ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

Size: px
Start display at page:

Download "ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)"

Transcription

1 Approval Amendment Record Approval Date Version Description 15/10/ This policy takes precedence over L1-NAM-PRO-003 Infrastructure As Built Drawing Management due to business restructures. New Content Applicable. 15/02/ Minor updates and edits throughout document 13/04/ Guideline of Best Practice Added (Appendix 1) 21/12/ Incorporate organisational structure changes, address INX feedback concern regarding PTV DMS access required by operations and maintenance and minor edits to be inclusive of Infrastructure. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 15

2 Table of Contents 1 Purpose Scope Governance Hierarchy Abbreviation Definitions Reference & Legislations Related Documents Engineering Design and IFC Management Policy Design Phase Issued For Construction Phase Engineering As-Built / As In Service Management Policy As-Built / AIS Drawings must capture: As-Built / AIS Drawing Package(s) submission to Engineering must contain: Management of As Built / AIS Drawing Package(s): Engineering Design/ Issue For Construction/ As-Built Management Lifecycle PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 2 of 15

3 1 Purpose The purpose of this policy is to define the responsibilities and processes required for Metro Trains Melbourne (MTM) to fulfil its role as an Accredited Rail Transport Operator (ARTO) under the terms of the DMS Service Level Agreement, in order to comply with the requirements of the Public Transport Victoria (PTV) Drawing Management System (DMS) and the PTV Infrastructure Drafting Standards. This policy covers (and is written from the perspective of) Engineering Process & Interface Management (P&IM) Design & Review (D&R) policy for the control, management, reporting, project expediting and DMS interfacing on behalf of the MTM Engineering Division. This is to ensure KPIs for Engineering / Infrastructure drawings continue to be met and reported. 2 Scope This document applies to the management of Design Drawings, Issue for Construction (IFC) Drawings through to As-Built Drawings (ABD) by the Engineering, Process & Interface Management Design & Review team. However, for independent projects (e.g. Level Crossing Removal, Melbourne Metro Tunnel) at the discretion of MTM, the Director of Projects and Planning and the Director of Engineering - independent internal Projects - may establish/apply/manage/govern their own and/or contribute to engineering and infrastructure drawings management processes in addition to compliance and coordination with L1-CHE-POL-001. This policy does not apply to Rolling Stock managed by Fleet Engineering. It underpins alignment and compliance with the customer PTV DMS Policy. This policy shall be applicable to all works undertaken on the MTM network. It will be applicable for all works managed by MTM Projects and Planning Division (PPD), Infrastructure Delivery or external 3rd Party organisations, designs by design consultants and in-house designs undertaken by Engineering, and organisations that are responsible to complete as-built drawings. This policy serves as a generic document that applies to Engineering P&IM and all Engineering disciplines in common. Where applicable, PPD and Engineering (including Infrastructure Delivery) shall refer to all applicable (including discipline-specific) Standards, Processes, Procedures and Requirements. Section 8 stipulates the policy regarding design and IFC management while section 9 covers the policy on As-Built and As-In-Service management. 3 Governance Hierarchy Figure 1 below depicts the Governance Hierarchy amongst the various stakeholders associated with Design/IFC/As-Builts as described in this policy. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 3 of 15

4 PTV DRAWING MANAGEMENT SYSTEM POLICY MTM FRANCHISE AGREEMENT - ARTO MTM ENGINEERING DRAWINGS MANAGEMENT POLICY (DESIGN/IFC/AS BUILTS) INDEPENDENT MAJOR PROJECT ALLIANCE MTM PROJECTS / INFRASTRUCTURE DESIGN / ISSUED FOR CONSTRUCTION MANAGEMENT POLICY MTM PROJECTS / INFRASTRUCTURE AS-BUILT / AS IN SERVICE MANAGEMENT POLICY Figure 1 Governance Hierachy 4 Abbreviation ABD AIS ARTO CM DMS D&R IDD IFC MTM M&R P&IM PPD PTV VRIOGS As-Built Drawings As In Service Accredited Rail Transport Operator Configuration Management Drawing Management System P&IM Design & Review Infrastructure Delivery Issued for Construction Metro Trains Melbourne Maintenance & Renewals Process & Interface Management Projects & Planning Division Public Transport Victoria Victorian Rail Industry Operators Group Standards PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 4 of 15

5 5 Definitions As Built (As In Service) Drawing Book In Book In Authoriser Booked Out Drawing Certifier Certified Copy Check Print Clean Copy Controlled Drawing Compliant Drawing Revised set of drawings submitted by a contractor upon completion of a project or a particular job. They reflect all changes made in the specifications and working drawings during the construction process, and show the exact dimensions, geometry, and location of all elements of the work as completed under the contract. A Drawing is considered As In Service when it accurately reflects the configuration of the As Built infrastructure in the field. The process of Booking In a Drawing after it has been Booked Out in accordance with the DMS Processes. The person (Head of Engineering (or delegate)) who determines that a Drawing Package has been reviewed and is ready to be authorised and booked in to DMS. A Drawing is considered to be Booked Out when it is locked and issued to a User for editing. A Drawing can only be Booked Out to one User at a time. Viewing of a PDF version of a Drawing is possible while the Drawing is Booked Out. The person who certifies that a Drawing is As In Service in accordance with the DMS Processes and who has the technical competency to perform this role to the reasonable satisfaction of the relevant Authoriser. A Certified Copy is a PDF version of the CAD Design for an As Built Drawing which has the signature of the Certifier that the AIS Drawing is the update of the IFC or Post-IFC Drawing capturing all subsequently approved Design Change Requests (DCRs) and accurately reflecting the latest Configuration of the network and as built condition. A Check Print is an As Built Drawing submittal believed to be a Compliant Drawing, but contains the Check Print watermark within the Title Block and does not contain the Certified Signature. Its purpose is to cut down administration within Engineering Review Time for Projects. A Clean Copy is an original PDF version of the CAD Design for an As Built Drawing which has not been signed by the Certifier. A Drawing is considered Controlled by a Drawing Controller when that Drawing Controller has Booked Out the Drawing in their name. Compliant Drawings are As in Service Drawings that have been certified and authorised in accordance with the DMS Processes and which comply with the components of PTV Infrastructure Drafting Standards & PASS Geometric Coordinates. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 5 of 15

6 Dispensation Designers Design Change Request (DCR) Engineering First Pass Issued for Construction Non-Compliant Drawing Red-Line Drawing A Dispensation is a formal agreement with PTV for exemption of compliance with VRIOG Standards. Designers as used in this policy document includes: External design consultants and MTM designers (including Engineering, Projects, Infra- Delivery) & covers any authorised individual(s) undertaking design. Design Change Request (DCR) is used to control and manage all requests for design changes after a design package has been approved and has been Issued for Construction. Refers to Office of the Chief Engineer. The initial review of an Engineering As-Built Drawing Package within Engineering. A Drawing is considered Issued for Construction when the drawing has undergone design review(s), the design solution presented on the drawing has been accepted by Engineering and by all appropriate stakeholders with no outstanding comments, and has been issued with a stamp Issued for Construction, ready and authorised to be used for site construction or installation. Non-Compliant Drawings are Drawings that have not been certified and authorised As in Service in accordance with the DMS Processes and / or do not comply with the components of Infrastructure Drafting Standards. A Red-Line drawing is essentially an intermediate drawing that shows corrections or changes made to the drawing during the manufacture or construction phase. 6 Reference & Legislations PTV Drawing Management System (DMS) Policy Melbourne Metropolitan Train Franchise Agreement PTV Infrastructure Drafting Standards PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 6 of 15

7 7 Related Documents PTV Drawing Management System User Guide PTV DMS Book In Request Form L1-CHE-GDL-002 Master Engineering As-Built DMS Register Process Map L1-CHE-INS-002 DPN Dispensation for Signalling Drawings L1-CHE-PRO-007 Management of Overlapping Design Agreement L1-NAM-PRO-001 Signalling Design Technical Review Procedure L1-NAM-PRO-002 MTM Design and Technical Review Procedure L1-NPD-PRO-002 Works Readiness Procedure L1-PRJ-PRO-002 Gate Procedure for Projects L3-CHE-GDL-001 Drawing Check Print & Drawing Revision Stamp Process L3-PRJ-PRO-004 As Built Drawing Managed by Projects L3-PRJ-PRO-005 Design Document Change Request Construction Phase L4-CHE-FOR-035 Metro As In Service Tracking Control Form L4-CHE-FOR-042 Engineering As-Built Review Template L4-CHE-FOR-043 Unrevised/Obsolete/Unused Drawing Declaration Form L4-CHE-FOR-045 Engineering - Design Review Request Form L4-CHE-FOR-046 Engineering Design Review Comments Sheet 8 Engineering Design and IFC Management Policy All Project or M&R (maintenance & renewal) works shall require designs to be undertaken, unless exempted by Engineering. Engineering Design & Review (P&IM) is the central contact point for all Design (reports, drawings and testing and commissioning plans) submissions for MTM Engineering review and responses. All works undertaken on the MTM network must be in accordance with the Management of Change process and shall have the appropriate sign off by relevant stakeholders. The Project Manager / Alliance shall comply with the Works Readiness Procedure (L1- NPD-PRO-002) and Gate Procedure for Projects (L1-PRJ-PRO-002) to ensure Works Readiness requirements are satisfied. Designs shall demonstrate conformance with the functional, non-functional, performance, operational and maintenance requirements and all relevant Standards. Design packages developed in-house by Engineering disciplines shall adhere to the Drawing Check Print & Drawing Revision Stamp Process (L3-CHE-GDL-001). PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 7 of 15

8 8.1 Design Phase Designers shall be responsible for the preparation of design documentation for all relevant Engineering disciplines that will be affected by the works, commencing from the concept design phase through to the final design phase, including, Concept, Preliminary, Detailed and Final designs. The appointed design consultant shall produce and maintain Design / Drawings Management Plan(s) which will include a Master Design Drawings Register that will be prepared prior to design production and maintained throughout the project execution by the Projects. Designers shall book out drawings (if existing in DMS) or shall obtain new drawing numbers (if new drawings to be developed) from PTV DMS as needed before production of drawings and drawing alterations. A schedule of design packages shall be developed based on project / program scope and timeframes and will be provided to Engineering. Designer(s) shall submit all design packages, drawings, reports and testing and commissioning plans to Engineering (P&IM) Design & Review team as per MTM Design and Technical Review Procedure (L1-NAM-PRO-002) and Signalling Design Technical Review Procedure (L1-NAM-PRO-001). All design preparation and checking shall be carried out by competent people prior to submission to MTM Engineering for review as per Business Rules Manual for the Contracting Rail Safety Worker (L0-HMR-MAN-001). Design team members qualifications, experience and competencies shall be submitted prior to receipt of design submissions by Engineering. The technical review shall be conducted using the appropriate Engineering Design Review Comments Sheet template in Excel spreadsheet (L4-CHE-FOR-046). Engineering P&IM D&R team will interface with all Engineering disciplines and MTM Programs / Projects / Infrastructure teams to facilitate design reviews and response via agreed protocol (e.g. Outlook , TeamBinder, etc). Design packages for MTM Engineering review must be sent via correspondence to Engineering D&R box (EDRG.DOC@metrotrains.com.au) with appropriate Design Review Request Form (L4-CHE-FOR-045) included as cover sheet. All fields in this form are to be completed; otherwise the design package may not be processed for review by Engineering. Each design package submission shall include the occupation(s) that the design package relates to and relevant design review cycle (Preliminary, Detailed, Final). Designs submitted to individuals in Engineering not in accordance with the above instructions will not be accepted, tracked or responded to by Engineering (P&IM) D&R. Engineering will manage the design reviews and respond to Projects within 10 business days (excluding the submission and return response days themselves). Designer(s) must provide responses back to MTM Engineering on Engineering s review comments within 10 business days (excluding the submission and return response days themselves). All comments shall be agreed to be closed or transferred to the next design stage before the designer may proceed to submit the next phase of the design. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 8 of 15

9 All Design drawings will be produced in compliance with the PTV Infrastructure Drafting Standards (compliant drawings) and MTM Management of Overlapping Design Agreement procedure, L1-CHE-PRO-007. Non-compliant drawings shall require dispensation approval via PTV DMS website. Designers shall identify all drawings required (new, to be revised, obsolete and superseded) in the Master Design Drawings Register. The Engineering Design Package submitted during the design phases shall be marked up with a watermark Preliminary Design, Detailed Design or Final Design stamp in red just above the Title Block. Designers shall prepare appropriate enabling / staging works design package(s) when applicable and submit to Engineering for review and acceptance. These drawings if appropriately discussed and agreed with Engineering discipline may be produced in project internal drawing numbers if as-built drawings are not required to be booked into DMS. The Engineering P&IM D&R team will work with MTM programs / projects / infrastructure teams to propose and support improvements where required. 8.2 Issued For Construction Phase Project team shall ensure that all comments have been addressed by the designer and agreed to be closed out by Engineering before the issue of IFC. Upon design acceptance, the designer(s) shall issue the complete set of design packages for construction, and the design packages shall be baselined and identified as Issued for Construction or Approved for Construction. MTM Engineering Design Package(s) approved for construction shall be produced with a watermark Issued for Construction stamp in red above the Title Block. Designer(s) must use the lssue for Construction drawings package and associated documents and reports for construction activity on site. All Design / Document / Drawing changes that occur after IFC shall be captured in a Design Change Request (DCR) Form (L3-PRJ-PRO-005) and submitted to Engineering for review and acceptance. (Note: DCR Form is expected to be released by March If needed, contact the D&R Manager P&IM in the interim.) All design drawings updated after IFC must be stamped Post - Issue for Construction and the superseded design drawing stamped Superseded and the two drawings kept together. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 9 of 15

10 9 Engineering As-Built / As In Service Management Policy As-Built or As In Service Engineering Drawing Packages are the revised set of engineering drawings compiled upon completion of a Project or M&R (maintenance & renewal) works. All rail infrastructure As In Service drawings, their current status and any other baseline information are stored and maintained on the PTV DMS website ( Only approved users are allowed to gain access to this system. MTM staff (Engineering, Projects, Operations and Maintenance) who require access to the rail infrastructure drawings or PTV DMS system may to dms@ptv.vic.gov.au with their name and contact details. A DMS User Access Request Form will be sent by PTV to apply and seek approval for access. MTM users who have been granted access to DMS system are to comply with the DMS policy. On the PTV DMS system, users will be able to locate and download specific drawings in PDF format for viewing however a drawing can only be updated when it is booked out from the DMS system. DMS users can find out if a drawing has been booked out to someone or otherwise anytime. If a drawing is not booked out of DMS, the drawing is not being updated by any project and the version available on the DMS system is the latest. However, if a drawing has been booked out by anyone, the drawing in the DMS system may not be the latest version. For further information regarding current status or drawing numbers that have not been submitted, users may contact the PTV DMS or the user who has booked out the drawing. 9.1 As-Built / AIS Drawings must capture: All changes to Issue for Construction and Post Issue for Construction drawings during the Construction phase. The exact As In Service physical configuration baseline of the Project / M&R works capturing all updates of final completed works, post commissioning. Compliance to PTV Infrastructure Drafting Standards. 9.2 As-Built / AIS Drawing Package(s) submission to Engineering must contain: Drawings certified by an authorised person (Certifier) from the project. Native CAD file and corresponding PDF file (with Clean Copy and scanned Certified Copy combined into a single PDF file) for each of the drawings (based on drawing numbers) being enclosed. If exempted by MTM Engineering, Check Print copies (including clean PDF, CAD Files, PTV Book In Form) may be submitted for First Pass review by Engineering. The As-Built drawings will subsequently be rectified based on review comments and resubmitted with Clean and Certified PDF copies and native CAD files to Engineering for further review and approval. Red-Line mark-up copies of IFC or Post IFC drawings shall be submitted as supporting documentation together with As-Built packages for Engineering review The designer must address all comments and resubmit the complete certified package (with native and PDF files as above) for Engineering review prior to book-in to DMS. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 10 of 15

11 PTV DMS Book In Request Form (current template) must be completed with applicable PTV DMS Drawing Authoriser signatories as applicable to Engineering discipline. MTM As In Service Tracking Control Sheet (current template) and all applicable fields must be populated as per L4-CHE-FOR-035. All Projects fields in this form are to be completed; otherwise the design package may not be processed for review by Engineering. Non-Compliance: An Engineering As-Built Drawing Package will be rejected and returned to Project Completions if compliance with any of the listed protocols as detailed within this policy has not been met. 9.3 Management of As Built / AIS Drawing Package(s): All Engineering As-Built Packages must be submitted by individual discipline teams (Infrastructure Delivery only) or through Project Completions (applicable to Projects and Planning) via EDRG.DMS@metrotrains.com.au and hardcopy delivered to P&IM Design & Review team. NOTE: 1) Packages will not be accepted from individuals that are sent directly to individual engineers or without first going through Project Completions (applicable to Projects). 2) As Built drawings relating to M&R Retentions are to be submitted for review and DMS book in via M&R.Retentions@metrotrains.com.au with M&R Retentions tracker number for appropriate tracking and close-out with PTV. The Master As-Built DMS Register shall be managed and controlled by P&IM D&R team. This Register provides complete lifecycle management traceability from package receipt, review, DMS submittal and rejection/acceptance of packages from PTV. For Dispensation Requests, Test Copies and Overlapping Design Agreements, refer to PTV Infrastructure Drafting Standards and MTM Procedure L1-CHE-PRO-007 Management of Overlapping Design Agreement. For Unused Numbers, Unrevised Drawings, Non-Compliant Drawings, L4-CHE-FOR-043 [Unused, Obsolete, Unrevised Declaration Form] must be submitted. The applicable MTM Engineering discipline reviewer will review the As Built design, for its technical AIS compliance, PTV Infrastructure Drafting Standard compliance and provide comments on the Engineering As-Built Review Comment Template (L4-CHE-FOR-042). Engineering has 20 Business Days to provide the review of each As-Built Engineering Drawing Package (excluding submission and processing management, as well as the written response days themselves). Authorisation of PTV DMS Book in Forms shall only be carried out by a MTM Head of Engineering (or standing delegate) that has Drawing Authoriser status in PTV DMS. MTM/PTV Drawing Controller and Drawing Authoriser Master Access Listings are controlled by P&IM, as approved by the Design & Review Manager (P&IM) and PTV Manager, Configuration Management. If any errors relating to technical content/ PTV Infrastructure Drafting Standards/PASS Coordinates within the As-Built Engineering Drawing Packages are found (by the MTM Engineer or by PTV), the package will be rejected and returned to the project (via Project Completions) or delivery teams. They, in turn, will coordinate with the applicable designer(s) for rework and re-submission until compliance has been attained meeting all the above requirements. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 11 of 15

12 A Compliant As-Built Engineering Drawing Package will achieve acceptance by the PTV s DMS through the DMS Book In Request Complete notification. This notification is provided to Engineering P&IM D&R Team by PTV for on forwarding by D&R to Delivery team or Project Completions to forward to the respective Project. Note: An initial notification is provided to D&R when an As-Built Engineering Drawing Package has been booked into PTV DMS. This does not indicate completion/compliance. PTV s CM Team via DMS conducts all compliance checks with PTV Infrastructure Drafting Standards/PASS Coordinates. Once a package has been submitted to PTV, MTM Engineering P&IM D&R has no responsibility or visualisation as to the workload/priorities/processing-time by PTV. If not accepted by PTV, the package will be rejected with an error report notification by PTV which will be forwarded to Project Completions by Engineering P&IM D&R for further action. Individual Non-Compliant Drawings within a Drawing Package when being re-submitted to PTV DMS will be done manually by Project Completions with Engineering being notified as Project Completions holds responsibility for individual drawing tracking/closeout. Overall responsibility for satisfactory As-Built completion lies with the MTM Project Completions Team. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 12 of 15

13 10 Engineering Design/ Issue For Construction/ As-Built Management Lifecycle Figure 2 - Engineering Drawings Management (Design/IFC/As-Built) Process Flow PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 13 of 15

14 L1-CHE-POL-001 Version: 4 Effective from: 21 December 2016 Appendix 1 MTM Engineering Drawings Management Guideline for Best Practice Background/Scope: Engineering D&R team within Engineering P&IM - is the central point of contact for all IFC design and As-Built DMS Engineering Packages. They provide the key interface between Project > Project Completions > Engineering > PTV, facilitating Engineering drawing review & management between all engineering disciplines: Signals, Track & Structures, Electrical, OCS. NOTE: (Rolling Stock not applicable), across all MTM Project Works, M&R Works, Retentions, Legacy Project works. While also providing support across Alliance Projects and PTV initiatives. Purpose: This guideline is set to promote best practice recommendations for Engineering drawing management compliance and meeting Project milestones through Works Readiness gates and Project Completions process from the Engineering perspective. Guideline Recommendations: Issue For Construction (IFC) The Project team/alliance should provide Engineering (particularly for major projects) with a comprehensive Drawings Management Plan, Drawing Register (listing all booked out drawings/drawing numbers from PTV DMS) and Drawing Submission Schedule based on design lots and work packages. Design Packages are recommended to be planned early and split into manageable work submittals per construction stages and per discipline (e.g. for work occupations), as each design package would be reviewed and approved by Engineering separately to enable progress of each stage of construction. Detailed design packages should be submitted prior to T-12 for Engineering to review and comment within 10 business days. Every subsequent design package submission to Engineering should be accompanied with the designer responses to engineering comments and revised design drawing(s) or report(s) for close-out of comments raised by Engineering. Re-submittal without the designer response to comments will result in direct rejection of the design package. It is the project team s responsibility to ensure sufficient lead times for Engineering reviews and closing out of comments to achieve IFC at T-5 as per the Works Readiness requirement. As Built Management As Built packages should be broken down into design lots of work per discipline into manageable DMS drawing work submittals eg. 50 Drawings per package submittal (not exceeding 100 drawings in a package). Check-Print/Red Line mark ups should be provided at First Draft Review of As Builts. Certified copies will be accepted at 2nd Pass Engineering Review, 1st Pass submittal into PTV DMS. The project is to ensure that designers/contractors incorporate ALL comments identified by Engineering for submission of clean and certified As-Builts. Engineering Design & Review is available to provide PTV Infrastructure Drafting Standard checks, post Engineering (discipline) review. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 14 of 15

15 L1-CHE-POL-001 Version: 4 Effective from: 21 December 2016 It is recommended the 1st Pass, draft As-Built packages are provided at T+0 for initial engineering review (T+20 days) for response to projects by T+4. Certified As-Builts should be provided post T+4 (T+20 days) for amendment review & initial PTV DMS submittal. This is mandatory to meet the T+8 milestone detailed in the Works Readiness. There are to be no outstanding comments remaining against an As-Built package prior to loading into PTV DMS. A possibility exists [upon agreements between the Project and Engineering] to attempt to meet towards T+10 day turnaround of As-Built reviews (for major programs) if dedicated resources were funded by the project and are available. NOTE: Total completion of an Engineering As-Built package (regardless of drawing numbers) can average between 2 to 3 passes, before final acceptance into PTV DMS. That can best case span between 2-6 months for completion. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 15 of 15

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT Approval Amendment Record Approval Date Version Description 30/05/2014 1 Initial issue under MTM. This procedure supersedes the Overlapping Design Agreement, Application and Transfer Log documents L2-SIG-PRO-007,

More information

TYPE APPROVAL PROCEDURE

TYPE APPROVAL PROCEDURE Approval Amendment Record Approval Date Version Description 15/06/2012 1 Initial issue under MTM. Replaces Connex documents cml- 8.13-PR-002 & cml-8.21-po-168 30/11/2012 2 Document revised and updated

More information

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN Approval Amendment Record Approval Date Version Description 01/04/2014 1 Initial Issue under MTM PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 7 Table of Contents

More information

Earthing Requirements for HV Transmission Structures

Earthing Requirements for HV Transmission Structures Engineering Standard Electrical MEST 000002-07 Earthing Requirements for Transmission Structures Version: 1 Issued: February 2015 Owner: Engineering Approved By: Patrick Kelly Head of Electrical Engineering

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

GENERAL DESCRIPTION OF THE CMC SERVICES

GENERAL DESCRIPTION OF THE CMC SERVICES STANDARD FOR CERTIFICATION No.1.1 GENERAL DESCRIPTION OF THE CMC SERVICES MAY 2007 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property and the

More information

Air Monitoring Directive Chapter 9: Reporting

Air Monitoring Directive Chapter 9: Reporting Air Monitoring Directive Chapter 9: Reporting Version Dec 16, 2016 Amends the original Air Monitoring Directive published June, 1989 Title: Air Monitoring Directive Chapter 9: Reporting Number: Program

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

Type Approval JANUARY The electronic pdf version of this document found through is the officially binding version

Type Approval JANUARY The electronic pdf version of this document found through  is the officially binding version STANDARD FOR CERTIFICATION No. 1.2 Type Approval JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The content of this service

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability

More information

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer.

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer. SPEC-0002 1/8 1.0 PURPOSE This specification describes the requirements and procedure for requesting new drawing numbers, requesting drawing files for revision, and submitting drawings for archiving. This

More information

DNVGL-CP-0338 Edition October 2015

DNVGL-CP-0338 Edition October 2015 CLASS PROGRAMME DNVGL-CP-0338 Edition October 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Design Submittal and Review Protocol In-progress and Draft 15% Design Submittals TM 0.7 Prepared by: Signed document on file 4 Jun 2009 Ken Jong, PE, Engineering Manager Date Checked

More information

1 SERVICE DESCRIPTION

1 SERVICE DESCRIPTION DNV GL management system ICP Product Certification ICP 4-6-3-5-CR Document number: ICP 4-6-3-5-CR Valid for: All in DNV GL Revision: 2 Date: 2017-05-05 Resp. unit/author: Torgny Segerstedt Reviewed by:

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...

More information

Signalling Documentation and Drawings

Signalling Documentation and Drawings Discipline: Engineering (Signalling) Category: Standard Signalling Documentation and Drawings SCP 06 Applicability New South Wales CRIA (NSW CRN) Primary Source RIC Standard SC 00 23 00 00 SP Version 3.0

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Drawing Management Standard

Drawing Management Standard Record Number: R0000393979 Version Number: 1.0 Date: December 2015 Authorisations Action Name and title Date Prepared by TasNetworks 23/12/2015 Reviewed by David King With input from Rick Stevens, Jeshua

More information

Cloud Based Plan Review Process (Applicant)

Cloud Based Plan Review Process (Applicant) 1 Cloud Based Plan Review Process (Applicant) Organize Documentation Process Overview Upload Documents To Mercer Island FTP Site No Initial Submittal? Yes Intake Screening Approved? CST will inform you

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

00-General Drawings. Doc. no.: NA-00-STS002

00-General Drawings. Doc. no.: NA-00-STS002 Gæðaskjal (GSK) GSK-1773 Date of issue: 24.11.2016 Revision no.:2.0 Responsible: Einar Friðgeir Björnsson Editor: Rafn Magnús Jónsson 00-General Drawings Doc. no.: NA-00-STS002 This standard technical

More information

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town.

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town. Subject: Antenna Systems Policy Number: Date Developed: 2008/09 Date Approved: April 8, 2009 Lead Department: Planning and Development Date Modified: (if applicable) November 26, 2014 A. PROTOCOL STATEMENT:

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

Joint ILAC CIPM Communication regarding the. Accreditation of Calibration and Measurement Services. of National Metrology Institutes.

Joint ILAC CIPM Communication regarding the. Accreditation of Calibration and Measurement Services. of National Metrology Institutes. Joint ILAC CIPM Communication regarding the Accreditation of Calibration and Measurement Services of National Metrology Institutes 7 March 2012 Authorship This document was prepared by the International

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

National BIM Standard - United States Version 3

National BIM Standard - United States Version 3 National BIM Standard - United States Version 3 5 Practice Documents 5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination Requirements for Construction Installation

More information

Office for Nuclear Regulation

Office for Nuclear Regulation Office for Nuclear Regulation Redgrave Court Merton Road Bootle Merseyside L20 7HS www.hse.gov.uk/nuclear PROJECT ASSESSMENT REPORT Report Identifier: ONR-Policy-all-PAR-11-001 Revision: 2 Project: Implementation

More information

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000

More information

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007 BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission

More information

DESIGN PRACTICE NOTE GENERAL OCS SPECIFICATION UPDATE

DESIGN PRACTICE NOTE GENERAL OCS SPECIFICATION UPDATE Approval Amendment Record Approval Date Version Description 22/03/2017 1 Initial Issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 11 Table of Contents 1. Purpose...

More information

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution Herts Valleys Clinical Commissioning Group Review of NHS Herts Valleys CCG s constitution Agenda Item: 14 REPORT TO: HVCCG Board DATE of MEETING: 30 January 2014 SUBJECT: Review of NHS Herts Valleys CCG

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

Design Appendix: Throughout this document various supporting appendixes are referenced. These appendixes can be found at

Design Appendix: Throughout this document various supporting appendixes are referenced. These appendixes can be found at Aetna Information Services (AIS) http://ot.aetna.com March 16, 2016 Ver 21 Design Phase / Process This sequence of eight design weeks DW s leads the project team from project kickoff through to construction

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah I. Introduction STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah The Bureau of Land Management s (BLM) St. George Field Office (SGFO) requires

More information

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14. 14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic

More information

e-submission Quick Reference Guide for Economic Operators

e-submission Quick Reference Guide for Economic Operators e-submission Quick Reference Guide for Economic Operators e-submission Quick Guide for Economic Operators Page 1 Welcome to e-submission. This quick reference guide contains: Introduction to e-submission

More information

Level 1 VRQ Qualifications in Photo Imaging (7512) Assessment pack

Level 1 VRQ Qualifications in Photo Imaging (7512) Assessment pack Level 1 VRQ Qualifications in Photo Imaging (7512) Assessment pack www.cityandguilds.com May 2012 Version 1.1 About City & Guilds City & Guilds is the UK s leading provider of vocational qualifications,

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Working Drawing Procedure

Working Drawing Procedure Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

Kinyun Australia KP : Procedure for Control of Engineering Drawings PROCEDURE FOR CONTROL OF ENGINEERING DRAWINGS

Kinyun Australia KP : Procedure for Control of Engineering Drawings PROCEDURE FOR CONTROL OF ENGINEERING DRAWINGS PROCEDURE FOR CONTROL OF ENGINEERING DRAWINGS 1 General Kinyun has established, documented, implemented and maintains this Quality Procedure for the control of engineering drawings. This procedure defines

More information

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL AUTHORISATION PROCESS FOR THE PROPOSED UPGRADE AND NEW CONSTRUCTION RELATED TO THE DEVELOPMENT OF THE SWAZILAND RAIL LINK PROJECT, FROM DAVEL TO NERSTON (MPUMALANGA)

More information

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents. SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.

More information

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Engineering Specification Head of Electrical Engineering MESP 050100-01 TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Version:

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS (This contents page does not form part of the Grid Code) Paragraph No/Title Page No ECP.1 INTRODUCTION... 2 ECP.2 OBJECTIVE... 3 ECP.3 SCOPE...

More information

Delivery of Developer Funded Infrastructure A New Model

Delivery of Developer Funded Infrastructure A New Model A New Delivery Model for Developer Works Hunter Water has a clear role in supporting the delivery of the Government 2036 vision, as articulated in the recently released Hunter Regional Plan. In consultation

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines 2014 Citizens Wastewater of Westfield - GIS Digital Standards Table of Contents Introduction... 3 Definitions and Terms... 3 Reference Documents...

More information

Section XV - PER, Design, and Construction Submittal Requirements

Section XV - PER, Design, and Construction Submittal Requirements Section XV - PER, Design, and Construction Submittal Requirements A. Introduction - In an effort to reduce paper and to further implement the Oracle Unifier Project Management System, the Engineering Department

More information

Estates Development & Projects

Estates Development & Projects Estates Development & Projects Production Guidelines for the Building Fabric Manual (incorporating Health & Safety File) Guidance for the Technical Author REVISION 10.2 Issue Date 09/2017 Contents Part

More information

AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation

AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation The Republic of Belarus, Republic of Kazakhstan and the Russian

More information

PROCEDURE FOR PROCESSING WORKING DRAWINGS

PROCEDURE FOR PROCESSING WORKING DRAWINGS PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,

More information

Designated Institutes participating in the CIPM MRA

Designated Institutes participating in the CIPM MRA Designated Institutes participating in the CIPM MRA Expectations and nomination form Version 1.2 Contents 1. Introduction... 1 2. Designated Institute in Appendix A of the KCDB... 2 2.1. Designation of

More information

Procedures for the management of satellite network filings

Procedures for the management of satellite network filings Procedures for the management of satellite network filings Reference: MCA/O/16-2656 Publication Date: 28 December 2016 Valletta Waterfront, Pinto Wharf, Floriana FRN1913, Malta. Tel: (+356) 2133 6840 Fax:

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

European Charter for Access to Research Infrastructures - DRAFT

European Charter for Access to Research Infrastructures - DRAFT 13 May 2014 European Charter for Access to Research Infrastructures PREAMBLE - DRAFT Research Infrastructures are at the heart of the knowledge triangle of research, education and innovation and therefore

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

SUBMITTAL PROCEDURES

SUBMITTAL PROCEDURES SUBMITTAL PROCEDURES PART 1 GENERAL The ASPA Project Engineer (APE) may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective

More information

Appeals Policy Council for the Accreditation of Educator Preparation th Street, N.W., Suite 400 Washington, D.C

Appeals Policy Council for the Accreditation of Educator Preparation th Street, N.W., Suite 400 Washington, D.C Appeals Policy Council for the Accreditation of Educator Preparation 1140 19th Street, N.W., Suite 400 Washington, D.C. 20036 Website: caepnet.org Phone: 202.223.0077 July 2017 Document Version Control

More information

Co-ordination of the Group of Notified Bodies for the Construction Products Directive 89/106/EEC. GNB-CPD Conference on CPR

Co-ordination of the Group of Notified Bodies for the Construction Products Directive 89/106/EEC. GNB-CPD Conference on CPR GNB-CPD All Co-ordination of the Group of Notified Bodies for the Construction Products Directive 89/106/EEC NB-CPD/All-13/112 Issued: 13 June 2013 Answers to GNB- CPD questions GNB-CPD Conference on CPR

More information

Electronic Plan Review. City of Mesquite, TX. eplan Review Standards Document

Electronic Plan Review. City of Mesquite, TX. eplan Review Standards Document Electronic Plan Review City of Mesquite, TX eplan Review Standards Document Contents Document Control... Error! Bookmark not defined. Document Contacts... Error! Bookmark not defined. eplan Review Standards...

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

Jacksonville District Master

Jacksonville District Master -01 33 00 (April 2006) From USACE / NAVFAC / AFCESA UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Revised thoughout - changes not indicated by CHG tags SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS

More information

Working Party 5D. Radiocommunication Study Groups 参考資料 2

Working Party 5D. Radiocommunication Study Groups 参考資料 2 参考資料 2 Radiocommunication Study Groups Source: Document 5D/TEMP/357(Rev.1) Document IMT-ADV/24-E 27 July 2010 English only Working Party 5D PROCESS AND THE USE OF GLOBAL CORE SPECIFICATION (GCS), REFERENCES

More information

DNVGL-CG-0214 Edition September 2016

DNVGL-CG-0214 Edition September 2016 CLASS GUIDELINE DNVGL-CG-0214 Edition September 2016 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that it is prohibited by

More information

Guide to the Requirements for Public Information and Disclosure GD-99.3

Guide to the Requirements for Public Information and Disclosure GD-99.3 Guide to the Requirements for Public Information and Disclosure GD-99.3 November 2010 Guide to the Requirements for Public Information and Disclosure Guidance Document GD-99.3 Minister of Public Works

More information

UK Research and Innovation Conflicts of Interest Policy

UK Research and Innovation Conflicts of Interest Policy UK Research and Innovation Conflicts of Interest Policy Contents: Policy Statement 1. Introduction and Purpose. 2. Principles 3. Policy Review. 4. Definitions 5. Examples of Conflicts of Interest 6. Policy

More information

WP197 Capacity Market Metering Test

WP197 Capacity Market Metering Test WP197 Capacity Market Metering Test EMRS Working Practice Public Version: 4.0 Date: 20 July 2018 Table of Contents Change Amendment Record 4 1. Introduction 5 1.1 Scope and Purpose 5 1.2 Main Users and

More information

CTF to JISA Transfer Guidelines

CTF to JISA Transfer Guidelines CTF to JISA Transfer Guidelines We recommend that CTF/JISA providers adopt the procedures below, devised by representatives of the industry. They are recommendations only and not prescriptive. The process

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.

More information

Contents EUROPEAN UNION AGENCY FOR RAILWAYS. Accompanying Report Practical arrangements for safety certification ERA-REC-126/ACR V 1.

Contents EUROPEAN UNION AGENCY FOR RAILWAYS. Accompanying Report Practical arrangements for safety certification ERA-REC-126/ACR V 1. Contents 1. Executive summary... 3 2. Introduction... 4 2.1. Purpose and scope... 4 2.2. Background... 4 3. Workgroups... 5 4. Working method... 5 5. Content of the practical arrangements... 7 5.1. Objective...

More information

How to Complete a PCR

How to Complete a PCR How to Complete a PCR Information you will need In order to complete your Project Completion Report (PCR), you will need to know the following: Actual Project Outcomes Achieved How these Outcomes have

More information

The enclosed information is provided for consideration in the preparation of your response to the abovereferenced

The enclosed information is provided for consideration in the preparation of your response to the abovereferenced To: Prospective Vendor(s) Date: October 25, 2016 Subject: Solicitation Number: DHSMV-RFI-007-16 Cameras and Related Accessories Addendum No. 1 The enclosed information is provided for consideration in

More information

Intimate Communications Hub Interface Specification Report to Secretary of State

Intimate Communications Hub Interface Specification Report to Secretary of State Intimate Communications Hub Interface Specification Report to Secretary of State DCC V1.0 28/02/14 Page 1 of 14 Executive Summary 1. DCC is required in accordance with the terms of its Licence to produce,

More information

SECTION 13. ACQUISITIONS

SECTION 13. ACQUISITIONS SECTION 13. ACQUISITIONS... 13-1 13.1 Introduction... 13-1 13.2 On-Market Takeover... 13-1 13.3 Off-Market Takeover... 13-2 13.3.1 Accepting an Off-Market Bid... 13-3 13.3.2 Accepting an Off Market Bid

More information

South African Distribution Code

South African Distribution Code South African Distribution Code Metering Code Version 6.0 July 2014 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact: Mr.

More information

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) Page 1 Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) ECC RECOMMENDATION (06)05 ON THE PROVISION OF INFORMATION ON THE

More information

Electronic Document Review (EDR)

Electronic Document Review (EDR) Electronic Document Review (EDR) Submittal Requirements Table of Contents Introduction... 3 Electronic Document Review Submittals:... 4 Plans... 4 Plat... 4 Forms... 4 Correspondence... 5 Plan Revisions...

More information

CARRA PUBLICATION AND PRESENTATION GUIDELINES Version April 20, 2017

CARRA PUBLICATION AND PRESENTATION GUIDELINES Version April 20, 2017 CARRA PUBLICATION AND PRESENTATION GUIDELINES Version April 20, 2017 1. Introduction The goals of the CARRA Publication and Presentation Guidelines are to: a) Promote timely and high-quality presentation

More information

Procedure for Obtaining Verification of a Stormwater Manufactured Treatment Device from New Jersey Corporation for Advanced Technology

Procedure for Obtaining Verification of a Stormwater Manufactured Treatment Device from New Jersey Corporation for Advanced Technology Procedure for Obtaining Verification of a Stormwater Manufactured Treatment Device from New Jersey Corporation for Advanced Technology For use in accordance with the Stormwater Management Rules, N.J.A.C.

More information

11.0 INSTRUMENTATION LOOP DIAGRAMS

11.0 INSTRUMENTATION LOOP DIAGRAMS 11.0 INSTRUMENTATION LOOP DIAGRAMS Table of Contents 11.0 INSTRUMENTATION LOOP DIAGRAMS... 11-1 11.1 HISTORY OF CHANGE... 11-2 11.2 INSTRUMENT LOOP DIAGRAMS (ILD)... 11-4 11.2.1 Drawing Content... 11-4

More information