Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area

Size: px
Start display at page:

Download "Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area"

Transcription

1 Guideline for Creating Disconnection Points and Establishing a Not Document Number: Authorised by: Issue Date: 29 June 2012 Previous Document: 12 February 2010 Principal Authors: J Dohmen Powerlink D Brown Ergon R Gordon Energex. Page 1 of June 2012

2 1.0 Introduction This Guideline has been developed by Powerlink, Ergon Energy and Energex to provide an industry Guideline for the creation of HV Disconnection Points and HV Not Electrically Connected Areas. The provision of this Guideline is to support safe systems of work for activities in a High Voltage electricity network environment. Note: Where practical, preference shall be given to using the Queensland Electricity Entity Procedures for Safe Access to High Voltage Electrical Apparatus (SAHVEA) and Electricity Entity approved procedures 2.0 Scope The requirements of this Guideline apply to all persons intending to establish or are establishing a Not for the purposes of conducting work on or Near previously commissioned Electricity Entity HV Electrical Apparatus. This Guideline shall not be applied to any structures with multiple circuits unless all sources of supply are Disconnected from the network by Disconnection Points and deemed Not Electrically Connected (e.g.: twin circuit HV towers or poles or a combination of circuits on a pole). A Not Notice (the Notice) shall be issued whenever work is being performed in a Not. Only one Notice shall be on issue for any delineated Work Area within a Not. 3.0 Purpose To provide guidelines for the creation and control of an area suitably disconnected from all possible sources of High Voltage supply or energisation. To provide a guideline for establishing a Not for High Voltage Electrical Apparatus by the creation of Disconnection Points and other Control Measures. To ensure that: A safe working environment is achieved when working on or Near High Voltage Electrical Apparatus within a Not, High Voltage Electrical Apparatus within a Not is in an electrically safe condition through the creation of Disconnection Points and the application of earthing. The Queensland Electricity Entity Procedures for Safe Access to High Voltage Electrical Apparatus or Approved High Voltage Live work methods or Approved LV procedures are used to establish a Not. Establishing a Not is conducted in a safe and coordinated manner. Any sources of supply capable of causing inadvertent High Voltage energisation are Disconnected. Switching Coordinators are aware of the status of the High Voltage network. Page 2 of June 2012

3 Data and Records pertaining to Electrical Apparatus are available before a Not is created. All persons and mobile plant and equipment are clear before High Voltage Electrical Apparatus is handed over for re-energisation. The Issue of the Notice has been recorded as a switching operation on an associated Switching Sheet. The return of the Notice is recorded in accordance with Electricity Entity Procedures. 4.0 Defining a Not 4.1 Substations For substation High Voltage Electrical Apparatus, any Not shall be delineated in accordance with the Queensland Electrical Supply Industry Substation Barrier Chart, by the use of the following: A barrier of white tape or white flag bunting with NOT ELECTRICALLY CONNECTED black text erected at a height of approximately 1.3 metres from ground level with a single appropriately sized opening; or A combination of steel mesh panels with a white tape or white flag bunting with NOT ELECTRICALLY CONNECTED black lettering and erected at a height of approximately 1.3 metres from ground level with a single entry point. The barrier shall not be erected within the relevant Exclusion Zone to the Live side of the Disconnection Point. A white sign bearing the words NOT ELECTRICALLY CONNECTED in black text shall be placed at the entrance point to the Work Area. 4.2 Overhead and Underground HV Lines For Overhead and Underground HV Electrical Apparatus, any Not Electrically Connected Area established shall be delineated by: A white sign bearing the words NOT ELECTRICALLY CONNECTED in black text placed at each Disconnection Point on the Not side; or A barrier of white tape or white flag bunting with NOT ELECTRICALLY CONNECTED black text attached around the tower/pole at a height of approximately 1.3 metres from ground level at each Disconnection Point on the Not side; or A combination of both of the above methods Note: Barriers and signs used to delineate the Not shall not be removed or altered without the consent of the Entity Representative and the On Site Supervisor, with all amendments recorded on the Not Notice. Page 3 of June 2012

4 5.0 Establishing a Not A Not can be established provided Disconnection Point/s and Control Measures are established in accordance with this Guideline. An application for work or Live work shall be submitted to the relevant Outage Coordinator in accordance with Electricity Entity requirements for all work to establish a Not Electrically Connected Area on the previously commissioned network. The following shall be recorded on the Notice: a) Description of the HV Electrical Apparatus Not Electrically Connected b) Disconnection Points including any sources of supply which may cause inadvertent HV energisation c) Earthing applied prior to the issue of the Notice d) Barrier and signage details e) Work details and location f) Nearby Live HV/LV g) Additional Earthing applied and removed to limit the rise in potential difference at the Work Area h) Issue, Receipt and Return details (date, Issuer name and signature, Receiver name & signature) i) Workgroup sign on, sign off j) Abnormalities. In addition to the above: a) Any known sources of stored energies and other identified hazards in the Not shall be recorded on the Notice b) A site plan or other appropriate diagram/drawing may be required to identify the Work Area and Disconnection Points to parties associated with the Not. 6.0 Establishing a Disconnection Point High Voltage Electrical Apparatus can be considered to be Not Electrically Connected provided Disconnection Point/s and Control Measures in accordance with this Guideline are established. Where a non-flashover distance is to be utilised in the establishment of a Disconnection Point, it must be assessed and Approved by an appropriately qualified and authorised electrical engineer on a case by case basis. Any such approval shall be documented. NOTE: WHERE A DISCONNECTION POINT IS ESTABLISHED BY MAINTAINING NON- FLASHOVER DISTANCES, IT MAY NOT MAINTAIN OR PROVIDE THE RELEVANT EXCLUSION ZONE CLEARANCES! Page 4 of June 2012

5 To establish a Disconnection Point: a) A section of Conductor shall be removed in accordance with the relevant Electricity Entity s Approved procedure and may include the removal of VT connections as possible energisation points b) Removal of one end of the Conductor is acceptable, in accordance with Approved Electricity Entity procedures, if Approved by an appropriately qualified and authorised electrical engineer. c) Queensland Electricity Entity Procedures for Safe Access to High Voltage Electrical Apparatus [SAHVEA] or Approved HV Live Work methods shall be used. 7.0 Earthing The Electricity Entity shall ensure the Not Electrically Connected HV Electrical Apparatus has initial earthing applied prior to the issue of a Not Notice. The On Site Supervisor shall ensure that while work is in progress, earthing is maintained to suit the progress of work and to limit the rise in potential difference at the Work Area. Only appropriately trained and qualified persons shall apply and remove earths. All Earths placed and removed shall be recorded on the Not Notice. 8.0 Working 8.1 Prior to any work being performed or undertaken in a Not, the Notice shall be issued. When work is being performed within a defined Not, care must be taken to ensure that all personnel are aware of the relevant Exclusion Zone that is required to be maintained by them at all times. Personnel or Mobile Plant are not permitted to pass through barriers used to delineate the Not without the consent of the On Site Supervisor after a valid risk assessment has been performed and all Control Measures identified are in place. All known sources of supply and sources of stored energy in the area shall be identified to the work group during induction processes into the Not. Eg: AC and DC control supplies, Insulating Gas Pressure, Spring Charge. Appropriate Control Measures shall be applied to address these hazards. Page 5 of June 2012

6 8.2 Preparation Prior to providing clearance to issue the Notice, the Switching Co-ordinator shall confirm the Disconnection Points have been created. 8.3 Issue The Notice shall be issued in person and on site by the Entity Representative to the On Site Supervisor. The clearance to issue shall be recorded as an operation on a Switching Sheet. Prior to issuing the Notice to the On Site Supervisor, the Entity Representative shall make themselves aware of all the Control Measures and conditions of the Notice The Entity Representative issuing the Notice shall: o Positively identify the HV Electrical Apparatus recorded on the Notice. Positively identify the Disconnection Points, including any sources of supply which may cause inadvertent HV energisation. Positively identify that initial earthing has been applied and recorded in Section 4 of the Notice. Confirm that a qualified and authorised electrical engineer has assessed and Approved the Disconnection Point/s where non-flashover distance is used or only one end of the conductor has been removed. Any approval documentation shall be made available to the On Site Supervisor. If required, provide additional earthing and record in Section 4 of the Notice. Ensure barriers and signage are erected in accordance with this Guideline. Identify any known sources of stored energies and other hazards. Identify nearby Live HV/LV. Ensure all relevant sections of the Notice have been completed. Brief the On Site Supervisor of the details and conditions of the Notice. Issue the Notice by signing and dating in the appropriate location. Confirm that the On Site Supervisor understands the details and conditions of the Notice. Request the On Site Supervisor to confirm and accept the conditions of the Notice by signing and dating in the appropriate field Transfer of Not Notice Where the On Site Supervisor changes and the person in receipt of the Notice has to transfer the Notice to another On Site Supervisor, this shall be noted on the Notice in the relevant section. The person transferring the Notice shall ensure the new On Site Supervisor is made aware and understands the extent and conditions relating to the Notice. Page 6 of June 2012

7 8.4 Receipt Prior to receiving the Not Notice, the On Site Supervisor shall: Confirm the conditions of the Not Notice are suitable for the work to be performed. Confirm the location of all Disconnection Points as per Section 2 of Notice. Confirm that the initial earthing is in place as per Section 4 of Notice. Confirm barriers and signage erected is adequate. Understand any known hazards or known sources of remaining stored energy as advised by the Entity Representative. Confirm nearby Live HV/LV. Acknowledge the conditions of the Not Notice have been explained and are suitable for the work to be performed by signing on the Not Notice Prior to Work commencing, the On Site Supervisor shall: Brief the work party on the conditions of the Notice. Ensure adequate earthing to limit the rise in potential difference at the Work Area is applied, maintained and recorded in Section 4 of the Notice. Ensure all members of the work party acknowledge the conditions of the Notice by signing on. Indicate any supplementary page(s) for worker Sign On/Off on the related Notice. Attach any related supplementary page(s) for worker Sign On/Off to the Notice. Retain the Notice in a secure but accessible location On Site. 8.5 Return The Notice shall be returned when work is completed or the HV Electrical Apparatus has been completely removed or demolished or the HV Electrical Apparatus is being readied for testing or commissioning. The Notice shall be returned in person by the On Site Supervisor to the Entity Representative. Page 7 of June 2012

8 8.5.1 Prior to returning the Not Notice the On Site Supervisor shall: Advise the work party that the Notice is to be returned, and that work is to cease and the HV Electrical Apparatus is to be treated as being Live. Ensure all work party members acknowledge that work is to cease and that the HV Electrical Apparatus is to be treated as Live by signing off the Notice and any associated supplementary page(s) for worker Sign On/Off. Ensure all mobile plant and equipment is clear. Ensure the current state of all Earths applied at the Work Area are recorded in Section 4 Earth Schedule of the Notice. Confirm that any barriers and signage erected by the On Site Supervisor have been removed. Record any abnormalities. Return the Notice by signing off The Entity Representative accepting the returned Not Electrically Connected Area Notice shall: Confirm the Notice and all associated supplementary documents are returned by the On Site Supervisor. Confirm all members of work party have signed off the Notice. Confirm all mobile plant and equipment is clear. Confirm any abnormalities and advise the Switching Coordinator if applicable. Confirm the current status of Earthing applied at the Work Area is recorded in Section 4 Earth Schedule of the Notice. Acknowledge the return of the Notice by signing in the appropriate field. Process the returned Notice as per Electricity Entity procedures. 9. References Queensland Electricity Entity Procedures for Safe Access to High Voltage Electrical Apparatus ENA NENS National Guidelines for Safe Access to Electrical and Mechanical Apparatus Electricity Entity Safety Rules and Procedures Electrical Safety Act 2002 Electrical Safety Regulation 2002 Page 8 of June 2012

9 10. Definitions for the purposes of this Guideline Approved Authorised Person Conductor Control Measures Disconnected Disconnection Point Earthed Earths Electrical Apparatus ( Part in QLD Electricity Safety Legislation) Electricity Entity Entity Representative Having appropriate organisation endorsement in writing for a specific function. A person with the technical knowledge and sufficient experience who has been Approved, or has the delegated authority to act on behalf of the organisation, to perform the duty concerned. A wire, cable or form of metal designed for carrying electric current. Policies, standards, procedures or actions to eliminate, avoid or minimise risks. Means that the parts are not connected to an electrical source. Disconnection may be achieved by de-energising, isolating, separating or breaking connections, or through all of these methods. A part that is Disconnected may still require discharging to remove all electric and other energy. An adequate break created by the removal or absence of Conductors and deemed no longer a source of inadvertent energisation. The break shall:- 1. not be able to be re-established by normal switching operations, and 2. maintain Exclusion Zone appropriate to the voltage or maintain electrical non-flashover distance appropriate to the voltage as defined by the Electricity Entity, and 3. be created in accordance with an Approved procedure to establish a Disconnection Point. Electrically connected to the general mass of earth by a Conductor to ensure and maintain the effective dissipation of electrical energy. Approved earthing devices applied for the earthing and shortcircuiting of Electrical Apparatus. Any electrical equipment, including Overhead Lines and underground Cables, the Conductors of which are Live or can be made Live. As prescribed in the Queensland Electricity Safety Act. An Authorised Person who has been Approved or has the delegated authority to act on behalf of the organisation to perform the duty concerned. Page 9 of June 2012

10 10. Definitions [continued] Exclusion Zone Live Mobile Plant (Operating Plant) Near Not Electrically Connected Not Electrically Connected Area Notice (Notice) Not Electrically Connected Area [NECA] On Site Supervisor Queensland Electricity Entity Procedures for Safe Access to High Voltage Electrical Apparatus. Outage Coordinator Switching Coordinator Work Area The Exclusion Zone, for a person for Electrical Apparatus, or for the Mobile Plant or a vehicle for Electrical Apparatus, means the distance from the Electrical Apparatus stated for the person, Mobile Plant or vehicle in the Electrical Safety Regulation 2002 Part 4 Section 61. Energised or subject to hazardous induced or capacitive voltages. Cranes, elevating work platforms, tip trucks or similar plant, any equipment fitted with a jib or boom and any device capable of raising or lowering a load. A situation where there is a reasonable possibility of a person, either directly or through any conducting medium, coming within the relevant Exclusion Zones. Electrical Apparatus Disconnected from all sources of supply by the removal or absence of Conductors, appropriate to the voltage and insulating medium and, not able to be energised by switching and identified in accordance with an Approved procedure. A document that forms part of a safe system of work and provides authorisation for work to be performed within a Not Electrically Connected Area. A defined area where documented authorisation has been issued to allow work to be performed on or Near Not Electrically Connected HV Electrical Apparatus. A person in control of the Work Area and responsible for electrical safety at the Work Area in situations where work is required on or Near Not Electrically Connected HV Electrical Apparatus. The Industry procedures for providing a safe system of work for all persons accessing the Entity s high voltage network and apparatus. An Authorised Person who negotiates and determines access / test requirements with an Applicant, and arranges for the production and issue of Switching Sheets and related Permits and Notices. An Authorised Person who co-ordinates switching, performs switching by remote control and approves the issue of Permits and Notices. The area where work may be carried out under a Not Electrically Connected Area Notice. Page 10 of June 2012

UNCONTROLLED COPY. Queensland Electricity Entity Standard for Safe Access to High Voltage Electrical Apparatus. August 2015

UNCONTROLLED COPY. Queensland Electricity Entity Standard for Safe Access to High Voltage Electrical Apparatus. August 2015 Queensland Electricity Entity Standard for Safe Access to High Voltage Electrical Apparatus August 2015 August 2015 Queensland Electricity Entity Standard for Safe Access to HV Electrical Apparatus I This

More information

ACCESS TO HIGH VOLTAGE APPARATUS

ACCESS TO HIGH VOLTAGE APPARATUS CORPORATE PROCEDURE ACCESS TO HIGH VOLTAGE APPARATUS Approved By: Prepared By: Issue Date: 17/6/2011 Andrew Macrides Access to Apparatus Rules File No: Managing Director Committee QDOC2011/63 Status: Approved

More information

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards. 8.3 Induced Voltage Purpose The purpose of this instruction is to provide awareness of Electrostatic and Electromagnetic induced voltages and the method required to reduce or eliminate it. An induced voltage

More information

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety 8.22 Switching Activities Purpose This instruction provides a safe system for switching on Horizon Powers Low Voltage, High Voltage and or Transmission electrical apparatus/network, where switching operations

More information

Electrical Procedure No E032. Procedure No: ELE 032

Electrical Procedure No E032. Procedure No: ELE 032 Procedure No: ELE 032 Procedure Title: Date of Procedure: Responsible Person(s) Safety Isolation of Low Voltage Networks and Systems for work to be carried out by third parties. i.e. Non University personnel.

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

Endeavour Energy Electrical Safety Rules. October 2013

Endeavour Energy Electrical Safety Rules. October 2013 Endeavour Energy Electrical Safety Rules October 2013 Endeavour Energy Electrical Safety Rules Associated Procedures List Document No. Title GSY 0031 Operating or observing plant near overhead electrical

More information

Earthing, HV Switching and Associated Operational Equipment. Approval: Chief Operating Officer

Earthing, HV Switching and Associated Operational Equipment. Approval: Chief Operating Officer ACCESS PRACTICE AP 24 Earthing, HV Switching and Associated Operational Equipment Process Authority: Manager Operations Improvement Approval: Chief Operating Officer Version Date: 27/08/2013 Revision:

More information

SUBJECT HEADING: Switching Programmes ISSUE: 18

SUBJECT HEADING: Switching Programmes ISSUE: 18 SUBJECT: Switchgear/Switching PROCEDURE: S04 SUBJECT HEADING: Switching Programmes ISSUE: 18 DATE: Apr 2017 1. INTRODUCTION 1.1 A written programme of switching operations shall be prepared. This programme

More information

25kV A.C. Electrified Lines - Traction Bonding

25kV A.C. Electrified Lines - Traction Bonding Date:MAR 94 25kV A.C. Electrified Lines - Traction Page 1 of 6 Part A Synopsis This is issued by the to define the Boards requirements for continuity bonding on railway systems. This will ensure a continuous

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

IMP/007/011 - Code of Practice for the Application of Lightning Protection

IMP/007/011 - Code of Practice for the Application of Lightning Protection Version 1.1 of Issue Aug 2006 Page 1 of 11 IMP/007/011 - Code of Practice for the Application of Lightning Protection 1.0 Purpose The purpose of this document is to ensure the company achieves its requirements

More information

SWITCHING SAFETY & RELIABILITY CONFERENCE

SWITCHING SAFETY & RELIABILITY CONFERENCE SWITCHING SAFETY & RELIABILITY CONFERENCE JARGON WORKSHEET Energize (v) Energize is the process of applying rated voltage to circuit or equipment. Modified IEEE or OSHA from Adj. to verb. To make a piece

More information

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval

More information

SYNCHRONISING AND VOLTAGE SELECTION

SYNCHRONISING AND VOLTAGE SELECTION SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS. (This contents page does not form part of the Grid Code)

EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS. (This contents page does not form part of the Grid Code) GC0102 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018 Paragraph No/Title EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS (This contents page does not form part of the Grid Code) Page

More information

FAQ ON EARTHING STANDARDS 16/08/2018

FAQ ON EARTHING STANDARDS 16/08/2018 FAQ ON EARTHING STANDARDS 16/08/2018 This document has been updated to include changes made to substation earthing layouts that have been made necessary due to copper theft. The main changes to be aware

More information

Network Standard NS

Network Standard NS Network Standard NS 21-2006 Artwork on Western Power Assets Technical Requirements for application to South West Interconnected System (SWIS) DMS #1049174 NS 21-2006 Artwork on Western Power Assets REVISION

More information

Section 3. Test Procedures

Section 3. Test Procedures Section 3. Information contained within this section shall be read in conjunction with all sections of this manual Non - Compliant Test Results Where acceptable results are not attained in accordance with

More information

Sec Radio, television, satellite dish and communications antennas and towers.

Sec Radio, television, satellite dish and communications antennas and towers. Se 2106. - Radio, television, satellite dish and communications antennas and towers. (a) (b) (c) (d) No guy wires or other accessories associated with any antenna or tower shall cross, encroach, or otherwise

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and Guidance NSI 26 RAILWAY CONNECTION CIRCUITS Copyright National Grid plc 2016, all rights reserved. No part of this publication

More information

Guidance for UK Fire and Rescue Services. Dealing with incidents on or near National Grid high voltage overhead lines

Guidance for UK Fire and Rescue Services. Dealing with incidents on or near National Grid high voltage overhead lines Guidance for UK Fire and Rescue Services Dealing with incidents on or near National Grid high voltage overhead lines This document offers guidance to the UK s Fire and Rescue Services for dealing with

More information

Company Directive STANDARD TECHNIQUE: TP14C. Distribution Business Provided Metering Facilities

Company Directive STANDARD TECHNIQUE: TP14C. Distribution Business Provided Metering Facilities Company Directive STANDARD TECHNIQUE: TP14C Distribution Business Provided Metering Facilities Summary This standard technique document details the metering facilities to be provided by the distribution

More information

HIGH VOLTAGE RULES. Document Owner: HV Group. Authorised: Electrical Services Manager Liberty Primary Steel

HIGH VOLTAGE RULES. Document Owner: HV Group. Authorised: Electrical Services Manager Liberty Primary Steel HIGH VOLTAGE RULES Document Owner: HV Group Authorised: Electrical Services Manager Liberty Primary Steel HIGH VOLTAGE RULES Revision 10 INDEX 1.0 GENERAL 1.1 SCOPE 1.2 DUTIES 1.3 SUPPLY AND KNOWLEDGE

More information

PSSI 27 Work or Testing On or Near to High Voltage Direct Current (HVDC) Plant and Apparatus

PSSI 27 Work or Testing On or Near to High Voltage Direct Current (HVDC) Plant and Apparatus 1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical) and the Company Safety Instructions to achieve Safety from the System for

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

Reference Number PDS 07 (RIC Standard: EP SP)

Reference Number PDS 07 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PDS 07 (RIC Standard: EP 12 10 00 20 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Jan 05 Standards

More information

Distribution transformers Part 2 Ground mounted transformers not closecoupled

Distribution transformers Part 2 Ground mounted transformers not closecoupled PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 35-1 Distribution transformers Part 2 Ground mounted transformers not closecoupled www.energynetworks.org PUBLISHING

More information

Improving High Voltage Power System Performance. Using Arc Suppression Coils

Improving High Voltage Power System Performance. Using Arc Suppression Coils Improving High Voltage Power System Performance Using Arc Suppression Coils by Robert Thomas Burgess B Com MIEAust CPEng RPEQ A Dissertation Submitted in Fulfilment of the Requirements for the degree of

More information

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy National Grid s commitments when undertaking works in the UK Our stakeholder, community and amenity policy Introduction This document describes the ten commitments we have made to the way we carry out

More information

Transmission of Electrical Energy

Transmission of Electrical Energy Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors are usually aluminum cable steel reinforced (ACSR),

More information

TS RES - OUTSTANDING ISSUES

TS RES - OUTSTANDING ISSUES TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next

More information

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations C&G 2395-01 Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations Phase rotation and verification of voltage drop 1 Outcomes of this Session describe how to assess

More information

each time the Frequency is above 51Hz. Continuous operation is required

each time the Frequency is above 51Hz. Continuous operation is required GC0101 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018. ECC.6 ECC.6.1 ECC.6.1.1 ECC.6.1.2 ECC.6.1.2.1 ECC.6.1.2.1.1 ECC.6.1.2.1.2 ECC.6.1.2.1.3 TECHNICAL, DESIGN AND OPERATIONAL CRITERIA

More information

Education & Training

Education & Training Distribution System Operator Certificate This program provides you with a proficient working knowledge in modern electric power distribution systems. These four classes are designed to walk students through

More information

CUSTOMER SUPPLIED HIGH VOLTAGE METERING UNIT SPECIFICATION FOR 11, 22 & 33 kv

CUSTOMER SUPPLIED HIGH VOLTAGE METERING UNIT SPECIFICATION FOR 11, 22 & 33 kv CUSTOMER SUPPLIED HIGH VOLTAGE METERING UNIT SPECIFICATION FOR 11, 22 & 33 kv June 2016 Issue 1 1. INTRODUCTION Introduction of contestability and the ability of all major customers to become contestable

More information

Connection of Embedded Generating Plant up to 5MW

Connection of Embedded Generating Plant up to 5MW Engineering Recommendation No.3 of the Electricity Distribution Code Connection of Embedded Generating Plant up to 5MW Version 1.0 30th November 2005 Prepared by: Al Ain Distribution Company, Abu Dhabi

More information

SERVICING & METERING SERVICING AND METERING SECTION 5 SEC5:

SERVICING & METERING SERVICING AND METERING SECTION 5 SEC5: SECTION SERVICING AND METERING SECTION 1. SERVICING.... NST IMPEDANCE TESTING.... METERING... General Requirements.... CT METERING... 8 CT Metering General Requirements... 8 Existing Installation Alterations

More information

Operators Manual: Diamond Rock Saw Excavator Attachment Austramac Flashcut Series

Operators Manual: Diamond Rock Saw Excavator Attachment Austramac Flashcut Series Operators Manual: Diamond Rock Saw Excavator Attachment Austramac Flashcut Series! WARNING! Inappropriate use of rock saw may cause serious injury or death. Operators must read this manual before use and

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Procedure Mining Two Way Radio Usage (Surface)

Procedure Mining Two Way Radio Usage (Surface) Procedure Mining () M-SF-008 Relevant to: Business Unit: Mining Division: Document Owner: General Manager West Revision Status: Revision Date Section Page/s Revision Description Reviewed By Approved By

More information

EPR Fundamentals of Calculation of Earth Potential Rise in the Underground Power Distribution Cable Network by Ashok K.

EPR Fundamentals of Calculation of Earth Potential Rise in the Underground Power Distribution Cable Network by Ashok K. EPR Fundamentals of Calculation of Earth Potential Rise in the Underground Power Distribution Cable Network by Ashok K. Parsotam (1997) available free from NZCCPTS website (companion paper to Cable Sheath

More information

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN Approval Amendment Record Approval Date Version Description 01/04/2014 1 Initial Issue under MTM PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 7 Table of Contents

More information

Introduce system protection relays like underfrequency relays, rate of change of frequency relays, reverse - power flow

Introduce system protection relays like underfrequency relays, rate of change of frequency relays, reverse - power flow Module 1 : Fundamentals of Power System Protection Lecture 3 : Protection Paradigms - System Protection Objectives In this lecture we will: Overview dynamics in power systems. Introduce system protection

More information

IMP/010/011 Code of Practice for Earthing LV Networks and HV Distribution Substations

IMP/010/011 Code of Practice for Earthing LV Networks and HV Distribution Substations Version:- 3.0 Date of Issue:- January 2018 Page 1 of 70 IMP/010/011 Code of Practice for Earthing LV Networks and HV Distribution Substations 1. Purpose The purpose of this document is to ensure the company

More information

SECTION VI SCOPE OF WORK

SECTION VI SCOPE OF WORK SECTION VI SCOPE OF WORK Overhead Lines and Underground cables VI 5.2 - i TABLE OF CONTENTS 5.2 SCOPE OF WORKS... 1 5.2.1 General... 1 5.2.2 Factory Acceptance Test... 2 5.2.3 33KV Lines and Cables...

More information

HV Substation Earthing Design for Mines

HV Substation Earthing Design for Mines International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 4, Issue 6 (October 2012), PP. 100-107 HV Substation Earthing Design for Mines M.

More information

Reference Number PCP 02 (RIC Standard: EP SP)

Reference Number PCP 02 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PCP 02 (RIC Standard: EP 20 00 00 20 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

2-WIRE UNIVERSAL TEMPERATURE TRANSMITTER

2-WIRE UNIVERSAL TEMPERATURE TRANSMITTER SAFE INSTALLATION MANUAL (FM APPROVAL) -WIRE UNIVERSAL TEMPERATURE TRANSMITTER (HART communication, intrinsically safe/explosion-proof) MODEL B6U/B6U-B BEFORE USE... SAFETY PRECAUTIONS This manual describes

More information

Earthing of Electrical Devices and Safety

Earthing of Electrical Devices and Safety Earthing of Electrical Devices and Safety JOŽE PIHLER Faculty of Electrical Engineering and Computer Sciences University of Maribor Smetanova 17, 2000 Maribor SLOVENIA joze.pihler@um.si Abstract: - This

More information

EASQ ELECTRICAL APPLIANCE SERVICEPERSON (QUALIFIED) MARKING SCHEDULE. SECTION 1 Marks Reference Marking notes Qu 1 A 10 MΩ (2 marks)

EASQ ELECTRICAL APPLIANCE SERVICEPERSON (QUALIFIED) MARKING SCHEDULE. SECTION 1 Marks Reference Marking notes Qu 1 A 10 MΩ (2 marks) EASQ ELECTRICAL APPLIANCE SERVICEPERSON (QUALIFIED) MARKING SCHEDULE Notes: 1. (1mark) means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Substation Auxiliary Transformer from Rectifier Transformer Secondary Reference Number PDS 01 (RIC Standard: EP 05 00 00 01 SP) Document Control

More information

Draft Kenya Standard for Balloting Not to be Cited as Kenya Standard

Draft Kenya Standard for Balloting Not to be Cited as Kenya Standard KENYA STANDARD KS 1859-5:2010 ICS 29.240.01 Electrical power transmission and distribution High-voltage operating regulations Part 5: Standard procedure and terminology for the issuing of operating instructions

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

Greenlining and Bluelining of Ergon Energy Substation Drawings

Greenlining and Bluelining of Ergon Energy Substation Drawings Greenlining and Bluelining of Ergon Energy Table of Contents Purpose and Scope... 1 Responsibilities... 1 Definitions, Abbreviations and Acronyms... 1 References... 1 General... 1 Requirements... 3 Testing

More information

Prepared by Mick Maytum

Prepared by Mick Maytum IEC Technical Committee 109: Standards on insulation co-ordination for low-voltage equipment Warning Prepared by Mick Maytum mjmaytum@gmail.com The document content is of a general nature only and is not

More information

' -- [~III-~4] 7 New Delhi, the 30th September, 2013 File No.12/X/STD(CONN)/GM/CEA.-Whereas draft of the Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels

More information

When surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS

When surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS TRANSFORMER IN GRID When surge arres t ers are installed close to a power transformer, they provide protection against lightning overvoltage ABSTRACT The aim of this research article is to determine the

More information

4.1. Accurate: The information is a true reflection of the original observation.

4.1. Accurate: The information is a true reflection of the original observation. SOP #: DOC-101 Page: 1 of 7 Effective Date: 1. POLICY STATEMENT: The Principal Investigator and research team members are required to prepare and maintain adequate and accurate case histories designed

More information

Key DRAFT EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 13/12/17

Key DRAFT EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 13/12/17 Key DRAFT EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 13/12/17 Formatted: Highlight 1) Blue Text From Grid Code 2) Black Text Changes / Additional words 3) Orange/ Brown text From RfG 4) Purple From

More information

Customer Requirements RF Antenna Installations

Customer Requirements RF Antenna Installations Application Terms Attachment requirements and clearances on the Pole for Radio Frequency (RF) antenna equipment installations. This standard is intended to allow electrical workers to perform their normal

More information

Notice of Decision. [2] The subject property is on Plan Blk 1 Lot 51A, located at Avenue NW, within the PU Public Utility Zone.

Notice of Decision. [2] The subject property is on Plan Blk 1 Lot 51A, located at Avenue NW, within the PU Public Utility Zone. 10019 103 Avenue NW Edmonton, AB T5J 0G9 P: 780-496-6079 F: 780-577-3537 sdab@edmonton.ca edmontonsdab.ca Date: November 2, 2018 Project Number: 286136272-001 File Number: SDAB-D-18-181 Notice of Decision

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Equipment Description Quantity as per drawings Actual quantity

Equipment Description Quantity as per drawings Actual quantity NOTE: SAFETY: Tests must be carried out after the installation, alteration or repair and before putting back to service. At all times maintain suitable clearance to all other electrical equipment and verify

More information

DISTRIBUTION BUSINESS

DISTRIBUTION BUSINESS DISTRIBUTION BUSINESS DOCUMENT TITLE: MANUAL: DISTRIBUTION NETWORK OPERATION MANUAL DOCUMENT I.D. NUMBER: DS O SW 01 Copyright Aurora REVISIONS REV DATE REVISION DESCRIPTION APPROVAL NO. 1.0 1998 Interim

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

SECTION VI SCOPE OF WORK

SECTION VI SCOPE OF WORK SECTION VI SCOPE OF WORK Overhead Lines and Underground cables VI 5.2 - i TABLE OF CONTENTS 5.2 SCOPE OF WORKS... 1 5.2.1 General... 1 5.2.2 Factory Acceptance Test... 2 5.2.3 33KV Lines and Cables...

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE

More information

Earthing Requirements for HV Transmission Structures

Earthing Requirements for HV Transmission Structures Engineering Standard Electrical MEST 000002-07 Earthing Requirements for Transmission Structures Version: 1 Issued: February 2015 Owner: Engineering Approved By: Patrick Kelly Head of Electrical Engineering

More information

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS (This contents page does not form part of the Grid Code) Paragraph No/Title Page No ECP.1 INTRODUCTION... 2 ECP.2 OBJECTIVE... 3 ECP.3 SCOPE...

More information

TRAFFIC SIGNAL ELECTRICIAN, 3819

TRAFFIC SIGNAL ELECTRICIAN, 3819 01-31-92 TRAFFIC SIGNAL ELECTRICIAN, 3819 Summary of Duties: A Traffic Signal Electrician performs skilled technical work and acts as a lead for and works with a signal construction crew constructing,

More information

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Section 4.01 Purpose It is the intent of this Article to specify standards, application and data requirements, and the review process which shall

More information

Safe work Method Statement

Safe work Method Statement Safe work Method Statement For Federal Safety Commissioner (FSC) approved companies or builders who require a high level of Safe Work Method Statements the attached SWMS is a guide only. As some FSC approved

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

COURSE PLANNER. Subject: TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS ( ) B.E. Fourth Year (8 th Sem) Branch Electrical Engineering

COURSE PLANNER. Subject: TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS ( ) B.E. Fourth Year (8 th Sem) Branch Electrical Engineering COURSE PLANNER Subject: TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS (2180901) B.E. Fourth Year (8 th Sem) Branch Electrical Engineering Term: 16/2 (DECEMBER-16 to APRIL-17) Faculty: Prof. U. V.

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

RELEVANT ELECTRICAL STANDARDS

RELEVANT ELECTRICAL STANDARDS RELEVANT ELECTRICAL STANDARDS Issue 2 February 2014 National Grid 2014 No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means electronic,

More information

6.2 Environmental Statement Appendices Volume N Appendix 15.1 EMF Report

6.2 Environmental Statement Appendices Volume N Appendix 15.1 EMF Report The Millbrook Power (Gas Fired Power Station) Order 6.2 Environmental Statement Appendices Volume N Appendix 15.1 EMF Report Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms

More information

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis Company Directive STANDARD TECHNIQUE: SD5F Relating to connecting multiple small low voltage connections with limited network analysis Policy Summary This document specifies the procedure for connecting

More information

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy Version:- 1.1 Date of Issue:- Feb 2015 Page 1 of 13 NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy 1. Purpose The purpose of this document is to outline the Northern Powergrid

More information

ADDENDUM. (1) Ref. Regulation 33.4 (Page 643): (2) Ref. Regulation 71.2 (Page 676): Annexed as Appendix II to these Regulations at page 697.

ADDENDUM. (1) Ref. Regulation 33.4 (Page 643): (2) Ref. Regulation 71.2 (Page 676): Annexed as Appendix II to these Regulations at page 697. ADDENDUM No. AERC. 396/2012/Pt.-III/4.-Assam Electricity Regulatory commission (Terms and Conditions for determination of Multi Year tariff) Regulations, 2015 issued vide notification No. AERC.396/2012/Pt/-II/13

More information

S 0342 S T A T E O F R H O D E I S L A N D

S 0342 S T A T E O F R H O D E I S L A N D LC000 01 -- S 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO PUBLIC UTILITIES AND CARRIERS - SMALL CELL SITING ACT Introduced By: Senators DiPalma,

More information

Power Quality. Case Study. Conrad Bottu Laborelec January 2008

Power Quality. Case Study. Conrad Bottu Laborelec January 2008 Case Study Electromagnetic compatibility (EMC) study Breakdown of low voltage electronic equipment in a 25 kv substation Conrad Bottu Laborelec January 2008 Power Quality Power Quality 1 Introduction Description

More information

Distribution Code. Approved by CER. Version: 5.0 Date: April Distribution System Operator ESB Networks Limited

Distribution Code. Approved by CER. Version: 5.0 Date: April Distribution System Operator ESB Networks Limited Distribution Code Approved by CER Version: 5.0 Date: April 2016 Issued by: Distribution System Operator ESB Networks Limited CONTENTS Page Preface... vii 1. INDUSTRY STRUCTURE... viii 2. USE OF THE DISTRIBUTION

More information

TECHNICAL REQUIREMENTS FOR ELECTROMAGNETIC DISTURBANCES EMITTED FROM LIGHTING EQUIPMENT INSTALLED IN TELECOMMUNICATION CENTERS

TECHNICAL REQUIREMENTS FOR ELECTROMAGNETIC DISTURBANCES EMITTED FROM LIGHTING EQUIPMENT INSTALLED IN TELECOMMUNICATION CENTERS TR550004 TECHNICAL REQUIREMENTS FOR ELECTROMAGNETIC DISTURBANCES EMITTED FROM LIGHTING EQUIPMENT INSTALLED IN TELECOMMUNICATION CENTERS TR NO. 174001 EDITION 2.1 September 3 rd, 2018 Nippon Telegraph and

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Electrical Title Reference Number PDS 05 (RIC Standard: EP 12 10 00 11 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

AC Voltage- Pipeline Safety and Corrosion MEA 2015

AC Voltage- Pipeline Safety and Corrosion MEA 2015 AC Voltage- Pipeline Safety and Corrosion MEA 2015 WHAT ARE THE CONCERNS ASSOCIATED WITH AC VOLTAGES ON PIPELINES? AC concerns Induced AC Faults Lightning Capacitive coupling Safety Code Induced AC Corrosion

More information

APPLICATION OF A HIGH RESISTANCE GROUNDING (HRG) UNIT TO AN ESP WITHIN A HAZARDOUS AREA 2014 EUALF

APPLICATION OF A HIGH RESISTANCE GROUNDING (HRG) UNIT TO AN ESP WITHIN A HAZARDOUS AREA 2014 EUALF APPLICATION OF A HIGH RESISTANCE GROUNDING (HRG) UNIT TO AN ESP WITHIN A HAZARDOUS AREA 2014 EUALF INTRODUCTION When conventional attempts to eliminate electrical discharge activity in a zone 1 hazardous

More information

I. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted.

I. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted. SITE PLAN BUILDING ELEVATION LANDSCAPE PLAN SIGNAGE PLAN APPLICATION FOR THE VILLAGE OF MATTESON I. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted.

More information

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance Click to edit Master title style Click to edit Master title style Northern Powergrid Asset Recording Guidance Rules for ICP & IDNO Version 1.0 April 2017 Introduction Accurate records for all assets are

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

BVM Systems Limited. PQSensor MkIII Installation & Commissioning Manual - 1 -

BVM Systems Limited. PQSensor MkIII Installation & Commissioning Manual - 1 - BVM Systems BVM Systems Limited PQSensor MkIII Installation & Commissioning Manual Patents: 1295133, 6,919,717 BVM Systems LImited 21 Springvale Road Gilford Craigavon BT63 6EB United Kingdom Email: -

More information

Tech Talk (12) Down to Earth: A Discussion of the General Requirements for the Earthing of Control and Instrumentation Systems

Tech Talk (12) Down to Earth: A Discussion of the General Requirements for the Earthing of Control and Instrumentation Systems 701880MAC0010.1177/0020294017701880 research-article2017 Contributed Paper Tech Talk (12) Down to Earth: A Discussion of the General Requirements for the Earthing of Control and Instrumentation Systems

More information

NZQA registered unit standard version 2 Page 1 of 8. Demonstrate knowledge of theory for registration of electrical installers

NZQA registered unit standard version 2 Page 1 of 8. Demonstrate knowledge of theory for registration of electrical installers Page 1 of 8 Title Demonstrate knowledge of theory for registration of electrical installers Level 3 Credits 3 Purpose This unit standard covers the theory assessment required for registration as an electrical

More information

Slide 1. Slide 2. Slide 3. The Knack. Background Information

Slide 1. Slide 2. Slide 3. The Knack. Background Information Slide 1 Prepared by: Ian Humphrey, P. Eng. Paul Henderson, P. Eng. Slide 2 The Knack Slide 3 Background Information Began my career in the lifting industry in 1994 as a draftsman and returned to school

More information

GK/GN0653. Guidance on Control of Unwanted Voltages on Telecommunications. Equipment at Stations. Rail Industry Guidance Note for GK/RT0053

GK/GN0653. Guidance on Control of Unwanted Voltages on Telecommunications. Equipment at Stations. Rail Industry Guidance Note for GK/RT0053 GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2011 Rail Safety and Standards Board Limited GK/GN0653 Telecommunications Equipment at Stations Issue One: December 2011

More information