1 Addendum No. 1 June 8, 018 Allegany College of Maryland Softball Field Murphy & Dittenhafer Project No Willowbrook Road, Cumberland, MD 150 Abbreviations: ACM: Allegany College of Maryland, also Owner; M&D: Murphy & Dittenhafer Architects TRIAD: Triad Engineering GC: General Contractor/Bidder Q: Question A: Answer I. MINUTES OF THE PRE-BID CONFERENCE The Minutes of the Pre-Bid Meeting held on Wednesday June 4, 018 are hereby made part of this Addendum and are as follows: The objective of the meeting was for representatives of Allegany College of Maryland (ACM), and the Architect/Engineering design team to meet with potential bidders (Contractors) on site to provide an overview of the project, answer questions and to allow bidders to tour the site and building. Introductions The following persons introduced themselves and stated their role on the project: Sheila Dyche, (representing ACM); Billie Swailes (representing Triad Engineering, Inc.), and Adam Phipps (ACM Maintenance). Peter Schwab ( M&D Architects) was not present. Overview Billie Swailes (TRIAD) provided an overview of the project including existing conditions, ADA parking/ramp, gates and fencing, and dugouts to be constructed by the College. Also provided information on geothermal wells with advisory that the contractor was responsible for locating/preserving well caps and to be mindful of the wells during construction. Attendance / Sign In Sheets 1. Attendance at the Pre-Bid Conference is mandatory for General Contractors bidding on this project.. The sign in sheets are attached hereto. Name Company Contact Kathy King WG Land Compnay kathy@wglandco.com Eugene Thrasher Don Harden Excavating Brant Rd. Cumberland, MD 150

2 Robert Robison Don Harden Excavating Dave Snyder BELT Lenny Bartee Time Technologies Inc Larry Weigle Excavating Associates Inc Patrick Coakley Dura Edge Notice to Proceed (NTP) The time allotted for completion does not start until NTP is issued. BIDDER QUESTIONS Preliminary Bidder Questions at Conference 1. Question 1: Elevations on ADA ramp Q: Are elevations to be provided? If not, how are they to be determined? A: See attached sketch.. Question : Field Drains Advised field drains are not part of the project Q: Are Field Drains to be provided? A: No. Question : Thickness of Warning Track and Infield Materials Q: Where are these provided in the specifications? A: The warning track shall be thick and shall be Diamond Tex or equivalent. Provide an alternate cost for plain stone dust. The infield shall be 4 thick per spec on drawing and an alternate cost for equivalent can be provided. 4. Question 4: Backfill at Concrete Pads Q: What material is to be used? Dirt, paved? A: See revised drawing. Provide of 4 stone dust around back of dugouts to gate. 5. Question 5: Water Line Q: What is source and where is termination at field? A: See revised drawing. Line is to tap existing line between tennis courts and PE building. 6. Question 6: Scoreboard Advised that scoreboard was being donated and installed by College Q: Does this contract include provision of electric service to scoreboard location? If yes, where is board to be located? A: The scoreboard will go in centerfield. 7. Question 7: Seed Mix Q: Where is mix specified? If not, what is mix? A: The seed mix is: 70% turf type fescue and either 0% blue grass and 10% perennial rye or 0% perennial rye and 10% blue grass. 8. Question 8: Ramp Gate Q: What is purpose of gate at end of ramp? Is this an error and to be eliminated? A: This was an error note removed on revised drawing. 9. Question 9: Final Date for Questions Q: What is the final date that you will respond to questions? A: June 10, 018 COB. 10. Question 10: Wage Rates Q: Please clarify rates, prevailing or not?

3 A: No. 11. Question 11: Stake Out Q: Who is responsible? We assumed the contractor. A: Contractor is responsible for all stakeout. 1. Question 1: Existing Backstop College to take Q: Does the college want the existing backstop? A: Contractor to remove and provide to college. 1. Question 1: Release Estimated Budget No Q: Will the college provide the estimated budget for the project. A: No. 14. Question 14: Geothermal Q: Who installed the system, or do you have this information? A: Wayne s well and septic. 15. Question 15: Thickness of Slab Q: Is this specified? Where? A: The slab thickness is to be Question 16: Drawing C..0 Q: Fence calls for galvanized 1 1/4" chain link A: All fence and backstop to be spacing. 17. Question 17: Drawing C..0 Q: The backstop call for " galvanized chain link A: See Question 18: Drawing C..0 Q: The gates call for all black vinyl coating A: All fence and backstop materials to be black vinyl coated. Building and Site Tour 1. ACM and TRIAD accompanied the Bidders in attendance on a tour of the site. II. ADDENDUM NO. 1 GENERAL ITEMS 1. The Minutes of the Pre-Bid Conference above are hereby part of Addendum No.1. LIST OF ATTACHMENTS GENERAL ITEMS Pre-Bid Conference Sign in Sheets END OF ADDENDUM NO. 1

4

5

6 Project No North Charles Street, Baltimore, Maryland Voice Fax 10'-0" C-C MAX. (TYP) POLYCAP ON ALL 6' FENCING (SEE ANTHEM SPORTS #A OR EQUIVALENT) 1 5/8"Ø BRACE RAIL (TYP.) 6'-0" TO 8'-0" (TYP.) (SEE PLAN VIEW) " 1-1/4" SQUARE MAXIMUM SPACE FENCE TOP SHALL BE KNUCKLE TOP AND VINYL COATED IN BLACK. '-0" GALVANIZED COATED CHAIN LINK FENCE LIMITS OF DISTURBANCE AND ESD AREA 1.87 AC. 1" DIA. SPACE UNDER FABRIC 1" (NORMAL) " (MAXIMUM) END CORNER, OR PULL POST CIVIL TRIAD ENGINEERING, INC SHERMAN AVE. HAGRSTOWN, MD " 10" DIA. INTERMEDIATE POST LnA 6' HIGH CHAIN LINK FENCE DETAIL NOT TO SCALE BMP N- GRADING TO MAINTAIN EXISTING DRAINAGE PATTERNS STAGING AND STOCKPILE AREA UTILIZE EXISTING SWALE AND DRAINAGE SYSTEM TO MINIMIZE DISTURBANCE, SITE IMPACT AND MAINTAIN EXISTING RUNOFF PATTERNS SCOREBOARD E INFIELD MATERIAL SHALL BE NEW ENTERPRISE MT CYDONIA INFIELD MIX OR EQUIVALENT 0.5% SLOPE FROST FREE YARD HYDRANT 6'x6' GATE % 7 6 BMP N- 6' HIGH CHAIN LINK FENCE (SEE DETAIL THIS SHEET) ACM SOFTBALL FIELD S.C.E. SOFTBALL FIELD LOCATED TO MINIMIZE DISTURBANCE AND REDUCE SITE IMPACT E 9 ACCESS C..0 DRIVE 8' HIGH CHAIN LINK FENCE IN FRONT OF DUGOUT. DUGOUT F.F.E. = 66.5 (SEE DETAIL THIS SHEET) BACKSTOP SHALL BE 10'x0'x10'x15' HIGH PANELIZED BASEBALL BACKSTOP KIT FROM DISCOUNT FENCE SUPPLY, INC. OR EQUIVALENT. OPTIONAL SOFTBALL BACKSTOP PROTECTIVE PADDING (SEE ANTHEM SPORTS #A4-846 OR EQUIVALENT) WITH BLACK VINYL COATING 6" PVC SOFTBALL PIPE FROM WALKWAY FIELD CROSSING 8' HIGH CHAIN LINK FENCE IN FRONT OF DUGOUT. DUGOUT F.F.E. = 66.5 (SEE DETAIL THIS SHEET) OP SL HANDICAP PARKING OP 6'x6' GATE 0.5% SLOPE FENCE 0.5% S LOPE SL STABILIZED CONSTRUCTION ENTRANCE 6' HIGH CHAIN LINK FENCE C C..0 BMP N- % 1-8 C..0 6'x6' GATE TYPICAL EXISTING GEOTHERMAL WELL FIELD. 6' HIGH CHAIN LINK FENCE CONTRACTOR TO VERIFY WELL CAPS AND PIPING 6'x6' GATE 14 STANDARD C..0 INLET PROTECTION 9 ACCESS C..0 TRAIL BMP N- PRESSURE TREATED HANDICAP RAMP. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS. RAMP TO MEET ALL ADA SPECIFICATIONS 'x6' GATE 5 6 6/8/018 REVISIONS TO FENCE AND ADDITION OF SCOREBOARD REVISIONS TO DUGOUT AND WATERLINE LAYOUT LnA BeB 6/6/ SILT FENCE Date 5/10/ C..0 No. 1 POLYCAP ON ALL 6' FENCING (SEE ANTHEM SPORTS #A OR EQUIVALENT) Description BID SET JAYPRO 1' FOUL POLE (SEE ANTHEM SPORTS #A OR EQUIVALENT) CAD DWG FILE: DRAWN BY: WCPII CHECKED BY: BJS PROJECT NO: DATE: 10 MAY 018 DEVELOPER: 1" PE WATER LINE WITH ONE INCH TAPPING SLEEVE AND 1" WATER VALVE GRAPHIC SCALE " SQUARE MAX SPACING FENCE TOP SHALL BE KNUCKLE TOP. 6' x 6' CHAIN LINK FENCE GATE DETAIL NOT TO SCALE ALLEGANY COLLEGE OF MARYLAND 1401 WILLOWBROOK ROAD CUMBERLAND, MD 150 PHONE: SITE PLAN & EROSION/SEDIMENT CONTROL & GRADING PLAN SHEET SOIL TYPE ON SITE SYMBOL BeB LnA DESCRIPTION BERKS-URBAN LAND COMPLEX, 0 TO 8 PERCENT SLOPES LINDSIDE SILT LOAM, 0 TO PERCENT SLOPES, OCCASIONALLY FLOODED K FACTOR HYDROLOGIC (WHOLE) SOILS GROUP B C C..0 ( IN FEET ) 1 inch = 0 ft. BID SET SHEET OF 5

7 PR HIG FR EQ PR #A PROPO PIPE FR CROSS

This addendum forms a part of the Contract Documents dated: August 10, 2012.

This addendum forms a part of the Contract Documents dated: August 10, 2012. Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911

More information

LONCY LEAKE BASEBALL FIELD RENOVATION MESQUITE, TX PROJECT NO ISSUED FOR PROPOSALS

LONCY LEAKE BASEBALL FIELD RENOVATION MESQUITE, TX PROJECT NO ISSUED FOR PROPOSALS MESQUITE, T PROJECT NO. 54-18 NOVEMBER 13, 2018 CLIENT PRIME CONSULTANT GENERAL NOTES INDE of SHEETS CITY OF MESQUITE 1. PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR SHALL BE FAMILIAR WITH THE PLANS INCLUDING

More information

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP 1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of

More information

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

Project: # Solano Community College District

Project: # Solano Community College District ADDENDUM #02 Project: #16 007 Solano Community College District Horticulture Site Improvements Date: April 26, 2016 The following clarifications are provided based on questions received or changes in District

More information

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO PAGE PROJECT NO. 0-0 0 0 0 0 0 DATE: PROJECT: GATEWAY STEM ATHLETICE FIELD ALTERATIONS GATEWAY STEM HIGH SCHOOL - ST. LOUIS PUBLIC SCHOOLS 0 MCRTEE AVENUE ST. LOUIS, MISSOURI 0 TO BID DOCUMENTS DATED DECEMBER,

More information

INVITATION FOR BID (IFB) IFB NO. GSWA

INVITATION FOR BID (IFB) IFB NO. GSWA INVITATION FOR BID (IFB) IFB NO. GSWA-005-16 AGAT AND MALOJLOJ RESIDENTIAL TRANSFER STATION IMPROVEME AND DEDEDO RESIDENTIAL TRANSFER STATION CLOSURE ADDENDUM NO. 6 September 22, 2016 ALL BIDDERS MUST

More information

OFFICE OF MANAGEMENT AND FINANCE

OFFICE OF MANAGEMENT AND FINANCE CITY OF PORTLAND OFFICE OF MANAGEMENT AND FINANCE Charlie Hales, Mayor Fred Miller, Chief Administrative Officer Ken Rust, Director, Bureau of Revenue and Financial Services Christine Moody Chief Procurement

More information

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD JUNE 27, 2016 Addendum No. 1 Page 1 of 2 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD FAA AIP PROJECTS NO. 3-36-0114-XXX-16

More information

HUSSEY GAY BELL SAVANNAH, GEORGIA

HUSSEY GAY BELL SAVANNAH, GEORGIA HUSSEY GAY BELL SAVANNAH, GEORGIA ------------------------------------------------------------------------------------------------------------ ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2

City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2 City of Waltham Purchasing Department Waltham, Massachusetts 02452 ADDENDUM NO. 2 Plans & Specifications for: Elsie Turner Field & Graverson Playground, Waltham, MA TO: ALL PLAN HOLDERS This Addendum No.

More information

Essential Skills: Reading and Interpreting Maps and Plans

Essential Skills: Reading and Interpreting Maps and Plans Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /

More information

FUTURE PARKING (5) LEGEND PROPERTY LIMIT CURB & GUTTER EASEMENT BUILDING RETAINING WALL WETLAND LIMITS TREELINE SAWCUT LINE SIGN PIPE BOLLARD NUMBER O

FUTURE PARKING (5) LEGEND PROPERTY LIMIT CURB & GUTTER EASEMENT BUILDING RETAINING WALL WETLAND LIMITS TREELINE SAWCUT LINE SIGN PIPE BOLLARD NUMBER O FUTURE PARKING (5) LEGEND PROPERTY LIMIT CURB & GUTTER EASEMENT BUILDING RETAINING WALL WETLAND LIMITS TREELINE SAWCUT LINE SIGN PIPE BOLLARD NUMBER OF PARKING STALLS PER ROW PROPOSED EXISTING STANDARD

More information

Miscellaneous. Demolition

Miscellaneous. Demolition Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt

More information

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court Dated 06-29-17 SPECIAL VILLAGE BOARD MEETING Notice of Meeting and Agenda Wednesday, July 5, 2017 Time: Place: Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board

More information

EXTERIOR BUILDING, ROOFING, AND SITE IMPROVEMENTS

EXTERIOR BUILDING, ROOFING, AND SITE IMPROVEMENTS CONTRACT NUMBER: IFB-8-B006 ARCHITECT / ENGINEER : HURST-ROSCHE, INC. NO. LINOIS 62203 (68) 398-0890 -7 E. RANDLE ST./ N. FRITZ ST. 402 CHERRY ST., 404-406 ST. LOUIS ST. 502-506 DEE ST. 50-505 PLUM ST.

More information

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1 No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

NRE DESIGN PARK SITE DEVELOPMENT PLANS SECTION 3 TOWNSHIP 50 SOUTH, RANGE 25 EAST CITY OF NAPLES, COLLIER COUNTY, FLORIDA

NRE DESIGN PARK SITE DEVELOPMENT PLANS SECTION 3 TOWNSHIP 50 SOUTH, RANGE 25 EAST CITY OF NAPLES, COLLIER COUNTY, FLORIDA SITE DEVELOPMENT PLANS LEGAL SUBJECT PROPERTY SECTION 3 TOWNSHIP 50 SOUTH, RANGE 25 EAST CITY, COLLIER COUNTY, FLORIDA PROPERTY OWNER: ENTERPRISE PLAZA LLC 404 CITATION PT, FL 34104 GULF MEXICO PREPARED

More information

CHAIN LINK FENCING DOCUMENT NUMBER: APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL

CHAIN LINK FENCING DOCUMENT NUMBER: APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL CHAIN LINK FENCING DOCUMENT NUMBER: 02800 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 06-02-98 - miscellaneous revisions 08-06-97 - miscellaneous clarifications 06-02-97 - miscellaneous

More information

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE

More information

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES FINAL DESIGN, BID PHASE, AND CONSTRUCTION SERVICES BACKGROUND ARCADIS U.S., Inc. (ARCADIS)

More information

Appendix C Construction Details

Appendix C Construction Details 7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses

More information

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 003 Subject:

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

MTJ Outdoor Baggage Claim

MTJ Outdoor Baggage Claim MTJ Outdoor Baggage Claim 915 S. Tenth St. Montrose, CO 8101 p: (970) 29-1980 f: (970) 797-6811 www.motleyarc.com Drawings and Dimensions 1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS,

More information

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum. ADDENDUM 1 CITY OF MEDFORD RIVERSIDE NORTH PARKING LOT ITB 15-012BL JUNE 22, 2015 PAGE 1 I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this

More information

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements

More information

CITY OF NEW WESTMINSTER SECTION Westminster Pier Park ADDENDUM NO. 1 Landscape Contract

CITY OF NEW WESTMINSTER SECTION Westminster Pier Park ADDENDUM NO. 1 Landscape Contract ADDENDUM NO. 1 November 10, 2010 This Addendum forms part of the Bid Documents and amends the original Contracting Requirements, Specifications, and Drawings, and clarifies Bidders questions received between

More information

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

DECK PERMIT APPLICATION PACKET

DECK PERMIT APPLICATION PACKET Building Division 865 SE Barrington Dr Oak Harbor, WA 98277 Ph 360.279.4510 Fax 360.279.4519 DECK PERMIT APPLICATION PACKET SUBMITTAL FORMS INDEX Basic Deck Submittal Checklist Residential Deck Submittal

More information

SECTION 2 GENERAL REQUIREMENTS

SECTION 2 GENERAL REQUIREMENTS SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall

More information

Laser Grading Sports Fields

Laser Grading Sports Fields www.stma.org Laser Grading Sports Fields What is Laser Grading? Grading is the process of leveling a land surface to a desired gradient by cutting, filling, and smoothing the soil. In the athletic field

More information

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts RESPONSES TO QUESTIONS and/or RFI s # 3 Date: 09/14/18 The attention of Contractors

More information

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) 190-66. General procedure for completeness review. A. In order to be determined complete for review by the Board, all of the required information must

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

A. Dewatering observation wells are part of dewatering allowance.

A. Dewatering observation wells are part of dewatering allowance. SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA (804) (804) (fax)

King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA (804) (804) (fax) King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA 23085 (804) 785-5975 (804) 785-5999 (fax) Shoreline Erosion Project Water Quality Impact Assessment (WQIA) & Wetland Board Permit Submittal

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 SAN FRANCISCO UNIFIED DISTRICT, DESIGN AND ADDENDUM NO. PROJECT: ADA Site Improvements of April 0, 08 Upper Play Yard at Noriega EES 775 44 th -Avenue San Francisco, CA 94 SFUSD Project No. 004 OWNER:

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By: CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS

More information

KC Water Rules and Regulations For Water Main Extensions and Relocations

KC Water Rules and Regulations For Water Main Extensions and Relocations KC Water Rules and Regulations For Water Main Extensions and Relocations MAY 2017 NOTE: Changes from 2016 are highlighted in yellow and appear on Pages 5, 8, 10-11, 13, and 15. Additional changes made

More information

Ecological Restoration Drafting & Design Guidelines

Ecological Restoration Drafting & Design Guidelines Ecological Restoration Drafting & Design Guidelines Version 2.0 July 2017 Philadelphia Water Ecological Restoration Drafting & Design Guidelines Table of Contents 1.0 INTRODUCTION...2 2.0 GENERAL PLAN

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223 PROJECT LOCATION: 95 NOCATEE PARKWAY PONTE VEDRA, FL. 38 J. Collins Engineering Associates, LLC 56-3 San Jose Blvd. Jacksonville, Florida 32223 NOT TO SCALE 904-262-42 sm sm ON DRAWING WHERE SECTION OR

More information

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016. GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

Raceline / Shockline/Endloop Installation Manual

Raceline / Shockline/Endloop Installation Manual Raceline / Shockline/Endloop Installation Manual Scan this QR code to watch the Installation Video. Trouble Shooting Hotline -800-878-5644 Flex Fence Raceline/Shockline Fence Installation Guide Before

More information

APPENDIX FENCE GENERAL NOTES

APPENDIX FENCE GENERAL NOTES APPENDIX FENCE GENERAL NOTES 1. Fabric: 9 gage, 2" mesh, knuckle top and bottom, placed on the outside of posts, single fabric width for the entire height. 2. All fencing to be standard galvanized finish.

More information

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements. MINOR SUBDIVISION 190-69. Minor subdivisions. In addition to the requirements indicated in 190-67 (SEE BELOW), the information below shall be shown on the plans for all minor subdivision applications.

More information

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS DECEMBER 2014 LIST OF DRAWINGS EASTHAM TOWN ADMINISTRATOR

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS DECEMBER 2014 LIST OF DRAWINGS EASTHAM TOWN ADMINISTRATOR LIST OF DRAWINGS DISTRICT G TANK SITE LOCATION I G-1 GENERAL NOTES AND LEGEND SHEILA VANDERHOEF C-1 EXISTING CONDITIONS PLAN BOARD OF SELECTMEN C-2 PROPOSED WATER STORAGE TANK SITE PLAN CD - 2 CONSTRUCTION

More information

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project

More information

SOFTBALL BLEACHER REPLACEMENT PROJECT 4000 SUISUN VALLEY ROAD, FAIRFIELD, CA PROJECT NO: APPLICATION NO: SUBMITTAL INDEX

SOFTBALL BLEACHER REPLACEMENT PROJECT 4000 SUISUN VALLEY ROAD, FAIRFIELD, CA PROJECT NO: APPLICATION NO: SUBMITTAL INDEX SOFTBALL BLEACHER REPLACEMENT PROJECT SOLANO COMMUNITY COLLEGE DISTRICT 4000 SUISUN VALLEY ROAD, FAIRFIELD, CA 94534 PROJECT NO: 7-003 APPLICATION NO: SUBMITTAL GENERAL NOTES LEGEND PROJECT SCOPE INDEX

More information

MILL HILL ARTS VILLAGE

MILL HILL ARTS VILLAGE OWNER CIVIL ENGINEER MACON-BIBB URBAN DEVELOPMENT AUTHORITY ALEX MORRISON, EXECUTIVE DIRECTOR 200 CHERRY STREET, SUITE 300 MACON, GA 31201 OFFICE PHONE : (478) 803-2402 TRIPLE POINT ENGINEERING DAN WALLACE,

More information

No No No

No No No INSTALLATION, ASSEMBLY & MAINTENANCE MANUAL BASEBALL BACKSTOP No. 331025 No. 331036 No. 331039 No. 331025 No. 331036 No. 331039 INSTALLER NOTE: Upon completion of the installation/assembly of this baseball

More information

STANDARD DETAILS Crow Canyon Road San Ramon, CA Telephone: (925) Fax: (925)

STANDARD DETAILS Crow Canyon Road San Ramon, CA Telephone: (925) Fax: (925) STANDARD DETAILS 2401 Crow Canyon Road San Ramon, CA 94583 Telephone: (925) 973-2670 Fax: (925) 838-3937 CITY OF SAN RAMON STANDARD DETAILS INDEX CONCRETE WORK NAME DRAWING # Curb, Gutter & Sidewalk C-1

More information

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

Section 808. FENCING

Section 808. FENCING 808.01 Section 808. FENCING 808.01. Description. This work consists of providing and erecting, or moving existing, woven wire fence, temporary fence, protective fence, chain link fence, high-tensile wire

More information

MATERIALS PREPARATION SETTING FENCE POSTS 01 TIP

MATERIALS PREPARATION SETTING FENCE POSTS 01 TIP Skill Level: INTERMEDIATE Give these projects a try if you're a confident DIYer with a good working knowledge of a variety of tools. They can take a day or more to complete. If you can build a birdhouse

More information

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS REQUIREMENTS for ENGINEERING SERVICES on PUBLIC CONSTRUCTION PROJECTS April, 2007 David W. Johnson Senior Engineer Design & Construction Requirements for Engineering Services on Public Construction Projects

More information

PART MATERIALS. Section Fencing Materials. Description

PART MATERIALS. Section Fencing Materials. Description PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

CHAPTER 11. Plan Standards

CHAPTER 11. Plan Standards CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.

More information

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be

More information

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 5 BID NO. Y14-792 PH IFB EAST SERVICE AREA POTABLE WATER AND RECLAIMED WATER STORAGE AND REPUMP FACILITY BID OPENING: June

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

ADDENDUM NO. 02 July 31, 2012

ADDENDUM NO. 02 July 31, 2012 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON

More information

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must

More information

1.01 NOTICE TO BIDDERS

1.01 NOTICE TO BIDDERS ADDENDUM NO. 1 1.01 NOTICE TO BIDDERS A. Date: 15 March 2013 B. From: Bahr Vermeer and Haecker Architects, Ltd. C. To: Prospective Bidders. D. Project: Lexington Public Schools Lexington Middle School

More information

580 - NOISE BARRIERS OPSS 580 INDEX

580 - NOISE BARRIERS OPSS 580 INDEX 580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading

More information

IOWA CITY WASTEWATER TREATMENT PLANT RELOCATION PROJECT NORTH PLANT SALVAGE AND DEMOLITION PHASE CITY OF IOWA CITY FEBRUARY, 2015

IOWA CITY WASTEWATER TREATMENT PLANT RELOCATION PROJECT NORTH PLANT SALVAGE AND DEMOLITION PHASE CITY OF IOWA CITY FEBRUARY, 2015 IOWA CITY WASTEWATER TREATMENT PLANT RELOCATION PROJECT No Record Drawing Comments by Veit for this Sheet! FOR FEBRUARY, 2015 VEIT Record Drawings Demolition Project Manager: Jason Mueller Demolition Superintendent:

More information

Information for File # RMM

Information for File # RMM Information for File # 3-4-RMM Applicant:, L.P. Corps Contact: Ryan Malterud Address: 8 Fifth Street East, St. Paul, Minnesota 56 E-Mail: Ryan.M.Malterud@usace.army.mil Phone: (65) 9-586 Primary County:

More information

City of Regina Standard Construction Specification SECTION 2660 CHAIN LINK FENCE

City of Regina Standard Construction Specification SECTION 2660 CHAIN LINK FENCE 1.0 GENERAL 1.1 Scope 1.1.1 The work shall consist of supply and installing chain link fence, including braces and gates, as shown on the plans and specifications at the locations designated by the Engineer.

More information

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations The following specification refers to the Stepstone, Inc. product known as: Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations Large Scale CalArc Pavers are part of the California Architectural

More information

A. Submit manufacturer's technical data and installation for each type of sign required.

A. Submit manufacturer's technical data and installation for each type of sign required. SECTION 10425 PART ONE GENERAL 1.1 SECTION INCLUDES A. Interior Building Signage. B. Handicapped parking signs. C. Permanent Project Sign. 1.2 DESCRIPTION A. Signage shall consist of room number and room

More information

Testing. Material testing will be according to applicable AASHTO, ASTM or Department methods as specified.

Testing. Material testing will be according to applicable AASHTO, ASTM or Department methods as specified. 907.01 Section 907. FENCING MATERIALS 907.01 General Requirements. Materials for use in fencing property, right-of-way and other installations must comply with this section. 907.02 Testing. Material testing

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

Minor Site Plan Application and Checklist Land Disturbing Activities

Minor Site Plan Application and Checklist Land Disturbing Activities Minor Site Plan Application and Checklist Land Disturbing Activities INSTRUCTIONS: Please provide the requested information below. The Development Services Department reviews each site plan submittal based

More information

1. Land survey Work. 2. Civil and Structural engineering services.

1. Land survey Work. 2. Civil and Structural engineering services. SECTION 01050 FIELD ENGINEERING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division-1 Specification

More information

Baseball Backstopper System

Baseball Backstopper System D 8 7 6 5 4 3 2 1 Baseball Backstopper System Cable Design - 4 Poles Layout Form Project Name: Zip Code: A2/A1 = D C B1/A2 = B2/A1 = C A2 POLE A1 POLE B A2/B2 = B1/A1 = B B2 POLE B1 POLE A Please fill

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

Item 550 Chain Link Fence

Item 550 Chain Link Fence Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating

More information

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS FEBRUARY 2015

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS FEBRUARY 2015 LIST OF DRAWINGS DISTRICT G TANK SITE LOCATION I EASTHAM ENGINEER'S PROJECT NUMBER G-1 GENERAL NOTES AND LEGEND C-1 EXISTING CONDITIONS PLAN DWSRF PROJECT NUMBER C-2 PROPOSED WATER STORAGE TANK SITE PLAN

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014 Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014 This form is to be completed by either applicant or their representative and submitted with Preliminary Review plans.

More information

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves.

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. Section 02520 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment is on a unit price basis

More information

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure