ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

Size: px
Start display at page:

Download "ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030"

Transcription

1 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions are hereby made a part of the Contract Documents for the aforementioned Project as fully and completely as if the same were fully set forth therein: A. PART 1 BIDDING REQUIREMENTS There are no changes to the Bidding Requirements. B. PART 2 CONTRACT FORMS There are no changes to the Contract Forms in this Addendum. C. PART 3 CONTRACT CONDITIONS There are no changes to the Contract Conditions in this Addendum. D. PART 4 SPECIFICATIONS 1. DELETE the existing first line item of Section Concrete Finish Schedule paragraph 3.05 and INSERT the following: 2. MODIFY Section paragraph 1.04 B General Sequence Phase 2 on page 12 to paragraph 1.04 C General Sequence Phase ADD the following to the end of the first sentence of Section E:, unless as otherwise shown of the Drawings.

2 4. ADD the following to the end of second to last sentence of Section A: For air service piping and for conditions specified in Section 15390, Schedules for water service. 5. ADD the following to the end of each sentence of Section B 5: And unless otherwise specified in Section 15390, Schedules. 6. ADD Section 16476, Enclosed Circuit Breakers included in this addendum. 7. Section CONTROL AND INFORMATION SYSTEMS SCOPE AND GENERAL REQUIREMENTS, 1.04 A after Lord & Company, Inc, and before or Micro-Tech Designs, Inc. INSERT Optimum Controls Corporation,. E. PART 5 DRAWINGS 1. MODIFY Note C-3. D on Drawing S01 from Class B Concrete (4,000 psi) to Class B Concrete (3,000 psi). 2. ADD the following note 5 to Drawing E251: 5. Power monitor shall be provided adjacent to the panelboard in a NEMA 1 enclosure. Power monitor shall be a Power Monitor 500 by Allen-Bradley, with Ethernet/IP communication. No other power monitor will be accepted. 3. Site Plan Amendment Courtland Pump Station Sheet 1 to 18: CHANGE ALL references from PVC SAN to DIP SAN. 4. Site Plan Amendment Courtland Pump Station Sheet 1 to 18: DELETE 8 Isolation Valve on 8 DIP SAN upstream of Manhole Number Site Plan Amendment Courtland Pump Station Sheet 8, Waterline C Phase 1, CHANGE 2 DIP WATERLINE C to 2 COPPER WATERLINE C. END OF ADDENDUM

3 QUESTIONS AND ANSWERS NO On drawing E251 the one line riser diagram shows a power monitor. I did not see a specification for this. Please advise if there will be a specification issued for the power monitor. Please see this Addendum, note was added on Drawing E Note 1 on Drawing C21 provides the location of a waterline isolation valve for this site. Specification B-7 requires a wet tap, in order to connect the new waterline. Is a wet tap required, or can the connection be performed during a short-term waterline shutdown? A wet tap is required for the connection to the existing water line. 3. Per Note 2 on Drawing C22, the Contractor is responsible for all fees required for water meter installation. Please clarify of this includes permit fee, meter cost, water availability charge, and sewer availability charge. Also, what model meter is required? Contractor is responsible for paying the Meter Cost and Permit Fee. The meter model is referenced in detail W-27 (2 OMNI C2 Meter). 4. Drawing C22 seems to depict a new 2 water meter inline on the 6 PW main. Will this be allowed with a fire hydrant downstream from the meter? Should there be a 2 branch, off of the 6 main, that is metered and feeds the pump station? This arrangement is allowed. The hydrant is provided for pump station flushing activities. 5. Please provide as-built drawings of the existing WRF to be demolished during Phase II construction. Current DM series drawings provide inadequate information for assessing the characteristics of the existing structure and analysis of scope and cost of the building and below grade demolition. Moreover, the detail of existing building perimeter wall and foundation is required to assess the need of potential temporary support during construction of Phase 1 Activities. Courtland Farms Water Reclamation Facility drawings by Pinnacle Design and Consulting dated September 16, 2003 and revised on March 2, 2004 are attached to this Questions and Answers as INFORMATIONAL ONLY and not included as part of the Contract. 6. Drawing C21 Note 4 indicates protect and maintain exiting utilities with a leader pointing to each of two lines entering the existing facility on the south end. Please confirm the outer most second line is actually an easement demarcation and not actually an underground utility to be protected. One of the arrows referencing note 4 on sheet C21 is pointing to the easement demarcation.

4 7. Section A prescribes the use of blasting or explosives will not be allowed. Please confirm. Confirmed. Blasting is prohibited on this Project. 8. Earthwork Section Select Fill Paragraph A implies that soils from excavations may be suitable for use, among other, as structural subgrade support. However, under the same section and within paragraph E, the requirement appears that all subgrade support shall be coarse aggregate as specified in Section Aggregates, please advise. Structural subgrade support shall be coarse aggregate material, meeting the requirements of 2.01.E. 9. Earthwork Paragraph E indicates all structures shall bear on an aggregate base of stone not less than 6. Many drawing sections clearly indicate the requirement of a 3 mud mat and no mention or detail of a stone base. Please advise. Please see this Addendum. 10. Earthwork Paragraph I prescribe methods of odor abatement when uncovering sludge contaminated and odorous material in excavation. Insofar as this specification is included, the Owner must anticipate that contaminated and odorous material will be exposed during excavations. Accordingly, please provide an allowance or unit price to cover the cost of managing this material. Sludge contaminated soil or odorous material is not expected. However, if it is encountered, the Contractor is expected to satisfy this paragraph. 11. With reference to Concrete Finish Schedule, please confirm the interior face of hydraulic structures normally filled with fluid, requires a Type II Grout Cleaned Finish in accordance with A.2. Please see this Addendum, Section 03350, Concrete Finish Schedule was modified. 12. Section indicates Class B Concrete 3000 psi whereas So1 C-3 D prescribes 4000 psi for class B. Please advise. Please see this Addendum, Note C-3 was modified psi concrete is acceptable for Class B Concrete. 13. Will the Authority charge the contractor for water used for testing? The Contractor is responsible for metering and paying for the water used for construction activities including testing in accordance with Section D.

5 14. We recognize the requirement of a Virginia Contractor s License for GC s proposing. Please confirm a Virginia Contractor s License is not required for a specialty trade subcontractor. Loudoun Water does not require that trade subcontractors have trade licenses. However, Trade Building Permits will need to be obtained from Loudoun County Department of Building and Development and the General Contractor shall be knowledgeable of and comply with those requirements. 15. Drawing M225, Item is marked FE 301 on the six-inch force main. Is there a spec for this item? Flowmeters are specified in Section 17701, Magnetic Flow Meters. Also, see section for flow rate and size information. 16. Drawings M227, FE 301 is identified on view A, however, it also appears on the bypass view C. Please confirm how this is coordinated with M225. Sheet M225 is the plan view of the vault piping including the flowmeter, while sheet M227 contains two section views A and C. The location of the section cuts is indicated on sheet M Specification calls out stainless steel pipe of diameter 4 and smaller to have welded joints. The steel pipe specification (15012) calls for threaded joints for diameter of 3 and below. Please clarify which joint type is required. If welded joints are required would socket weld fittings be acceptable? Provide welded water piping in accordance with Section 15390, Schedule. 18. There is heat tracing specification (15391), and the electrical panel schedules show connections for heat tracing. For which lines is heat tracing required? Heat tracing is required for water piping inside the vault and in the screening room per Note 12 on sheet M Sheet 6, and others, of the site plan amendment issued in addendum 1 show the sanitary line feeding the pump station to be PVC. The piping schedule in specification section calls out DIP for this line. Please confirm which is the correct material. See this Addendum. Provide ductile iron pipe for sanitary piping in accordance with Section 15390, Schedules. 20. Sheet 4 of the site plan amendment shows a new 45 elbow which connects to what appears to be the existing hydrant. Sheet C-22 in the original documents shows the hydrant as new. Please confirm if the existing hydrant is to remain in place, or if a new one is to be installed.

6 The existing hydrant shall be demolished. A new hydrant and associated piping and valves shall be provided as shown on sheet C-22 in accordance with Loudoun Water details. 21. Sheet 4 through 8 of the site plan amendment. As well as C22 of the original documents, show a 2 water meter (detail W-27) on a 6 DIP water line. Is this the correct size and detail for this line? See answer to question # Sheet 8 of the site plan amendment calls for 2 DIP for waterline C. DIP is not made in a diameter less than 3. Please confirm the pipe material for this line. Please see this Addendum. Provide 2-inch potable water line material in accordance with Section 15390, Schedules. 23. Specification C.2 (as renumbered in this addendum) and C reference removal of existing temporary pump station pumps, refurbishing, and kept as spares. a. Upon evaluation and written report, will a change order be issued for refurbishment? Are any of these to be unknown? b. Spec indicates 2 installed, 1 spare. How many require refurbishment? Are any of these to be installed in the new pump station, or are these 2 pumps new? a. Section 01520, Maintenance of Utility Operations During Construction 1.04 C 2 includes removal, evaluation, and refurbishment of pumps currently installed in the Temporary Courtland Pump Station during Phase 2 of the project as specified in Section The purpose of the written report is to capture the state of the pump prior to refurbishment to manufacturer recommendations. No Change Order will be issued for refurbishment as it is included in the requirements of this paragraph. b. Section 11130, Submersible Non-Clog Pumps, requires three new pumps to be provided. Two pumps shall be installed in the new Courtland Pump Station, and one pump shall be furnished as a spare during Phase 1 of the project as specified in Section Sheet 8 of the site plan amendment shows the waterline C profile. This line attaches to a 2 water meter. In the original documents, this line is tied into the existing facility water meter; the profile on sheet 8 calls this a temp 2 meter. Please confirm if the contractor is to tie into the existing meter or provide a new temporary meter. The water meter that connects to waterline C is existing. END OF QUESTIONS AND ANSWERS

7 SECTION ENCLOSED CIRCUIT BREAKERS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. The Contractor shall furnish and install enclosed circuit breakers of voltage and current ratings as specified herein and indicated on the Drawings. B. This specification is intended to apply to circuit breakers separately-mounted from other equipment in an individual enclosure. This Section does not apply to circuit breakers as part of an equipment assembly such as motor control centers, panelboards, switchboards, etc. C. Reference Section 16000, Basic Electrical Requirements CODES AND STANDARDS A. Enclosed circuit breakers shall comply with the following codes and standards: 1. UL Molded Case Circuit Breakers, Molded Case Switches, and Circuit Breaker Enclosures 2. NEMA 250 Enclosures for Electrical Equipment 3. National Electrical Code 1.03 SUBMITTALS A. In accordance with the procedures and requirements set forth in the General Conditions and Section 01300, Submittals, the Contractor shall obtain from the equipment manufacturer and submit the following: 1. Shop Drawings. 2. Spare Parts List. 3. Operation and Maintenance Manuals. B. Each submittal shall be identified by the applicable specification section SHOP DRAWINGS A. Each submittal shall be complete in all respects, incorporating all information and data listed herein and all additional information required for evaluation of the proposed equipment's compliance with the Contract Documents BR \16476:01/ COURTLAND PUMP STATION

8 B. Partial, incomplete, or illegible submittals will be returned to the Contractor without review for resubmittal. C. Shop drawings shall include but not be limited to: 1. Product data sheets. 2. Complete assembly, layout, and installation drawings with clearly marked dimensions for each enclosed circuit breaker SPARE PARTS A. For each enclosed circuit breaker, the Contractor shall furnish to the Owner all spare parts as recommended by the equipment manufacturer IDENTIFICATION A. Each enclosed circuit breaker shall be identified with the identification name and/or number indicated on the Drawings. A nameplate shall be securely affixed in a conspicuous place on the front of each enclosed circuit breaker. Nameplates shall be as specified in Section 16195, Electrical - Identification. PART 2 -- PRODUCTS 2.01 MANUFACTURERS A. The Equipment shall be designed, constructed and installed in accordance with the best practices of the trade, and shall operate satisfactorily when installed as shown on the Drawings. B. Enclosed circuit breakers shall be manufactured by Eaton, the General Electric Company, the Square D Company, or Siemens Energy and Automation, Inc ENCLOSED CIRCUIT BREAKERS A. Circuit breakers shall be molded case type with trip and frame ratings as indicated on the Drawings. Provide electronic trip unit where indicated on the Drawings, with adjustable functions as indicated on the Drawings. B. Circuit breakers shall have an interrupting rating of 65,000 amperes symmetrical at 480 VAC, unless otherwise indicated on the Drawings. C. Enclosed circuit breakers in non-hazardous locations shall be UL 489 Listed. Circuit breakers in hazardous locations shall be UL 1203 Listed \16476:01/ COURTLAND PUMP STATION

9 D. In non-hazardous locations, enclosed circuit breakers shall be furnished with the following enclosure type and material of construction, dependent upon the designation of the area in which they are to be installed. Area designations are indicated on the Drawings. AREA DESIGNATION Indoor Wet Process Area Indoor Dry Process Area Indoor Dry Non-process Area Indoor Type 1 Chemical Storage/Transfer Area Indoor Type 2 Chemical Storage/Transfer Area All Outdoor Areas ENCLOSURE TYPE AND MATERIAL NEMA 4X, Type 304 Stainless Steel NEMA 12, Painted Steel NEMA 1, Painted Steel NEMA 4X, Fiberglass NEMA 4X, Type 304 Stainless Steel NEMA 4X, Type 304 Stainless Steel E. In hazardous locations, enclosed circuit breakers shall be furnished with the following enclosure type and material of construction, dependent upon the classification of the area in which they are to be installed. Area classifications are indicated on the Drawings. AREA CLASSIFICATION Class 1, Division 1, Group D Class 1, Division 2, Group D Class 2, Division 1, Group F Class 2, Division 2, Group F ENCLOSURE TYPE AND MATERIAL NEMA 7, Die Cast Aluminum NEMA 7, Die Cast Aluminum NEMA 9, Die Cast Aluminum NEMA 9, Die Cast Aluminum F. Enclosed circuit breakers shall be quick-make, quick-break and with an interlocked cover which cannot be opened when the breaker is in the ON position and capable of being locked in the OPEN position. G. An Underwriter's Laboratories, Inc. inspection label shall appear on the interior of the enclosure. H. Enclosed circuit breakers shall be suitable for use as service entrance equipment where indicated on the Drawings and so labeled to suit the application. I. Where indicated on the Drawings, enclosed circuit breakers shall be 100% rated. PART 3 -- EXECUTION 3.01 INSTALLATION A. The enclosed circuit breaker shall be furnished and installed as shown on the Drawings and as recommended by the equipment manufacturer. B. Enclosed circuit breakers shall be set true and plumb in locations as shown on the Drawings. The top of enclosure shall not exceed six (6) feet above finished floor elevation \16476:01/ COURTLAND PUMP STATION

10 C. Enclosed circuit breakers shall be provided in the enclosure type and material of construction required for the area in which it is installed. Reference the requirements in Part 2 herein, and the area designations indicated on the Drawings TESTING A. All tests shall be performed in accordance with the requirements of the General Conditions and Division 1. The following tests are required: 1. Witnessed Shop Tests a. None required 2. Field Tests a. Field testing shall be done in accordance with the requirements specified in the General Conditions, Division 1, and NETA Acceptance Testing Specifications, latest edition. - END OF SECTION \16476:01/ COURTLAND PUMP STATION

11

12

13

14

15

16

17

18

19

20

21

22

23

24

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE PAGE 262400-1 SECTION 262400 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION! PREFACE This publication has been prepared as a guide for Architectural and Engineering (A&E) firms in the preparation of documents for the design and construction of new structures and the remodeling

More information

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 5 BID NO. Y14-792 PH IFB EAST SERVICE AREA POTABLE WATER AND RECLAIMED WATER STORAGE AND REPUMP FACILITY BID OPENING: June

More information

Plan Submittal and Review Checklist

Plan Submittal and Review Checklist Improving quality of life today creating a better tomorrow Plan Submittal and Review Checklist Version 1.2 September 4, 2017 Contents Overview... 2 Plan Submittal Checklist... 2 Plan Review Checklist -

More information

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality. PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

B. Manufacturers: Square-D, G.E. or Westinghosue.

B. Manufacturers: Square-D, G.E. or Westinghosue. SECTION 16470 - PANELBOARDS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE

More information

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated

More information

For crossing under a railroad, contact the specific railroad company's engineering department.

For crossing under a railroad, contact the specific railroad company's engineering department. PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure

More information

Grease Interceptor Design Checklist

Grease Interceptor Design Checklist CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting

More information

Appendix C Construction Details

Appendix C Construction Details 7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section

More information

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be

More information

Plan Review and Standards

Plan Review and Standards Plan Review and Standards Minnesota Rules, part 4720.0010, states that prior to the installation, alteration, or extension of any water supply infrastructure, plans and specifications must be submitted

More information

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached). ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct

More information

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2 SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.

More information

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS Detailed construction drawings for system extensions shall be prepared for approval with a submittal to the Authority. All construction

More information

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:

More information

HUSSEY GAY BELL SAVANNAH, GEORGIA

HUSSEY GAY BELL SAVANNAH, GEORGIA HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

More information

Oil-Water Separator Design Checklist

Oil-Water Separator Design Checklist CHECKLIST C3 Revised 5/2/2016 Oil-Water Separator Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private oil-water

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

DESIGN CHECKLIST INTRODUCTION

DESIGN CHECKLIST INTRODUCTION INTRODUCTION 1 The checklist is intended to serve as a convenient guide in design development as well as the final checking of plans and specifications for construction projects. Its main usefulness for

More information

SECTION LIGHTING PART 1- GENERAL

SECTION LIGHTING PART 1- GENERAL SECTION 16500 LIGHTING PART 1- GENERAL 1.01 WORK INCLUDED A. The Contractor shall provide all lighting fixtures, panelboards, labor, material, etc., in accordance with the preceding specifications, the

More information

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications

More information

SECTION DISTRIBUTION SWITCHBOARDS

SECTION DISTRIBUTION SWITCHBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 13 DISTRIBUTION SWITCHBOARDS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also, delete any other item or

More information

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute

More information

Public Works City of Lebanon, Tennessee; Department of Public Works

Public Works City of Lebanon, Tennessee; Department of Public Works SECTION 1 GENERAL 1. DEFINITIONS Public Works City of Lebanon, Tennessee; Department of Public Works City City of Lebanon, Wilson County, Tennessee City Engineer Employed by the City of Lebanon, Registered

More information

TG Glazing Design-Build

TG Glazing Design-Build TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications

More information

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled

More information

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time) ADDENDUM No. 1 ITB No. 4521 Northside Interceptor Condition Assessment Due: February 1, 2018 at 10:00 A.M. (Local Time) The following changes, additions, and/or deletions shall be made to the Invitation

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

UNDERGROUND UTILITY TRENCHES AND VAULTS Page 1 of 6 ADDENDUM #1

UNDERGROUND UTILITY TRENCHES AND VAULTS Page 1 of 6 ADDENDUM #1 Page 1 of 6 ADDENDUM #1 PART 1 GENERAL 1.01 PRINCIPAL WORK IN THIS SECTION A. The requirements of the Owner's General Conditions, Supplementary Conditions, Special Conditions, and Division 1 - General

More information

1. ASME A Scheme for the Identification of Piping Systems.

1. ASME A Scheme for the Identification of Piping Systems. SECTION 40 05 53 - IDENTIFICATION FOR PROCESS PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe markers. 5. Labels. 6. Lockout devices. B. Related Requirements:

More information

A. Product Data: For each electrical identification product indicated.

A. Product Data: For each electrical identification product indicated. SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY Section 16195 A. This Section includes electrical identification for the following: 1. Nameplates and labels 2. Wire and cable markers 3. Conduit markers 4. Cable tray markers

More information

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS 2.1 MASTER PLAN 2.1.1 A Master Plan for water, wastewater, and/or reclaimed water is required for all residential or commercial

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

Brown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS

Brown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS SECTION 16461C - DRY TYPE TRANSFORMERS PART 1 - GENERAL 1.1 This section includes design and performance requirements for dry-type transformers rated for use on secondary distribution systems rated 600

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions conduit? 9/8/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Can branch circuits of different services be installed in the same Yes, see 300.3(C)(1) for conductors of different systems

More information

SECTION THERAPEUTIC POOL ACCESSORIES

SECTION THERAPEUTIC POOL ACCESSORIES PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 13 17 23.11 THERAPEUTIC POOL ACCESSORIES SPEC WRITER NOTES: Delete between // // if not applicable to project. Also, delete any other item or paragraph not applicable

More information

SECTION DISTRIBUTION SWITCHBOARDS

SECTION DISTRIBUTION SWITCHBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 11 SPEC WRITER NOTES: Use this section only for NCA projects. Delete between // -- // if not applicable to project. Also delete any other item or paragraph

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves.

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. Section 02520 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment is on a unit price basis

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST APPENDIX 1: CONSTRUCTION PLAN CHECKLIST October 2017 APPENDIX A APPENDIX 1: CONSTRUCTION PLAN CHECKLIST ALL PLANS Plans on 24-inch by 36-inch paper (Originals shall be transmitted on a CD as an electronic

More information

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410 DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original

More information

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R. ADDENDUM NO. 1 October 21, 2016 PROJECT: CWU CAMPUS GENERATOR PROJECT #: CWU Project No. 12238-02 The additions, clarifications and corrections contained herein shall be made to the Project Manual, Drawings

More information

ADDENDUM NO. 02 July 31, 2012

ADDENDUM NO. 02 July 31, 2012 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON

More information

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a

More information

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE IFB 2014-014 Rail Expansion (Streetcar) Rampart Street Addendum IV Acknowledge receipt of this addendum in the bid submission. This addendum is a part of the Contract

More information

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

This addendum forms a part of the Contract Documents dated: August 10, 2012.

This addendum forms a part of the Contract Documents dated: August 10, 2012. Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

U of I Facilities Standards Updates for 2017

U of I Facilities Standards Updates for 2017 U of I Facilities Standards Updates for 2017 Updates to the U of I Facilities Standards will occur on a periodic basis (typically all standards will be reviewed for accuracy & completeness every 3 years),

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

SECTION TRACER WIRE FOR NONMETALLIC PIPE

SECTION TRACER WIRE FOR NONMETALLIC PIPE PART 1 GENERAL 1.1 DESCRIPTION A. The CONTRACTOR shall furnish and install a conductive tracer wire with all buried plastic water mains, services and appurtenances in accordance with the Water Utilities

More information

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1 No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

1.1 GENERAL RECORD DRAWING REQUIREMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has

More information

B17. Sewer Site Plans BULLETIN

B17. Sewer Site Plans BULLETIN BULLETIN B17 Revised 5/2/2016 Sewer Site Plans Public Works This bulletin is designed to assist you in submitting the required documentation for sewer site plans to the Pierce County Sewer Division in

More information

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017. !!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This

More information

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202 Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 May 24, 2017 ADDENDUM NUMBER: Three (3) TITLE: Construction Services for Arlington

More information

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards. PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:

More information

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846 PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y Proposal P.O. Box 846 Baker, MT 59313 P R E C A S T R E I N F O R C E D C O N C R E T E B O X C U L V E R T F O R W E S T M O

More information

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL This summary is not all inclusive of the requirements set forth by the York County Planning & Development Services, York County

More information

Renewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM IV - CONTRACT REVISIONS.

Renewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM IV - CONTRACT REVISIONS. Renewable Water Resources Greenville, South Carolina CONTRACT DOCUMENTS ADDENDUM IV - CONTRACT REVISIONS Prepared by Black & Veatch Corporation Greenville, South Carolina B&V Project No. 192263 October

More information

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) SPEC NO.: PE-SS-999-145-I009 REV. NO. 01 DATE : 20.04.2012 SHEET 1 OF 4 1.0 SCOPE This specification covers the Design, Manufacture, Inspection and Testing

More information

BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS

BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS March 17, 2016 To prospective bidders & others concerned: This addendum sets forth changes and/or information

More information

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Assign unit identification numbers to operating units of equipment within a class or subclass during the design phase of new buildings, additions,

More information

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS

More information

Onslow Water & Sewer Authority

Onslow Water & Sewer Authority Onslow Water & Sewer Authority REQUIREMENTS FOR SITE PLAN SUBMITTALS THAT DO NOT INCLUDE EXTENSIONS OF WATER/SEWER MAINS BY OWNERS/DEVELOPERS/CONTRACTORS February 28, 2017 (Revised) Required Items for

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130 PART 1 GENERAL 1.01 SUMMARY Section 15130 PRESSURE GAUGES, This Section includes the furnishing and subsequent installation of pressure gauges and pressure level transmitters as shown on Plans and specified

More information