1 PROCEDURE FOR CONTROL OF ENGINEERING DRAWINGS 1 General Kinyun has established, documented, implemented and maintains this Quality Procedure for the control of engineering drawings. This procedure defines how Kinyun controls all engineering drawings that are required by our Quality Management System. 2 Purpose To ensure that the right persons have the current version of the engineering drawings they need, while unauthorized persons are prevented from use. 3 Scope Engineering drawings include, but are not limited to, Electronics designs: Schematic, printed circuit board (PCB) and bill of materials (BOM). A BOM is not a drawing, but is considered to be a drawing because of its nature. Mechanical designs: CAD files or image. Graphic design: Drawings for packages, labels and plates, test setup, system diagrams and concept map. All schedule drawings listed in all Ex certificates. All engineering drawings are controlled but the level of control is appropriate to the importance and impact of the document. 4 Responsibility All employees. 5 Terms and Definitions Schedule drawing: Drawing listed in the Ex certificate and/or test report. Related drawing: Drawing or document not listed in the Ex certificate but linked to the schedule drawing and used, for example, for detailed manufacture of component parts. Revision Date: April 1, 2012 Page 1 (of 5)

2 6 System The current revision of an engineering drawing shall have both softcopy, which is a file in a computer, and hardcopy. The master copies are original editable files and published softcopies created from the editable file. The published softcopies shall not be in any editable format. Kinyun uses PDF format whenever possible. The master copies shall be saved in the computer accessible to top management only, including the R&D Manager, to protect documents from unintended and unauthorised use and/or change. The master copies shall be backed up in another computer accessible to top management only. The archive storage for published softcopy can be a server, an Intranet, an Internet place, a shared drive or other equipment, which is safe, easy to access and controlled. Protect documents from unintended and unauthorised use and/or change. There are two stamps for hardcopy control managed by the Quality Manager Obsolete and Current. Information contained within engineering drawings is compatible with documentation that enables the conformity of the product with the requirements of the standard(s) to be assessed. Kinyun shall not initially approve or subsequently amend related drawings unless they are in compliance with the schedule drawings. Where any engineering drawing is passed to a third party, it shall be provided in a way that is not misleading. No factor (type, characteristic, position etc.) defined within the Ex certificate and technical documentation (e.g. schedule drawings) is modified. A document called Engineering Drawing List records details of all engineering drawings and their distributions. All employees shall follow the instructions below to ensure our documents and engineering drawings are controlled. Revision Date: April 1, 2012 Page 2 (of 5)

3 7 Control Procedures D ra w in g R e v ie w & A p p ro v e - A p p ro v a l re c o rd - G e t a c o p y R e v is e A rc h iv e Illustration of Control of Engineering Drawing Process Make a new drawing You may or may not need to get a template depending on what kind of drawing. Give it a title. Make your drawing. Complete the Title Block except Reviewed by. The Title Block shall at lease include the following information: - Description - Revision - Designer by - Reviewed by - Issued date - Drawing number - Sheet number and total sheets, e.g., 4 of 9. An electronic drawing must comply with Australian standards or international standards. Make changes Get the editable copy from the R&D Manager with his or her consent Make changes. Update the Title Block. Record changes on the Engineering Change Request form. For any schedule drawing, check all associated Ex certificates and report to the R&D Manager. Revision Date: April 1, 2012 Page 3 (of 5)

4 The R&D Manager shall take corresponding actions for all associated Ex certificates. Hand written changes are not allowed Sign off Get the approval from the R&D Manager. The R&D Manager completes the Reviewed by to approve the new drawing. For drawing changes, the R&D Manager also needs to sign the Engineering Change Request form to approve the changes. The R&D Manager may authorize another person for review and approval. The R&D Manager makes the last revision obsolete and archives the new revision. Archive For the first revision, record it in the Engineering Drawing List. Print out a hardcopy. Save editable version in the master copy computer and the back-up computer. Stamp the Current stamp on the new revision of the hardcopy, then put it in the hardcopy archive storage. Make sure the drawing accessible to intended users. If you want to keep a hardcopy of the last revision, cross-out the Current then stamp the Obsolete on the last revision. All obsolete engineering drawings shall be archived for at least 2 years in a softcopy for any possible reference. Only the R&D Manager can destroy an obsolete engineering drawing after 2 years. The above requirements on identification and distribution also apply to engineering drawings that originate outside of Kinyun. If you modify any such engineering drawing (thus making them your own), all of the above requirements apply. Revision Date: April 1, 2012 Page 4 (of 5)

5 Revision History Revision Date List of Changes Author (Name & Date) 1/4/2012 First version Henry Gong 1/4/2012 Approval (Name & Date) Hanson Chen 1/4/2012 Revision Date: April 1, 2012 Page 5 (of 5)

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Services Title Compilation of Historical Records of Buildings Scheduled for Demolition Reference Number EYP 01 (RIC Standard: G 2650) Document Control Status

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS) Approval Amendment Record Approval Date Version Description 15/10/2015 1 This policy takes precedence over L1-NAM-PRO-003 Infrastructure As Built Drawing Management due to business restructures. New Content

More information

EU- T y p e E x a m i n a t i o n C e r t i f i c a t e

EU- T y p e E x a m i n a t i o n C e r t i f i c a t e MiCOM Labs, Inc.: EU Notified Body Number 2280 EU- T y p e E x a m i n a t i o n C e r t i f i c a t e Rev: A Date: 27 th June 2017 Approval Holder Name: Suhan Kim MANDO corp. Approval Holder Address 32,

More information

EU- T y p e E x a m i n a t i o n C e r t i f i c a t e

EU- T y p e E x a m i n a t i o n C e r t i f i c a t e MiCOM Labs, Inc.: EU Notified Body Number 2280 EU- T y p e E x a m i n a t i o n C e r t i f i c a t e Rev: A Date: 5 January 2018 Approval Holder Name: Ajax Systems Inc. Approval Holder Address 910 Foulk

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE

NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE Radio Equipment Directive (RED) 2014/53/EU MiCOM Labs Inc., Notified Body Number 2280 declares, on the basis of the assessment of the tests and the technical

More information

NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE

NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE Radio Equipment Directive (RED) 2014/53/EU MiCOM Labs Inc., Notified Body Number 2280 declares, on the basis of the assessment of the tests and the technical

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard - NSW Category Signalling Title Power Supply Units for Signalling Equipment - DC Track Feeds Reference Number SPS 29 - (RIC Standard: SC 09 10 06 00 SP) Document Control

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

LA Solutions. JobTracker. Projects, Clients, and Drawings. Issue Sheets. MicroStation Software and Consultancy

LA Solutions. JobTracker. Projects, Clients, and Drawings. Issue Sheets. MicroStation Software and Consultancy JobTracker JobTracker helps maintain a catalogue of projects, clients, users, and drawings Tracks clients and drawings associated with each project Tracks CAD files used in each drawing Automates the production

More information

NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE

NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE Radio Equipment Directive (RED) 2014/53/EU MiCOM Labs Inc., Notified Body Number 2280 declares, on the basis of the assessment of the tests and the technical

More information

NUMBERING OF DRAWINGS, SPECIFICATIONS AND SIMILAR DOCUMENTS. L. D'Addario,

NUMBERING OF DRAWINGS, SPECIFICATIONS AND SIMILAR DOCUMENTS. L. D'Addario, ALMA Memo No. 323 NUMBERING OF DRAWINGS, SPECIFICATIONS AND SIMILAR DOCUMENTS L. D'Addario, 2000-09-11 INTRODUCTION This memo describes a system for assigning identifying numbers to certain critical documents

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

BE PREPARED FOR SIGFOX READY TM CERTIFICATION

BE PREPARED FOR SIGFOX READY TM CERTIFICATION May 18th 2018 BE PREPARED FOR SIGFOX READY TM CERTIFICATION Public use Revision History Revision Number Date Change description 0.1 August 15 th, 2017 Initial spec 0.2 May 18 th, 2018 CW test time Content

More information

Drawing Management Standard

Drawing Management Standard Record Number: R0000393979 Version Number: 1.0 Date: December 2015 Authorisations Action Name and title Date Prepared by TasNetworks 23/12/2015 Reviewed by David King With input from Rick Stevens, Jeshua

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

Overview of Textron Systems Supplier First Article Inspection (FAI) expectations

Overview of Textron Systems Supplier First Article Inspection (FAI) expectations Overview of Textron Systems Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions PURPOSE Ensure the product being delivered meets drawing requirements

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

11.0 INSTRUMENTATION LOOP DIAGRAMS

11.0 INSTRUMENTATION LOOP DIAGRAMS 11.0 INSTRUMENTATION LOOP DIAGRAMS Table of Contents 11.0 INSTRUMENTATION LOOP DIAGRAMS... 11-1 11.1 HISTORY OF CHANGE... 11-2 11.2 INSTRUMENT LOOP DIAGRAMS (ILD)... 11-4 11.2.1 Drawing Content... 11-4

More information

Record As-Built Drawings for Capital Projects

Record As-Built Drawings for Capital Projects Section 19.1 Record As-Built Drawings for Capital Projects Overview - Section 19.1 Internal Use: Full compliance where applicable Contractor Use: Full compliance where applicable The intention of this

More information

Drawing Standard for Plans Showing Horizontal Alignment

Drawing Standard for Plans Showing Horizontal Alignment Discipline: Engineering (Track & Civil) Category: Standard Drawing Standard for Plans Showing Horizontal Alignment ETD-00-01 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard

More information

Privacy Policy SOP-031

Privacy Policy SOP-031 SOP-031 Version: 2.0 Effective Date: 18-Nov-2013 Table of Contents 1. DOCUMENT HISTORY...3 2. APPROVAL STATEMENT...3 3. PURPOSE...4 4. SCOPE...4 5. ABBREVIATIONS...5 6. PROCEDURES...5 6.1 COLLECTION OF

More information

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Substation Auxiliary Transformer from Rectifier Transformer Secondary Reference Number PDS 01 (RIC Standard: EP 05 00 00 01 SP) Document Control

More information

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

EMC & Radio requirements within EU

EMC & Radio requirements within EU EMC & Radio requirements within EU Roy Uggerud 2018/10/17 1 New directives EMC 2014/30/EU (replace EMC directive Implemented 20.04.2016 RED 2014/53/EU (replace R&TTE directive 1999/5/EC) Implemented 13.June

More information

Reference Number PDS 07 (RIC Standard: EP SP)

Reference Number PDS 07 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PDS 07 (RIC Standard: EP 12 10 00 20 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Jan 05 Standards

More information

Title Lightning/ Surge Protection - Power Inductors. Reference Number SPS 37 - (RIC Standard: SC SP)

Title Lightning/ Surge Protection - Power Inductors. Reference Number SPS 37 - (RIC Standard: SC SP) Discipline Engineering Standard NSW Category Signalling Title Reference Number SPS 37 - (RIC Standard: SC 09 15 04 00 SP) Document Control Status Date Prepared Reviewed Endorsed Approved May 05 Standards

More information

DNVGL-CP-0338 Edition October 2015

DNVGL-CP-0338 Edition October 2015 CLASS PROGRAMME DNVGL-CP-0338 Edition October 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class

More information

A Department of the Recorder s Division, Cuyahoga County Fiscal Office

A Department of the Recorder s Division, Cuyahoga County Fiscal Office A Department of the Recorder s Division, Cuyahoga County Fiscal Office 1261 Superior Avenue, 2 nd Floor Cleveland, Ohio 44114 Tel: 216-698-6442 Fax: 216-443-8909 PROBLEM? SOLUTION!! Many agencies are storing

More information

00-General Drawings. Doc. no.: NA-00-STS002

00-General Drawings. Doc. no.: NA-00-STS002 Gæðaskjal (GSK) GSK-1773 Date of issue: 24.11.2016 Revision no.:2.0 Responsible: Einar Friðgeir Björnsson Editor: Rafn Magnús Jónsson 00-General Drawings Doc. no.: NA-00-STS002 This standard technical

More information

TAB B-9 RECORD DRAWINGS

TAB B-9 RECORD DRAWINGS TAB B-9 RECORD DRAWINGS Project record drawings and shall be prepared for all University of Arizona projects. The concept Record Drawings shall replace what has previously been called As-Builts. During

More information

Certificate of Conformity

Certificate of Conformity Applicant: Moore Industries International Inc. 16650 Schoenborn Street North Hills CA 91343-6196 U.S.A Electrical Apparatus: Fully Encapsulated PC-Programmable Temperature Transmitters (TRX: nonisolated;

More information

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement 1 BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement February 27, 2019 2 Scope The intent of this document is to provide an understanding, and clarification as to what BAE Systems

More information

Electrical Overcurrent Studies

Electrical Overcurrent Studies Electrical Overcurrent Studies 11-01-2011 Deliverables associated with electrical overcurrent studies are as follow : a. Draft Reports i. Construction Related Projects have the following draft reports

More information

Measurement of Signalling Distances

Measurement of Signalling Distances Division / Business Unit: Function: Document Type: Enterprise Services Signalling Standard Measurement of Signalling Distances Applicability ARTC Network Wide SMS Publication Requirement Internal / External

More information

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000

More information

A. Section includes administrative and procedural requirements for project record documents, including the following:

A. Section includes administrative and procedural requirements for project record documents, including the following: SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01

More information

Schedule - 20 LED LAMPS

Schedule - 20 LED LAMPS Date: 8 th February, 2018 Revision 2 (*Red color represents the changes inserted.) Schedule - 20 LED LAMPS 1. SCOPE 1.1. This schedule specifies the energy labeling requirements for self-ballasted nondirectional

More information

Certificate of Conformity

Certificate of Conformity pplicant: Moore Industries-International Inc. 16650 Schoenborn Street North Hills C 91343 United States of merica Electrical pparatus: Current to Pressure Transmitter Models IPX2, IPX2-NG, IPH2 and IPT2

More information

Earthing Requirements for HV Transmission Structures

Earthing Requirements for HV Transmission Structures Engineering Standard Electrical MEST 000002-07 Earthing Requirements for Transmission Structures Version: 1 Issued: February 2015 Owner: Engineering Approved By: Patrick Kelly Head of Electrical Engineering

More information

Certification of EXPLOSION PROTECTED ELECTRICAL EQUIPMENT

Certification of EXPLOSION PROTECTED ELECTRICAL EQUIPMENT Certificate of Conformity Certificate No: ANZEx 11.2009 Issue: 0 16 December 2011 Original Issue Applicant: Pepperl+Fuchs GmbH Lilienthalstrasse 200 68307 Mannheim GERMANY Electrical Equipment: Isolation

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1051 - REVISED: 2009 Individual and Branch Type Air Admittance Valves MANUFACTURER: CONTACT PERSON: E-MAIL: ADDRESS:

More information

PPAP REQUIREMENTS. Revision: March Methode Electronics, Inc. G-MB of 12 Printed copies are not controlled.

PPAP REQUIREMENTS. Revision: March Methode Electronics, Inc. G-MB of 12 Printed copies are not controlled. PPAP REQUIREMENTS Revision: March 2018 G-MB-1023 1 of 12 Printed copies are not controlled. Production Part Approval Process (PPAP) A) Introduction: 1) This document explains Methode s PPAP requirements.

More information

Robot e.do. Certifications, Service, Warranty. Rel Versions: 4 axes and 6 axes

Robot e.do. Certifications, Service, Warranty. Rel Versions: 4 axes and 6 axes Robot e.do Rel. 00 - Versions: 4 axes and 6 axes Certifications, Service, Warranty Directives and reference standards according to which the Robot has been certified. Terms, conditions to be fulfilled

More information

Specification For. Asset Information Pr8701

Specification For. Asset Information Pr8701 Specification For Asset Pr8701 Written Direction Control Document Sponsor Document Owner Subject Matter Expert References Infrastructure Technical Standards Committee Manager, Capital Delivery, SIS Network

More information

Air Monitoring Directive Chapter 9: Reporting

Air Monitoring Directive Chapter 9: Reporting Air Monitoring Directive Chapter 9: Reporting Version Dec 16, 2016 Amends the original Air Monitoring Directive published June, 1989 Title: Air Monitoring Directive Chapter 9: Reporting Number: Program

More information

P.L. 1999, CHAPTER 258, approved October 15, 1999 Assembly, No (First Reprint)

P.L. 1999, CHAPTER 258, approved October 15, 1999 Assembly, No (First Reprint) P.L., CHAPTER, approved October, Assembly, No. 0 (First Reprint) 0 0 0 AN ACT concerning the approval and filing of maps and amending P.L.0, c.. BE IT ENACTED by the Senate and General Assembly of the

More information

36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE)

36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE) CEB STANDARD 022 : 1994 Specification for 36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE) CEYLON ELECTRICITY BOARD SRI LANKA Specification for 36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE) CEB Standard 022 : 1994

More information

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents. SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.

More information

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...

More information

TYPE APPROVAL PROCEDURE

TYPE APPROVAL PROCEDURE Approval Amendment Record Approval Date Version Description 15/06/2012 1 Initial issue under MTM. Replaces Connex documents cml- 8.13-PR-002 & cml-8.21-po-168 30/11/2012 2 Document revised and updated

More information

Part 1: General requirements

Part 1: General requirements Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO 3098-1 Second edition 2015-03-01 Technical product documentation Lettering Part 1: General requirements Documentation technique de produits Écriture

More information

BIM. e Submission Guideline Structural. Annex 1a. Recommended Process Revit 2010

BIM. e Submission Guideline Structural. Annex 1a. Recommended Process Revit 2010 BIM e Submission Guideline Structural Annex 1a Recommended Process Revit 2010 Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore 069110 www.bca.gov.sg Revision

More information

Signalling Documentation and Drawings

Signalling Documentation and Drawings Discipline: Engineering (Signalling) Category: Standard Signalling Documentation and Drawings SCP 06 Applicability New South Wales CRIA (NSW CRN) Primary Source RIC Standard SC 00 23 00 00 SP Version 3.0

More information

Gippsland Water Drafting Specifications

Gippsland Water Drafting Specifications Gippsland Water Drafting Specifications Drafting Specifications for Drawings Produced for Gippsland Water COR/02/22774 December 15 Gippsland Water Document Details Business Owner Gippsland Water Procedure

More information

EECAD s MUST List. Requests for drawing numbers MUST be submitted via the EECAD job request form at

EECAD s MUST List. Requests for drawing numbers MUST be submitted via the EECAD job request form at Customers are required to follow certain criteria for all designs whether they are ultimately done in EECAD or by the customers themselves. These criteria, approved by EES Management, are listed below:

More information

Term Design Project Details

Term Design Project Details Term Design Project Details ME170 Project Description: Form teams* of 3 to 4 students and design a new mechanical or electro-mechanical product. The product should have moving parts. Your product will

More information

015 : 1993 CEB STANDARD

015 : 1993 CEB STANDARD 015 : 1993 CEB STANDARD UNGALVANIZED STAY ASSEMBLIES CEYLON ELECTRICITY BOARD SRI LANKA Specification for UNGALVANIZED STAY ASSEMBLIES CEB Standard 015 : 1993 CEYLON ELECTRICITY BOARD No. 50, Sir Chittampalam

More information

DNVGL-CP-0212 Edition March 2016

DNVGL-CP-0212 Edition March 2016 CLASS PROGRAMME Type approval DNVGL-CP-0212 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

Artwork Lifecycle Process Management. Vilva Natarajan CEO, Karomi

Artwork Lifecycle Process Management. Vilva Natarajan CEO, Karomi Artwork Lifecycle Process Management Vilva Natarajan CEO, Karomi Which Artworks? Labels Cartons PIL Pack Inserts PACKAGE LABEL.PRINCIPAL DISPLAY PANEL Section in the SPL Mock Artwork for Submission Commercial

More information

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR THE ISRAEL ELECTRIC CORPORATION LTD. ENGINEERING PROJECTS GROUP SPECIFICATION No. 01-1E/S STANDARD SPECIFICATION FOR STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING

More information

Miami University. Physical Facilities Department. CAD Standards. April 2004

Miami University. Physical Facilities Department. CAD Standards. April 2004 Miami University Physical Facilities Department CAD Standards April 2004 1.0.0 OVERVIEW These standards pertain to the use, production and submittal of electronic CAD files at Miami University. They have

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

Alfa Laval Material Standard T

Alfa Laval Material Standard T Marking of material and components for heat exchangers Prepared and edited by Materials & Chemistry Centre, Tumba, Sweden Page No. of pages Revision No. Date 1 7 10 2014-04-28 COPYRIGHT Alfa Laval AB 2014.

More information

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines 2014 Citizens Wastewater of Westfield - GIS Digital Standards Table of Contents Introduction... 3 Definitions and Terms... 3 Reference Documents...

More information

ELECTRONIC DRAFTING GUIDELINES

ELECTRONIC DRAFTING GUIDELINES ELECTRONIC DRAFTING GUIDELINES Edition No. 6 Updated November 2016 TABLE OF CONTENTS Section Title Page 1 Definitions 3 2 Drawing Format 3 2.1 Standards & Guidelines 3 2.2 Survey Plans 4 2.3 Underground

More information

Distribution transformers Part 2 Ground mounted transformers not closecoupled

Distribution transformers Part 2 Ground mounted transformers not closecoupled PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 35-1 Distribution transformers Part 2 Ground mounted transformers not closecoupled www.energynetworks.org PUBLISHING

More information

CRICUT ACCESS TERMS OF USE

CRICUT ACCESS TERMS OF USE CRICUT ACCESS TERMS OF USE THIS IS AN AGREEMENT BETWEEN YOU AND PROVO CRAFT & NOVELTY, INC., (DOING BUSINESS AS CRICUT ) WITH ITS AFFILIATES, ( PROVO CRAFT OR WE ). PLEASE READ THESE TERMS OF USE, ALL

More information

Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID

Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID Company (applicant): hereby applies to RISE Research Institutes of Sweden AB, as Notified

More information

Reference Number PCP 02 (RIC Standard: EP SP)

Reference Number PCP 02 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PCP 02 (RIC Standard: EP 20 00 00 20 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

New Title Block Editor

New Title Block Editor New Title Block Editor Marta Garcia Carnero CAD services EDMS: 1950023 Index Why a new Title Block Editor? New Title Block Editor in detail General Information Fields CDD Information Bill Of Materials

More information

Cutting tool data representation and exchange. Part 72:

Cutting tool data representation and exchange. Part 72: Provläsningsexemplar / Preview TECHNICAL SPECIFICATION ISO/TS 13399-72 First edition 2016-07-15 Cutting tool data representation and exchange Part 72: Creation of documents for the standardized data exchange

More information

It is expected that this standard will evolve over time; however the use of this standard should remain consistent within individual projects.

It is expected that this standard will evolve over time; however the use of this standard should remain consistent within individual projects. 1.0 Introduction A computer aided design (CAD) procedure is necessary to ensure that drawings produced by and for the University are readable, understandable, of a consistent standard, and, where necessary,

More information

ARCHITECTURAL DESIGN (542)

ARCHITECTURAL DESIGN (542) DESCRIPTION This is the first assessment in a sequence, Architectural Design I prepares students with knowledge of residential architectural and related construction. Topics include; architectural blueprint

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 5599-1 Third edition 2001-08-15 Pneumatic fluid power Five-port directional control valves Part 1: Mounting interface surfaces without electrical connector Transmissions pneumatiques

More information

ACB, Inc. Notified Body Number Whittier Avenue, Suite C110 McLean, VA 22101, USA

ACB, Inc. Notified Body Number Whittier Avenue, Suite C110 McLean, VA 22101, USA Manufacturer company name: Shanghai Simcom Wireless Solutions Co., Ltd Manufacturer address: BuildingA, SIM Technology Building, No. 633, Jinzhong Road, Changning District, Shanghai P.R.China Description

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

AWS J1.1M/J1.1:2013 An American National Standard. Specification for Resistance Welding Controls

AWS J1.1M/J1.1:2013 An American National Standard. Specification for Resistance Welding Controls An American National Standard Specification for Resistance Welding Controls An American National Standard Approved by American National Standards Institute July 29, 2013 Specification for Resistance Welding

More information

QUALITY CONTROL INSTRUCTIONS

QUALITY CONTROL INSTRUCTIONS QUALITY CONTROL INSTRUCTIONS QCI NO. 100 REVISION E SPC PROCEDURE WRITTEN BY: R. Zielinski DATE: 2/3/92 APPROVED BY: APPROVED BY: Department Manager Quality Assurance Manager DATE: DATE: SF 118 1 CHANGE

More information

ETSI EN V1.2.1 ( ) Harmonized European Standard (Telecommunications series)

ETSI EN V1.2.1 ( ) Harmonized European Standard (Telecommunications series) EN 300 086-2 V1.2.1 (2008-09) Harmonized European Standard (Telecommunications series) Electromagnetic compatibility and Radio spectrum Matters (ERM); Land Mobile Service; Radio equipment with an internal

More information

Release: 1. MEM30031A Operate computer-aided design (CAD) system to produce basic drawing elements

Release: 1. MEM30031A Operate computer-aided design (CAD) system to produce basic drawing elements Release: 1 MEM30031A Operate computer-aided design (CAD) system to produce basic drawing elements MEM30031A Operate computer-aided design (CAD) system to produce basic drawing elements Modification History

More information

SPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES

SPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES KP/3CB/TSP/0/00 04-09-9 Page of 9 TABLE OF CONTENTS 0. Circulation List 0. Amendment Record FOREWORD. SCOPE. REFERENCES 3. TERMS AND DEFINITIONS 4. REQUIREMENTS 5. TESTS AND INSPECTION 6. MARKING, LABELLING

More information

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN Approval Amendment Record Approval Date Version Description 01/04/2014 1 Initial Issue under MTM PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 7 Table of Contents

More information

EUROPEAN ETS TELECOMMUNICATION August 1993 STANDARD

EUROPEAN ETS TELECOMMUNICATION August 1993 STANDARD EUROPEAN ETS 300 166 TELECOMMUNICATION August 1993 STANDARD Source: ETSI TC-TM Reference: DE/TM-3002 ICS: 33.020, 33.040.40 Key words: Transmission, multiplexing, interfaces Transmission and Multiplexing

More information

Certificate of Appropriateness (CoA) Checklist

Certificate of Appropriateness (CoA) Checklist Certificate of Appropriateness (CoA) Checklist This Checklist is intended to assist you in preparing a complete application for submittal. Occasionally, additional items may be required to complete the