MIX OFFICE BUILDING (N2-32) PREPARATION OF DESIGN AND EIA PROJECT BRIEF
|
|
- Emery Banks
- 5 years ago
- Views:
Transcription
1 MIX OFFICE BUILDING (N2-32) PREPARATION OF DESIGN AND EIA PROJECT BRIEF 1. INTRODUCTION The Mix Office building plot N2-32, is the first low carbon, energy efficient building to be developed in hulhumale located in the heart of Hulhumale phase 1, near the Central Park. The building is to become an iconic institutional development. 2. PROJECT DETAILS 2.1 Plot Area: 940 sqm (10,118 sqft) 2.2 Foot print: 737 sqm (7,933 sqft) 2.3 Gross Floor Area: 7,683 sqm (82,699) 2.4 Height: 37m (10 stories) 3. SCOPE OF WORK The project is designing as an energy efficient, contemporary office building with green sustainable strategies. The designer is expected to obtain the necessary consultancy from the relevant parties during the course of design stage to incorporate green sustainable strategies into the design. Following are the features that the Employer requires the Designer to explore within the course of the design, however the Designer will have the flexibility to decide and recommend the most relevant and cost effective features to this building; 3.1 Green strategies Rainwater harvesting system Solar/PV cells sufficient to power common areas Vertical roof gardens at the different levels (with specially engineered Mix-Office Building Design and EIA Project Brief Planning & Development Department, Housing Development Corporation Ltd, Tel: , Fax: , 1
2 slabs) Central AC system (OR) Water chill system Energy efficient cladding (E.g. Low E, tinted glass) Sun screen louvre system of exterior walls (Where required) Natural light and ventilation The employer will propose a basic concept design. The designer shall not deviate his detail from this concept by the employer, however can propose methods in detail design to improve the project. (Please find attached concept drawings for further details). Employer will provide the support to give clarification to any queries which the designer would require at any stage. The designer is required to submit a work schedule indicating the important milestones of Design Stage considering the review period (Feedback period) within two days of signining the contract. Please find below the Required documents. With the submission of Required documents, the Employer would provide the necessary feedback. In giving feedbacks we would check whether if it fits the design guidelines, function, aesthetics, materials, façade etc. and a two way dialogue attain satisfactory level of work. The designer shall complete the Required documents in the order given 3.1 Required documents. The time of completion for the project shall be maximum 90 calendar days from which within the first 15 days designer has to submit documents to under 3.1 Required documents Please note that these documents should be designed and presented in a way which. Designer has to submit the documents to within the next 55 days. For the remaining 20 days the designer can submit the remaining document , The project is only deemed to be completed when the Employer has issued the approval for all Required Documents. Designer should accommodate for the review period after submission and attend to any corrections or supplementary documents if required by the Employer. However please note that this will not change the time of completion of project. Mix-Office Building Design and EIA Project Brief Planning & Development Department, Housing Development Corporation Ltd, Tel: , Fax: , planning@hdc.com.mv 2
3 3.2 Required Documents Basic Architectural Drawings (Floor plans, Sections, Elevations, Exterior and interior material finishes) D rendered floor plans for each floor highlighting unit type and area exterior 3D renders interior 3D renders Detailed Architectural Drawings & Structural drawings Material schedule(in MS Word & PDF Format) Design Specifications (In MS Word & PDF Format) Services drawings Plumbing drawings (referring to the latest MWSC guidelines) Electical drawings (referring to the latest STELCO guidelines) Fire (approved as per the latest MNDF fire guidelines) Landscaping Details design Environmental Impact Assessment Report Structural calculations protection method inspection report Bill of quantities both priced and unpriced (In MS Excel & PDF format) Final exterior and interior render as per the final detail drawings D walkthrough animation/video Please note that the designer can start preparation of Environment impact assessment and (E.I.A) send for approval to the relevant authorities for approval once the documents to has been approved by the employer. For any further information, please refer to the attached guideline/concept drawings for further details Mix-Office Building Design and EIA Project Brief Planning & Development Department, Housing Development Corporation Ltd, Tel: , Fax: , planning@hdc.com.mv 3
4
5 HDC Building Mini Mall Mix Office Building N2 Mosque PROJECT:N2-32 MIX OFFICE BUILDING DRAWING:LOCATION PLAN PLANNING AND DEVELOPMENT DEPARTMENT
6 PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: SITE PLAN PLANNING AND DEVELOPMENT DEPARTME
7 PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: GROUND FLOOR PLANNING AND DEVELOPMENT DEPARTMENT
8 PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: FIRST FLOOR PLANNING AND DEVELOPMENT DEPARTME
9 PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: SECOND FLOOR PLANNING AND DEVELOPMENT DEPARTME
10 OPTION 1 OPTION 2 PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: THIRD FLOOR PLANNING AND DEVELOPMENT DEPARTMENT
11 PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: FOURTH TO NINTH FLOOR PLANNING AND DEVELOPMENT DEPARTMENT
12 PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: TENTH FLOOR PLAN PLANNING AND DEVELOPMENT DEPARTMENT
13 PROJECT:N2-32 MIX OFFICE BUILDING DRAWING:ROOF PLAN PLANNING AND DEVELOPMENT DEPARTME
14
15
16
Last Name: First Name: M.I:
ARCHITECTURE DESIGN REVIEW BOARD APPLICATION OFFICE USE ONLY APPLICATION # Permit # Fee Collected $ 1. Filing Status Initial Submission Amendment Withdrawal 2. Cost of Construction (Industry Standards)
More information2018 Conference Theme Imagine the Future"
2017-2018 ADDA Design Drafting Contest General Rules Instructor to submit entries per the directions listed below.. 51 st Annual Design Drafting Contest Entry Information 2018 Conference Theme Imagine
More informationCertificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.
INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing
More informationOver-the-Rhine Historic District New Construction Guidelines Competition: The Challenge to elevate new build design in OTR to national recognition.
Over-the-Rhine Historic District New Construction Guidelines Competition: The Challenge to elevate new build design in OTR to national recognition. 1. Brief: Over the Rhine Foundation Infill Committee
More informationPITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION
PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION DOCUMENT SUBMISSION For Building Permit Submittal: Applicants bring Permit Application, Digital Drawings, and Supporting Documents
More informationAddendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers
Addendum to Description of Services for Building and Planning, 2012 8.4 Digital Design 2016 The Association of of Consulting Engineers FRI and DANSKE ARK Addendum to Description of Services for Building
More informationFIT-OUT PERMIT REQUEST (GENERAL WORKS)
Dubai Maritime City P.O. Box 8988 Dubai, UAE T +97143450626 F +97143450116 www.dubaimaritimecity.com FIT-OUT PERMIT REQUEST (GENERAL WORKS) PROJECT DETAILS Project Name: Plot Number: TENANT DETAILS Contact
More informationArchitectural Review Board Application For Modifications & Renovations
4110 Club Course Drive ~ N. Charleston, SC 29420 Phone: 843-767-9000 ext. 223 Fax: 843-207-7438 poaofficemanager@coosawcreek.com Architectural Review Board Application For Modifications & Renovations Homeowners
More informationNiguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION
Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION / / Date Received by NSCA Office / / Submittal Expiration Date Owner s Name: Tract:
More informationAPPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT
209 South Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT *** IMPORTANT
More informationArchitectural Review Application
Architectural Review Application City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 Tel. (310) 285 1141 Fax. (310) 858 5966 Architectural Review Overview: The Architectural
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More informationMailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:
/ Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax
More information5.7 Plan Documentation and Supporting Information.
5.7 and Supporting Information. In any case where the and Supporting Information for a Development Plan requires the submission of a Site Plan, Overall Plan, Landscape Plan, Building Elevations, Sign Plan
More informationIMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION
IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION This Page Intentionally Left Blank Date Received Receipt Number Approved Date Date: Zoning: Intended Use of Structure: Home
More informationProject 01: Infill Office Building Precast Concrete
Project 01: Infill Office Building Precast Concrete NAAB Criteria: A- Life-safety and accessibility Ability to design sites, facilities, and systems to provide independent and integrated use by individuals
More informationDesign Deliverables. Summary. A. Expectations for Design Deliverables:
Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations
More informationREVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty
HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to
More informationArchitectural Floor Plan Symbols
Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section
More informationDESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN
209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN *** IMPORTANT INFORMATION Please
More informationINDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION
INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION I/We hereby request approval by the Architectural Review Committee for the modification shown below of Lot #: Street Address: Phone
More informationCielito Lindo de Tubac Home Owners Association PAINTING POLICIES AND PROCEDURES
Cielito Lindo de Tubac Home Owners Association PAINTING POLICIES AND PROCEDURES The CC&Rs for Cielito Lindo de Tubac HOA address exterior repainting only briefly under Article 3.1(A), (B) and (E). As this
More informationLandmarks Preservation Commission Tacoma Economic Development Department Culture and Tourism Division
Tacoma Economic Development Department Culture and Tourism Division 747 Market Street Room 1036 Tacoma WA 98402-3793 253.591.5220 APPLICATION FOR DESIGN REVIEW FOR SINGLE FAMILY RESIDENTIAL PROPERTIES
More informationThe GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.
Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer
More informationArchitectural Design Process
Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation
More informationCompany. Signed: Date:
ADDENDUM No. 1 For: Please acknowledge receipt of this Addendum No. 1 Sign and return by fax to 856-424-1688: Company Signed: BURLINGTON TOWNSHIP BOARD OF EDUCATION RENOVATIONS TO B, C & H WING GANG TOILET
More informationPromontory Architectural Review Committee
Promontory Architectural Review Committee Design Review Application Purpose The Design Review Process and Application have been established to insure that a proposed project is compatible with historical,
More informationExhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule
Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample
More informationDimension Below are the critical settings in AutoCAD. Other software should follow the same settings.
8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff
More informationMULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST
MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be
More informationSimonson Design Lab, Inc. Design Agreement
2016-2017 Simonson Design Lab, Inc. The Terms Consultation Time: The time you spend working directly with a designer either with or without your builder. We highly recommend you use the A Guide to Designing
More informationBIM/VDC on TAA Projects:
2018 Logan International Airport BIM/VDC on TAA Projects: Direct Tenant TAA Projects Third Party Development Properties Massachusetts Port Authority Capital Programs & Environmental Affairs Preface Massport
More informationDOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES
DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET
More informationDeveloper Design Review Submittal Requirements - SECTION 5
Developer Design Review Submittal Requirements - SECTION 5 5.0 Developer Design Review 1.0 Procedures for Submittals - All Housing Types 1. Submittals shall be by the Guest Builder or authorized agent
More informationTri-County Commercial Application Checklist
TRI-COUNTY SERVICE CENTER TRI-COUNTY SERVICE CENTER State of Oregon Clackamas Multnomah Washington C O U N T I E S Tri-County Commercial Application Checklist Department of Consumer & Business Services
More informationParticipants are limited to one (1) team, or one (1) individual, per chapter; one (1) entry per team or individual.
ARCHITECTURAL DESIGN OVERVIEW Participants develop a set of architectural plans and related materials in response to an annual architectural design challenge and construct a physical, as well as a computer-generated
More informationState College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationCHAPTER 5 ARCHITECTURE
CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1
More informationTenant Design Criteria Section k Kiosk Design Criteria Updated: September 2013
5220 Rose Street, Rosemont, IL 60018 FASHION OUTLETS OF 2011 All ideas, arrangements, and plans indicated or represented by the above drawings are property of ka, Inc. and were created for the sole use
More information2018 Design Competition Frequently Asked Questions. Q: Are teams allowed to register in more than one category of the competition?
2018 Design Competition Frequently Asked Questions Q: Are teams allowed to register in more than one category of the competition? Q: How many students can participate in a team? A: There is no max for
More informationCertificate of Appropriateness (CoA) Checklist
Certificate of Appropriateness (CoA) Checklist This Checklist is intended to assist you in preparing a complete application for submittal. Occasionally, additional items may be required to complete the
More informationARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION
For Office Use Only Date Received: Approved: ARC Non-Refundable Fees ARC Refundable Deposit Pd: For Office Use Only Plat Name: Lot # Street Address: New Construction Alteration Preliminary Final ARCHITECTURAL
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING
INFORMATION BULLETIN / PUBLIC - GENERAL INFORMATION REFERENCE NO.: Effective: 10-01-99 DOCUMENT NO. P/GI 2002-008 Revised: 11-01-02 Previously Issued As: IB ST-4 DOCUMENT SUBMITTAL REQUIREMENTS FOR AN
More informationNON-RESIDENTIAL DEVELOPMENT
GENERAL REQUIREMENTS (Print or Type) Name of Proposed Project: Location of Project: Legal Description of Project (Assessor s Parcel No. or T, R,S): Staff Use Only FILE NO.: RELATED FILES: Applicant s Name:
More informationStanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines
SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationSECTION PROJECT COORDINATION VIA BIM
SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationRequired Supporting Information and Documentation for Historic Preservation Certification Applications
Required Supporting Information and Documentation for Historic Preservation Certification Applications Part 1 Submittal- Evaluation of Significance Descriptive Information Describe the major features of
More informationArchitectural Drafting
Measuring What Matters in Job Ready Assessment Blueprint Architectural Drafting Test Code: 4004 / Version: 01 Copyright 2012 General Assessment Information Blueprint Contents General Assessment Information
More informationEntry Level Assessment Blueprint Architectural Drafting
Entry Level Assessment Blueprint Architectural Drafting Test Code: 4004 / Version: 01 Specific Competencies and Skills Tested in this Assessment: Preparing to Draw Identify drafting tools, materials, and
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More informationArchitect. Architect.
The The line line sketch sketch with with modified modified height height for for plinth plinth floor floor is is displayed. displayed. Open Open Architectural Architectural plan plan file, file, which
More information3 Basic Code Enforcement, Part 3
Study Session 3 Basic Code Enforcement, Part 3 Technical Aspects of Code Enforcement OBJECTIVE: To become familiar with the technical aspects of code enforcement: first, by learning to recognize the basic
More informationListed below are the competencies required and examples from the aforementioned job:
1. Technical Analysis Instructions: Describe a project for which you collected and interpreted or analyzed technical data for development of engineering designs and drawings from concepts and specifications.
More informationSIGN PERMIT APPLICATION
SIGN PERMIT APPLICATION City of Hawaiian Gardens Community Development Department 21815 Pioneer Boulevard, Hawaiian Gardens, CA 90716 Ph: (562) 420-2641 Fax: (562) 420-8521 www.hgcity.org Please complete
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING
INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY
More informationCITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET
CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES
More informationEnvironmental Design. Floor Plan. Planometric Drawing. Target Audience. Media. Materials
Environmental Design The design of large-scale aspects of the environment by means of architecture, interior design, way-finding, landscape architecture, etc. Floor Plan A scale diagram of the arrangement
More informationDESIGN REVIEW PROCESS AND APPLICATION
DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring
More informationUPDATE TO ARCOM SUBMITTAL REQUIREMENTS - JULY 2018
UPDATE TO ARCOM SUBMITTAL REQUIREMENTS - JULY 2018 Please note that for all ARCOM submittals, the following must be included in your application, record and presentation files/folders: Dimensioned details
More informationNew Denver, BC FEASIBILITY REPORT OCTOBER 2018 BOSUN HALL. p f
BOSUN HALL New Denver, BC FEASIBILITY REPORT OCTOBER 2018 www.coverac.ca p. 250.354.4445 f. 250.352.0017 OVERVIEW Bosun Hall is the heart of New Denver community life, and provide space for events such
More informationJAZZ DESIGNS. Looking for a designer that understands you and your market? B U I L D I N G D E S I G N E R S
RESIDENTIAL DESIGN COMMERCIAL DESIGN URBAN DESIGN INTERIOR DESIGN JAZZ DESIGNS IS A PROGRESSIVE AND INNOVATIVE BUILDING DESIGN FIRM THAT IS COMMITTED TO PROVIDING ITS CLIENTS WITH A HIGH STANDARD OF BUILD
More informationEXECUTIVE SUMMARY of DESIGN REVIEW
EXECUTIVE SUMMARY of DESIGN REVIEW 1 - REVISIONING PROMONTORY From its inception, Promontory has focused on creating a premier community which blends the natural beauty of its mountain setting with excellence
More informationContents OVERVIEW INTRODUCTION TO CHIEF ARCHITECT GETTING READY TO DRAW QUICK START VACATION CABIN: FLOOR PLAN. How this Book is Put Together
Contents OVERVIEW How this Book is Put Together Conventions Icon Key Files on the Website INTRODUCTION TO CHIEF ARCHITECT The Chief Architect Interface Working with the Toolbars Chief Architect s Views
More informationSPARTAN DAY CAMP 4814 FREEDOM RING RD
484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS
More informationAssignment 1.5 Pre-Design Base Building Model Investment Bank ARCH 5901 Instructor: Glenn Hill Fall 2013
Assignment 1.5 Pre-Design Base Building Model Investment Bank ARCH 5901 Instructor: Glenn Hill Fall 2013 TASK: Develop a 3d digital model of a Pre-Design Base Building for a typical Bank Building using
More informationNational Association of Women in Construction Education Foundation CADIDESIGNIDRAFTING COMPETITION HIGH SCHOOL STUDENTS
National Association of Women in Construction Education Foundation CADIDESIGNIDRAFTING COMPETITION HIGH SCHOOL STUDENTS DESIGN PROBLEM AND PROJECT DESCRIPTION I. PROJECT DESCRIPTION The design problem
More informationELECTRONIC DRAFTING GUIDELINES
ELECTRONIC DRAFTING GUIDELINES Edition No. 6 Updated November 2016 TABLE OF CONTENTS Section Title Page 1 Definitions 3 2 Drawing Format 3 2.1 Standards & Guidelines 3 2.2 Survey Plans 4 2.3 Underground
More informationRezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation
Development Permit Application Rezoning/OCP Amendment Application Zoning DP Area yes no Variances Requested Development Details Property Size (m² or ha) Current Zoning Current OCP Designation Proposed
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationWindmill Village Homeowners Association
Windmill Village Homeowners Association Rules & Design Guidelines Windmill Village Homeowners Association P.O. Box 5720 Mesa, AZ 85211 APPLICATION PROCEDURE Submittal Application and plans (which will
More informationThis Call for Qualifications does not require the preparation of a design proposal.
EDMS# 211137 I. Introduction This Call for Qualifications invites professional artists, or artist team, to participate in a two-stage selection process to develop an original, public art work for Port
More informationCHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS
CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS The Commission on Chicago Landmarks reviews all permit applications for work to designated and proposed Chicago Landmarks and
More informationGENERAL REQUIREMENTS (Print or Type) PROJECT DESCRIPTION OWNER CERTIFICATION
GENERAL REQUIREMENTS (Print or Type) Name of Proposed Project: Location of Project: Legal Description of Project (Assessor s Parcel No. or T, R S,): Staff Use Only CASE NO.: RELATED FILES: Applicant s
More informationNEW SINGLE FAMILY HOMES
NEW SINGLE FAMILY HOMES Your submission must include the following to be accepted as a complete application: 1 copy of the deed and / or purchase and sales agreement if you have owned the property less
More informationScope of work of Architect (as per the agreement signed by the Architect)
Annexure I Scope of work of Architect (as per the agreement signed by the Architect) 3. DETAILED SCOPE OF WORK The detailed scope of works for Architect/ Consultant shall comprise of the following for
More informationMajor Requirements Code Title Credits Description. 4 Interior Design Studio III
School Major School of Arts & Science Major Requirements IDES495 IDES480 IDES445 IDES40 IDES420 IDES400 IDES94 Senior Project Professional Practice Studio III Computer Rendering for Landscape Architectural
More informationBRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB
BRYANT HERITAGE PLAZA, AB RE-ISSUED FOR BUILDING PERMIT May 9, 206 L I S T O F D R A W I N G S HD ENGINEERING SERVICES LTD. D.B.K. ENGINEERING LTD. D.B.K. ENGINEERING LTD. JUBILEE ENGINEERING CONSULTANTS
More informationTYPICAL PATIO COVERS. OWNER: ADDRESS: PHONE:
City of Aliso Viejo Building Division 12 Journey, Suite 100 Aliso Viejo, CA 92656 (949)425-2540 Fax (949)425-3899 www.cityofalisoviejo.com TYPICAL PATIO COVERS 111 I. GENERAL Patio covers are one-story,
More informationB. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.
McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT
More informationAttachment A HERON RIDGE ESTATES RESIDENTIAL NEIGHBORHOODS PROCEDURE FOR OBTAINING DESIGN COMMITTEE APPROVAL
Attachment A HERON RIDGE ESTATES RESIDENTIAL NEIGHBORHOODS PROCEDURE FOR OBTAINING DESIGN COMMITTEE APPROVAL 1. Submittal of one set of preliminary or construction documents as outlined on the following
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationArchicad Layout of Drawings
Archicad Layout of Drawings NOTE: It is important that house features (Walls, Cabinets, Floors, etc.) Have been placed on the proper layer and layer combination for ease of transferring your final drawings
More informationElectronic Plan Review. City of Mesquite, TX. eplan Review Standards Document
Electronic Plan Review City of Mesquite, TX eplan Review Standards Document Contents Document Control... Error! Bookmark not defined. Document Contacts... Error! Bookmark not defined. eplan Review Standards...
More information752 ST. MARYS RD. LAFAYETTE, CA. PROJECT DATA FLOOR AREA
FLOOR AREAS 1ST. FLOOR LIVING AREA 2ND. FLOOR LIVING AREA TOTAL LIVING GARAGE TOTAL PROPOSED GROSS FLOOR AREA PROPOSED CUT PROPOSED FILL 3,686 SQ.FT 1,668 SQ.FT 5,354 SQ.FT 875 SQ.FT. 6,229 SQ.FT. 420
More informationChuck Caesar. VIA: /Webposting April 27, 2017
VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John
More informationARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION
For Office Use Only Date Received: Approved: ARC Non-Refundable Fees: ARC Refundable Deposit Pd: For Office Use Only Plat Name: Lot # Street Address: New Construction Alteration Preliminary Final ARCHITECTURAL
More informationA GUIDE TO APPLYING FOR A BUILDING PERMIT FOR A DETACHED GARAGE OR ACCESSORY BUILDING
January, 2013 BUILDING DIVISION A GUIDE TO APPLYING FOR A BUILDING PERMIT FOR A DETACHED GARAGE OR ACCESSORY BUILDING This bulletin is for general guidance only. It does not replace by-laws or other legal
More informationBuilding Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review
Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review eplan Submission Standards Building Standards February 2018 SUBMISSION STANDARDS PREPARING YOUR ELECTRONIC
More informationSANTA MONICA BOULEVARD BEVERLY HILLS OWNER: 9908 SANTA MONICA BLVD., LLC SAN VICENTE BLVD. SUITE 550
BEVERLY HILLS OWNER: 777 SAN VICENTE BLVD. 550 SHEET INDEX: A-000.00 A-00.00 A-00.00 A-003.00 A-004.00 A-005.00 A-006.00 A-007.00 A-080.00 A-090.00 A-00.00 A-0.00 A-0.00 A-30.00 A-40.00 A-50.00 A-00.00
More informationBDT119 Carpentry Basics
BDT119 Carpentry Basics Course Information Credits 4 Campus Washburn Institute of Technology Address 5724 SW Huntoon City/State/Zip Topeka, Kansas 66604 Office Fax 785-273-7080 Description The intent of
More informationA-308 SITE 75A. Gensler 2020 K Street, Northwest Suite 200 Washington DC Telephone Facsimile
Telephone 0.7.500 //0 06-G/06-G EXTERIOR RENDERINGS A-08 0 NOTE: SIGNAGE SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. STREETSCAPE DETAILS ARE SHOWN IN CONCEPT FOR ILLUSTRATIVE PURPOSES. THE FINAL DETAILS OF THE
More informationCOVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS
TWO-STORY DUPLEX UNIT ONE (WILLOW): THREE BEDROOM, TWO BATH UNIT TWO (FIR): TWO BEDROOMS, ONE AND ONE-HALF BATH - 2012 INTERNATIONAL RESIDENTIAL CODE - CITY OF BRECKENRIDGE MUNICIPLE CODE 1. ALL WORK SHALL
More informationAPPLICATION FOR SITE PLAN REVIEW
APPLICATION FOR SITE PLAN REVIEW ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fees (Nonrefundable) $ Arch.: $ (772) 871-5212 FAX: (772) 871-5124
More informationtechnologically advanced residential design software
technologically advanced residential design software Why SoftPlan remodel? For over thirty years, SoftPlan has delivered the most complete design solution available by listening to our customers and creating
More informationPublic Call to Artists for Expressions of Interest Newton Recreation Centre Glass Curtain Wall Design for glass frit application
Public Call to Artists for Expressions of Interest Newton Recreation Centre Glass Curtain Wall Design for glass frit application Goal: an image and metaphor that represents: Weaving Communities Together
More informationCOURSE OUTLINE. Course Number Course Title Credits. Co- or Pre-requisite BCT110 Construction Materials & Methods
COURSE OUTLINE Course Number Course Title Credits BCT101 Construction Graphics 3 Hours: 2 Lecture 2 Studio/Lab, Co- or Pre-requisite BCT110 Construction Materials & Methods Implementation sem/year Fall
More informationNorth West Facilities Ltd Gaerwen Industrial Estate Gaerwen Isle of Anglesey LL60-6HR Tel: Fax: Mobile:
North West Facilities Ltd 17-18 Gaerwen Industrial Estate Gaerwen Isle of Anglesey LL60-6HR Tel: 01248-422555 Fax: 01248-422556 Mobile: 07891-557581 Project/Contract Second fix Joinery Principle Contractor
More informationTelecommunication Application Form
Page 1 of 5 Fees Total Fee $1130.00 Processing Fee $330.00 *Advertising Deposit $800.00 *Where costs differ from the deposit, the balance will be charged or refunded to the applicant. Description of proposed
More informationBritish Club Renovation, Bangkok, Thailand Proposal for Full Scope Architectural & Engineering Services Submission Date:
INTERNATIONAL ARCHITECTS MASTERPLANNERS DESIGNERS British Club Renovation, Bangkok, Thailand Proposal for Full Scope Architectural & Engineering Services Submission Date: 21.07.2016 Att: Ali Adam Chapman
More information