1 SECTION PRECAST CONCRETE STRUCTURES PART 1 GENERAL 1.01 DESCRIPTION A. CONTRACTOR shall provide all professional services, labor, materials, equipment and incidentals as shown, specified and required to design, furnish, and install all precast concrete structures. B. Structures shall conform in shape, size, dimensions, material, and other respects to the details shown or as ordered by ENGINEER. Minimum thickness sizes for slabs and walls are provided on the Drawings. C. The sodium hypochlorite injection vault shall be governed by this specification. All stormwater inlet structures shall be governed by Section Site Drainage RELATED SECTIONS A. Section Excavating, Backfilling, and Grading for Structures B. Section Aluminum Access Hatches 1.03 QUALITY ASSURANCE A. Standards referenced in this Section are: 1. American Association of State Highway and Transportation Officials (AASHTO). 2. ASTM C 478, Standard Specification for Circular Precast Reinforced Concrete Manhole Sections. 3. AWWA C 302, Reinforced Concrete Pressure Pipe, Non-Cylinder Type for Water and Other Liquids. 4. Precast/Prestressed Concrete Institute (PCI) MNL-116, Manual for Quality Control for Plants and Production of Structural Precast Concrete Products. B. Fabrication Tolerances: 1. General: Fabricate precast concrete units complying with manufacturing and testing procedures, quality control recommendations, and dimensional tolerances of PCI MNL-116, unless otherwise indicated. Keep bar sizes small, even where this will reduce the spacing of the bars. 2. Units shall be true to dimensions. Unit bow, as fabricated and installed, shall not exceed 1/8-inch per unit in the short dimension and 1/4 inch per unit in the long dimension. Step in alignment face and jog in alignment shall not exceed 1/4-inch. Provide a 3/4-inch chamfer or 1 x 2-inch radius on all exposed edges and corners PN:

2 SECTION PRECAST CONCRETE STRUCTURES 3. Imperfections such as air bubbles, ripples, joint lines, warpage, stains, projections, honeycombs, uneven matrix plate, and other defects will not be acceptable. C. Qualifications and Responsibilities of CONTRACTOR s Design Professional: 1. Professional Engineer a. Engage a registered professional engineer qualified to practice in the State of Florida and experienced in providing engineering services of the kind indicated. b. Responsibilities include but are not necessarily limited to: 1) Carefully reviewing precast concrete structural performance and design criteria stated in the Contract Documents. 2) Preparing written requests for clarifications or interpretations of performance or design criteria for submittal to ENGINEER by CONTRACTOR. 3) Preparing or supervising the preparation of design calculations and related drawings, shop drawings, testing plan development, test result interpretation and a comprehensive engineering analysis verifying compliance of the precast concrete structure with the requirements of the Contract Documents. 4) Signing and sealing all calculations and design drawings, and shop drawings. 5) Certifying that: i. It has performed the design of the precast concrete structure in accordance with the performance and design criteria stated in the Contract Documents, and ii. The said design conforms to all applicable local, state and federal codes, rules and regulations, and to the prevailing standards of practice. D. Qualifications of Fabricator: A firm that complies with the following requirements and is experienced in producing structural precast concrete units similar to those indicated for this Project and with a record of successful in-service performance. 1. Participates in PCI s Plant Certification program at the time of bidding and is designated a PCI-certified plant for Group C, Category C1 Precast Concrete Products (no pre-stressed reinforcement). 2. Certification shall be maintained throughout the production of the precast concrete units. Production shall immediately stop if at any time the fabricator s certification is revoked, regardless of the status of completion of contracted work. Production will not be allowed to re-start until the necessary corrections are made and certification has been re-established. In the event certification(s) cannot be re-established in a timely manner, causing project delays, the PN:

3 1.04 SUBMITTALS SECTION PRECAST CONCRETE STRUCTURES fabricator, at no additional cost, will contract out the remainder of the units to be manufactured at a PCI certified plant. A. Submit for approval the following: 1. Qualifications a. Submit qualifications data for the CONTRACTOR s Design Professional. 2. Precast Structures a. Drawing showing design and construction of all precast concrete, as well as the location and details of all items that are to be embedded in the precast units. b. Provide manhole drawings showing the elevations and all piping to and from each structure. c. Design calculations and shop drawings, signed and stamped with a seal of a Registered Professional Engineer licensed to practice in the State of Florida and PE certification provided in Section d. Test result from concrete cylinder strength tests. B. Shop Tests 1. Submit description of proposed testing methods, procedures, and apparatus. Prepare and submit report for each test DELIVERY, STORAGE, AND HANDLING A. Delivery of Materials 1. Deliver precast concrete units to project site in such quantities and at such times to assure continuity of installation. B. Storage of Materials 1. Store units at project site in a manner that will prevent cracking, distortion, warping, staining, or other physical damage and so that precast copings are without damage at time of installation. C. Handling of Materials 1. Lift and support units only at designated lifting or supporting points as shown on final Shop Drawings. PART 2 PRODUCTS 2.01 PRECAST CONCRETE STRUCTURES A. Layout and details shall be as shown and specified. Design shall be adequate to withstand live loads, lateral earth pressure loading, and uplift case PN:

4 SECTION PRECAST CONCRETE STRUCTURES 1. Design Criteria a. Top slab live load: 300 psf. b. Maximum ground water table = assume at existing ground surface c. Vertical surcharge on soil of 300 psf. d. Safety factor for uplift normal ground water > 1.5. e. Safety factor for uplift 100 year storm ground water > Design shall meet the requirements of ACI 350 and the current Florida Building Code. B. Concrete Mix: Standard-weight concrete consisting of specified Portland cement, pigments, aggregates, admixtures, and water to produce the following properties: 1. Compressive Strength: 5,000 psi minimum at 28 days. 2. Total Air Content: not less than 4 percent nor more than 6 percent. C. Where precast structures are made up of various precast components such as base sections, riser sections and top sections, the joint between sections shall be watertight and be the tongue and groove type complying with AWWA C302. D. Walls shall be precast with wall pipes or with pipe sleeves with water stop suitable for application or as shown on Drawings. E. Precast structure shall be designed and constructed to accept access hatches or castings as shown and specified. F. Precast structures shall be designed to support the weight of equipment lifted from the station to the top slab as necessary. G. Underground precast units shall have a shop-applied exterior coating. The units shall be given two coats of bitumastic coating with a total dry film thickness of 12 mils. Each coat shall be applied at a rate not to exceed one gallon per 100 square feet. Time shall be allowed between coats to permit sufficient drying. Field application of coating is unacceptable except for coating repairs. H. Lifting holes, if used, shall be tapered. Tapered, solid rubber plugs shall be furnished to seal the lifting holes. The lifting holes shall be made to be sealed by plugs driven from the outside face only. I. Mark date of manufacture and name of trademark of manufacturer on inside of barrel ACCESS HATCHES AND CASTINGS A. All necessary access hatches as shown and specified shall be cast into concrete as necessary, refer to the civil details and/or Section for additional requirements PN:

5 SECTION PRECAST CONCRETE STRUCTURES B. The CONTRACTOR shall provide built-up type brick risers to place castings at grade where shown on the Drawings SHOP TESTING A. At a minimum, conduct the following shop test: 1. Conduct concrete cylinder strength tests. Cylinders shall be cured in the same manner as the precast structures. Collect a minimum of 1 test cylinder from every 10 cubic yards of concrete poured. PART 3 EXECUTION 3.01 INSPECTION A. CONTRACTOR and his installer shall examine the substrate and the conditions under which Work is to be performed and notify OWNER of unsatisfactory conditions. Do not proceed with the Work until unsatisfactory conditions have been corrected in a manner acceptable to OWNER INSTALLATION A. Set units in true alignment. All joints shall be sealed with cement mortar inside and out and troweled smooth to the contour of the wall surface. Raised or rough joint finishes will not be accepted. B. Precast structures shall be set on a crushed stone, crushed gravel, or concrete foundation as shown on drawings and in accordance with geotechnical recommendations. Precast units shall be set at the proper grade and carefully leveled and aligned. C. Install units in accordance with manufacturer s recommendations. D. Replace precast concrete units damaged for any reason or which fail to perform as specified. E. Each structure shall be watertightness tested and the ENGINEER shall observe each test. 1. Lower groundwater table below bottom of the manhole, wet well, or structure for the duration of the test. Plug all pipes and other openings into the structure and brace to prevent blow out. Fill structure with water to the top of the section. If the excavation has not been backfilled and no water is observed moving down the surface of the structure, the structure is satisfactorily watertight. If the test, as described above is unsatisfactory as determined by the ENGINEER, PN:

6 SECTION PRECAST CONCRETE STRUCTURES or if the structure excavation has been backfilled, continue the test. A period of time may be permitted to allow for absorption. Following this period, refill manhole to the top of the cone, if necessary and allow at least 8 hours to pass. The requirement shall be zero leakage over the time period. Uncover the rejected structure as necessary and to disassemble, reconstruct or replace it as directed by the ENGINEER. Retest the structure and, if satisfactory, fill and paint the interior joints. 2. No adjustment in the leakage allowance will be made for unknown causes such as leaking plugs, absorptions, etc. It will be assumed that all loss of water during the test is a result of leaks through the joints or through the concrete. 3. Testing shall be completed prior to any interior coating (if required) being applied. END OF SECTION PN:

7 SECTION ALUMINUM ACCESS HATCHES PART 1 GENERAL 1.01 SCOPE OF WORK A. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required to furnish and install access hatches. B. The Work includes providing openings in and attachments to the access hatch to accommodate the Work under this and other Sections, and required accessory items such as anchorage devices for which provision is not specifically included under other Sections. C. Review installation procedures under this and other Sections and coordinate the installation of items to be installed with or before the access hatches QUALITY ASSURANCE A. MANUFACTURER shall have not less than five years experience producing products substantially like those specified and, upon ENGINEER s request, shall submit documentation of not less than five satisfactory installations in place for not less than five years each. B. Obtain all products included in this Section regardless of the component MANUFACTURER from a single access hatch MANUFACTURER. Furnishing hatches from more than one MANUFACTURER is not acceptable. C. The access hatch MANUFACTURER shall prepare, or shall review and approve, all shop drawings and other submittals for all components furnished under this Section. D. Components shall be suitable for specified service conditions and shall be integrated into the overall assembly by the access hatch MANUFACTURER SUBMITTALS A. Submit the following in accordance with Section Detailed plans and other drawings showing location of products and direction of door swing; access hatch schedules indicating cover location, material, type, loading capacity, and other information; and fabrication details for the access hatch covers Work, including materials, thickness of metals, finishes, latching or locking provisions, type of anchorages, and accessory items. 2. Copies of MANUFACTURER s literature and specifications for each type of access hatch incorporated in the Work. 3. Installation data, including setting drawings and templates PN:

8 SECTION ALUMINUM ACCESS HATCHES 1.04 DELIVERY, STORAGE, AND HANDLING A. Packing and Shipping: 1. Protect mill finish and other finish during shipping and installation by an attached, adhesive-backed vinyl material that is removable during and after installation of the access hatch. B. Storage and Protection: 1. Protect aluminum members and packaged materials from corrosion and deterioration. 2. Refer to Section for additional information. PART 2 PRODUCTS 2.01 GENERAL A. Provide MANUFACTURER s standard fabricated access hatch units, modified when necessary to comply with the Contract Documents. Where standard units are not available for the sizes and types required, provide custom-fabricated units of the same quality as MANUFACTURER s similar standard-sized units. B. Fabricate each access hatch unit in the shop, complete with anchors, gaskets, hardware, and accessory items, as required. C. Galvanizing Repair Paint: For repairing damaged galvanized surfaces, provide high zinc-dust content paint complying with MIL-P-21035B. D. Provide access hatches in accordance with Table A, Access Hatch Schedule: TABLE A ACCESS HATCH SCHEDULE Size Hatch Material Leaf Type Frame Type Location No. Width (clear opng), inches Length (clear opng), inches Aluminum Single See 2.02A Chemical Injection Vault 2.02 ANGLE-FRAME TYPE ACCESS HATCH A. Aluminum Access Hatch 1. Design Live Load: 300 pounds per square foot. 2. Products and MANUFACTURERS: a. Single-Leaf Door Aluminum Access Hatch Cover 1. TPS by USF Fabrication. 2. Or ENGINEER approved equal. b. Double-Leaf Door Aluminum Access Hatch Cover PN:

9 SECTION ALUMINUM ACCESS HATCHES 1. TPD by USF Fabrication. 2. Or ENGINEER approved equal. 3. Cover: 1/4-inch thick, aluminum diamond-pattern plate reinforced for 300 psf live load. Cover shall be equipped with a lifting handle and 316 stainless steel hold-open arm with red vinyl grip that automatically locks the cover in the 90- degree open position. 4. Frame: Frame shall be 3/8-inch aluminum angle with integral anchor flange on all four sides. The frame shall include an EPDM odor reduction gasket that reduces the amount of odor that escapes from below the door. A 1.5-inch drain coupling shall be provided for a pipe connection to the wet/clear well below. 5. Gasket: A U-shaped EPDM gasket mechanically attached or riveted to the channel frame. 6. Hinges: Type 316 stainless steel, heavy-duty butt hinges with Type 316 stainless steel pin fastened to door with Type 316 stainless steel tamperresistant bolts. 7. Latch: Latches shall be 316 stainless steel pressure locks with exterior staple for padlock. 8. Lift Assistance: Compression spring operators enclosed in telescopic tubes. Automatic hold-open arm with release handle automatically locks cover(s) in the open position. 9. Fall-Through Prevention System: Provide access hatch cover MANUFACTURER s standard safety grating of FRP or aluminum, constructed for live load capacity of not less than 300 psf. Provide hinges and lift-assist to allow grating sections to automatically lock in place in fullopen 90-degree position. Provide hold-open arm and release assembly of aluminum or Type 316 stainless steel. Grating shall be colored OSHA Safety Yellow or Safety Orange. 10. Finish: Mill finish aluminum with SS hardware. 11. Bituminous coating shall be applied to surfaces in contact with concrete. PART 3 EXECUTION 3.01 INSPECTION A. Examine areas and conditions under which roof access hatch cover Work will be performed and notify ENGINEER in writing of conditions detrimental to proper and timely completion of the Work. Do not proceed with the Work until unsatisfactory conditions are corrected INSTALLATION A. Install access hatches in accordance with approved shop drawings and other approved submittals, the Contract Documents, and MANUFACTURER s instructions. B. Set each access hatch level and true to line or grade, without warp or rack. C. Protection of aluminum from dissimilar materials: Coat surfaces of aluminum in PN:

10 SECTION ALUMINUM ACCESS HATCHES contact with dissimilar materials such as concrete, masonry, steel, and other metals in accordance with Section or as described above. D. Galvanized covers: Where zinc coating is damaged, touch-up abraded surfaces with galvanizing repair paint applied in accordance with the paint MANUFACTURER s instructions and recommendations ADJUSTING AND CLEANING A. Adjust leaves of roof access hatch covers as necessary to provide proper operations. B. Remove stains, concrete splatter, oils, grease, and other foreign materials necessary and provide clean, finished surfaces. END OF SECTION PN:

11

12

Standard Specifications

Standard Specifications Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and

More information

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

SECTION PRECAST CONCRETE SECTIONAL MANHOLES SECTION 02545 PRECAST CONCRETE SECTIONAL MANHOLES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Precast reinforced concrete cylindrical sectional manholes, complete with openings, inserts, hardware,

More information

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS 1. DESCRIPTION THESE SPECIFICATIONS ARE FOR A PRECAST THREE SIDED ARCH STRUCTURE, HEADWALLS

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard

More information

A. Extent of structural precast concrete work is shown on drawings and in schedules.

A. Extent of structural precast concrete work is shown on drawings and in schedules. SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification

More information

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications

More information

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the

More information

SECTION PUBLIC UTILITY MANHOLES AND STRUCTURES. 2. Modular precast concrete pump wetwell. 5. Manhole bedding and cover materials.

SECTION PUBLIC UTILITY MANHOLES AND STRUCTURES. 2. Modular precast concrete pump wetwell. 5. Manhole bedding and cover materials. SECTION 02082 PUBLIC UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Modular precast concrete manholes with tongue-and-groove joints, transition to cover frame, covers,

More information

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute

More information

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP 1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of

More information

SECTION ARCHITECTURAL PRECAST CONCRETE PART 1 - GENERAL

SECTION ARCHITECTURAL PRECAST CONCRETE PART 1 - GENERAL SECTION 03450 - ARCHITECTURAL PRECAST CONCRETE PART 1 - GENERAL 1.01 DESCRIPTION A. Work of this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary

More information

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018 SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO BROOKFIELD NB-500 EXTREME DUTY OPERATOR

SECTION SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO BROOKFIELD NB-500 EXTREME DUTY OPERATOR SECTION 084229.33 SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO BROOKFIELD NB-500 EXTREME DUTY OPERATOR PART 1-GENERAL 1.01 DESCRIPTION A. This section describes

More information

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM). PART 1 - GENERAL 1.1 SECTION INCLUDES A. Benches. B. Trash receptacles. C. Bike storage. 1.2 REFERENCE STANDARDS A. Including but not limited to: 1. American Society for Testing and Materials (ASTM). 1.3

More information

b. B aluminum and aluminum-alloy extruded bar, rod, wire, shape and tube

b. B aluminum and aluminum-alloy extruded bar, rod, wire, shape and tube MODEL 240I SECTION 08120 FLUSH ALUMINUM DOORS AND FRAMES PART I GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required to deliver and install aluminum doors, frames,

More information

Project: # Solano Community College District

Project: # Solano Community College District ADDENDUM #02 Project: #16 007 Solano Community College District Horticulture Site Improvements Date: April 26, 2016 The following clarifications are provided based on questions received or changes in District

More information

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section 02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. 1.2 RELATED WORK SPECIFIED ELSEWHERE.1 Installation

More information

SECTION SWINGING AUTOMATIC ENTRANCES

SECTION SWINGING AUTOMATIC ENTRANCES SECTION 084229.33 SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO IR/DOR-O-MATIC SENIOR SWING & ASTRO SWING OPERATOR PART 1-GENERAL 1.01 DESCRIPTION A. This section

More information

1. Architectural precast concrete cladding units.

1. Architectural precast concrete cladding units. SECTION 034500 - PRECAST ARCHITECTURAL CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Architectural precast concrete cladding units. 1.2 DEFINITION A. Design Reference

More information

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations The following specification refers to the Stepstone, Inc. product known as: Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations Large Scale CalArc Pavers are part of the California Architectural

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available. SECTION 105113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8 September 2013 Page 1 of 8 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of air release chambers, flushout chambers, valve chambers, meter chambers

More information

SECTION COUNTERTOPS ecox PART 1 GENERAL

SECTION COUNTERTOPS ecox PART 1 GENERAL SECTION 11456 COUNTERTOPS ecox PART 1 GENERAL 1.1 SECTION INCLUDES A. Countertops B. Bar tops C. Vanity tops D. Table tops E. Reception counters F. Cash/back wraps G. Transaction counters H. Service counters

More information

SECTION PRECAST HOLLOW CORE PLANKS

SECTION PRECAST HOLLOW CORE PLANKS PART 1 GENERAL 1.1 SECTION INCLUDES A. Roof planks. B. Floor planks. C. Accessories. 1.2 RELATED REQUIREMENTS A. Division 01 General Requirements. SECTION 03 4113 PRECAST HOLLOW CORE PLANKS B. Section

More information

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC STANDARD SPECIFICATION SECTION 05121 MISCELLANEOUS METALWORK PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, fabrication, and installation of structural steel, connecting bolts, pipes,

More information

SECTION ARCHITECTURAL PRECAST CONCRETE

SECTION ARCHITECTURAL PRECAST CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Column covers. 1.2 SUBMITTALS A. Design Mixtures: For each precast concrete mixture. Include compressive strength and waterabsorption

More information

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised

More information

DIVISION 6 WOOD AND PLASTICS

DIVISION 6 WOOD AND PLASTICS DIVISION 6 WOOD AND PLASTICS PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Wood framing. 2. Wood supports. 3. Wood blocking. 4. Wood cants. 5. Wood nailers. 6. Wood furring.

More information

BPDL Architectural precast concrete specifications USA TESTING AND INSPECTION A. Testing by Independent Agency : Materials and workmanship furn

BPDL Architectural precast concrete specifications USA TESTING AND INSPECTION A. Testing by Independent Agency : Materials and workmanship furn BPDL Architectural precast concrete specifications USA 01 PART 1 General 1.1 DESCRIPTION OF WORK The work includes, but is not limited to : 1. Architectural precast concrete 2. Structural design, fabrication,

More information

SECTION SHEET METAL FLASHING AND TRIM

SECTION SHEET METAL FLASHING AND TRIM SECTION 07620 PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Formed roof drainage sheet metal fabrications. 2. Formed low-slope roof sheet metal fabrications. 1.2 SUBMITTALS A. Shop Drawings: Show

More information

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL. METAL FABRICATION SCOPE This specification applies to all metal intended to be rubber lined. Metals furnished must conform to this specification with respect to suitability for rubber lining or covering.

More information

SECTION Display Case Door Series 1301-CM

SECTION Display Case Door Series 1301-CM 1 SECTION 12 3559 Display Case Door Series 1301-CM PART 1 - GENERAL 1.01 SUMMARY A. This section includes: 1. Display Case Glass Doors. 2. Sidelites. B. Related work in other sections: 1. 08 8000- Glazing

More information

B. Terracotta Precast Facade Assembly consisting of single-leaf, through body color terracotta clay tiles.

B. Terracotta Precast Facade Assembly consisting of single-leaf, through body color terracotta clay tiles. SECTION 07 4229 TERRACOTTA CLAY TILE IN PRECAST SPECIFICTION FOR TERRART SOLID PART 1 GENERAL 1.1 SECTION INCLUDES A. Drawings and general provisions of the Contract, including General and Supplementary

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.

More information

Collins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY

Collins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY PART 1 GENERAL 1.1 RELATED SECTIONS SECTION 061000 ROUGH CARPENTRY A. Drawings and general provisions of the Construction Contract, including General Conditions and Division 1 Specification Sections, apply

More information

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS A. Drawings and General Provisions of Contract, including General and Supplementary Conditions and

More information

STRUCTURAL STEEL AND ALUMINUM PART 1 - GENERAL 1.01 SCOPE:

STRUCTURAL STEEL AND ALUMINUM PART 1 - GENERAL 1.01 SCOPE: SECTION 05100 STRUCTURAL STEEL AND ALUMINUM PART 1 - GENERAL 1.01 SCOPE: A. The WORK of this SECTION shall consist of furnishing all the labor, materials, and equipment necessary for installation of structural

More information

SECTION TRAFFIC SIGNAGE

SECTION TRAFFIC SIGNAGE SECTION 10 14 53 TRAFFIC SIGNAGE PART 1 - GENERAL 1.01 SECTION INCLUDES A. Furnishing and installing roadside traffic signage. B. Providing additional traffic signs as required in Sections 01 55 28 Controlling

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

14 March 2016 City Hall Station Renovations Bid Documents 15 th Street Station Phase Station Improvements SECTION PRECAST CONCRETE

14 March 2016 City Hall Station Renovations Bid Documents 15 th Street Station Phase Station Improvements SECTION PRECAST CONCRETE SECTION 03400 PRECAST CONCRETE PART 1 GENERAL 1.01 DESCRIPTION A. The work specified in this Section consists of designing, furnishing and installing precast concrete components. 1.02 RELATED SECTIONS

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation

More information

NITTERHOUSE CONCRETE PRODUCTS, INC Molly Pitcher Highway South Chambersburg, PA

NITTERHOUSE CONCRETE PRODUCTS, INC Molly Pitcher Highway South Chambersburg, PA NITTERHOUSE CONCRETE PRODUCTS, INC. 2655 Molly Pitcher Highway South Chambersburg, PA 17201 717-267-4505 GUIDE SPECIFICATION FOR ARCHITECTURAL PRECAST CONCRETE INDEX Page PART I - GENERAL...1 A. DESCRIPTION...1

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo 2016 Specification Treads, Base, Stringers and other Amenities 09400 Wausau Tile Precast Epoxy Terrazzo PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to complete, as indicated by the Contract

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

SECTION HOLLOW METAL DOORS AND FRAMES

SECTION HOLLOW METAL DOORS AND FRAMES SECTION 081113 HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: Include construction details, material

More information

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

3400 Tectura Designs Precast Concrete

3400 Tectura Designs Precast Concrete 3400 Tectura Designs Precast Concrete PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to furnish and complete the proper installation of precast concrete. B. Types of Precast Concrete work include:

More information

1. INTRODUCTION 2. REFERENCE SPECIFICATIONS. Page -1- Bonding and Grouting

1. INTRODUCTION 2. REFERENCE SPECIFICATIONS. Page -1- Bonding and Grouting Page -1-1. INTRODUCTION 1.1 Scope This specification covers non-shrink and epoxy grouting of structural column base plates and equipment bases, Portland cement grout for minor elements and bonding agents

More information

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY SECTION 07312 PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This Section Includes the following: 1. Endureed Dominica PVC thatch shingles. 2. Self- adhering sheet underlayment. B. Related

More information

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid

More information

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE Installation Instructions PART Y015 JUNE 2016 Table of Contents Section 1. GENERAL NOTES AND GUIDELINES... 2. DOOR HARDWARE A. Locks B. Push/Pulls

More information

How to Estimate the Cost of a. Precast Concrete Parking Structure

How to Estimate the Cost of a. Precast Concrete Parking Structure How to Estimate the Cost of a Precast Concrete Parking Structure 1 TABLE OF CONTENTS 1. INTRODUCTION 2. TYPES AND METHODS OF MEASUREMENT 3. SPECIFIC FACTORS THAT MAY AFFECT TAKE OFF AND PRICING 4. OVERVIEW

More information

SECTION SHEET METAL FLASHING AND TRIM

SECTION SHEET METAL FLASHING AND TRIM SECTION 07620 SHEET METAL FLASHING AND TRIM PART 1 GENERAL 1.1 SUMMARY A. Section includes flashings and counterflashings, sheet metal roofing and fabricated sheet metal items, as indicated in Schedule.

More information

SECTION MANUFACTURED CASEWORK

SECTION MANUFACTURED CASEWORK 1 GENERAL 1.1 SECTION INCLUDES SECTION 12300 MANUFACTURED CASEWORK A. Work required to complete the manufactured casework indicated by the Contract Documents, and the items necessary for its proper installation.

More information

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification. Cast Iron Slide Gates Spec Sheet General The contractor shall furnish and install the following cast iron slide gate assemblies as listed on the Gate Schedule and detailed on the manufacturer s drawings.

More information

Product Guide Specification

Product Guide Specification Shield Casework February 2014 3421 Merriam Lane Overland Park, Kansas 66203 Phone 913-744-2183 Fax 913-384-3477 Website www.shieldcasework.com E-mail info@shieldcasework.com Product Guide Specification

More information

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

SCI-FAB Product Specifications. Casework Section 1. Part 1 General SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.

More information

Chevy Chase Club June 30, 2008 Bowie Gridley Architects

Chevy Chase Club June 30, 2008 Bowie Gridley Architects SECTION 081433 - STILE AND RAIL WOOD DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION CHAIN LINK FENCING

SECTION CHAIN LINK FENCING SECTION 32 31 13 CHAIN LINK FENCING PART 1 - GENERAL 1.01 SECTION INCLUDES A. The Work specified in this Section consists of furnishing and installing permanent chain link fences and gates in accordance

More information

Design and Construction Standards SECTION ATHLETIC LOCKERS

Design and Construction Standards SECTION ATHLETIC LOCKERS SECTION 10505 ATHLETIC LOCKERS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The provisions of the General Conditions, Supplementary Conditions, and the Sections included under Division 1, General Requirements,

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION METAL LOCKERS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION METAL LOCKERS PART 0 A/E INSTRUCTIONS 0.01 GENERAL DESIGN REQUIREMENTS A. Architect shall coordinate with the DPS Project Manager the type, layout and size of lockers required on the project. B. Varsity athletic Lockers

More information

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"

More information

UNDERGROUND UTILITY TRENCHES AND VAULTS Page 1 of 6 ADDENDUM #1

UNDERGROUND UTILITY TRENCHES AND VAULTS Page 1 of 6 ADDENDUM #1 Page 1 of 6 ADDENDUM #1 PART 1 GENERAL 1.01 PRINCIPAL WORK IN THIS SECTION A. The requirements of the Owner's General Conditions, Supplementary Conditions, Special Conditions, and Division 1 - General

More information

1.1 RELATED DOCUMENTS

1.1 RELATED DOCUMENTS SECTION 050505 -BEVEL RAIL ENDS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 Specification Sections

More information

Testing. Material testing will be according to applicable AASHTO, ASTM or Department methods as specified.

Testing. Material testing will be according to applicable AASHTO, ASTM or Department methods as specified. 907.01 Section 907. FENCING MATERIALS 907.01 General Requirements. Materials for use in fencing property, right-of-way and other installations must comply with this section. 907.02 Testing. Material testing

More information

SECTION G ESTIMATE OF QUANTITIES

SECTION G ESTIMATE OF QUANTITIES PROJECT STATE OF SOUTH DAKOTA NH 2115(45)87 SHEET G2 TOTAL SHEETS G27 SECTION G ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 560E0068 7'x3' Precast Concrete

More information

SECTION WOOD DOORS

SECTION WOOD DOORS SECTION 08211 WOOD DOORS Notice to Vendors: CANV prefers to purchase products that contain tropical wood only if they are certified according to the guidelines of the Forest Stewardship Council (FSC).

More information

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION PAGE 032015-1 SECTION 032015 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

SECTION SAND CUSHION TERRAZZO FLOORING

SECTION SAND CUSHION TERRAZZO FLOORING SECTION 09 66 13.13 SAND CUSHION TERRAZZO FLOORING THIS GUIDE SPECIFICATION HAS BEEN PREPARED BY THE NATIONAL TERRAZZO AND MOSAIC ASSOCIATION, INC., AND IS DISTRIBUTED FOR USE BY ITS MEMBERS AND DESIGN

More information

SECTION CHAIN LINK FENCING AND GATES

SECTION CHAIN LINK FENCING AND GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor, equipment and incidentals required to provide chain link fencing and gates as Shown on the Contract Drawings

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 101400 - SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and supplementary Conditions and Division-1 Specification Sections,

More information

SECTION PRE-MANUFACTURED CABINETS

SECTION PRE-MANUFACTURED CABINETS SECTION 12390 PRE-MANUFACTURED PART 1 GENERAL 1.1 DESCRIPTION OF WORK A. The work includes furnishing all labor, materials and equipment required to complete the Pre-Manufactured Cabinet work as shown

More information

GENERAL ISOMETRIC LAYOUT

GENERAL ISOMETRIC LAYOUT EXISTING OR PROPOSED WIPER WALL SUPPORT STRUCTURE GATE LID CARBATHAN HG 0 WEB GRAY LOWER PAN GRATING ALUMINUM WIPER WALL CARBATHANE HG, 90 GRAY STRUCTURAL SPECIFICATIONS:. FLOODGATE MATERIAL TO BE ALUMINUM

More information

SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS

SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS 8.01 - Page i UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS Table of Contents SECTION

More information

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,

More information

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations. General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings

More information

Stop Gates & Stop Logs. Series 500. ine. Manufacturing high quality gates since 1977

Stop Gates & Stop Logs. Series 500. ine. Manufacturing high quality gates since 1977 Stop Gates & Stop Logs Series 500 Manufacturing high quality gates since 1977 ine Stop Gates & Stop Logs Series 500 Contents Stop Gate Introduction 3 Model 501 3 Model 503 4 Model 503-C 4 Stop Gate Specification

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SHEET METAL FLASHING AND TRIM Christ on the Mountain

SHEET METAL FLASHING AND TRIM Christ on the Mountain SECTION 076200 - SHEET METAL FLASHING AND TRIM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Compatibly with the bumping of flashings and trim as identified in the Membrane Roofing Section 075000.

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

4. Metal roof jacks at penetrations and attachments

4. Metal roof jacks at penetrations and attachments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -

More information

A. Deviation from this standard must be approved by the Project Architect.

A. Deviation from this standard must be approved by the Project Architect. September 2012, rev. 00 26 5600 Exterior Lighting PART 1. GENERAL 1.01 Related Documents A. Deviation from this standard must be approved by the Project Architect. B. Drawings and general provisions of

More information

W DESIGN ASSOCIATES. Consulting Engineers & Architects McCook, Nebraska Hastings, Nebraska 68901

W DESIGN ASSOCIATES. Consulting Engineers & Architects McCook, Nebraska Hastings, Nebraska 68901 Consulting Engineers & Architects McCook, Nebraska 69001 Hastings, Nebraska 68901 ACME BUILDING DEVELOPMENT ADDENDUM NO. 1 SOUTHERN BELL HEARTLAND LLC HASTINGS, NEBRASKA WDA PROJECT #614-18 I. INSTRUCTIONS

More information

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series SECTION 31 66 13 HELICAL PILES AND HELICAL ANCHORS PART 1 - GENERAL 1.1 DESCRIPTION A. This work pertains to furnishing and installing Helical Piles and Bracket Assemblies shown in the Contract in accordance

More information

Toll-Free

Toll-Free Primary applications for Ross DS Series Security Doors and Frames include government, industrial, commercial and residential properties where protection of people and property is of utmost concern and

More information

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves.

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. Section 02520 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment is on a unit price basis

More information

C. HMMA 863: Guide Specifications for Detention Security Hollow Metal Doors and Frames

C. HMMA 863: Guide Specifications for Detention Security Hollow Metal Doors and Frames SECTION 083463 DETENTION DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

OSE Submittal July 20, 2018

OSE Submittal July 20, 2018 SECTION 055000 - METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

PART MATERIALS. Section Fencing Materials. Description

PART MATERIALS. Section Fencing Materials. Description PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain

More information

STRUCTURES FOR SANITARY AND STORM SEWERS

STRUCTURES FOR SANITARY AND STORM SEWERS SUDAS Standard Specifications Division 6 - Structures for Sanitary and Storm Sewers Section 600 - Structures for Sanitary and Storm Sewers STRUCTURES FOR SANITARY AND STORM SEWERS PART - GENERAL.0 SECTION

More information