ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.
|
|
- Gary Carroll
- 5 years ago
- Views:
Transcription
1 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY, FLORIDA ADDENDUM DATE: August 17, 2017 Bidders on the Project are hereby notified that this Addendum shall be attached to and made a part of the above-named Contract Documents and Specifications. These items shall have full force and effect as the Contract Documents and Specifications and cost involved shall be included in the bid prices. Bids to be submitted on the specified bid date shall conform with the additions/deletions/revisions listed herein. LIST OF ATTACHMENTS 1. Pre Bid Meeting Sign In Sheet. 2. Concrete Pipe Support Detail SPECIFICATIONS 1. See Questions/Responses DRAWINGS 1. See Questions/Responses CLARIFICATION 1. None IN THE CONTRACT DOCUMENTS 1. None QUESTIONS/RESPONSES Q1. Section Measurement and Payment, 1.05 C2, Bid Item #3 calls for Sludge Draw Off Piping to be 6" SCH10 304L SS Piping, however the pipe schedule on Drawing P 22 calls for ductile iron. Please clarify. The Sludge Draw Off Piping shall be ductile iron. Revise Section C.2 to state that the Sludge Draw Off Piping shall be ductile iron. Page 1
2 Q2. Does the air supply piping require insulation? No. Q3. Drawing P 12, Section A, note calls for Contractor to provide pipe supports, see structural sheets. There is no detail for the 12" AS Pipe. Please provide. See concrete pipe support detail attached to this addendum. Q4. Section Process Piping and Valves, Section 2.06 B, the butterfly valve specification calls for flanged ends, the butterfly valve schedule calls for welded connection for 6 inch and 3 inch valves. Please clarify. Butterfly valves shall have flanged ends. Revised valve schedule on Drawing P 22 to state that butterfly valves shall have flanged ends. Q5. Section Process Piping and Valves, D.1 calls for stainless steel pipe greater than 3 inch diameter type 304L, Schedule 5. However, the pipe schedule calls for Schedule 10. Please clarify. Stainless steel pipe shall be Schedule 10. Revise Section D.1 to state that stainless steel pipe shall be Schedule 10. Q6. The air supply system is drawn with welded fittings, however the pipe schedule calls for flanged fittings. Please clarify. Air piping shall be welded. Revised valve schedule on Drawing P 22 to state that air piping is to be welded. Q7. Please provide a specification for the check valves. The following shall be added to Specification Section 15200, Paragraph E. Check Valves 1. Check valves shall be resilient seat swing check valves meeting the material requirements of AWWA C508. The valve body shall be ductile iron per ASTM Standards A536 grade and the valve disc shall be a carbon steel core completely encapsulated with EPDM. Bonnet bolts shall be 304/316 stainless steel. Body and bonnet shall have fusion bonded epoxy coating on interior and exterior complying with AWWA C550. Hinge and hinge pin shall be 316 stainless steel. O rings shall be Nitrile Buna N. All internal exposed metal shall be stainless steel. 2. The valve shall be pressure rated for 175 psi (minimum) working water pressure. Ends shall be 125 pound ANSI B16.1 flanges. 3. Factory Mutual Approved (FM) and Underwriter Laboratory Listed (UL) as noted by (UL/FM). Shall have UL, FM mark displayed visibly and permanently on the valve. Page 2
3 4. The valve shall have a resilient seat that is drop tight, even at low pressures. The valve shall also have no obstructions in the flow path for a 100% clear waterway. 5. Valves shall be constructed so that the disc, hinge, and bonnet can be removed as one assembly. 6. Valves shall be furnished with an outside lever and weight. 7. Resilient Seat Swing Check Valve shall DeZurik/APCO, American AVK, Pratt, Clow, or equal. Q8. What is the elevation for the plug valve PV on Detail 3, Drawing P 3? Elevation of Plug Valve PV is the same as the existing aboveground piping that it will be connected to. Q9. Drawing P 2 calls for plug valves PV 16 01, PV 14 01, PV 14 02, PV 08 01, PV 09 04, and PV to be for WAS, however Drawing P 7 shows the line to be sludge draw off piping with different tag numbers. Please clarify. Based on Drawing P 2 valve tag numbers, the following are WAS and Sludge Draw Off Valves: WAS: PV 09 03, PV 10 03, PV and PV Sludge Draw Off: PV 08 01, PV 09 04, PV 09 05, PV 10 01, PV 10 02, PV 14 01, PV 14 02, and PV Revise valve tag numbers in Drawing P 7 and the valve schedule in Drawing P 22 accordingly. Q.10 We are unable to locate check valve CK PS 01 at the Intermediate PS as shown on the valve schedule. Please advise. The check valve at the Intermediate PS (CK PS 01) is from a previous design that was inadvertently left on the valve schedule. Delete check valve CK PS 01 from the valve schedule on Drawing P 22. Q.11 Hudson Pump & Equipment is the Florida distributor for Crane Pumps & Systems. Their application manager carefully reviewed Section and confirmed that the Barnes 4SHDF solids handling pump will meet or exceed the specification. We have therefore prepared a concise package of information that includes a pump selection for this application. We request consideration to be added as an acceptable manufacturer by addendum. A more complete pre submittal package can be supplied. Per Article of the Instructions to Bidders (Section 00100), substitute or or equal items of material or equipment will only be considered after the Effective Date of the Agreement. Page 3
4 Q12. I noticed in the Pre Bid Notes from our Employee, that you stated Completion Time as Substantial=330 Days & Final=365 Days In your ITB, you state that it is only 360 Days NOT 365 Days Which is correct. Contract times shall be per Article 11 of Section 00100, Instructions to Bidder. Page 4
5
6
7 8010 Woodland Center Boulevard Suite 1200, Tampa, FL / FAX: Certificate of Authorization No.: relationships on a foundation of excellence
SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2
SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.
More informationSection COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe.
PART 1 GENERAL 1.01 SUMMARY Section 15155 This Section covers couplings and coupling adapters for ductile iron and steel pipe. 1.02 MEASUREMENT AND PAYMENT A. No separate payment for Work performed under
More informationCITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves.
Section 02520 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment is on a unit price basis
More informationThis specification describes the minimum requirements for piping systems for the following service:
201/11/2 1/9 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Underground Service Water Note: This specification does not apply to piping
More informationADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions
More informationJoint Restraints/ Bell & Spigot Joint/ New & In-Service Installations (2" IPS PVC Pipe)
C 1 C 1.1 Joint Restraints/ Bell & Spigot Joint/ New & In-Service Installations (2" IPS PVC Pipe) Joint Restraints/ Bell & Spigot Joint/ New & In-Service Installations (AWWA C-900 PVC Pipe) C 1.1.1 Joint
More informationPALM COAST WASTEWATER TREATMENT PLANT NO. 2
ITB-CD-CME--0 ADDENDUM NO. PALM COAST WASTEWATER TREATMENT PLANT NO. ISSUE DATE: December 0, 0 BID DATE: January 0, 0 SUBJECT: Statements, Questions and Answers INTENT: This addendum is issued prior to
More informationThis specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.
SPEC-3500 1/9 1.0 PURPOSE This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. Note: This specification does
More informationAnticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationQUALITY ASSURANCE SPECIFICATION
Page 1 of 8 QAS: 2.02 QUALITY ASSURANCE SPECIFICATION REVISION: 0 DATE: 08/29/14 MATERIAL PURCHASING Code Material Purchase Specification for Pipe, Valves, Fitting, and Flanges PAGE 1 OF 8 1.0 Purpose
More informationHUSSEY GAY BELL SAVANNAH, GEORGIA
HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
More informationSECTION MANHOLES
SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard
More informationThis specification describes the minimum requirements for piping systems for the following service:
SPEC-3004 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Water Design Conditions Operating Conditions 10 PSIG @ 33 o F to
More informationJune 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA
June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 5 BID NO. Y14-792 PH IFB EAST SERVICE AREA POTABLE WATER AND RECLAIMED WATER STORAGE AND REPUMP FACILITY BID OPENING: June
More informationSECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section
02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,
More informationADDENDUM NO. 02 July 31, 2012
Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON
More informationHYDRONIC PIPING
SECTION 23 21 13 HYDRONIC PIPING PART 1 GENERAL 1.01 SECTION INCLUDES A. Hydronic system requirements. B. Heating water piping, above grade. C. Chilled water piping, above grade. D. Condenser water piping,
More informationMEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C
MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C Revised October 2007 Armtec reserves the right to alter designs. General The Armtec Sluice Gate is a quality and highly economical gate for a variety of
More informationProduct Guide Specification
HALFEN USA Inc. March 2012 8521 FM 1976 P.O. Box 547 Converse, TX 78109 Toll Free 800-423-9140 Fax 888-277-1695 Website www.halfenusa.com E-mail info@halfenusa.com Product Guide Specification Specifier
More informationAF-4 Grooved Flange Adapter
SUBMITTAL INFORMATION PROJECT NAME: ENGINEER: CONTRACTOR: SPEC. SECTION: MEMBER FEATURES & ADVANTAGES Designed for connecting ANSI/AWWA C110/A21.10 and ASME/ANSI B16.1 Class 125/ flanged end components
More informationSECTION BASIC MATERIALS AND METHODS
SECTION 15050 BASIC MATERIALS AND METHODS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and Fittings. 1.02 RELATED SECTIONS A. Basic Mechanical Requirements: Section 15010. B. Supports, Anchors, and Seals:
More informationTG Glazing Design-Build
TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011
More information1. ASME A Scheme for the Identification of Piping Systems.
SECTION 40 05 53 - IDENTIFICATION FOR PROCESS PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe markers. 5. Labels. 6. Lockout devices. B. Related Requirements:
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130
PART 1 GENERAL 1.01 SUMMARY Section 15130 PRESSURE GAUGES, This Section includes the furnishing and subsequent installation of pressure gauges and pressure level transmitters as shown on Plans and specified
More informationRodney Hunt. A GA Industries Company Glydaseal Gates
Rodney Hunt A GA Industries Company Glydaseal Gates GUIDE BRONZE GUIDE BAR FRAME NUT POCKET SEAT FACING RESILIENT INVERT SEAT DISC GUIDE BAR ADJUSTMENT BOLT WITH LOCK NUT GUIDE BAR ATTACHING BOLT The Glydaseal
More informationThis specification describes the minimum requirements for piping systems for the following service:
201/01/13 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Air Design Conditions Operating Conditions Blast Air (see Note 1)
More informationSECTION PANELBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section
More informationState College of Florida, Manatee-Sarasota
State College of Florida, Manatee-Sarasota SCF Venice Chiller Plant Upgrade Project FAC2017-58 Project No. 7-17-2-11 and 3-17-2-12 ADDENDUM NUMBER #1 Date: December 4, 2017 NOTE: THIS ADDENDUM SHOULD BE
More informationSoftware Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationStandard Specifications
Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and
More informationThis addendum forms a part of the Contract Documents dated: August 10, 2012.
Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911
More informationWe Are the Worldwide Provider for All Your Valve and Fitting Needs
Product Catalog We Are the Worldwide Provider for All Your and Fitting Needs C&C strives to earn your business by offering an extensive line of high quality products with a proven track record for successful
More information.1 Materials and installation for steel piping, valves and fittings for hydronic systems in building services piping..2 Related Sections.
Issued 2006/08/01 Section 15183 Hydronic Systems: Steel Page 1 of 6 PART 1 GENERAL 1.1 SUMMARY.1 Section Includes..1 Materials and installation for steel piping, valves and fittings for hydronic systems
More informationSPECIFICATION STEEL COUPLING MODEL 411
Sleeve Bolt Nut Follower Gasket 1/2 2 TWO BOLT 3 12 HIGH STRENGTH 2 12 SMALL O.D. 14 60 LARGE O.D. APPLICATIONS Typical Uses Joining plain-end pipe of same outside diameters Replace split or excessively
More informationB. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.
McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT
More informationSECTION PRECAST CONCRETE STRUCTURES
SECTION 02605 PRECAST CONCRETE STRUCTURES PART 1 GENERAL 1.01 DESCRIPTION A. CONTRACTOR shall provide all professional services, labor, materials, equipment and incidentals as shown, specified and required
More informationCITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT
CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS For EQUIPMENT FOR THE 2014 CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT:
More informationPipe Restraints and Adapter Flanges. Section U. For PVC, Ductile Iron and Steel Pipe. 09/2017 Web Revision
DQS Inc. THE FORD METER BOX COMPANY, INC. CERTIFIED TO ISO 9001:2015 10004466 Section U 09/2017 Web Revision 11-29-17 Restraints and Adapter Flanges For PVC, Ductile Iron and Steel Contents Applications
More informationARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)
ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.
More informationUL / FM E-1 FIRE PROTECTION PRODUCTS INDICATOR POST FEATURES. *Applies to "ORDER LENGTH" codes B through F; code A has 22" adjustment.
UL / FM MUELLER Indicator Post are used in fire protection systems and perform several functions. The Indicator Post provides a means to operate a buried or otherwise inaccessible valve. Also, the Indicator
More informationPioneers in Gate Design
Stop Logs Pioneers in Gate Design Hydro Gate 3888 E. 45th Ave. #120 Denver, CO 80216 Your Source for Water Control Gates No matter what type of gates your project demands, chances are excellent Hydro Gate
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCESA / NASA UFGS-33 34 13 (April 2008) -------------------------- Preparing Activity: USACE Superseding UFGS-33 34 13 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationSECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1 PROJECT: Miraloma Elementary School DATE: March 24, 2016 175 Omar Way, SF,
More informationNovember 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT
November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated
More informationThis specification describes the minimum requirements for piping systems for the following service:
SPEC-3501 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Instrument Air Design Conditions 150 PSIG @ 180 F Operating Conditions 125
More informationFIRE PROTECTION PRODUCTS
FEATURES Rev. 7-11 Mueller Indicator Post are used in fire protection systems and perform several functions. The Indicator Post provides a means to operate a buried or otherwise inaccessible valve. Also,
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-12 36 00.00 20 (August 2011) --------------------------------- Preparing Activity: NAVFAC Superseding UFGS-12 36 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationSECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationCLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.
June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,
More informationFUEL GAS PIPING SECTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section.
FUEL GAS PIPING SECTION 15355 PART 1 GENERAL 1.1 DESCRIPTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section. B. This specification covers both interior and exterior
More informationSECTION TRACER WIRE FOR NONMETALLIC PIPE
PART 1 GENERAL 1.1 DESCRIPTION A. The CONTRACTOR shall furnish and install a conductive tracer wire with all buried plastic water mains, services and appurtenances in accordance with the Water Utilities
More informationMSU Barnard Hall 105 Cleanroom Installation PPA # Page 1
ADDENDUM NUMBER 1 DATE: February 10, 2017 PROJECT: MSU Barnard Hall Room 105 Cleanroom Installation PPA# 16-0002 (Consulting Design Solutions, Inc. Project # 1613) BID DATE: February 23, 2017 2:00 PM,
More informationSTANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines.
STANDARD PHRASEOLOGY SECTION G 1. This section of standard phraseology is for general use in piping disciplines. Hydrostatically test, using at PSIG for a minimum of minutes. Allowable leakage: None. G1
More informationSECTION BULLET- RESISTANT DOORS
1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...
More informationPage 1 of 12 Second Revision No. 5-NFPA 12-2014 [ Section No. 2.3.4 ] 2.3.4 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C 700, West Conshohocken, PA 19428-2959. ASTM A53, Standard
More informationBID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS
BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS March 17, 2016 To prospective bidders & others concerned: This addendum sets forth changes and/or information
More informationFIELD LOK 350. Gasket 4" 24" JOINT RESTRAINT NSF FOR WATER & WASTEWATER, FIRE PROTECTION & INDUSTRIAL APPLICATIONS. Certified to ANSI/NSF 61
4" 24" FIELD LOK 350 JOINT RESTRAINT Gasket FOR WATER & WASTEWATER, FIRE ROTECTION & INDUSTRIAL ALICATIONS 4" 24" FIELD LOK 350 Gasket 2 Table of Contents FIELD LOK 350 Gasket 3 Assembly 4 Alternative
More informationCS3 represents manufacturers of products for use in the municipal waterworks industry.
Brian Drexel & Rob Grier WWW.CS3WATERWORKS.COM Established in 2000, CS3 Waterworks is a Florida Based company with offices in Orange Springs Florida and Savannah Georgia. CS3 represents manufacturers of
More informationSECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Benches. B. Trash receptacles. C. Bike storage. 1.2 REFERENCE STANDARDS A. Including but not limited to: 1. American Society for Testing and Materials (ASTM). 1.3
More informationStormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18
StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationSECTION METAL FABRICATIONS
SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM
More informationThe Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8
September 2013 Page 1 of 8 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of air release chambers, flushout chambers, valve chambers, meter chambers
More informationEssex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationSECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP
1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of
More informationDesign and Construction Standards SECTION ATHLETIC LOCKERS
SECTION 10505 ATHLETIC LOCKERS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The provisions of the General Conditions, Supplementary Conditions, and the Sections included under Division 1, General Requirements,
More informationSECTION FUEL OIL SYSTEM (PLUMBING)
SECTION 15484 FUEL OIL SYSTEM (PLUMBING) PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-In-Place Concrete. 3. 15410 -
More informationUFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCESA / NASA UFGS-27 05 28.36 40 (August 2011) ----------------------------------- Preparing Activity: NASA Superseding UFGS-27 05 28.36 40 (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationSYGEF Standard SYGEF Plus PVDF Flanges
Installation Instructions 2009 Volume, Rev 02 PM451 SYGEF Standard SYGEF Plus PVDF Flanges Please read all instructions before attempting to install flanges. Introduction When to Use a Flange Flanges may
More informationSECTION PRECAST CONCRETE SECTIONAL MANHOLES
SECTION 02545 PRECAST CONCRETE SECTIONAL MANHOLES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Precast reinforced concrete cylindrical sectional manholes, complete with openings, inserts, hardware,
More information2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.
General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings
More informationMontclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017
Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (February 2009) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (January 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationFIELD LOK 350 Gasket 4" 24"
FIELD LOK 350 Gasket JOINT RESTRAINT FOR WATER & WASTEWATER, FIRE PROTECTION & INDUSTRIAL APPLICATIONS NSF P 2 Table of Contents FIELD LOK 350 Gasket 3 Assembly 4 Alternative Assembly Methods 7 Pipe Diameters
More informationSECTION HOLLOW METAL DOORS AND FRAMES
PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 08 11 13 HOLLOW METAL DOORS AND A. Non-fire-rated hollow metal doors and frames. B. Hollow metal frames for wood doors. C. Fire-rated hollow metal doors and
More informationAttached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.
Dear Sir/Madam: Attached is Addendum No. 2 to SEPTA Sealed Bid 17-00222-APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. The Bid due date and time is changed from Thursday, Nov.
More informationA. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures.
SECTION 22 05 16 LOOPS FOR PLUMBING PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-27 05 28.36 40 (May 2017) --------------------------------- Preparing Activity: NASA Superseding UFGS-27 05 28.36 40 (August 2014) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationSECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION
PAGE 032015-1 SECTION 032015 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationStormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17
StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications
More informationWTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE
WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION
More informationRESIDENTIAL ROOFS ADDENDUM NUMBER ONE. August 28, 2017
RESIDENTIAL ADDENDUM NUMBER ONE August 28, 2017 The following additions to, deletions from, and clarifications of the Contract Documents govern insofar as they apply and shall take precedence over those
More informationNAVSEA STANDARD ITEM T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods
NAVSEA STANDARD ITEM ITEM NO: 009-48 DATE: 29 JUL 2011 CATEGORY: II 1. SCOPE: 1.1 Title: Pressure Seal Bonnet Valve; repair (shop) 2. REFERENCES: 2.1 S9086-CJ-STM-010/CH-075, Fasteners 2.2. T9074-AS-GIB-010/271,
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationThe Redi-Flange Method. How It Works. Services. Engineering & Costing Assistance
... g n ldi ng... e i W No hread ing! T oov o N Gr o N The Redi-Flange Method Redi-Flange is a method of joining valves, fi ttings and equipment with integral fl anged ends to plain-ended pipe, with all
More informationADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015
ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the
More informationProject: # Solano Community College District
ADDENDUM #02 Project: #16 007 Solano Community College District Horticulture Site Improvements Date: April 26, 2016 The following clarifications are provided based on questions received or changes in District
More informationMulti-Set II Drop-In Anchors
CONCRETE ANCHORING SPECIALISTS Internally Threaded Heavy- Duty Anchoring Systems DESCRIPTION/SUGGESTED SPECIFICATIONS Drop-In, Shell-Type Anchors SPECIFIED FOR ANCHORAGE INTO CONCRETE Drop-In, shell-type
More informationSAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: May 21, 2015 BID NO.: 15-7031 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.
More informationSECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.
SECTION 23 05 53 IDENTIFICATION OF HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes nameplates, tags, stencils and pipe markers. B. Related Sections: 1. Section 09 05 00 Common
More informationPIP STF05121 Anchor Fabrication and Installation Into Concrete
June 2017 Structural PIP STF05121 Anchor Fabrication and Installation Into Concrete PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this
More informationSTANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines.
STANDARD PHRASEOLOGY SECTION G 1. This section of standard phraseology is for general use in piping disciplines. Hydrostatically test, using at PSIG for a minimum of minutes. Allowable leakage: None. G1
More informationCITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE
San Francisco Water Power Sewer SOUTHEAST WATER POLLUTION CONTROL PLANT BUILDINGS 040, 041, 044, 060, 061, 062, 925, AND 960 MECHANICAL IMPROVEMENTS CONTRACT NO. WW-654 ADDENDUM NO. 3 Signatures: 9i;,.,,:.._\
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationCITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST
CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,
More informationFor crossing under a railroad, contact the specific railroad company's engineering department.
PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure
More information