1 PROCEDURE FOR CONTROL OF ENGINEERING DRAWINGS 1 General Kinyun has established, documented, implemented and maintains this Quality Procedure for the control of engineering drawings. This procedure defines how Kinyun controls all engineering drawings that are required by our Quality Management System. 2 Purpose To ensure that the right persons have the current version of the engineering drawings they need, while unauthorized persons are prevented from use. 3 Scope Engineering drawings include, but are not limited to, Electronics designs: Schematic, printed circuit board (PCB) and bill of materials (BOM). A BOM is not a drawing, but is considered to be a drawing because of its nature. Mechanical designs: CAD files or image. Graphic design: Drawings for packages, labels and plates, test setup, system diagrams and concept map. All schedule drawings listed in all Ex certificates. All engineering drawings are controlled but the level of control is appropriate to the importance and impact of the document. 4 Responsibility All employees. 5 Terms and Definitions Schedule drawing: Drawing listed in the Ex certificate and/or test report. Related drawing: Drawing or document not listed in the Ex certificate but linked to the schedule drawing and used, for example, for detailed manufacture of component parts. Revision Date: April 1, 2012 Page 1 (of 5)
2 6 System The current revision of an engineering drawing shall have both softcopy, which is a file in a computer, and hardcopy. The master copies are original editable files and published softcopies created from the editable file. The published softcopies shall not be in any editable format. Kinyun uses PDF format whenever possible. The master copies shall be saved in the computer accessible to top management only, including the R&D Manager, to protect documents from unintended and unauthorised use and/or change. The master copies shall be backed up in another computer accessible to top management only. The archive storage for published softcopy can be a server, an Intranet, an Internet place, a shared drive or other equipment, which is safe, easy to access and controlled. Protect documents from unintended and unauthorised use and/or change. There are two stamps for hardcopy control managed by the Quality Manager Obsolete and Current. Information contained within engineering drawings is compatible with documentation that enables the conformity of the product with the requirements of the standard(s) to be assessed. Kinyun shall not initially approve or subsequently amend related drawings unless they are in compliance with the schedule drawings. Where any engineering drawing is passed to a third party, it shall be provided in a way that is not misleading. No factor (type, characteristic, position etc.) defined within the Ex certificate and technical documentation (e.g. schedule drawings) is modified. A document called Engineering Drawing List records details of all engineering drawings and their distributions. All employees shall follow the instructions below to ensure our documents and engineering drawings are controlled. Revision Date: April 1, 2012 Page 2 (of 5)
3 7 Control Procedures D ra w in g R e v ie w & A p p ro v e - A p p ro v a l re c o rd - G e t a c o p y R e v is e A rc h iv e Illustration of Control of Engineering Drawing Process Make a new drawing You may or may not need to get a template depending on what kind of drawing. Give it a title. Make your drawing. Complete the Title Block except Reviewed by. The Title Block shall at lease include the following information: - Description - Revision - Designer by - Reviewed by - Issued date - Drawing number - Sheet number and total sheets, e.g., 4 of 9. An electronic drawing must comply with Australian standards or international standards. Make changes Get the editable copy from the R&D Manager with his or her consent Make changes. Update the Title Block. Record changes on the Engineering Change Request form. For any schedule drawing, check all associated Ex certificates and report to the R&D Manager. Revision Date: April 1, 2012 Page 3 (of 5)
4 The R&D Manager shall take corresponding actions for all associated Ex certificates. Hand written changes are not allowed Sign off Get the approval from the R&D Manager. The R&D Manager completes the Reviewed by to approve the new drawing. For drawing changes, the R&D Manager also needs to sign the Engineering Change Request form to approve the changes. The R&D Manager may authorize another person for review and approval. The R&D Manager makes the last revision obsolete and archives the new revision. Archive For the first revision, record it in the Engineering Drawing List. Print out a hardcopy. Save editable version in the master copy computer and the back-up computer. Stamp the Current stamp on the new revision of the hardcopy, then put it in the hardcopy archive storage. Make sure the drawing accessible to intended users. If you want to keep a hardcopy of the last revision, cross-out the Current then stamp the Obsolete on the last revision. All obsolete engineering drawings shall be archived for at least 2 years in a softcopy for any possible reference. Only the R&D Manager can destroy an obsolete engineering drawing after 2 years. The above requirements on identification and distribution also apply to engineering drawings that originate outside of Kinyun. If you modify any such engineering drawing (thus making them your own), all of the above requirements apply. Revision Date: April 1, 2012 Page 4 (of 5)
5 Revision History Revision Date List of Changes Author (Name & Date) 1/4/2012 First version Henry Gong 1/4/2012 Approval (Name & Date) Hanson Chen 1/4/2012 Revision Date: April 1, 2012 Page 5 (of 5)
Status Date Prepared Reviewed Endorsed Approved
Discipline Engineering Standard NSW Category Services Title Compilation of Historical Records of Buildings Scheduled for Demolition Reference Number EYP 01 (RIC Standard: G 2650) Document Control Status
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationUNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General
More informationSECTION SUBMITTAL PROCEDURES
SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply
More informationA. Action Submittals: Written and graphic information that requires Architect's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationUCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationSECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)
Approval Amendment Record Approval Date Version Description 15/10/2015 1 This policy takes precedence over L1-NAM-PRO-003 Infrastructure As Built Drawing Management due to business restructures. New Content
More informationEU- T y p e E x a m i n a t i o n C e r t i f i c a t e
MiCOM Labs, Inc.: EU Notified Body Number 2280 EU- T y p e E x a m i n a t i o n C e r t i f i c a t e Rev: A Date: 27 th June 2017 Approval Holder Name: Suhan Kim MANDO corp. Approval Holder Address 32,
More informationEU- T y p e E x a m i n a t i o n C e r t i f i c a t e
MiCOM Labs, Inc.: EU Notified Body Number 2280 EU- T y p e E x a m i n a t i o n C e r t i f i c a t e Rev: A Date: 5 January 2018 Approval Holder Name: Ajax Systems Inc. Approval Holder Address 910 Foulk
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationA. Action Submittals: Written and graphic information that requires Engineer's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationNOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE
NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE Radio Equipment Directive (RED) 2014/53/EU MiCOM Labs Inc., Notified Body Number 2280 declares, on the basis of the assessment of the tests and the technical
More informationNOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE
NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE Radio Equipment Directive (RED) 2014/53/EU MiCOM Labs Inc., Notified Body Number 2280 declares, on the basis of the assessment of the tests and the technical
More informationStatus Date Prepared Reviewed Endorsed Approved
Discipline Engineering Standard - NSW Category Signalling Title Power Supply Units for Signalling Equipment - DC Track Feeds Reference Number SPS 29 - (RIC Standard: SC 09 10 06 00 SP) Document Control
More informationEast Central College
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationDIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES
DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationLA Solutions. JobTracker. Projects, Clients, and Drawings. Issue Sheets. MicroStation Software and Consultancy
JobTracker JobTracker helps maintain a catalogue of projects, clients, users, and drawings Tracks clients and drawings associated with each project Tracks CAD files used in each drawing Automates the production
More informationNOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE
NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE Radio Equipment Directive (RED) 2014/53/EU MiCOM Labs Inc., Notified Body Number 2280 declares, on the basis of the assessment of the tests and the technical
More informationNUMBERING OF DRAWINGS, SPECIFICATIONS AND SIMILAR DOCUMENTS. L. D'Addario,
ALMA Memo No. 323 NUMBERING OF DRAWINGS, SPECIFICATIONS AND SIMILAR DOCUMENTS L. D'Addario, 2000-09-11 INTRODUCTION This memo describes a system for assigning identifying numbers to certain critical documents
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationBE PREPARED FOR SIGFOX READY TM CERTIFICATION
May 18th 2018 BE PREPARED FOR SIGFOX READY TM CERTIFICATION Public use Revision History Revision Number Date Change description 0.1 August 15 th, 2017 Initial spec 0.2 May 18 th, 2018 CW test time Content
More informationDrawing Management Standard
Record Number: R0000393979 Version Number: 1.0 Date: December 2015 Authorisations Action Name and title Date Prepared by TasNetworks 23/12/2015 Reviewed by David King With input from Rick Stevens, Jeshua
More informationDIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have
More informationOverview of Textron Systems Supplier First Article Inspection (FAI) expectations
Overview of Textron Systems Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions PURPOSE Ensure the product being delivered meets drawing requirements
More informationAnswer: Qualification statement should be provided with the bid.
Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street
More information11.0 INSTRUMENTATION LOOP DIAGRAMS
11.0 INSTRUMENTATION LOOP DIAGRAMS Table of Contents 11.0 INSTRUMENTATION LOOP DIAGRAMS... 11-1 11.1 HISTORY OF CHANGE... 11-2 11.2 INSTRUMENT LOOP DIAGRAMS (ILD)... 11-4 11.2.1 Drawing Content... 11-4
More informationRecord As-Built Drawings for Capital Projects
Section 19.1 Record As-Built Drawings for Capital Projects Overview - Section 19.1 Internal Use: Full compliance where applicable Contractor Use: Full compliance where applicable The intention of this
More informationDrawing Standard for Plans Showing Horizontal Alignment
Discipline: Engineering (Track & Civil) Category: Standard Drawing Standard for Plans Showing Horizontal Alignment ETD-00-01 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard
More informationPrivacy Policy SOP-031
SOP-031 Version: 2.0 Effective Date: 18-Nov-2013 Table of Contents 1. DOCUMENT HISTORY...3 2. APPROVAL STATEMENT...3 3. PURPOSE...4 4. SCOPE...4 5. ABBREVIATIONS...5 6. PROCEDURES...5 6.1 COLLECTION OF
More informationTitle Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)
Discipline Engineering Standard NSW Category Electrical Title Substation Auxiliary Transformer from Rectifier Transformer Secondary Reference Number PDS 01 (RIC Standard: EP 05 00 00 01 SP) Document Control
More informationMESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER
Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT
More informationSPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS
Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized
More informationEMC & Radio requirements within EU
EMC & Radio requirements within EU Roy Uggerud 2018/10/17 1 New directives EMC 2014/30/EU (replace EMC directive Implemented 20.04.2016 RED 2014/53/EU (replace R&TTE directive 1999/5/EC) Implemented 13.June
More informationReference Number PDS 07 (RIC Standard: EP SP)
Discipline Engineering Standard NSW Category Electrical Title Reference Number PDS 07 (RIC Standard: EP 12 10 00 20 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Jan 05 Standards
More informationTitle Lightning/ Surge Protection - Power Inductors. Reference Number SPS 37 - (RIC Standard: SC SP)
Discipline Engineering Standard NSW Category Signalling Title Reference Number SPS 37 - (RIC Standard: SC 09 15 04 00 SP) Document Control Status Date Prepared Reviewed Endorsed Approved May 05 Standards
More informationDNVGL-CP-0338 Edition October 2015
CLASS PROGRAMME DNVGL-CP-0338 Edition October 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class
More informationA Department of the Recorder s Division, Cuyahoga County Fiscal Office
A Department of the Recorder s Division, Cuyahoga County Fiscal Office 1261 Superior Avenue, 2 nd Floor Cleveland, Ohio 44114 Tel: 216-698-6442 Fax: 216-443-8909 PROBLEM? SOLUTION!! Many agencies are storing
More information00-General Drawings. Doc. no.: NA-00-STS002
Gæðaskjal (GSK) GSK-1773 Date of issue: 24.11.2016 Revision no.:2.0 Responsible: Einar Friðgeir Björnsson Editor: Rafn Magnús Jónsson 00-General Drawings Doc. no.: NA-00-STS002 This standard technical
More informationTAB B-9 RECORD DRAWINGS
TAB B-9 RECORD DRAWINGS Project record drawings and shall be prepared for all University of Arizona projects. The concept Record Drawings shall replace what has previously been called As-Builts. During
More informationCertificate of Conformity
Applicant: Moore Industries International Inc. 16650 Schoenborn Street North Hills CA 91343-6196 U.S.A Electrical Apparatus: Fully Encapsulated PC-Programmable Temperature Transmitters (TRX: nonisolated;
More informationBAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement
1 BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement February 27, 2019 2 Scope The intent of this document is to provide an understanding, and clarification as to what BAE Systems
More informationElectrical Overcurrent Studies
Electrical Overcurrent Studies 11-01-2011 Deliverables associated with electrical overcurrent studies are as follow : a. Draft Reports i. Construction Related Projects have the following draft reports
More informationMeasurement of Signalling Distances
Division / Business Unit: Function: Document Type: Enterprise Services Signalling Standard Measurement of Signalling Distances Applicability ARTC Network Wide SMS Publication Requirement Internal / External
More informationSECTION ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000
More informationA. Section includes administrative and procedural requirements for project record documents, including the following:
SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01
More informationSchedule - 20 LED LAMPS
Date: 8 th February, 2018 Revision 2 (*Red color represents the changes inserted.) Schedule - 20 LED LAMPS 1. SCOPE 1.1. This schedule specifies the energy labeling requirements for self-ballasted nondirectional
More informationCertificate of Conformity
pplicant: Moore Industries-International Inc. 16650 Schoenborn Street North Hills C 91343 United States of merica Electrical pparatus: Current to Pressure Transmitter Models IPX2, IPX2-NG, IPH2 and IPT2
More informationEarthing Requirements for HV Transmission Structures
Engineering Standard Electrical MEST 000002-07 Earthing Requirements for Transmission Structures Version: 1 Issued: February 2015 Owner: Engineering Approved By: Patrick Kelly Head of Electrical Engineering
More informationCertification of EXPLOSION PROTECTED ELECTRICAL EQUIPMENT
Certificate of Conformity Certificate No: ANZEx 11.2009 Issue: 0 16 December 2011 Original Issue Applicant: Pepperl+Fuchs GmbH Lilienthalstrasse 200 68307 Mannheim GERMANY Electrical Equipment: Isolation
More informationThis specification describes the general requirements for Engineering Services provided to Vale.
1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred
More informationAmerican Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM
American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1051 - REVISED: 2009 Individual and Branch Type Air Admittance Valves MANUFACTURER: CONTACT PERSON: E-MAIL: ADDRESS:
More informationPPAP REQUIREMENTS. Revision: March Methode Electronics, Inc. G-MB of 12 Printed copies are not controlled.
PPAP REQUIREMENTS Revision: March 2018 G-MB-1023 1 of 12 Printed copies are not controlled. Production Part Approval Process (PPAP) A) Introduction: 1) This document explains Methode s PPAP requirements.
More informationRobot e.do. Certifications, Service, Warranty. Rel Versions: 4 axes and 6 axes
Robot e.do Rel. 00 - Versions: 4 axes and 6 axes Certifications, Service, Warranty Directives and reference standards according to which the Robot has been certified. Terms, conditions to be fulfilled
More informationSpecification For. Asset Information Pr8701
Specification For Asset Pr8701 Written Direction Control Document Sponsor Document Owner Subject Matter Expert References Infrastructure Technical Standards Committee Manager, Capital Delivery, SIS Network
More informationAir Monitoring Directive Chapter 9: Reporting
Air Monitoring Directive Chapter 9: Reporting Version Dec 16, 2016 Amends the original Air Monitoring Directive published June, 1989 Title: Air Monitoring Directive Chapter 9: Reporting Number: Program
More informationP.L. 1999, CHAPTER 258, approved October 15, 1999 Assembly, No (First Reprint)
P.L., CHAPTER, approved October, Assembly, No. 0 (First Reprint) 0 0 0 AN ACT concerning the approval and filing of maps and amending P.L.0, c.. BE IT ENACTED by the Senate and General Assembly of the
More information36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE)
CEB STANDARD 022 : 1994 Specification for 36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE) CEYLON ELECTRICITY BOARD SRI LANKA Specification for 36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE) CEB Standard 022 : 1994
More informationSECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.
SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.
More informationELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER
Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...
More informationTYPE APPROVAL PROCEDURE
Approval Amendment Record Approval Date Version Description 15/06/2012 1 Initial issue under MTM. Replaces Connex documents cml- 8.13-PR-002 & cml-8.21-po-168 30/11/2012 2 Document revised and updated
More informationPart 1: General requirements
Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO 3098-1 Second edition 2015-03-01 Technical product documentation Lettering Part 1: General requirements Documentation technique de produits Écriture
More informationBIM. e Submission Guideline Structural. Annex 1a. Recommended Process Revit 2010
BIM e Submission Guideline Structural Annex 1a Recommended Process Revit 2010 Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore 069110 www.bca.gov.sg Revision
More informationSignalling Documentation and Drawings
Discipline: Engineering (Signalling) Category: Standard Signalling Documentation and Drawings SCP 06 Applicability New South Wales CRIA (NSW CRN) Primary Source RIC Standard SC 00 23 00 00 SP Version 3.0
More informationGippsland Water Drafting Specifications
Gippsland Water Drafting Specifications Drafting Specifications for Drawings Produced for Gippsland Water COR/02/22774 December 15 Gippsland Water Document Details Business Owner Gippsland Water Procedure
More informationEECAD s MUST List. Requests for drawing numbers MUST be submitted via the EECAD job request form at
Customers are required to follow certain criteria for all designs whether they are ultimately done in EECAD or by the customers themselves. These criteria, approved by EES Management, are listed below:
More informationTerm Design Project Details
Term Design Project Details ME170 Project Description: Form teams* of 3 to 4 students and design a new mechanical or electro-mechanical product. The product should have moving parts. Your product will
More information015 : 1993 CEB STANDARD
015 : 1993 CEB STANDARD UNGALVANIZED STAY ASSEMBLIES CEYLON ELECTRICITY BOARD SRI LANKA Specification for UNGALVANIZED STAY ASSEMBLIES CEB Standard 015 : 1993 CEYLON ELECTRICITY BOARD No. 50, Sir Chittampalam
More informationDNVGL-CP-0212 Edition March 2016
CLASS PROGRAMME Type approval DNVGL-CP-0212 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD
More informationCHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS
CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05
More informationArtwork Lifecycle Process Management. Vilva Natarajan CEO, Karomi
Artwork Lifecycle Process Management Vilva Natarajan CEO, Karomi Which Artworks? Labels Cartons PIL Pack Inserts PACKAGE LABEL.PRINCIPAL DISPLAY PANEL Section in the SPL Mock Artwork for Submission Commercial
More informationSTANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR
THE ISRAEL ELECTRIC CORPORATION LTD. ENGINEERING PROJECTS GROUP SPECIFICATION No. 01-1E/S STANDARD SPECIFICATION FOR STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING
More informationMiami University. Physical Facilities Department. CAD Standards. April 2004
Miami University Physical Facilities Department CAD Standards April 2004 1.0.0 OVERVIEW These standards pertain to the use, production and submittal of electronic CAD files at Miami University. They have
More information***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)
DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB
More informationAlfa Laval Material Standard T
Marking of material and components for heat exchangers Prepared and edited by Materials & Chemistry Centre, Tumba, Sweden Page No. of pages Revision No. Date 1 7 10 2014-04-28 COPYRIGHT Alfa Laval AB 2014.
More informationDIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines
DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines 2014 Citizens Wastewater of Westfield - GIS Digital Standards Table of Contents Introduction... 3 Definitions and Terms... 3 Reference Documents...
More informationELECTRONIC DRAFTING GUIDELINES
ELECTRONIC DRAFTING GUIDELINES Edition No. 6 Updated November 2016 TABLE OF CONTENTS Section Title Page 1 Definitions 3 2 Drawing Format 3 2.1 Standards & Guidelines 3 2.2 Survey Plans 4 2.3 Underground
More informationDistribution transformers Part 2 Ground mounted transformers not closecoupled
PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 35-1 Distribution transformers Part 2 Ground mounted transformers not closecoupled www.energynetworks.org PUBLISHING
More informationCRICUT ACCESS TERMS OF USE
CRICUT ACCESS TERMS OF USE THIS IS AN AGREEMENT BETWEEN YOU AND PROVO CRAFT & NOVELTY, INC., (DOING BUSINESS AS CRICUT ) WITH ITS AFFILIATES, ( PROVO CRAFT OR WE ). PLEASE READ THESE TERMS OF USE, ALL
More informationApplication for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID
Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID Company (applicant): hereby applies to RISE Research Institutes of Sweden AB, as Notified
More informationReference Number PCP 02 (RIC Standard: EP SP)
Discipline Engineering Standard NSW Category Electrical Title Reference Number PCP 02 (RIC Standard: EP 20 00 00 20 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards
More informationNew Title Block Editor
New Title Block Editor Marta Garcia Carnero CAD services EDMS: 1950023 Index Why a new Title Block Editor? New Title Block Editor in detail General Information Fields CDD Information Bill Of Materials
More informationCutting tool data representation and exchange. Part 72:
Provläsningsexemplar / Preview TECHNICAL SPECIFICATION ISO/TS 13399-72 First edition 2016-07-15 Cutting tool data representation and exchange Part 72: Creation of documents for the standardized data exchange
More informationIt is expected that this standard will evolve over time; however the use of this standard should remain consistent within individual projects.
1.0 Introduction A computer aided design (CAD) procedure is necessary to ensure that drawings produced by and for the University are readable, understandable, of a consistent standard, and, where necessary,
More informationARCHITECTURAL DESIGN (542)
DESCRIPTION This is the first assessment in a sequence, Architectural Design I prepares students with knowledge of residential architectural and related construction. Topics include; architectural blueprint
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 5599-1 Third edition 2001-08-15 Pneumatic fluid power Five-port directional control valves Part 1: Mounting interface surfaces without electrical connector Transmissions pneumatiques
More informationACB, Inc. Notified Body Number Whittier Avenue, Suite C110 McLean, VA 22101, USA
Manufacturer company name: Shanghai Simcom Wireless Solutions Co., Ltd Manufacturer address: BuildingA, SIM Technology Building, No. 633, Jinzhong Road, Changning District, Shanghai P.R.China Description
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018
SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationAWS J1.1M/J1.1:2013 An American National Standard. Specification for Resistance Welding Controls
An American National Standard Specification for Resistance Welding Controls An American National Standard Approved by American National Standards Institute July 29, 2013 Specification for Resistance Welding
More informationQUALITY CONTROL INSTRUCTIONS
QUALITY CONTROL INSTRUCTIONS QCI NO. 100 REVISION E SPC PROCEDURE WRITTEN BY: R. Zielinski DATE: 2/3/92 APPROVED BY: APPROVED BY: Department Manager Quality Assurance Manager DATE: DATE: SF 118 1 CHANGE
More informationETSI EN V1.2.1 ( ) Harmonized European Standard (Telecommunications series)
EN 300 086-2 V1.2.1 (2008-09) Harmonized European Standard (Telecommunications series) Electromagnetic compatibility and Radio spectrum Matters (ERM); Land Mobile Service; Radio equipment with an internal
More informationRelease: 1. MEM30031A Operate computer-aided design (CAD) system to produce basic drawing elements
Release: 1 MEM30031A Operate computer-aided design (CAD) system to produce basic drawing elements MEM30031A Operate computer-aided design (CAD) system to produce basic drawing elements Modification History
More informationSPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES
KP/3CB/TSP/0/00 04-09-9 Page of 9 TABLE OF CONTENTS 0. Circulation List 0. Amendment Record FOREWORD. SCOPE. REFERENCES 3. TERMS AND DEFINITIONS 4. REQUIREMENTS 5. TESTS AND INSPECTION 6. MARKING, LABELLING
More informationDESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN
Approval Amendment Record Approval Date Version Description 01/04/2014 1 Initial Issue under MTM PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 7 Table of Contents
More informationEUROPEAN ETS TELECOMMUNICATION August 1993 STANDARD
EUROPEAN ETS 300 166 TELECOMMUNICATION August 1993 STANDARD Source: ETSI TC-TM Reference: DE/TM-3002 ICS: 33.020, 33.040.40 Key words: Transmission, multiplexing, interfaces Transmission and Multiplexing
More informationCertificate of Appropriateness (CoA) Checklist
Certificate of Appropriateness (CoA) Checklist This Checklist is intended to assist you in preparing a complete application for submittal. Occasionally, additional items may be required to complete the
More information