1 CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS JAMES RIDEOUTTE, CHAIRMAN JOHN NOCERA, VICE CHAIRMAN DICK EVANS DONNA MESSER RAYMOND STRICKLEN EXECUTIVE DIRECTOR THEODORE SOLIDAY PROJECT LOCATION NORTH ROAD TAXIWAY B RUNWAY PULLING ROAD SENIOR DIRECTOR OF DEVELOPMENT AND FACILITIES KERRY KEITH GORDON RIVER TAXIWAY C W N E NAPLES MUNICIPAL COLLIER COUNTY NORTH ROAD NOTICE TO CONTRACTORS AND BIDDERS S WHERE DRAWINGS AND NOTES REFERENCE AN "INDEX NO." OR "SEC. NO.", THIS REFERS TO FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND DESIGN STANDARDS, 2014 EDITION. THESE ARE MADE PART OF THE CONTRACT. THESE CONSTRUCTION PLANS RELY UPON THE PROJECT SPECIFICATIONS AND SPECIAL PROVISIONS TO PROVIDE FOR A COMPLETE OF THE WORK AND CONSTRUCTION REQUIREMENTS. THE PLANS SHALL ONLY BE USED IN COMBINATION WITH ALL CONTRACT DOCUMENTS. VICINITY MAP LOCATION MAP Civil Engineer Plans Prepared By: No. Issue/Description Sheets Changed Date By Scott T. Brady, P.E. Registered Engineer No State of Florida Date Hanson Professional Services Inc. CA Lic. No EG Solutions, Inc Town Center Parkway Lakewood Ranch, FL Fax: (941) CA Lic. No Naples Airport Authority 160 Aviation Drive Naples, Florida Telephone: Fax:

2 SUMMARY OF QUANTITIES ITEM NO. CODE NO. UNIT TOTAL QUANTITY BASE BID 1 P MOBILIZATION LS 1 2 P CLEARING AND GRUBBING AC P UNCLASSIFIED EXCAVATION CY 1,200 4 P ROCK EXCAVATION CY P EMBANKMENT IN PLACE CY 3,480 6 P A INSTALLATION AND REMOVAL OF SILT FENCE LF P B TEMPORARY INLET PROTECTION EA 6 8 P E SYNTHETIC BALES LF 50 9 P F SOIL TRACKING PREVENTION DEVICE EA 1 10 P LIMEROCK BASE COURSE CY P BITUMINOUS SURFACE COURSE TON P BITUMINOUS PRIME COAT GAL P BITUMINOUS TACK COAT GAL P PERMANENT PAINTED PAVEMENT MARKING, WITHOUT REFLECTIVE MEDIA S.F P PERMANENT PAINTED PAVEMENT MARKING, WITH REFLECTIVE MEDIA S.F F CHAIN-LINK FENCE L.F F PEDESTRIAN GATE EA 1 18 D A 30 INCH RCP, CLASS IV L.F D B 19 X 30 HERCP, CLASS IV L.F D TYPE F DITCH BOTTOM INLET EA 1 21 D TYPE J-7 MANHOLE EA 1 22 D FDOT INDEX 272 MITERED END SECTION FOR DOUBLE 19 X 30 HERCP EA 2 23 D FDOT INDEX 272 MITERED END SECTION FOR SINGLE 30 RCP EA 1 24 T SODDING SY 3, T INCH TOPSOILING (OBTAINED ON SITE OR REMOVED FROM STOCKPILE) CY L NO. 8 AWG, 5 KV, L-824, TYPE C CABLE, INSTALLED IN TRENCH, DUCT BANK OR CONDUIT L.F L NO. 2 AWG, SOLID, TINNED COPPER COUNTERPOISE WIRE, INSTALLED IN TRENCH, INCLUDING GROUND RODS AND GROUND CONNECTORS L.F L WAY, 2-INCH SCHEDULE 40 PVC, CONCRETE ENCASED L.F L ELECTRICAL CONDUIT 1-WAY, 2-INCH L.F L ELECTRICAL HANDHOLE 30 BY 30 BY 36 DEEP EA 2 31 L REMOVE EXISTING L-861T TAXIWAY EDGE LIGHT FIXTURE EA 2 32 L L-861T TAXIWAY EDGE LIGHT FIXTURE EA 12 ADDITIVE ALTERNATE NO. 1 AA1-1 L INSTALLATION OF TRANSFORMER VAULT EQUIPMENT IN PLACE LS 1 AS-BUILT QUANTITY INDEX TO SHEETS SHEET NO. 1 COVER SHEET 2 SUMMARY OF QUANTITIES AND INDEX TO SHEETS 3 SCOPE OF WORK 4 CONSTRUCTION SAFETY AND PHASING PLAN 5 CONSTRUCTION SAFETY NOTES AND DETAILS 6 TYPICAL SECTION 7 HORIZONTAL AND VERTICAL CONTROL PLAN 8 EXISTING SITE PLAN 9 REMOVAL PLAN 10 GRADING, DRAINAGE, AND PAVING PLAN 11 PLAN AND PROFILE 12 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN - TEMPORARY 13 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN - PERMANENT 14 STORMWATER POLLUTION AND PREVENTION PLAN DETAILS 15 STORMWATER POLLUTION AND PREVENTION PLAN DETAILS AND NOTES 16 FENCE DETAILS 17 TAXILANE F CROSS SECTIONS - SHEET 1 18 TAXILANE F CROSS SECTIONS - SHEET 2 19 TAXILANE F CROSS SECTIONS - SHEET 3 20 PROPOSED PAVEMENT MARKING PLAN 21 PROPOSED ELECTRICAL PLAN 22 AIRFIELD LIGHTING NOTES 23 AIRFIELD LIGHT FIXTURE DETAILS 24 CABLE SPLICE DETAILS SHEET 25 COUNTERPOISE PLAN DETAIL 1 26 COUNTERPOISE PLAN DETAIL 2 27 DUCT BANK DETAILS AND NOTES 28 HANDHOLES AND DUCT MARKER DETAILS 29 ELECTRICAL NOTES - SHEET 1 30 ELECTRICAL NOTES - SHEET 2 31 ELECTRICAL LEGEND AND ABBREVIATIONS 32 EXISTING ELECTRICAL ONE-LINE FOR VAULT 33 EXISTING HIGH VOLTAGE WIRING SCHEMATIC - SHEET 1 34 EXISTING HIGH VOLTAGE WIRING SCHEMATIC - SHEET 2 35 PROPOSED HIGH VOLTAGE WIRING SCHEMATIC - SHEET 1 36 PROPOSED HIGH VOLTAGE WIRING SCHEMATIC - SHEET 2 37 LEGEND PLATE SCHEDULES 38 GROUNDING NOTES Hanson Professional Services Inc. SCOTT T. BRADY STATE OF FLORIDA: UTILITY NOTE: EARTHWORK SUMMARY TABLE OCT 02, :16 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-002-QTY THE LOCATION, SIZE AND TYPE OF MATERIAL OF EXISTING UNDERGROUND AND/OR ABOVEGROUND UTILITIES INDICATED ON THE PLANS IS NOT REPRESENTED AS BEING ACCURATE, SUFFICIENT OR COMPLETE. NEITHER THE OWNER NOR THE ENGINEER ASSUMES ANY RESPONSIBILITY WHATEVER IN RESPECT TO ACCURACY, COMPLETENESS, OR SUFFICIENCY OF THE INFORMATION. THERE IS NO GUARANTEE EITHER EXPRESSED OR IMPLIED, THAT THE LOCATIONS, SIZE AND TYPE OF MATERIAL OF EXISTING UNDERGROUND UTILITIES INDICATED ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED IN THE CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE ACTUAL LOCATION OF ALL SUCH FACILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND UTILITIES. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES OF HIS OPERATIONAL PLANS AND SHALL OBTAIN FROM THE RESPECTIVE UTILITY COMPANIES DETAILED INFORMATION AND ASSISTANCE RELATIVE TO THE LOCATION OF THEIR FACILITIES AND THE WORKING SCHEDULE OF THE COMPANIES FOR REMOVAL OR ADJUSTMENT WHERE REQUIRED. IN THE EVENT AN UNEXPECTED UTILITY INTERFERENCE IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE UTILITY COMPANY OF JURISDICTION. THE OWNER'S REPRESENTATIVE AND/OR THE RESIDENT ENGINEER SHALL ALSO BE IMMEDIATELY NOTIFIED. ANY DAMAGE TO SUCH MAINS AND SERVICES SHALL BE RESTORED TO SERVICE AT ONCE AND PAID FOR BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE CONTRACT. ALL UTILITY CABLES AND LINES SHALL BE LOCATED BY THE RESPECTIVE UTILITY. CONTACT SUNSHINE811 FOR UTILITY INFORMATION AT 811 OR SUNSHINE811.COM. CONTACT THE FAA (FEDERAL AVIATION ADMINISTRATION) FOR ASSISTANCE IN LOCATING FAA CABLES AND UTILITIES. LOCATION OF FAA POWER, CONTROL, AND COMMUNICATION CABLES SHALL BE COORDINATED WITH AND/OR LOCATED BY THE FAA. ALSO CONTACT DIRECTOR/MANAGER AND PERSONNEL FOR ASSISTANCE IN LOCATING UNDERGROUND CABLES AND/OR UTILITIES. ALSO COORDINATE WORK WITH ALL ABOVEGROUND UTILITIES. UNCLASSIFIED EXCAVATION (FOR UNDERCUT) ROCK EXCAVATION (FOR UNDERCUT) 1200 CY 100 CY CUT 310 CY FILL (EXISTING GROUND TO TO FINISHED GRADE) 2180 CY BACKFILL (FOR UNDERCUTS) 1300 CY EARTHWORK NOTES: 1. THE QUANTITIES SHOWN ABOVE ARE AN ESTIMATE PURPOSES. 2. THE CUT AND FILL VOLUMES WERE CALCULATED BY THE AVERAGE END AREA METHOD USING THE CROSS SECTIONS AND ARE BASED ON THE DIFFERENCE BETWEEN EXISTING GROUND AND FINISHED GRADE (BOTTOM OF SUBBASE). AS SUCH THE EARTHWORK QUANTITIES DO NOT INCLUDE CUT FOR TOPSOIL STRIPPING/REMOVAL IN EMBANKMENT AREAS OR OVERCUT FOR TOPSOIL REPLACEMENT IN CUT AREAS. THIS WORK SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. NO MEASUREMENT OR PAYMENT WILL BE MADE FOR THIS WORK. 3. THE QUANTITY FOR ITEM P , EMBANKMENT IN PLACE IS THE TOTAL OF THE FILL REQUIRED PLUS BACKFILL MATERIAL FOR UNDERCUTS. NO. CAD FILE: C-002-QTY.DWG DESIGN BY: MLH 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: STB 09/24/2015 SUMMARY OF QUANTITIES AND INDEX TO SHEETS 2

3 SCOTT T. BRADY STATE OF FLORIDA: NO. CAD FILE: C-003.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 OCT 02, :16 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-003 SCOPE OF WORK 3

4 W Hanson Professional Services Inc. SCOTT T. BRADY STATE OF FLORIDA: NO. CAD FILE: C-004-SFY.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 OCT 02, :17 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-004-SFY CONSTRUCTION SAFETY AND PHASING PLAN 4

5 SCOTT T. BRADY STATE OF FLORIDA: NO. CAD FILE: C-005-SFY.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 OCT 02, :17 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-005-SFY CONSTRUCTION SAFETY NOTES AND DETAILS 5

6 SCOTT T. BRADY STATE OF FLORIDA: NO. CAD FILE: C-300-TYP.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 OCT 02, :17 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-300-TYP TYPICAL SECTION 6

7 X X X Hanson Professional Services Inc. SCOTT T. BRADY STATE OF FLORIDA: NO. CAD FILE: C-111-HVC.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 OCT 02, :18 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-111-HVC X X X X X X X X X X X X X X HORIZONTAL AND VERTICAL CONTROL PLAN 7

8 SCOTT T. BRADY STATE OF FLORIDA: NO. CAD FILE: C-101-SIT.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 OCT 02, :19 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-101-SIT EXISTING SITE PLAN 8

9 SCOTT T. BRADY STATE OF FLORIDA: OCT 02, :19 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-102-RMVL NO. CAD FILE: C-102-RMVL.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 REMOVAL PLAN 9

10 X X > > > > > > > Hanson Professional Services Inc. SCOTT T. BRADY STATE OF FLORIDA: OCT 02, :20 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-131-DRN NO. CAD FILE: C-131-DRN.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 GRADING, DRAINAGE, AND PAVING PLAN 10

11 X X Hanson Professional Services Inc. SCOTT T. BRADY STATE OF FLORIDA: OCT 02, :21 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-701-PNP NO. CAD FILE: C-701-PNP.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 PLAN AND PROFILE 11

12 X X > > > > > > > > > > X Hanson Professional Services Inc. SCOTT T. BRADY STATE OF FLORIDA: W X X X X X X X X OCT 02, :21 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-181-SWP1 NO. CAD FILE: C-181-SWP1.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN - TEMPORARY 12

13 X X > > > > > > > > > > X Hanson Professional Services Inc. SCOTT T. BRADY STATE OF FLORIDA: W X X X X X X X X OCT 02, :22 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-182-SWP2 NO. CAD FILE: C-182-SWP2.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN - PERMANENT 13

14 SCOTT T. BRADY STATE OF FLORIDA: OCT 02, :23 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-581-SWP NO. CAD FILE: C-581-SWP.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 STORMWATER POLLUTION AND PREVENTION PLAN DETAILS 14

15 SCOTT T. BRADY STATE OF FLORIDA: OCT 02, :23 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-581-SWP NO. CAD FILE: C-581-SWP.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 STORMWATER POLLUTION AND PREVENTION PLAN DETAILS AND NOTES 15

16 KEVIN N. LIGHTFOOT STATE OF FLORIDA: NO. CAD FILE: C-561-FEN.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: MLH/KNL 09/24/15 OCT 02, :29 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-561-FEN FENCE DETAILS 16

17 SCOTT T. BRADY STATE OF FLORIDA: NO. CAD FILE: C-301-XS.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 OCT 02, :23 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-301-XS TAXILANE F CROSS SECTIONS - SHEET 1 17

18 SCOTT T. BRADY STATE OF FLORIDA: NO. CAD FILE: C-301-XS.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 OCT 02, :24 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-301-XS TAXILANE F CROSS SECTIONS - SHEET 2 18

19 SCOTT T. BRADY STATE OF FLORIDA: NO. CAD FILE: C-301-XS.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 OCT 02, :24 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-301-XS TAXILANE F CROSS SECTIONS - SHEET 3 19

20 X X X Hanson Professional Services Inc. SCOTT T. BRADY STATE OF FLORIDA: NO. CAD FILE: C-152-MRK.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: STB 09/24/2015 OCT 02, :24 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-152-MRK X X X X X X X X X X X X X X PROPOSED PAVEMENT MARKING PLAN 20

21 X X X Hanson Professional Services Inc. KEVIN N. LIGHTFOOT STATE OF FLORIDA: NO. CAD FILE: C-142-ELE.DWG DESIGN BY: MLH 08/29/2015 DRAWN BY: RAD 08/29/2015 REVIEWED BY: MLH/KNL 09/24/15 OCT 02, :25 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\C-142-ELE X X X X X X X X X X X X X X PROPOSED ELECTRICAL PLAN 21

22 KEVIN N. LIGHTFOOT STATE OF FLORIDA: NO. CAD FILE: E-001-ELE.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 OCT 02, :25 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-001-ELE AIRFIELD LIGHTING NOTES 22

23 KEVIN N. LIGHTFOOT STATE OF FLORIDA: NO. CAD FILE: E-501-ELE.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 OCT 02, :26 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-501-ELE AIRFIELD LIGHT FIXTURE DETAILS 23

24 KEVIN N. LIGHTFOOT STATE OF FLORIDA: NO. CAD FILE: E-502-ELE.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 OCT 02, :26 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-502-ELE CABLE SPLICE DETAILS SHEET 24

25 KEVIN N. LIGHTFOOT STATE OF FLORIDA: NO. CAD FILE: E-503-ELE.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 OCT 02, :26 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-503-ELE COUNTERPOISE PLAN DETAIL 1 25

26 KEVIN N. LIGHTFOOT STATE OF FLORIDA: NO. CAD FILE: E-504-ELE.DWG DESIGN BY: KNL 08/10/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 OCT 02, :27 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-504-ELE COUNTERPOISE PLAN DETAIL 2 26

27 KEVIN N. LIGHTFOOT STATE OF FLORIDA: OCT 02, :27 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-505-ELEC NO. CAD FILE: E-505-ELEC.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 DUCT BANK DETAILS AND NOTES 27

28 KEVIN N. LIGHTFOOT STATE OF FLORIDA: NO. CAD FILE: E-506-ELE.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 OCT 02, :27 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-506-ELE HANDHOLES AND DUCT MARKER DETAILS 28

29 KEVIN N. LIGHTFOOT STATE OF FLORIDA: NO. CAD FILE: E-002-ELE.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 OCT 02, :27 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-002-ELE ELECTRICAL NOTES - SHEET 1 29

30 KEVIN N. LIGHTFOOT STATE OF FLORIDA: NO. CAD FILE: E-003-ELE.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 OCT 02, :27 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-003-ELE ELECTRICAL NOTES - SHEET 2 30

31 KEVIN N. LIGHTFOOT STATE OF FLORIDA: OCT 02, :28 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-004-LGND NO. CAD FILE: E-004-LGND.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 ELECTRICAL LEGEND AND ABBREVIATIONS 31

32 KEVIN N. LIGHTFOOT STATE OF FLORIDA: NO. CAD FILE: E-601-LIN.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 OCT 02, :28 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-601-LIN EXISTING ELECTRICAL ONE-LINE FOR VAULT 32

33 KEVIN N. LIGHTFOOT STATE OF FLORIDA: OCT 02, :28 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-602_E-603 NO. CAD FILE: E-602_E-603.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 EXISTING HIGH VOLTAGE WIRING SCHEMATIC - SHEET 1 33

34 KEVIN N. LIGHTFOOT STATE OF FLORIDA: OCT 02, :28 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-602_E-603 NO. CAD FILE: E-602_E-603.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 EXISTING HIGH VOLTAGE WIRING SCHEMATIC - SHEET 2 34

35 KEVIN N. LIGHTFOOT STATE OF FLORIDA: OCT 02, :28 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-604_E-605 NO. CAD FILE: E-604_E-605.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 PROPOSED HIGH VOLTAGE WIRING SCHEMATIC - SHEET 1 35

36 KEVIN N. LIGHTFOOT STATE OF FLORIDA: OCT 02, :28 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-604_E-605 NO. CAD FILE: E-604_E-605.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 PROPOSED HIGH VOLTAGE WIRING SCHEMATIC - SHEET 2 36

37 KEVIN N. LIGHTFOOT STATE OF FLORIDA: OCT 02, :29 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-606-SCH NO. CAD FILE: E-606-SCH.DWG DESIGN BY: KNL 08/07/2015 DRAWN BY: RAD 09/01/2015 REVIEWED BY: MLH/KNL 09/24/15 LEGEND PLATE SCHEDULES 37

38 KEVIN N. LIGHTFOOT STATE OF FLORIDA: OCT 02, :29 PM HARRI01115 I:\15JOBS\15A0023\CAD\\SHEET\E-005-NOTE NO. CAD FILE: E-005-NOTE.DWG DESIGN BY: KNL 09/15/2015 DRAWN BY: RAD 09/15/2015 REVIEWED BY: MLH/KNL 09/24/15 GROUNDING NOTES 38

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

TONOPAH AIRPORT RECONSTRUCT TAXIWAY A

TONOPAH AIRPORT RECONSTRUCT TAXIWAY A RECONSTRUCT TAXIWAY A AIP NO. 3-32-0019-15 PWP-NY-2018-137 NYE COUNTY BID NUMBER 2018-01 NYE COUNTY, NEVADA MARCH 16, 2018 376 Coaldale 265 Silver Peak 6 95 Tonopah TONOPAH AIRPORT Goldfield Warm Springs

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

Miscellaneous. Demolition

Miscellaneous. Demolition Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt

More information

This addendum forms a part of the Contract Documents dated: August 10, 2012.

This addendum forms a part of the Contract Documents dated: August 10, 2012. Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911

More information

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD JUNE 27, 2016 Addendum No. 1 Page 1 of 2 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD FAA AIP PROJECTS NO. 3-36-0114-XXX-16

More information

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1 No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible

More information

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED: ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS

More information

Riverside County Flood Control & Water Conservation District

Riverside County Flood Control & Water Conservation District 10/11/2018 Page 1 of 10 ENGINEER'S ESTIMATE MAMCO, INC. dba ALABBASI G.J. GENTRY GENERAL ENGINEERING, INC. 1 MOBILIZATION L.S. 1 $100,000.00 $100,000.00 $48,000.00 $48,000.00 $88,580.77 $88,580.77 2 WATER

More information

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court Dated 06-29-17 SPECIAL VILLAGE BOARD MEETING Notice of Meeting and Agenda Wednesday, July 5, 2017 Time: Place: Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board

More information

.1 Applicability: These criteria shall be applied as follows:

.1 Applicability: These criteria shall be applied as follows: DESIGN CRITERIA DIVISION 4800 STREET LIGHTING 4801 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the

More information

Customer Requirements Commercial Secondary Service

Customer Requirements Commercial Secondary Service Application Installation requirements for commercial services from Tacoma Power overhead or underground facilities. It applies to new construction or upgrades of older services. Electrical service may

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 11/29/2017 The attention of Contractors submitting

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) BID TABULATION SUMMARY JOB 970010 PAGE 1 STATE PROJECT NO. 27-618-70 BIDS RECEIVED UNTIL 2:00 P.M. ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) AT THE JUNCTION OF AUTO CLUB ROAD AND

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

Valley Road Main Replacement

Valley Road Main Replacement Bonding Provided Construction Co., Construction, Construction, 5% 5% 5% 5% 5% 5% 5% acknowledged 2 - Bidder Acknowledges Receipt of Addendums there was only 1 Affadivit of Preferential Bidders Status not

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting

More information

For crossing under a railroad, contact the specific railroad company's engineering department.

For crossing under a railroad, contact the specific railroad company's engineering department. PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure

More information

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE) MUST be qualified under Minnesota Department of Transportation Prequalification Program - Work Type 15.1 Subsurface Utility Engineering The first section, Work Type Definition, provides a detailed explanation

More information

EXCAVATION AND BACKFILL

EXCAVATION AND BACKFILL Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223 PROJECT LOCATION: 95 NOCATEE PARKWAY PONTE VEDRA, FL. 38 J. Collins Engineering Associates, LLC 56-3 San Jose Blvd. Jacksonville, Florida 32223 NOT TO SCALE 904-262-42 sm sm ON DRAWING WHERE SECTION OR

More information

MILL HILL ARTS VILLAGE

MILL HILL ARTS VILLAGE OWNER CIVIL ENGINEER MACON-BIBB URBAN DEVELOPMENT AUTHORITY ALEX MORRISON, EXECUTIVE DIRECTOR 200 CHERRY STREET, SUITE 300 MACON, GA 31201 OFFICE PHONE : (478) 803-2402 TRIPLE POINT ENGINEERING DAN WALLACE,

More information

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD. Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND

More information

Riverside County Flood Control & Water Conservation District

Riverside County Flood Control & Water Conservation District 9/28/2016 Page 1 of 10 ENGINEER'S ESTIMATE MAMCO, INC. dba ALABBASI H & H GENERAL CONTRACTORS, INC. 1 MOBILIZATION L.S. 1 $50,000.00 $50,000.00 $106,571.00 $106,571.00 $180,000.00 $180,000.00 2 WATER CONTROL

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for

More information

580 - NOISE BARRIERS OPSS 580 INDEX

580 - NOISE BARRIERS OPSS 580 INDEX 580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading

More information

Introduction to Substation Design TADP 542

Introduction to Substation Design TADP 542 Introduction to Substation Design TADP 542 Distribution Substations- Drawings and Documentation Instructor: Richard Snell Transmission & Distribution Program Drawings Drawings are prime method for communicating

More information

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031. ADDENDUM NO. 2 April 11, 2017 Page 1 The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents,. These Exhibits are re-issued in their entirety, unless

More information

Digitally Signed 06/02/2015

Digitally Signed 06/02/2015 Digitally Signed 06/0/05 Digitally Signed 06/0/05 Digitally Signed 06/0/05 FED. ROAD DIST. NO. STATE FED. AID PROJ. NO. SHEET NO. TOTAL SHEETS 6--5 6 ARK. JOB NO. 08057 6 8 075 QUANTITIES 5706 SUMMARY

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section 02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,

More information

BID TABULATION SUMMARY Project: CONTRACT 3 SANITARY SEWER REPLACEMENTS Bid Date: Wednesday, January 10, :00 PM

BID TABULATION SUMMARY Project: CONTRACT 3 SANITARY SEWER REPLACEMENTS Bid Date: Wednesday, January 10, :00 PM PATTERSON AVENUE 101 Mobilization, Bonds, Insurance LS 1 $40,000.00 $40,000.00 $22,072.00 $22,072.00 102 18-Inch SDR-26 PVC Sanitary Sewer Line Installation LF 1048 $275.00 $288,200.00 $334.00 $350,032.00

More information

PROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS

PROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS EVANS DREXEL DREXEL ELLIS ELLIS PROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS SHEETS INDEX TO SHEETS DESCRIPTION 90 294 94 LANGLEY EVANS 48TH COTTAGE

More information

FINAL ENGINEERING FOR 11 W. HOME AVE. VILLA PARK, IL LOCATION MAPS VICINITY SITE LOCATION SUMMARY OF QUANTITIES 67 FT. 32 FT. 92 SQ.-FT.

FINAL ENGINEERING FOR 11 W. HOME AVE. VILLA PARK, IL LOCATION MAPS VICINITY SITE LOCATION SUMMARY OF QUANTITIES 67 FT. 32 FT. 92 SQ.-FT. FINAL FOR W. HOME AVE., IL 608 LEGEND DESCRIPTION SANITARY SEWER STORM SEWER PROPOSED COMBINED SEWER WATERMAIN GAS TELEPHONE ELECTRIC OVER HEAD WIRE CURB FENCE STORM CATCHBASIN OR MANHOLE, OPEN LID STRUCTURE

More information

2' x 3' Polymer Pull Box Cover 4'-0" 7'-0" 24" x 76" Access Opening 3'-6"

2' x 3' Polymer Pull Box Cover 4'-0 7'-0 24 x 76 Access Opening 3'-6 Scope.1 Precast Concrete Equipment Slab Box 8' x 10' x Pad with 4' x 7' x 3'- Box for 5-Way RAM Gas Switch, 2-Way, 3-Way, and 4-Way Pad-Mounted RAG Gas Switches, VFI 9, VFI 12, Bypass Switch, and 33 kv

More information

Customer Connection Guide Updates Effective May 2017

Customer Connection Guide Updates Effective May 2017 This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services

More information

Ecological Restoration Drafting & Design Guidelines

Ecological Restoration Drafting & Design Guidelines Ecological Restoration Drafting & Design Guidelines Version 2.0 July 2017 Philadelphia Water Ecological Restoration Drafting & Design Guidelines Table of Contents 1.0 INTRODUCTION...2 2.0 GENERAL PLAN

More information

Survey Control Point Observations

Survey Control Point Observations Level Name SURVEY_CTRL SURVEY_CTRL_CHK_NODE SURVEY_CTRL_NODE SURVEY_CTRL_OBS SURVEY_CTRL_REF_SYM SURVEY_CTRL_SETUPS SURVEY_CTRL_SYM SURVEY_CTRL_TXT SURVEY_DTM_BREAKLINE SURVEY_DTM_BREAKLINE_NODE SURVEY_DTM_CHECK_NODE

More information

KC Water Rules and Regulations For Water Main Extensions and Relocations

KC Water Rules and Regulations For Water Main Extensions and Relocations KC Water Rules and Regulations For Water Main Extensions and Relocations MAY 2017 NOTE: Changes from 2016 are highlighted in yellow and appear on Pages 5, 8, 10-11, 13, and 15. Additional changes made

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

REQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT

REQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT REQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT The Cherokee Nation is requesting proposals from qualified professionals to provide aerial photography and digital mapping of

More information

Section 808. FENCING

Section 808. FENCING 808.01 Section 808. FENCING 808.01. Description. This work consists of providing and erecting, or moving existing, woven wire fence, temporary fence, protective fence, chain link fence, high-tensile wire

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

NRE DESIGN PARK SITE DEVELOPMENT PLANS SECTION 3 TOWNSHIP 50 SOUTH, RANGE 25 EAST CITY OF NAPLES, COLLIER COUNTY, FLORIDA

NRE DESIGN PARK SITE DEVELOPMENT PLANS SECTION 3 TOWNSHIP 50 SOUTH, RANGE 25 EAST CITY OF NAPLES, COLLIER COUNTY, FLORIDA SITE DEVELOPMENT PLANS LEGAL SUBJECT PROPERTY SECTION 3 TOWNSHIP 50 SOUTH, RANGE 25 EAST CITY, COLLIER COUNTY, FLORIDA PROPERTY OWNER: ENTERPRISE PLAZA LLC 404 CITATION PT, FL 34104 GULF MEXICO PREPARED

More information

INVITATION TO BID. * EA Mounted) 24 Detector Card (NEMA TS-2) * EA 25 Concrete Curb Ramp *848 5 EA

INVITATION TO BID. * EA Mounted) 24 Detector Card (NEMA TS-2) * EA 25 Concrete Curb Ramp *848 5 EA INVITATION TO BID TOWN OF CARY Cary, North Carolina Sealed bids must be submitted no later than 1:30 p.m. on October 1, 2018 to the Town of Cary at the office of the Transportation and Facilities Department],

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14. 14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation 7 Backfilling

More information

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO.

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO. CELL: (715) 803-8009 MABOSI@WISCONSINPUBLICSERVICE.COM CELL: (715) 573-7806 CHVIRCKS@WISCONSINPUBLICSERVICE.COM CALVIN.KLADE@FTR.COM DGAU@KRONENWETTER.COM SCOTT OLSEN (715) 302-1348 S REVISED TO CONFORM

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

11/06/2014 Pay Items - 1

11/06/2014 Pay Items - 1 Pay Item Description Pay Unit 90701 Mobilization.... LS 91101 Excavation.... L.F. 91102 Excavation.... mi 91103 Excavation.... LS 91104 Borrow..... C.Y. 91105 Borrow..... LS 91106 Existing Trail Restoration...

More information

SECTION 5 TRANSFORMERS

SECTION 5 TRANSFORMERS SECTION 5 TRANSFORMERS Necessary transformers will be installed and maintained by The City of Aspen. The City of Aspen will not furnish transformers unless they are of standard size and voltage as established

More information

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division Application Submittal Checklist for a BASIC USE PERMIT (BUP) APPLICABILITY. This checklist should be used when submitting an application for a Basic Use Permit. When is a Basic Use Permit required? Section

More information

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d Development Name: Submitted by: Highlands County Engineering Department Improvement Plan Checklist Date Received: Due Date: Y N E N / S O A Permits/Approvals 1. Copy of water management district permit

More information

LETTING : CALL : 029 COUNTIES : GOODHUE

LETTING : CALL : 029 COUNTIES : GOODHUE PAGE : -1 NUMBER OF DAYS: 80 BRIDGE COUNT : 2 CONTRACT DESCRIPTION : GRADING, SURFACING, LIGHTING AND BRIDGE NO. 25024. CONTRACT LOCATION: LOCATED ON T.H. 61 FROM 30' NORTH OF NORTH LAKESHORE DRIVE TO

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION ENGINEER S COST ESTIMATE USING UNIT PRICES FOR BOND PURPOSES-REVISED NOVEMBER 9, 2006 (Calculations are already set-up in

More information

CONTINUOUS COUNTERPOISE ON POLES

CONTINUOUS COUNTERPOISE ON POLES Project Procedure CONTINUOUS COUNTERPOISE ON POLES 07/25/2011 PAGE 1 OF 5 1.0 PURPOSE The purpose of this procedure is to provide guidance and direction for the installation of continuous counterpoise

More information

Municipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS

Municipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS Municipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS 2016 20.02 M 20.03 M 20.03 SP 20.04 M 20.04 M 20.04 M 20.06 M 20.06 M 20.07 M 20.07 M 20.08 M 20.08

More information

MARQUETTE GREENWAY TRAIL

MARQUETTE GREENWAY TRAIL ------ ------ TRAFFIC DATA A.A.D.T. (2010) A.A.D.T. (ED 2022) D.H.V. (2022) DIRECTIONAL DISTRIBUTION TRUCKS N/A N/A N/A N/A N/A DESIGN DATA DESIGN SPEED DESIGN CRITERIA FUNCTIONAL CLASSIFICATION RURAL/URBAN

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

Essential Skills: Reading and Interpreting Maps and Plans

Essential Skills: Reading and Interpreting Maps and Plans Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /

More information

ROWAN UNIVERSITY 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028

ROWAN UNIVERSITY 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028 THE CENTER FOR RESEARCH AND EDUCATION IN ADVANCED TRANSPORTATION ENGINEERING SYSTEMS (CREATEs) ISSUED FOR BID - CONTRACT - 02 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028 ALL DIMENSIONS MUST BE VERIFIED

More information

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts RESPONSES TO QUESTIONS and/or RFI s # 3 Date: 09/14/18 The attention of Contractors

More information

TABLE OF CONTENTS 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES

TABLE OF CONTENTS 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES TABLE OF CONTENTS 1.0 SCOPE 2.0 BURIAL DEPTH 3.0 MINIMUM BENDING RADIUS FOR POWER CABLES 4.0 PULLING TENSIONS AND SIDEWALL PRESSURES 5.0 PARAMETERS OF CABLE PULLING 6.0 DIRECT BURIED CABLE INSTALLATION

More information

CONSTRUCTION PLANS. for TOWN OF YORKVILLE 2017 PAVING & DRAINAGE PROGRAM BRAUN ROAD (57TH DRIVE TO WOODLAND TRAIL) 53RD DRIVE

CONSTRUCTION PLANS. for TOWN OF YORKVILLE 2017 PAVING & DRAINAGE PROGRAM BRAUN ROAD (57TH DRIVE TO WOODLAND TRAIL) 53RD DRIVE LOG CT. TR. CONSTRUCTION PLANS for TOWN YORKVILLE INDEX Plan Sheet COVER TYPICAL SECTIONS & CONSTRUCTION DETAILS PLAN & PRILE Sheet No. 1 2 3-8 LEGEND Description EDGE WOODS DECIDUOUS TREE DECIDUOUS TREE

More information

DIVISION APPROVED MATERIAL LIST AND STANDARD DETAILS

DIVISION APPROVED MATERIAL LIST AND STANDARD DETAILS DIVISION 400 - APPROVED MATERIAL LIST AND STANDARD DETAILS Section 403 - STANDARD DETAILS TABLE OF CONTENTS DIVISION 400, Section 403 - STANDARD DETAILS SECTION DETAIL NOS. Application Table 403-1 I. Concrete

More information

Grading, Erosion and Sediment Control (GESC) Checklist

Grading, Erosion and Sediment Control (GESC) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment

More information

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM 600-06 SHOULDER WIDENING FOR TYPE (SPECIAL) GUARDRAIL TERMINALS E:\Wilmot\DGN\08pp.dgn //05 6:9:6 AM E:\DGN\08SUP.dgn //05 ::55 PM E:\DGN\08SUP.dgn //05 :8:0 PM E:\DGN\08-WRG.dgn //05 :8:5 PM E:\DGN\08SM.dgn

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.

More information

Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations

Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations MDOT SUGGESTED TRAFFIC SIGNAL DESIGN PROCEDURE INDEFINITE DELIVERY INSTALLATION

More information

I. MINUTES OF THE PRE-BID CONFERENCE

I. MINUTES OF THE PRE-BID CONFERENCE Addendum No. 1 June 8, 018 Allegany College of Maryland Softball Field Murphy & Dittenhafer Project No. 17118 1401 Willowbrook Road, Cumberland, MD 150 Abbreviations: ACM: Allegany College of Maryland,

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

TABLE OF CONTENTS 1200 PLAN PREPARATION

TABLE OF CONTENTS 1200 PLAN PREPARATION 1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4

More information

X X X X X - Finalize drawing list X X B. Project Description

X X X X X - Finalize drawing list X X B. Project Description Design Submittals, Details Submittal Requirements General For all LAWA issued projects, the Construction Document plans and specifications shall include all information in previous submittals plus all

More information

SECTION 6A ROADWAY PLAN PREPARATION

SECTION 6A ROADWAY PLAN PREPARATION SECTION 6A ROADWAY PLAN PREPARATION Table of Contents Page No 6A.1 GENERAL...1 6A.2 PRELIMINARY PLANS...3 6A.2.1 PRELIMINARY PLAN SHEETS...3 6A.2.2 PRELIMINARY PROFILE SHEETS...4 6A.3 PHASE A PLANS...4

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

Page Electric Utility Service Specifications

Page Electric Utility Service Specifications T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum - UG-1 Sheet 1 of 3 87 T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum

More information

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS FEBRUARY 2015

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS FEBRUARY 2015 LIST OF DRAWINGS DISTRICT G TANK SITE LOCATION I EASTHAM ENGINEER'S PROJECT NUMBER G-1 GENERAL NOTES AND LEGEND C-1 EXISTING CONDITIONS PLAN DWSRF PROJECT NUMBER C-2 PROPOSED WATER STORAGE TANK SITE PLAN

More information

Any of the above may be used as source documents. Let's discuss each of these types of documentation.

Any of the above may be used as source documents. Let's discuss each of these types of documentation. INTRODUCTION TO DOCUMENTATION Much of the work of preparing final estimates involves careful and orderly documentation of measurements and computations. You will become familiar with the various types

More information

TURNPIKE DESIGN HANDBOOK (TDH) PLANS PRODUCTION PART 3

TURNPIKE DESIGN HANDBOOK (TDH) PLANS PRODUCTION PART 3 TURNPIKE DESIGN HANDBOOK (TDH) PLANS PRODUCTION PART 3 FLORIDA S TURNPIKE ENTERPRISE PRODUCTION DESIGN DEPARTMENT OCOEE, FL January 2018 Introduction As part of the Turnpike s continuing quality enhancement

More information

9. Pay for the power consumed until the project has been accepted as substantially complete.

9. Pay for the power consumed until the project has been accepted as substantially complete. 9. Pay for the power consumed until the project has been accepted as substantially complete. A4-2. SECTION 01 23 00 ALTERNATES A. Reference Page 2, Paragraph 1.03.: Modification: Add the following paragraph:

More information

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard

More information

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 5 BID NO. Y14-792 PH IFB EAST SERVICE AREA POTABLE WATER AND RECLAIMED WATER STORAGE AND REPUMP FACILITY BID OPENING: June

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...

More information

SPECIAL SPECIFICATION LIGHTNING PROTECTION SYSTEM

SPECIAL SPECIFICATION LIGHTNING PROTECTION SYSTEM 2004 Specifications CSJ 3622-01-001, ETC. SPECIAL SPECIFICATION 8398 LIGHTNING PROTECTION SYSTEM 1. Description. This Special Specification governs the design and installation of Lightning Protection System

More information

POWER SERVICE DETAILS

POWER SERVICE DETAILS POWER SOURCE # POLE MOUNTED SERVICE TRANSFORMER BY POWER HANDHOLE 0/0V, -PHASE, SERVICE CONDUCTORS; -# AWG SERVICE CONDUCTOR AND -# AWG GROUNDED SERVICE CONDUCTOR (NEUTRAL) SERVICE XFMR SECONDARY. A 0V

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

Washington County Road Engineering Plan Submittal/Review Checklist

Washington County Road Engineering Plan Submittal/Review Checklist Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should

More information

CITY OF LAREDO 3MG SAN ISIDRO SUBDIVISION ELEVATED STORAGE TANK

CITY OF LAREDO 3MG SAN ISIDRO SUBDIVISION ELEVATED STORAGE TANK PROJECT LOCATION FOR 3MG ELEVATED STORAGE TANK AT SAN ISIDRO SUBDIVISION CITY OF LAREDO 3MG SAN ISIDRO SUBDIVISION ELEVATED STORAGE TANK engineers architects surveyors below. Knowwhat's Call beforeyoudig.

More information

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES FINAL DESIGN, BID PHASE, AND CONSTRUCTION SERVICES BACKGROUND ARCADIS U.S., Inc. (ARCADIS)

More information