST: 2 (9) FLOOR FRAMING AND SHEATHING: 1) BAND BOARD 2 x 6 x 12 PRESSURE
More informationThis addendum forms a part of the Contract Documents dated: August 10, 2012.
Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911
More information4. Metal roof jacks at penetrations and attachments
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -
More informationWindows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016
Windows Installed into Walls with Polyiso and Wood Framing Installation Instructions Standard Method Revised 10/24/2016 Background There are many acceptable ways to mount and detail windows for support
More informationOFFICE OF MANAGEMENT AND FINANCE
CITY OF PORTLAND OFFICE OF MANAGEMENT AND FINANCE Charlie Hales, Mayor Fred Miller, Chief Administrative Officer Ken Rust, Director, Bureau of Revenue and Financial Services Christine Moody Chief Procurement
More informationSECTION ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. 1 JULY 12, 2017
Project No. 6040.0, Contract No. E7-09 SECTION 0090 ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. JULY 2, 207 This Addendum No. ( Addendum ) as dated above modifies certain
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationSeries 9000 Vinyl Single Hung
Series 9000 Single Hung Series 9000 Vinyl Single Hung Contents List of Architectural Drawings...9000SH - 3 Elevations - Single Hung...9000SH - 4 Available Sizes - Single Hung...9000SH - 5 Elevations -
More informationSECTION CARPENTRY
SECTION 06100 CARPENTRY PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Carpentry work including grounds, nailers, blocking, miscellaneous framing, plywood backing panels, plywood sheathing, preservative
More informationADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION
July 6, 2011 City of Miami Fire Station #13 ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION This Addendum is issued to modify the previously issued Bidding and Contractual Documents,
More informationB. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.
McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section includes standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationThe following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.
ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless
More informationTAS 201, TAS 202, TAS 203 and ASTM E330 PERFORMANCE TEST REPORT. Rendered to: DIAMOND DOOR PRODUCTS
Architectural Testing TAS 201, TAS 202, TAS 203 and ASTM E330 PERFORMANCE TEST REPORT Rendered to: DIAMOND DOOR PRODUCTS SERIES/MODEL: Diamond GEM 130 MPH Series PRODUCT TYPE: Out-Swing Steel Entry Door
More informationCITY OF NEW WESTMINSTER SECTION Westminster Pier Park ADDENDUM NO. 1 Landscape Contract
ADDENDUM NO. 1 November 10, 2010 This Addendum forms part of the Bid Documents and amends the original Contracting Requirements, Specifications, and Drawings, and clarifies Bidders questions received between
More informationMETAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.
METAL FABRICATION SCOPE This specification applies to all metal intended to be rubber lined. Metals furnished must conform to this specification with respect to suitability for rubber lining or covering.
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationNEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER
NEW SEVICE CENTER VINITA, OK 70 9 S. 7th St. VINITA, OK 70 06 W. 2nd St., Joplin, MO 680 Phone: 7-62- Fax: 7-782-678 GENERAL G0.0 COVER CIVIL C.0 SITE DEMO C. SITE PLAN C.2 GRADING PLAN (FORTHCOMING) ARCHITECTURAL
More informationRAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch
Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted
More information.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.
PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. 1.2 RELATED WORK SPECIFIED ELSEWHERE.1 Installation
More informationNotre Dame High Addition/Renovation Addendum 3 Page 1
School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)
More informationINVITATION FOR BID (IFB) IFB NO. GSWA
INVITATION FOR BID (IFB) IFB NO. GSWA-005-16 AGAT AND MALOJLOJ RESIDENTIAL TRANSFER STATION IMPROVEME AND DEDEDO RESIDENTIAL TRANSFER STATION CLOSURE ADDENDUM NO. 6 September 22, 2016 ALL BIDDERS MUST
More informationSECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...
More informationWAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence
MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised
More informationSeries 6000 Vinyl Single Hung
Series 6000 Horizontal Slider Series 6000 Vinyl Single Hung Contents List of Architectural Drawings...6000SH - 3 Elevations - Single Hung...6000SH - 4 Available Sizes - Single Hung...6000SH - 5 Series
More informationBol FEATURES: SPECIFICATIONS: 8' 24' Round Tapered and Straight Wood Poles STRUCTURA INC. FIXTURE TYPE: PROJECT NAME:
Bol 8' 24' Round Tapered and Straight Wood Poles FIXTURE TYPE: PROJECT NAME: Round Taper Glulam solid wood and aluminum pole available in 8' 24' lengths. Tenon adapters, slip fitters and side bracket mounts
More informationMSU Barnard Hall 105 Cleanroom Installation PPA # Page 1
ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,
More informationTG Glazing Design-Build
TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011
More informationSECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS
9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a
More information9. Pay for the power consumed until the project has been accepted as substantially complete.
9. Pay for the power consumed until the project has been accepted as substantially complete. A4-2. SECTION 01 23 00 ALTERNATES A. Reference Page 2, Paragraph 1.03.: Modification: Add the following paragraph:
More informationADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.
ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,
More informationC. HMMA 863: Guide Specifications for Detention Security Hollow Metal Doors and Frames
SECTION 083463 DETENTION DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationA. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type.
SECTION 062000 - FINISH CARPENTRY PART 1 - GENERAL 1.1 SECTION REQUIREMENTS A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and
More informationSECTION INTERIOR SIGNAGE
SECTION 10 14 02 INTERIOR SIGNAGE PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by
More informationARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)
ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.
More informationA. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.
SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation
More informationSECTION BULLET- RESISTANT DOORS
1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and
More informationBidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.
ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationPERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY
PERFORMANCE TEST REPORT Rendered to: GLASSCRAFT DOOR COMPANY SERIES/MODEL: Buffalo Forge Steel Doors / Arch Top Double PRODUCT TYPE: In-swing Arch Top Double Door RH-4-5/8 Title Uniform Load Deflection
More informationManhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard
More informationSeries 9000 Vinyl Horizontal Slider
Series 9000 Horizontal Slider Series 9000 Vinyl Horizontal Slider Contents List of Architectural Drawings...9000HS - 3 Elevations - XO or OX...9000HS - 4 Available Sizes - XO or OX...9000HS - 5 Elevations
More informationINSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL
March 2016 INSTALLATION INSTRUCTIONS FOR FURTHER QUESTIONS, PLEASE CALL 775 440 2025 JENSEN WATER RESOURCES 521 Dunn Circle, Sparks, NV 89431 JensenPumps.com Figure 1: This illustration shows a complete
More informationTraining Manual The Installation of Siphonic Pipework
Training Manual The Installation of Siphonic Pipework The Engineered Rainwater Solution Training Manual: The Installation of Siphonic Pipework o Overview of Principals of Siphonic Drainage o Interpreting
More informationTECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING
TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING TABLE OF CONTENTS This installation guide provides detailed step-by-step instructions for do-it-yourself projects. We invite you to read it carefully and
More informationA. Deviation from this standard must be approved by the Project Architect.
September 2012, rev. 00 26 5600 Exterior Lighting PART 1. GENERAL 1.01 Related Documents A. Deviation from this standard must be approved by the Project Architect. B. Drawings and general provisions of
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationPART 4 STANDARD DRAWINGS FOR CONSTRUCTION
4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of
More informationCS3 represents manufacturers of products for use in the municipal waterworks industry.
Brian Drexel & Rob Grier WWW.CS3WATERWORKS.COM Established in 2000, CS3 Waterworks is a Florida Based company with offices in Orange Springs Florida and Savannah Georgia. CS3 represents manufacturers of
More informationA. Rough carpentry includes but is not limited to the following:
SECTION 06100 ROUGH CARPENTRY PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections,
More informationSECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section
02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,
More informationAddendum No. 1 page 1
Addendum No. 1 page 1 Project: Proj. No: 1634.02 Scottsburg High School HVAC Renovation 2017 Scott County School District 2 Scottsburg, Indiana Date: November 22, 2016 This addendum is a part of the bid
More informationA. Product Data: For each electrical identification product indicated.
SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationPiping & Equipment Identification
Piping & Equipment Identification Part 1 General 1.01 Description of Work A. Work in this section includes: Identification materials, including necessary accessories indicated on Contract Documents and
More informationMTJ Outdoor Baggage Claim
MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,
More informationADDENDUM 4 BID OPPORTUNITY NO
` Corporate Finance Department Materials Management Branch ADDENDUM 4 BID OPPORTUNITY NO. 74-2005 Page 1 of 8 NEWPCC SECONDARY EFFLUENT UV DISINFECTION FACILITY URGENT PLEASE FORWARD THIS DOCUMENT TO WHOEVER
More informationHIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11
HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum
More informationResidential Room Addition / Remodel Submittal Requirement Checklist
City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY
More informationA. Extent of structural precast concrete work is shown on drawings and in schedules.
SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D
HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS
More informationExcavating, Backfilling, and Compaction for Utilities Piping (Plumbing).
SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required
More information