CITY OF NEW WESTMINSTER SECTION Westminster Pier Park ADDENDUM NO. 1 Landscape Contract

Size: px
Start display at page:

Download "CITY OF NEW WESTMINSTER SECTION Westminster Pier Park ADDENDUM NO. 1 Landscape Contract"

Transcription

1

2 ADDENDUM NO. 1 November 10, 2010 This Addendum forms part of the Bid Documents and amends the original Contracting Requirements, Specifications, and Drawings, and clarifies Bidders questions received between November 3 and 8, This Addendum consists of seven pages and two pages of attachments. DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION Instructions to Bidders A1-1 ADD the following to the end of Clause 3.3: The City has arranged a mandatory Bidder s meeting on Tuesday, November 16, 2010 at 1:00 p.m. at 610 Front Street, New Westminster, BC. Those attending the meeting must wear their own personal protective equipment, including as a minimum a hard hat, safety glasses, a high visibility vest, and steel toed boots. If there is a train on the tracks adjacent to the site at the time of the meeting that restricts access to the site, the alternative entrance is at Begbie Street. A1-2 DELETE Clause 8.4 in its entirety and REPLACE with the following: 8.4 The Bid deposits of unsuccessful Bidders will be returned without interest within 60 days from the date of closing. A1-3 DELETE Clause 9.2 in its entirety and REPLACE with the following: 9.2 Bids will be received by: Main Reception Desk MKT Arkle Development Management Inc. # Granville Street Vancouver, BC V6Z 1G3 Attention: Dugal Purdie SECTION Appendix to Bid Form - Stipulated Sum (Single-Prime Contract) A1-4 DELETE Item Storm Drainage in its entirety from the table in Clause 2 - Schedule of Values _rev0_addendum 1_ doc Page 1 of tmw : 10-Nov-10

3 DIVISION 32 - EXTERIOR IMPROVEMENTS SECTION Mechanically Stabilized Earthen Retaining Walls A1-5 DELETE Clauses and in their entirety and REPLACE with the following:.2 Acceptable DeltaLok Manufacturer:.1 DeltaLok Inc. 125 Charles Street North Vancouver, BC V7H 1S1 Phone: Fax: Contact: Bruce Stickney (bstickney@deltalok.com).3 Substitutions: not permitted unless noted otherwise. All substitutions must be approved by the Consultant. A1-6 DELETE Clause in its entirety and REPLACE with the following:.6 DeltaLok System: DeltaLok Bag Type GTX R031 W with DeltaLok standard connector units. SECTION Growing Medium Preparation and Placement A1-7 DELETE Clause in its entirety. A1-8 ADD the following as Clause 2.2.3:.3 Festival Lawn Fertilizer: Sustane 5-2-4, Sustane Natural Fertilizer Inc., Auburn, California or pre-approved equal. A1-9 ADD the following as Clause 3.4.5:.5 Festival Lawn Growing Medium: add Sustane fertilizer to growing medium mix at offsite mixing yard. Ensure Sustane is thoroughly and uniformly mixed within the finished product prior to delivery to site. Note that Sustane fertilizer shall be added at 3% to 4% by volume of growing medium. The addition of Sustane fertilizer on site is not acceptable. SECTION Growing Medium Preparation and Placement - Structural Soil A1-10 DELETE Clause in its entirety and REPLACE with the following:.1 Acceptable Suppliers include Eco-Soil, Langley, BC; or pre-approved equal _rev0_addendum 1_ doc Page 2 of tmw : 10-Nov-10

4 SECTION Sodding A1-11 DELETE Clause in its entirety and REPLACE with the following: DRAWINGS.1 Nursery Sod:.1 Shall be No. 1 premium grade sand based sod with no netting and contain only species of grass indicated on the Suppliers certificate: DRAWING NO AR-DSW-1050 Sand Base Sod Elka II Perenial Ryegrass 50% Kentucky Bluegrass 50% Acceptable Products include Pro Sport Turf as supplied by Anderson Sod Farms, Dewdeny, BC or approved equal. A1-12 DELETE the P6 material designation for TIMBER DECK TYPE C ON GRADE mm WIDTH SEE ENGINEERING DWGS under the PAVING header and REPLACE with P7. DRAWING NO AR-DSW-1052 A1-13 DELETE the P6 material designation for the area of timber deck located directly south of the concession and washroom building and seat steps and REPLACE with P7. DRAWING NO AR-DSW-1071 A1-14 On Detail 1 and Detail 2, DELETE DRAIN MAT and REPLACE with DRAIN MAT, LIGHT DUTY POLYMERIC SHEET CUPSATED UNDER HEAT AND PRESSURE TO FORM A HIGH FLOW DIMPLED DRAINAGE CORE. THE CORE IS BONDED TO A NON WOVEN FILTER CLOTH, ASSEMBLY TO HAVE A COMPRESSIVE STRENGTH OF AT LEAST 528 kn PER SQUARE METRE (11,000 psi) AND FLOW OF AT LEAST 223 LITRES/MINUTE/METRE (18 GALLONS/MINUTE.FOOT). ACCEPTABLE PRODUCTS INCLUDE J DRAIN 200, MANUFACTURED BY JDR ENTERPRISES OR NUDRAIN WD/15 MANUFACTURED BY NILEX GEOTECHNICAL PRODUCTS INC., BURANBY, BC, OR APPROVED EQUAL _rev0_addendum 1_ doc Page 3 of tmw : 10-Nov-10

5 DRAWING NO AR-DSW-1072 A1-15 On Detail 1, Detail 2, Detail 3, and Detail 4, DELETE DRAIN MAT and REPLACE with DRAIN MAT, LIGHT DUTY POLYMERIC SHEET CUPSATED UNDER HEAT AND PRESSURE TO FORM A HIGH FLOW DIMPLED DRAINAGE CORE. THE CORE IS BONDED TO A NON WOVEN FILTER CLOTH, ASSEMBLY TO HAVE A COMPRESSIVE STRENGTH OF AT LEAST 528 kn PER SQUARE METRE (11,000 psi) AND FLOW OF AT LEAST 223 LITRES/MINUTE/METRE (18 GALLONS/MINUTE.FOOT). ACCEPTABLE PRODUCTS INCLUDE J DRAIN 200, MANUFACTURED BY JDR ENTERPRISES OR NUDRAIN WD/15 MANUFACTURED BY NILEX GEOTECHNICAL PRODUCTS INC., BURANBY, BC, OR APPROVED EQUAL. DRAWING NO AR-DSQ-1075 A1-16 On Detail 2, ADD DRAIN MAT, LIGHT DUTY POLYMERIC SHEET CUPSATED UNDER HEAT AND PRESSURE TO FORM A HIGH FLOW DIMPLED DRAINAGE CORE. THE CORE IS BONDED TO A NON WOVEN FILTER CLOTH, ASSEMBLY TO HAVE A COMPRESSIVE STRENGTH OF AT LEAST 528 kn PER SQUARE METRE (11,000 psi) AND FLOW OF AT LEAST 223 LITRES/MINUTE/METRE (18 GALLONS/MINUTE.FOOT). ACCEPTABLE PRODUCTS INCLUDE J DRAIN 200, MANUFACTURED BY JDR ENTERPRISES OR NUDRAIN WD/15 MANUFACTURED BY NILEX GEOTECHNICAL PRODUCTS INC., BURNABY, BC, OR APPROVED EQUAL on top of filter fabric. DRAWING NO AR-DSQ-1080 A1-17 On Detail 1 and Detail 2, carry reveal indicated in the vertical face of the concrete over the entire extent of the seat steps. The aluminum panels will only be installed as indicated on the drawing. A1-18 In the box below Detail 1, DELETE all references to METAL PANEL - ¼ (6 mm) BRUSHED ALUPANEL or ALUPANEL and REPLACE with METAL PANEL - ¼ (6 mm) SOLID ALUMINUM PANEL or SOLID ALUMINUM PANEL. A1-19 In the box below Detail 1, DELETE FINISH: APPLIED DIGITAL PHOTOGRAPH FULL BLEED TO EDGE, SEPIA COLOUR and REPLACE with FINISH: APPLIED DIGITAL PHOTOGRAPH FULL BLEED TO EDGE, SEPIA COLOUR. ACCEPTABLE FABRICATOR FOR SOLID ALUMINUM PANELS IS JOHN PEACHEY AND ASSOCIATES, NORTH VANCOUVER, BC. DRAWING NO AR-DSQ-1096 A1-20 On Detail 2, DELETE reference to ROOT BARRIER. Root barrier is not required for this project _rev0_addendum 1_ doc Page 4 of tmw : 10-Nov-10

6 CLARIFICATIONS A1-21 Question: Is the legend designation for the timber deck Type C supposed to be P7? If so, where on the plans is this material? Yes, the material designation for TIMBER DECK TYPE C ON GRADE mm WIDTH SEE ENGINEERING DWGS under the PAVING header on Drawing No AR-DSW-1050 should be P7. This material is only located directly south of the concession and washroom building and seat steps as shown on Drawing No AR-DSW A1-22 Question: Is the timber structure above the concession and washroom building N.I.C.? No. The timber structure is in the contract and is described in Section Summary of Work in Clause A1-23 Question: Are the piles and pile caps part of a previous contract? Yes. Drawing Nos MA-DRS-1000 to MA-DRD-1031 were included in the Contract as reference drawings. The scope of work contained on these drawings is currently being completed by M2K Construction Ltd., the marine facilities contractor. The reference drawings shall be used to reference the elevations on site at the completion of the marine facilities Contract and construction zones. A1-24 Question: Are the precast slabs part of a previous contract? Yes. Precast slabs indicated on Drawing Nos MA-DRS-1000 to MA-DRD-1031 are part of the marine facilities contract currently being completed by marine facilities contractor. All other precast concrete components are included in the landscape contract. A1-25 Question: Is the densification part of a previous contract? Yes. Densification indicated on Drawing Nos MA-DRS-1000 to MA-DRD-1031 are part of the marine facilities contract currently being completed by marine facilities contractor. A1-26 Question: Is there a detail for the terminal ends of the 100 mm SDR 28 down spouts? Deck drain and area drain details are provided on Drawing No CI-DLP The down spouts shall terminate open ended 150 mm below the underside of the precast concrete panels. The marine facilities contractor will provide rough block-outs through the precast concrete panels for these drains. The landscape contractor shall epoxy set the drains into the rough block-outs _rev0_addendum 1_ doc Page 5 of tmw : 10-Nov-10

7 A1-27 Question: What are the specifications for the foam blocks at the transition slabs? The foam blocks at the transition slabs are deleted, as indicated in the attached Drawing No ST-DRD-1119, Rev. C. A1-28 Question: Is there a detail for the steel expansion joint plates for the cracked asphalt? The steel plates specified to be installed at locations of significant cracks in the existing portion of timber deck to remain at the east end of the site are intended to locally support reinstated asphalt. Assume that these plates will be 12 mm thick and connected to the timber deck on each side of the crack at 300 mm on centre with 150 mm long spikes. A1-29 Question: The 1.8 m height chain-link fence at the play court is not shown on the drawings. Please advise. The material designation for 1.8 m HEIGHT CHAIN LINK FENCE AT PLAY COURT under the SITE MATERIALS header on Drawing No AR-DSW-1050 is 9. This material is located on the west side of the play court as shown on Drawing No AR-DSW A1-30 Question: For the SierraScape plan on Drawing No. 1125, does the line indicating the ground at base of walk refer to the bottom of the buried portion of the [finished grade] of material above the buried portion? For clarification of the vertical extent of the MSE walls, please refer to the attached Drawing No ST-DAL-1125, Rev. B. A1-31 Question: What is the load capacity of the precast decks? Refer to Reference Drawing No MA-DRS-1000, Rev. 0. A1-32 Question: Is there a spec or detail for the root barrier? Where [is] the root barrier required? As noted above, the reference to root barrier on Detail 2 on Drawing No AR-DSQ-1096 is deleted. A1-33 Question: Is there a spec for the drain mat? See above for added description of drain mat on Drawing Nos AR-DSW-1071, AR-DWS-1072 and AR-DSQ _rev0_addendum 1_ doc Page 6 of tmw : 10-Nov-10

8 A1-34 Question: Is there a detail for cleanout manholes? Can you supply the pipe inverts. The cleanout manhole is documented in Drawing No CI-DRS-1040, Rev. B, General Notes, Section D-4 - Refer to Section of MMCD 2000 for detailed specification on manholes and catch basins. Drawing No. S1 gives the general arrangement for the 1,050 mm diameter manhole shown on the underground piping plan Drawing Nos CI-DRS-1041, Rev. C and CI-DRS-1042, Rev. C. Drawing No. S2 in the MMCD details the plan and cutaway section of typical manhole pipe connection. In the New Westminster case, the diameter of the pipes is specified to be 150 mm perforated drain pipe and 200 mm PVC storm drain. The clean out details are shown in Drawing No. S6 - Midblock Cleanout. The cutaway section shows the 45 degree wye connection to a maximum 200 mm diameter 45 degree long bend cleanout pipe. A1-35 Question: Is there a detail for the lawn basins? Can you supply the pipe inverts? The lawn basin is documented in Drawing No CI-DRS-1040, Rev. B, General Notes, Section D-2 - Lawn Drains: 600 mm diameter precast concrete in accordance with Section of the MMCD (Type 2). Drawing No. S12 in the MMCD details a cutaway section of the lawn drain. The concrete cylinder has an interior length of 1,200 mm, a wall thickness of 75 mm and a bottom thickness of 150 mm. The surface grating is specified as a Dobney B22A or approved equivalent. Approved native backfill surrounds the drain for its entire depth. An aluminum trapping hood protects a 150 mm outlet connection to the storm sewer. A1-36 Question: Can you clarify what scope of drainage is to be designated site drainage and what scope of drainage is to be storm drainage? See above for deletion of Item Storm Drainage from the Schedule of Values in Section *** END OF ADDENDUM NO. 1 *** _rev0_addendum 1_ doc Page 7 of tmw : 10-Nov-10

9

10

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

HUSSEY GAY BELL SAVANNAH, GEORGIA

HUSSEY GAY BELL SAVANNAH, GEORGIA HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

More information

This addendum forms a part of the Contract Documents dated: August 10, 2012.

This addendum forms a part of the Contract Documents dated: August 10, 2012. Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911

More information

STORM M ANHOLE FOR 42" PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30"MAX 3 OR 3.5 PRECAST ECCENTIC CONC

STORM M ANHOLE FOR 42 PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30MAX 3 OR 3.5 PRECAST ECCENTIC CONC 01-APR-2015 13:33 = I:\MSV8i\Plotting\piblack.ptb V:\201001\\C\8x11_Howell_Det\stm_det01_8x11_st01.dgn TIME = MIN 3 CRSES MAX 5 CRSES 3 OR 3.5 PRECAST ECCENTIC CONC ID PIPE GRADE A CONC FILL 4" 8" 2-0"SUMP

More information

City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2

City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2 City of Waltham Purchasing Department Waltham, Massachusetts 02452 ADDENDUM NO. 2 Plans & Specifications for: Elsie Turner Field & Graverson Playground, Waltham, MA TO: ALL PLAN HOLDERS This Addendum No.

More information

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015 ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the

More information

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard

More information

CONSTRUCTION CERTIFICATION PACKAGE

CONSTRUCTION CERTIFICATION PACKAGE Purpose: The intent of this Construction Certification Package is to ensure that acceptable documentation is maintained during the construction of stormwater management practices (SMPs). For general information

More information

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications

More information

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute

More information

Standard Specifications

Standard Specifications Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

SUPPLEMENTARY STANDARD DETAIL DRAWINGS

SUPPLEMENTARY STANDARD DETAIL DRAWINGS CITY OF MAPLE RIDGE DESIGN AND CONSTRUCTION DOCUMENTS Part 4 SUPPLEMENTARY STANDARD DETAIL DRAWINGS September 2015 Updated: October 2015 THIS PAGE INTENTIONALLY LEFT BLANK City of Maple Ridge Supplementary

More information

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1 No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible

More information

RENOVATION OF THE FARMERS MARKET Reference Number:

RENOVATION OF THE FARMERS MARKET Reference Number: RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 ADDENDUM NUMBER 2 DATED September 19, 2013 Marshall Truck Station Laboratory Addition Project No. TZ-91523 MnDOT 13-6574 Architect:

More information

NIAGARA REGIONAL HOUSING MZE FILE NO

NIAGARA REGIONAL HOUSING MZE FILE NO M A C D O N A L D Z U B E R E C E N S S L E N A rch it ects I nc. NRH NEW DEVELOPMENT PROJECT 527 CARLTON ST., ST. CATHARINES, ONTARIO NIAGARA REGIONAL HOUSING MZE FILE NO. 16-44 Project No. 16-44 April

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS

More information

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D ASPHALT 20 GUTTER LINE CONCRETE CURB FINISHED GRADE PRECAST GRADE RINGS, 2 50 100 MAX PRECAST CB LID GROUT ALL AROUND CB LEAD, INSIDE & OUTSIDE OF

More information

I. MINUTES OF THE PRE-BID CONFERENCE

I. MINUTES OF THE PRE-BID CONFERENCE Addendum No. 1 June 8, 018 Allegany College of Maryland Softball Field Murphy & Dittenhafer Project No. 17118 1401 Willowbrook Road, Cumberland, MD 150 Abbreviations: ACM: Allegany College of Maryland,

More information

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD. Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS 9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed 6/1/18 STANDARD DRAWINGS

UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed 6/1/18 STANDARD DRAWINGS Date 6/1/18 STANDARD DRAWINGS UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed WATER STANDARD DRAWINGS Title Drawing Number Current Date Fire Hydrant and Appurtenance Locations, Improved Streets with Curb

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard

More information

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. Dear Sir/Madam: Attached is Addendum No. 2 to SEPTA Sealed Bid 17-00222-APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House. The Bid due date and time is changed from Thursday, Nov.

More information

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum. ADDENDUM 1 CITY OF MEDFORD RIVERSIDE NORTH PARKING LOT ITB 15-012BL JUNE 22, 2015 PAGE 1 I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this

More information

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details. DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard

More information

INVITATION FOR BID (IFB) IFB NO. GSWA

INVITATION FOR BID (IFB) IFB NO. GSWA INVITATION FOR BID (IFB) IFB NO. GSWA-005-16 AGAT AND MALOJLOJ RESIDENTIAL TRANSFER STATION IMPROVEME AND DEDEDO RESIDENTIAL TRANSFER STATION CLOSURE ADDENDUM NO. 6 September 22, 2016 ALL BIDDERS MUST

More information

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September

More information

MAJOR GRADING PLAN CHECKLIST

MAJOR GRADING PLAN CHECKLIST MAJOR GRADING PLAN CHECKLIST PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: (619) 667-1166 Fax: (619) 667-1380 Grading plans shall address both rough grading

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction This standard developed by the International Grooving and Grinding Association (IGGA) specifies the procedures for construction of dowel

More information

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS March 2004 STANDARD DRAWINGS Partners With The Environment March 2004 FORWARD The March 2004 version of the City of Vaughan Design Standard

More information

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

Notre Dame High Addition/Renovation Addendum 3 Page 1

Notre Dame High Addition/Renovation Addendum 3 Page 1 School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard

More information

Chuck Caesar. VIA: /Webposting April 27, 2017

Chuck Caesar. VIA:  /Webposting April 27, 2017 VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

Pipe Product Catalog Table of Contents

Pipe Product Catalog Table of Contents Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"

More information

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts RESPONSES TO QUESTIONS and/or RFI s # 3 Date: 09/14/18 The attention of Contractors

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (15-03) MANUAL: Standard

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

HOENER ASSOCIATES INC. ARCHITECTS

HOENER ASSOCIATES INC. ARCHITECTS HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,

More information

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure

More information

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO.

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO. CELL: (715) 803-8009 MABOSI@WISCONSINPUBLICSERVICE.COM CELL: (715) 573-7806 CHVIRCKS@WISCONSINPUBLICSERVICE.COM CALVIN.KLADE@FTR.COM DGAU@KRONENWETTER.COM SCOTT OLSEN (715) 302-1348 S REVISED TO CONFORM

More information

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations The following specification refers to the Stepstone, Inc. product known as: Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations Large Scale CalArc Pavers are part of the California Architectural

More information

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings Engineering and Construction Services Division Construction Drawings for Sewers and Watermains Revision No. 8 April All T drawings New title block for each drawing is now standardized. Revision numbers

More information

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017. !!! Addendum EXP Project No: MTA Project No: WIND-17-01 Project: Windsor Hall Renovations October 12, 2017 Addendum No: 3 The following information supplements and/or supersedes the bid documents. This

More information

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation Development Permit Application Rezoning/OCP Amendment Application Zoning DP Area yes no Variances Requested Development Details Property Size (m² or ha) Current Zoning Current OCP Designation Proposed

More information

OFFICE OF MANAGEMENT AND FINANCE

OFFICE OF MANAGEMENT AND FINANCE CITY OF PORTLAND OFFICE OF MANAGEMENT AND FINANCE Charlie Hales, Mayor Fred Miller, Chief Administrative Officer Ken Rust, Director, Bureau of Revenue and Financial Services Christine Moody Chief Procurement

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2 SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

Housing Authority of Utah County

Housing Authority of Utah County Legend Springville Site Vicinity Map (not to scale) Planning Department 110 South Main Street Phone (801) 491-7861 Fax (801) 489-2716 Community Development Director - J Fred Aegerter Public Works Department

More information

1.01 NOTICE TO BIDDERS

1.01 NOTICE TO BIDDERS ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School

More information

SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS

SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS 8.01 - Page i UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS Table of Contents SECTION

More information

CITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package

CITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package CITY OF RICHMOND CITY OF RICHMOND Notice of Public Opening Contract T.3263 Contract: Richmond Speed Skating Interior/ Exterior Signage Package Tenders have been issued for the Richmond Speed Skating Interior/

More information

TOWN of LAKESHORE SITE PLAN CHECKLIST

TOWN of LAKESHORE SITE PLAN CHECKLIST TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.

More information

PROPOSED NEW ERECTION OF A COVERED LNIKWAY AND ADDITION & ALERATION TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND NORTH BRIDGE ROAD

PROPOSED NEW ERECTION OF A COVERED LNIKWAY AND ADDITION & ALERATION TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND NORTH BRIDGE ROAD Page 3 Our Ref : FG5131622/Corr1 Date : 09 March 2015 Tender Ref No: TG/ITT/2014/0023 PROPOSED NEW ERECTION OF A COVERED LNIKWAY AND ADDITION & ALERATION TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND

More information

Miscellaneous. Demolition

Miscellaneous. Demolition Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard

More information

Record Drawing Standards for Projects Version 2.1

Record Drawing Standards for Projects Version 2.1 for Projects Version 2.1 Updated September 21, 2016 Department: Spatial Data Group Engineering & Maintenance 1. INTRODUCTION... 1 2. GENERAL STANDARDS... 1 2.1 Drawing Standards... 1 2.2 Digital Submission

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

TYPE 4-C TYPE 6 TYPE 7 TYPE 8

TYPE 4-C TYPE 6 TYPE 7 TYPE 8 ````` Face of ase rad. 42 TYPE rad. " T T T 22.5 2'- unless otherwise shown on plans 5" 5" 5" Slope 2: TYPE 2 rad. Concrete TYPE 2-A rad. Wearing Course Concrete ase Course TYPE 2-0" rad. TYPE 3 As Shown

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted

More information

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled

More information

TG Glazing Design-Build

TG Glazing Design-Build TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011

More information

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part

More information

This specification describes the minimum requirements for structural steel drawings.

This specification describes the minimum requirements for structural steel drawings. 1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED: ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS

More information

Standard Plate Sheer Reinforcement for Precast Drainage Structures has been updated upon recommendation of the Bridge Office.

Standard Plate Sheer Reinforcement for Precast Drainage Structures has been updated upon recommendation of the Bridge Office. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (13-03) MANUAL: Standard

More information

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016. GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE IFB 2014-014 Rail Expansion (Streetcar) Rampart Street Addendum IV Acknowledge receipt of this addendum in the bid submission. This addendum is a part of the Contract

More information

Cooke Precast Concrete

Cooke Precast Concrete Cooke Precast Concrete INSPECTION OPENINGS History Cooke Precast Concrete Pty. Ltd. commenced business in September 1996, with a staff combining together bringing many decades of knowledge and experience

More information