1 BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 1T-18 LIVE LINE PERMITS, ASSURANCE OF NO RECLOSE PERMITS AND CAUTION TAGS Supersedes OO 1T-18 issued 13 October 2010 Review Year: 2019 Original signed by: APPROVED BY: Paul Choudhury General Manager Real Time Operations Denotes Revision Distribution: In addition to SOO distribution list add LOO(D) Distribution-LM, LOO(D) Distribution NI, LOO(D) Distribution SI, and LOO(D) Distribution - VI
2 Page 2 of GENERAL The purpose of this operating order is to outline procedures relating to the use of Live Line and Assurance of No Reclose Permits and caution tags. 2.0 LIVE LINE PERMITS 2.1 Live Line Permits (LLPs) will only be used for live line work. When dealing with the BC Hydro Control Centre, this can be referred to as a LLP or Live Line Permit. By definition, live line work includes: a) Work with insulated tools contacting energized conductors, but where all parts of the worker s body, including uninsulated tools, are outside the Normal Limits of Approach (SPR Table 401.1, Column 2). b) Work similar to (a) where the workers and uninsulated tools come up to the Absolute Limits of Approach (SPR Table 401.1, Column 1) for brief, planned operations. c) Work where approved live line tools and equipment shall be used to remove any trees (or portions thereof) which are within normal limits of approach to energized or deenergized high voltage lines (SPR rule (c)). d) High pressure water jet cleaning of insulators which support energized conductors. e) Bare hand work where workers are bonded to the conductor. See OO 1T-30 for specific requirements related to Barehand work. f) Whenever there is contact, or possibility of contact, between vegetation growth and an energized high voltage line (SPR rule (b)). g) Cable manhole inspection. h) Rubber glove work. 2.2 LLPs will not normally be required for application or removal of hot taps (SPR 415.1(a)). 2.3 Before issuing an LLP, arrangements must be made to prevent re-energizing of the circuit or apparatus unless the circuit is de-energized. (NOTE: There is no requirement to block auto reclosing if feeder/line is de-energized) Where facilities exist, Live Line protection mode on substation feeder circuit breakers will also be placed in the ON position to enable low set instantaneous, fast trip protection. When in the Live Line protection mode, both the 1200 A phase and 1200 A ground instantaneous elements of the protection are enabled. With the Live Line protection mode enabled, any auto-reclosing associated with feeder protection will be disabled. 2.4 If a circuit or apparatus on which a LLP is in effect is tripped by its own protective relaying, it will not be re-energized until the permit holder has been contacted.
3 Page 3 of Section 2.5 does not apply to Barehand work. See OO 1T-30. When a LLP is in effect and a circuit or apparatus is de-energized by other than its own protective relaying, it is not necessary to contact the permit holder before re-energizing the circuit (SPR 423.5). For example, a) If a transmission line servicing a substation trips out or is deliberately de-energized by the operator while there are one or more LLPs issued on the substation feeders, the transmission line may be re-energized without reference to the permit holder(s). b) When there is a system disturbance with widespread under-frequency load shedding, the circuits may be re-energized without reference to the Live Line Permit holders. c) If a Transmission line crew is working on a de-energized transmission circuit with a live line permit (LLP) in effect, the permit holder must be contacted before re-energizing the circuit. 2.6 LLPs should not be withheld or withdrawn because of routine switching on the power system. The tools and procedures used in Live Line work have been designed to provide safe working conditions including allowances for switching surges and surges occurring as a result of fault conditions. 2.7 When an LLP is in effect on a distribution feeder, the feeder will not be paralleled with any other feeder without first notifying the permit holder (see SPR 423.6). Most transmission lines have protective relaying which is designed to allow normal parallel line operation; any exceptions will be stated in local operating orders. When paralleling lines by closing line disconnects, the no-reclose restrictions must apply to both lines if an LLP is in effect on either line. 2.8 Portions of trees encroaching on the Absolute Limits of Approach for transmission lines (60 kv and above) must be removed with the circuit de-energized and personal protective grounds applied. The exception to this is when the work is carried out from an insulated aerial device using live line tools. (SPR 405.2(d)). 3.0 ASSURANCE OF NO RECLOSE PERMITS When dealing with the BC Hydro Control Centre, this can be referred to as an ANR, ANRP or Assurance of No Reclose. 3.1 Assurance of No Reclose (ANR) Permits are issued for tree trimming in the proximity of an energized line or apparatus (where the worker is between the general limits of approach defined in OH&S Part Table 19-1 and the closer limits defined in OH&S Part Table 19-3). 3.2 Where an Assurance of No Reclose Permit is in place, procedures 2.3, 2.4, 2.5, 2.6, and 2.8 apply with Assurance of No Reclose substituted in place of LLP. 3.3 Assurance of No Reclose Permits may be applied for station civil work and blasting, work on tower footings, removing tops of trees inside limits of approach with a shotgun, danger tree removal with a Feller Buncher, etc.
4 Page 4 of CAUTION TAGS 4.1 Caution Tags may be used as information tags to highlight unusual conditions which affect the normal operation of equipment. 4.2 Caution Tags will not be applied to a device that is used to support work where, should the device be operated, an unsafe condition could result. 4.3 All Caution Tags placed in the SCADA must be supported with a corresponding CROW reference (UC or event) or operating orders, except for Caution Tags applied as part of a SPG on transformers, voltage regulators and shunt reactors which shall be listed on the SPG form. 4.4 The PIC may tag Level 1 to 4 devices with Caution Tags on the mimic. 4.5 The PIC may agree to placement of Caution Tags on Level 1 to 4 devices in the field only when equipment is defective. 4.6 The PIC may direct the field worker to place Caution Tags on state switch of transformers, voltage regulators, shunt reactors, control switch of auto change over scheme, tap changer control etc. 4.7 Some of the Caution Tag examples are disconnect is stiff to open, motor is burnt out or disconnect trip coil is burnt out, locked in closed position, SS automatic transfer does not work (require manual transfer), etc. 4.8 If the PIC has any concerns as to how the work is planned then the matter must be referred to an RTO System Control Manager (SCM) for clarification and resolution. 5.0 COMMUNICATIONS WITH CONTROL CENTRE AND REQUEST TO DE-ENERGIZE: 5.1 Persons holding Live Line Permits or Assurance of No Reclose Permits must be in radio/ telephone contact with the BC Hydro Control Centre at all times. If continuous communication is not possible to maintain, a third reliable person will be required, through whom information can be relayed. 5.2 If the holder of a Live Line Permit or an Assurance of No Reclose Permit causes a tripout, the holder must immediately advise the BC Hydro Control Centre. The circuit should be reenergized if it is safe to do so. The dispatcher should inform the Field Manager so he/she can investigate the incident.
5 Page 5 of Request by Live Line Permit holder to de-energize equipment There may be a requirement for crews to request the PIC to switch out the electrical lines and/or apparatus during Live Line work. If the PIC receives such a request, the PIC will consider it to be urgent and will complete the switching as quickly as possible. The PIC will de-energize the line or apparatus as promptly as possible. The electric system will be adjusted after the line or apparatus is de-energized. If generation shedding or Remedial Action Schemes need to be disarmed, and this can be done quickly, it should be done. Delays in de-energizing the line should not be considered if the request is urgent and is for personnel safety. For all Level I and II transmission lines and / or apparatus, any System Operator (GC,TC,Grid) receiving the request to de-energize will de-energize the line as soon as possible and inform the Transmission Coordinator as soon as practical after the line is deenergized. 6.0 PROCEDURES FOR OBTAINING LIVE LINE PERMITS and ASSURANCE OF NO RECLOSE PERMITS Requests for Live Line Permits and/or Assurance of No Reclose Permits should be pre-scheduled with the BC Hydro Control Centre as follows: 6.1 For Transmission circuits All requests must be entered via the CROW as per outage scheduling OO 1T For Distribution Circuits Please refer to OO 1D Emergency Work Requests for emergency work (motor vehicle accident, wires down, etc.) will be accepted anytime by the BC Hydro Control Centre. 7.0 TAGGING 7.1 "Reclose Off" tags shall be applied to the reclose control in the field (only if the BC Hydro Control Centre does not have supervisory control) and to the PIC s mimic display when reclosing has been turned off (SPR 614.7). 7.2 Tagging of the PIC s mimic display for Assurance of No Reclose Permits will be done using ASSURANCE OF NO RECLOSE PERMIT tags. The tags will be placed as stated in SPR and PSSP 1T-12F (3.1). 7.3 Tagging of the PIC s mimic display for Live Line Permits will be done using LIVE LINE PERMIT tags. The tags will be placed as stated in SPR
6 Page 6 of REVISION HISTORY (This order is also posted on BC Hydro s External website) Revised By Revision Date Summary of Revision DSG 5 November 2007 Added 5.3 request to de-energize equipment during LLP work. AMS 29 April 2010 Updated to remove SCC and ACC terminology DSG/Eric Valois 21 June 2010 BCH/BCTC integration. Caution tag information moved from 1T-13 to 1T-18 DSG 13 September 2010 Revised caution tag section. Protection outage requests will be submitted using no permit required rather than caution tag. DSG 13 October 2010 Updated Section 2.3. DSG 15 October 2010 Updated Section 2.1. MPP,AS,BH, DSM 08 April 2015 Language has been added in Section to instruct operators to enable Live Line protection where available.
Education & Training
Distribution System Operator Certificate This program provides you with a proficient working knowledge in modern electric power distribution systems. These four classes are designed to walk students through
More informationSWITCHING SAFETY & RELIABILITY CONFERENCE
SWITCHING SAFETY & RELIABILITY CONFERENCE JARGON WORKSHEET Energize (v) Energize is the process of applying rated voltage to circuit or equipment. Modified IEEE or OSHA from Adj. to verb. To make a piece
More informationBC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014
BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 Expiry Year: 2018 APPROVED BY: Original signed by: Paul
More informationPJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016
PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 Prepared by System Planning Division Transmission Planning Department PJM 2016 Table of Contents Table of Contents Approval...6
More informationModule 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY
Module 9 Fault Type Form 4.X 1 M9 Fault Type The descriptor of the fault, if any, associated with each Automatic Outage of an Element. 1. No fault 2. Phase-to-phase fault (P-P) 3. Single phase-to-ground
More informationUPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS
UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS 1 B. RAMESH, 2 K. P. VITTAL Student Member, IEEE, EEE Department, National Institute of Technology Karnataka,
More informationTransmission Availability Data System Definitions
Table of Contents Transmission Availability Data System Definitions February 1, 2018 1 of 31 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents
More informationBED INTERCONNECTION TECHNICAL REQUIREMENTS
BED INTERCONNECTION TECHNICAL REQUIREMENTS By Enis Šehović, P.E. 2/11/2016 Revised 5/19/2016 A. TABLE OF CONTENTS B. Interconnection Processes... 2 1. Vermont Public Service Board (PSB) Rule 5.500... 2
More informationTable of Contents. Introduction... 1
Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...
More informationFunctional Specification Revision History
Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer
More informationDistance Protection for Distribution Feeders. Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng.
Distance Protection for Distribution Feeders Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng. Why use distance protection for distribution feeders? Distance protection is mainly used for protecting
More informationLeslie J. Anderson Supervising Attorney Public Service Commission of West Virginia 201 Brooks St. PO Box 812 Charleston, WV Dear Ms.
J 5001 NASA Boulevard Fairmonl, WV 26554 Gary A. Jack Senior Cornorale Counsel VIA EMAIL AND FEDEX OVERNIGHT Leslie J. Anderson Supervising Attorney Public Service Commission of West Virginia 201 Brooks
More informationUtility Interconnection and System Protection
Utility Interconnection and System Protection Alex Steselboim President, Advanced Power Technologies, Inc. Utility paralleling vs. isolated operation. Isochronous kw load sharing Reactive power (VAR) sharing
More informationCanadian Technology Accreditation Criteria (CTAC) POWER SYSTEMS ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC)
Canadian Technology Accreditation Criteria (CTAC) POWER SYSTEMS ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC) Preamble These CTAC are applicable to programs having titles involving
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements
Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements
Section 502.8 SCADA Technical and Operating Requirements Applicability 1 Subject to subsections 2 and 3 below, section 502.8 applies to: (a) (c) (d) the legal owner of a generating unit or an aggregated
More informationWind Power Facility Technical Requirements CHANGE HISTORY
CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical
More informationAppendix B to Working on Exposed Energized Parts
Working on Exposed Energized Parts. - 1910.269 App B Regulations (Standards - 29 CFR) - Table of Contents Part Number: 1910 Part Title: Occupational Safety and Health Standards Subpart: R Subpart Title:
More informationEarthing, HV Switching and Associated Operational Equipment. Approval: Chief Operating Officer
ACCESS PRACTICE AP 24 Earthing, HV Switching and Associated Operational Equipment Process Authority: Manager Operations Improvement Approval: Chief Operating Officer Version Date: 27/08/2013 Revision:
More informationBC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-17. BC - ALBERTA INTERCONNECTION Supersedes 7T-17 dated 07 January 2015
BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-17 BC - ALBERTA INTERCONNECTION Supersedes 7T-17 dated 07 January 2015 Review Year: 2019 APPROVED BY: Original signed by: Paul Choudhury, General Manager,
More informationOPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS
OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS CONNECTED TO THE DISTRIBUTION SYSTEM ORANGE AND ROCKLAND
More informationNotes 1: Introduction to Distribution Systems
Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission
More informationATTACHMENT - AESO FUNCTIONAL SPECIFICATION
ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements
Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system
More informationESB National Grid Transmission Planning Criteria
ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and
More informationOPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS
OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS AND MEDIUM-SIZE FACILITIES (5,000-25,000KW) CONNECTED
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements
Section 502.8 SCADA Technical and Operating Applicability 1 Section 502.8 applies to: (a) the legal owner of a generating unit: (i) connected to the transmission facilities in the balancing authority area
More informationRevision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.
Our Ref: Your Ref: Date: November 2007 To: All Recipients of the Serviced Grid Code Regulatory Frameworks Electricity Codes National Grid Electricity Transmission plc National Grid House Warwick Technology
More informationModule 10. Initiation Code RELIABILITY ACCOUNTABILITY
Module 10 Initiation Code 1 M10 Initiation Code This is not the Initiating cause code The Outage Initiation Codes describe where an Automatic Outage was initiated on the power system. Element-Initiated
More informationThe Connecticut Light and Power Company
The Connecticut Light and Power Company and The United Illuminating Company Exhibit B - Generator Interconnection Technical Requirements May 12, 2010 Page 1 of 26 Table of Contents 1. SCOPE... 3 2. GENERAL
More informationField Instruction Switching Activities. Purpose. Scope. Objective. Safety
8.22 Switching Activities Purpose This instruction provides a safe system for switching on Horizon Powers Low Voltage, High Voltage and or Transmission electrical apparatus/network, where switching operations
More informationTexas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event
Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event
More informationSUBJECT HEADING: Switching Programmes ISSUE: 18
SUBJECT: Switchgear/Switching PROCEDURE: S04 SUBJECT HEADING: Switching Programmes ISSUE: 18 DATE: Apr 2017 1. INTRODUCTION 1.1 A written programme of switching operations shall be prepared. This programme
More information60 kv to 500 kv Technical Interconnection Requirements For Power Generators
60 kv to 500 kv Technical Interconnection Requirements For Power Generators Revision: 0 October 2008 COPYRIGHT, BC TRANSMISSION CORPORATION, OCTOBER 2008 Disclaimer This document is not intended as a design
More informationImpact Assessment Generator Form
Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project
More informationArizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan
Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan Mark Hackney October 5-8, 2009 Amman, Jordan Energy Control Center Layout 2 Energy Control
More informationHUTCHINSON UTILITIES COMMISSION TRANSMISSION INTERCONNECTION GUIDELINES
HUTCHINSON UTILITIES COMMISSION TRANSMISSION INTERCONNECTION GUIDELINES MAY 2013 I. INTRODUCTION A. OBJECTIVES The purpose of this handbook is to provide technical guidelines to assist the Applicant desiring
More informationE N G I N E E R I N G M A N U A L
1 1 1.0 PURPOSE The purpose of this document is to define policy and provide engineering guidelines for the AP operating companies (Monongahela Power Company, The Potomac Edison Company, and West Penn
More informationElectrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E
Electrical Switchgear & Power Transformer Testing H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This will provide you with practical knowledge
More informationDraft Kenya Standard for Balloting Not to be Cited as Kenya Standard
KENYA STANDARD KS 1859-5:2010 ICS 29.240.01 Electrical power transmission and distribution High-voltage operating regulations Part 5: Standard procedure and terminology for the issuing of operating instructions
More informationOne line and Three line diagrams Schematics Wiring Diagrams Logic ladders Ancillary prints Pictorial instructions
One line and Three line diagrams Schematics Wiring Diagrams Logic ladders Ancillary prints Pictorial instructions One line diagram (1) One line diagrams will typically show in a simple fashion an over
More informationGeneration Interconnection Requirements at Voltages 34.5 kv and Below
Generation Interconnection Requirements at Voltages 34.5 kv and Below 2005 March GENERATION INTERCONNECTION REQUIREMENTS AT 34.5 KV AND BELOW PAGE 1 OF 36 TABLE OF CONTENTS 1. INTRODUCTION 5 1.1. Intent
More informationField Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.
8.3 Induced Voltage Purpose The purpose of this instruction is to provide awareness of Electrostatic and Electromagnetic induced voltages and the method required to reduce or eliminate it. An induced voltage
More informationIntroduce system protection relays like underfrequency relays, rate of change of frequency relays, reverse - power flow
Module 1 : Fundamentals of Power System Protection Lecture 3 : Protection Paradigms - System Protection Objectives In this lecture we will: Overview dynamics in power systems. Introduce system protection
More informationOvervoltage Protection
Overvoltage Protection S T U D E N T M A N U A L March 31, 2005 2 STUDENT TRAINING MANUAL Prerequisites: Single-Phase Transformer Load Checks Objectives: From memory, you will be able to describe the electrical
More informationDISTRIBUTION BUSINESS
DISTRIBUTION BUSINESS DOCUMENT TITLE: MANUAL: DISTRIBUTION NETWORK OPERATION MANUAL DOCUMENT I.D. NUMBER: DS O SW 01 Copyright Aurora REVISIONS REV DATE REVISION DESCRIPTION APPROVAL NO. 1.0 1998 Interim
More informationEI HIGH VOLTAGE INSULATION TESTING POLICY
Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and
More information69 kv to 500 kv INTERCONNECTION REQUIREMENTS FOR TRANSMISSION FACILITIES
69 kv to 500 kv INTERCONNECTION REQUIREMENTS FOR TRANSMISSION FACILITIES Revision: 0.1 10 September 2013 Interconnection Requirements For Transmission Facilities Revision History R 0 April 2008 Initial
More informationThis document covers common questions concerning the design of an effectively grounded system.
This document covers common questions concerning the design of an effectively grounded system. To prevent against temporary overvoltage conditions when a line-to-ground fault occurs on the power grid.
More informationThis section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.
Basis of Design This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Background Information A Short Circuit and Coordination
More informationArc Flash Analysis Training
Arc Flash Analysis Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq An arc flash analysis study is
More informationfiell4,b r E.VERGY HLBP - REAL n.we OPER4 T1O.VS DfI ISI0.v OWAGE AND CLEARANCE COORDINATlOtV PROCEDUW rvove%.weer I. I999
fiell4,b r E.VERGY HLBP - REAL n.we OPER4 T1O.VS DfI ISI0.v OWAGE AND CLEARANCE COORDINATlOtV PROCEDUW rvove%.weer I. I999 The Customer is responsible for providing all equipment, in accordance with the
More informationGeneration and Load Interconnection Standard
Generation and Load Interconnection Standard Rev. 0 DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5
More informationModule 11a. Initiating Cause Code Form 4.X RELIABILITY ACCOUNTABILITY
Module 11a Initiating Cause Code Form 4.X 1 M11 Initiating and Sustained Cause Codes An Initiating Cause Code that describes the initiating cause of the outage. A Sustained Cause Code that describes the
More informationEH2741 Communication and Control in Electric Power Systems Lecture 2
KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationDistribution/Substation Transformer
Distribution/Substation Transformer Type VFI, Vacuum Fault Interrupter Transformer Option Functional Specification Guide Functional specification for 15 kv, 25 kv, or 35 kv vacuum fault interrupter distribution/substation
More informationHamdy Faramawy Senior Application Specialist ABB Sweden
Design, Engineering and Application of New Firm Capacity Control System (FCCS) Mohammed Y. Tageldin, MSc. MIET Senior Protection Systems Engineer ABB United Kingdom mohammed.tageldin@gb.abb.com Hamdy Faramawy
More informationBC HYDRO T&D SYSTEM OPERATIONS SYSTEM OPERATING ORDER 7T-14. BRIDGE RIVER LOWER MAINLAND INTERCONNECTION Supersedes 7T-14 issued 03 April 2017
BC HYDRO T&D SYSTEM OPERATIONS SYSTEM OPERATING ORDER 7T-14 BRIDGE RIVER LOWER MAINLAND INTERCONNECTION Supersedes 7T-14 issued 03 April 2017 Review Year: 2022 APPROVED BY: Original signed by Bob Cielen
More informationACCESS TO HIGH VOLTAGE APPARATUS
CORPORATE PROCEDURE ACCESS TO HIGH VOLTAGE APPARATUS Approved By: Prepared By: Issue Date: 17/6/2011 Andrew Macrides Access to Apparatus Rules File No: Managing Director Committee QDOC2011/63 Status: Approved
More informationFunctional Specification Revision History
Functional Specification Revision History Revision Description of Revision By Date R0B0 For Comments Yaoyu Huang February 10, 2016 R0 For Issuance Yaoyu Huang February 29, 2016 Transformer rating description
More informationELECTRIC TRANSMISSION (ET) Guideline G0104
ELECTRIC TRANSMISSION (ET) ISSUING DEPARTMENT: ETM x ETEC ETPO ETTS EFFECTIVE DATE: 06-01-1997 DEPARTMENTS AFFECTED: ETM ETEC ETPO x ETTS REVIEW DATE: 01-01-1998 DEPARTMENT GROUP: ALL All All x All P E
More informationECP HV INSULATION TESTING
Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and
More informationSection L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES
Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE The following is PG&E's procedure for pre-energization inspections. For PG&E to provide the Load
More information2 Grounding of power supply system neutral
2 Grounding of power supply system neutral 2.1 Introduction As we had seen in the previous chapter, grounding of supply system neutral fulfills two important functions. 1. It provides a reference for the
More informationVI 3 - i TABLE OF CONTENTS
VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3
More informationDP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation
DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Single Phase
More informationTechnical Requirements For Generation Connected to The ODEC System
Old Dominion Electric Cooperative Technical Requirements For Generation Connected to The ODEC System March 30, 2010 1 2 Table of Contents Topics Page Number Disclaimer.. 3 Perquisites.. 3 Applicability..
More informationFACILITY RATINGS METHOD TABLE OF CONTENTS
FACILITY RATINGS METHOD TABLE OF CONTENTS 1.0 PURPOSE... 2 2.0 SCOPE... 3 3.0 COMPLIANCE... 4 4.0 DEFINITIONS... 5 5.0 RESPONSIBILITIES... 7 6.0 PROCEDURE... 8 6.4 Generating Equipment Ratings... 9 6.5
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationOverview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.
Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. HP Critical Facility Services delivered by EYP MCF What is VOLTAGE? Difference of Electric Potential
More informationAutomated Power System Waveform Analytics for Improved Visibility, Situational Awareness, and Operational Efficiency
Automated Power System Waveform Analytics for Improved Visibility, Situational Awareness, and Operational Efficiency B. Don Russell (Presenter) Carl L. Benner Jeffrey Wischkaemper Karthick Muthu Manivannan
More informationSDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01
SEC DISTRIBUTION GROUNDING STANDARD SDCS-03 Part-II Rev.01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING Rev. 01 This specification is property of SEC
More informationMOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE
MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE Scott Storrar Contributors: Bill Hansen, Kyle Reddell, Tom McGrath Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer
More informationThe Importance of the Neutral-Grounding Resistor. Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T.
The Importance of the Neutral-Grounding Resistor Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T. Presentation Preview What is high-resistance grounding (HRG)? What is the purpose of HRG? Why
More informationECP HV INSULATION TESTING
Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing
More informationEDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS
ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of
More informationSouthern Company Interconnection Requirements for Inverter-Based Generation
Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection
More informationHIGH VOLTAGE RULES. Document Owner: HV Group. Authorised: Electrical Services Manager Liberty Primary Steel
HIGH VOLTAGE RULES Document Owner: HV Group Authorised: Electrical Services Manager Liberty Primary Steel HIGH VOLTAGE RULES Revision 10 INDEX 1.0 GENERAL 1.1 SCOPE 1.2 DUTIES 1.3 SUPPLY AND KNOWLEDGE
More informationBC HYDRO GRID OPERATIONS OPERATING ORDER 7T-33. SOUTH INTERIOR SUBSYSTEM Supersedes OO 7T-33 Issued 05 July 2011
BC HYDRO GRID OPERATIONS OPERATING ORDER 7T-33 SOUTH INTERIOR SUBSYSTEM Supersedes OO 7T-33 Issued 05 July 2011 Expiry Year: 2015 APPROVED BY: Original signed by: Paul Choudhury General Manager, Real Time
More informationShunt Reactors. Global Top Energy, Machinery & Plant Solution Provider
Shunt Reactors Global Top Energy, Machinery & Plant Solution Provider Our Business Brief introduction of Hyosung Power & Industrial Systems PG While Hyosung is an established name for world-class electrical
More informationSequence Networks p. 26 Sequence Network Connections and Voltages p. 27 Network Connections for Fault and General Unbalances p. 28 Sequence Network
Preface p. iii Introduction and General Philosophies p. 1 Introduction p. 1 Classification of Relays p. 1 Analog/Digital/Numerical p. 2 Protective Relaying Systems and Their Design p. 2 Design Criteria
More informationGeneration and Load Interconnection Standard
Generation and Load Interconnection Standard Rev. 0A DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5
More informationPOWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS
POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS Juan Manuel Gers, PhD Protection coordination principles Relay coordination is the process of selecting settings that will assure that the relays
More informationONTARIO ENERGY BOARD. Transmission System Code
ONTARIO ENERGY BOARD Transmission System Code July 14, 2000 TABLE OF CONTENTS 1. INTRODUCTION...1 1.1. PURPOSE...1 1.2. DEFINITIONS...1 1.3. INTERPRETATION...6 1.4. TO WHOM THIS CODE APPLIES...6 1.5.
More information6B.6 Substation Grounding
1 No v 1 6 1 No v 1 6 Iu d a Mo r a r a n d ma n a g e r R a c h e le Ha n n o n Vo l.6 -S u b s ta tio n a n d Hig h Vo lta g e E q u ip me n t;p a r tb -S u b s ta tio n Co n fig u r a tio n s 1. Scope
More informationTransmission Interconnection Requirements for Inverter-Based Generation
Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional
More informationCOS MANUAL. March 24, Version 1.2. Outage Coordination Process. Peak Reliability. Version 1.0. NERC Reliability Standard IRO-017-1
Outage Coordination Process Version 1.0 NERC Reliability Standard IRO-017-1 COS MANUAL March 24, 2017 www.peakrc.com. Contents 1. Conventions... 2 2. Introduction... 2 3. Purpose... 2 4. Applicability...
More informationMANITOBA HYDRO TRANSMISSION SYSTEM INTERCONNECTION REQUIREMENTS. April 2009 Version 2
MANITOBA HYDRO TRANSMISSION SYSTEM INTERCONNECTION REQUIREMENTS April 2009 Version 2 LEGISLATIVE AUTHORITY Section 15(5) of The Manitoba Hydro Act authorizes Manitoba Hydro to set, coordinate and enforce
More informationTechnical Interconnection Requirements For Transmission Voltage Customers for Service at 60,000 to 287,000 Volts R XX
Technical Interconnection Requirements For Transmission Voltage Customers for Service at 60,000 to 287,000 Volts R XX May 2018 Disclaimer This document provides general technical interconnection requirements
More informationEH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström
EH27401 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsn@ics.kth.se 1 Course map 2 Outline 1. Power System Topologies Transmission Grids vs Distribution grids Radial grids
More informationModern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions
1 Transmission transformers are important links in the bulk power system. They allow transfer of power from generation centers, up to the high-voltage grid, and to bulk electric substations for distribution
More information2018 Consultant s Handbook Division 26 Electrical ARC Flash Hazard Analysis
1 Summary 1.1 Provide a complete Arc Flash Hazard Analysis for the project indicated in the accompanying RFP. The Analysis may be performed: independent of the construction project in concert with the
More informationSection G2: PROTECTION AND CONTROL REQUIREMENTS FOR TRANSMISSION GENERATION ENTITIES
Section G2: PROTECTION AND CONTROL REQUIREMENTS FOR TRANSMISSION GENERATION ENTITIES Purpose This section specifies the requirements for protective relays and control devices for Generation Entities interconnecting
More informationITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/
ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...
More informationELECTRICAL EQUIPMENT. Inspection. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E
ELECTRICAL EQUIPMENT Inspection H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: The course begins with the fundamental principles that always
More informationSubstation Preventive Maintenance
Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS
More informationMANITOBA HYDRO TRANSMISSION SYSTEM INTERCONNECTION REQUIREMENTS. July 2016 Version 4
MANITOBA HYDRO TRANSMISSION SYSTEM INTERCONNECTION REQUIREMENTS July 2016 Version 4 This page intentionally blank LEGISLATIVE AUTHORITY Section 15.0.3(1) of The Manitoba Hydro Act (C.C.S.M. c. H190) authorizes
More informationMidAmerican Energy Company 69 kv Facility Ratings Methodology
MidAmerican Energy Company 69 kv Facility Ratings Methodology Version 1.0 Issued by: Luke Erichsen Reviewed by: Tom Mielnik Last Reviewed: 8/29/2012 1 1.0 Scope: This document provides MidAmerican Energy
More informationGUIDE FOR GENERATOR INTERCONNECTION THE WIRES OWNER DISTRIBUTION SYSTEM
DATE: 200/06/2 PAGE 1 of GUIDE FOR GENERATOR INTERCONNECTION TO THE WIRES OWNER DISTRIBUTION SYSTEM The intent of this Guide is to establish the interconnection requirements of Distributed Resources with