1 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer. The Engineer will deal directly with Vale s Project Engineer for technical matters, and Vale s Engineering Outsourcing Coordinator (EOC) for all non-technical matters. All correspondence shall be in writing. Telephone conversations related to the project shall be followed-up by with copies to Vale s Project Engineer and the EOC. Refer to Vale Engineering Specification SPEC for additional information. Note: On projects where an EOC is not assigned, all technical and non-technical matters are directed through Vale s Project Engineer. 3.0 DESIGN REQUIREMENTS 3.1 GENERAL Plant Layout and Design must be in accordance with the requirements of Vale Specification SPEC and all other specifications listed in the Reference Document section of this document. If the Engineer wishes to offer methods and details that are superior to Vale Specifications, these may be incorporated but only after approval in writing from the Vale Project Engineer. If the Engineer determines that a particular Vale Engineering Specification is not appropriate for the application then this must be brought to the attention of Vale s Project Engineer. When referencing a Vale Engineering Standard Specification, the Engineer shall ensure that it is the latest revision. The Engineer shall confirm and be responsible for the accuracy of all calculations. Any drawings or other reference information in archive, or provided to the Engineer, are to be used for reference only. Any critical information as it relates to the project must be verified in the field by the Engineer. 3.2 DESIGN CALCULATIONS All design calculations must be completed in accordance with the requirements of Vale Specification SPEC-0001.

2 2/9 3.3 SPECIFIC DESIGN REQUIREMENTS Structural, Mechanical, Electrical and Instrumentation All discipline engineering is to be in accordance with the requirements of Vale Specification SPEC The Engineer shall not transfer the design responsibility to fabricators and constructors through purchase orders or construction specifications unless this method is approved by Vale in writing. 3.4 PROCESS HAZARDS REVIEW The Engineer shall complete and document the required Design Process Hazards Reviews (PHR) in accordance with Vale Engineering Specification SPEC Any Engineering related action items shall be incorporated into the design before final package issue. The Engineer shall also participate in FEL stage PHR s and Construction and Commissioning PHRs. 3.5 PURCHASED EQUIPMENT The Engineer shall ensure that Vale receives all manufacturer s and fabricator s drawings, specifications and manuals in accordance with Vale Engineering Specification SPEC DRAWING REQUIREMENTS 4.1 GENERAL Existing drawings of Vale facilities are available to the Engineer for viewing and printing through the Drawing Management System (jdms) in the print room of the Engineering Building located in Copper Cliff. Requests for existing drawings for revision, and the reserving of new drawing numbers shall be in accordance with Vale Specification SPEC All drawings must be submitted electronically and in accordance with Vale Standards SPEC series and SPEC-0000 series standards. Drawings shall be drawn, checked, approved and reviewed by the Engineer in accordance with the requirements of Vale Standards SPEC series and SPEC-0000 series standards. All cross-references between drawings shall be done using Vale drawing numbers only. All new drawings are to include the Consulting Firm s logo in the lower right hand corner of the drawing. For revisions to existing drawings, no logo is required but the Consulting Firm s name is entered in the drawing revision description similar to the following example:

3 3/9 ~ Platform Added At EL 96-0 (ABC Engineering) ~ Upon issuing for construction, drawings are submitted to Vale for archiving, accompanied by drawing checker report. For drawing submission, return of drawings, and submission of vendor drawings for archive, refer to SPEC AS-BUILT DRAWINGS Generally, as stated above, drawings are submitted for archive at the time of Issue for Construction. Only drawings that incur changes in the field during construction require updating to the as-built condition. Only those drawings requiring an as-built update are requested for check-out, and not the entire drawing package. For As-built drawing requirements, refer to Vale Specification SPEC DESIGN CHANGE CONTROL All design changes to scope, budget or schedule must be authorized using the Design Change Request template NAV-TE Additional work must be approved by Vale prior to proceeding. 6.0 PROGRESS OF WORK 6.1 PROGRESS PRINTS AND QUALITY ASSURANCE REVIEWS The Scope of Work for Engineering Services will define the requirements for progress prints and quality assurance reviews. Prints will be submitted via in PDF format. The prints will be stamped above the title block "Progress Prints. The will list the drawings to be reviewed. Reviews by Vale s Project Engineer will be of a cursory nature to ensure general compliance with Vale standards and industry best-practices. This review by Vale does not relieve the Engineer of any responsibility or accountability. No responsibility for the design is assumed by Vale. Upon receipt of the reviewed prints, the Engineer shall address all comments. 6.2 PROJECT SCHEDULE Where requested, a detailed project schedule, in Microsoft Project, will be updated for regularly scheduled meetings (issued in both.pdf and.mpp formats). 6.3 WEEKLY STATUS REPORTING The Engineer shall submit weekly status reports using Vale Form NAV-TE-0110, or upload sheet (in the case of overflow consultants).

4 4/9 6.4 MONTHLY STATUS REPORTING The Engineer shall submit monthly cost forecasting as specified on Vale s Consultant Forecasting Schedule. This schedule is issued at the beginning of each year to consultants and the PMO groups, by Central Engineering. 6.5 WEEKLY PROGRESS MEETINGS Weekly meetings will be held reviewing the project status as required. The Engineer shall record and issue meeting minutes to all meeting participants and the Vale Project Manager and Engineering Outsource Coordinator. The minutes shall be issued within two days of the meeting. The engineer shall provide minutes for all kick-off, design review and process hazard review meetings. 7.0 CLIENT REVIEW (DESIGN REVIEW WITH PLANT) Design reviews with the plant should occur at the 30% and 70% design complete stage of a project, but depending on the size and complexity of a project, more or less reviews may be required. Refer to Vale Guideline GUID for client review requirements. 7.1 VALE AND/OR THIRD PARTY REVIEWS At any time, the Engineer s Work, including progress prints, functional specifications, design briefs, etc. shall be subject to review by Vale Representatives or Third Party Representatives retained by Vale, to ensure quality, design intent, functionality, operational compatibility, completeness, etc..0 DESIGN PACKAGE ISSUE Completed design packages are issued to the EOC as individual files, combined into one ZIP file, and will typically include: A Design Package Transmittal (PDF Format) Technical Scope of Work (PDF & Word format) Drawings (PDF Format) Custom Specifications (PDF Format) Equipment Specifications (PDF Format) Functional Specification (PDF Format) PHR (PDF Format) Report (PDF Format) Estimate (PDF & Excel format) NOTE: For any design package that includes equipment/piping that requires TSSA approval and registration, a copy of the design package must be forwarded to tssa@vale.com. The transmittal above must also indicate that a copy has been sent to that address.

5 5/9 9.0 DELIVERABLES All Project Documentation shall be considered Deliverables and shall form the core of the Project record. It is the intent that these Deliverables be submitted in electronic format unless otherwise specified. Final deliverables shall be in their native format accompanied by a PDF copy of each. Progress issues during the course of the project will generally be in PDF format. It is the Engineer s responsibility to ensure that the requirements for all deliverables be applied to all Subconsultants, Contractors, Subcontractors and Vendors. All supporting and originating data (graphs, data, pictures, tables, etc.) that are developed and incorporated into the deliverable documentation shall be included in the electronic deliverables in a logical file folder structure. All data collected as part of the Project and relating to the deliverables that have been organized into database tables and spreadsheets shall be included electronically as supporting data for the deliverable. 9.1 MEDIA Upon completion of the job, deliverables are submitted to Vale s EOC via for smaller jobs or through Vale s FTP site for larger jobs. Files shall be organized into a logical file folder structure to match the grouping of the data. Example: Design Calculations, Letters, Reports, Scope of Work, Drawings, PHR, etc. 9.2 FILE FORMAT All project documents that are part of the Deliverables shall be supplied in current versions of Microsoft Office compatible file formats for current Windows operating systems. All photographs shall be supplied in JPEG format. When inserting photos into a document, such as a report, the resolution should be suitable for web viewing, in order to minimize file sizes. Higher resolution pictures should be submitted separately when required, depending on the purpose or application. 9.3 FONTS Except for CADD files, all deliverables shall use Arial font. The preferred font size is twelve point but shall be no less than ten point.

6 6/9 9.4 FINAL DELIVERABLES Final deliverables shall be created and forwarded to the EOC by the Engineer. This information, once submitted, will be filed for Vale's records. All of this information shall represent the final/latest revision of all documents, drawings, manuals, design calculations, etc. Final deliverables include but are not limited to: Engineering Drawings with the Drawing Checker report (submitted upon issue for construction) Engineering Drawings as-builts (where applicable) Design calculations (Indexed and arranged by Plant, Area Code, Discipline and Description) All Lifting Device documentation Process Hazard Reviews documentation Soils Reports arranged by Plant, Area Code and Description Shop Fabrication Drawings including all erection diagrams and detail drawings for steelwork, steel reinforcement and equipment, Bills of Materials, Mill Test Certificates, Reinforcing Schedules, etc. Vendor Data including: o a list of all equipment by equipment number referenced to Plant, Area Code and Description as to where the equipment is located o all equipment drawings o all supplementary documents o data sheets o performance curves, set-points, calibration information, etc. o operating and maintenance manuals including spare parts lists, schematic and wiring diagrams of internal systems such as hydraulic, pneumatic, electrical, instrumentation All custom Equipment Specifications For EPCM contracts - Purchase Orders including: o List of all POs describing equipment by Plant, Area Code, Description, PO No. o Copies of all POs with all pertinent equipment specifications, change orders and correspondence

7 7/9. o Copies of general terms and conditions used for the purchase of equipment. Any exclusions negotiated with the supplier on a specific order shall be noted, especially as they apply to proprietary information For EPCM contracts - Contract Information including: o List of all contract packages o Copies of contract documents issued for each contract o Name of general contractor for each contract and subcontractors for structural, miscellaneous steelwork, chute, bins, tanks vessels, etc. for which shop fabrication drawings would have been prepared Quality Assurance including copies of all inspections, NDE reports and tests - Commissioning and Performance Test Reports - Special Studies and Reports Functional Specification for PLC/DCS programming and for complex systems. PLC, DCS and HMI Programs - Copies of all programs Commissioning Manual including any checklists and sign-offs Training Course and Manual o Operator/maintenance training course at Vale s site, including training manual o Updated operating and maintenance procedures if required Miscellaneous - Any other general project files, correspondence or communications that should be retained by Vale Job Completion form NAV-TE-0161, must be submitted within 4 weeks of issuing the final job deliverables INVOICES Proforma invoices shall be submitted to the EOC (Project Engineer for jobs where no EOC is assigned) for approval and authorization of payment. Proforma invoices shall be submitted to suit the cost forecasting report that is submitted monthly by the consultant. Outstanding Claims Form NAV-TE-0030 shall accompany all proforma invoices REFERENCE DOCUMENTATION The following documents are related to this specification and shall be used to their latest revision: SPEC SPEC SPEC Process Hazards Reviews General Review of Construction Drawing Controls System Requirements for Consultants

8 /9 SPEC SPEC SPEC SPEC GUID GUID SPEC-0001 SPEC-0002 SPEC-0003 SPEC-0004 SPEC-0005 SPEC-0006 SPEC-0007 SPEC-000 SPEC-0009 SPEC-0010 SPEC-0011 SPEC-0012 SPEC-0013 SPEC-0014 SPEC-1001 Overflow & Outsourced Eng Vale Coordination of Work Microstation Configuration for Vale Drawings Working with the Vale Standard Drawing Border Vale Drawing Checker Utility Overflow & Outsourced Eng Post-IFC Engineering Support Overflow & Outsourced Eng Client Reviews - Guideline Plant Layout and Design General Requirements Drawings Administrative Requirements Drawings Technical Requirements General Drawings Technical Requirements Flow Diagrams Drawings Technical Requirements Concrete Drawings Technical Requirements Structural Steel Drawings Technical Requirements Mechanical & Piping Drawings Technical Requirements Electrical/Instrumentation Removal Drawings Void Drawings Drawing Checking, Approval and Review Vendor Drawing Requirements As Built Drawings Requirements for DWG Files (AutoCAD) Lifting Devices Requirements

9 9/ REVISION AND TRANSITION NOTES Revision notes describe: what was changed, and if applicable, why it was changed, and the plan to implement the change, including whether changes are retroactive. Note: The revision notes are a summary of the changes and may not necessarily be a complete list. A risk code is entered for each revision and if applicable, the revision notes will describe how risk was addressed for the revision. Risk Risk Category Code A This revision is a minor change and/or introduces no risk. B C Risk has been addressed for this revision by the reviewer and approver. Low risk or no new hazards identified. For this revision, a PHR or other risk management tool has been used to address risk and minimize hazards. This risk assessment has been documented and is available through Central Engineering. Rev Revision Notes Document format and number changed due to Vale Engineering Document Program changes in 2011/2012. Previous standard number was Rev Some content from the former specification was moved to specification SPEC-0001 Clarification added for Drawing Checker Report submission format Drawing requirements clarified - Requirements for reserving drawing numbers and requesting drawings for revision was moved to SPEC References added regarding the Drawing Checker Utility - Requirements for the Submission of Drawings moved to SPEC Vendor drawing requirements moved to SPEC-0012 Risk Code Approved by Reviewed by Issue Date YYYY/MM/DD --- IG AD 2013/04/ TR AD 2013/05/ CM AD 2013/0/12 4 Clarification added regarding existing drawings in archive --- CM AD 2013/10/ Drawing requirement references updated. No changes to procedures. Added information regarding Job Completion in Final Deliverables Document Reviewed Format Updated - Clarifications Added around Drawing Submission and As-Builts, progress reporting, reviews, forecasting, and invoicing. --- CM AD 2015/03/ CM AD 2015/05/29 A C.Marshall A.Delost 2016/0/26 Design package issue requirement added for TSSA documentation A C.Marshall A.Delost

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements.

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements. 1/5 1.0 PURPOSE This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements. It outlines the expectations for requesting Vendor

More information

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer.

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer. SPEC-0002 1/8 1.0 PURPOSE This specification describes the requirements and procedure for requesting new drawing numbers, requesting drawing files for revision, and submitting drawings for archiving. This

More information

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines.

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines. SPEC-0800 1/5 1.0 PURPOSE This specification describes the minimum technical requirements for drawings, as applicable to all disciplines. 2.0 VALE DRAWING TYPE DEFINITIONS Engineering Drawings Engineering

More information

The drawing numbering system applies to all drawings produced for Vale that are archived in the Drawing Management System.

The drawing numbering system applies to all drawings produced for Vale that are archived in the Drawing Management System. SPEC-0002 2016/0/26 1/15 1.0 PURPOSE This specification describes the administrative drawing requirements such as numbering, titles, and border information, etc. for Engineering Drawings produced for Vale.

More information

The Microstation configuration must be set up with the correct CAD resource files as outlined in SPEC

The Microstation configuration must be set up with the correct CAD resource files as outlined in SPEC 1.0 PURPOSE 016/08/6 1/11 This specification describes the procedure for working with the Vale standard drawing border in Microstation V8i, covering the border insertion and filling the border information..0

More information

The Microstation configuration must be set up with the correct CAD resource files as outlined in SPEC

The Microstation configuration must be set up with the correct CAD resource files as outlined in SPEC 1/7 1.0 PURPOSE This specification describes the procedure for working with the Vale Drawing Checker Utility. This utility checks the drawing for adherence to many mandatory Vale drawing standards and

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

This specification describes the minimum requirements for structural steel drawings.

This specification describes the minimum requirements for structural steel drawings. 1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Section includes administrative and procedural requirements for project record documents, including the following:

A. Section includes administrative and procedural requirements for project record documents, including the following: SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

Vanderbilt University Standard Specification Revised 2/6/08

Vanderbilt University Standard Specification Revised 2/6/08 SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 RELATED SECTIONS A. Section 01 77 00 Closeout Procedures B. Section 01 78 39 Project Record Documents 1.02 SUMMARY A. This section provides

More information

DRAWING PROCESS EXTERNAL DRAWINGS

DRAWING PROCESS EXTERNAL DRAWINGS CERN CH-1211 Geneva 23 Switzerland LHC Project Document No. CERN Div./Group or Supplier/Contractor Document No. the Large Hadron Collider project EDMS Document No. 103559 Date:1998-06-25 Quality Assurance

More information

CONVEYANCE PIPELINE AND PUMP STATION

CONVEYANCE PIPELINE AND PUMP STATION SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station

More information

00-General Drawings. Doc. no.: NA-00-STS002

00-General Drawings. Doc. no.: NA-00-STS002 Gæðaskjal (GSK) GSK-1773 Date of issue: 24.11.2016 Revision no.:2.0 Responsible: Einar Friðgeir Björnsson Editor: Rafn Magnús Jónsson 00-General Drawings Doc. no.: NA-00-STS002 This standard technical

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

Cloud Based Plan Review Process (Applicant)

Cloud Based Plan Review Process (Applicant) 1 Cloud Based Plan Review Process (Applicant) Organize Documentation Process Overview Upload Documents To Mercer Island FTP Site No Initial Submittal? Yes Intake Screening Approved? CST will inform you

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

Estates Development & Projects

Estates Development & Projects Estates Development & Projects Production Guidelines for the Building Fabric Manual (incorporating Health & Safety File) Guidance for the Technical Author REVISION 10.2 Issue Date 09/2017 Contents Part

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

Chapter 1 General Design Information

Chapter 1 General Design Information Chapter 1 General Information Introduction The primary aim in both designing and checking is to produce a structure that will safely carry the anticipated loads. The design team, consisting of the designers,

More information

Electrical Overcurrent Studies

Electrical Overcurrent Studies Electrical Overcurrent Studies 11-01-2011 Deliverables associated with electrical overcurrent studies are as follow : a. Draft Reports i. Construction Related Projects have the following draft reports

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

Working Drawing Procedure

Working Drawing Procedure Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines 2014 Citizens Wastewater of Westfield - GIS Digital Standards Table of Contents Introduction... 3 Definitions and Terms... 3 Reference Documents...

More information

PROCEDURE FOR PROCESSING WORKING DRAWINGS

PROCEDURE FOR PROCESSING WORKING DRAWINGS PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,

More information

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) ATTACHMENT 5, CONTRACT 13, ADDENDUM 3 2017 CDM Smith 14955-109447 SECTION 01725 PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) PART 1 GENERAL 1.01 DESCRIPTION A. The Owner and Contractor shall utilize the

More information

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION

More information

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards] SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel CHAPTER 10 SHOP DRAWING REVIEW 10.01 TYPES OF SHOP DRAWINGS 10.01.01 Structural Steel 10.01.02 Prestressed Concrete 10.01.03 Bearings 10.01.04 Metal Stay - In - Place Forms () 10.01.05 Expansion Joints

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

ATDESIGN. Working with an Assignment Photographer

ATDESIGN. Working with an Assignment Photographer Working with an Assignment Photographer Making sure your project is professionally photographed is an essential step in communicating your ideas. With the photographs being used to market your firm s expertise,

More information

U.S.A.C.E. ALBUQUERQUE DISTRICT A/E/C CADD STANDARD SUPPLEMENTAL STANDARD

U.S.A.C.E. ALBUQUERQUE DISTRICT A/E/C CADD STANDARD SUPPLEMENTAL STANDARD U.S.A.C.E. ALBUQUERQUE DISTRICT A/E/C CADD STANDARD SUPPLEMENTAL STANDARD (FOR USE WITH THE A/E/C CADD STANDARDS RELEASE 4.0) 24 March 2009 26 January 2012 PURPOSE AND SCOPE The purpose of this document

More information

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog

More information

SUBMITTAL PROCEDURES

SUBMITTAL PROCEDURES SUBMITTAL PROCEDURES PART 1 GENERAL The ASPA Project Engineer (APE) may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective

More information

DRAWINGREQUIREMENTS FOR DEVICE CONNECTOR DRAWINGS

DRAWINGREQUIREMENTS FOR DEVICE CONNECTOR DRAWINGS DRAWINGREQUIREMENTS FOR DEVICE CONNECTOR DRAWINGS HOW TO USE EWCAP DRAWING/DRAFTING REQUIREMENTS This document is to be used to check newly-released drawings for use by EWCAP. Confirm compliance by confirming

More information

ELECTRONIC DRAFTING GUIDELINES

ELECTRONIC DRAFTING GUIDELINES ELECTRONIC DRAFTING GUIDELINES Edition No. 6 Updated November 2016 TABLE OF CONTENTS Section Title Page 1 Definitions 3 2 Drawing Format 3 2.1 Standards & Guidelines 3 2.2 Survey Plans 4 2.3 Underground

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.

More information

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Construction Documents 1.1 to 1.6 Create Submittal Log 1.1 Construction Docs Focus of this process is to transmit submittal

More information

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 DEFINITIONS... 4 3.0 DRAWING CONTROL... 4 4.0 PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5 5.0 GUIDELINES FOR PREPARATION OF DRAWINGS... 5 6.0 CONTENTS

More information

Miami University. Physical Facilities Department. CAD Standards. April 2004

Miami University. Physical Facilities Department. CAD Standards. April 2004 Miami University Physical Facilities Department CAD Standards April 2004 1.0.0 OVERVIEW These standards pertain to the use, production and submittal of electronic CAD files at Miami University. They have

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

FACILITIES CADD STANDARD

FACILITIES CADD STANDARD 2015 Facilities Services Division of Design and Construction CADD Department FACILITIES CADD STANDARD CAD, BIM, & GIS Standards for the University of Alaska Fairbanks The University of Alaska Fairbanks

More information

Specification For. Asset Information Pr8701

Specification For. Asset Information Pr8701 Specification For Asset Pr8701 Written Direction Control Document Sponsor Document Owner Subject Matter Expert References Infrastructure Technical Standards Committee Manager, Capital Delivery, SIS Network

More information

Scope of Services. Project management tasks are estimated based upon anticipated project duration of 52 weeks.

Scope of Services. Project management tasks are estimated based upon anticipated project duration of 52 weeks. Scope of Services Project Understanding The City of Sparks (City) has also requested the HDR Engineering, Inc. (HDR) provided limited shop drawing review and periodic observation during construction and

More information

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting. Number: BD-020 Title: Electronic Plan Submittal and Review Effective Keywords: Permits, Plan Review, Plan Submittal Date: April 3, 2013 Revision Date: vember 4, 2015 Approved By: Thomas Hogarth Contact

More information

SUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE

SUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE (Project) (Date) (Location) Turner Job # (TBD) Item No. 15 SUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE (Location) TURNER CONTRACT

More information

SECTION OPERATION AND MAINTENANCE DATA

SECTION OPERATION AND MAINTENANCE DATA SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information

CMW DELIVERABLES SPECIFICATION Version 1.0

CMW DELIVERABLES SPECIFICATION Version 1.0 CMW DELIVERABLES SPECIFICATION Version 1.0 Code: CMW-CADD-STD-06 June 2012 CONTENTS 1 INTRODUCTION... 3 2 GENERAL... 3 3 GRAPHIC FORMAT... 3 4 CADD STANDARDS... 3 5 DELIVERY MEDIA AND FORMAT... 4 6 DRAWING

More information

UDS OVERVIEW Uniform Drawing System

UDS OVERVIEW Uniform Drawing System UDS OVERVIEW Uniform Drawing System The Construction Specifications Institute 601 Madison Street Alexandria, VA 1994 CSI began development of UDS Organization and presentation of drawing sets Organization

More information

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Section 1 Introduction and Intersection Information State Project (SP) 6401-37 on MN Highway 14 SP 6401-37 is a Bituminous

More information

Mastering the Machine

Mastering the Machine Table of Contents 1 INTRODUCTION 3 2 CONCEPTING THE SYSTEM 3 2.1 Establishing System Requirements 4 2.2 Selecting a Method 4 2.3 Applications 5 2.4 Vendor Selection 7 3 DESIGNING THE SYSTEM AND MACHINERY

More information

Technology transactions and outsourcing deals: a practitioner s perspective. Michel Jaccard

Technology transactions and outsourcing deals: a practitioner s perspective. Michel Jaccard Technology transactions and outsourcing deals: a practitioner s perspective Michel Jaccard Overview Introduction : IT transactions specifics and outsourcing deals Typical content of an IT outsourcing agreement

More information

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD SECTION 01 10 12 DESIGN AFTER AWARD 1. DESIGN RESPONSIBILITY The Contractor shall furnish and be responsible for a complete set of design documents as called for in specification section 01 10 10 DESIGN

More information

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents. SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.

More information

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents

More information

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does

More information

Design Appendix: Throughout this document various supporting appendixes are referenced. These appendixes can be found at

Design Appendix: Throughout this document various supporting appendixes are referenced. These appendixes can be found at Aetna Information Services (AIS) http://ot.aetna.com March 16, 2016 Ver 21 Design Phase / Process This sequence of eight design weeks DW s leads the project team from project kickoff through to construction

More information

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy Version:- 1.1 Date of Issue:- Feb 2015 Page 1 of 13 NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy 1. Purpose The purpose of this document is to outline the Northern Powergrid

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS PART 1 GENERAL 1.01 REQUIREMENTS INCLUDED SECTION 01 20 00 PROJECT MEETINGS A. Construction Manager shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called

More information

NTG Technical Drawings

NTG Technical Drawings DEPARTMENT OF INFRASTRUCTURE, PLANNING AND LOGISTICS NTG Technical Drawings Part 1 Requirements for Technical Records Management Approval Sheet Title NTG Technical Drawings Part 1 Requirements for Technical

More information

2018 Consultant s Handbook Division 26 Electrical ARC Flash Hazard Analysis

2018 Consultant s Handbook Division 26 Electrical ARC Flash Hazard Analysis 1 Summary 1.1 Provide a complete Arc Flash Hazard Analysis for the project indicated in the accompanying RFP. The Analysis may be performed: independent of the construction project in concert with the

More information

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION DOCUMENT SUBMISSION For Building Permit Submittal: Applicants bring Permit Application, Digital Drawings, and Supporting Documents

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

11.0 INSTRUMENTATION LOOP DIAGRAMS

11.0 INSTRUMENTATION LOOP DIAGRAMS 11.0 INSTRUMENTATION LOOP DIAGRAMS Table of Contents 11.0 INSTRUMENTATION LOOP DIAGRAMS... 11-1 11.1 HISTORY OF CHANGE... 11-2 11.2 INSTRUMENT LOOP DIAGRAMS (ILD)... 11-4 11.2.1 Drawing Content... 11-4

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review eplan Submission Standards Building Standards February 2018 SUBMISSION STANDARDS PREPARING YOUR ELECTRONIC

More information