1 Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1
2 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS substation 4) Preliminary operation before preventive maintenance 5) Preventive maintenance operation details of AIS substation and GIS substation 2
3 A kind of substation 1) AIS Outdoor substation 2) GIS Indoor substation 3
4 Electrical Equipment Details of AIS substation 1) 115 kv Switchyard 1) Gas Circuit Breaker 2) Disconnecting & Earthing Switch 3) Current Transformer 4) Voltage Transformer 5) Lightning Arrester 6) Protection Relay 7) Digital Multimeter 2) 115/22 kv Power Transformer 3) Station Service Transformer 4) Distribution Board 5) 22 kv Switchgear 1) Vacuum Circuit Breaker 2) Load Break Switch 3) Current Transformer 4) Voltage Transformer 5) Protection Relay 6) Digital Multimeter 7) Bus Bar 8) Power Cable 6) Battery & Battery Charger 7) Grounding 4
5 Electrical Equipment Details of GIS substation 1) 115 kv Gas Insulated Switchgear 2) 115/22 kv Power Transformer 3) Protection & Control Board 4) Lightening Arrester/Surge Counter 5) Station Service Transformer 6) Distribution Board 7) Battery & Battery Charger 8) Grounding 9) 22 kv Switchgear 1) Vacuum Circuit Breaker 2) Load Break Switch 3) Current Transformer 4) Voltage Transformer 5) Protection Relay 6) Digital Multimeter 7) Bus Bar 8) Power Cable 5
6 Preliminary operation before Preventive Maintenance 1) Visual inspection of electrical equipment inside substation 2) Thermo-scan an electrical equipment inside substation before and after preventive maintenance 6
7 Preliminary operation before Preventive Maintenance 7
8 Preliminary operation before Preventive Maintenance 8
9 Thermoscan (Before After) Classification : Minor. - > Normal Description : Probably poor connection Recommendation : Should be checked and cleaned the indicated connection point. Criteria of temperature - Temperature normal : less than 40 ºC - Temperature dangerous : more than 40 ºC Before Visible Image After 9
10 Thermoscan (Before After) Before Visible Image After 10
11 Preventive Maintenance operations details of AIS substation and GIS substation 11
12 115 kv Disconnecting & Earthing Switch Electrical Test - Insulation Resistance Test Insulation resistance test of each pole to ground by energize voltage 2500 Vdc for 1 min with switch open, shall be exceed than 100,000 MΩ - Contact Resistance Test It will be made across the main contact with switch close by energize 100 Adc, and value compare by factory test should be very less. - Operating Interlocking Check When ground bar is closed, It should not operate to close with mechanic interlocking. 12
13 96 kv, 108 kv Lightning Arrester Visual Inspection - Support Structure - Seal and Body - Grounding System - Cleaning Electrical Test - Insulation Resistance Test Energize 5,000 Vdc for 1 min on each arrester, phase to ground. The value shall be exceed more than 100,000 MΩ - Counter Operation Test Verify correct operation of surge counter by input about 100 Vdc (by capacitor 300mF) at top and bottom of surge counter and counter should count up - (Optional) DC Hi-Pot Test Power frequency voltage test on the main circuit for 1 min at lease 62% of maximum test voltage, should have a few difference leakage current of each phases 13
14 115 kv Voltage Transformer & Current Transformer Electrical Test - Insulation Resistance Test Insulation resistance test of primary winding and secondary winding with respect to ground at voltage 2,500 Vdc for 1 min. The value shall be exceed more than 1,000 MΩ - Turn Ratio Test Verification check by voltage method, measure a turn ratio of each phase and each tap by energize current following nameplate (such as 1000 A for CT, 150 A for VT) between HV and LV in every core Then, read the ratio value from a test instrument in A. analyze the value of turn ratio in the every core, the different value should be very less comparing by nameplate shall not deviate more than 0.5% 14
15 115 kv Voltage Transformer & Current Transformer Electrical Test - Winding Resistance Test Measure a secondary winding resistance of each phase by energize DC current ( 1 A or 5 A follows its nameplate) between HV and ground in every core at full tap. Receive the value of V and calculate to R from a test instrument in Ω and analyze the value, the different value should be very less and/or comparing by factory test 15
16 115 kv Gas Circuit Breaker (SF6) Electrical Test - Insulation Resistance Test Insulation resistance test at 5000 Vdc between top and middle, and between middle and case for 1 min, shall be exceed than 100,000 MΩ - Contact Resistance Test It will be made between the upper fixed contact through the GCB to the lower contact points (top to middle) with GCB close at 100 Adc, the different value should be very less comparing by factory test - Operating Timing Test Energize 125 Vdc at coil for operate GCB to change position to close and open and catch that time in use for compare with factory test. 16
17 115 kv Gas Insulated Switchgear (115kV GIS) Visual Inspection - Support Structure - Seal and Body - Motor Charging - Cleaning Electrical Test - SF6 Pressure System Test to measure pressure of each compartments by instrument (IR zero waste SF6 analyzer), compare with its nameplate and gauge (green zone) - SF6 Moisture (Dew-Point) and leakage to measure dew point by analyzer and refer to moisture inside compartments, shall be less than -30ºC Standard H2O SO2 SF6 HF IEC ppm 12.0 ppm 97 % 25 ppm 17
18 115 kv Gas Insulated Switchgear (115 kv GIS) Electrical Test - Contact Resistance Test It will be made between the upper fixed contact through the CB at 100 Adc (at the terminal box), the different value in µω should be very less comparing by factory test - Operating Timing Test Energize 125 Vdc at coil (in the terminal box) for operate CB to change position to close and open and catch that time in use for compare with factory test. - Insulation Resistance Test It test between current transformer secondary and ground usually checked by use of megger test at 1000 Vdc (500 Vdc if required) for 1 min shall be exceed than 100,000 MΩ - Winding Resistance Test Test with multi-meter, measure in Ω. - Alarm Circuit Check 18
19 Visual Inspection - Bushing, Tank and associated device - Load Tap-changer - Oil Level Check - Replace Silica Gel - Cleaning Electrical Test - Polarization Index Test Perform polarization index on each winding (primary and secondary shorting 3 phases) to ground. Energize voltage at 2,500 Vdc (about 0.5 ampare) for 1 min and 10 mins. PI should be more than /22 kv Power Transformer PI= MΩ at 10 mins MΩ at 1 min 19
20 115/22 kv Power Transformer Electrical Test - Winding Resistance Test Measure a winding resistance of each phase by energize current 10 Adc between each phase in every primary taps and secondary tap in V and calculate to Ω. Analyze the value with each phases in the same tap, the different value should be very less comparing by factory test - Turn Ratio Test Measure a turn ratio of each phase and each tap by energize voltage 10 Vac (or auto mode) between HV and LV in every tap in V. Analyze the value of turn ratio in the every tap, the different value should be very less comparing by nameplate (including phase angle difference in degree) 20
21 115/22 kv Power Transformer Electrical Test - Oil Transformer Test By IEC (ASTM if any) including Dielectric Breakdown Test at both main tank and OLTC. Standard Type Gap No. of Test Acceptable IEC Spherical 2.5 mm 6 > 60 kv ASTM D877 Plate 2.5 mm 5 > 30 kv ASTM D1816 Spherical 2.0 mm 5 > 50 kv - Water Content Test By ASTM D1533, to sampling transformer oil to test in the laboratory, shall be less than 25 ppm on main tank and less than 40 ppm on OLTC. 21
22 Electrical Test - Dissolved Gas Analysis (DGA) By ASTM D3612, to analyze key gas in transformer oil such as O 2 N 2 H 2 CH 4 CO CO 2 C 2 H 4 C 2 H 6 C 2 H 2 C 3 H 6 C 3 H 8 of main tank and OLTC. O 2 N 2 H 2 CH 4 CO 115/22 kv Power Transformer N/A N/A <100 <120 <350 CO 2 /CO CO 2 C 2 H 4 C 2 H 6 C 2 H 2 >3 <2500 <50 <65 <1 - Oil/Winding Temp. See a winding temperature at a gauge, shall be in the length of setting * Normally Setting Fan : 70 C Alarm : 95 C Trip : 105 C - Tr. Fan (Motor/Fan) See fan working by simulate all functions refer by temperature (on/off/work at high temp.), shall work by its setting 22
23 115 kv Protection & Control Board 115 kv Protection Relay Visual Inspection - Seal and Body - Setting Relay Recording - Cleaning - Relay Feature (Operation) Check - Digital Multi-meter Check Relay in testing 27/59 Under/Over Voltage Relay 50/51G Instantaneous/Inverse Time Overcurrent Relay 21 Distance Relay 87 Differential Relay 23
24 22 kv Switchgear & Bus Bar Item - Vacuum Circuit Breaker - Current Transformer - Voltage Transformer - Protection Relay - Metering - Power Cable Visual Inspection - Support Structure - Seal and Body - Bus Bar Connection - Cleaning - Motor Charging (VCB) - Terminator (Power Cable) - Record Setting Relay (Relay) 24
25 22 kv Switchgear & Bus Bar Electrical Test (VCB) - Contact Resistance Test - Insulation Resistance Test - Operation Timing Test - Operation Test Electrical Test (CT&PT) - Winding Resistance Test - Insulation Resistance Test - Turn Ratio - Contact Resistance Test Electrical Test (Power Cable) - Insulation Resistance Test Electrical Test (Protection Relay) - Secondary Injection Test 25
26 Station Service Transformer Visual Inspection - Bushing, Tank and associated device - Oil Level Check - Cleaning Electrical Test - Winding Insulation Resistance Test Perform insulation resistance and/or polarization index on each winding to ground. Recommended minimum DC test voltage at 2500 Vdc for primary and 500 Vdc for secondary. - Oil Transformer Test By IEC (ASTM if any) including Dielectric Breakdown Test. 26
27 Computerized Substation Control System (CSCS) - Visual Inspection - Cleaning - Communication System Test 27
28 AC/DC Distribution Board - Visual Inspection - Cleaning - Insulation Resistance Test (Panel) Test for 1 min on each bus, phase to ground and phase to phase with input/output off. 28
29 Battery & Battery Charger Visual Inspection - Seal and Body - Cleaning Electrical Test - Insulation Resistance Test - Charger Operating - System Function Check - Voltage Battery Cell Check Measure cell voltage compare by its nameplate and analyze its defect. - Impedance Test Measure cell resistance (impedance) between pole + and pole - in Ω compare by nearby cell and analyze its defect. 29
30 Grounding Systems Visual Inspection - Grounding System Connection Check - Torque at joint Electrical Test - Grounding Resistance Test Performed the test by fall of potential method. The resistance of grounding point should less than 5 ohm. - Grounding Continuity Test Performed the test by two points method. The resistance of ground and another ground should be very less 30
31 Insulation Resistance and Polarity Index Test 1. Prepare a test instrument (such as Megger/MIT515) 2. Measure an insulation resistance of each core by energize 5,000 Vdc between core and ground for 1 min and 10 mins with switch open 3. Read the value from a test instrument in MΩ 4. Measure in every phases and cores, then analyze the value compare by each phase in the same core, the different value should be very less but shall be exceed than 100,000 MΩ 5. PI (Polarization Index) is the value of Insulation Resistance at 10 mins divided by at 1 min, shall be above
32 Contact Resistance Test 1. Prepare a test instrument (such as Megger/MOM200A) 2. Measure a contact resistance of each coil (status close and open) by energize current 100 Adc in every phases 3. Read the value from a test instrument in µω 4. analyze the value with each phases, the different value should be very less comparing by factory test 32
7. INSPECTION AND TEST PROCEDURES
7.1 Switchgear and Switchboard Assemblies A. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect
More informationPRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer
PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values This is measured to measure the Insulation Resistance of the whole transformer. a) For 33/11 KV Power Transformer
More informationELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
101135-ELE-CMOS-E-2001 Electrical Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has over 14 years hands-on experience, including 13 years working in operation, maintenance, construction
More informationEPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY
EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY EPS AUSTRALIA SERVICES COMPANY OVERVIEW EPS is a recognised company specialising in Electrical, Instrumentation, Structural, Mechanical and
More informationSection L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES
Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE The following is PG&E's procedure for pre-energization inspections. For PG&E to provide the Load
More informationPower Transformer Condition Assessment Based on Standard Diagnosis
Power Transformer Condition Assessment Based on Standard Cattareeya Suwanasri Abstract The diagnostic techniques of electrical and insulating oil testing are proposed to assess the internal condition of
More informationKNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers
KNOW MORE ABOUT THE TRANSFORMERS Glossary Transformers Ambient temperature The existing temperature of the atmosphere surrounding a transformer installation. Ampere The practical unit of electric current.
More informationTransformer Testing & Maintenance Fundamentals. AVO Training Institute, Inc. 2018
Transformer Testing & Maintenance Fundamentals 1 AVO Training Institute, Inc. 2018 Moderator n Ron Spataro AVO Training Institute Marketing Manager 2 Q&A n Send us your questions and comments during the
More informationSpecialists in HV and MV test and diagnostics. Testing in Substations
Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies
More informationFIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC.
Regional Technical Seminar FIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC. Field Electrical Testing Applications Key Purposes of Field Electrical Testing: Receiving inspection Acceptance testing/commissioning
More informationAdvanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing
Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) CP RC Resonance circuit for GIS testing A new approach to testing gas-insulated switchgear Testing gas-insulated switchgear
More informationEI HIGH VOLTAGE INSULATION TESTING POLICY
Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and
More informationSERVICE OFFERINGS FOR POWER SYSTEM STUDY & CONDITION MONITORING FOR STATIC EQUIPMENT
SERVICE OFFERINGS FOR POWER SYSTEM STUDY & CONDITION MONITORING FOR STATIC EQUIPMENT Page TABLE OF CONTENTS POWER SYSTEM STUDY: 5 DATA COLLECTION AND NETWORK MODELLING 5 LOAD FLOW STUDY 5 SHORT CIRCUIT
More informationشركة كهرباء محافظة القدس المساهمة المحدودة JERUSALEM DISTRICT ELECTRICITY CO. LTD.
Our Ref : 2/2018- Date : Messrs: Dear Sir, Tender 2/2018 Main Transformers You are kindly requested to quote for the supply and delivery DDP to our stores the transformers detailed in the attached schedules
More informationUnderstanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA
Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser,
More informationDATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO
PART - A : SPECIFIC REQUIREMENTS THIS DATA SHEET IS APPLICABLE FOR IN BOILER A CLIMATIC CONDITIONS PACKAGE 1 DESIGN AMBIENT TEMPERATURE 45 C 2 ALTITUDE ( ABOVE MSL ) 6.71 MTRS. 3 RELATIVE HUMIDITY 74 %
More informationMV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING
Training Title MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Duration 5 days Training Date MV, HV and EHV Switchgear Testing & Commissioning 5 21 25 Sep $3,750 Dubai, UAE In any of the 5 star
More informationThe NOVA Recloser shall be designed and tested in accordance with the following standards as applicable:
Reclosers NOVA Three-Phase Recloser Functional Specification Guide Functional specification for NOVA three-phase recloser 1. Scope This specification describes the features and ratings of the NOVA recloser.
More informationINDEX. Micro-ohmmeter MH-10 Page 3. MI (5, 10, 15, 20 kv) Page 4 Mega-ohmmeter MD (5 kv) Page 4
Micro-ohmmeter MH-10 Page 3 MI (5, 10, 15, 20 kv) Page 4 Mega-ohmmeter MD (5 kv) Page 4 Earth resistance meter TL-5 Page 5 Indirect earth contact simulator MPC (5, 20, 50 A) Page 6 Trip time tester CR
More informationHands-On Transformer Testing and Maintenance
Hands-On Course Description This Hands-On course will teach you how to prioritize your transformer maintenance strategy, stretch your maintenance budget and at the same time maximize the life and condition
More informationELECTRICAL TESTING PLANS AND PROCEDURES FOR TRANSFORMERS-DRY TYPE, AIR-COOLED
ELECTRICAL TESTING PLANS AND PROCEDURES FOR TRANSFORMERS-DRY TYPE, AIR-COOLED Bergelectric to test transformer feeder circuits with leads disconnected. o Visually inspection of all wiring and cabling,
More informationTitle: Southern States Type SLS Smart Sectionalizer Solid Dielectric Three Phase Sectionalizer. Product Specification Guide TABLE OF CONTENTS
TABLE OF CONTENTS PAGE 1.0 SCOPE... 2 2.0 STANDARDS... 2 3.0 DESIGN REQUIREMENTS... 2 3.01 Service Conditions... 2 3.02 Ratings... 3 4.0 Sectionalizer Construction... 4 5.0 Mechanism... 6 6.0 Solid Dielectric
More informationA Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment
International Research Journal of Engineering and Technology (IRJET) eissn: 23 0056 Volume: 04 Issue: 02 Feb 2017 www.irjet.net pissn: 072 A Review Comprehension: Guideline for Testing of HV, EHV and UHV
More informationProblems connected with Commissioning of Power Transformers
Problems connected with Commissioning of Power Transformers ABSTRACT P Ramachandran ABB India Ltd, Vadodara, India While commissioning large Power Transformers, certain abnormal phenomena were noticed.
More informationTransformer Factory Testing
Transformer Factory Testing John J. Foschia Test Engineer John.Foschia@spx.com September 2018 Reasons for Testing Compliance with user specifications Assessment of quality and reliability Verification
More informationPower Frequency Withstand Voltage On-site testing of 400 kv GIS
Power Frequency Withstand Voltage On-site testing of 400 kv GIS D. Anaraki Ardakani, A. Omidkhoda, M. Solati High Voltage Engineering Center ACECR Tehran, Iran Da_ardakani@yahoo.com Paper Reference Number:
More informationCondition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology
Condition Assessment of High Voltage Insulation in Power System Equipment R.E. James and Q. Su The Institution of Engineering and Technology Contents Preface xi 1 Introduction 1 1.1 Interconnection of
More informationECP HV INSULATION TESTING
Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and
More informationIndustrial Electrician Level 3
Industrial Electrician Level 3 Industrial Electrician Unit: C1 Industrial Electrical Code I Level: Three Duration: 77 hours Theory: Practical: 77 hours 0 hours Overview: This unit is designed to provide
More informationECP HV INSULATION TESTING
Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing
More informationMV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer
PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with
More informationUnderstanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques
Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques Charles Sweetser, Services Manager, PRIM Engineering, Waltham, Mass. Topics of Discussion
More informationVI 3 - i TABLE OF CONTENTS
VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3
More informationUBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5
Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations 1.2 Description.1 UBC requirements for Substation Transformers. 2.0 MATERIAL AND DESIGN REQUIREMENTS
More informationAfrica Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound
Africa Utility Week Focus Day 2014 Substation Condition Monitoring Benefits of Ultrasound Agenda Review - Substation Condition Monitoring Electrical discharge Types and origin In switchgear Results/consequences
More informationLa protection sélective des réseaux électriques
La protection sélective des réseaux électriques ULG 21. 11. 2012 The T&D grids Generation Transmission Distribution Industry The electricity network ensure an efficient supply of energy High Voltage Transformers
More informationContents. Measurement and checking equipment for transformation centers Micro-ohmmeter MH-10 Page 3. Indirect earth contact simulator TL-5 Page 5
Measuring and testing equipments P 6 P.6.01 GB for substations Micro-ohmmeter MH-10 Page 3 Mega-ohmmeter MI (5, 10, 15, 20 kv) Page 4 MD (5 kv) Page 4 Indirect earth contact simulator TL-5 Page 5 Indirect
More informationUnderstanding the Value of Electrical Testing for Power Transformers. Charles Sweetser - OMICRON
Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser - OMICRON Transformers Diagnostic Testing - OVERALL DGA Oil Screen Power Factor / Capacitance Exciting Current Transformer
More informationReport on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)
Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/F.06/2015-16/Mgr(Bawana)/353 dated
More informationPrevention of transformers damage in HPP with double generating units connected to GIS via HV cables
nd This paper is part of the Proceedings of the 2 International Conference on Energy Production and Management (EQ 2016) www.witconferences.com Prevention of transformers damage in HPP with double generating
More informationDistribution/Substation Transformer
Distribution/Substation Transformer Type VFI, Vacuum Fault Interrupter Transformer Option Functional Specification Guide Functional specification for 15 kv, 25 kv, or 35 kv vacuum fault interrupter distribution/substation
More informationElectrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E
Electrical Switchgear & Power Transformer Testing H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This will provide you with practical knowledge
More informationWelcome to the Session on. HT Distribution Network
Welcome to the Session on HT Distribution Network Learning Objective By the end of this session you will be able to: Explain the HT distribution network breakdown maintenance - possible faults, identification
More informationSECTION VI TECHNICAL SCHEDULES
SECTION VI TECHNICAL SCHEDULES Kenya Power and Lighting Company VI 4.3 - i Contract A36B TECHNICAL SCHEDULES 1 PREAMBLE...1 TECHNICAL SCHEDULES SUBSTATIONS...2 SCHEDULE VI-1a TECHNICAL GUARANTEES, OUTDOOR
More informationDMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)
DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- 0005/ DMRC-E-TR-TRANSF-05 SPECIFICATIONS FOR THREE PHASE 33 kv/415 V AUXILIARY Issued on: Date
More informationTransformer Protection
Transformer Protection Nature of transformer faults TXs, being static, totally enclosed and oil immersed develop faults only rarely but consequences large. Three main classes of faults. 1) Faults in Auxiliary
More informationUTILITY & SUBSTATION TESTING
UTILITY & SUBSTATION TESTING Application Guide APT Power Technology Co., Ltd. Xi an FOREWORD Substations are key part of power infrastructure. Consist mostly of transformers, GIS, Switchgears, CT/PT, Surge
More informationTECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES
INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION October 2014 TECHNICAL DESCRIPTION 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES I. SCOPE This
More informationSchedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK
2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK PO Box 25876 Safat 13119 Kuwait Contact: Mr Atul Madhukar Vaidya Tel: +965 1822600 Fax: +965 24761963 E-Mail: factory@ahleiasg.com Website:
More informationCommissioning Manual Distribution Transformers - Three-phase Oil Filled
1LPL000006A2110 rev. 1 Commissioning Manual Distribution Transformers - Three-phase Oil Filled 1LPL000006A2110 rev. 1 2 / 7 Table of contents 1 Commissioning and start-up... 3 1.1 Transformer survey...
More informationNSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation
Version:- 1.0 of Issue:- March 2016 Page 1 of 7 NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation 1. Purpose The purpose of this document is to provide guidance
More informationECP GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE
ENGINEERING COMMISSIONING PROCEDURE ECP 11-0512 GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE Network(s): Summary: EPN, LPN, SPN This procedure details the testing and commissioning
More informationBenefits of SFRA - Case Studies
6 th International Conference on Large Power Transformers- Modern Trends Benefits of SFRA - Case Studies B B Ahir Gujarat Energy Transmission Corporation Limited 1 Outline Condition Monitoring in GETCO
More information10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY
9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor
More informationRESIDUAL LIFE ASSESSMENT OF GENERATOR TRANSFORMERS IN OLD HYDRO POWER PLANTS
RESIDUAL LIFE ASSESSMENT OF GENERATOR TRANSFORMERS IN OLD HYDRO POWER PLANTS Authored by: Sanjay Srivastava, Chief Engineer (HE&RM), Rakesh Kumar, Director (HE&RM), R.K. Jayaswal, Dy. Director (HE&RM)
More informationSingle Line Diagram of Substations
Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are
More informationsave energy, it is precious SYNERGY transformers Mfg. of all types of Distribution / Power & Furnace Transformers
save energy, it is precious Mfg. of all types of Distribution / Power & Furnace Transformers SYNERGY transformers SAFETY AND EFFICIENCY, COMBINED WITH LONG-TERM RELIABILITY, ARE THE HALLMARKS OF WORLD-RENOWNED
More informationPomona, CA May 24 & 25, LTC Applications - Location, Series & Preventative Auto Transformers
Pomona, CA May 24 & 25, 2016 LTC Applications - Location, Series & Preventative Auto s siemens.com/answers Introduction Tap changer at active part Example of 3-phase tapchanger Page 2 Winding Configurations
More informationPOWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009
POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 Nkosinathi Buthelezi Senior Consultant: Power Transformers and Reactors Presentation Content Standardization of Power
More informationCPC 100. Multi-functional primary test system for substation commissioning and maintenance
CPC 100 Multi-functional primary test system for substation commissioning and maintenance CPC 100 The revolutionary all-in-one test system The patented test system replaces numerous individual testing
More informationCPC 100. Multi-functional Primary Test System for Substation Commissioning and Maintenance
CPC 100 Multi-functional Primary Test System for Substation Commissioning and Maintenance CPC 100 - The Revolutionary All-in-One Test System The patented test system replaces numerous individual testing
More informationIN ELECTRICAL ENGINEERING - I C M E T CRAIOVA
Taking into account that power transformer is the major item of equipment in power systems, its correct operation is vital to system operation. It is well known that transformer failures are sometimes
More informationTECHNICAL SPECIFICATION FOR POWER TRANSFORMER
TECHNICAL SPECIFICATION FOR POWER TRANSFORMER NOTE: Vendor to give their offer in line with this data sheet only. Any deviations/additions/deletions shall be brought out in a separate sheet. A TECHNICAL
More informationTraining Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch.
Training Title POWER TRANSFORMERS Training Duration 5 days Training Venue and Dates Power transformers 5 20-24 May $3,300 Abu Dhabi In any of the 5 star hotel. The exact venue will be informed soon. Training
More informationCONTENTS. 1. Introduction Generating Stations 9 40
CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific
More informationANNEXURE 1 LIST OF EQUIPMENTS LOT 1
ANNEXURE LIST OF EQUIPMENTS LOT Sl. No. Description Quantity Nos Recommended Make Digital Multimeter Fluke AC/DC Clamp meter with flexi clamp Fluke/Kyoritsu AC/DC Clamp meter(0ma to 0A) Kyoritsu/Fluke/Hioki
More informationCPC 100. Multi-functional primary test system for substation commissioning and maintenance
CPC 100 Multi-functional primary test system for substation commissioning and maintenance CPC 100 The revolutionary all-in-one test system The patented test system replaces numerous individual testing
More informationKENYA ELECTRICITY GENERATING COMPANY LTD
KENYA ELECTRICITY GENERATING COMPANY LTD TENDER No. KGN-HYD-014-2016 TENDER FOR REHABILITATION OF PROTECTION EQUIPMENT FOR MASINGA HYDRO POWER STATION 20/06/2016 ADDENDUM NO. 1 In accordance with the tender
More informationNotes 1: Introduction to Distribution Systems
Notes 1: Introduction to Distribution Systems 1.0 Introduction Power systems are comprised of 3 basic electrical subsystems. Generation subsystem Transmission subsystem Distribution subsystem The subtransmission
More informationArild Furnes,ATPA OGP/Petrobras workshop, Dry type transformers-ideal for FPSO - Transformers for electrical and drive systems
Arild Furnes,ATPA OGP/Petrobras workshop, 22.09.09 Dry type transformers-ideal for FPSO - Transformers for electrical and drive systems September 24, 2009 Slide 1 Transformers for Ships and Offshore -
More informationHOW TO SAFE GUARD THE TRANSFORMER..???
CPRI HOW TO SAFE GUARD THE TRANSFORMER..??? CPRI Efficient and Effective network planning, Design and Forecasting Highly Reliable and Stable Protection system and co-ordination Measures to mitigate various
More informationDiscipline Electrical Testing Issue Date Certificate Number T-2837 Valid Until Last Amended on - Page 1 of 6 LOCATION 1
Post: Last Amended on - Page 1 of 6 LOCATION 1 I. TRANSFORMERS AND REACTORS 1. 500 MVA, 765 kv 500 MVA, 400 kv Ratio & Polarity Check Magnetic Balance & Magnetizing Current Measurement at Low Voltage Vector
More informationN. TEST TEST DESCRIPTION
Multi function system for testing substation equipment such as: current, voltage and power transformers, over-current protection relays, energy meters and transducers Primary injection testing capabilities
More informationCEYLON ELECTRICITY BOARD SRI LANKA. Procurement of Plant
CEYLON ELECTRICITY BOARD SRI LANKA GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY IMPROVEMENT INVESTMENT PROGRAMME (TRANCHE 2) PACKAGE 2: LOT A MANNAR NADUKUDA TRANSMISSION DEVELOPMENT (ADB LOAN NO: 47037-SRI)
More informationGas-Insulated Medium-Voltage Switchgear siemens.com/8dab12
8DB 12 blue GIS Gas-Insulated Medium-Voltage Switchgear siemens.com/8dab12 Features Gas-insulated switchgear (GIS) type 8D/B has been an integral part of the medium-voltage portfolio at Siemens for more
More informationECP GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE
Document Number: ECP 11-0511 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0511 GROUND-MOUNTED SWITCHGEAR COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and
More informationSECTION 16322B SUBSTATION TRANSFORMERS DRY-TYPE
SUBSTATION TRANSFORMERS DRY-TYPE PART 1 GENERAL 1.01 1.02 1.03 1.04 SCOPE The Contractor shall furnish and install the primary and/or secondary substation transformers as specified herein and as shown
More informationOFFER OF SERVICE / Cité 1200 Logts, Coopérative Granitex Bt. 05, N 01-Bab Ezzouar Alger Algerie
2016 OFFER OF SERVICE Cité 1200 Logts, Coopérative Granitex Bt. 05, N 01-Bab Ezzouar 16024 Alger Algerie +213 770 602 510 / +213 661 602 515 keddachearezki@kermelec-dz.com Attention Of Project Manager
More informationIn-Service Testing and Diagnosis of Gapless Metal Oxide Surge Arresters According to IEC
In-Service Testing and Diagnosis of Gapless Metal Oxide Surge Arresters According to IEC60099-5 Overview of presentation Motivation for condition monitoring of metal oxide surge arresters (MOSA) The Surge
More informationPOWER TRANSFORMER. Failure Analysis & Troubleshooting. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E
POWER TRANSFORMER Failure Analysis & Troubleshooting H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: Electricity is high-grade energy. Working
More informationMGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide
MGM Transformer Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide MGM Transformer Company 5701 Smithway Street Commerce, CA 90040 www.mgmtransformer.com Phone: 323.726.0888
More informationUnit 2. Single Line Diagram of Substations
Unit 2 Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission
More informationMVCT. Megger VT & CT Analyzer. MVCT Megger VT & CT Analyzer
MVCT Ability to test both VT and CT Easy to use one-button automated test plans Industry leading test duration using patented simultaneous tap measurements Smallest and lightest unit on the market CT Kneepoints
More informationArc Suppression Coils
Arc Suppression Coils (22kV Arc Suppression Coils ) Introduction Resonance grounding by Petersen coils (Arc Suppression Coils) has been used in Scandinavia and other European countries for some eighty
More informationBack to the Basics Current Transformer (CT) Testing
Back to the Basics Current Transformer (CT) Testing As test equipment becomes more sophisticated with better features and accuracy, we risk turning our field personnel into test set operators instead of
More informationAdvanced Test Equipment Rentals ATEC (2832) Lightning Surge Simulator LSS-F02.
Lightning Surge Simulator Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) LSS-F02 www.noiseken.com Conforming to IEC61000-4-5 ed2 Standard LSS-F02 series A simulator
More informationSubstation Test Equipment Guidebook
Substation Test Equipment Guidebook CONTENTS TRANSFORMER TURNS RATIO TESTERS CURRENT TRANSFORMER TESTERS CIRCUIT BREAKER ANALYZERS CIRCUIT BREAKER POWER SUPPLIES BREAKER ANALYZER ACCESSORIES 4 5 6 7 8
More informationREPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD.
REPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD. (DTL) 1.0 Introduction: 1.1 DTL vide letter No. F.DTL/206/2015-16/Mgr(T)O&M-E-2/22
More informationCONDITIONS FOR A TENTATIVE APROVAL FOR CONNECTION OF TRANSFORMERS
CONDITIONS FOR A TENTATIVE APROVAL FOR CONNECTION OF TRANSFORMERS Management has tentatively approved your request subject to the following conditions: 1. All distribution materials/equipment must be purchased
More informationPRESENTATION ON IS 1180 (Part 1): 2014 DISTRIBUTION TRANSFORMERS SHYAM KUMAR SCIENTIST B ELECTROTECHNICAL BUREAU OF INDIAN STANDARDS
PRESENTATION ON IS 1180 (Part 1): 2014 DISTRIBUTION TRANSFORMERS SHYAM KUMAR SCIENTIST B ELECTROTECHNICAL BUREAU OF INDIAN STANDARDS n Bureau of Indian Standards (BIS) is the NATIONAL STANDARD BODY. Established
More informationSPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA)
SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA) 0.415/33kV DESIGN AND CONSTRUCTION General 1. The transformer shall be three phase, oil immersed type, air cooled, core type, outdoor
More informationProtection of Electrical Networks. Christophe Prévé
Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé
More informationMV network design & devices selection EXERCISE BOOK
MV network design & devices selection EXERCISE BOOK EXERCISES 01 - MV substation architectures 02 - MV substation architectures 03 - Industrial C13-200 MV substation 04 - Max. distance between surge arrester
More informationN. TEST TEST DESCRIPTION
Multi function system for testing substation equipment such as: current, voltage and power transformers, all type of protection relays, energy meters and transducers Primary injection testing capabilities
More informationOnsite Mobile AC High Voltage Test System
TSGMF(T) series Onsite Mobile AC High Voltage Test System Onsite mobile AC high voltage test systems are used for withstand voltage testing, partial discharge measurement, tan delta measurement to instrument
More informationPower Measurements and Basic Electrical Diagnostic Tests
Power Measurements and Basic Electrical Diagnostic Tests Instrument Basics Burden VA Sources V and I Meters V and I KVL and KCL Kelvin Connection KVL and KCL Kelvin Connection 4-Wire Technique Exclude
More informationGUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT
GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM COURSE TITLE: MAINTENANCE OF TRANSFORMER AND CIRCUIT BREAKER (COURSE CODE:3360907) Diploma Programme in which this course is offered
More informationPIPSPC. Prepared by Eng: Ahmed Safie Eldin. And. Introduction. Protection Control. Practical. System. Power
PIPSPC Practical Introduction Power System Protection Control Practical Introduction To Power System Protection And Control Prepared by Eng: Ahmed Safie Eldin 2005 Contents POWER SYSTEMS PRINCIPALS. 1
More informationCASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION. - S K Mishra & S K Das NHPC Ltd O&M Division
CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION - S K Mishra & S K Das NHPC Ltd O&M Division 1 PRESENTATION COVERS Introduction DESCRIPTION OF EVENTS INITIAL RESPONSE DETAILED INSPECTION
More information