1 CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site At the pre-bid job walk on onday, June, 0, Ron Christenson indicated that REVISED drawings would be issued on Thursday, June. No; a single addendum answering questions and adding additional scope information is being prepared, to be issued about one week before G s are due. lease confirm that drawings will be issued. See Above If revised drawings will be issued can you indicate what changes will be included? Addendum will have written description of what is included If new drawings are going to be issued will additional time be allowed for the completion of our proposals? TBD Also at the pre-bid, it was indicated that we would be able to submit our proposal electronically. lease confirm if this is true. YES If it is true, please provide the addresses that should be used for the electronic submittal. Geer, Blaine Blaine.Geer@ccmh.net Ted Zontelli ted@christensoncorporation.com It is our understanding that the project site previously had structures on it. lease indicate to what extent the previously demolished buildings were removed? Additional information to be provided Are foundations still in place? Additional information to be provided Are existing utility lines still in place? Additional information to be provided Will the design fees provided by antz Boggio include Contract Administration fees? YES lease indicate what the last day for questions will be. TBD Also please indicate if a formal addendum will be issued and if so, when it will be issued. A single addendum answering questions and adding additional scope information is being prepared, to be issued about one week before G s are due Is it possible for you to provide the AutoCAD Civil Drawings for our earthwork subcontractors to use for their quantity take-offs? TBD with Civil Engineer
2 lease provide clarification for the foundation system for the building. The specifications include sections for Engineered Aggregate iers and Drilled Concrete iers. Sheet S-00 indicates FOUNDATION ATERNATIVES; these include Engineered Aggregate iers and Driven H iles. Sheet indicates that the footings are placed on aggregate piers. lease indicate which system should be used for the basis of the design. Engineered Aggregate iers for a basis, however alternatives are encouraged There is a emory Care wing indicated on the drawings. Will there be a requirement for a Wanderguard type system? If so will it be provided by the General Contractor or the Owner? Also, is there any rough-in required by the General Contractor? For purposes of the G process, assume Owner will be providing the Wanderguard system through a third party vendor. General Contractors are to include costs for reasonable coordination between vendor to other building systems provided under the General s scope of work. Questions from Sampson Construction, June, 0 Can you provide information concerning the elevations of the proposed utilities and services coming into the site? ost demolition survey is being completed but may not be available prior to submittal date. Contractors to make reasonable assumptions regarding invert elevations. Who is responsible for the entrance signs on Sheet C-.0? If GC is responsible can we get some details on size, footings (etc.). All General s to provide an allowance of $0,000 for the construction of main entry signage elements Can you provide specifications for the block retaining walls shown on sheet C-.0? Intent is for the block site walls to be a stackable, interlocking architectural block with both color and texture. Can you provide information on the decorative fencing shown on Sheet C-.0? Fence to be a high black ornamental metal picket fence with verticals at on centers and minimum x posts at max Can you provide information on the existing construction of the gazebo that will be relocated from the existing facility? Owner to be responsible for the relocating of their existing gazebo. Regarding section 000 and 00, is there any additional information (interior elevations, schedules, etc) regarding quantities required under these specification sections? Detail /A-0 indicates a number of moulding profiles, but there is little to no info in the balance of the bid documents outlining requirements? Would an allowance be more appropriate for these trims at this time? Additional interior elevations further defining some detail of the scope will be issued by addendum. Can you provide missing head and jamb details on Sheet A-00 & A-0? lease provide some general information explaining which types of frames will require casing/trims (as shown on detail /A-)? Documents are Design Development documents. General Contractor s are to make educated reasonable assumptions based upon their experiences with similar Senior Care facilities consistent with the quality level and intent generally described.
3 Can you provide additional info on quantity of handrail required per detail /A-0? NO, General Contractor to make best assumptions on their experience with applicable codes and doing similar high quality Senior Care facilities. Are dashed lines on ID-/ series sheets indicating handrail or a different "chair rail" assembly? Dashed lines on Interior lan sheets thru indicate where there is one type finish below the handrail shown on detail /A-0 and another above Can you provide additional information (ie interior elevations) for typical kitchen, living, and dining rooms? The walls separating these spaces from the corridor look like they could potentially be quite ornate, but not information is available regarding any materials, trims, glazings, etc? Additional interior elevations to be provided by addendum Spec section 000 states shelving is to be DF, where section 0000 article.0 D states DF not to be used? lease clarify. DF is acceptable Which drawing sheets depict traffic coating requirements under division 000? lan drawings show exterior second level terraces where a traffic coating will be provided as a waterproofing membrane and a finished surface. Documents are a Design Development set requiring General Contractor s to extrapolate certain detail information based upon construction experience with similar building types and construction methodologies Is there a specification for the cementitious siding and panel? Section 0-; Both horizontal siding and vertical board and batt siding to be products produced by manufacturers listed. Which sheets depict access door size, quantity, keying, and rating requirements under spec 000? Can you please provide schedule outlining these requirements? NO to schedule. No specific sheets show where access panels may be located. Spec Section is intended to establish the quality level of such features where such access will be required. Documents are a Design Development set intended to show the general scope, intent, and quality level of the project only. General Contractor s to make experienced and educated assumptions as to quantities of access panels that will be required based upon their prior similar experience with buildings of this use and type. Which drawing sheets depict plaster requirements under division 000? laster to be the substrate behind all exterior walls receiving stone veneer Could you please provide a schedule of signs required under 000? Or please clarify an allowance amount if the sign information is not available at this time? General Contractor s to provide an allowance of $0,000 for the purchase and installation of interior signage. Regarding Specification 0, could you please provide additional information as to where curtain tracks are shown to be required on the drawings? At all resident room showers
4 Under spec section 000 allowances, the last article states Items to be furnished by GC include "wall mounted TV's/Blocking as required.." Can we assume the owner will provide the TV and the GC will only provide the blocking as noted in detail /A-0? If not, please clarify quantity, size, and models of TV's required. For purposes of the G, provide an allowance of $,000 for the purchase of 0 HDTV, and for ten HDTV for public spaces. Regarding Specification 000, could you please provide additional information as to where Fire Extinguisher Cabinets are shown to be required on the drawings? Fire Extinguisher and cabinets to be located where the local Fire Department says they are to be located. For the purposes of the G, General Contractors are to assume fire extinguisher cabinets per zone per floor. lease provide a specification for the loading dock equipment shown on sheet A-00 items & elley 0 pound Cx eveler with associated bumpers or equal. Include factory installed Neoprene weather seal; lip, and B0-F bumpers. Detail /A-00 depicts a refrigerator inside the patient cabinets at the footwall. Who is responsible for those appliances? General Contractor s to include an allowance of $0,000 for the purchase of under counter in cabinet refrigerators at all resident rooms I have noticed that there are two furnaces on the st floor mechanical zone drawings. Could someone point me in the direction of the schedule for these furnaces, I do not see them on 0. Do they have a/c s on them? Furnaces are Ton units with A/C to serve the two mechanical zones ( one interior, one with exterior exposures)associated with the Administration area portion of Zone, as opposed to serving these small spaces from roof top mounted equipment. The geotechnical report from Strata indicates that ground improvement is necessary and rammed aggregate pier elements should be used for support of the foundations due to the potential settlement of the subsurface soils. Their report also mentions that it may be advisable to use rammed aggregate pier elements as ground improvement beneath the floor slabs to minimize settlement. Are we to include rammed aggregate pier elements beneath the floor slabs in our scope/estimate? NO, base price to include piers just for the principle column and wall loads. Contractors to provide a unit cost for providing piers at sensitive slab on grade conditions if that becomes necessary. In order for us to determine our pier design/layout, we need to know the structural loads/reactions for each of the individual columns and walls. I will also need to know the design floor slab loading if we are to place piers beneath the slabs. See attached pdf from the Structural Engineer for load information.
5 0 0 Ext. Strip Footing D =. F =. F S = 0. F Baement area Int. Strip Footing D =.0 F =. F S = 0. F A S-0 B C D ' - 0".. Int. Strip Footing D =.0 F =. F S = 0. F ' - 0". S-0 '- /". Int. ad Footing D =. =. S =. ' - 0" E S-0 F S WX Basement ad Footing D =. = 0. S =. H W0X W0X J WX Ext. Strip Footing D =. F =. F S = 0. F W0X G WX.0 WX WX 00' - 0" Ext. ad Footing D =. =. S =.. WX WX.0. 00' - 0". WX WX N Q ' - 0" Ext. Strip Footing D =. F =. F S = 0. F Basement Strip Footing D =.0 F =. F S = 0.0 F R
6 0 A. C... D I. I... I I I..0 I F.0 WX WX.0 WX.0 WX WX. WX.0 ' - " WX WX WX J B WX H AIGN? EA WX BE A WX WX WX " EXANSION JOINT G 0. BE A WX WX WX WX WX WX WX A BE WX " EXANSION JOINT ' - " WX I I E.0 I. I I I I I I I I I HF# I I I I I I I I I I I I I I I I I I I. I. B TRUSS. WX I I I I I I I I I I I I I I I I I I I I I I I I HF# I I I. I I.0.. I ' - " ' - " I.0 I I I. I I WX..0 TRUSS. N. TRUSS.0 Q. R
7 0 A /: " OC D /: /" / '-0" /" / '-0" /: C /: " OC /: /: B S-0 E F WX 0 WX WX ' - /" WX " / '-0" J WX 0 H " / '-0" G " OC " OC 0 0' - /" ' - /" /: /: " / '-0" " / '-0" /: /" / '-0" /" / '-0" /: /" / '-0" /" / '-0" " OC " OC N Q R
State College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationArchitectural Design Process
Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation
More informationPLAN SUBMITTAL REQUIREMENTS
DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing
More informationFebruary 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida
February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following
More informationTO WHOM IT MAY CONCERN:
TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit
More information1. Name the horizontal member that rests on the foundation wall to support other wood members.
Student Name: Teacher: Date: District: Rowan Assessment: 9_12 T and I IC62 - Drafting - Architr II Test 1 Description: Unit C - Floorplans - Test 3 (ALL) Form: 501 1. Name the horizontal member that rests
More informationADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings
MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.
More informationMerrick Pet Care New Distribution Center Hereford, Texas
Merrick Pet Care New Distribution Center Hereford, Texas DATE: March 16, 2015 ARCHITECTURAL/ELECTRICAL ADDENDUM #6 FROM: TO: PROJECT: Lavin Associates, Architects Plan Holders of Record Merrick Pet Care,
More informationApril 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593
April 7, 2016 City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 393 RE: Conditional Use Arby s Restaurant Multi-Tenant Development 631 Hometown Circle-Lot 6
More informationSingle-Family Dwelling Submittal Requirements
Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING
INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY
More informationGRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO
PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,
More informationADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016
ADDENDUM NO. 1 DATE: MARCH 1, 2016 PROJECT: ARCHITECT: TO: 2017 BAND ADDITION, ROOF REPLACEMENT AND AIR-CONDITIONING WORK ROCK FALLS HIGH SCHOOL 101 12 TH STREET ROCK FALLS, IL 61071 BCA PROJECT NO. 1620
More informationADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.
ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority
More informationADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON
The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR
More informationSUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013
SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5 February 25, 2013 Owner: Architect: Administrative Office of the Courts 2860 Gateway Oaks Drive, Suite 400 Sacramento,
More information1.01 NOTICE TO BIDDERS
ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School
More informationADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015
ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the
More informationAddendum Number: 1 WT White HS Additions and Renovations, Dallas ISD
Addendum #1 July 9, 2018 Addendum Number: 1 Project: WT White HS Additions and Renovations, Dallas ISD Bid Package: BP#215 Project Number: 1719 - ORG 021 The following items modify the plans and specifications
More informationADDENDUM NO. 1 November 10, 2016
COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding
More informationCHAPTER 5 ARCHITECTURE
CHAPTER 5 ARCHITECTURE 5.1 GENERAL... 4 5.2 CONCEPT/PROJECT DEFINITION DESIGN (30%) SUBMITTAL REQUIREMENTS... 4 5.2.1 DESIGN ANALYSIS... 4 5.2.1.1 Design Criteria... 4 5.2.1.2 Narratives... 4 5.2.1.2.1
More informationPermits (Submitted to Permit Counter) APPLICATION CHECKLIST
Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING
INFORMATION BULLETIN / PUBLIC - GENERAL INFORMATION REFERENCE NO.: Effective: 10-01-99 DOCUMENT NO. P/GI 2002-008 Revised: 11-01-02 Previously Issued As: IB ST-4 DOCUMENT SUBMITTAL REQUIREMENTS FOR AN
More informationHOENER ASSOCIATES INC. ARCHITECTS
HOENER ASSOCIATES INC. ARCHITECTS BRUCE D. DELL MARK REUTHER ADDENDUM NO. 1 PROJECT 15-22C RENOVATION AND SITE WORK AT: BUILDING B DDRB OF ST. CHARLES DEVELOPMENT DISABILITIES RESOURCE BOARD ST. CHARLES,
More informationB. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.
McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT
More informationThe Bluffs at Eagle. Design Review Application. Date Bluffs Lot Number Street Address. Address. and/or fax. Address. Owner (if different) Phone
Design Review Application Bluffs Lot Number Street Applicant Contact Person Email and/or fax Owner (if different) Architect/Designer (if different) Contractor Contact Person Email and/or fax Lot Area (SF)
More informationOwner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review
Step 1: Request for Conditional Approval, page 1 of 5 Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review I,, the Property Owner, or Owner
More information*For complete material(s) information, refer to
Butler Community College Science, Technology, Engineering, and Math Division Brett Trimpe Revised Spring 2016 Implemented Fall 2016 COURSE OUTLINE Residential Design and CAD I Course Description EN 103.
More informationHow to Estimate the Cost of a. Precast Concrete Parking Structure
How to Estimate the Cost of a Precast Concrete Parking Structure 1 TABLE OF CONTENTS 1. INTRODUCTION 2. TYPES AND METHODS OF MEASUREMENT 3. SPECIFIC FACTORS THAT MAY AFFECT TAKE OFF AND PRICING 4. OVERVIEW
More informationSpecifications: Other: sign in sheet
To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015
More information1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.
DESIGN REQUIREMENTS 1. CONTRACT DOCUMENT FORMAT: 1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word. 1.2 The Electronic Drafting Program used for the Contract Drawings
More informationADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030
ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions
More informationSolicitation No. VA B-0155, Building 3: Construct Lab & Outpatient Medical Suites Questions & Answers
Solicitation No. VA244-13-B-0155, Building 3: Construct Lab & Outpatient Medical Suites Questions & Answers 1. Question: Is this project Tax Exempt in regards to materials and equipment as per PA State
More informationRECORD GROUP NUMBER 156
DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION HOSPITAL AND SCHOOL FOR THE RETARDED ARLINGTON, TENN. BLUEPRINTS, 1965 RECORD GROUP NUMBER 156 Processed by: David R. Sowell Archival Technical Services
More informationADDENDUM No. 4 Page 1 of 8 (includes attachment)
ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J
More informationAddendum #1 - Bid Package #
Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction
More informationADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01
ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014
More informationSoftware Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More informationThe following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.
ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationA. Submit properly identified manufacturer's literature before starting work.
SECTION 10400 IDENTIFYING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor and materials required for installation of plaque, school name and address numbers, directional signage, signage
More informationHousing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB. Job # BID-CDBG #16
Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB Job # BID-CDBG #16 Bid is to be turn-key, including all applicable code requirements, materials, labor, City Business License permits,
More informationDOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY DWELLING
INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: DOCUMENT NO.: P/GI 2014-009 Previously Issued As: P/GI 2011-009 Effective: 01-01-2014 Revised : DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY
More informationHIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11
HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum
More informationSECTION WOOD DOORS
SECTION 08211 WOOD DOORS Notice to Vendors: CANV prefers to purchase products that contain tropical wood only if they are certified according to the guidelines of the Forest Stewardship Council (FSC).
More informationExhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule
Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample
More informationResidential Room Addition / Remodel Submittal Requirement Checklist
City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY
More informationLoudoun Residence NEW CUSTOM HOME: PROJECT INFORMATION: SCOPE OF WORK: A Hopwood. Cover Sheet SITE ADDRESS: OWNER:
NEW CUSTOM HOME: PROJECT INFORMATION: SCOPE OF WORK: Loudoun Residence SITE ADDRESS: 3456 HOPWOOD PLACE, COLWOOD BC STRATA LOT 0, SECTION 63, ESQUIMALT DISTRICT, STRATA PLAN VIS74 CONSTRUCTION OF A NEW
More informationCommercial Infill Project Guide
Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit
More informationPLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material
PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS Per the provisions
More informationBUILDING PLANS. BUILDING DEPARTMENT
BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,
More informationThe GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.
Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer
More informationSERIES 300 SINGLE HUNG WINDOW INSTALLATION
IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS
More informationSECTION IDENTIFYING DEVICES
SECTION 10400 IDENTIFYING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor and materials required for installation of plaque, school name and address numbers, directional signage, signage
More informationADDENDUM #1. April 29, 2009
April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA
More informationADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS
ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley
More informationCertificate of Appropriateness (CoA) Checklist
Certificate of Appropriateness (CoA) Checklist This Checklist is intended to assist you in preparing a complete application for submittal. Occasionally, additional items may be required to complete the
More informationSPARTAN DAY CAMP 4814 FREEDOM RING RD
484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More informationDecember 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions
December 31, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y16-721-MM / ADDENDUM No. 1 ORANGE COUNTY CONVENTION CENTER PHASE III VALENCIA BALLROOM RENOVATION Bid Opening Date: January 12, 2016
More informationUDS OVERVIEW Uniform Drawing System
UDS OVERVIEW Uniform Drawing System The Construction Specifications Institute 601 Madison Street Alexandria, VA 1994 CSI began development of UDS Organization and presentation of drawing sets Organization
More informationMontclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017
Montclair, NJ 0704 ADDENDUM NO. Issue Date: May 5, 207 Request for Proposal # 294 Building 47 West Renovation- Phase 6a Number of Pages: 2 plus 5 sketches Date of Original Bidding Documents: April 26,
More informationOperating Standards Attachment to Development Application
Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS
More informationSMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)
REVIEW TYPE: PRELIMINARY FINAL LANDSCAPE ABBREVIATED ADDITION COLOR BOARD Application Form* X X X X X Design Review Fee* X X X Registered Survey** X Site Plan X X X X X Floor Plans X X X Elevations X X
More informationINDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:
INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK
More informationHall of Waters List of Historic Drawings
List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral
More informationArchitectural Review Application
Architectural Review Application City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 Tel. (310) 285 1141 Fax. (310) 858 5966 Architectural Review Overview: The Architectural
More informationListed below are the competencies required and examples from the aforementioned job:
1. Technical Analysis Instructions: Describe a project for which you collected and interpreted or analyzed technical data for development of engineering designs and drawings from concepts and specifications.
More informationBUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT
BUILDING PLANS BUILDING INSPECTIONS DEPARTMENT 507-537-6773 www.ci.marshall.mn.us This handout is intended only as a guide to the subject matter covered herein and is based in part on the 2015 Minnesota
More informationOnce you select a model from the model list you will see the following index.
2010 Parts Catalog In the 2010 Parts Catalog, you will be seeing a reproduction of our actual engineering drawings. This new format will require that you use our web tools a little differently. Our drawings
More informationSITE PLAN Application Packet (Required For All Non-Residential Development Projects)
SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,
More informationDOCUMENT NARRATIVE PETSMART # 3131 GREEN VALLEY SAHUARITA, ARIZONA Construction Change Directive #1 (CCD-1) / September 22, 2017
These documents, indicated as Construction Change Directive #1 with a delta - 1, supersede the previous issue and should be inserted into the Construction Documents. The tags in the column indicate which
More informationCHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO. 18-04 ADDENDUM NO. ONE DATE: September 07, 27 CLIENT / PROJECT: Chabot-Las Positas CCD Campus Master
More informationCOMPILATION OF TENDER DOCUMENTS
COMPILATION OF TENDER DOCUMENTS Arc. Ibrahim A. Haruna, FNIA, PNIA, mni. -the familiar question!- Mr. Architect, after these your beautiful drawings, what next? ARCHITECT S PROCEDURE: -drawing board to
More information12560 W. Cedar Drive Lakewood, CO Barry Himmelman President
Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 16-BS-2260 ADDENDUM NUMBER FOUR January 8, 2016 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM
More informationBOOK OF MOLDINGS ~ 8TH EDITION W W P E E C. C O AN AMHERST WOODWORKING W O & SUPPLY, INC. COMPANY
BOOK OF MOLDINGS ~ 8TH EDITION 800.532.9110 WWW.COPPERBEECH.COM W W P E E C. C O AN AMHERST WOODWORKING W O & SUPPLY, INC. COMPANY WE ARE PROUD TO PRESENT THE 8TH EDITION OF OUR MOLDING CATALOG OVER 850
More informationCHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS
CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS The Commission on Chicago Landmarks reviews all permit applications for work to designated and proposed Chicago Landmarks and
More informationSOFTBALL BLEACHER REPLACEMENT PROJECT 4000 SUISUN VALLEY ROAD, FAIRFIELD, CA PROJECT NO: APPLICATION NO: SUBMITTAL INDEX
SOFTBALL BLEACHER REPLACEMENT PROJECT SOLANO COMMUNITY COLLEGE DISTRICT 4000 SUISUN VALLEY ROAD, FAIRFIELD, CA 94534 PROJECT NO: 7-003 APPLICATION NO: SUBMITTAL GENERAL NOTES LEGEND PROJECT SCOPE INDEX
More informationARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)
ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI) PROJECT: Villa Joseph Marie High School - Auditorium Addition ARCHITECTS PROJECT NO: 2339 ASI NO: 001 DATE OF ISSUANCE: 12/5/2017 TO: Twining Construction Co.
More informationDesign Deliverables. Summary. A. Expectations for Design Deliverables:
Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations
More informationCITY OF CAPE CANAVERAL COMMUNITY APPEARANCE BOARD APPLICATION PACKET
Instruction Sheet... 2 Conceptual Plan Requirements... 3 Information Sheet... 4 Submittal Checklist... 5 Application Fee Sheet... 6 City of Cape Canaveral Community Appearance Board Application 12/2018
More informationMTJ Outdoor Baggage Claim
MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,
More informationAPPLICATION FOR A BUILDING PERMIT
APPLICATION FOR A BUILDING PERMIT City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 95.487.7330 fax 95.654.9896 Must print legibly, submit (3) sets of building and plot plans. Fill out all
More informationDelivering Reliability. Services. Strength You Can Count On. oldcastleprecast.com/services
Delivering Reliability A Strength You Can Count On SERVICES TENANT IMPROVEMENTS Above And Below Ground Solutions Strength You Can Count On Oldcastle Precast is well trained and knowledgeable in all aspects
More information24' - 0" 99' - 0" B15 B16 B17 B18 B19 SLOPE SLOPE BIKE STOR. / SERVICE 2 ACCESSIBLE COMMUNITY ACCESIBLE BIKE BIKE STORAGE ROOM STORAGE
5' ' 6 /4" RETAINING WALL ALONG BOUNDARY ILLUMINATED SIGNAGE TBD MOUNTED TO TOP AND/OR FACE OF RETAININGS WALL PROPERTIES FENCE TO REMAIN SIDEWALK ENTRY TIE NEW SIDE WALK INTO EXISTING SIDEWALKS AS CURRENTLY
More informationHAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA
HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: 08012.00 SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA ADDENDUM NUMBER 1 to the BID SET August 10, 2009 General This Addendum will become part
More informationBid No. B14-02 Building 100 HVAC Improvements
Bid No. B14-02 Building 100 HVAC Improvements Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work described as: Building
More informationKankakee Community College
Kankakee Community College Course prefix and number: DRFT 2414 Course title: Architectural Drafting with Revit Credit hours: 4 Lecture hours: 2 Lab hours: 4 Semester: Spring 2013 Catalog description: Prerequisite:
More informationFor crossing under a railroad, contact the specific railroad company's engineering department.
PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure
More informationSERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION
IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS
More informationArchitectural Floor Plan Symbols
Architectural Floor Plan Symbols The symbols below are used in architectural floor plans. Every office has their own standard, but most symbols should be similar to those shown on this page. Building Section
More informationTown of Skowhegan Application For Development Review
Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:
More informationAnswer: Only to ChurchWoods, LLC.
ADDENDUM ADDENDUM NO.: 3 DATE: 06/27/16 PROJECT: CHW ChurchWoods PROJECT ADDRESS: 4130 Old Post Road Charlestown, RI TO: All Bidders of Record: This Addendum forms a part of and modifies the bidding requirements
More informationKNOXVILLE HISTORIC ZONING COMMISSION STAFF REPORT - CERTIFICATE OF APPROPRIATENESS APPLICATION
KNOXVILLE HISTORIC ZONING COMMISSION STAFF REPORT - CERTIFICATE OF APPROPRIATENESS APPLICATION PROPERTY ADDRESS: DISTRICT: Fourth and Gill H-1 906 Luttrell St 37917 FILE NO.: 11-I-13-HZ MEETING DATE: 11/21/2013
More informationInformation package for obtaining a building permit
Information package for obtaining a building permit To apply for a building permit, you must be a licensed contractor or the legal property owner. Electrical, Mechanical, Plumbing and the Roofing subcontractors
More informationOAK RUN BUILDING PERMIT
OAK RUN BUILDING PERMIT (DOCK APPLICATION) ALL PERMIT APPLICATIONS MUST BE SUBMITTED AT THE POA OFFICE A MINIMUM OF 48 HOURS BEFORE THE SCHEDULED MEETING. ALL INFORMATION MUST BE SUPPLIED AND HAVE PROPER
More informationBidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.
ADDENDUM NO. March 3, 202 Re: MCC Student Center Addition, Manchester, NH To: Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM. All items in this Addendum shall
More informationCLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.
June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total
More informationDesign Technology Architectural Design 2 The second in a sequence of courses that prepares individuals with knowledge of residential architectural
Design Technology Architectural Design 2 The second in a sequence of courses that prepares individuals with knowledge of residential architectural and related construction. This course includes instruction
More informationFAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014
FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services ADDENDUM #4 December 5, 2014 This Addendum is issued to provide answers to questions from potential bidders
More information