Field Instruction Switching Activities. Purpose. Scope. Objective. Safety
|
|
- Patience Reeves
- 5 years ago
- Views:
Transcription
1 8.22 Switching Activities Purpose This instruction provides a safe system for switching on Horizon Powers Low Voltage, High Voltage and or Transmission electrical apparatus/network, where switching operations are taking place. Scope This instruction provides the minimum safety requirements for access to Low Voltage, High Voltage and or Transmission Electrical Apparatus in switchyards, switch rooms, cables and overhead lines that applies to all Horizon Power workers, including trainee-switching operators, who switch on Horizon Power s electrical apparatus/network. Objective To ensure all Horizon Power workers that operate Horizon Power s electrical network are appropriately trained for the work they intend to do, and are competent and authorised, by Horizon Power. The main objective of this instruction is to: Minimise the risk of harm to employees, contractors and the public Maintain the integrity of assets owned and operated by Horizon Power Ensure security of Horizon Power s network and continuity of electricity supply to our customers Safety Before commencement of work, a risk assessment must be carried out using the Risk Analysis Procedure (OSH ), to identify and document the hazards and risks associated with the task and ensure appropriate control measures are implemented. It is important that, appropriate control measures must be identified, documented and implemented to lessen or control the identified hazards. Using the correct PPE (see Field Instruction 2.6 Worksite Clothing / Personal Protective Equipment Requirements) Appointing a safety observer (see Field Instruction 2.27 Safety Observer Role) Appointing a trainee-switching operator If arc Flash is listed as a hazard ensuring that only the switching operator that is operating the switchgear is within the arc flash envelope Other personnel in the vicinity Note: If any members of the public are close enough to be at risk, or place the switching operator at risk, during the performance of switching operations, personnel must ask them to move away to a safe distance. If other services attend a substation (e.g. Department of Fire and Emergency Services DFES), the switching operator must advice the Service s team leader of the energised /de-energised status of all primary and secondary plant limits of access. CS10 # FI 8.22 Switching Activities Page 1 of 7
2 DANGER Personnel must be aware that in-service breakers and switchgear could operate at any time. Operation could be due to: Protection operation (trip and possible auto-reclose) Automatic voltage management (capacitor circuit breakers) Load shedding. Instruction Before commencing work on or near Low Voltage, High Voltage and or Transmission apparatus one of the following Permits shall be issued: Electrical Access Permit (EAP) No Horizon Power employee or contractor (who is not authorised to carry out HV live work) shall work on high voltage apparatus which is live or is capable of being made live unless an Electrical Access Permit (EAP) has been issued. Before issuing an EAP, the apparatus, HV / LV equipment must be confirmed de-energised, isolated and earthed. Access is permitted to electrical apparatus only after that apparatus has been isolated, proved de-energised, and earthed (for HV work) or short-circuited (for LV work). The EAP is a written document that stipulates the scope of work and the NPTWTM conditions under which that work is to be carried out. It describes to Recipients: The job area and the scope of work The isolation points The earthing points (i.e. program / permit earths and additional working earths Any additional safety precautions Vicinity Access Permit (VA) Allows personnel to work safely near electrical apparatus that is live or could be made live The Sanction to Test (STT) Permit allows access to specific electrical apparatus by personnel who are required to test new or maintained electrical apparatus, carry out adjustments to electrical apparatus, or fit, test, and remove test devices Switching Communication It is essential that effective communication takes place between all personnel. Adherence to the communication protocol is essential to maintain safety and prevent incidents. The communication protocol involves four key steps: 1. clear ensure that what you say is easy to understand and is not confusing CS10 # FI 8.22 Switching Activities Page 2 of 7
3 2. concise minimise banter and use proper and specific terms 3. confirm information must be repeated by the receiver for confirmation, and 4. complete all of the necessary information is communicated and closed out Written documents must be clear and legible. They must be completed in accordance with Horizon Power s official terminology and instructions. Verbal communication should include: 1. greeting complete with name and location of each party 2. confirm scope of work both parties are working on the same task 3. context establish the current status of the task/job 4. communicate clearly communicate and confirm the next set of tasks, and 5. close out ensure the job is formally complete and all parties clearly acknowledge this status The order of priority for switching is: Emergency takes precedence over non-emergency work. Programed switching takes precedence over all non-programed work. If the risk assessment notes the presence of personnel in the vicinity of the planned switching activities, the switching operator and the onsite Recipient in Charge (RIC) or the Tester in Charge (TIC) must agree on the control measures to be taken, such control measures may include: Requesting that non-switching personnel vacate the area. Not distracting the switching operator during the performance of switching duties. Confirming that applicable protection systems are in service. Personnel who find themselves in an area where switching operations are to take place must: Adhere to requests by the switching operator. Vacate the immediate area. Alert the switching operator to any abnormalities that may affect switching operations. Alert the switching operator if any at risk actions or situations are observed. Points of isolation and the position of programed earths may only be confirmed to the RIC/TIC when the permits being issued. Horizon Power Control Centre (HPCC) has primary control of the electricity systems. Switching Switching operations are actions that involve operating low and high voltage apparatus with the intent to: CS10 # FI 8.22 Switching Activities Page 3 of 7
4 1. Allow access to parts of an electrical apparatus with the intent to connect/remove conductors, fittings, equipment, generators and power lines. 2. De-energise a part of an electrical network. 3. Isolate a part of an electrical network. 4. Re-arrange the electricity supply to an electrical network by means of opening and/or closing switches to change the flow of electricity through the network. All persons that undertake switching operations on Horizon Power networks must be trained, competent and authorised by Horizon Power. Switching Operators will be assessed to verify their competency at two yearly intervals. High Voltage Transition from a live high voltage state to an earthed state for EAP process For the network to transition from a live (hazardous) state, to a de-energised (off) state, there must be a gap (air or other rated insulation) created. This is typically achieved by opening a switch. To progress to an isolated network state, a visible break or other approved isolating switch must be opened, barriered and locked when locking facilities are available or by other means of rendering the network incapable of being inadvertently energised must be put into place and a Danger Do Not Operate tag attached. An earthed state is then achieved following testing procedures and applying program earths. Planned Switching The Switching Operator must contact HPCC before carrying out switching on the network and must be in be possession of an approved switching program. The Switching Operator and the Controller will verify the switching program to confirm: 1. The correct program for the planned work at the right time. 2. The correct item number on the program. 3. The correct location. 4. The correct apparatus. 5. The apparatus is in the expected state prior to operation and is fit to be operated. Following the STOP THINK CHECK protocol is mandatory. After operating the electrical apparatus, the Switching Operator and/or Controller must: 1. Confirm any visible contacts are in the final desired position on each phase. 2. Use mechanical or other positive indications to visually confirm circuit breakers are off before operating the associated dis-connectors (isolators) or racking withdrawable switchgear. 3. Record the exact time a switching operation is executed for each step of the switching program. CS10 # FI 8.22 Switching Activities Page 4 of 7
5 4. Where available, voltage and current indicators must be used by the Controller and/or Switching Operator to confirm switching and the apparatus operational status. Unplanned Switching A Switching Operator may be requested by HPCC to conduct switching actions as the result of an emergency and/or faulty section of the network. The Controller and the Switching Operator will discuss the switching requirements and necessary steps to be undertaken. The Controller will prepare a switching program and dispatch it to the Switching Operator. Power Systems Earthing The purpose of earthing is to: 1. Limit the rise in potential difference in the work area and trigger the protection equipment to disconnect supply if supply is inadvertently restored. 2. Control induction when used in conjunction with equipotential bonding techniques. 3. Safely discharge electrical charges caused by lightning, wind, changes in ambient conditions or altitude. Before electrical apparatus is earthed it must first be tested to prove de-energisation with an approved instrument. The de-energised test is performed using the following sequence: 1. The instrument is proved to be working. 2. The instrument is used to prove the circuit under test is de-energised. 3. The instrument is proved to be working. Earths must be applied immediately after the tests have proven de-energisation. This process must be repeated at all earthing points. Insulated and un-insulated mobile plant is to be appropriately earthed when working on or near any overhead HV and LV wires/conductors (energised or de-energised). Shown in Figure 1 below is the process required to obtain an earthed state for electrical apparatus. CS10 # FI 8.22 Switching Activities Page 5 of 7
6 Hazardous state Live Apply gap (air or other) De-energised Render incapable of energisation and Apply tag Isolated Test and Apply program earth(s) Earthed EAP can now be safely issued Figure 1 - The process required to obtain an earthed state of electrical apparatus. Hand Over Certificate Handover Certificates are used where an electrical site, facility, power line, generator and/or substation is to be handed over from one Operating Authority to another such as, a new zone substation to the HPCC. Handover certificates are also used in conjunction with an Authority for Placing Major Plant / Equipment into Service form (HP System Operations procedure). All persons working at a particular site to be handed over are to sign off the Handover certificate. Low Voltage Safe working techniques must be implemented for work on or near LV electrical apparatus. All LV electrical apparatus must be treated as live unless it is isolated and short-circuited by an approved means. Persons required to work on or near LV network assets must be appropriately trained and authorised. The description and location of the electrical apparatus to be worked on, and the safety measures to be taken, must be clearly understood by all authorised persons intending to work on the electrical apparatus. Isolated and Shorted Low Voltage Dead overhead/underground LV apparatus may be worked on without insulating covers/sleeves or pole top rescue kits. An Electrical Access Permit (EAP) must be issued to all personnel who perform work on any isolated section of Horizon Power s low voltage (LV) network. All isolation points and location of short-circuiting equipment, barriers, locking devices and danger labels must be recorded on the EAP. All members of the crew must sign onto the EAP once they are satisfied that the required safety precautions have been taken. CS10 # FI 8.22 Switching Activities Page 6 of 7
7 Low Voltage Switching All switching operations must be performed by an appropriately authorised Switching Operator using a switching program that has been created by one Switching Operator and checked by another Switching Operator. The operation of the low voltage network is not coordinated or controlled by HPCC and therefore is the responsibility of the local Switching Operator. An LV switching program is required when a work permit is to be issued and, when back-feeding an LV network. Where LV switching is required for operating an LV dis-connector as part of a HV switching program, an LV switching program is not required provided the step is included in the HV program. All LV switching programs must be kept for audit purposes. References Occupational Safety & Heath Act 1984 Occupational Safety & Health Regulations 1996 SHMS OSH Job Risk Analysis (JRA) Procedure SHMS OSH Personal Protective Equipment Electrical Safety Standards Switching Process and Rules Switchgear Instruction Manual Network Permit to Work Training Manual Field Instruction 2.6 Worksite Clothing / Personal Protective Equipment Requirements Field Instruction 2.23 Job Hazard and Risk Management (JRA) Field Instruction 8.6 Switching Authorisations Field Instruction 8.21 Work Permits Field Instruction 8.22 Switching Activities Field Instruction 8.24 Network Tags When planning to visit a Horizon Power substation, personnel must refer too: Field Instruction 2.24 Substation Entry and Distribution Security Key Requirements Field Instructions 4.1 Substation Entry Requirements CS10 # FI 8.22 Switching Activities Page 7 of 7
Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.
8.3 Induced Voltage Purpose The purpose of this instruction is to provide awareness of Electrostatic and Electromagnetic induced voltages and the method required to reduce or eliminate it. An induced voltage
More informationEarthing, HV Switching and Associated Operational Equipment. Approval: Chief Operating Officer
ACCESS PRACTICE AP 24 Earthing, HV Switching and Associated Operational Equipment Process Authority: Manager Operations Improvement Approval: Chief Operating Officer Version Date: 27/08/2013 Revision:
More informationSWITCHING SAFETY & RELIABILITY CONFERENCE
SWITCHING SAFETY & RELIABILITY CONFERENCE JARGON WORKSHEET Energize (v) Energize is the process of applying rated voltage to circuit or equipment. Modified IEEE or OSHA from Adj. to verb. To make a piece
More informationGuideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area
Guideline for Creating Disconnection Points and Establishing a Not Document Number: Authorised by: Issue Date: 29 June 2012 Previous Document: 12 February 2010 Principal Authors: J Dohmen Powerlink D Brown
More informationEducation & Training
Distribution System Operator Certificate This program provides you with a proficient working knowledge in modern electric power distribution systems. These four classes are designed to walk students through
More informationUNCONTROLLED COPY. Queensland Electricity Entity Standard for Safe Access to High Voltage Electrical Apparatus. August 2015
Queensland Electricity Entity Standard for Safe Access to High Voltage Electrical Apparatus August 2015 August 2015 Queensland Electricity Entity Standard for Safe Access to HV Electrical Apparatus I This
More informationSUBJECT HEADING: Switching Programmes ISSUE: 18
SUBJECT: Switchgear/Switching PROCEDURE: S04 SUBJECT HEADING: Switching Programmes ISSUE: 18 DATE: Apr 2017 1. INTRODUCTION 1.1 A written programme of switching operations shall be prepared. This programme
More informationHIGH VOLTAGE RULES. Document Owner: HV Group. Authorised: Electrical Services Manager Liberty Primary Steel
HIGH VOLTAGE RULES Document Owner: HV Group Authorised: Electrical Services Manager Liberty Primary Steel HIGH VOLTAGE RULES Revision 10 INDEX 1.0 GENERAL 1.1 SCOPE 1.2 DUTIES 1.3 SUPPLY AND KNOWLEDGE
More informationACCESS TO HIGH VOLTAGE APPARATUS
CORPORATE PROCEDURE ACCESS TO HIGH VOLTAGE APPARATUS Approved By: Prepared By: Issue Date: 17/6/2011 Andrew Macrides Access to Apparatus Rules File No: Managing Director Committee QDOC2011/63 Status: Approved
More informationSERVICING & METERING SERVICING AND METERING SECTION 5 SEC5:
SECTION SERVICING AND METERING SECTION 1. SERVICING.... NST IMPEDANCE TESTING.... METERING... General Requirements.... CT METERING... 8 CT Metering General Requirements... 8 Existing Installation Alterations
More informationDraft Kenya Standard for Balloting Not to be Cited as Kenya Standard
KENYA STANDARD KS 1859-5:2010 ICS 29.240.01 Electrical power transmission and distribution High-voltage operating regulations Part 5: Standard procedure and terminology for the issuing of operating instructions
More informationDISTRIBUTION BUSINESS
DISTRIBUTION BUSINESS DOCUMENT TITLE: MANUAL: DISTRIBUTION NETWORK OPERATION MANUAL DOCUMENT I.D. NUMBER: DS O SW 01 Copyright Aurora REVISIONS REV DATE REVISION DESCRIPTION APPROVAL NO. 1.0 1998 Interim
More informationSYNCHRONISING AND VOLTAGE SELECTION
SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any
More informationGreenlining and Bluelining of Ergon Energy Substation Drawings
Greenlining and Bluelining of Ergon Energy Table of Contents Purpose and Scope... 1 Responsibilities... 1 Definitions, Abbreviations and Acronyms... 1 References... 1 General... 1 Requirements... 3 Testing
More informationGuidance for UK Fire and Rescue Services. Dealing with incidents on or near National Grid high voltage overhead lines
Guidance for UK Fire and Rescue Services Dealing with incidents on or near National Grid high voltage overhead lines This document offers guidance to the UK s Fire and Rescue Services for dealing with
More informationSection 3. Test Procedures
Section 3. Information contained within this section shall be read in conjunction with all sections of this manual Non - Compliant Test Results Where acceptable results are not attained in accordance with
More informationEI HIGH VOLTAGE INSULATION TESTING POLICY
Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and
More informationECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE
Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0507 COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and commissioning procedures for
More informationECP HV INSULATION TESTING
Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing
More informationPSSI 27 Work or Testing On or Near to High Voltage Direct Current (HVDC) Plant and Apparatus
1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical) and the Company Safety Instructions to achieve Safety from the System for
More informationField Instruction. This instruction outlines the safe method for joining/assembling and lifting in-ground mounted two piece steel power poles.
5.32 Steel Pole Assembly Purpose This instruction outlines the safe method for joining/assembling and lifting in-ground mounted two piece steel power poles. Scope This instruction applies to all Horizon
More informationECP HV INSULATION TESTING
Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and
More informationDESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN
Approval Amendment Record Approval Date Version Description 01/04/2014 1 Initial Issue under MTM PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 7 Table of Contents
More informationNational Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance
National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and Guidance NSI 26 RAILWAY CONNECTION CIRCUITS Copyright National Grid plc 2016, all rights reserved. No part of this publication
More informationElectrical Procedure No E032. Procedure No: ELE 032
Procedure No: ELE 032 Procedure Title: Date of Procedure: Responsible Person(s) Safety Isolation of Low Voltage Networks and Systems for work to be carried out by third parties. i.e. Non University personnel.
More informationEDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS
ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of
More informationTitle Operating Work - Low Voltage Distribution System. Reference Number POP 06 - (RIC Standard: EP SI)
Discipline Engineering Standard - NSW Category Electrical Title Operating Work - Low Voltage Distribution System Reference Number POP 06 - (RIC Standard: EP 95 30 00 03 SI) Document Control Status Date
More informationEndeavour Energy Electrical Safety Rules. October 2013
Endeavour Energy Electrical Safety Rules October 2013 Endeavour Energy Electrical Safety Rules Associated Procedures List Document No. Title GSY 0031 Operating or observing plant near overhead electrical
More informationECP DISTRIBUTION TRANSFORMER COMMISSIONING PROCEDURE
Document Number: ECP 11-0506 ENGINEERING COMMISSIONING PROCEDURE ECP 11-0506 DISTRIBUTION TRANSFORMER COMMISSIONING PROCEDURE Network(s): Summary: EPN, LPN, SPN This procedure details the testing and commissioning
More informationSDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01
SEC DISTRIBUTION GROUNDING STANDARD SDCS-03 Part-II Rev.01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING Rev. 01 This specification is property of SEC
More informationTS RES - OUTSTANDING ISSUES
TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next
More informationArc Flash Analysis Training
Arc Flash Analysis Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq An arc flash analysis study is
More informationECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: ECP 11-0515 ENGINEERING COMMISSIONING PROCEDURE ECP 11-0515 HV METERING EQUIPMENT COMMISSIONING PROCEDURE
More informationEquipment Description Quantity as per drawings Actual quantity
NOTE: SAFETY: Tests must be carried out after the installation, alteration or repair and before putting back to service. At all times maintain suitable clearance to all other electrical equipment and verify
More informationElectrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E
Electrical Switchgear & Power Transformer Testing H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This will provide you with practical knowledge
More information10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY
9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor
More informationIMP/007/011 - Code of Practice for the Application of Lightning Protection
Version 1.1 of Issue Aug 2006 Page 1 of 11 IMP/007/011 - Code of Practice for the Application of Lightning Protection 1.0 Purpose The purpose of this document is to ensure the company achieves its requirements
More information2 Grounding of power supply system neutral
2 Grounding of power supply system neutral 2.1 Introduction As we had seen in the previous chapter, grounding of supply system neutral fulfills two important functions. 1. It provides a reference for the
More informationGeneration Interconnection Requirements at Voltages 34.5 kv and Below
Generation Interconnection Requirements at Voltages 34.5 kv and Below 2005 March GENERATION INTERCONNECTION REQUIREMENTS AT 34.5 KV AND BELOW PAGE 1 OF 36 TABLE OF CONTENTS 1. INTRODUCTION 5 1.1. Intent
More informationSingle Line Diagram of Substations
Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are
More informationConnection of Embedded Generating Plant up to 5MW
Engineering Recommendation No.3 of the Electricity Distribution Code Connection of Embedded Generating Plant up to 5MW Version 1.0 30th November 2005 Prepared by: Al Ain Distribution Company, Abu Dhabi
More informationEarthing Guidance Notes
Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head
More informationVI 3 - i TABLE OF CONTENTS
VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3
More information' -- [~III-~4] 7 New Delhi, the 30th September, 2013 File No.12/X/STD(CONN)/GM/CEA.-Whereas draft of the Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation
More informationHow to maximize reliability using an alternative distribution system for critical loads
White Paper WP024001EN How to maximize reliability using an alternative distribution system for critical loads Executive summary The electric power industry has several different distribution topologies
More informationSECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY
SECTION 16075 - SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide a short-circuit, component protection, flash
More informationSPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it.
1. SCOPE The requirements of this document apply to all Plant, Equipment and Apparatus that are part of, or are Directly connected to, the Company network. Requirements contained herein may be modified
More informationCompany Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System
Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels
More informationECP GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE
ENGINEERING COMMISSIONING PROCEDURE ECP 11-0512 GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE Network(s): Summary: EPN, LPN, SPN This procedure details the testing and commissioning
More informationBC HYDRO REAL TIME OPERATIONS OPERATING ORDER 1T-18
BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 1T-18 LIVE LINE PERMITS, ASSURANCE OF NO RECLOSE PERMITS AND CAUTION TAGS Supersedes OO 1T-18 issued 13 October 2010 Review Year: 2019 Original signed by:
More informationUnit 2. Single Line Diagram of Substations
Unit 2 Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission
More information2015 NFPA 70E. SESHA 2015 ARIZONA MINI CONFERENCE December 10, 2015 Intel Corporation
2015 NFPA 70E SESHA 2015 ARIZONA MINI CONFERENCE December 10, 2015 Intel Corporation Introduction Jeffrey A. Pugh, P.E. Pugh Engineering LLC Bachelor of Science Degrees in Electrical Engineering and Computer
More informationIndustrial Electrician Level 3
Industrial Electrician Level 3 Industrial Electrician Unit: C1 Industrial Electrical Code I Level: Three Duration: 77 hours Theory: Practical: 77 hours 0 hours Overview: This unit is designed to provide
More information25kV A.C. Electrified Lines - Traction Bonding
Date:MAR 94 25kV A.C. Electrified Lines - Traction Page 1 of 6 Part A Synopsis This is issued by the to define the Boards requirements for continuity bonding on railway systems. This will ensure a continuous
More informationCompany 'A' Wind Turbine Safety Rules (3 rd Edition) Support Procedure P2 PROCEDURE FOR APPROVAL OF TOOLS, EQUIPMENT AND PROCESSES
Company 'A' Wind Turbine Safety Rules (3 rd Edition) 2015 Support Procedure P2 PROCEDURE FOR APPROVAL OF TOOLS, EQUIPMENT AND PROCESSES 1. INTRODUCTION The purpose of this procedure is to enable Company
More informationModule Title: Electrical Installation II Laboratory Sheet:
Vocational Training Council Hong Kong Institute of Vocational Education Department of Engineering Module Title: Electrical Installation II Laboratory Sheet: Student name: Course / Year: Subject: Date:
More informationENGINEERING STANDARD FOR INSTRUMENTS ELECTRICAL POWER SUPPLY AND DISTRIBUTION SYSTEMS FIRST EDITION MAY 2013
ENGINEERING STANDARD FOR INSTRUMENTS ELECTRICAL POWER SUPPLY AND DISTRIBUTION SYSTEMS FIRST EDITION MAY 2013 This Standard is the property of Iranian Ministry of Petroleum. All rights are reserved to the
More informationRevision Control. 0 18/07/2012 Initial Document Creation. STAKEHOLDERS The following positions shall be consulted if an update or review is required:
Standard: Technical Requirements for Bumpless Transfer of Customer Load between Embedded Generators and the Distribution Network Standard Number: HPC-9OJ-13-0001-2012 * Shall be the Process Owner and is
More informationMINISTRY OF ELECTRICITY
MINISTRY OF ELECTRICITY IRAQ SUPERGRID PROJECTS 400/132 KV GIS SUBSTATIONS VOLUME 3 TECHNICAL SCHEDULES JANUARY 2007 LIST OF REVISIONS 1 2 3 4 5 Current Rev. Date 19.11.04 18.03.05 Aug 05 Oct 05 Jan 07
More informationINTERPLANT STANDARD - STEEL INDUSTRY
INTERPLANT STANDARD - STEEL INDUSTRY SPECIFICATION FOR MOULDED - CASE CIRCUIT-BREAKER FOR VOLTAGES NOT EXCEEDING 1000 V ac OR 1500 V dc (FIRST REVISION) IPSS:1-04-004-11 IPSS BASED ON IS/IEC 60947(Part
More informationRELEVANT ELECTRICAL STANDARDS
RELEVANT ELECTRICAL STANDARDS Issue 2 October 2014 Issue 2 September 2014 National Grid 2014 2014 Copyright owned by National Grid Electricity Transmission plc, all rights reserved. No part of this publication
More informationElectricity Supply to Africa and Developing Economies. Challenges and opportunities. Technology solutions and innovations for developing economies
Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Technology solutions and innovations for developing economies Magnetic induced currents and voltages on earthed lines
More informationADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions
More informationMV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING
Training Title MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Duration 5 days Training Date MV, HV and EHV Switchgear Testing & Commissioning 5 21 25 Sep $3,750 Dubai, UAE In any of the 5 star
More informationDistribution transformers Part 2 Ground mounted transformers not closecoupled
PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 35-1 Distribution transformers Part 2 Ground mounted transformers not closecoupled www.energynetworks.org PUBLISHING
More informationFINAL - IT 30 ELECTRICAL INSPECTOR EXAMINATION ANSWER SCHEDULE. Question 1 Marks Reference Marking notes. (2 marks) EA 2
FINAL - IT 30 ELECTRICAL INSPECTOR EXAMINATION ANSWER SCHEDULE Notes:1. (1 mark) means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination
More informationECP GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE
Document Number: ECP 11-0511 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0511 GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and
More informationSubstation Preventive Maintenance
Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS
More informationFAQ ON EARTHING STANDARDS 16/08/2018
FAQ ON EARTHING STANDARDS 16/08/2018 This document has been updated to include changes made to substation earthing layouts that have been made necessary due to copper theft. The main changes to be aware
More informationDP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation
DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Single Phase
More informationNATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL WORKMANSHIP NQF LEVEL 3 NOVEMBER 2009
NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL WORKMANSHIP NQF LEVEL 3 NOVEMBER 2009 (12041013) 3 November (X-Paper) 09:00 12:00 This question paper consists of 5 pages. (12041013) -2- NC740(E)(N3)V TIME:
More informationC&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations. Earth Fault Loop Impedance Tests
C&G 2395-01 Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations Earth Fault Loop Impedance Tests 1 Revision Inspections are made to verify that the installed
More informationFirst Draft Language
110.16 First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1) Nominal system voltage (2) Arc flash boundary (3)
More informationET 40 - Electrician Theory Examination Marking Schedule
ET 40 - Electrician Theory Examination Marking Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions. A marker
More informationNumbering System for Protective Devices, Control and Indication Devices for Power Systems
Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements
More informationTN, TT & IT Earthing Arrangements
TN, TT & IT Earthing Arrangements In IT and TN-C networks, residual current devices are far less likely to detect an insulation fault. In a TN-C system, they would also be very vulnerable to unwanted triggering
More informationElectrical Measurement Safety. Sponsored By:
Electrical Measurement Safety Sponsored By: About the Viewer Panel Slides: Go to the Links tab at the top and click on the link to download the PDF of the slides If you re watching the archive version,
More informationGuidance Material for ILS requirements in RSA
Guidance Material for ILS requirements in RSA General:- Controlled airspace required with appropriate procedures. Control Tower to have clear and unobstructed view of the complete runway complex. ATC to
More informationCurriculum Document. Name Phone Logo. TETA House 344 Pretoria Avenue Randburg Gauteng. Physical Address. Postal Address
Curriculum Document Occupational Code Qualification Title NQF Level 671301-002 Railway Traction Line Worker 4 Name Email Phone Logo Development Quality Partner Transport Education and Training Authority
More informationEUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS. (This contents page does not form part of the Grid Code)
GC0102 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018 Paragraph No/Title EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS (This contents page does not form part of the Grid Code) Page
More informationSection L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES
Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE The following is PG&E's procedure for pre-energization inspections. For PG&E to provide the Load
More informationEDS FAULT LEVELS
Document Number: EDS 08-1110 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 08-1110 FAULT LEVELS This standard provides guidance on the calculation, application and availability of
More informationLV/MV/HV CIRCUIT BREAKERS (SWITCH GEAR) DESIGN, INSPECTION, MAINTENANCE, REPAIR & TROUBLESHOOTING
Training Title LV/MV/HV CIRCUIT BREAKERS (SWITCH GEAR) DESIGN, INSPECTION, MAINTENANCE, REPAIR & TROUBLESHOOTING Training Duration 5 days Training Venue and Dates LV/MV/HV Circuit Breakers (Switchgear):
More informationPRACTICAL PROBLEMS WITH SUBSTATION EARTHING
1 PRACTICAL PROBLEMS WITH SUBSTATION EARTHING Dr Hendri Geldenhuys Craig Clark Eskom Distribution Technology This paper considers the issues around substation sites where the soil resistivity is of particularly
More informationNetwork Standard NS
Network Standard NS 21-2006 Artwork on Western Power Assets Technical Requirements for application to South West Interconnected System (SWIS) DMS #1049174 NS 21-2006 Artwork on Western Power Assets REVISION
More informationA Guide to Establish an Arc Flash Safety Program for Electric Utilities
A Guide to Establish an Arc Flash Safety Program for Electric Utilities by Craig Clarke, P.E. Eaton Corporation 50 Soccer Park Rd. Fenton, MO 63026 (636) 717-3406 CraigClarke@Eaton.com Ilanchezhian Balasubramanian,
More informationC&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations
C&G 2395-01 Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations Phase rotation and verification of voltage drop 1 Outcomes of this Session describe how to assess
More informationINTEGRATED TRANSMISSION PLAN Glossary
INTEGRATED TRANSMISSION PLAN Glossary SEPTEMBER 2017 GLOSSARY Term AC ACM asset health and asset health index (AHI) automatic underfrequency load shedding (AUFLS) availability bus cable capacitor bank
More informationNATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 4 NOVEMBER 2009
NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 4 NOVEMBER 2009 (12041004) 23 November (X-Paper) 09:00 12:00 Calculators may be used. This question paper consists of 7 pages.
More information3. COMBINED TRANSFORMERS Oil-paper insulation
3. COMBINED TRANSFORMERS Oil-paper insulation 123 kv Combined transformers. 26 Instrument transformers High voltage INTRODUCTION Combined instrument transformers contain a current transformer and an inductive
More informationIMP/010/011 Code of Practice for Earthing LV Networks and HV Distribution Substations
Version:- 3.0 Date of Issue:- January 2018 Page 1 of 70 IMP/010/011 Code of Practice for Earthing LV Networks and HV Distribution Substations 1. Purpose The purpose of this document is to ensure the company
More informationAppendix B to Working on Exposed Energized Parts
Working on Exposed Energized Parts. - 1910.269 App B Regulations (Standards - 29 CFR) - Table of Contents Part Number: 1910 Part Title: Occupational Safety and Health Standards Subpart: R Subpart Title:
More informationELECTRICIAN S THEORY EXAMINATION 17 November 2012 QUESTION AND ANSWER BOOKLET
Candidate Code No. ET43 For Board Use Only Result Date Int Result Date Int ELECTRICIAN S THEORY EXAMINATION 17 November 2012 QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three
More informationPREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!
PREFACE This publication has been prepared as a guide for Architectural and Engineering (A&E) firms in the preparation of documents for the design and construction of new structures and the remodeling
More informationESB National Grid Transmission Planning Criteria
ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and
More informationAN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY
The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com AN EXAMPLE OF A STANDARD ARC
More informationWebinar: An Effective Arc Flash Safety Program
Webinar: An Effective Arc Flash Safety Program Daleep Mohla September 10 th, 2015: 2pm ET Agenda Arc Flash Defined and Quantified NFPA 70E / CSA Z 462 - Recent Updates What is the ANSI Z10 Hierarchy of
More informationUpgrading Your Electrical Distribution System To Resistance Grounding
Upgrading Your Electrical Distribution System To Resistance Grounding The term grounding is commonly used in the electrical industry to mean both equipment grounding and system grounding. Equipment grounding
More informationSDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01
SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice
More informationTABLE OF CONTENT
Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES