1 Procedure No: ELE 032 Procedure Title: Date of Procedure: Responsible Person(s) Safety Isolation of Low Voltage Networks and Systems for work to be carried out by third parties. i.e. Non University personnel. Aug 2011 (Rev.1) Personnel i.e. Those persons Authorise to isolate & reinstate LV Switchgear and Cable Networks Who Requires to Use this Procedure: : - Senior Electrical Engineer. Electrical Engineer. Clerk of Works (Electrical). Electrical Supervisor & Electrical Foreman DLO Section. Legislative or Other Compliance: Electricity at Work Regulations 1989 Health and Safety at Work Regulations 1974 etc. Departmental Local Rules for Electrical Safety Overview: It is the responsibility of to ensure that all alteration works or modifications carried out on University owned LV Networks & LV Systems by third parties (with particular emphasis made to Electrical Contractors) to achieve compliance with legislation. The foregoing works must be carried out safely. This procedure is aimed at controlling safety and shall include formal written procedures e.g. (LV) Isolation Certificate. Page 1 of 5

2 Narrative: This procedure is applicable where subject to a site specific risk assessment the appropriate point of electrical safety isolation is outwith the control of third parties. (see Appendix No. 1 definition of Third Party ) This procedure is also applicable where subject to a risk assessment the appropriate point of electrical safety isolation may or could conflict with the safe operation of existing University services & equipment. A block electrical diagram is attached to this procedure ref ELE 032/1 (see Appendix No 2 Block Diagram). The purpose of the diagram is to explain the difference between local electrical isolation which would normally be under the control of third parties and remote points of safety isolation which would primarily be covered by this procedure. Irrespective of the foregoing it is necessary that dialog takes place with all concerned to reach an agreement on the arrangements for electrical isolation to allow work on LV networks to be carried out safely. Those persons who require using and applying this procedure must be Authorised to do so and be Competent (see Appendix No. 1 Definition of Competent Person ) both in the understanding of the equipment to be worked on and on the hazards that may arise if specific precautions are not undertaken. Procedure: Those authorised Competent persons employed by University of Strathclyde, Department of requiring using this procedure shall make arrangements to visit site to discuss with third parties the precise nature of the works being carried out. They shall establish what LV switching operations are necessary to completely isolate the LV system from all parts of the network such that all parts to be worked on are dead and verified to be dead using appropriate test instrument. Where necessary devices such as Safety Padlocks, shall be applied to the points where the system being worked on could be made live. (LV) Isolation Certificate An (LV) Isolation Certificate shall be prepared by those Competent persons responsible for carrying out the switching operations on behalf of the University. The Certificate shall record the points at which the system is isolated and locked off and a description of work to be carried out. If deemed necessary and for information only a sketch illustrating a schematic layout of the LV Network relative to the work in question and the points of isolation may be appended to the Certificate. Receipt The third party shall sign the Certificate accepting that they are satisfied with the provisions of safety isolation and confirm that they are in agreement with the description of works to be carried out. Clearance Following completion of work the Authorised Representative of the third party shall notify the issuer of the Certificate that the work for which the Isolation Certificate was issued is now completed and that all persons under the cover of the Certificate have been withdrawn and warned that it is no longer safe to work on the apparatus specified and that all tools and additional equipment have been removed. The Authorised Representative of the third party shall sign, time and date the Clearance section of the Certificate. Confirmation / Cancellation Following declaration of Clearance the Authorised Representative of the University shall sign, time and date the Confirmation / Cancellation section of the Certificate. Page 2 of 5

3 Subject to standard testing all in accordance with BS7671 IEE Wiring Regulations Current Edition and amendments the Authorised Representative of the University shall remove all safety devices and reinstate power. Page 3 of 5

4 APPENDICES Appendix No.1 Third Party (Defn.) Third party personnel are those outsourced services that are not directly employed by a University department. E.g. Sub-Contractors, Technical Support Services etc. Competent Person (Defn.) A person who has: - Adequate knowledge & training of electricity. Adequate experience of electrical work. Adequate understanding of the equipment to be worked on and technical knowledge or experience of the system. Adequate understanding of the hazards, which may arise during the works and hazards in adjacent areas that may have an impact to the works. Page 4 of 5

5 Appendix No.2 Block Diagram Page 5 of 5

6

Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area

Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area Guideline for Creating Disconnection Points and Establishing a Not Document Number: Authorised by: Issue Date: 29 June 2012 Previous Document: 12 February 2010 Principal Authors: J Dohmen Powerlink D Brown

More information

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN Approval Amendment Record Approval Date Version Description 01/04/2014 1 Initial Issue under MTM PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 7 Table of Contents

More information

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety 8.22 Switching Activities Purpose This instruction provides a safe system for switching on Horizon Powers Low Voltage, High Voltage and or Transmission electrical apparatus/network, where switching operations

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

SYNCHRONISING AND VOLTAGE SELECTION

SYNCHRONISING AND VOLTAGE SELECTION SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

Earthing, HV Switching and Associated Operational Equipment. Approval: Chief Operating Officer

Earthing, HV Switching and Associated Operational Equipment. Approval: Chief Operating Officer ACCESS PRACTICE AP 24 Earthing, HV Switching and Associated Operational Equipment Process Authority: Manager Operations Improvement Approval: Chief Operating Officer Version Date: 27/08/2013 Revision:

More information

UNCONTROLLED COPY. Queensland Electricity Entity Standard for Safe Access to High Voltage Electrical Apparatus. August 2015

UNCONTROLLED COPY. Queensland Electricity Entity Standard for Safe Access to High Voltage Electrical Apparatus. August 2015 Queensland Electricity Entity Standard for Safe Access to High Voltage Electrical Apparatus August 2015 August 2015 Queensland Electricity Entity Standard for Safe Access to HV Electrical Apparatus I This

More information

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT Approval Amendment Record Approval Date Version Description 30/05/2014 1 Initial issue under MTM. This procedure supersedes the Overlapping Design Agreement, Application and Transfer Log documents L2-SIG-PRO-007,

More information

TS RES - OUTSTANDING ISSUES

TS RES - OUTSTANDING ISSUES TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next

More information

SECTION 13. ACQUISITIONS

SECTION 13. ACQUISITIONS SECTION 13. ACQUISITIONS... 13-1 13.1 Introduction... 13-1 13.2 On-Market Takeover... 13-1 13.3 Off-Market Takeover... 13-2 13.3.1 Accepting an Off-Market Bid... 13-3 13.3.2 Accepting an Off Market Bid

More information

SUBJECT HEADING: Switching Programmes ISSUE: 18

SUBJECT HEADING: Switching Programmes ISSUE: 18 SUBJECT: Switchgear/Switching PROCEDURE: S04 SUBJECT HEADING: Switching Programmes ISSUE: 18 DATE: Apr 2017 1. INTRODUCTION 1.1 A written programme of switching operations shall be prepared. This programme

More information

ACCESS TO HIGH VOLTAGE APPARATUS

ACCESS TO HIGH VOLTAGE APPARATUS CORPORATE PROCEDURE ACCESS TO HIGH VOLTAGE APPARATUS Approved By: Prepared By: Issue Date: 17/6/2011 Andrew Macrides Access to Apparatus Rules File No: Managing Director Committee QDOC2011/63 Status: Approved

More information

PSSI 27 Work or Testing On or Near to High Voltage Direct Current (HVDC) Plant and Apparatus

PSSI 27 Work or Testing On or Near to High Voltage Direct Current (HVDC) Plant and Apparatus 1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical) and the Company Safety Instructions to achieve Safety from the System for

More information

Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID

Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID Company (applicant): hereby applies to RISE Research Institutes of Sweden AB, as Notified

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability

More information

Title Operating Work - Low Voltage Distribution System. Reference Number POP 06 - (RIC Standard: EP SI)

Title Operating Work - Low Voltage Distribution System. Reference Number POP 06 - (RIC Standard: EP SI) Discipline Engineering Standard - NSW Category Electrical Title Operating Work - Low Voltage Distribution System Reference Number POP 06 - (RIC Standard: EP 95 30 00 03 SI) Document Control Status Date

More information

Type Approval JANUARY The electronic pdf version of this document found through is the officially binding version

Type Approval JANUARY The electronic pdf version of this document found through  is the officially binding version STANDARD FOR CERTIFICATION No. 1.2 Type Approval JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The content of this service

More information

1 SERVICE DESCRIPTION

1 SERVICE DESCRIPTION DNV GL management system ICP Product Certification ICP 4-6-3-5-CR Document number: ICP 4-6-3-5-CR Valid for: All in DNV GL Revision: 2 Date: 2017-05-05 Resp. unit/author: Torgny Segerstedt Reviewed by:

More information

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes Company Directive STANDARD TECHNIQUE: SD1E/2 Technical Requirements for Customer Export Limiting Schemes Policy Summary This Standard Technique specifies the requirements for customer owned Export Limitation

More information

Signalling Documentation and Drawings

Signalling Documentation and Drawings Discipline: Engineering (Signalling) Category: Standard Signalling Documentation and Drawings SCP 06 Applicability New South Wales CRIA (NSW CRN) Primary Source RIC Standard SC 00 23 00 00 SP Version 3.0

More information

Absolute Block. Uncontrolled When Printed Document to be part superseded by GKRT0055 Iss 1 and GKRT0077 Iss 1 (published on 07/09/2013)

Absolute Block. Uncontrolled When Printed Document to be part superseded by GKRT0055 Iss 1 and GKRT0077 Iss 1 (published on 07/09/2013) Signatures removed from electronic version Submitted by... Richard Genner Nominated Responsible Manager Approved by... Philip Wiltshire Chairman, Train Control & Communications Subject Committee Approved

More information

Section 3. Test Procedures

Section 3. Test Procedures Section 3. Information contained within this section shall be read in conjunction with all sections of this manual Non - Compliant Test Results Where acceptable results are not attained in accordance with

More information

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer.

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer. SPEC-0002 1/8 1.0 PURPOSE This specification describes the requirements and procedure for requesting new drawing numbers, requesting drawing files for revision, and submitting drawings for archiving. This

More information

25kV A.C. Electrified Lines - Traction Bonding

25kV A.C. Electrified Lines - Traction Bonding Date:MAR 94 25kV A.C. Electrified Lines - Traction Page 1 of 6 Part A Synopsis This is issued by the to define the Boards requirements for continuity bonding on railway systems. This will ensure a continuous

More information

Requirements for GSM-R Voice Radio System

Requirements for GSM-R Voice Radio System Requirements for GSM-R Voice Radio System Signatures removed from electronic version Synopsis This document mandates requirements for the use of GSM-R systems, where these are available, to support operational

More information

Company 'A' Wind Turbine Safety Rules (3 rd Edition) Support Procedure P2 PROCEDURE FOR APPROVAL OF TOOLS, EQUIPMENT AND PROCESSES

Company 'A' Wind Turbine Safety Rules (3 rd Edition) Support Procedure P2 PROCEDURE FOR APPROVAL OF TOOLS, EQUIPMENT AND PROCESSES Company 'A' Wind Turbine Safety Rules (3 rd Edition) 2015 Support Procedure P2 PROCEDURE FOR APPROVAL OF TOOLS, EQUIPMENT AND PROCESSES 1. INTRODUCTION The purpose of this procedure is to enable Company

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and Guidance NSI 26 RAILWAY CONNECTION CIRCUITS Copyright National Grid plc 2016, all rights reserved. No part of this publication

More information

TYPE APPROVAL PROCEDURE

TYPE APPROVAL PROCEDURE Approval Amendment Record Approval Date Version Description 15/06/2012 1 Initial issue under MTM. Replaces Connex documents cml- 8.13-PR-002 & cml-8.21-po-168 30/11/2012 2 Document revised and updated

More information

HIGH VOLTAGE RULES. Document Owner: HV Group. Authorised: Electrical Services Manager Liberty Primary Steel

HIGH VOLTAGE RULES. Document Owner: HV Group. Authorised: Electrical Services Manager Liberty Primary Steel HIGH VOLTAGE RULES Document Owner: HV Group Authorised: Electrical Services Manager Liberty Primary Steel HIGH VOLTAGE RULES Revision 10 INDEX 1.0 GENERAL 1.1 SCOPE 1.2 DUTIES 1.3 SUPPLY AND KNOWLEDGE

More information

APPENDIX C APPROVAL PROCESS SUBMISSION FORMS. HCJ/LJ/B100841/JR Issue J Nov 17. Appendix C

APPENDIX C APPROVAL PROCESS SUBMISSION FORMS. HCJ/LJ/B100841/JR Issue J Nov 17. Appendix C APPENDIX C APPROVAL PROCESS SUBMISSION FORMS STEP 2A CONCEPT DESIGN SUBMISSION To: Edward Utteridge From: Bristol BS1 6AL Retailer: c.c. Piers Gorman piers.gorman@landsecurities.com Jonathan Everitt jeveritt@oriumdesign.co.uk

More information

Seychelles Civil Aviation Authority SAFETY NOTICE. Coding and registration of Seychelles 406 Mhz Emergency Locator Transmitters (ELTs)

Seychelles Civil Aviation Authority SAFETY NOTICE. Coding and registration of Seychelles 406 Mhz Emergency Locator Transmitters (ELTs) Seychelles Civil Aviation Authority Safety Notice SAFETY NOTICE Number: Issued: 25 April 2018 Coding and registration of Seychelles 406 Mhz Emergency Locator Transmitters (ELTs) This Safety Notice contains

More information

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007 BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission

More information

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations C&G 2395-01 Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations Phase rotation and verification of voltage drop 1 Outcomes of this Session describe how to assess

More information

Page 2 of 69 VDE Report No.: / DC - DC Converter for building in. TDK Innoveta Inc. iba - Series (see model matrix appendix 1)

Page 2 of 69 VDE Report No.: / DC - DC Converter for building in. TDK Innoveta Inc. iba - Series (see model matrix appendix 1) Page 2 of 69 VDE Report No.: 2520400-3336-0009/132550 Test item description... : Trade Mark...: Manufacturer...: Model/Type reference...: Serial Number..: Ratings...: Input: Output: Ambient: DC - DC Converter

More information

Position Paper.

Position Paper. Position Paper Brussels, 30 September 2010 ORGALIME OPINION ON THE POSITION OF THE COUNCIL AT FIRST READING WITH A VIEW TO THE ADOPTION OF A REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL LAYING

More information

IMP/010/011 Code of Practice for Earthing LV Networks and HV Distribution Substations

IMP/010/011 Code of Practice for Earthing LV Networks and HV Distribution Substations Version:- 3.0 Date of Issue:- January 2018 Page 1 of 70 IMP/010/011 Code of Practice for Earthing LV Networks and HV Distribution Substations 1. Purpose The purpose of this document is to ensure the company

More information

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments

More information

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) Page 1 Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) ECC RECOMMENDATION (06)05 ON THE PROVISION OF INFORMATION ON THE

More information

Safety of Toys Implementing Regulation

Safety of Toys Implementing Regulation Safety of Toys Implementing Regulation SECTION I Aim, Scope, Basis and Definitions Aim ARTICLE 1 - (1) The aim of this Implementing Regulation is to lay down the procedures and principles on the safety

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

LOCKOUT / TAGOUT PROGRAM

LOCKOUT / TAGOUT PROGRAM Page 1 of 7 1. SCOPE LOCKOUT / TAGOUT PROGRAM This Program outlines the purpose, rules, responsibilities and techniques to be followed by all University of Pittsburgh employees to guard against the unexpected

More information

Drawing Management Standard

Drawing Management Standard Record Number: R0000393979 Version Number: 1.0 Date: December 2015 Authorisations Action Name and title Date Prepared by TasNetworks 23/12/2015 Reviewed by David King With input from Rick Stevens, Jeshua

More information

EU- T y p e E x a m i n a t i o n C e r t i f i c a t e

EU- T y p e E x a m i n a t i o n C e r t i f i c a t e MiCOM Labs, Inc.: EU Notified Body Number 2280 EU- T y p e E x a m i n a t i o n C e r t i f i c a t e Rev: A Date: 27 th June 2017 Approval Holder Name: Suhan Kim MANDO corp. Approval Holder Address 32,

More information

Lineside Signs. Withdrawn Document Uncontrolled When Printed. Railway Group Standard. Issue Three Date July 1996

Lineside Signs. Withdrawn Document Uncontrolled When Printed. Railway Group Standard. Issue Three Date July 1996 Railway Group Standard Date July 1996 Lineside Signs Signatures removed from electronic version Submitted by Philip Wiltshire Nominated Responsible Manager Approved by Synopsis This standard defines signs

More information

Collection of standards in electronic format (PDF) 1. Copyright

Collection of standards in electronic format (PDF) 1. Copyright Collection of standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance

More information

LICENCE. for WEB LINKS. Check if this document is current Find similar documents StandardsWatch (info and login) Visit our website

LICENCE. for WEB LINKS. Check if this document is current Find similar documents StandardsWatch (info and login) Visit our website LICENCE for Licensee: Date: Conditions of use: Click here for full conditions of Licence WEB LINKS Check if this document is current Find similar documents StandardsWatch (info and login) Visit our website

More information

AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation

AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation The Republic of Belarus, Republic of Kazakhstan and the Russian

More information

WP197 Capacity Market Metering Test

WP197 Capacity Market Metering Test WP197 Capacity Market Metering Test EMRS Working Practice Public Version: 4.0 Date: 20 July 2018 Table of Contents Change Amendment Record 4 1. Introduction 5 1.1 Scope and Purpose 5 1.2 Main Users and

More information

Kryptonite Authorized Seller Program

Kryptonite Authorized Seller Program Kryptonite Authorized Seller Program Program Effective Date: January 1, 2018 until discontinued or suspended A Kryptonite Authorized Seller is one that purchases Kryptonite offered products directly from

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE

NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE Radio Equipment Directive (RED) 2014/53/EU MiCOM Labs Inc., Notified Body Number 2280 declares, on the basis of the assessment of the tests and the technical

More information

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007. Our Ref: Your Ref: Date: November 2007 To: All Recipients of the Serviced Grid Code Regulatory Frameworks Electricity Codes National Grid Electricity Transmission plc National Grid House Warwick Technology

More information

Moline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE

Moline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE Moline Illinois CODE OF ORDINANCES Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE SEC. 8-9300. TITLE. The title of this division shall be the Emergency Radio System Coverage

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 4114.2 Australian/New Zealand Standard Spray painting booths, designated spray painting areas and paint mixing rooms Part 2: Installation and maintenance This Joint Australian/New Zealand Standard

More information

BEMFV. Order on the procedure for providing proof as regards limiting exposure to. electromagnetic fields

BEMFV. Order on the procedure for providing proof as regards limiting exposure to. electromagnetic fields BEMFV Order on the procedure for providing proof as regards limiting exposure to electromagnetic fields Unofficial translation. Only the German text is authentic. The Order on the procedure for providing

More information

Signalling Maintenance Testing

Signalling Maintenance Testing Date Feb 1997 Signalling Maintenance Testing Signatures removed from electronic version Synopsis This standard defines the testing requirements for previously working and commissioned signalling systems

More information

EE Limited - Public Wireless Network Licence Company Registration no First Issued: 26/03/93 - Licence Number: Rev: 20-10/01/17

EE Limited - Public Wireless Network Licence Company Registration no First Issued: 26/03/93 - Licence Number: Rev: 20-10/01/17 Office of Communications (Ofcom) Wireless Telegraphy Act 2006 EE Limited - Public Wireless Network Licence PUBLIC WIRELESS NETWORK LICENCE This Licence document replaces the version of the Licence issued

More information

Road signs Specifications

Road signs Specifications AS 1743:2018 AS 1743:2018 Road signs Specifications This Australian Standard was prepared by Committee MS-012, Road Signs and Traffic Signals. It was approved on behalf of the Council of Standards Australia

More information

Procedure Mining Two Way Radio Usage (Surface)

Procedure Mining Two Way Radio Usage (Surface) Procedure Mining () M-SF-008 Relevant to: Business Unit: Mining Division: Document Owner: General Manager West Revision Status: Revision Date Section Page/s Revision Description Reviewed By Approved By

More information

By: Georgia Institute of Technology

By: Georgia Institute of Technology Date: / / Page 1 of 19 1.0 PURPOSE 2.0 SCOPE To provide instructions for the registration, use, operation, control, and accountability of radiation machines at the Georgia Institute of Technology (Georgia

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS) Approval Amendment Record Approval Date Version Description 15/10/2015 1 This policy takes precedence over L1-NAM-PRO-003 Infrastructure As Built Drawing Management due to business restructures. New Content

More information

Appendix A: Resolution 18 (1994) Review of the ITU s Frequency Coordination and Planning Framework for Satellite Networks

Appendix A: Resolution 18 (1994) Review of the ITU s Frequency Coordination and Planning Framework for Satellite Networks Appendix A: Resolution 18 (1994) Review of the ITU s Frequency Coordination and Planning Framework for Satellite Networks The Plenipotentiary Conference of the International Telecommunication Union (Kyoto,

More information

SECTION 6. CONVERSION BETWEEN SUBREGISTERS... 1

SECTION 6. CONVERSION BETWEEN SUBREGISTERS... 1 SECTION 6. CONVERSION BETWEEN SUBREGISTERS... 1 6.1 Conversion Concepts... 1 6.1.1 Warranties and Indemnities... 1 6.1.2 Carrying Forward of Standing Instructions... 2 6.1.3 Conversion Requests Approaching

More information

CHESS CLEARING HOUSE ELECTRONIC SUBREGISTER SYSTEM

CHESS CLEARING HOUSE ELECTRONIC SUBREGISTER SYSTEM CHESS CLEARING HOUSE ELECTRONIC SUBREGISTER SYSTEM Information provided is for educational purposes and does not constitute financial product advice. You should obtain independent advice from an Australian

More information

PRODUCT MANUAL. AGD Systems Limited 2016 Doc. Ref. 932 PM ISS3 ISO ISO 9001 Registered Quality Management. Registered Environmental Management

PRODUCT MANUAL. AGD Systems Limited 2016 Doc. Ref. 932 PM ISS3 ISO ISO 9001 Registered Quality Management. Registered Environmental Management ISO 14001 PRODUCT MANUAL ISO 9001 Registered Quality Management 015 Registered Environmental Management 015 AGD Systems Limited 2016 Doc. Ref. 932 PM ISS3 TABLE OF CONTENTS INTRODUCTION Product & technology

More information

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS (This contents page does not form part of the Grid Code) Paragraph No/Title Page No ECP.1 INTRODUCTION... 2 ECP.2 OBJECTIVE... 3 ECP.3 SCOPE...

More information

CENTRAL BANK OF MALTA

CENTRAL BANK OF MALTA CENTRAL BANK OF MALTA DIRECTIVE NO 10 in terms of the CENTRAL BANK OF MALTA ACT (CAP. 204) AUTHENTICATION, FITNESS CHECKING AND RECIRCULATION OF EURO BANKNOTES AND COINS Ref: CBM/10 DIRECTIVE NO 10 DIRECTIVE

More information

CLARK COUNTY FIRE CODE AMENDMENTS

CLARK COUNTY FIRE CODE AMENDMENTS CLARK COUNTY FIRE CODE AMENDMENTS SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM is amended to read as follows: SECTION 510 EMERGENCY RESPONDER RADIO COVERAGE SYSTEM 510.1 Emergency responder radio

More information

Procedures for the management of satellite network filings

Procedures for the management of satellite network filings Procedures for the management of satellite network filings Reference: MCA/O/16-2656 Publication Date: 28 December 2016 Valletta Waterfront, Pinto Wharf, Floriana FRN1913, Malta. Tel: (+356) 2133 6840 Fax:

More information

UCF Patents, Trademarks and Trade Secrets. (1) General. (a) This regulation is applicable to all University Personnel (as defined in section

UCF Patents, Trademarks and Trade Secrets. (1) General. (a) This regulation is applicable to all University Personnel (as defined in section UCF-2.029 Patents, Trademarks and Trade Secrets. (1) General. (a) This regulation is applicable to all University Personnel (as defined in section (2)(a) ). Nothing herein shall be deemed to limit or restrict

More information

TEST REPORT IEC Information technology equipment Safety Part 1: General requirements

TEST REPORT IEC Information technology equipment Safety Part 1: General requirements Test Report issued under the responsibility of: TEST REPORT IEC 60950-1 Information technology equipment Safety Part 1: General requirements Report Number.... : 207721-AS3-1 CB/DE1-55140 Date of issue...

More information

TEST REPORT IEC Information technology equipment Safety Part 1: General requirements

TEST REPORT IEC Information technology equipment Safety Part 1: General requirements Test Report issued under the responsibility of: TEST REPORT IEC 60950-1 Information technology equipment Safety Part 1: General requirements Report Number.... : 210282-CI3-2 CB DE1-56459 Date of issue...

More information

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE

More information

त न ब. BUREAU OF INDIAN STANDARDS Hallmarking Department, BIS. Subject: Draft BIS Hallmarking Regulations for comments

त न ब. BUREAU OF INDIAN STANDARDS Hallmarking Department, BIS. Subject: Draft BIS Hallmarking Regulations for comments त न ब ल र व, ए 11 प ल 2017 व :- ट प पव वलए ए ल र व वन द त न ब ( ए ) व वन 2016 प न त त त क ए ए ए ल र व वन द, व त ज न ट प पव वलए प स ट प पव, कद ल जट ए hallmarking@bis.gov.in 28/04/2017 त ज ज त लग :- ऊप क

More information

GENERAL DESCRIPTION OF THE CMC SERVICES

GENERAL DESCRIPTION OF THE CMC SERVICES STANDARD FOR CERTIFICATION No.1.1 GENERAL DESCRIPTION OF THE CMC SERVICES MAY 2007 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property and the

More information

TECHNOLOGY QUALIFICATION MANAGEMENT

TECHNOLOGY QUALIFICATION MANAGEMENT OFFSHORE SERVICE SPECIFICATION DNV-OSS-401 TECHNOLOGY QUALIFICATION MANAGEMENT OCTOBER 2010 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property

More information

Endeavour Energy Electrical Safety Rules. October 2013

Endeavour Energy Electrical Safety Rules. October 2013 Endeavour Energy Electrical Safety Rules October 2013 Endeavour Energy Electrical Safety Rules Associated Procedures List Document No. Title GSY 0031 Operating or observing plant near overhead electrical

More information

Installation & Operating Manual. iwap202

Installation & Operating Manual. iwap202 Installation & Operating Manual iwap202 This page is intentionally left blank. Document Number 409345 (based on 407655) (See Last Page for Revision Details) For warranty information, refer to Terms and

More information

EU- T y p e E x a m i n a t i o n C e r t i f i c a t e

EU- T y p e E x a m i n a t i o n C e r t i f i c a t e MiCOM Labs, Inc.: EU Notified Body Number 2280 EU- T y p e E x a m i n a t i o n C e r t i f i c a t e Rev: A Date: 5 January 2018 Approval Holder Name: Ajax Systems Inc. Approval Holder Address 910 Foulk

More information

SERVICING & METERING SERVICING AND METERING SECTION 5 SEC5:

SERVICING & METERING SERVICING AND METERING SECTION 5 SEC5: SECTION SERVICING AND METERING SECTION 1. SERVICING.... NST IMPEDANCE TESTING.... METERING... General Requirements.... CT METERING... 8 CT Metering General Requirements... 8 Existing Installation Alterations

More information

NPS/002/016 Technical Specification for 33 kv Cable Joints and Terminations

NPS/002/016 Technical Specification for 33 kv Cable Joints and Terminations Version: 3.1 Date of Issue: September 2016 Page: 1 of 21 NPS/002/016 Technical Specification for 33 kv Cable Joints and Terminations 1. Purpose The purpose of this document is to detail the technical requirements

More information

ENGINEERING STANDARD FOR INSTRUMENTS ELECTRICAL POWER SUPPLY AND DISTRIBUTION SYSTEMS FIRST EDITION MAY 2013

ENGINEERING STANDARD FOR INSTRUMENTS ELECTRICAL POWER SUPPLY AND DISTRIBUTION SYSTEMS FIRST EDITION MAY 2013 ENGINEERING STANDARD FOR INSTRUMENTS ELECTRICAL POWER SUPPLY AND DISTRIBUTION SYSTEMS FIRST EDITION MAY 2013 This Standard is the property of Iranian Ministry of Petroleum. All rights are reserved to the

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer

More information

Machinery Directive 2006/42/EC

Machinery Directive 2006/42/EC Machinery Directive 2006/42/EC All machinery and safety devices are subject to Directive 2006/42/EC, known as "Machinery Directive", implemented in Italy with Legislative Decree 17/2010. This Directive

More information

NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE

NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE Radio Equipment Directive (RED) 2014/53/EU MiCOM Labs Inc., Notified Body Number 2280 declares, on the basis of the assessment of the tests and the technical

More information

June Advisory Services on Rewiring Works of Existing Buildings

June Advisory Services on Rewiring Works of Existing Buildings June 2014 Welcome Express. to our e-rew Express. In view of the increasing number of rewiring works in recent years, we would like to share with you the advisory services on rewiring works of existing

More information

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

835 Gil Harbin Industrial Blvd Valdosta, GA 31601 QUALITY CONTROL PLAN NAVFAC SE PUBLIC WORKS MAYPORT FEAD MAYPORT 1966 BONHOMME RICHARD STREET MAYPORT NAVAL STATION FL 32228-0073 N69450-08-D-1781/0004 835 Gil Harbin Industrial Blvd Valdosta, GA 31601

More information

WHEREAS, the City of (the City ) is an Illinois municipality in. accordance with the Constitution of the State of Illinois of 1970; and,

WHEREAS, the City of (the City ) is an Illinois municipality in. accordance with the Constitution of the State of Illinois of 1970; and, SMALL CELL ANTENNA/TOWER RIGHT-OF-WAY SITING ORDINANCE WHEREAS, the City of (the City ) is an Illinois municipality in accordance with the Constitution of the State of Illinois of 1970; and, WHEREAS, the

More information

Category: ELECTRICITY Requirement: EL-ENG Page: 1 of 13. Document(s): S-E-01, S-E-04 Issue Date: Effective Date:

Category: ELECTRICITY Requirement: EL-ENG Page: 1 of 13. Document(s): S-E-01, S-E-04 Issue Date: Effective Date: Requirements for Certification Category: ELECTRICITY Requirement: EL-ENG-11-02 Page: 1 of 13 Requirements for Certification and Use of Portable Measuring Apparatus for Reverification and Dispute Meter

More information

Siemens ST950 & ST900 Statement of Compliance Against TR 2513 Issue A, September 2005 Performance Specification for Wig Wag Signal Control Equipment

Siemens ST950 & ST900 Statement of Compliance Against TR 2513 Issue A, September 2005 Performance Specification for Wig Wag Signal Control Equipment Mobility and Logistics Traffic Solutions Sopers Lane Poole, Dorset BH17 7ER SYSTEM/PROJECT/PRODUCT: Traffic Controllers Siemens ST950 & ST900 Statement of Against TR 2513 Issue A, September 2005 Performance

More information

SWITCHING SAFETY & RELIABILITY CONFERENCE

SWITCHING SAFETY & RELIABILITY CONFERENCE SWITCHING SAFETY & RELIABILITY CONFERENCE JARGON WORKSHEET Energize (v) Energize is the process of applying rated voltage to circuit or equipment. Modified IEEE or OSHA from Adj. to verb. To make a piece

More information

Chapter 1 General Design Information

Chapter 1 General Design Information Chapter 1 General Information Introduction The primary aim in both designing and checking is to produce a structure that will safely carry the anticipated loads. The design team, consisting of the designers,

More information

Signalling Works Testing

Signalling Works Testing Railway Group Standard Issue Two Date September 1995 Signalling Works Testing Synopsis This standard defines the requirements for the through testing of new or altered signalling installations before they

More information

1. The Office of Communications (Ofcom) grants this wireless telegraphy licence ( the Licence ) to

1. The Office of Communications (Ofcom) grants this wireless telegraphy licence ( the Licence ) to Office of Communications (Ofcom) Wireless Telegraphy Act 2006 Telefónica UK Limited - Public Wireless Network Licence PUBLIC WIRELESS NETWORK LICENCE This Licence document replaces the version of the Licence

More information

MEDICAL DEVICES : Guidance document

MEDICAL DEVICES : Guidance document EUROPEAN COMMISSION DG ENTERPRISE Directorate G Unit 4 - Pressure Equipment, Medical Devices, Metrology MEDICAL DEVICES : Guidance document MEDDEV 2.10-2 Rev. 1 April 2001 (NOTE: For attachment 1 to 4

More information

EMERGENCY RESPONDER RADIO SIGNAL PERMIT APPLICATION

EMERGENCY RESPONDER RADIO SIGNAL PERMIT APPLICATION CITY OF LACEY Community & Economic Development Department 420 College Street SE Lacey, WA 98503 (360) 491-5642 CASH OR CHECK ONLY PLEASE EMERGENCY RESPONDER RADIO SIGNAL PERMIT APPLICATION FOR INSTALLATION/MODIFICATION

More information

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES Issue 9: May 2013 National Grid National Grid Registered Office National Grid Electricity Transmission plc Registered Office: 1-3 Strand London

More information

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval

More information