1 2015 NFPA 70E SESHA 2015 ARIZONA MINI CONFERENCE December 10, 2015 Intel Corporation

2 Introduction Jeffrey A. Pugh, P.E. Pugh Engineering LLC Bachelor of Science Degrees in Electrical Engineering and Computer Engineering from the University of Missouri-Columbia Electrical Engineering, Instrumentation and Controls, and Life Safety Systems for 25 years

3 Definitions (Article 100) Arc Flash Hazard A dangerous condition associated with the possible release of energy caused by an electric arc Arc Rating The value attributed to materials that describes their performance to exposure to an electrical arc discharge Boundary Arc Flash, Limited Approach, & Restricted Approach Electrical Hazard A dangerous condition such that contact or equipment failure can result in electrical shock, arc flash burn, thermal burn, or blast Electrically Safe Work Condition A state in which an electrical conductor or circuit part has been disconnected from energized parts Incident Energy The amount of thermal energy impressed on a surface (at a certain distance) generated during an electrical arc event (cal/cm 2 )

4 General Requirements for Electrical Safety-Related Work Practices (Article 110) Maintenance The electrical safety program shall include elements that consider conditions of maintenance of electrical equipment and systems Risk Assessment Procedure An electrical safety program shall include a risk assessment procedure that addresses employee exposure to electrical hazards Electrical Safety Auditing Electrical Safety Program Audits shall be performed at intervals not to exceed 3 years; Field Work Audits shall be performed at intervals not to exceed 1 year

5 Establishing an Electrically Safe Work Condition (Article 120) Verification of an Electrically Safe Work Condition An electrically safe work conditions shall be achieved with proper LOTO procedures and verification Use of an adequately rated test instrument to test each phase conductor or circuit part Lockout/Tagout Simple LOTO Involve only qualified person(s) deenergizing one set of conductors or circuit Complex LOTO Multiple energy sources, crews, crafts, locations, employers, or disconnecting means

6 Work Involving Electrical Hazards (Article 130) Electrically Safe Working Conditions Employee is within the limited approach boundary Employee interacts with equipment where conductors or circuit parts are not exposed but an increased likelihood of injury from an expose to an arc flash hazard exists Energized Work Additional Hazards or Increased Risk Infeasibility Less than 50 Volts Normal Operation (NEW)

7 2015 Change Normal Operation Normal operation of electric equipment shall be permitted: Equipment is properly installed Equipment is properly maintained Equipment doors are closed and secured All equipment covers are in place and secured There is no evidence of impending failure

8 Work Involving Electrical Hazards (Article 130) Energized Electrical Work Permit Required when energized work is permitted in accordance with the Standard Work performed within the restricted approach boundary Likelihood of injury from an exposure to an arc flash hazard exists Exemptions Qualified person is provided with and uses appropriate safe work practices and PPE Testing, troubleshooting, and voltage measuring Thermography and visual inspections outside restricted approach boundary Access to and egress from an area General housekeeping

9 Equipment Flash Protection Boundary Must wear appropriate Arc-Rated PPE Prohibited Shock Boundary: Qualified Persons Only. PPE as if direct contact with live part Restricted Shock Boundary: Qualified Persons Only Limited Shock Boundary: Qualified or Unqualified Persons* * Only if accompanied by Qualified Person Note: shock boundaries dependent on system voltage level (from NFPA 70E-2000)

10 Equipment Arc Flash Boundary Must wear appropriate Arc-Rated PPE Restricted Shock Boundary: Qualified Persons Only Limited Shock Boundary: Qualified or Unqualified Persons* * Only if accompanied by Qualified Person Note: shock boundaries dependent on system voltage level (from NFPA 70E-2015)

11 Work Involving Electrical Hazards (Article 130) Arc Flash Risk Assessment An arc flash risk assessment shall be performed and shall determine if an arc flash hazard exists Appropriate safety-related work practices Arc flash boundary PPE to be used within the arc flash boundary Reviewed periodically at intervals not to exceed 5 years Takes into consideration the design of the overcurrent protective device and its opening time, including its condition of maintenance

12 Work Involving Electrical Hazards (Article 130) Arc Flash Boundary The distance at which the incident energy equals 1.2 cal/cm 2 Arc Flash PPE (2015 CHANGE) Incident Energy Analysis Method (Calculations) Arc Flash PPE Categories Method (Table) Equipment Label Nominal System Voltage Arc Flash boundary Available incident energy or minimum arc rating of clothing or site-specific level of PPE

13 Work Involving Electrical Hazards (Article 130)

14 2015 Change Table or Calculation method, but not both, shall be permitted to be used on the same piece of equipment The results of an incident energy analysis to specify an arc flash PPE Category (per Tables) shall not be permitted

15 Incident Energy Examples

16 Incident Energy Examples

17 Incident Energy Examples

18 2015 Change New equipment-based tables were added for determining the arc flash PPE category Arc-Flash Hazard Identification Table lists task, equipment condition, arc flash PPE requirement (YES/NO) Arc-Flash Hazard PPE Categories Tables list the equipment, arc flash PPE category, and the arc flash boundary

19 2015 Change Hazard/risk category 0 has been removed from Table 130.7(C)(16) Hazard/risk category is now PPE category; category 0 was deleted because the new PPE table only specifies PPE for work within the arc flash boundary

20 Safety-Related Maintenance Requirements (Chapter 2) General Maintenance Requirements Substations, switchgear assemblies, switchboards, panelboards, motor control centers, and disconnect switches Premises Wiring Controller Equipment Fuse and Circuit Breakers Rotating Equipment Hazardous Locations Batteries and Battery Rooms Portable Electric Tools and Equipment PPE

21 Safety Requirements for Special Equipment (Chapter 3) Electrolytic Cells Batteries and Battery Rooms Lasers Power Electronic Equipment Research and Development Laboratories

22 Annex Information Limits of Approach Incident Energy and Arc Flash Boundary Calculations Electrical Safety Program Risk Assessment Procedure LOTO Procedure Guidance on Selection of PPE (Table & Calculations Methods) Job Briefing and Planning Checklist Energized Electrical Work Permit General Categories of Electrical Hazards (shock, arc flash, arc blast) Layering of Protective Clothing and Total System Arc Rating Safety Related Design Requirements

23 Arc Flash Cleanroom Garments

24 Questions & Answers Jeffrey A. Pugh, P.E. Pugh Engineering LLC 2995 W. Elliot Road, #4 Chandler, AZ Phone: (480) Wed:

NFPA-70E. Electrical Safety in the Workplace. Standard for Edition

NFPA-70E. Electrical Safety in the Workplace. Standard for Edition NFPA-70E Standard for Electrical Safety in the Workplace 2015 Edition NFPA-70E 90.1 Purpose. The purpose of this standard is to provide a practical safe working area for employees relative to the hazards

More information

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com AN EXAMPLE OF A STANDARD ARC

More information

Paul Dobrowsky Innovative Technology Services

Paul Dobrowsky Innovative Technology Services Significant Changes to NFPA 70E -2009 Edition Paul Dobrowsky Innovative Technology Services 2008 IEEE PCIC 1 Repeat Presentation This has been previously presented 2008 IEEE Electrical Safety Workshop

More information

First Draft Language

First Draft Language 110.16 First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1) Nominal system voltage (2) Arc flash boundary (3)

More information

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com AN EXAMPLE OF A STANDARD ARC

More information

STANDARDIZING ARC FLASH PPE LABELS

STANDARDIZING ARC FLASH PPE LABELS The Electrical Power Engineers Qual-Tech Engineers, Inc. 01 Johnson Road Building #1 Suite 03 Houston, PA 1534-1300 Phone 74-873-975 Fax 74-873-8910 www.qualtecheng.com STANDARDIZING ARC FLASH PPE LABELS

More information

Arc Flash and NFPA 70E

Arc Flash and NFPA 70E Arc Flash and NFPA 70E Presented by: J.D. Kyle Safe Work Practices Wearing Proper PPE? OSHA 1910.333 (a) (1) not to work hot or live except : 1. De energizing introduces additional or increased hazards

More information

Arc Flash Analysis and Documentation SOP

Arc Flash Analysis and Documentation SOP Arc Flash Analysis and Documentation SOP I. Purpose.... 2 II. Roles & Responsibilities.... 2 A. Facilities Maintenance (FM).... 2 B. Zone Supervisors/ Shop Foremen... 2 C. PMCS & CPC... 2 III. Procedures...

More information

Electrical Arc Hazards

Electrical Arc Hazards Arc Flash Analysis 1996-2009 ETAP Workshop Operation Notes Technology, 1996-2009 Inc. Operation Workshop Technology, Notes: Arc Inc. Flash Analysis Slide 1 Electrical Arc Hazards Electrical Arcs can occur

More information

A Guide to Establish an Arc Flash Safety Program for Electric Utilities

A Guide to Establish an Arc Flash Safety Program for Electric Utilities A Guide to Establish an Arc Flash Safety Program for Electric Utilities by Craig Clarke, P.E. Eaton Corporation 50 Soccer Park Rd. Fenton, MO 63026 (636) 717-3406 CraigClarke@Eaton.com Ilanchezhian Balasubramanian,

More information

Key factors to maintaining arc flash safety

Key factors to maintaining arc flash safety APPLICATI TE Key factors to maintaining arc flash safety Arc flash and blast When an arc fault occurs, the result is a massive electrical explosion. The light and heat emitted by the explosion is known

More information

Steve Kovach District Sales Engineer

Steve Kovach District Sales Engineer Steve Kovach District Sales Engineer 630-740-7463 Steveekovach@Eaton.com Institute of Electrical and Electronics Engineers American Society of Safety Engineers 1 Electrical Hazards Electrical Hazards Shock

More information

2017 ELECTRICAL SAFETY SERVICES. Arc Flash Electrical Maintenance Lockout/Tagout And More

2017 ELECTRICAL SAFETY SERVICES. Arc Flash Electrical Maintenance Lockout/Tagout And More 2017 ELECTRICAL SAFETY SERVICES Arc Flash Electrical Maintenance Lockout/Tagout And More ABOUT LEWELLYN TECHNOLOGY Improving workplace safety since 1993 Daryn Lewellyn founded Lewellyn Technology more

More information

Arc Flash Analysis Training

Arc Flash Analysis Training Arc Flash Analysis Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq An arc flash analysis study is

More information

Electrical Safety Policy Health and Safety FCX-HS03 Release 07/2018 Version 1

Electrical Safety Policy Health and Safety FCX-HS03 Release 07/2018 Version 1 Electrical Safety Policy Health and Safety FCX-HS03 Release 07/2018 Version 1 POTENTIAL FATAL RISKS Exposure to Electrical Hazards CRITICAL CONTROLS Access Control Barriers and Segregation Electrical PPE

More information

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also, delete any other item or

More information

DC ARC FLASH. THE IMPLICATIONS OF NFPA 70E 2012 ON BATTERY MAINTENANCE

DC ARC FLASH. THE IMPLICATIONS OF NFPA 70E 2012 ON BATTERY MAINTENANCE DC ARC FLASH. THE IMPLICATIONS OF NFPA 70E 2012 ON BATTERY MAINTENANCE William Cantor, P.E. TPI Exton, PA 19341 Phil Zakielarz TPI Exton, PA 19341 Mario Spina Verizon Wireless Uniontown, OH 44685 Abstract

More information

Electrical Severity Measurement Tool Revision 4

Electrical Severity Measurement Tool Revision 4 Electrical Severity Measurement Tool Revision 4 November 2017 Electrical Severity Measurement Tool 1.0 Purpose: This tool is intended to measure the severity of exposure to an electrical safety event based

More information

2014 NEC Changes Part 1

2014 NEC Changes Part 1 www.garyklinka.com Page 1 of 8 Instructions: Fee $20 1. Print these pages. 2. Circle the correct answers and transfer them to the answer sheet. 3. Page down to the last page for the verification forms

More information

Education & Training

Education & Training Distribution System Operator Certificate This program provides you with a proficient working knowledge in modern electric power distribution systems. These four classes are designed to walk students through

More information

{40C54206-A3BA D8-8D8CF }

{40C54206-A3BA D8-8D8CF } Informative Annex D Incident Energy and Arc Flash Boundary Calculation Methods This informative annex is not a part of the requirements of this NFPA document but is included for informational purposes

More information

ARC FLASH & PPE UPDATE. Michael Olivo, P.E. Aaron Ramirez, E.I.T.

ARC FLASH & PPE UPDATE. Michael Olivo, P.E. Aaron Ramirez, E.I.T. ARC FLASH & PPE UPDATE Michael Olivo, P.E. Aaron Ramirez, E.I.T. What is Arc Flash? Arc Flash is the release of heat and light produced when electrical current flows through an air gap between two conductors

More information

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY SECTION 16075 - SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide a short-circuit, component protection, flash

More information

Arc Flash Calculation Methods

Arc Flash Calculation Methods Arc Flash Calculation Methods Course No: E04-033 Credit: 4 PDH Velimir Lackovic, Char. Eng. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F:

More information

Electrical Overcurrent Studies

Electrical Overcurrent Studies Electrical Overcurrent Studies 11-01-2011 Deliverables associated with electrical overcurrent studies are as follow : a. Draft Reports i. Construction Related Projects have the following draft reports

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

Electrical testing safety Part 1: Preparing for absence of voltage testing

Electrical testing safety Part 1: Preparing for absence of voltage testing APPLICATION NOTE Electrical testing safety Part 1: Preparing for absence of voltage testing James R. White, Training Director, Shermco Industries, Inc. OSHA and the NFPA 70E Standard for Electrical Safety

More information

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION! PREFACE This publication has been prepared as a guide for Architectural and Engineering (A&E) firms in the preparation of documents for the design and construction of new structures and the remodeling

More information

Electrical Measurement Safety. Sponsored By:

Electrical Measurement Safety. Sponsored By: Electrical Measurement Safety Sponsored By: About the Viewer Panel Slides: Go to the Links tab at the top and click on the link to download the PDF of the slides If you re watching the archive version,

More information

Arc Flash Mitigation An Overview. Gus Nasrallah, P.E. Electroswitch May 30, 2013

Arc Flash Mitigation An Overview. Gus Nasrallah, P.E. Electroswitch May 30, 2013 Arc Flash Mitigation An Overview Gus Nasrallah, P.E. Electroswitch May 30, 2013 Agenda Origin of Modern Arc Flash studies Why Now more than before NFPA 70E Standards Protection Zone IEEE 1584 2002 IEEE

More information

LOCKOUT / TAGOUT PROGRAM

LOCKOUT / TAGOUT PROGRAM Page 1 of 7 1. SCOPE LOCKOUT / TAGOUT PROGRAM This Program outlines the purpose, rules, responsibilities and techniques to be followed by all University of Pittsburgh employees to guard against the unexpected

More information

2018 Consultant s Handbook Division 26 Electrical ARC Flash Hazard Analysis

2018 Consultant s Handbook Division 26 Electrical ARC Flash Hazard Analysis 1 Summary 1.1 Provide a complete Arc Flash Hazard Analysis for the project indicated in the accompanying RFP. The Analysis may be performed: independent of the construction project in concert with the

More information

NATIONAL ELECTRIC SAFETY CODE 2012 EDITION

NATIONAL ELECTRIC SAFETY CODE 2012 EDITION NATIONAL ELECTRIC SAFETY CODE (ANSI C2 / NESC) 2012 EDITION Jim Tomaseski IBEW Director of Safety and Health EEI Safety and Health Committee Conference NESC 2012 IMPORTANT DATES SEPTEMBER 1, 2009 - Preprint

More information

Arc Flash Hazard and Mitigation 2 nd Workshop on Power Converters for Particle Accelerators June 14 16, 2010

Arc Flash Hazard and Mitigation 2 nd Workshop on Power Converters for Particle Accelerators June 14 16, 2010 Arc Flash Hazard and Mitigation 2 nd Workshop on Power Converters for Particle Accelerators June 14 16, 2010 Paul Bellomo June 14-16, 2010 2nd Workshop on Power Converters for Particle Accelerators - Arc

More information

REDUCING ARC FLASH HAZARD BY REMOTE SWITCHING

REDUCING ARC FLASH HAZARD BY REMOTE SWITCHING The Electrical Power Engineers Qual-Tech Engineers, Inc. 21 Johnson Road Building #1 Suite 23 Houston, PA 15342-13 Phone 724-873-9275 Fax 724-873-891 www.qualtecheng.com REDUCING ARC FLASH HAZARD BY REMOTE

More information

Cause, Effect & Mitigation Strategies

Cause, Effect & Mitigation Strategies WSU HANDS ON RELAY SCHOOL 2019 Arc Flash Fault Cause, Effect & Mitigation Strategies Joe Xavier, Technical Manager West Region Arc Flash Fault - Agenda What is an Arc Flash? Why and when does Arc Flash

More information

THREE PHASE PAD MOUNTED DISTRIBUTION TRANSFORMER ARC FLASH TESTING JUNE 23, 2009 FERRAZ SHAWMUT HIGH POWER LABORATORY NEWBURYPORT, MA

THREE PHASE PAD MOUNTED DISTRIBUTION TRANSFORMER ARC FLASH TESTING JUNE 23, 2009 FERRAZ SHAWMUT HIGH POWER LABORATORY NEWBURYPORT, MA THREE PHASE PAD MOUNTED DISTRIBUTION TRANSFORMER ARC FLASH TESTING JUNE 23, 2009 FERRAZ SHAWMUT HIGH POWER LABORATORY NEWBURYPORT, MA Witnessed by: Jim Phillips, PE, Consultant Craig DeRouen, ERMCO Director

More information

APPLYING LOW-VOLTAGE CIRCUIT BREAKERS TO LIMIT ARC FLASH ENERGY

APPLYING LOW-VOLTAGE CIRCUIT BREAKERS TO LIMIT ARC FLASH ENERGY APPLYING LOW-VOLTAGE CIRCUIT BREAKERS TO LIMIT ARC FLASH ENERGY Copyright Material IEEE Paper No. PCIC-2006-2 George Gregory Kevin J. Lippert Fellow Member, IEEE Senior Member, IEEE Schneider Electric

More information

Webinar: An Effective Arc Flash Safety Program

Webinar: An Effective Arc Flash Safety Program Webinar: An Effective Arc Flash Safety Program Daleep Mohla September 10 th, 2015: 2pm ET Agenda Arc Flash Defined and Quantified NFPA 70E / CSA Z 462 - Recent Updates What is the ANSI Z10 Hierarchy of

More information

Arc Hazard Assessment for DC Applications in the Transit Industry

Arc Hazard Assessment for DC Applications in the Transit Industry Arc Hazard Assessment for DC Applications in the Transit Industry Kenneth S.Y. Cheng Kinectrics Inc. Toronto, Canada Stephen L. Cress Kinectrics Inc. Toronto, Canada Donald J. Minini Excalibur Associates,

More information

Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost

Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost Adam T. Powell, PE President Emerald Engineering, Inc. Jeffrey L. Small, Sr. Senior

More information

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com ARC FLASH PPE GUIDELINES FOR

More information

Arc Flash Hazard Standards:

Arc Flash Hazard Standards: Arc Flash Hazard Standards: The Burning Question Presented by Sesha Prasad Specialist Power System Engineer Welcon Technologies At IDC Electrical Arc Flash Forum Melbourne April 14th & 15th 2010. Session

More information

Arc Flash Study Principles & Procedures for below 15 kv AC Systems. Xuan Wu, Dennis Hoffman, Ronald Wellman, and Manish Thakur

Arc Flash Study Principles & Procedures for below 15 kv AC Systems. Xuan Wu, Dennis Hoffman, Ronald Wellman, and Manish Thakur Arc Flash Study Principles & Procedures for below 15 kv AC Systems Xuan Wu, Dennis Hoffman, Ronald Wellman, and Manish Thakur Agenda Arc Flash Study Purposes Introduction of Arc Flash Arc Flash Risk Locations

More information

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Basis of Design This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Background Information A Short Circuit and Coordination

More information

SECTION POWER SYSTEMS STUDIES

SECTION POWER SYSTEMS STUDIES PART 1 - GENERAL 1.1 RELATED SECTIONS: Refer to Division 15 for Mechanical requirements. Refer to Division 16 for Electrical requirements. 1.2 OBJECTIVE: A. The short-circuit study is to calculate the

More information

SEI Certification Program Manual

SEI Certification Program Manual Safety Equipment Institute SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Program 0 of 6 SEI Certification Program Manual Section 29: Industrial Protective Clothing

More information

PRODUCTIVELY SAFER LOCK-OUT TAG-OUT PROCEDURE

PRODUCTIVELY SAFER LOCK-OUT TAG-OUT PROCEDURE PRODUCTIVELY SAFER LOCK-OUT TAG-OUT PROCEDURE with PESDs WRITTEN BY: Philip B. Allen, Owner and CEO 1515 W. Kimberly Road Davenport, Iowa 52807, USA 1.800.280.9517 www.graceport.com PRODUCTIVELY SAFER

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

AT Advanced Wire Tracer. Users Manual

AT Advanced Wire Tracer. Users Manual AT-1000 Advanced Wire Tracer Users Manual AT-1000 Advanced Wire Tracer English Users Manual AT1000_Rev001 2008 Amprobe Test Tools. All rights reserved. Limited Warranty and Limitation of Liability Your

More information

GV3000/SE AC Drive HP, 460V AC

GV3000/SE AC Drive HP, 460V AC Hardware Reference, Installation, and Troubleshooting Manual D2-3392-7 GV3000/SE AC Drive 30-200 HP, 460V AC Version 6.07 Important User Information Solid-state equipment has operational characteristics

More information

15B+/17B+/18B+ Calibration Manual. Digital Multimeter

15B+/17B+/18B+ Calibration Manual. Digital Multimeter 5B+/7B+/8B+ Digital Multimeter Calibration Manual April 206 206 Fluke Corporation. All rights reserved. Specifications are subject to change without notice. All product names are trademarks of their respective

More information

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4 SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: 16.10 Document Number: KUCSH0039 Rev: 4 16.10.1 INTRODUCTION 16.10.1.1 The intent of this standard is to ensure that continuity

More information

The Importance of the Neutral-Grounding Resistor. Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T.

The Importance of the Neutral-Grounding Resistor. Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T. The Importance of the Neutral-Grounding Resistor Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T. Presentation Preview What is high-resistance grounding (HRG)? What is the purpose of HRG? Why

More information

COMMON SOURCES OF ARC FLASH HAZARD IN INDUSTRIAL POWER SYSTEMS

COMMON SOURCES OF ARC FLASH HAZARD IN INDUSTRIAL POWER SYSTEMS COMMON SOURCES OF ARC FLASH HAZARD IN INDUSTRIAL POWER SYSTEMS Joost Vrielink Hans Picard Wilbert Witteman Eaton Eaton SABIC-IP Europalaan 202 7559 SC Hengelo Europalaan 202 7559 SC Hengelo Plasticslaan

More information

HIGH VOLTAGE RULES. Document Owner: HV Group. Authorised: Electrical Services Manager Liberty Primary Steel

HIGH VOLTAGE RULES. Document Owner: HV Group. Authorised: Electrical Services Manager Liberty Primary Steel HIGH VOLTAGE RULES Document Owner: HV Group Authorised: Electrical Services Manager Liberty Primary Steel HIGH VOLTAGE RULES Revision 10 INDEX 1.0 GENERAL 1.1 SCOPE 1.2 DUTIES 1.3 SUPPLY AND KNOWLEDGE

More information

Best Practice Reducing The Risk of Arc Flash Cross Over

Best Practice Reducing The Risk of Arc Flash Cross Over Best Practice Reducing The Risk of Arc Flash Cross Over 1 2 Electrical Systems Are Critical 3 Why Do We Complete Electrical Maintenance Energized?? 4 Which Bulb Is Not Working?? 5 Functioning Correctly

More information

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5 Applied Grounding and Bonding Paul Dobrowsky Member NEC Panel 5 1 Introduction This presentation is a representative sample from the following Chapters of Applied Grounding and Bonding. Chapter 1, Introduction

More information

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS)

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS) WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS) 1 PART 1: GENERAL This section describes materials and installation requirements for low voltage

More information

PHASE ROTATION METER. Operating and Instruction Manual. a n d A C C E S S O R I E S

PHASE ROTATION METER. Operating and Instruction Manual. a n d A C C E S S O R I E S PHASE ROTATION METER a n d A C C E S S O R I E S Operating and Instruction Manual HD ELECTRIC COMPANY 1 4 7 5 L A K E S I D E D R I V E WA U K E G A N, I L L I N O I S 6 0 0 8 5 U. S. A. PHONE 847.473.4980

More information

Photovoltaic System Commissioning and Testing A Guide for PV System Technicians and Engineers

Photovoltaic System Commissioning and Testing A Guide for PV System Technicians and Engineers 4097 PV Com & Test_CoverV3:Layout 2 28/6/12 09:41 USA Office: Seaward Group USA 6304 Benjamin Road, Suite 506, Tampa, Florida, 33634 Page 2 Part of Tel: +1 (813) 886-2775 Email: enquiry@seawardsolar.com

More information

ARC FLASH HAZARD ANALYSIS AND MITIGATION

ARC FLASH HAZARD ANALYSIS AND MITIGATION ARC FLASH HAZARD ANALYSIS AND MITIGATION J.C. Das IEEE PRESS SERIES 0N POWER ENGINEERING Mohamed E. El-Hawary, Series Editor IEEE IEEE PRESS WILEY A JOHN WILEY & SONS, INC., PUBLICATION CONTENTS Foreword

More information

GV3000 AC General Purpose (Volts/Hertz) and Vector Duty Drive

GV3000 AC General Purpose (Volts/Hertz) and Vector Duty Drive Software Start-Up and Reference Manual D2-3339-1 GV3000 AC General Purpose (Volts/Hertz) and Vector Duty Drive Version 5.0 Important User Information Solid-state equipment has operational characteristics

More information

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety 8.22 Switching Activities Purpose This instruction provides a safe system for switching on Horizon Powers Low Voltage, High Voltage and or Transmission electrical apparatus/network, where switching operations

More information

NSA, Double layered system: Two Layers of Style IC UQ60 (XCYE) 9.0 oz/yd² 305 g/m² Woven, 88% Cotton 12% Nylon, Navy, January, 2011

NSA, Double layered system: Two Layers of Style IC UQ60 (XCYE) 9.0 oz/yd² 305 g/m² Woven, 88% Cotton 12% Nylon, Navy, January, 2011 Hugh Hoagland Consulting, Inc. Electric Arc Exposure Tests For NSA Fabric System Outer Layer 9.0 oz/yd² 305 g/m² Woven, 88% Cotton 12% Nylon Style IC UQ60 (XCYE) Inner Layer 9.0 oz/yd² 305 g/m² Woven,

More information

374/375/376 Clamp Meter. Users Manual

374/375/376 Clamp Meter. Users Manual 374/375/376 Clamp Meter Users Manual Introduction XWWarning Read "Safety Information" before you use the Meter. The Fluke 374, 375, and 376 (the Meter) measure true-rms ac current and voltage, dc current

More information

NORTHWEST FLORIDA STATE COLLEGE MONUMENT SIGNS WITH LED DISPLAYS

NORTHWEST FLORIDA STATE COLLEGE MONUMENT SIGNS WITH LED DISPLAYS PREPARED FOR: FOUNDATION PLAN & STRUCTURAL NOTES DESIGNED BY: NJB DRAWN BY: NJB REVIEWED BY: BLSE S1 PREPARED FOR: FRAMING PLANS DESIGNED BY: NJB DRAWN BY: NJB REVIEWED BY: BLSE S2 PREPARED FOR: SECTION

More information

high RESISTANCE GROUNDING SYSTEM the power to protect www. ElectricalPartManuals. com Instruction Manual C-102

high RESISTANCE GROUNDING SYSTEM the power to protect www. ElectricalPartManuals. com Instruction Manual C-102 G e m i n i high RESISTANCE GROUNDING SYSTEM the power to protect Instruction Manual C-102 HIGH RESISTANCE GROUNDING SYSTEM Gemini is a unique, fail safe, all-in-one neutral grounding system, combining

More information

Bulletin 509 Three Phase Full Voltage NEMA Starters Size 9 Series A. Renewal Parts

Bulletin 509 Three Phase Full Voltage NEMA Starters Size 9 Series A. Renewal Parts Bulletin 509 Three Phase Full Voltage NEMA Starters Size 9 Series A Renewal Parts Warning: To avoid hazards of electrical shock, remove all power before proceeding. Auxiliary contacts commonly control

More information

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE The following is PG&E's procedure for pre-energization inspections. For PG&E to provide the Load

More information

Ft Worth IEEE-PES. Presented by: Doug Harris Specifications Engineer Dallas, TX. Arc-Flash Hazard Mitigation & Selectivity

Ft Worth IEEE-PES. Presented by: Doug Harris Specifications Engineer Dallas, TX. Arc-Flash Hazard Mitigation & Selectivity Ft Worth IEEE-PES Presented by: Doug Harris Specifications Engineer Dallas, TX Arc-Flash Hazard Mitigation & Selectivity Electrical hazards Energized circuit/conductor Today s power system engineer must

More information

netzerotools.com 374/375/376 Users Manual Clamp Meter

netzerotools.com 374/375/376 Users Manual Clamp Meter 374/375/376 Clamp Meter Users Manual Fluke 376 True RMS AC DC Clamp Meter Fluke 374 True RMS AC / DC Clamp Meter Fluke 373 True RMS AC Clamp Meter Fluke 375 True RMS AC / DC Clamp Meter LIMITED WARRANTY

More information

Key Elements for Better Infrared Thermography

Key Elements for Better Infrared Thermography Key Elements for Better Infrared Thermography R. James Seffrin, Director Infraspection Institute 425 Ellis Street Burlington, NJ 08016 609-239-4788 www.infraspection.com Abstract Successful thermography

More information

Endeavour Energy Electrical Safety Rules. October 2013

Endeavour Energy Electrical Safety Rules. October 2013 Endeavour Energy Electrical Safety Rules October 2013 Endeavour Energy Electrical Safety Rules Associated Procedures List Document No. Title GSY 0031 Operating or observing plant near overhead electrical

More information

A controlled arc-flash, produced in a flashtube. Even though the energy level used is fairly low (85 joules), the low-impedance, low-inductance

A controlled arc-flash, produced in a flashtube. Even though the energy level used is fairly low (85 joules), the low-impedance, low-inductance An arc flash (also called a flashover), which is distinctly different from the arc blast, is part of an arc fault, a type of electrical explosion or discharge that results from a low-impedance connection

More information

CHANGEABILITY OF ARC FLASH PARAMETERS AND ITS IMPACT ON HAZARD MITIGATION IN LOW VOLTAGE POWER SYSTEMS

CHANGEABILITY OF ARC FLASH PARAMETERS AND ITS IMPACT ON HAZARD MITIGATION IN LOW VOLTAGE POWER SYSTEMS CHANGEABILITY OF ARC FLASH PARAMETERS AND ITS IMPACT ON HAZARD MITIGATION IN LOW VOLTAGE POWER SYSTEMS by Abdeslem Kadri Bachelor of Engineering, Boumerdes University INELEC, 1996 A thesis presented to

More information

EFCOG BEST PRACTICE # 211. Best Practice Title: Managing Hazards of Multiwire Branch Circuits Installed Before the 2008 NEC

EFCOG BEST PRACTICE # 211. Best Practice Title: Managing Hazards of Multiwire Branch Circuits Installed Before the 2008 NEC EFCOG BEST PRACTICE # 211 Best Practice Title: Managing Hazards of Multiwire Branch Circuits Installed Before the 2008 NEC Facility: DOE Complex Point of Contact: John (Jackie) McAlhaney, Savannah River

More information

Electrical Wiring: Commercial, Seventh Canadian Edition

Electrical Wiring: Commercial, Seventh Canadian Edition Electrical Wiring Commercial Canadian 7th Edition Mullin SOLUTIONS MANUAL Full download at: https://testbankreal.com/download/electrical-wiring-commercialcanadian-7th-edition-mullin-solutions-manual/ Unit

More information

2015 RIGOL TECHNOLOGIES, INC.

2015 RIGOL TECHNOLOGIES, INC. Service Guide DG000 Series Dual-channel Function/Arbitrary Waveform Generator Oct. 205 TECHNOLOGIES, INC. Guaranty and Declaration Copyright 203 TECHNOLOGIES, INC. All Rights Reserved. Trademark Information

More information

MM V 10A ENGLISH. INSTRUCTION MANUAL Auto-Ranging DATA HOLD AUDIBLE CONTINUITY MIN / MAX TEMPERATURE DIODE TEST CAPACITANCE

MM V 10A ENGLISH. INSTRUCTION MANUAL Auto-Ranging DATA HOLD AUDIBLE CONTINUITY MIN / MAX TEMPERATURE DIODE TEST CAPACITANCE INSTRUCTION MANUAL Auto-Ranging Digital Multimeter MM400 DATA HOLD AUDIBLE CONTINUITY MIN / MAX TEMPERATURE DIODE TEST CAPACITANCE 600V 10A 40MΩ 2 GENERAL SPECIFICATIONS Klein Tools MM400 is an auto-ranging

More information

NOTICE ER Roland Flood Pumping Station Arc Flash Study

NOTICE ER Roland Flood Pumping Station Arc Flash Study NOTICE This document contains the expression of the professional opinion of SNC-Lavalin Inc. (SLI) as to the matters set out herein, using its professional judgment and reasonable care. It is to be read

More information

Model : OPERATING MANUAL Table of Contents (1)

Model : OPERATING MANUAL Table of Contents (1) Table of Contents (1) Title Overview Unpacking Inspection Safety Information Rules For Safe Operation International Electrical Symbols The Meter Structure Functional Buttons Measurement Operation A. DC

More information

Licensed Electricians Practical Assessment (LEP)

Licensed Electricians Practical Assessment (LEP) Licensed Electricians Practical Assessment (LEP) Surname: Date: Given Names: Time: Assessment Time (includes 10 minutes reading time): At the end of this time you will be asked to stop. 4 hours Have you

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions conduit? 9/8/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Can branch circuits of different services be installed in the same Yes, see 300.3(C)(1) for conductors of different systems

More information

MS8268 HANDHELD DIGITAL MULTIMETER OPERATOR S INSTRUCTION MANUAL

MS8268 HANDHELD DIGITAL MULTIMETER OPERATOR S INSTRUCTION MANUAL MS8268 HANDHELD DIGITAL MULTIMETER OPERATOR S INSTRUCTION MANUAL Table of Contents TITLE PAGE 1. GENERAL INSTRUCTIONS 1 1.1 Precaution safety measures 1 1.1.1 Preliminary 1 1.1.2 During use 2 1.1.3 Symbols

More information

374/375/376 Clamp Meter

374/375/376 Clamp Meter 374/375/376 Clamp Meter Users Manual PN 3608883 July 2010 2010 Fluke Corporation. All rights reserved. Printed in China. Specifications are subject to change without notice. All product names are trademarks

More information

Broadband Step-Up Transformer. User Manual

Broadband Step-Up Transformer. User Manual Broadband Step-Up Transformer User Manual 990-1930 09/2004 Introduction Introduction About this unit The APC Step-Up Transformer provides 220 V power from 60 VAC Broadband cable systems. Safety Electrical

More information

User Manual Digital Multimeter

User Manual Digital Multimeter User Manual Digital Multimeter model no.: MSR-R500 Questions or Concerns? support@etekcity.com visit etekcity.com for more products Safe and Proper Usage Thank you for purchasing the Etekcity MSR-R500

More information

Industrial Electrician Level 3

Industrial Electrician Level 3 Industrial Electrician Level 3 Industrial Electrician Unit: C1 Industrial Electrical Code I Level: Three Duration: 77 hours Theory: Practical: 77 hours 0 hours Overview: This unit is designed to provide

More information

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56 1. Two Electrical Technicians are discussing markings that are required for AC wiring. Tech A says that AC conductors must be rated for 600 volts and must have their jackets and individual conductors marked

More information

Conext Core XC-NA ES Series Energy Storage Inverter

Conext Core XC-NA ES Series Energy Storage Inverter Conext Core XC-NA ES Series Energy Storage Inverter Operation Manual 990-9730A January 2016 solar.schneider-electric.com Copyright 2016 Schneider Electric. All Rights Reserved. All trademarks are owned

More information

SWITCHING SAFETY & RELIABILITY CONFERENCE

SWITCHING SAFETY & RELIABILITY CONFERENCE SWITCHING SAFETY & RELIABILITY CONFERENCE JARGON WORKSHEET Energize (v) Energize is the process of applying rated voltage to circuit or equipment. Modified IEEE or OSHA from Adj. to verb. To make a piece

More information

312, 316, 318. Clamp Meter. Users Manual

312, 316, 318. Clamp Meter. Users Manual 312, 316, 318 Clamp Meter Users Manual PN 1989445 July 2002 Rev.2, 2/06 2002, 2006 Fluke Corporation. All rights reserved. Printed in China. All product names are trademarks of their respective companies.

More information

Series NRX with PXR - Instructions for Neutral Current Sensor Type NF

Series NRX with PXR - Instructions for Neutral Current Sensor Type NF Supersedes March 2016 Series NR Series NR with PR - Instructions for Neutral Current Sensor Type NF Instructions apply to: UL1066/ANSI, UL489 series NR NF frame IEC IZM16 WARNING (1) ONLY QUALIFIED ELECTRICAL

More information

CP /240-MC4 User Manual

CP /240-MC4 User Manual CP-250-60-208/240-MC4 User Manual Chilicon Power LLC Jan 2014 1 CONTENTS Important Safety Instructions... 3 Safety Instructions... 3 CP-250 Microinverter System Introduction... 4 Inverter Label Information...

More information

Selection of PPE Practical experience of different arc assessment methods and their comparison

Selection of PPE Practical experience of different arc assessment methods and their comparison Selection of PPE Practical experience of different arc assessment methods and their comparison Dr.-Ing. Thomas Jordan Markus Kauschke Slide 1 ICOLIM 2017 Selection of Arc Flash PPE BSD Electrical Safety

More information

RMEL Safety Conference

RMEL Safety Conference Derek Bell, Kansas City Power & Light Jim Phillips, Brainfiller KCP&L s Senior Director Corporate Safety Derek Bell examines two recent arc flash events that resulted in life changing and potentially life

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I have a 500 KVA generator, with no overcurrent protection

More information

B. Manufacturers: Square-D, G.E. or Westinghosue.

B. Manufacturers: Square-D, G.E. or Westinghosue. SECTION 16470 - PANELBOARDS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

1. Oklahoma Administrative Code (OAC) 252:410, titled Radiation Management

1. Oklahoma Administrative Code (OAC) 252:410, titled Radiation Management X-Ray Radiation Safety Management Program The University of Tulsa (TU) February 22, 2016 (version 2016.02.22) References: 1. Oklahoma Administrative Code (OAC) 252:410, titled Radiation Management 2. 10

More information