1 GENERAL DIRECTORATE FOR REGIONAL DEVELOPMENT PHARE FOUNDS M.I.E. IEŞIRE Nr.. Ziua 12 Luna 10 Anul 2006 To: «Companie» «Adresa» Fax: «Fax» Dear Mrs. / Mr. «Persoana_de_Contact», Circular Letter No. 1 TENDER REF: Rehabilitation of 12 School Laboratories and Workshops in the north part of the North-East Region - RO 2004/ Please find attached questions received from tenderers and their respective answers. As well, please find attached revised drawings and Bill of Quantities incorporating agreed modifications to the design of Schools 6, 27, 30 and 31 in Tender Dossier 2 (North Part of the North-East Region). The changes necessary to the Tender Dossier are listed on the following page. One original of each revised drawings is enclosed together with the modified pages from the BoQ. The latest electronic versions of the BoQ for Lot 2.1, 2.2 and Lot 2.3 are provided on floppy disk attached. These should be read in conjunction with the Tender Documents. Please confirm receipt of this letter within 3 days of receiving it, at fax: Yours faithfully, Maria Crivineanu Director General - PAO Encl: 3 page with clarifications, 2 pages table of content, 10 BoQ pages, 29 drawings, 1 floppy disk Bld. Libertatii 12, Bucuresti, sect 5, tel , fax
2 ECONOMIC AND SOCIAL COHESION PROGRAMME PHARE 2004 Project No. RO 2004/ REHABILITATION OF 12 SCHOOL LABORATORIES AND WORKSHOPS IN THE NORTH PART OF THE NORTH-EAST REGION LOTS NO 2.1, 2.2 & 2.3 QUESTIONS AND ANSWERS Workshop (Atelier): The Layout plan is missing. Please refer to 06-NE-AR-01-PR sheet 2/2 for the site layout. Workshop (Atelier): The Earthquake proofing measures plan is missing. The seismic conditions are taken into account in the structural design and shown the drawings 06-NE-ST-01 to 10. This issue is fully addressed as part of this clarification package. Please refer to the new and revised drawings for this school. Workshop (Atelier): Table for windows and door joinery is missing. Joinery schedule for the workshop is found on drawing 06-NE-AR-10-PR. Workshop (Atelier): There is a disparity between architectural drawings and building resistance drawings (building height). This issue is addressed as part of this clarification package. Please refer to the new and revised drawings for this school. Workshop (Atelier): Documentation does not comprise geotechnical survey. The geotechnical survey is not included in the Tender Dossier. All relevant data and technical memoranda will be made available to the Contractor after award of the Works contract. Workshop (Atelier): The list of quantities for structural works differs from the drawings. This issue is addressed as part of this clarification package. Please refer to the new and revised Bills of Quantities for this school. Circular_Letter01_TD02 Page 1 of 15
3 Greenhouse (Sera): Project for resistance structure is incomplete, dimensions for façade purlins and girders are not quoted. Drawing 06-NE-ST-14-PR provides a detailed description of the metallic structure including details, dimensions and references to the profiles. See also Drawings 06-NE- ST-13-PR, 06-NE-ST-15-PR and 06-NE-AR-16-PR for details. The quantity of steelwork is shown by weight in Bill No 2: Structural. A detailed list of each member, necessary for fabrication, is included in the Technical Memorandum, (Memoriu Tehnic Rezistenta) which will be made available on award of the Works contract. Greenhouse (Sera): 3 beams instead of 2 are necessary for side closings. There are 3 beams, the bottom one is at ground level and shown on Drawings 06-NE- AR-16-PR and 06-NE-ST-16-PR. Greenhouse (Sera): There are no excerpts for mill works. Please refer the answer to Q 7 above. Greenhouse (Sera): Details are missing for frame joinings. Frame will be welded. Please refer the answer to Q 7 above. Greenhouse (Sera): Details missing for purlins, fasteners, polycarbonate. The details of the polycarbonate roofing and fixings depends on which product is selected by the Contractor (subject the approval of the Engineer). The roofing system must have a K value (Coeficient transfer termic) no greater that 2.0 w/m 2 k and resist a snow load of g z =2.0 kn/m 2. With reference to Lot 2.3, School 07 Grupul Scolar, Darabani: - Foundations drawings are missing for the equipment station (remiza). Please refer to drawing 07-NE-ST-07-PR for foundation plan, roof covering plan, foundation and structural details. With reference to Lot 2.3, School 07 Grupul Scolar, Darabani: - There are no architectural plans for closings, compartment, roof covering, joinery, flooring etc for the equipment station (remiza). There are no closings, compartmentalization, joinery and flooring. The remiza is a simple concrete platform without walls and with only a metallic roof covering as shown on drawings 07-NE-AR-10-PR and 07-NE-ST-07-PR. With reference to Lot 2.3, School 07 Grupul Scolar, Darabani: - There are no excerpts for mill work. Drawing 07-NE-ST-07-PR provides a detailed description of the metallic structure including details, dimensions and references to the profiles. The quantity of steelwork is Circular_Letter01_TD02 Page 2 of 15
4 shown by weight in Bill No 2: Structural. With reference to Lot 2.1, School 27 Grupul Scolar Silvic Campulung Moldovenesc: The plans, technical specifications and the BOQ differ on the exterior plaster finish. Which is the correct solution? There is 5cm of polystyrene with plaster over it, as shown on drawing 27-RE-AR-18-pr. Please refer to the revised Bills of Quantities for this school. With reference to Lot 2.1, School 27 Grupul Scolar Silvic Campulung Moldovenesc: The plans and BOQ are unclear as to where gyp board goes on the ceiling. Gypsum board ceiling applies to all rooms/surfaces being rehabilitated, as indicated on the architectural drawings. With reference to Lot 2.1, School 27 Grupul Scolar Silvic Campulung Moldovenesc: Are the cables for the fire alarm to be apparent or buried in the plaster of the wall? The cables are to be surface mounted. Q17 With reference to Lot 2.1, School 27 Grupul Scolar Silvic Campulung Moldovenesc: The technical specifications do not include details for the heating plant or pump? The heating station is located elsewhere on the site, the scope of works for this project only applies to the connection to existing heating station where needed. The heating plant is not subject to works. Circular_Letter01_TD02 Page 3 of 15
5 ECONOMIC AND SOCIAL COHESION PROGRAMME PHARE 2004 Project No. RO 2004/ REHABILITATION OF 12 SCHOOL LABORATORIES AND WORKSHOPS IN THE NORTH PART OF THE NORTH-EAST REGION LOTS NO 2.1, 2.2 & 2.3 TENDER CLARIFICATION TENDER DOSSIER 2 AMENDMENTS TO BE ISSUED AS TENDER CLARIFICATION Volume 4: Bill of Quantities Amend Volume 4: Bill of Quantities as follows: Replace Lot 2.1: School 27, Bill 1, pages 18-19, with the attached pages. Replace Lot 2.2: School 30, Bill 2, page 20, with the attached page. Replace Lot 2.2: School 30, Bill 3, page 22, with the attached page. Replace Lot 2.2: School 31, Bill 1, page 29, with the attached page. Replace Lot 2.2: School 31, Bill 2, page 32, with the attached page. Replace Lot 2.2: School 31, Bill 5, page 40, with the attached page. Replace Lot 2.3: School 06, Bill 1, pages 17, with the attached page. Replace Lot 2.3: School 06, Bill 2, pages 18-19, with the attached pages. Volume 5: Drawings Amend Volume 5: Drawings, Lot 2.2, School 30: GRUP SCOLAR "M. BACESCU" - FALTICENI, as follows: Replace Table of Contents with revised Table of Contents attached. Replace existing drawing with revised drawing attached. Drawing Number Revision 30-RE-IE-02-pr Revision 1 Add new drawings attached. Drawing Number 30-RE-ST-01-pr 30-RE-ST-02-pr Amend Volume 5: Drawings, Lot 2.2, School 31: GRUP SCOLAR "AL. CEL BUN" - GURA HUMORULUI, as follows: Replace Table of Contents with revised Table of Contents attached. Replace existing drawings with revised drawings attached. Drawing Number Revision 31-RE-AR-16-pr Revision 1 31-RE-AR-17-pr Revision 1 31-RE-AR-21-pr Revision 1 31-RE-AR-22-pr Revision 1 31-RE-AR-23-pr Revision 1 31-RE-ST-04-pr Revision 1 31-RE-ST-05-pr Revision 1 31-RE-IE-01-pr Revision 1 31-RE-IE-02-pr Revision 1 Circular_Letter01_TD02 Page 4 of 15
6 31-RE-IT-04-pr Revision 1 31-RE-IT-05-pr Revision 1 31-RE-IS-01-pr Revision 1 31-RE-IS-03-pr Revision 1 31-RE-IS-05-pr Revision 1 Add new drawings attached. Drawing Number 31-RE-ST-12-pr 31-RE-IT-06-pr Amend Volume 5: Drawings, Lot 2.3, School 6: GRUPUL SCOLAR INDUSTRIAL "N. BALCESCU" - FLAMANZI, as follows: Replace Table of Contents with revised Table of Contents attached. Replace existing drawings with revised drawings attached. Drawing Number Revision 06-NE-ST-01-pr Revision 1 06-NE-ST-02-pr Revision 1 06-NE-ST-03-pr Revision 1 06-NE-ST-04-pr Revision 1 06-NE-ST-05-pr Revision 1 06-NE-ST-06-pr Revision 1 06-NE-ST-07-pr Revision 1 06-NE-ST-08-pr Revision 1 06-NE-ST-09-pr Revision 1 06-NE-ST-10-pr Revision 1 Circular_Letter01_TD02 Page 5 of 15
7 Circular_Letter01_TD02 Page 6 of 15
8 Circular_Letter01_TD02 Page 7 of 15
9 Circular_Letter01_TD02 Page 8 of 15
10 Circular_Letter01_TD02 Page 9 of 15
11 Circular_Letter01_TD02 Page 10 of 15
12 Circular_Letter01_TD02 Page 11 of 15
13 Circular_Letter01_TD02 Page 12 of 15
14 Circular_Letter01_TD02 Page 13 of 15
15 Circular_Letter01_TD02 Page 14 of 15
16 Circular_Letter01_TD02 Page 15 of 15
APPENDIX C APPROVAL PROCESS SUBMISSION FORMS. HCJ/LJ/B100841/JR Issue J Nov 17. Appendix C
APPENDIX C APPROVAL PROCESS SUBMISSION FORMS STEP 2A CONCEPT DESIGN SUBMISSION To: Edward Utteridge From: Bristol BS1 6AL Retailer: c.c. Piers Gorman piers.gorman@landsecurities.com Jonathan Everitt jeveritt@oriumdesign.co.uk
More informationThis specification describes the minimum requirements for structural steel drawings.
1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More informationAnswer: Only to ChurchWoods, LLC.
ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements
More informationAVEVA PDMS. Business Benefits. Accurate and clash-free 3D plant design
AVEVA PDMS Accurate and clash-free 3D plant design With ever increasing global demand for products from process and power plants, AVEVA PDMS enables companies to design, construct and maintain high quality
More informationAddendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers
Addendum to Description of Services for Building and Planning, 2012 8.4 Digital Design 2016 The Association of of Consulting Engineers FRI and DANSKE ARK Addendum to Description of Services for Building
More informationADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON
The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR
More informationEstates Development & Projects
Estates Development & Projects Production Guidelines for the Building Fabric Manual (incorporating Health & Safety File) Guidance for the Technical Author REVISION 10.2 Issue Date 09/2017 Contents Part
More informationINVITATION TO TENDER ITT / NO. PS CONSTRUCTION SERVICES FOR THE VANCOUVER SOUTH TRANSFER STATION ODOR AND DUST CONTROL SYSTEM IMPROVEMENTS
FINANCIAL SERVICES GROUP Supply Management INVITATION TO TENDER ITT / NO. PS20152055 QUESTIONS AND ANSWERS NO. 1 ISSUED ON MARCH 4, 2016 Q1 Would it be possible to schedule another site visit to allow
More informationCITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package
CITY OF RICHMOND CITY OF RICHMOND Notice of Public Opening Contract T.3263 Contract: Richmond Speed Skating Interior/ Exterior Signage Package Tenders have been issued for the Richmond Speed Skating Interior/
More informationMIX OFFICE BUILDING (N2-32) PREPARATION OF DESIGN AND EIA PROJECT BRIEF
MIX OFFICE BUILDING (N2-32) PREPARATION OF DESIGN AND EIA PROJECT BRIEF 1. INTRODUCTION The Mix Office building plot N2-32, is the first low carbon, energy efficient building to be developed in hulhumale
More informationADDENDUM No. 4 Page 1 of 8 (includes attachment)
ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J
More informationEstimaXpro. S&R Consultants
EstimaXpro S&R Consultants Contents 1. Introduction... 5 2. Masters... 7 2.1 Project Details... 7 2.2 Storey Details... 8 2.3 Joinery Details... 8 2.4 Rate types... 9 2.5 Rates... 9 2.6 Rate Analysis Type...
More informationwww.cad-designers.com Staffing Services Cad Designers is an established staffing company that specializes in providing professional support for the A/E/C industry. All candidates are screened with a complete
More informationshawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.
shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. BEBO ARCH SYSTEMS BEBO ARCH units are high quality, low maintenance precast structures
More informationAVEVA PDMS 12.0 The 3D plant design application for accurate and clash-free plant design
AVEVA PDMS 12.0 The 3D plant design application for accurate and clash-free plant design The process and power industries seek to commission high-quality plant earlier, and to bring it on line with minimum
More informationADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.
ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority
More informationHIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11
HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationINDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION
INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION I/We hereby request approval by the Architectural Review Committee for the modification shown below of Lot #: Street Address: Phone
More informationLandmarks Preservation Commission Tacoma Economic Development Department Culture and Tourism Division
Tacoma Economic Development Department Culture and Tourism Division 747 Market Street Room 1036 Tacoma WA 98402-3793 253.591.5220 APPLICATION FOR DESIGN REVIEW FOR SINGLE FAMILY RESIDENTIAL PROPERTIES
More informationTCN 01. Page No. 1 of 2 Ref: PSER:SCT:ABJ:T1178:TCN-01 Date:
TCN 01 Page No. 1 of 2 Ref: PSER:SCT:ABJ:T1178:TCN-01 Date: 21-02-2011 Sub Tender Change Notice (TCN- 01). Job Identification & Receipt of materials, Erection, Testing, Commissioning, Handing over etc
More informationFinding Aid to the Ghirardelli Square Architectural Records, No online items
http://oac.cdlib.org/findaid/ark:/13030/kt2h4nd9tp No online items Finding Aid written by Bancroft Library staff The Bancroft Library University of California, Berkeley Berkeley, California, 94720-6000
More informationThis specification describes the general requirements for Engineering Services provided to Vale.
1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred
More informationBUILDING PLANS. BUILDING DEPARTMENT
BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,
More informationRENOVATION OF THE FARMERS MARKET Reference Number:
RENOVATION OF THE FARMERS MARKET Reference Number: 13-098 A D D E N D U M NO. 1 The following shall form part of the tender documents issued by the City of Guelph s Purchasing Department, June, 2013. NOTE:
More informationWATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:
WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced
More informationStructural Design And Drawing Reinforced Concrete And
We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer, you have convenient answers with structural design and
More informationSECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More information#1 Hollister-Whitney Parkway Fax: FIELD SURVEYS
Fax: 217-222-0493 Quincy, IL 62305 e-mail: layouts@hollisterwhitney.com Phone: 217-222-0466 www.hollisterwhitney.com FIELD SURVEYS BULLETIN 1139_ FIELD SURVEYS_PUR #843_03-03-2017 Fax: 217-222-0493 Quincy,
More informationbedroom CROSS SECTION FLOOR PLAN S.F. 1 Bedroom Flat kitchen 6'-8" x 8' bath bedroom 10' X 10' FLOOR PLAN AND CROSS SECTION 1BF / 01 Gr. Lev.
0'42 3 0'- 8' 2' 2' 2-8" 0' '- 2' '- See Roof Framing Plan And Roof Anchorage Details W2 W 8" 6'-8" kitchen 6'-8" x 8' bath 6'-8"x -8" D3 2'- 2'- 2'-8" D D2 0' X 0' W 0' 0'-8" ' Steel Framed Window Gr.
More informationScope of work of Architect (as per the agreement signed by the Architect)
Annexure I Scope of work of Architect (as per the agreement signed by the Architect) 3. DETAILED SCOPE OF WORK The detailed scope of works for Architect/ Consultant shall comprise of the following for
More informationBentley speedikon V8i
Bentley speedikon V8i Overview Bentley speedikon V8i Products of the speedikon product line Bentley speedikon Industrial V8i Bentley speedikon Architectural V8i Bentley speedikon ProjectEditor V8i Bentley
More informationPROPOSED NEW ERECTION OF A COVERED LNIKWAY AND ADDITION & ALERATION TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND NORTH BRIDGE ROAD
Page 3 Our Ref : FG5131622/Corr1 Date : 09 March 2015 Tender Ref No: TG/ITT/2014/0023 PROPOSED NEW ERECTION OF A COVERED LNIKWAY AND ADDITION & ALERATION TO 2 EXISTING BUS SHELTERS AT COLEMAN STREET AND
More informationCertificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.
INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing
More informationINVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2
FINANCE, RISK AND BUSINESS PLANNING Supply Chain Management May 17, 2016 INVITATION TO TENDER ITT No. PS20160468 FIRE HALL 5 + HOUSING CONSTRUCTION ADDENDUM No. 2 and AMENDMENT No. 2 RE: Various additions
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015
ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the
More information3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?
Mobile County Public Works Residential Plan Reviewers Checklist For Structural Requirements of Wood Framed Residences Recommendation: Permit as Noted Revise Plans and Resubmit MCPW Ref. No. Design Criteria:
More informationInstallation Instructions
Installation Instructions Roof edge trim profile Series TAG multi-piece aluminium profile Front face height: 250-1050 mm supplied with patented 4F brackets as standard height-adjustable, horizontally moveable,
More informationAddendum No.2. Rehabilitation of Maqam en-nabi Musa in Jericho Governorate. 29 September 2:00 PM (Jerusalem Time)
United Nations Development Programme Programme of Assistance to the Palestinian People برنامج الا مم المتحدة الا نماي ي/ برنامج مساعدة الشعب الفلسطيني ITB-2016-205 Addendum No. 2 dated 8 September 2016
More informationGRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO
PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,
More information[Corporate Communications Department] Notice Inviting Tender
[Corporate Communications Department] Notice Inviting Tender Tender Ref: CorpComm/GreetingCardPrinting/2018 Tender Date: 22.11.2017 Last Date for Tender Submission: 28.11.2017 Balmer Lawrie & Co. Ltd.
More information***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)
DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB
More informationADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings
MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.
More informationDOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES
DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET
More informationCertificate of Appropriateness (CoA) Checklist
Certificate of Appropriateness (CoA) Checklist This Checklist is intended to assist you in preparing a complete application for submittal. Occasionally, additional items may be required to complete the
More informationProven precast solutions for every application
Proven precast solutions for every application Seventy five years of UNDISPUTED LEADERSHIP HP shell roof, bowstring girders and trussed gantry girders for L&T Bengaluru Works Larsen & Toubro is a major
More informationWESTERN POWER DISTRIBUTION
WESTERN POWER DISTRIBUTION Framework Document on cable recording techniques to be read in conjunction with other Western Power Distribution Framework Document Appendices relating to Housing and to Industrial
More informationSUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013
SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,
More informationProcurement UNDP Sudan
United Nations Development Programme REQUEST FOR QUOTATION Procurement UNDP Sudan Number: RFQ/DDR/KRT/2010/026 IMPORTANT: ALL CORRESPONDENCE MUST SHOW THE REQUEST FOR QUOTATION NUMBER NAME & ADDRESS OF
More informationNotre Dame High Addition/Renovation Addendum 3 Page 1
School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)
More informationSECTION PROJECT COORDINATION VIA BIM
SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationCan you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site
CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation
More informationSubscribe Past Issues Translate Cascade Cuts
Subscribe Past Issues Translate Cascade Cuts Spring 2019 "Beauty is everywhere a welcome guest." ~Johann Wolfgang von Goethe Ship-in-a-Bottle: Filson Flagship Seattle John Miller, co-owner of Cascade Joinery,
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More informationSubject Description Form
Subject Description Form Subject Code Subject Title Credit Value BRE222 Workshop Practices and Draftsmanship 3 Academic Credits Level 2 Pre-requisite/ Co-requisite/ Exclusion Objectives Nil 1) Provide
More informationINTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant)
SECTION 066030 EXTERIOR PVC PERGOLAS (IBC Compliant) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and other Contract Documents, listed in the agreement between the Owner and Contractor, apply to
More informationGrowSpan Series 1000 End Wall Cladding Kits
GrowSpan Series 1000 End Wall Cladding Kits 24' Wide 2017 FarmTek All Rights Reserved. Reproduction is prohibited without permission. Revision date: 02.16.17 STK# GK1EWC24120G 24' Wide (Twin Wall) Important
More informationThe CAD Technician s Role in Office Practice and Procedure
COMMERCIAL DRAFTING AND DETAILING 4TH EDITION JEFFERIS SOLUTIONS MANUAL Full download at: https://testbankreal.com/download/commercial-drafting-detailing-4th-editionjefferis-solutions-manual/ Chapter 2
More information3 Basic Code Enforcement, Part 3
Study Session 3 Basic Code Enforcement, Part 3 Technical Aspects of Code Enforcement OBJECTIVE: To become familiar with the technical aspects of code enforcement: first, by learning to recognize the basic
More informationGrowSpan Series 1000 End Wall Cladding Kits
GrowSpan Series 1000 End Wall Cladding Kits 30' Wide 2017 FarmTek All Rights Reserved. Reproduction is prohibited without permission. Revision date: 02.16.17 STK# GK1EWC30120G 30' Wide (Twin Wall) Important
More informationDeck Tutorial. Decks and Porches. Drawing Decks
Deck Tutorial The Deck Tutorial continues where the Landscaping Tutorial left off, and explains how to create a deck off the back of the house and connect it to the terrain with an exterior staircase.
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationKidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:
KidsAbility Guelph Hub Renovation ADDENDUM #2 This Addendum amends and forms part of the Bidding and Contract Documents for the above Project as follows: CLARIFICATIONS Q1. Is it possible to set up a secondary
More informationSECTION - II BID DATA SHEET
SECTION - II BID DATA SHEET Kenya Power and Lighting Company II - 1 Contract: A36 SECTION -II BID DATA SHEET The following bid-specific data for the plant and equipment to be procured shall amend and/or
More informationDIY SHED GUIDE Planning your Project I Simple Illustrations I Hints
Easy Step by Step Guide DIY SHED GUIDE Planning your Project I Simple Illustrations I Hints TIMBERLINK. MADE OF TASMANIA. DIY Shed Guide Timberlink Green Outdoor Structural Range Timberlink Green Outdoor
More informationPRECAST CONCRETE STRUCTURES
PRECAST CONCRETE STRUCTURES 1. INTRODUCTION The concept of precast (also known as prefabricated ) construction includes those buildings, where the majority of structural components are standardized and
More informationCONVEYANCE PIPELINE AND PUMP STATION
SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station
More informationDrawing Standards & Conventions for IDD
Drawing Standards & Conventions for IDD This document consists of a set of standards that have been developed to maintain a consistency in Interior Decoration and Design students work. The standards are
More informationADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016
ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620
More informationCOMPILATION OF TENDER DOCUMENTS
COMPILATION OF TENDER DOCUMENTS Arc. Ibrahim A. Haruna, FNIA, PNIA, mni. -the familiar question!- Mr. Architect, after these your beautiful drawings, what next? ARCHITECT S PROCEDURE: -drawing board to
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationState College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationHOLLOW METAL DOOR/WINDOW SYSTEM FOR THERMALSAFE CF WALLS WINDOW ASEMBLY GUIDE PIONEERING INSULATED METAL PANEL TECHNOLOGY
HOLLOW METAL DOOR/WINDOW SYSTEM FOR THERMALSAFE CF WALLS WINDOW ASEMBLY GUIDE PIONEERING INSULATED METAL PANEL TECHNOLOGY PIONEERING INSULATED METAL PANEL TECHNOLOGY TABLE OF CONTENTS DETAIL TITLE PAGE
More informationDESIGNING YOUR BARN. Ridgway F. Shinn, III. 272 Fleming Road Hardwick, Massachusetts
DESIGNING YOUR BARN Ridgway F. Shinn, III Published in the United States of America Hardwick Post and Beam Hardwick, MA 01037 Copyright Hardwick Post and Beam, Corp. 2017 Designing your barn We can design
More informationCHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS
CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS The Commission on Chicago Landmarks reviews all permit applications for work to designated and proposed Chicago Landmarks and
More informationSECTION LIGHTING PART 1- GENERAL
SECTION 16500 LIGHTING PART 1- GENERAL 1.01 WORK INCLUDED A. The Contractor shall provide all lighting fixtures, panelboards, labor, material, etc., in accordance with the preceding specifications, the
More informationSUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS
SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS SEAC/ RMSCA Steel Liaison Committee May 17, 2006 Disclaimer SEAC, RMSCA, nor its committees, writers, editors and individuals who have
More informationTotal Precast Concrete Structures
Total Precast Concrete Structures 1 This program is registered with CPCI for continuing professional education. CPCI s continuing-education program emphasizes on learning for architects, engineers and
More informationPROCUREMENT SERVICES th St, SW Calgary, AB T2R 0L4 Telephone: (403) Fax: (403)
TENDER ADDENDUM PROCUREMENT SERVICES 1221 8 th St, SW Calgary, AB T2R 0L4 Telephone: (403) 817-7495 Fax: (403) 777-6008 Proposal No: 2017TEN754 Covering: DR. G. M. EGBERT SCHOOL VARIOUS UPGRADES Addendum
More informationListed below are the competencies required and examples from the aforementioned job:
1. Technical Analysis Instructions: Describe a project for which you collected and interpreted or analyzed technical data for development of engineering designs and drawings from concepts and specifications.
More informationEntry Level Assessment Blueprint Architectural Drafting
Entry Level Assessment Blueprint Architectural Drafting Test Code: 4004 / Version: 01 Specific Competencies and Skills Tested in this Assessment: Preparing to Draw Identify drafting tools, materials, and
More informationA GUIDE TO APPLYING FOR A BUILDING PERMIT FOR A DETACHED GARAGE OR ACCESSORY BUILDING
January, 2013 BUILDING DIVISION A GUIDE TO APPLYING FOR A BUILDING PERMIT FOR A DETACHED GARAGE OR ACCESSORY BUILDING This bulletin is for general guidance only. It does not replace by-laws or other legal
More informationHOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES
HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES Grenville W Phillips II BSc, BEng, MASc, MURP, CEng, FIStructE, FCIHT, MAPM, MCSCE, MBAPE Chartered
More informationClopay Models 835/837 Sliding Door System Installation Guide
Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationDESIGN REVIEW PROCESS AND APPLICATION
DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring
More informationStrands & Standards CARPENTRY 2
Strands & Standards CARPENTRY 2 COURSE DESCRIPTION This is the second in a sequence of courses that prepares individuals to layout, fabricate, erect, install, and repair wooden structures and fixtures
More informationTCN Ref: PSER:SCT:RKL-M1797:TCN-03 Date:
TN - 03 Ref: PSER:ST:RKL-M1797:TN-03 Date: 20-02-2017 Sub Tender hange Notice (TN) - 03 Job Design, Engineering, Manufacturing, Supply, Erection, Testing, ommissioning, Etc Of Air onditioning System For
More informationCITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION
CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION Christine S. Primiano, Principal Planner Room 14, City Hall, Jay Street SCHENECTADY, NY 12305-1938 518.382.5147 cprimiano@schenectadyny.gov www.cityofschenectady.com
More informationSpec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN
SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary
More informationTOWN OF GRAND FALLS-WINDSOR TENDER FOR SUPPLY OF BRONZE PLAQUES MEMORIAL GROUNDS CENOTAPH TENDER #
TOWN OF GRAND FALLS-WINDSOR TENDER FOR SUPPLY OF BRONZE PLAQUES MEMORIAL GROUNDS CENOTAPH TENDER #16010601 General Conditions 1. All taxes must be included. 2. Tenders which are incomplete, conditional,
More informationFebruary 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida
February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following
More informationCHENNAI METRO RAIL LIMITED CHENNAI ADDENDUM-01
Chennai - 600 107 for Chennai metro Rail Limited, Chennai". Sl.No Tender clause Original Tender Condition AMENDMENT CLAUSE-2: Part-Tenderer should have satisfactorily completed interior works A, Qualifying
More informationA Shell construction
A Shell construction A 4/2012 Content 1 BASE AND WALL ANCHORING 1.1 Base with mortar bed 1.2 Base with sill plate 1.3 Base with raised sill plate 1.4 Concrete base (mortar bed) 1.5 Concrete base (sill
More information2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ
1 Rafter Size Spacing Allowable span 24" 11'-9" 24" 2x6 14'-1" 2x4 12" 15'-6" 12" 24" 14'-10" 24" 2x8 18'-2" 2x6 12" 20'-5" 12" 24" 18'-2" 24" 2x10 22'-3" 2x8 12" 25'-8" 12" 24" 21'-0" 24" 2x12 25'-9"
More informationPrequalification Tender Notice No.: 04/IIA/CIVIL/TMT/PQ/ Dated 11/09/2015
INDIAN INSTITUTE OF ASTROPHYSICS (IIA) KORAMANGALA, BANGALORE-560034 Request for Prequalification of contractors for Construction of TMT-Optics Fabrication Facility at CREST campus, IIA, Hosakote, Bangalore
More informationType of system: fully automated operation
Type of system: fully automated operation Element types Pivotable end panel: Standard element: Door with frame: Fully automated drive and locking. Fully automated travel With an integrated door closer
More information