PROPOSED NEW ERECTION OF A COVERED LNIKWAY AND ADDITION & ALERATION TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND NORTH BRIDGE ROAD

Size: px
Start display at page:

Download "PROPOSED NEW ERECTION OF A COVERED LNIKWAY AND ADDITION & ALERATION TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND NORTH BRIDGE ROAD"

Transcription

1

2

3 Page 3 Our Ref : FG /Corr1 Date : 09 March 2015 Tender Ref No: TG/ITT/2014/0023 PROPOSED NEW ERECTION OF A COVERED LNIKWAY AND ADDITION & ALERATION TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND NORTH BRIDGE ROAD TENDER CORRIGENDUM NO. 1 S/N Item Original Pages Amendment Pages No. of Pages A Volume 1 of 2 To replace / add pages 1 SECTION 1 Preliminaries S.1/45-46 S.1(Corr1)/ CIVIL & STRUCTURE DRAWINGS SECTION 193-S_SE S_SE CIVIL & STRUCTURE DRAWINGS DETAIL S_DET S_DET ELECTRICAL INSTALLATION COVERD LINKWAY LIGHTING LAYOUT 1563/E-02 REV /E-02 REV ELECTRICAL INSTALLATION SINGLE LINE DIAGRAM 6 ARCHITECTURAL PARTIAL FLOOR PLAN PART 1 7 ARCHITECTURAL PARTIAL FLOOR PLAN PART 2 8 ARCHITECTURAL PARTIAL FLOOR PLAN PART 3 9 ARCHITECTURAL PARTIAL FLOOR PLAN PART 4 10 ARCHITECTURAL PARTIAL FLOOR PLAN PART 5 11 ARCHITECTURAL PLANTER GRATING DETAIL 12 ARCHITECTURAL S 450MM SEAT 13 ARCHITECTURAL S 450MM SEAT TYPICAL SECTION 1563/E-03 REV /E-03 REV REV REV REV REV REV REV REV REV

4 FAITHFUL+GOULD PTE. LIMITED TENDER REF NO: TG/ITT/2014/0023 PROPOSED NEW ERECTION OF A COVERED LINKWAY AND ADDITION & ALTERATION TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND NORTH BRIDGE ROAD TENDER CLARIFICATION NO MARCH 2015 Item Query Reply 6 Refer to drawing no: 193-S_PL08-00 enlarged 1 st storey roof plan zone 6 and 193-S_SE-00 section, there are some discrepancy for steel members, please clarify it. Refer to drawing 193-S_PL ) We confirm that the edge beam for Canopy 1 is 100x100x10mm THK ANGLE (B8). Refer to drawing 193-S_SE-00 2) We would like to highlight the change of column to beam connection short stump from 100x100x6mm THK SHS to 120x120x10mm THK SHS. It is 200mm in length as shown in Detail 8 of drawings issued. 3) We confirm that the main cantilever beam for Canopy 1 is 150x150x8mm THK SHS (B3). 4) We confirm that the edge beam for Canopy 1 is 100x100x10mm THK ANGLE (B8). Clarified in layout. 7 As per tender submission date: 12 March 2015, 12.00pm, can you confirm the final tender submission date. Please refer to clause 6(a) Submission of Tender on Page IT/3 in the section on Instruction to Tenderers of the Tender Documents. Page 2

5 FAITHFUL+GOULD PTE. LIMITED TENDER REF NO: TG/ITT/2014/0023 PROPOSED NEW ERECTION OF A COVERED LINKWAY AND ADDITION & ALTERATION TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND NORTH BRIDGE ROAD TENDER CLARIFICATION NO MARCH 2015 Item Query Reply 8 9 Please kindly advise that we should need to include the portraits of the people into the etched copper panel for the platforms? Any supplier contract number? Refer to drawing no: partial floor plan part 5 and partial floor finish plan part 5 the mentioned area (as per attachement) is under our scope of works? If it to be under our scope of works, can provide the detail of floor? Portraits of the people will be a graphic provided by the artist that will be etched on the copper panels. Contractor is to supply and install copper panels etched with these graphics. For copper panels, refer to drawing number For floor finishes, refer to drawing no The final 10 decorative concrete floor finishes are to be developed in collaboration with the architect, artist and concrete artisan. through a process of mockups and reviews. The concrete artisan will prepare mockups on site for architect's and artist's approval. These mockups will comprise a combination of aggregates, colours and effects to achieve the desired outcomes. The aggregates, colours and effects listed here are not exhaustive and is subject to further confirmation upon architect's and artist's reviewing of mockups. Page 3

6 SCHEDULE OF RATES Art Connector SECTION 1 - PRELIMINARIES ITEM NO DESCRIPTION Q/T/F Amount $ 48 WORKING DAYS AND WORKING HOURS (CONT'D) Subject to any provision to the contrary contained in the Contract, and subject to any written law on noise pollution (including the Environmental Protection and Management (Control of Noise at Construction Sites) Regulations), no work which requires supervision shall be carried out during the night or on Sundays or on public holidays without the written permission of the Superintending Officer except when such work is rendered unavoidable or necessary for the saving of life or property or for the safety of the Works, in which case the Contractor shall inform the Superintending Officer at the earliest possible opportunity of the same. For the purposes of this Clause, the term "night" shall mean the period from 6.00 p.m. to 8.00 a.m. Please note that no works are allowed to be carried out at Coleman Street, from 2.00AM to 11.00PM on the following dates: 6, 7, 13, 14, 20, 21, 27 and 28 June , 5, 11,12, 18, 19, 25 and 26 July , 2, 8 and 9 August 2015 Please note that no works are allowed to be carried out at North Bridge Road, from 2.00AM to 11.00PM on the following dates: 8 and 9 August 2015 In addition, any part of the Works which requires the Employer s supervision shall be carried out during the Employer s official works hours. The Superintending Officer s prior written permission shall be obtained. 49 WORK PERFORMED BY CONSULTANTS AND/OR EMPLOYER S SITE SUPERVISORY STAFF BEYOND NORMAL WORKING HOURS If overtime work is required either at the Contractor's request or in circumstances deemed necessary and approved by the SO, the Contractor will be required to reimburse the Employer for the nett overtime charges including CPF contributions, paid by the Employer to his Clerk-of-Works (Resident Technical Officer) and other site resident staff in this connection. The rates shall be 1½ times the normal rate for overtime on weekdays and Saturdays, and 1½ times the normal rate for overtime on Sundays and Public Holidays. The normal working hours shall be as follows: Monday to Friday 8.30 a.m. to 5.30 p.m. Saturday 8.30 a.m. to 1.00 p.m S.1(Corr1)/45

7 SCHEDULE OF RATES Art Connector SECTION 1 - PRELIMINARIES ITEM NO DESCRIPTION 49 WORK PERFORMED BY CONSULTANTS AND/OR EMPLOYER S SITE SUPERVISORY STAFF BEYOND NORMAL WORKING HOURS (CONT'D) The Contractor shall be deemed to have made all necessary allowances for any and all overtime expenses as may be required to be incurred by the Employer s site supervisory staff under the Contract. Q/T/F Amount $ The Contractor shall not pay overtime expenses to the Employer s site supervisory staff directly. Any such payment shall be forfeited by the Employer and the Contractor shall still remain liable for the overtime expenses to the Employer. 50 TESTING & TESTING FACILITIES The Contractor shall provide all the necessary labour, Plant, tools, instruments and materials for carrying out all tests stipulated in the Contract or as directed by the SO including the provision of all necessary transport for the transportation of instruments, tests materials, samples and supervisors, etc. to and from any accredited laboratory or any other testing facilities as and when directed by the SO or his appointed site representative. The Contractor shall make allowance for all the above in his tender price as no monetary claim for compensation or extras shall be paid for any work carried out by the Contractor in connection with the above work unless otherwise specified elsewhere in this Specification. The Contractor shall arrange for submission of copies of test results to the SO as soon as they are available. All tests and checks on Site shall be carried out as directed by or in the presence of the SO. Prior to the commencement of any concreting, the Contractor shall provide on Site at a shaded area at least one lockable water- tight curing tank of approved material and design. The tank shall be at least 760mm long, 530mm wide and 660mm high. The Contractor shall provide a sufficient number of tanks to accommodate the expected number of cubes, before they are sent for testing. The Contractor shall also provide and maintain for the duration of the Contract adequate apparatus on Site for concrete testing to the approval of the SO. The cost of all samples, transport and other expenses incidental to testing shall be borne by the Contractor. The Contractor shall arrange and pay for the tests listed to be carried out at the approved Engineering Laboratory as and when the SO may direct or at such intervals as the Specifications so require S.1(Corr1)/46

8

9

10

11

12

13

14

15

16 DET 8 & SECT H-H 100 x 100 x 10mm THK ANGLE (B8) FULL PENETRATION BUTT WELD (TYP.) 10mm THK ANGLE PLATE TYP x120x10mm SHS 6mm THK FILLET WELD (TYP.) 100 x 100 x 10mm THK ANGLE (B8) TITLE STAGE KEY PLAN PROJECT CLIENT DETAIL 4 TENDER PROPOSED NEW ERECTION OF A COVERED LINKWAY AND ADDITION & ALTERATION TO 2 EXISTING BUS SHELTERS at COLEMAN STREET and NORTH BRIDGE ROAD x 150 x 8mm THK RHS (B3) 10mm THK STIFFENER PLATE TYP. 139mm Ø x 10mm THK CHS () GROUTED WITH GRADE 45 CONCRETE GROUT SECTION H-H NATIONAL GALLERY SINGAPORE LOCATION COLEMAN STREET and NORTH BRIDGE ROAD x 250 x 12mm THK MS END PLATE (TYP.) 150x150x8mm THK SHS (B3) 139mm Ø x 10mm THK CHS () 250 x 250 x 12mm THK END PLATE DRAWING NO B3 EPS (Expanded polystyrene) FOAM COATED WITH "DRYVIT" BY OTHERS 100 x 100 x 10mm THK ANGLE (B8) S _ D E T PROJECT SHEET REVISION - REVISION DRAWN CHECKED DATE SCALE LLF/SDN ASA :20 THIS DRAWING IS MADE FOR AN A1 AND INDICATES THE DESIGN INTENT ONLY. ALL DIMENSIONS ARE IN MILLIMETRES OTHERWISE STATED AND SHOULD BE VERIFIED ON SITE BEFORE PROCEEDING WITH WORK. PLEASE READ THIS IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS. COPYRIGHT OF THIS DESIGN DRAWING REST SOLELY WITH FARM AND MAY NOT BE USED OR REPRODUCED WITHOUT PERMISSION FROM FARM. C&S CONSULTANT: A E

17 SECTION Z1C7: ZONE 1 CANOPY 7 PROPOSED NEW LINKWAY ACROSS COLEMAN STREET 200D x 200W x 8mm THK RHS (B2) SECTION BS: ZONE 6 EXISTING BUS SHELTER 1 SECTION Z6: ZONE 6 CANOPY 1 AND ZONE 8 EXISTING BUS SHELTER 2 SECTION Z7EL1: ZONE 7 EXISTING LINKWAY 1 PROPOSED NEW LINKWAY AT NORTH BRIDGE ROAD A&A TO EXISTING BUS SHELTERS AT NORTH BRIDGE ROAD A&A TO EXISTING LINKWAY 1 AT NORTH BRIDGE ROAD EXISTING STEEL COLUMN TO BE AND GROUTED WITH GRADE 45 CONCRETE GROUT EXISTING BUS ROUTE NOTICE BOARD TO BE 0 (Refer To Architect Drawing) EXISTING BOLLARD TO BE EXISTING KERB TO BE EXISTING ST ANDREW CATHEDRAL FENCES TO BE & PROTECTED DURING CONSTRUCTION SECTION Z5: ZONE 5 CANOPY 2 PROPOSED NEW LINKWAY AT COLEMAN STREET & NORTH BRIDGE ROAD INTERSECTION 2450 'ART' FLOORING IN DIFFERENT GRANOLITHIC FINISH & DIFFERENT APPLICATION METHOD BY OTHERS EXISTING DRAIN TO BE TOP OF DRAIN COVER IN PEBBLE WASH FINISH BY OTHERS EXISTING FOUNDATION & SLAB TO BE EXISTING STEEL 100x100x6mm SHS TO BE EXISTING KERB TO BE 20 VARIES (REFER TO ROOF PLAN) MAX 2950mm (REFER TO ROOF PLAN) EPS (Expanded polystyrene) FOAM COATED WITH "DRYVIT" BY OTHERS 850 ASPHALT ROAD BY OTHERS 200D x 200W x 8mm THK RHS (B2) EXISTING BEAM TO BE Øx10mm THK CHS GROUTED WITH GRADE 45 CONCRETE GROUT EXISTING ST ANDREW CATHEDRAL FENCES TO BE & PROTECTED DURING CONSTRUCTION 'ART' FLOORING IN DIFFERENT GRANOLITHIC FINISH & DIFFERENT APPLICATION METHOD BY OTHERS EXISTING DRAIN TO BE TOP OF DRAIN COVER IN PEBBLE WASH FINISH BY OTHERS EXISTING STRUCTURAL SLAB TO BE EPS (Expanded polystyrene) FOAM COATED WITH "DRYVIT" BY OTHERS 2650 (Refer To Architect Drawing) x120x10mm THK SHS 250 VARIES (REFER TO ROOF PLAN) 'ART' FLOORING FINISHES BY OTHERS) 1200 T BOTH WAYS TOP AND BOTTOM HOMOGENOUS TACTILE TILES BY OTHERS 219Ø x 10mm THK CHS () KERB BY OTHERS 50D x 100W x 8mm THK RHS (B3) 2465 ASPHALT ROAD BY OTHERS EPS (Expanded polystyrene) FOAM COATED WITH "DRYVIT" BY OTHERS EPS (Expanded polystyrene) FOAM COATED WITH "DRYVIT" AND D10 MESH TOP AND BOTTOM BY OTHERS PROPOSED NEW LINKWAY ALONG COLEMAN STREET SECTION CM: CANOPIES 3 (ZONE 4),4 (ZONE 3), 5 (ZONE 2), 6 (ZONE 1) VARIES (REFER TO ROOF PLAN) EPS (Expanded polystyrene) FOAM COATED WITH "DRYVIT" AND D10 TOP MESH BY OTHERS HEIGHT VARIES (REFER TO ARCHITECT DWG) EXISTING SCREEDING AND GROUND SLAB TO BE HACKED AWAY AND REINSTATED TO ORIGINAL CONDITION PROPOSED PLANTING VERGE KERB BY OTHERS ASPHALT ROAD BY OTHERS EXISTING DRAINAGE PIPE POSITION INDICATIVE. CONTRACTOR TO VERIFY ON SITE 750mm HIGH RC PLATFORM (DETAILS REFER TO DWG TYP1) 100D x 100W x 8mm THK RHS (B1) T BOTH WAYS TOP AND BOTTOM 101.6Ø x 8.1mm THK CHS () mm HIGH RC PLATFORM (DETAILS REFER TO DWG TYP1) 450mm HIGH RC PLATFORM (DETAILS REFER TO DWG TYP1) EXISTING ST ANDREW CATHEDRAL FENCES TO BE & PROTECTED DURING CONSTRUCTION EXISTING DRAIN TO BE UPGRADED BY PUB 'ART' FLOORING FINISHES BY OTHERS) EXISTING DRAINAGE PIPE TO BE VERIFIED ON SITE BY CONTRACTOR. CONTRACTOR TO COORDINATE WITH PUB FOR RELOCATION OF PIPE IN THE EVENT WHEN RELOCATION IS REQUIRED 800 KERB BY OTHERS 'ART' FLOORING FINISHES BY OTHERS) T BOTH WAYS TOP AND BOTTOM Ø x 10mm THK CHS () B4 EPS (Expanded polystyrene) FOAM COATED WITH "DRYVIT" AND D10 MESH TOP AND BOTTOM BY OTHERS VEHICULAR ACCESS GROUND SLAB TO MATCH EXISTING SPECIFICATIONS ACCORDING TO LTA STANDARD DETAILS 219Ø x 10mm THK CHS () THK LEAN CONCRETE 150mm THK WELL COMPACTED HARDCORE WELL COMPACTED SOIL 50 THK LEAN CONCRETE 150mm THK WELL COMPACTED HARDCORE WELL COMPACTED SOIL EXISTING BEAM TO BE 50 THK LEAN CONCRETE 150mm THK WELL COMPACTED HARDCORE WELL COMPACTED SOIL 2800 HEADROOM CLEARANCE EXISTING DRAINAGE PIPE POSITION INDICATIVE. CONTRACTOR TO VERIFY ON SITE 100 x 100 x 10mm THK ANGLE (B8) EXISTING KERB TO BE EXISTING DRAINAGE PIPE TO BE VERIFIED ON SITE BY CONTRACTOR. CONTRACTOR TO COORDINATE WITH PUB FOR RELOCATION OF PIPE IN THE EVENT WHEN RELOCATION IS REQUIRED B2 B2 B1 B1 B B3 100 x 100 x 10mm THK ANGLE (B8) 50 THK LEAN CONCRETE 150mm THK WELL COMPACTED HARDCORE WELL COMPACTED SOIL EXISTING 150x150x12mm ANGLE (B9) TO BE AND ADJUSTED B MM PRECAST CONCRETE BUS STOP SEAT (DETAILS REFER TO DWG TYP1) EXISTING ST ANDREW CATHEDRAL FENCES TO BE & PROTECTED DURING CONSTRUCTION 'ART' FLOORING IN DIFFERENT GRANOLITHIC FINISH & DIFFERENT APPLICATION METHOD BY OTHERS EXISTING DRAIN TO BE TOP OF DRAIN COVER IN PEBBLE WASH FINISH BY OTHERS EXISTING FOUNDATION & SLAB TO BE FULL PENETRATION BUTT WELD EXISTING 150x150x12mm 4M22 BOLT G8.8 TO BE ANGLE (B9) TO BE AND ADJUSTED 10mm THK ANGLE PLATE TYP. EXISTING 100x100x10mm ANGLE (B8) TO BE AND ADJUSTED 280 EXISTING STEEL COLUMN TO BE AND GROUTED WITH GRADE 45 CONCRETE GROUT 4M16 BOLT GRADE 8.8 TO BE TITLE STAGE KEY PLAN PROJECT CLIENT SECTION TENDER PROPOSED NEW ERECTION OF A COVERED LINKWAY AND ADDITION & ALTERATION TO 2 EXISTING BUS SHELTERS at COLEMAN STREET and NORTH BRIDGE ROAD LOCATION EXISTING 180x180x8mm STEEL SHS TO BE 324mmØx12mm THK MS END PLATE 10mm THK STIFFENER PLATE TYP. NATIONAL GALLERY SINGAPORE COLEMAN STREET and NORTH BRIDGE ROAD 1 DRAWING NO S _ S E C PROJECT SHEET REVISION - REVISION 04 DRAWN CHECKED DATE SCALE 1 LLF/SDN ASA :30 230mmØx10mm THK MS END PLATE 40x40x10mm THK STIFFENER PLATE EXISTING 100x100x10mm ANGLE (B8) TO BE AND ADJUSTED THIS DRAWING IS MADE FOR AN A1 AND INDICATES THE DESIGN INTENT ONLY. ALL DIMENSIONS ARE IN MILLIMETRES OTHERWISE STATED AND SHOULD BE VERIFIED ON SITE BEFORE PROCEEDING WITH WORK. PLEASE READ THIS IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS. COPYRIGHT OF THIS DESIGN DRAWING REST SOLELY WITH FARM AND MAY NOT BE USED OR REPRODUCED WITHOUT PERMISSION FROM FARM. C&S CONSULTANT: A E

18 PROPOSED NEW ERECTION OF A COVERED LINKWAY AND ADDITION & ALTERATIONS TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND NORTH BRIDGE ROAD

19 NEW WEATHERPROOF TWIN 13A SSO (ON EACH BENCH) TO BE PROVIDED NEW WEATHERPROOF TWIN 13A SSO (ON EACH BENCH) TO BE PROVIDED LIGHTING CIRCUITS TO BE CONNECTED TO EXISTING OG BOX 'OG/CTH' NEW OG BOX 'OG/CTH' TO REPLACE THE OLD ONE PLEASE REFER TO LPA'S DRAWINGS (DRAWING NO. LTG_LP01 &LTG_LP02 (T1)) FOR THE LIGHTING LAYOUT PROPOSED NEW ERECTION OF A COVERED LINKWAY AND ADDITION & ALTERATIONS TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND NORTH BRIDGE ROAD LIGHTING CIRCUITS TO BE CONNECTED TO NEW OG BOX 'OG' NEW OG BOX 'OG' COVERED LINWAY PLAN SCALE 1 : 100

20 FAITHFUL+GOULD PTE. LIMITED TENDER REF NO: TG/ITT/2014/0023 PROPOSED NEW ERECTION OF A COVERED LINKWAY AND ADDITION & ALTERATION TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND NORTH BRIDGE ROAD TENDER CLARIFICATION NO MARCH 2015 Item Query Reply 1 Please kindly advise the light fittings supply and install by contractor? Yes light fittings supply and install should be supplied and installed by contractor. For lighting plan and specifications, refer to Appendix lighting drawing no. LTG_LP01, LTG_LP02 & S Please kindly advise the planting verge is under our scope of work? 'Art' Flooring is various integral decorative concrete finishes? Should be install by contractor or others? From the ID drawings stated that by others. Dwg Ref: 193-S_SE-00 Please kindly advise the location for supply and lay pebble wash floor finish. Refer to drawing no: partial floor plan part 4 and schedule of rates, section 2 prime cost provisional sum, item A, landscape works, the works of 2 meter width planting verge will be under provisional sum landscape works. Please clarify it. Yes, planting verge and landscaping should be supplied and installed by contractor. For landscape plan, refer to drawing no to Yes, art flooring finishes should be supplied and installed by contractor. For floor finishes, refer to drawing no There is no pebble wash finish, only integral decorative concrete finish on floor for the whole site. For floor finishes, refer to drawing no Yes, the works of 2 meter width planting verge will be under provisional sum landscape works. Page 1

21 FAITHFUL+GOULD PTE. LIMITED TENDER REF NO: TG/ITT/2014/0023 PROPOSED NEW ERECTION OF A COVERED LINKWAY AND ADDITION & ALTERATION TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND NORTH BRIDGE ROAD TENDER CLARIFICATION NO MARCH 2015 Item Query Reply 6 Refer to drawing no: 193-S_PL08-00 enlarged 1 st storey roof plan zone 6 and 193-S_SE-00 section, there are some discrepancy for steel members, please clarify it. Refer to drawing 193-S_PL ) We confirm that the edge beam for Canopy 1 is 100x100x10mm THK ANGLE (B8). Refer to drawing 193-S_SE-00 2) We would like to highlight the change of column to beam connection short stump from 100x100x6mm THK SHS to 120x120x10mm THK SHS. It is 200mm in length as shown in Detail 8 of drawings issued. 3) We confirm that the main cantilever beam for Canopy 1 is 150x150x8mm THK SHS (B3). 4) We confirm that the edge beam for Canopy 1 is 100x100x10mm THK ANGLE (B8). Clarified in layout. 7 As per tender submission date: 12 March 2015, 12.00pm, can you confirm the final tender submission date. Please refer to clause 6(a) Submission of Tender on Page IT/3 in the section on Instruction to Tenderers of the Tender Documents. Page 2

22 FAITHFUL+GOULD PTE. LIMITED TENDER REF NO: TG/ITT/2014/0023 PROPOSED NEW ERECTION OF A COVERED LINKWAY AND ADDITION & ALTERATION TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND NORTH BRIDGE ROAD TENDER CLARIFICATION NO MARCH 2015 Item Query Reply 8 9 Please kindly advise that we should need to include the portraits of the people into the etched copper panel for the platforms? Any supplier contract number? Refer to drawing no: partial floor plan part 5 and partial floor finish plan part 5 the mentioned area (as per attachement) is under our scope of works? If it to be under our scope of works, can provide the detail of floor? Portraits of the people will be a graphic provided by the artist that will be etched on the copper panels. Contractor is to supply and install copper panels etched with these graphics. For copper panels, refer to drawing number For floor finishes, refer to drawing no The final 10 decorative concrete floor finishes are to be developed in collaboration with the architect, artist and concrete artisan. through a process of mockups and reviews. The concrete artisan will prepare mockups on site for architect's and artist's approval. These mockups will comprise a combination of aggregates, colours and effects to achieve the desired outcomes. The aggregates, colours and effects listed here are not exhaustive and is subject to further confirmation upon architect's and artist's reviewing of mockups. Page 3

23 SECTION Z1C7: ZONE 1 CANOPY 7 PROPOSED NEW LINKWAY ACROSS COLEMAN STREET 200D x 200W x 8mm THK RHS (B2) SECTION BS: ZONE 6 EXISTING BUS SHELTER 1 AND ZONE 8 EXISTING BUS SHELTER 2 A&A TO EXISTING BUS SHELTERS AT NORTH BRIDGE ROAD EXISTING STEEL COLUMN TO BE AND GROUTED WITH GRADE 45 CONCRETE GROUT EXISTING 150x150x12mm ANGLE (B9) TO BE 4M22 BOLT G8.8 TO BE AND ADJUSTED EXISTING BUS ROUTE NOTICE BOARD TO BE 0 (Refer To Architect Drawing) EXISTING BOLLARD TO BE EXISTING KERB TO BE EXISTING ST ANDREW CATHEDRAL FENCES TO BE & PROTECTED DURING CONSTRUCTION SECTION Z5: ZONE 5 CANOPY 2 PROPOSED NEW LINKWAY AT COLEMAN STREET & NORTH BRIDGE ROAD INTERSECTION SECTION Z7EL1: ZONE 7 EXISTING LINKWAY 'ART' FLOORING IN DIFFERENT GRANOLITHIC FINISH & DIFFERENT APPLICATION METHOD BY OTHERS EXISTING DRAIN TO BE TOP OF DRAIN COVER IN PEBBLE WASH FINISH BY OTHERS EXISTING FOUNDATION & SLAB TO BE EXISTING STEEL 100x100x6mm SHS TO BE EXISTING KERB TO BE 20 VARIES (REFER TO ROOF PLAN) MAX 2950mm (REFER TO ROOF PLAN) EPS (Expanded polystyrene) FOAM COATED WITH "DRYVIT" BY OTHERS 850 ASPHALT ROAD BY OTHERS 200D x 200W x 8mm THK RHS (B2) SECTION Z6: ZONE 6 CANOPY 1 EXISTING BEAM TO BE Øx10mm THK CHS GROUTED WITH GRADE 45 CONCRETE GROUT EXISTING ST ANDREW CATHEDRAL FENCES TO BE & PROTECTED DURING CONSTRUCTION 'ART' FLOORING IN DIFFERENT GRANOLITHIC FINISH & DIFFERENT APPLICATION METHOD BY OTHERS EXISTING DRAIN TO BE TOP OF DRAIN COVER IN PEBBLE WASH FINISH BY OTHERS EXISTING STRUCTURAL SLAB TO BE EPS (Expanded polystyrene) FOAM COATED WITH "DRYVIT" BY OTHERS 2650 (Refer To Architect Drawing) x100x6mm THK SHS 250 VARIES (REFER TO ROOF PLAN) 'ART' FLOORING FINISHES BY OTHERS) 1200 T BOTH WAYS TOP AND BOTTOM HOMOGENOUS TACTILE TILES BY OTHERS KERB BY OTHERS 50D x 100W x 8mm THK RHS (B3) 2465 ASPHALT ROAD BY OTHERS EPS (Expanded polystyrene) FOAM COATED WITH "DRYVIT" BY OTHERS EPS (Expanded polystyrene) FOAM COATED WITH "DRYVIT" AND D10 MESH TOP AND BOTTOM BY OTHERS PROPOSED NEW LINKWAY ALONG COLEMAN STREET SECTION CM: CANOPIES 3 (ZONE 4),4 (ZONE 3), 5 (ZONE 2), 6 (ZONE 1) VARIES (REFER TO ROOF PLAN) EPS (Expanded polystyrene) FOAM COATED WITH "DRYVIT" AND D10 TOP MESH BY OTHERS HEIGHT VARIES (REFER TO ARCHITECT DWG) EXISTING SCREEDING AND GROUND SLAB TO BE HACKED AWAY AND REINSTATED TO ORIGINAL CONDITION PROPOSED PLANTING VERGE KERB BY OTHERS ASPHALT ROAD BY OTHERS EXISTING DRAINAGE PIPE POSITION INDICATIVE. CONTRACTOR TO VERIFY ON SITE 750mm HIGH RC PLATFORM (DETAILS REFER TO DWG TYP1) 100D x 100W x 8mm THK RHS (B1) T BOTH WAYS TOP AND BOTTOM 101.6Ø x 8.1mm THK CHS () mm HIGH RC PLATFORM (DETAILS REFER TO DWG TYP1) 450mm HIGH RC PLATFORM (DETAILS REFER TO DWG TYP1) EXISTING ST ANDREW CATHEDRAL FENCES TO BE & PROTECTED DURING CONSTRUCTION EXISTING DRAIN TO BE UPGRADED BY PUB 'ART' FLOORING FINISHES BY OTHERS) EXISTING DRAINAGE PIPE TO BE VERIFIED ON SITE BY CONTRACTOR. CONTRACTOR TO COORDINATE WITH PUB FOR RELOCATION OF PIPE IN THE EVENT WHEN RELOCATION IS REQUIRED 800 KERB BY OTHERS 'ART' FLOORING FINISHES BY OTHERS) T BOTH WAYS TOP AND BOTTOM B4 EPS (Expanded polystyrene) FOAM COATED WITH "DRYVIT" AND D10 MESH TOP AND BOTTOM BY OTHERS VEHICULAR ACCESS GROUND SLAB TO MATCH EXISTING SPECIFICATIONS ACCORDING TO LTA STANDARD DETAILS THK LEAN CONCRETE 150mm THK WELL COMPACTED HARDCORE WELL COMPACTED SOIL 50 THK LEAN CONCRETE 150mm THK WELL COMPACTED HARDCORE WELL COMPACTED SOIL EXISTING BEAM TO BE 50 THK LEAN CONCRETE 150mm THK WELL COMPACTED HARDCORE WELL COMPACTED SOIL HEADROOM CLEARANCE EXISTING DRAINAGE PIPE POSITION INDICATIVE. CONTRACTOR TO VERIFY ON SITE 100 x 100 x 10mm THK ANGLE (B8) EXISTING KERB TO BE EXISTING DRAINAGE PIPE TO BE VERIFIED ON SITE BY CONTRACTOR. CONTRACTOR TO COORDINATE WITH PUB FOR RELOCATION OF PIPE IN THE EVENT WHEN RELOCATION IS REQUIRED B3 100 x 100 x 10mm THK ANGLE (B8) 50 THK LEAN CONCRETE 150mm THK WELL COMPACTED HARDCORE WELL COMPACTED SOIL EXISTING 150x150x12mm ANGLE (B9) TO BE AND ADJUSTED B MM PRECAST CONCRETE BUS STOP SEAT (DETAILS REFER TO DWG TYP1) EXISTING ST ANDREW CATHEDRAL FENCES TO BE & PROTECTED DURING CONSTRUCTION 'ART' FLOORING IN DIFFERENT GRANOLITHIC FINISH & DIFFERENT APPLICATION METHOD BY OTHERS EXISTING DRAIN TO BE TOP OF DRAIN COVER IN PEBBLE WASH FINISH BY OTHERS EXISTING FOUNDATION & SLAB TO BE FULL PENETRATION BUTT WELD EXISTING 100x100x10mm ANGLE (B8) TO BE AND ADJUSTED 280 EXISTING STEEL COLUMN TO BE AND GROUTED WITH GRADE 45 CONCRETE GROUT 4M16 BOLT GRADE 8.8 TO BE TITLE STAGE KEY PLAN PROJECT CLIENT SECTION TENDER PROPOSED NEW ERECTION OF A COVERED LINKWAY AND ADDITION & ALTERATION TO 2 EXISTING BUS SHELTERS at COLEMAN STREET and NORTH BRIDGE ROAD EXISTING 180x180x8mm STEEL SHS TO BE 324mmØx12mm THK MS END PLATE 50x50x10mm THK STIFFENER PLATE NATIONAL GALLERY SINGAPORE LOCATION COLEMAN STREET and NORTH BRIDGE ROAD DRAWING NO S _ S E C PROJECT SHEET REVISION - REVISION EXISTING STEEL 100x100x6mm SHS TO BE DRAWN CHECKED DATE SCALE LLF/SDN ASA :30 230mmØx10mm THK MS END PLATE 40x40x10mm THK STIFFENER PLATE EXISTING 100x100x10mm ANGLE (B8) TO BE AND ADJUSTED THIS DRAWING IS MADE FOR AN A1 AND INDICATES THE DESIGN INTENT ONLY. ALL DIMENSIONS ARE IN MILLIMETRES OTHERWISE STATED AND SHOULD BE VERIFIED ON SITE BEFORE PROCEEDING WITH WORK. PLEASE READ THIS IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS. COPYRIGHT OF THIS DESIGN DRAWING REST SOLELY WITH FARM AND MAY NOT BE USED OR REPRODUCED WITHOUT PERMISSION FROM FARM. C&S CONSULTANT: A E 219Ø x 10mm THK CHS () 219Ø x 10mm THK CHS () 04 B2 B2 B1 B1 B2 219Ø x 10mm THK CHS () PROPOSED NEW LINKWAY AT NORTH BRIDGE ROAD A&A TO EXISTING LINKWAY 1 AT NORTH BRIDGE ROAD

24 CANOPY 01 (2.65M HT) DET 6 CANOPY 01 (2.65M HT) DET 9 B C4 C4 (TYP. EXT'G COLUMNS TO BE C4 964 B10 DET DET 6 B8 (TYP. CANOPY 1 EDGE BEAM) B3 (TYP. CANOPY 1 CANTILEVER) B3 (TYP. CANOPY 1 EDGE BEAM) DET 9 B10 C4 C4 (TYP. EXT'G COLUMNS TO BE EXISTING COLUMNS AND BEAMS BETWEEN GRID E1 TO E30 TO BE AND ALTERED C4 B10 DET 9 PARTIAL PLAN CUT LINE PARTIAL PLAN CUT LINE Ø x 8.1mm THK CHS Ø x 10mm THK CHS Ø x 10mm THK CHS Ø x 12mm THK CHS CANOPY 03 (3.7M HT) CANOPY 01 (2.65M HT) EXT'G LINKWAY 1 (2.65M HT) EXT'G LINKWAY 1 (2.65M HT) DET 2 DET 2 B2 (TYP. CANOPY 7) B1 (TYP. CANOPY 3) B2 (TYP. CANOPY 2) B1 (TYP. CANOPY 4) B1 (TYP. CANOPY 5) B1 (TYP. CANOPY 6) DET 6 DET 9 DET 9 TITLE STAGE KEY PLAN PROJECT CLIENT ENLARGED 1ST STOREY & ROOF PLAN ZONE 6 TENDER PROPOSED NEW ERECTION OF A COVERED LINKWAY AND ADDITION & ALTERATION TO 2 EXISTING BUS SHELTERS at COLEMAN STREET and NORTH BRIDGE ROAD NATIONAL GALLERY SINGAPORE LOCATION COLEMAN STREET and NORTH BRIDGE ROAD DRAWING NO S _ P L PROJECT SHEET REVISION - REVISION DRAWN CHECKED DATE SCALE LLF/SDN ASA :75 ZONE 6 THIS DRAWING IS MADE FOR AN A1 AND INDICATES THE DESIGN INTENT ONLY. ALL DIMENSIONS ARE IN MILLIMETRES OTHERWISE STATED AND SHOULD BE VERIFIED ON SITE BEFORE PROCEEDING WITH WORK. PLEASE READ THIS IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS. COPYRIGHT OF THIS DESIGN DRAWING REST SOLELY WITH FARM AND MAY NOT BE USED OR REPRODUCED WITHOUT PERMISSION FROM FARM. C&S CONSULTANT: A E 1ST STOREY PLAN ZONE 6 ROOF PLAN ZONE 6 EXT'G BUS SHELTER 2 (3.0M HT)

Notre Dame High Addition/Renovation Addendum 3 Page 1

Notre Dame High Addition/Renovation Addendum 3 Page 1 School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)

More information

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work; THIS AGREEMENT made in triplicate this th day of, 200 BETWEEN: CITY OF OTTAWA (the City -and- (the Artist WHEREAS the Council of the former City of Ottawa, an old municipality as defined in the City of

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review Step 1: Request for Conditional Approval, page 1 of 5 Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review I,, the Property Owner, or Owner

More information

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site. INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing

More information

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14 BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2)

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

GROUND FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) FIRST FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only)

GROUND FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) FIRST FLOOR PLAN S.F. 2 Bedroom - 1Bath 2 Storey (First Floor Only) 3 5' ' 5' ' -0" High Wall -6" W W bedroom x ' carpet fl. fin. W bedroom ' x ' carpet fl. fin. W ' D3 5' 6' 5' D W3-8" x 8'-8" D4 ceramic tile fin. kitchen '- 8' x 8'-8" ceramic tile fin. D3 4 bath 5' -8"

More information

CITY OF NEW WESTMINSTER SECTION Westminster Pier Park ADDENDUM NO. 1 Landscape Contract

CITY OF NEW WESTMINSTER SECTION Westminster Pier Park ADDENDUM NO. 1 Landscape Contract ADDENDUM NO. 1 November 10, 2010 This Addendum forms part of the Bid Documents and amends the original Contracting Requirements, Specifications, and Drawings, and clarifies Bidders questions received between

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog

More information

ADDENDUM NO. 1 CLARIFICATION NO. 1

ADDENDUM NO. 1 CLARIFICATION NO. 1 October 23, 2014 ADDENDUM NO. 1 TO Central Loop Bus Rapid Transit (BRT) CDOT PROJECT NO: B-1-633 SPECIFICATION NO: 125921 RFQ: 4736 For which bids will be opened in the office of the Department of Procurement

More information

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall

More information

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax: City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS

More information

SOFTBALL BLEACHER REPLACEMENT PROJECT 4000 SUISUN VALLEY ROAD, FAIRFIELD, CA PROJECT NO: APPLICATION NO: SUBMITTAL INDEX

SOFTBALL BLEACHER REPLACEMENT PROJECT 4000 SUISUN VALLEY ROAD, FAIRFIELD, CA PROJECT NO: APPLICATION NO: SUBMITTAL INDEX SOFTBALL BLEACHER REPLACEMENT PROJECT SOLANO COMMUNITY COLLEGE DISTRICT 4000 SUISUN VALLEY ROAD, FAIRFIELD, CA 94534 PROJECT NO: 7-003 APPLICATION NO: SUBMITTAL GENERAL NOTES LEGEND PROJECT SCOPE INDEX

More information

Listed below are the competencies required and examples from the aforementioned job:

Listed below are the competencies required and examples from the aforementioned job: 1. Technical Analysis Instructions: Describe a project for which you collected and interpreted or analyzed technical data for development of engineering designs and drawings from concepts and specifications.

More information

W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603

W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603 869 86 863 W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI 53703 ph 608-709-1250 Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603 Re Submit/15002_Titleblock.dwg 868 SN LEGEND W 867

More information

HANSCOM FIELD ARFF AND CBP BUILDING

HANSCOM FIELD ARFF AND CBP BUILDING HANSCOM FIELD ARFF AND CBP BUILDING AERIAL VIEW OF AIRFIELD PROJECT SITE HANSCOM AIR FIELD CIVIL AIR TERMINAL HANSCOM AIR FORCE BASE 95 AIRFIELD MAIN ENTRY SITE AERIAL PLAN VIEW OF AIRFIELD N MASSACHUSETTS

More information

CORRIGENDA TO STEEL CONNECTIONS SERIES 1 AND 2 Version 2

CORRIGENDA TO STEEL CONNECTIONS SERIES 1 AND 2 Version 2 ASI Head Oice Level 3, 99 Mount Street North Sydney NSW 060 Tel: 0 993 6666 Email: enquiries@steel.org.au (ABN)/ACN (94) 000973 839 www.steel.org.au Author: T J HOGAN Date: February 0 Page o 9 CORRIGENDA

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

Architect. Architect.

Architect. Architect. The The line line sketch sketch with with modified modified height height for for plinth plinth floor floor is is displayed. displayed. Open Open Architectural Architectural plan plan file, file, which

More information

bedroom CROSS SECTION FLOOR PLAN S.F. 1 Bedroom Flat kitchen 6'-8" x 8' bath bedroom 10' X 10' FLOOR PLAN AND CROSS SECTION 1BF / 01 Gr. Lev.

bedroom CROSS SECTION FLOOR PLAN S.F. 1 Bedroom Flat kitchen 6'-8 x 8' bath bedroom 10' X 10' FLOOR PLAN AND CROSS SECTION 1BF / 01 Gr. Lev. 0'42 3 0'- 8' 2' 2' 2-8" 0' '- 2' '- See Roof Framing Plan And Roof Anchorage Details W2 W 8" 6'-8" kitchen 6'-8" x 8' bath 6'-8"x -8" D3 2'- 2'- 2'-8" D D2 0' X 0' W 0' 0'-8" ' Steel Framed Window Gr.

More information

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT

More information

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total

More information

NIAGARA REGIONAL HOUSING MZE FILE NO

NIAGARA REGIONAL HOUSING MZE FILE NO M A C D O N A L D Z U B E R E C E N S S L E N A rch it ects I nc. NRH NEW DEVELOPMENT PROJECT 527 CARLTON ST., ST. CATHARINES, ONTARIO NIAGARA REGIONAL HOUSING MZE FILE NO. 16-44 Project No. 16-44 April

More information

SPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES

SPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES KP/3CB/TSP/0/00 04-09-9 Page of 9 TABLE OF CONTENTS 0. Circulation List 0. Amendment Record FOREWORD. SCOPE. REFERENCES 3. TERMS AND DEFINITIONS 4. REQUIREMENTS 5. TESTS AND INSPECTION 6. MARKING, LABELLING

More information

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN *** IMPORTANT INFORMATION Please

More information

LOT 1: Provision and Installation of Electrical Networks for All Zones in Returnees Shelter Compound-Kilo 18- Ramadi- Anbar Governorate

LOT 1: Provision and Installation of Electrical Networks for All Zones in Returnees Shelter Compound-Kilo 18- Ramadi- Anbar Governorate HUB IN AMMAN Subject: LOT 1: Provision and Installation of Electrical Networks for All Zones in Returnees Shelter Compound-Kilo 18- Ramadi- Anbar Governorate Background: TERMS OF REFERENCE The ongoing

More information

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Room Addition / Remodel Submittal Requirement Checklist City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY

More information

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06 CGLS A R C H I T E C T S CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. 2500 Cumberland Parkway Suite 350 Atlanta, Georgia 30339 404.733.5493 (voice) 404.733.6804 (fax) www.cglsarchitects.com ARCHITECT

More information

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250)

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250) The Office of the Finance and Purchasing Manager Telephone : (250) 352-8204 Fax : (250) 352-6594 REQUEST FOR PREQUALIFICATIONS RADIO COMMUNICATIONS INFRASTRUCTURE UPGRADE CONTRACTOR SERVICES 2018-PRQ-01

More information

Total Precast Concrete Structures

Total Precast Concrete Structures Total Precast Concrete Structures 1 This program is registered with CPCI for continuing professional education. CPCI s continuing-education program emphasizes on learning for architects, engineers and

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION

Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION / / Date Received by NSCA Office / / Submittal Expiration Date Owner s Name: Tract:

More information

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers Addendum to Description of Services for Building and Planning, 2012 8.4 Digital Design 2016 The Association of of Consulting Engineers FRI and DANSKE ARK Addendum to Description of Services for Building

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the

More information

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...

More information

PARKING IMPROVEMENT AIRPORT CAMPUS AMENDED SITE PLAN APPROVAL DRAWINGS 113 KING STREET TOWN OF NORTH CASTLE, NEW YORK AIRPORT CAMPUS I-V LLC

PARKING IMPROVEMENT AIRPORT CAMPUS AMENDED SITE PLAN APPROVAL DRAWINGS 113 KING STREET TOWN OF NORTH CASTLE, NEW YORK AIRPORT CAMPUS I-V LLC AMENDED SITE PLAN APPROVAL DRAWINGS PARKING IMPROVEMENT AIRPORT CAMPUS CLIENT: AIRPORT CAMPUS I-V LLC 113 KING STREET TOWN OF NORTH CASTLE, NEW YORK JMC DRAWINGS SITE PLANNER, CIVIL ENGINEER, SURVEYOR

More information

Architectural Floor Plan Symbols

Architectural Floor Plan Symbols Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section

More information

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT 209 South Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT *** IMPORTANT

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid

More information

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated

More information

GENERAL ISOMETRIC LAYOUT

GENERAL ISOMETRIC LAYOUT EXISTING OR PROPOSED WIPER WALL SUPPORT STRUCTURE GATE LID CARBATHAN HG 0 WEB GRAY LOWER PAN GRATING ALUMINUM WIPER WALL CARBATHANE HG, 90 GRAY STRUCTURAL SPECIFICATIONS:. FLOODGATE MATERIAL TO BE ALUMINUM

More information

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NG NATIONAL CERTIFICATE MODULE DESCRIPTOR

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NG NATIONAL CERTIFICATE MODULE DESCRIPTOR -SQA-SCOTTISH QUALIFICATIONS AUTHORITY Hanover House 24 Douglas Street GLASGOW G2 7NG NATIONAL CERTIFICATE MODULE DESCRIPTOR -Module Number- 0065213 -Session-1986-87 -Superclass- -Title- TM STRUCTURAL

More information

PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION

PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION INTRODUCTION Planning permission was granted by the City of London on th February 0 for a scheme by Hugh Broughton Architects to refurbish and extend the Treasury Building in the Inner Temple. The project

More information

www.cad-designers.com Staffing Services Cad Designers is an established staffing company that specializes in providing professional support for the A/E/C industry. All candidates are screened with a complete

More information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects) SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,

More information

Addendum No.2. Rehabilitation of Maqam en-nabi Musa in Jericho Governorate. 29 September 2:00 PM (Jerusalem Time)

Addendum No.2. Rehabilitation of Maqam en-nabi Musa in Jericho Governorate. 29 September 2:00 PM (Jerusalem Time) United Nations Development Programme Programme of Assistance to the Palestinian People برنامج الا مم المتحدة الا نماي ي/ برنامج مساعدة الشعب الفلسطيني ITB-2016-205 Addendum No. 2 dated 8 September 2016

More information

SYARIKAT BEKALAN AIR SELANGOR SDN BHD

SYARIKAT BEKALAN AIR SELANGOR SDN BHD NOTE : 1. FOR LEGEND, ABBREVIATION AND GENERAL NOTES SEE DRG. NO. SYA / STD / 001. 2. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED. 3. ACTUAL LENGTH OF PE COMMUNICATION PIPES SHALL BE DETERMINED ON

More information

752 ST. MARYS RD. LAFAYETTE, CA. PROJECT DATA FLOOR AREA

752 ST. MARYS RD. LAFAYETTE, CA. PROJECT DATA FLOOR AREA FLOOR AREAS 1ST. FLOOR LIVING AREA 2ND. FLOOR LIVING AREA TOTAL LIVING GARAGE TOTAL PROPOSED GROSS FLOOR AREA PROPOSED CUT PROPOSED FILL 3,686 SQ.FT 1,668 SQ.FT 5,354 SQ.FT 875 SQ.FT. 6,229 SQ.FT. 420

More information

APPENDIX D: DRAWING SUBMISSION STANDARDS

APPENDIX D: DRAWING SUBMISSION STANDARDS 1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission

More information

HC Precast System ( 100 % Malaysia Technology With 6 IPs )

HC Precast System ( 100 % Malaysia Technology With 6 IPs ) Choose Industrialised Building System ( IBS ) for Economical Construction Industrialised Building System ( IBS ) functions as a comprehensive superstructure construction system whereby flexibility in it's

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION

More information

HOENER ASSOCIATES INC. ARCHITECTS

HOENER ASSOCIATES INC. ARCHITECTS HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,

More information

PROJECT: PROPOSED GARBAHAREY MEAT MARKET - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY MEAT MARKET GOVERNMENT. - GARBAHAREY DISTRICT -

PROJECT: PROPOSED GARBAHAREY MEAT MARKET - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY MEAT MARKET GOVERNMENT. - GARBAHAREY DISTRICT - : - GARBAHAREY DISTRICT - CONSULTANTS: GARBAHAREY GOVERNMENT. - GARBAHAREY DISTRICT - N O : SEPT. 2016 DRAWING INDEX SHEET N O DRAWING N O DRAWING CONTENT 01. 01/15 Cover Page.. /15 Drawing Index. 03.

More information

INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION

INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION I/We hereby request approval by the Architectural Review Committee for the modification shown below of Lot #: Street Address: Phone

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

APPLICATION FORM FOR INFRASTRUCTURE NOC

APPLICATION FORM FOR INFRASTRUCTURE NOC APPLICATION FORM FOR INFRASTRUCTURE NOC Submission Type New Resubmission (Previous Reference No): Arch. Str. HVAC EHS Others Revision /Amendment (Infrastructure NOC Reference No): Arch. Str. HVAC EHS Others

More information

COMPILATION OF TENDER DOCUMENTS

COMPILATION OF TENDER DOCUMENTS COMPILATION OF TENDER DOCUMENTS Arc. Ibrahim A. Haruna, FNIA, PNIA, mni. -the familiar question!- Mr. Architect, after these your beautiful drawings, what next? ARCHITECT S PROCEDURE: -drawing board to

More information

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced

More information

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593 April 7, 2016 City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 393 RE: Conditional Use Arby s Restaurant Multi-Tenant Development 631 Hometown Circle-Lot 6

More information

INVITATION FOR BID (IFB) IFB NO. GSWA

INVITATION FOR BID (IFB) IFB NO. GSWA INVITATION FOR BID (IFB) IFB NO. GSWA-005-16 AGAT AND MALOJLOJ RESIDENTIAL TRANSFER STATION IMPROVEME AND DEDEDO RESIDENTIAL TRANSFER STATION CLOSURE ADDENDUM NO. 6 September 22, 2016 ALL BIDDERS MUST

More information

Last Name: First Name: M.I:

Last Name: First Name: M.I: ARCHITECTURE DESIGN REVIEW BOARD APPLICATION OFFICE USE ONLY APPLICATION # Permit # Fee Collected $ 1. Filing Status Initial Submission Amendment Withdrawal 2. Cost of Construction (Industry Standards)

More information

Circular Letter No. 1

Circular Letter No. 1 GENERAL DIRECTORATE FOR REGIONAL DEVELOPMENT PHARE FOUNDS M.I.E. IEŞIRE Nr.. Ziua 12 Luna 10 Anul 2006 To: «Companie» «Adresa» Fax: «Fax» Dear Mrs. / Mr. «Persoana_de_Contact», Circular Letter No. 1 TENDER

More information

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11 HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum

More information

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review eplan Submission Standards Building Standards February 2018 SUBMISSION STANDARDS PREPARING YOUR ELECTRONIC

More information

Double Storey HC Precast System Drawing - 3D

Double Storey HC Precast System Drawing - 3D Double Storey HC Precast System Drawing - 3D Superstructure ( Frame & Wall ) : - By HC Precast System Sub- Structure By Other : - Appointed By Client 77 % 23 % INDUSTRIALISED BUILDING SYSTEM ( IBS ) is

More information

Plant Client Contract Code Document ID Contract No. TECHNICAL SPECIFICATIONS DC SHUNT Rev 00 Page 1 of 2

Plant Client Contract Code Document ID Contract No. TECHNICAL SPECIFICATIONS DC SHUNT Rev 00 Page 1 of 2 TECHNICAL SPECIFICATIONS Rev 00 Page 1 of 2 0 IFI Release for Enquiry 14/12/18 SSS 14/12/18 HGG 14/12/18 RBU - Rev. Status Description Date Prepared Date Checked Date Approved AC Based on: PIN-QMC-03-F101

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

Estates Development & Projects

Estates Development & Projects Estates Development & Projects Production Guidelines for the Building Fabric Manual (incorporating Health & Safety File) Guidance for the Technical Author REVISION 10.2 Issue Date 09/2017 Contents Part

More information

SYARIKAT BEKALAN AIR SELANGOR SDN BHD

SYARIKAT BEKALAN AIR SELANGOR SDN BHD NOTE : 1. FOR LEGEND, ABBREVIATION AND GENERAL NOTES SEE DRG. NO. SYA / STD / 001. 2. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED. 3. ACTUAL LENGTH OF PE COMMUNICATION PIPES SHALL BE DETERMINED ON

More information

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts RESPONSES TO QUESTIONS and/or RFI s # 3 Date: 09/14/18 The attention of Contractors

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

Loyola University Maryland Provisional Policies and Procedures for Intellectual Property, Copyrights, and Patents

Loyola University Maryland Provisional Policies and Procedures for Intellectual Property, Copyrights, and Patents Loyola University Maryland Provisional Policies and Procedures for Intellectual Property, Copyrights, and Patents Approved by Loyola Conference on May 2, 2006 Introduction In the course of fulfilling the

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

Electrical Procedure No E032. Procedure No: ELE 032

Electrical Procedure No E032. Procedure No: ELE 032 Procedure No: ELE 032 Procedure Title: Date of Procedure: Responsible Person(s) Safety Isolation of Low Voltage Networks and Systems for work to be carried out by third parties. i.e. Non University personnel.

More information

GENERAL PRELIMINARIES

GENERAL PRELIMINARIES GENERAL PRELIMINARIES JBCC Edition 6.2 MAY 2018 Page 1 of 2 pages The Joint Building Contracts Committee - NPC General Preliminaries Edition 6.2 May 2018 JBCC EXPLANATORY NOTES AND INSTRUCTIONS Introduction

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.

More information

TO WHOM IT MAY CONCERN:

TO WHOM IT MAY CONCERN: TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

What Plans Do I Need for a Building Permit?

What Plans Do I Need for a Building Permit? What Plans Do I Need for a Building Permit? 6 CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1900 SW 4th Avenue, Por tland, Oregon 97201 503-823-7300 www.portlandoregon.gov/bds This brochure

More information

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016

More information

INVITATION TO TENDER ITT / NO. PS CONSTRUCTION SERVICES FOR THE VANCOUVER SOUTH TRANSFER STATION ODOR AND DUST CONTROL SYSTEM IMPROVEMENTS

INVITATION TO TENDER ITT / NO. PS CONSTRUCTION SERVICES FOR THE VANCOUVER SOUTH TRANSFER STATION ODOR AND DUST CONTROL SYSTEM IMPROVEMENTS FINANCIAL SERVICES GROUP Supply Management INVITATION TO TENDER ITT / NO. PS20152055 QUESTIONS AND ANSWERS NO. 1 ISSUED ON MARCH 4, 2016 Q1 Would it be possible to schedule another site visit to allow

More information

Public Call to Artists for Expressions of Interest Newton Recreation Centre Glass Curtain Wall Design for glass frit application

Public Call to Artists for Expressions of Interest Newton Recreation Centre Glass Curtain Wall Design for glass frit application Public Call to Artists for Expressions of Interest Newton Recreation Centre Glass Curtain Wall Design for glass frit application Goal: an image and metaphor that represents: Weaving Communities Together

More information

CONSTRUCTION CERTIFICATION PACKAGE

CONSTRUCTION CERTIFICATION PACKAGE Purpose: The intent of this Construction Certification Package is to ensure that acceptable documentation is maintained during the construction of stormwater management practices (SMPs). For general information

More information

Promontory Architectural Review Committee

Promontory Architectural Review Committee Promontory Architectural Review Committee Design Review Application Purpose The Design Review Process and Application have been established to insure that a proposed project is compatible with historical,

More information

MANuFACturers industry QuALity statement.

MANuFACturers industry QuALity statement. MANuFACturers industry QuALity statement Precast New Zealand Inc. (PCNZ) was established in 1999 and is a national industry association of precast concrete manufacturers representing over 90% of the off

More information

APPENDIX D PHASE 1C PILE LAYOUT AND FOUNDATION DRAWINGS

APPENDIX D PHASE 1C PILE LAYOUT AND FOUNDATION DRAWINGS APPENDIX D PHASE 1C PILE LAYOUT AND FOUNDATION DRAWINGS Chobham Manor LLP Foundation Details Legacy Communities Scheme PDZ6 Phase 1C Report no. 25724-R12 (01) Ja Ka La Ma 0 CONTINUED ON DRAWING CA-2101

More information

City of Regina Standard Construction Specification SECTION 2660 CHAIN LINK FENCE

City of Regina Standard Construction Specification SECTION 2660 CHAIN LINK FENCE 1.0 GENERAL 1.1 Scope 1.1.1 The work shall consist of supply and installing chain link fence, including braces and gates, as shown on the plans and specifications at the locations designated by the Engineer.

More information